Federal Register/Vol. 67, No. 199/Tuesday, October

Total Page:16

File Type:pdf, Size:1020Kb

Federal Register/Vol. 67, No. 199/Tuesday, October 63546 Federal Register / Vol. 67, No. 199 / Tuesday, October 15, 2002 / Rules and Regulations Issued in Washington, DC, on this 8th day provided to the Coast Guard until the regulatory policies and procedures of October 2002. September 12, 2002, making it of the Department of Transportation Joseph H. Grant, impossible to draft or publish a NPRM. (DOT) (44 FR 11040; February 26, 1979). Deputy Executive Director and Chief, This closure is not expected to have a This conclusion is based on the fact Operating Officer, Pension Benefit Guaranty significant impact on navigation that the requested closures are of short Corporation. because vessel traffic on the Harlem duration and on Sunday when there [FR Doc. 02–26111 Filed 10–11–02; 8:45 am] River and Newtown Creek is mostly have been few requests to open these BILLING CODE 7708–01–P commercial vessels that normally pass bridges. under the draws without openings. The Small Entities commercial vessels that do require DEPARTMENT OF TRANSPORTATION openings are work barges that do not Under the Regulatory Flexibility Act operate on Sundays. Any delay (5 U.S.C. 601–612), we considered Coast Guard encountered in this regulation’s whether this rule would have a effective date would be unnecessary and significant economic impact on a 33 CFR Part 117 contrary to the public interest since substantial number of small entities. immediate action is needed to close the The term ‘‘small entities’’ comprises [CGD01–02–113] bridge in order to provide for public small businesses, not-for profit RIN 2115–AE47 safety and the safety of marathon organizations that are independently participants. owned and operated and are not dominant in their fields, and Drawbridge Operation Regulations: Background and Purpose Harlem River, Newtown Creek, NY governmental jurisdictions with The Willis Avenue Bridge, mile 1.5, populations less than 50,000. AGENCY: Coast Guard, DOT. across the Harlem River has a vertical The Coast Guard certifies under 5 ACTION: Temporary final rule. clearance of 24 feet at mean high water U.S.C. 605(b), that this rule will not (MHW) and 30 feet at mean low water have a significant economic impact on SUMMARY: The Coast Guard is (MLW) in the closed position. The a substantial number of small entities. temporarily changing the drawbridge Madison Avenue Bridge, mile 2.3, This conclusion is based on the fact operation regulations that govern the across the Harlem River has a vertical that the bridge closures are of short operation of the Willis Avenue Bridge, clearance of 25 feet at MHW and 29 feet duration and on Sunday when there mile 1.5, and the Madison Avenue at MLW in the closed position. The have been few requests to open these Bridge, mile 2.3, both across the Harlem Pulaski Bridge across Newtown Creek, bridges. River, and the Pulaski Bridge, mile 0.6, mile 0.6, has a vertical clearance of 39 across Newtown Creek in New York feet at MHW and 43 feet at MLW in the Collection of Information City, New York. This temporary final closed position. This rule calls for no new collection rule allows the bridge owner to close the The current operating regulations for of information under the Paperwork above three bridges on November 3, the Willis Avenue and Madison Avenue Reduction Act of 1995 (44 U.S.C. 3501– 2002, as follows: Willis Avenue and bridges, listed at 33 CFR 117.789(c), 3520). Madison Avenue bridges from 10 a.m. to require the bridges to open on signal 5 p.m. and the Pulaski Bridge from 8:30 from 10 a.m. to 5 p.m., if at least four- Federalism a.m. to 3 p.m. This action is necessary hours notice is given. The current A rule has implications for federalism to facilitate public safety during the operating regulations for the Pulaski under Executive Order 13132, running of the New York City Marathon. Bridge listed at 117.801(g) require it to Federalism, if it has a substantial direct DATES: This rule is effective on open on signal if at least a two-hour effect on State or local governments and November 3, 2002. advance notice is given. would either preempt State law or The bridge owner, New York City impose a substantial direct cost of ADDRESSES: Documents indicated in this Department of Transportation preamble as being available in the compliance on them. We have analyzed (NYCDOT), requested a temporary docket are part of docket (CGD01–02– this rule under that Order and have change to the operating regulations 113) and are available for inspection or determined that it does not have governing the Willis Avenue Bridge, the copying at the First Coast Guard implications for federalism. Madison Avenue Bridge, and the District, Bridge Administration Office, Pulaski Bridge, to