MWSS' PROJECTS FOR 2018 and Beyond:

Total Project Cost Status / Remarks No. Program/Project Title Description Outputs Outcomes Project Beneficiaries Plans for 2018 (PhP M) (as of 31 Dec 2018)

1 Angat Water Investigation and rehabilitation of New Tunnel No. 4 of 6.40 Improved flow and and the 3,290.00 Continue 84.49% actual Transmission raw water transmission system from kilometers length (4m flexibility in the entire MWSS service construction works accomplishment Improvement Project Ipo dam to La Mesa Dam, with the diameter) that will supply transmission which will area (AWTIP) construction of new Tunnel No. 4 19cms of raw water enable the full (4.00 meters diameter x 6.40 rehabilitation of the whole kilometers length) as the priority raw water transmission work in order to facilitate the system rehabilitation of the whole transmission system. Project Location: Norzagaray, 2 Bulacan Bulk Water Supply of treated bulk water to the 475 million liters per day It will address the water Province of Bulacan 16,320.00 Continue 96.23% actual Supply Project (BBWSP) entire Province of Bulacan through of treated bulk water supply requirements of construction works accomplishment its water districts. the Province of Bulacan. Project Location: Province of Bulacan 3 New Centennial Water Development of a new water source Additional volume of raw It will address the MWSS service area 12,200.00 Award of Contract to Notice Of Award (NOA) Source - Kaliwa Dam in order to meet the increasing water water in the amount of imminent deficit in water particularly in the east the winning Bidder was issued on 11 Dec Project (NCWS-KDP) demand by constructing a redundant 600 million liters per day supply due to increased and south service area 2018 to China Energy dam for Metro Manila's domestic (600mld) once completed. water demand Engineering Corporation water supply Limited (CEEC)

Project Location: Brgy. Pagsangahan, , 4 Rehabilitation, Operation The project involves the opportunity 28 megawatts of Extended economic life of Water supply security for 1,509.00 For NEDA approval The updated Project Cost and Maintenance of to optimize the benefit from the hydropower generation the auxiliary turbines by the entire MWSS service of its continued was submitted to NEDA MWSS-owned Auxiliary MWSS-owned Auxiliary Turbines 4 with an estimated annual another 30 years as well area; and additional viability on April 2018 for ICC Turbines 4 & 5 (AN-4 & 5) & 5 (AN-4 & AN-5) by developing electricity production of as increased energy power for the Luzon Grid evaluation and NEDA of the Angat Hydro- the hydropower generation 145.70 GWH. output and load capacity Board approval; Electric Power Plant component, a "by-product" of the (AHEPP) raw water flowing through the turbines. Project Location: Norzagaray, Bulacan

5 Sumag River Diversion This involves the tapping of the 600 meters length of it will increase the volume Water supply source for 774.00 Acquisition of Acquisition of required Project (SRDP) Sumag River which was originally tunnel (2.50m diameter) of raw water coming from BBWSP required quarry quarry permit is in part of the Umiray-Angat Transbasin that will provide an the Umiray River going to permit and progress. Tunnel Project additional raw water the Angat Reservoir. resumption of supply of 188 mld (million contract works liters per day). Proj. Location: Umiray, General Nakar, Quezon 6 Rehabilitation of Umiray- Rehabilitation and strengthening of Additional structures that It will mitigate the risk of Water supply security for 374.00 Acquisition of The Project resumed on Angat Transbasin Tunnel existing tunnel structures/facilties to will strengthen the water shortage, and the entire MWSS service required January 2018, and is now structures/facilities (UAT withstand future typhoons in order to existing system in order to secure the supply of raw area; construction permit 62.40% actual Rehab) ensure the continuous flow of raw withstand future typhoons water coming from the and resumption of accomplishment water from the Umiray River to the and to ensure the Umiray River contract works Proj.Angat Location: Reservoir Umiray, General availability of at least 9 Nakar, Quezon MWSS' PROJECTS FOR 2018 and Beyond:

Total Project Cost Status / Remarks No. Program/Project Title Description Outputs Outcomes Project Beneficiaries Plans for 2018 (PhP M) (as of 31 Dec 2018)

NEW PROJECTS: 1 Aqueduct No. 7 Project Detailed Engineering Design (DED) 3.60 meters x 15 It will serve as additional Water supply security for 6,720.00 Completion of Feasibility Study and Construction of new Aqueduct kilometers new Aqueduct transmission for additional the entire MWSS service Feasibility Study completed on August No. 7 that will convey 1,700 mld allocation area; 2018 of raw water. (this will replace the existing old aqueducts 1 & 2)

Proj. Location: Norzagaray, Bulacan

2 Tunnel No. 5 Project Detailed Engineering Design (DED) New tunnel intended to It will secure the Water supply security for For study of its Currently being discussed and Construction of new Tunnel No. replace or support the continuous supply of raw the entire MWSS service implementation with CPF and MWSS RO 5 existing very old Tunnel water coming from the area; scheme on the technical proposal No. 1 that will convey at Angat Reservoir submitted by CMC di least 1,700 mld of raw Ravenna water Proj. Location: Norzagaray, Bulacan

3 Ipo Dam 3 Project Proposed construction of Ipo Dam 3 New dam that can hold It will mitigate flooding in Water supply for domestic For Feasibility Study The consultancy services situated downstream of the existing an estimated 40 million Bulacan as this dam will (MWSS) and irrigation (FS) for the conduct of FS was Ipo Dam 2. cubic meters of raw water serve as an impounding (NIA) awarded to consultant reservoir for water coming EDCOP on 20 Dec 2018, from spills of existing Ipo and this was funded by Dam and rains around the NEDA through its PDRS area. funding.

Proj. Location: Norzagaray, Bulacan