River Diversion Project Under Construction
Total Page:16
File Type:pdf, Size:1020Kb
Angat (Bulacan) Water Transmission Improvement Project Under construction Project type Water Location Region III – Central Luzon Cost PhP 3.3 billion Source of funds ADB Proponent Cooperativa Muratori and Cementisti Construction started October 26, 2016 Status Active Target completion June 30, 2022 Photo Source: Metropolitan Waterworks and Sewerage System Developments Project Description: • Accomplishment: 57% Improve the reliability and security of raw water through partial • TBM Excavation: 3008 meters out of 6,400 meters or 47% rehabilitation of the transmission system from Ipo to La Mesa and the introduction of water safety, risk and asset management plans. The Project involves the construction of a new 4.00 meters tunnel (Tunnel no. 4) by 6.30 kilometers including intake and outlet works. Updated on October 29, 2018 Bulacan Bulk Water Supply Project Under construction Project type Water Location Region III – Central Luzon Cost PhP 24.4 billion Source of funds PPP, solicited San Miguel Holdings and Proponent Korea Water Resources Construction started April 2017 Status Active Target completion 2022 Photo Source: Public-Private Partnership Center Developments Project Description: • Accomplishment: 89% Supply of treated bulk water to the entire province of • Commissioning for Stage 1: October 26, 2018 Bulacan through its water districts as per MOA signed on • Commissioning for Stage 2: April 2019 July 2012 between MWSS and the Province of Bulacan. Updated on October 29, 2018 Chico (Cagayan) River Pump Irrigation Project Under construction Project type Water Location Cordillera Administrative Region Cost PhP 4.4 billion Source of funds ODA-China Proponent CAMC Engineering Construction started June 8, 2018 Status Active Target completion 2019 Photo Source: Philippine Information Agency Developments Project Description: • Groundbreaking on June 8, 2018 The project covers installation of electric motor-driven • Project mobilization and construction is on-going and on-track. pumps, construction of pumping station, construction of • NEDA Board approved June 27, 2017 (change in project irrigation canals, facilities, and other appurtenant structures. financing) The project will irrigate around 8,700 hectares, benefitting about 4,350 farmers and serving 21 barangays in Cagayan and Kalinga provinces. Updated on October 25, 2018 Rehabilitation of Umiray-Angat (Quezon-Bulacan) Facilities Under construction Project type Water Location Region IV-A – CALABARZON Cost PhP 717 million Source of funds Common Purpose Facility Proponent Manila Water and Maynilad Construction started Status Active Target completion End of 2018 Photo Source: Metropolitan Waterworks and Sewerage System Developments Project Description: • Accomplishment: 59% Rehabilitation and strengthening of existing tunnel • Requirements for construction permit were already complied by structures/facilities to withstand future typhoons in order to CPF. ensure continuous flow of raw water from the Umiray River • This Project is associated with the above-mentioned MOA with to the Angat Reservoir. LGU General Nakar. Updated on October 25, 2018 Sumag (Quezon) River Diversion Project Under construction Project type Water Location Region IV-A – CALABARZON Cost PhP 774 million Source of funds Common Purpose Facility Proponent Manila Water and Maynilad Construction started Status Inactive Target completion Photo Source: Metropolitan Waterworks and Sewerage System Developments Project Description: • Construction works under suspension; Accomplishment: 68% as of Construction of a diversion tunnel to supplement water July 31, 2016 coming from Umiray River going to the Angat Reservoir. • Securing of Gratuitous Permit is on-going. • Requirements for quarry permit were already complied by CPF. • Supplemental MOA on watersheds protection and management signed on September 27, 2017. Updated on October 25, 2018 Aqueduct No. 7 (Bulacan) Under development Project type Water Location Region III – Central Luzon Cost Source of funds ODA Proponent Target construction 2019 Status Active Target completion 2021 Photo Source: Metropolitan Waterworks and Sewerage System Developments Project Description: • A feasibility study is currently being conducted by Tractebel Construction of additional aqueduct to replace the existing (funded through grant from ADB) and is expected to be Aqueducts 1 and 2 whose functionality has diminished. The completed by August 2018. project ensures reliability, improve operational flexibility, and • To be submitted to NEDA ICC on September 2018. dependability of raw water conveyance to Metro Manila. Updated on October 25, 2018 Ipo (Bulacan) Dam No. 3 Under development Project type Water Location Region III – Central Luzon Cost Source of funds ODA-China Proponent Target construction Status Active Target completion Photo Source: Metropolitan Waterworks and Sewerage System Developments Project Description: • MWSS will explore the conduct of the feasibility study for the Construction of a dam downstream of the Ipo Dam and project with funding from the NEDA-Project Development and upstream of the Bustos Dam to serve as catchment for Other Rlated Studies Fund. spillage from Angat Dam and mitigate flooding within the • MWSS to submit the TOR for the feasibility study. area. Updated on October 25, 2018 New Centennial Water Source- Kaliwa (Rizal) Dam Project Under development Project type Water Location Region IV A – CALABARZON Cost PhP 18.7 billion Source of funds ODA-China Proponent Target construction 2018 Status Active Target completion 2022 Photo Source: Metropolitan Waterworks and Sewerage System Developments Project Description: • Loan Signing scheduled during visit of China President Xi Jinping Development of a new water source to meet the increasing November 19 to 21, 2018. water demand by constructing a redundant dam for Metro • Ongoing Acquisition of lots required for the Tunnel Outlet Portal. Manila’s domestic water supply. The project is an integrated • Ongoing coordination with government agencies. system that includes the 600 million liters per day (MLD) Kaliwa Dam, its intake and other appurtenant facilities, and a 2,400 MLD capacity raw water conveyance tunnel. Updated on October 25, 2018.