allow the bridges to Unfunded Mandates Reform Act 408 Atlantic Avenue, Boston, remain in the closed position at The Unfunded Mandates Reform Act Massachusetts, 02110–3350, between 7 different times on November 3, 2002, to of 1995 (2 U.S.C. 1531–1538) requires a.m. and 3 p.m., Monday through facilitate the running of the New York Federal agencies to assess the effects of Friday, except Federal holidays. City Marathon. Vessels that can pass their discretionary regulatory actions. In FOR FURTHER INFORMATION CONTACT: Mr. under the bridges without bridge particular, the Act addresses actions Joseph Schmied, Project Officer, First openings may do so at all times during that may result in the expenditure by Coast Guard District, (212) 668–7165. these bridge closures. State, local, or tribal government, in the SUPPLEMENTARY INFORMATION: aggregate, or by the private sector of Regulatory Evaluation $100,000,000 or more in any one year. Regulatory Information This rule is not a ‘‘significant Though this rule will not result in such We did not publish a notice of regulatory action’’ under section 3(f) of an expenditure, we do discuss the proposed rulemaking (NPRM) for this Executive Order 12866, Regulatory effects of this rule elsewhere in this regulation. Under 5 U.S.C. 553(b)(B), the Planning and Review, and does not preamble. Coast Guard finds that good cause exists require an assessment of potential costs for not publishing an NPRM in the and benefits under section 6(a)(3), of Taking of Private Property Federal Register. that Order. The Office of Management This rule will not effect a taking of Conclusive information about the and Budget has not reviewed it under private property or otherwise have New York City Marathon was not that Order. It is not ‘‘significant’’ under taking implications under Executive VerDate 0ct<02>2002 20:09 Oct 11, 2002 Jkt 200001 PO 00000 Frm 00018 Fmt 4700 Sfmt 4700 E:\FR\FM\15OCR1.SGM 15OCR1 Federal Register / Vol. 67, No. 199 / Tuesday, October 15, 2002 / Rules and Regulations 63547 Order 12630, Governmental Actions and List of Subjects in 33 CFR Part 117 DEPARTMENT OF TRANSPORTATION Interference with Constitutionally Protected Property Rights. Bridges. Coast Guard Regulations Civil Justice Reform 33 CFR Part 117 This rule meets applicable standards For the reasons set out in the [CGD01–02–112] in sections 3(a) and 3(b)(2) of Executive preamble, the Coast Guard amends 33 Order 12988, Civil Justice Reform, to CFR part 117 as follows: RIN 2115–AE47 minimize litigation, eliminate ambiguity, and reduce burden. PART 117—DRAWBRIDGE Drawbridge Operation Regulations; OPERATION REGULATIONS Long Island, New York Inland Protection of Children Waterway From East Rockaway Inlet to We have analyzed this rule under 1. The authority citation for part 117 Shinnecock Canal, NY Executive Order 13045, Protection of continues to read as follows: AGENCY: Coast Guard, DOT. Children from Environmental Health Authority: 33 U.S.C. 499; 49 CFR 1.46; 33 Risks and Safety Risks. This rule is not ACTION: Temporary final rule. CFR 1.05–1(g); section 117.255 also issued an economically significant rule and under the authority of Pub. L. 102–587, 106 SUMMARY: The Coast Guard is does not concern an environmental risk Stat. 5039. establishing a temporary final rule to health or risk to safety that may governing the operation of the Atlantic disproportionately affect children. 2. On November 3, 2002, from 10 a.m. Beach Bridge, at mile 0.4, across Indian Tribal Governments to 5 p.m., § 117.789 paragraph (c) is Reynolds Channel at New York. This temporarily suspended and a new rule allows the bridge owner to open This final rule does not have tribal paragraph (h) is added to read as only one lift span for bridge openings, implications under Executive Order follows: 7 a.m. to 5 p.m., from November 1, 2002 13175, Consultation and Coordination through November 30, 2002. Two span § 117.789 Harlem River. with Indian Tribal Governments, openings will be granted, provided a because it does not have substantial * * * * * two-hour advance notice is given, from direct effect on one or more Indian (h) The draws of the bridges at 103rd one hour before to one hour after tribes, on the relationship between the predicted high tide. This single span Federal Government and Indian tribes, Street, mile 0.0, 3rd Avenue, mile 1.9, 145th Street, mile 2.8, Macombs Dam, operation is necessary to facilitate or on the distribution of power and bridge painting operations at the bridge. responsibilities between the Federal mile 3.2, 207th Street, mile 6.0, and the DATES: Government and Indian tribes. two Broadway Bridges, mile 6.8, shall This rule is effective from open on signal if at least four-hours November 1, 2002 through November Energy Effects notice is given to the New York City 30, 2002.
Recommended publications
  • C 1000385 MMM: Willis Avenue Bridge
    CITY PLANNING COMMISSION July 27, 2011/Calendar No.2 C 100385MMM ___________________________________________ ________________________ IN THE MATTER OF an application, submitted by the Department of Transportation and the Department of Small Business Services, pursuant to Sections 1302, 197-c and 199 of the New York City Charter, and Section 5-430 et seq., of the New York City Administrative Code for an amendment to the City Map involving: • the modification of the lines and grades of the Willis Avenue Bridge, Harlem River Drive, and Marginal Street, Wharf or Place*; • The elimination of an elevated public highway; and • The delineation of bridge approach ramps, in Community District 11, Borough of Manhattan, in accordance with Map No. 30216 dated January 24, 2011 and signed by the Borough President. *This change to Marginal Street, Wharf or Place, where such Marginal Street, Wharf or Place is shown on any existing plans for the water front or portion thereof, shall be incorporated into the City Map. The application (C100385MMM) for an amendment to the City Map involving: the modification of the lines and grades of the Willis Avenue Bridge, Harlem River Drive, and Marginal Street, Wharf, or Place; elimination of an elevated public highway; and the delineation of bridge approach ramps was filed by the NYC Department of Transportation (DOT) and the NYC Department of Small Business Services (DSBS) on May 11, 2010. BACKGROUND The Department of Transportation and the Department of Small Business Services are requesting an amendment to the City Map involving the modification of the lines and grades of the Willis Avenue Bridge, Harlem River Drive, and Marginal Street, Wharf, or Place; elimination of an elevated public highway; and the delineation of bridge approach ramps, in order to facilitate the replacement of the Willis Avenue Bridge over the Harlem River and to provide a maintenance and emergency access area for both the Willis Avenue and JFK bridges, in the East Harlem neighborhood of Community District 11, Borough of Manhattan.
    [Show full text]
  • Appendix E: History and Projection of Traffic, Toll Revenues And
    APPENDIX E HISTORY AND PROJECTION OF TRAFFIC, TOLL REVENUES AND EXPENSES and Review of Physical Conditions of the Facilities of Triborough Bridge and Tunnel Authority April 26, 2013 Prepared for the Triborough Bridge and Tunnel Authority A Constituent Agency of the Metropolitan Transportation Authority By TABLE OF CONTENTS Page TRANSPORTATION INFRASTRUCTURE ............................................................................. E-1 Triborough Bridge and Tunnel Authority (TBTA) .......................................................... E-1 Metropolitan Area Arterial Network ............................................................................... E-3 Other Regional Toll Facilities .......................................................................................... E-4 Regional Public Transportation ....................................................................................... E-5 TOLL COLLECTION ON THE TBTA FACILITIES ................................................................ E-5 Present and Proposed Toll Structures and Operation ...................................................... E-5 E-ZPass Electronic Toll Collection System ..................................................................... E-8 TBTA‘s Role in E-ZPass ............................................................................................... E-10 Passenger Car Toll Rate Trends and Inflation ............................................................... E-11 HISTORICAL TRAFFIC, REVENUES AND EXPENSES AND ESTIMATED/BUDGETED NUMBERS
    [Show full text]
  • Willis Ave Bridge, NY 2012
    Boroughs of Manhattan & Bronx, New York, NY Willis Avenue Swing Bridge Over Harlem River Owner/Client: New York City DOT, New York Replacement of the Willis Avenue Bridge over the Harlem River connect- State DOT ing Manhattan to the Bronx, including the reconstruction of Willis Avenue over the Major Deegan Expressway and reconstruction of sections of the Major Deegan Expressway with entrance and exit ramps. Construction Engineer: Hardesty & Hanover included a new 2,400 ton, 363’ swing span bridge truss. Extensive plan- ning was required for the completion of the float-in of the new swing span Year Complete: 2012 and float-out of two 1100-ton existing trusses. Weeks Marine transported the new swing span 135 nautical miles and through 14 bridges from the Scope of Work: Demolition, Channel Dredging, erection site to the project site. Project involved 48” and 60” diameter Construction drilled caissons, 940-ton precast concrete cofferdam boxes for the con- struction of cast-in-place mass concrete bridge piers, large sheet pile walls, 6000 tons of steel tub and plate girder superstructures, 160,000 Project Cost: $636 Million square feet of cast-in-place concrete decks, submarine power cables, FRP pile and concrete fender systems, precast prestressed box beams, and precast T walls. Temporary construction included sheet pile walls with drilled tiebacks, sheet pile cofferdams with mass tremmie concrete seals, 24” to 48” driven pipe piles, steel jacket platforms, and temporary truss panel bridge erection. Channel dredging and the demolition of the exist- ing bridge approaches, piers, pneumatic caissons, and fender system also included. WEEKS MARINE, INC.
    [Show full text]
  • New York City Department of Transportation
    INNOVATIONS & ACCOMPLISHMENTS East River Bridges A $3.14 billion reconstruction program is underway to rehabilitate all four East River crossings. In 2005, these bridges carried some 498,213 vehicles per day. In 2002, working in coordination with the NYPD and other law enforcement agencies, the Division implemented enhanced security measures on these bridges. This work is ongoing. BROOKLYN BRIDGE The Brooklyn Bridge carried some 132,210 vehicles per day in 2005. The $547 million reconstruction commenced in 1980 with Contract #1, and will continue with Contract #6, currently in the design phase and scheduled for completion in 2013. This contract will include the rehabilitation of both approaches and ramps, the painting of the entire suspension bridge, as well as the seismic retrofitting of the structural elements that are within the Contract #6 project limits. Engineering Landmark Plaque. (Credit: Russell Holcomb) 1899 Plaque Near the Franklin Truss of the Bridge, Marking the Site of George Washington’s First Presidential Mansion, Franklin House. (Credit: Hany Soliman) Historic Landmark, 1954 Reconstruction, and Two Cities Plaques. (1954 & Cities Credit: Michele N. Vulcan) 44 2006 BRIDGES AND TUNNELS ANNUAL CONDITION REPORT INNOVATIONS & ACCOMPLISHMENTS The fitting of the remaining bridge elements requiring seismic retrofitting will be carried out under a separate contract by the end of 2013. Work completed on the bridge to date includes reconditioning of the main cables, replacement of the suspenders and cable stays, rehabilitation of the stiffening trusses, and the replacement of the suspended spans deck. The next work scheduled for the bridge is a project to replace the existing travelers with a state of the art technology system.
    [Show full text]
  • Visiting Student Resource Guide
    Lehman College Visiting Student Guide PREPARED BY THE OFFICE FOR SPECIAL ACADEMIC SESSIONS ( 3 4 7 ) 5 7 7 - 4 0 2 2 Lehman College Fast Facts A senior liberal arts college in The City University of New York, founded in 1968 and offering 69 undergraduate majors and programs and 39 graduate degree programs. Located on a 37-acre campus in the northwest Bronx across from the Jerome Park Reservoir and centered along a major educational corridor with four neighboring public schools Average class size of 19 students Lehman College’s faculty includes seven Distinguished Professors, including Billy Collins, Poet Laureate of the United States (2001-2003) and New York State Poet Laureate (2004-2006), and composer John Corigliano, winner of both the Academy Award (2000) and the Pulitzer Prize for Music (2001) For FY 2008, Lehman was awarded $18.77 million from Federal and State agencies as well as private sources to support scholarly research and to provide special services to local K-12 schools, community organizations, and residents of the Bronx and the metropolitan area. As a result, Lehman ranked fourth in this area among the 14 CUNY senior colleges Campus Map Getting to Lehman –Via Public Transportation By Train IRT No. 4 or the IND "D" line to Bedford Park Boulevard. The campus is a three-minute walk to the west. For more Information about subway service to the Lehman campus, call the New York City Transit Authority at (718) 330-1234. Metro North's Harlem line has a local stop at the Botanical Gardens station. The campus is about 12 blocks due west on Bedford Park Boulevard.
    [Show full text]
  • 2016 New York City Bridge Traffic Volumes
    2016 New York City Bridge Traffic Volumes TM NEW YORK CITY Bill de Blasio Polly Trottenberg Mayor Commissioner A member of the New York Metropolitan Transportation Council 2016 New York City Bridge Traffic Volumes Contract C033467 2014-2015: PTDT14D00.E01 2015-2016: PTDT15D00.E01 2016-2017: PTDT16D00.E02 2017-2018: PTDT17D00.E02 The preparation of this report has been financed through the U.S. Department of Transportation’s Federal Transit Administration and Federal Highway Administration. This document is disseminated under the sponsorship of the New York Metropolitan Transportation Council in the interest of information exchange. The contents of this report reflect the views of the authors who are responsible for the facts and accuracy of the data presented herein. The contents do not necessarily reflect the official views or policies of the Federal Transit Administration, Federal Highway Administration or the State of New York. This report does not constitute a standard, specification or regulation. NYCDOT is grateful to the Metropolitan Transportation Authority Bridges and Tunnels (MTABT), the Port Authority of New York and New Jersey (PANYNJ), and the New York Metropolitan Transportation Council (NYMTC) for providing data used to develop this report. This 2016 New York City Bridge Traffic Volumes Report was funded through the New York Metropolitan Transportation Council SFY 2017 Unified Planning Work Program project, Data Management PTDT17D00.E02, which was funded through matching grants from the Federal Transit Administration and from the Federal Highway Administration. Title VI Statement The New York Metropolitan Transportation Council is committed to compliance with Title VI of the Civil Rights Act of 1964, the Civil Rights Restoration Act of 1987, and all related rules and statutes.
    [Show full text]
  • Directions to Other Sites (TSP, Worship/Warfare Week)
    Directions to Other Sites (TSP, Worship/Warfare Week) To Tompkins Square Park, (Ave A & 7th Street Lower East Side, Manhattan) By Subway: You can also go to the website www.googlemaps.com to get accurate directions from your starting location • Take the 4, 5 or 6 Train Downtown to 14th Street. • Transfer to the L train heading towards Brooklyn. • Get off at 1st Ave, walk East to Ave A • Turn right on 7th Street. The SLM truck will be on the corner of 7th St. & Ave A. By Car: Please note: We have provided the following directions, which we highly recommend for you to use, as opposed to GPS which often leads you into excessive traffic and indirect routes. From Queens, and Long Island: using the Long Island Expressway and Queens Midtown Tunnel • Take the Long Island Expressway West to Queens Midtown Tunnel. • Bear left out of the tunnel toward Downtown. • After the tunnel, stay LEFT toward 2nd Ave. • Make a LEFT at first traffic light. • Then RIGHT onto 2nd Ave • Make a LEFT onto 14th St • Make a RIGHT onto Ave A • Turn RIGHT on 7th Street. The SLM truck will be on the corner of 7th Street & Ave A. From Queens, and Long Island: using the Brooklyn Queens Expressway and Williamsburg Bridge • Take the BQE to the Williamsburg Bridge. • Once off the bridge, make a right onto Chrystie St. • Go to Houston St. and then make a right. • Go to Ave A and make a left. • Go down to 7th St. The SLM truck will be on the corner of 7th Street & Ave A.
    [Show full text]
  • Tidal Scour Analysis - Willis Avenue Bridge, New York City, New York
    TIDAL SCOUR ANALYSIS - WILLIS AVENUE BRIDGE, NEW YORK CITY, NEW YORK SERKAN MAHMUTOGLU Earth Tech, 500 Southborough Drive South Portland, Maine 04106, USA RYAN M. EDISON, P.E. Earth Tech, 500 Southborough Drive South Portland, Maine 04106, USA This paper discusses the analysis of navigational velocities, scour and recommended countermeasures at Willis Avenue Bridge in New York City. The bridge crosses the Harlem River and serves as one of the major commuter routes into Manhattan Island. Today, this historic, swing span bridge is being replaced. During the proposed construction of the new bridge, the navigational channel will see varying levels of obstruction that will increase the local current velocities through the piers. This increase in velocities poses potential problems for safe navigation and increased risk of bridge scour. To characterize the very complex tidal dynamics of the project site, a 2D hydrodynamic model was calibrated and verified, prior to analyzing both the maximum expected velocities through the piers and the depth of the associated bridge scour for various construction phases. The results were used to map navigational velocities, design a semi-permeable fender system, calculate scour depths, and to design temporary scour countermeasures. 1 Introduction The Willis Avenue Bridge, opened in 1901, is located at the southern end of the Harlem River in New York, connecting Manhattan Island to the Bronx. It is a swing bridge that carries four lanes of one-way traffic with a daily load of 70,000 vehicles from Manhattan Island to the Bronx. Today, this historic bridge is being replaced with a similar type of structure to improve geometry for vehicle/pedestrian traffic, reduce accidents, increase loading capacity, and to eliminate the present structural and seismic issues.
    [Show full text]
  • WILLIS AVENUE SWING BRIDGE OVER HARLEM RIVER Boroughs of Manhattan & Bronx, New York, New York
    WILLIS AVENUE SWING BRIDGE OVER HARLEM RIVER Boroughs of Manhattan & Bronx, New York, New York Owner/Client: Project Description: New York City DOT Replacement of the Willis Avenue Bridge over the Harlem River connecting New York State DOT Manhattan to the Bronx, including the reconstruction of Willis Avenue over the Major Deegan Expressway and reconstruction of sections of the Major Deegan Expressway with entrance and exit ramps. Engineer: Hardesty & Hanover Construction includes a new 2,400 ton, 363’ swing span bridge truss. Extensive planning was required for the completion of the float-in of the new swing span Year Complete: and float-out of two 1100-ton existing trusses. Weeks Marine transported the new swing span 135 nautical miles and through 14 bridges from the erection site 2012 to the project site. Scope of Work: Project involved 48” and 60” diameter drilled caissons, 940-ton precast concrete Demolition cofferdam boxes for the construction of cast-in-place mass concrete bridge piers, large sheet pile walls, 6000 tons of steel tub and plate girder superstructures, Channel Dredging 160,000 square feet of cast-in-place concrete decks, submarine power cables, Construction FRP pile and concrete fender systems, precast prestressed box beams, and precast T walls. Temporary construction included sheet pile walls with drilled Project Cost: tiebacks, sheet pile cofferdams with mass tremmie concrete seals, 24” to 48” $636M driven pipe piles, steel jacket platforms, and temporary truss panel bridge erection. Channel dredging and the demolition of the existing bridge approaches, piers, pneumatic caissons, and fender system also included. Corporate/Northeast 4 COMMERCE DRIVE, CRANFORD, NJ 07016 (908) 272-4010 Gulf Coast/Caribbean/Latin America 11011 RICHMOND AVENUE, SUITE 650, HOUSTON, TX 77042 (713) 623-2006 www.WeeksMarine.com .
    [Show full text]
  • History and Projection of Traffic, Toll Revenues and Expenses
    Attachment 6 HISTORY AND PROJECTION OF TRAFFIC, TOLL REVENUES AND EXPENSES AND REVIEW OF PHYSICAL CONDITIONS OF THE FACILITIES OF TRIBOROUGH BRIDGE AND TUNNEL AUTHORITY September 4, 2002 Prepared for the Triborough Bridge and Tunnel Authority By 6-i TABLE OF CONTENTS Page TRANSPORTATION INFRASTRUCTURE 1 Triborough Bridge and Tunnel Authority (TBTA) 1 Metropolitan Area Arterial Network 3 Other Regional Toll Facilities 4 Regional Public Transportation 5 TOLL COLLECTION ON THE TBTA FACILITIES 5 Current Toll Structure and Operation 5 E-ZPass Electronic Toll Collection System 8 Passenger Car Toll Rate Trends and Inflation 9 HISTORICAL TRAFFIC, REVENUES AND EXPENSES AND ESTIMATED/FORECAST NUMBERS FOR 2002 12 Traffic and Toll Revenue, 1991 - 2001 12 Traffic by Facility and Vehicle Class, 2001 14 Monthly Traffic, 2001 15 Impact of September 11 Terrorist Attack 16 Estimated Traffic and Toll Revenue, 2002 20 Operating Expenses 1991 – 2001 21 Forecast of Expenses, 2002 23 FACTORS AFFECTING TRAFFIC GROWTH 23 Employment, Population and Motor Vehicle Registrations 24 Fuel Conditions 28 Toll Impacts and Elasticity 30 Bridge and Tunnel Capacities 32 TBTA and Regional Operational and Construction Impacts 33 Other Considerations 40 Summary of Assumptions and Conditions 41 PROJECTED TRAFFIC, REVENUES AND EXPENSES 43 Traffic and Toll Revenue at Current Tolls 43 Traffic and Toll Revenue with Periodic Toll Increases 45 Operating Expenses 48 Net Revenues from Toll Operations 49 REVIEW OF PHYSICAL CONDITION 50 Review of Inspection Reports 51 Long-Term Outlook
    [Show full text]
  • Hunts Point Location 1300 Viele Avenue & 1301 Ryawa Avenue Bronx, Ny
    STRATEGIC HUNTS POINT LOCATION 1300 VIELE AVENUE & 1301 RYAWA AVENUE BRONX, NY PRIME LARGE BOX INDUSTRIAL LEASING OPPORTUNITY 120,775 SF AVAILABLE OVER 5 MILLION NEW CAPITAL IMPROVEMENTS $ FOR LEASE OCCUPANCY 1ST QUARTER 2018 OWNED AND MANAGED BY CO-EXCLUSIVE LEASING BROKERS SITE SURVEY 1300 VIELE AVENUE 1301 RYAWA AVENUE CEILING HEIGHT: ± 17-26 FEET CEILING HEIGHT: ± 20 FEET COLUMN SPACING: ± 100’ X 25’ COLUMN SPACING: ± 48’ X 31’ 600’ 250’ Outside storage 4 Interior loading 2,800 SQ FT CAR PARKING 55’ docks 100’ Ryawa Avenue Ryawa 1300 VIELE BUILDING 1301 RYAWA BUILDING 70,300 SQ FT 50,475 SQ FT 205’ Viele Avenue Viele Warehouse office 350 SQ FT 150’ 2 Interior loading 100’ docks Office Spacce Office area 7,050 SQ FT (incl. mezz space) 9,500 SQ FT Dock door 2 Dock doors Dock door Lighting Place - Private TOTAL BUILDING AREA 120,775 SQ FT CAR/VEHICLE PARKING CAR/VEHICLE PARKING IMPROVEMENTS INCLUDE New Roof • New LED Lighting • New dock doors and load levelers • Renovated o­ce areas with new windows • New metal-panel wall system • Freshly painted warehouse interior walls & ceiling Sprinkler upgrades - dry system • Upgraded electrical • New asphalt on Lighting Place PREMIER HUNTS POINT LOCATION WITH DIRECT HIGHWAY ACCESS AND VISIBILITY PROPERTY HIGHLIGHTS TOTAL BUILDING SIZE ± 120,775 SF - divisions possible 1300 Viele Avenue 1301 Ryawa Avenue • WAREHOUSE ± 104,225 SF • OFFICES Viele Avenue - Front: ± 7,050 SF Ryawa Avenue - Rear: (2 Story) ± 9,500 SF • LOADING - expandable 8 Interior Tailgate Doors 7 Drive-In Doors • STORAGE ± 2,800
    [Show full text]
  • MARATHON SUNDAY TRAFFIC/PARKING UPDATES Get There Early and Find Parking on the STREETS Before They Close the Streets!! We Will Open the Gate on W
    MARATHON SUNDAY TRAFFIC/PARKING UPDATES Get there early and find parking ON THE STREETS before they close the streets!! We will open the gate on W. 77th St. for waiting (NOT unloading) at 7:30 AM for those vendors who are permitted to drive in. You can sit in your vehicle until the 8:15 unloading time. We will try to accommodate as many vendors as possible. GENERAL ADVICE If you are coming from the east, you must cross at either 57th St. or at W. 138th St. to the west side. (Upper level of the 59th St, bridge is OPEN. It may take you out of your way a bit but it will save you grief in the long run. Pay attention to the closing times of 1st and 5th Aves. (see below). If you are coming from the south, try to use the Brooklyn Battery Tunnel, or the Brooklyn Bridge, or the Williamsburg Bridge, and go north along the west side of Manhattan. If you are coming from the west or north, use the West Side Hwy. and W. 79th exit. Vendors who arrive by subway (not the bus) should not be inconvenienced. THE FOLLOWING ADVISORIES ARE TAKEN DIRECTLY FROM THE MARATHON WEBSITE – http://www.ingnycmarathon.org/road_closures.htm STREET/BRIDGE CLOSINGS: MARATHON SUNDAY Queensboro/59th Street Bridge, Queens – Manhattan Lower level: closed 8:00 a.m.-3:30 p.m. Upper level will remain open First Avenue, Manhattan, 59th Street - 125th Street Closed 9:15 a.m.-4:00 p.m. Willis Avenue Bridge, Bronx - Manhattan Closed 5:00 a.m.-4:45 p.m.
    [Show full text]