FLUKA Meeting at ELI-Beamlines Info

Total Page:16

File Type:pdf, Size:1020Kb

FLUKA Meeting at ELI-Beamlines Info FLUKA meeting at ELI-Beamlines Info Prague, November 21-22, 2013 Arrival at the airport When entering the airport arrival hall you will find on the left a kiosk where you can buy tickets for the public transport. On the right you will find the taxi kiosk. Leaving the hall you will be on the sidewalk for the taxi, cross the street to get on the bus-stop sidewalk. Ticket vending machines are available on the sidewalk. Three buses are available to reach the city center: • 100 Has its terminus at the Zličín terminus of subway B (yellow). It makes 4 stops in between. • 119 Has its terminus at the Dejvická terminus of subway A (green). It makes 14 stops in between. • AE Goes directly from the airport to the Dejvická terminus of subway A (green) and continues to the city center with stops in Náměstí Republiky, Masarykovo nádraží, and Hlavní nádraží (central station). The AE bus requires a special ticket that can be bought on board from the driver. A 90 minutes ticket should be adequate to reach your hotels using buses 100 or 119. Please check on the Public Transport web page, www.dpp.cz/en, for more details and for an estimate of the travel time. 1 Public Transport in Prague Public transport in Prague is highly reliable. Dopravni Podnik Prahy (the transport company) has a nice web site that easily allows to look for the connection. The English version of the page can be found on the page: www.dpp.cz/en. The last metro ride leaves the terminal at midnight, after midnight only night buses are available. Public transport fares Tickets allow you to take any subway, tram, or bus during their validity time. You may be interested in four kind of tickets: • Short-term ride The ticket lasts for 30 minutes. It costs 24 CZK. • Standard ride The ticket lasts for 90 minutes. It costs 32 CZK. • 24-h ticket The ticket lasts for 24 hours from its validation. It costs 110 CZK. • 72-h ticket The ticket lasts for 72 hours from its validation. It costs 310 CZK. This ticket can not be bought at the vending machines. The price are given as of October 21st. Vending machines are present at any subway station, see figure 1. You can also buy tickets at the kiosks in the subway station. Figure 1: Ticket vending machines are available at the airport and at each metro station. 2 Meeting location The meeting will be held in the ELI-Beamline offices in Prague located in the Harfa Office Park. The full address is: Harfa Office Park, 5th floor, Českomoravská 2420/15, 190 93 Praha 9 Access to the offices is restricted: please do not forget to register for the meeting so that your name will appear in the list for the receptionist. Unfortunately, Google Maps relies on old pictures showing a parking lot where now there are the Harfa Mall and Harfa Office Park. Anyway, the O2 Arena is already visible, immediately to the East. How to reach the meeting Harfa Office Park is well connected with the city center both with the subway and with the tram system. Upon your arrival, please ask the reception on the ground floor for your access card. Access cards need to be returned when leaving. How to reach the meeting: subway The subway stop for the Harfa Office Park is Českomoravská on the B line (yellow line), see figure 2. Figure 2: The subway station next to the ELI-Beamlines office is Ceskomoravska. Use to escalator to reach the surface. To reach the Harfa Office Park from the subway station, you have to cross the Harfa Mall. Once you are on top of the escalator turn right to exit to arrive on the Českomoravská bus terminal. In front of you, across the square there is the O2 Arena and on the right the Harfa Mall, the one with the dinosaurs on top, see figures 3 and 4. 3 Figure 3: On top of the escaltor, turn right to exit the subway station. In front of you there will be the O2 Arena and on the right the Galerie Harfa Entrance. Figure 4: Exiting the subway station turn right, then left, to arrive at the entrance of Galerie Harfa. 4 Enter the mall and go on the escalator in front of you, go across the entire hallway and at the end turn left, see figure 5. Figure 5: Once you enter the mall take the elevator in front of you. Go straight until the end of the balcony, then turn left. Go straight (more or less) to exit the mall, see figure 6. Figure 6: Go straight, turn right, and turn left to reach the exit. Ten meters to your right you will find the entrance of the Harfa Office Park, see figure 7. How to reach the meeting: tram The tram stop for the Harfa Office Park is Ocelářská on the tram 8 line. Exiting the tram, you will see the Harfa Office Park building, a brand new glass building with flags in front of it. Cross the street (watch left, watch right, lol), go up the stairs, and the entrance will be in front of you, see figure 8. Contrary to coming with the subway, there is no need to cross the Harfa Mall. Participants with restricted mobility Please contact us prior to make your arrangements for the trip. 5 Figure 7: Exiting the mall, on your right, you have the entrance of the Harfa Office Park Figure 8: The Harfa Office Park is clearly visible from the Ocelarska tram stop. Cross the street and on top of the stairs you will find the entrance. 6 Wi-Fi connection during the meeting During the meeting, participants will have access to the ELI “guest” wi-fi network. Details for the connection will be provided on site. Accommodations There are five hotels at walking distance from the Harfa Office Park: • Hotel Carol Kurta Konráda 12, Praha 9, Czech Republic Phone: +420 284 019 911 http://www.hotelcarol.com/ • Hotel Esprit Lihovarská 1094-8, Prague 9, Czech Republic Phone 1: +420 775 588 479 Phone 2: +420 284 810 288 http://www.hotelesprit.eu/en/uvod.html • Hotel Arlington Kurta Konráda 22, Praha 9, Czech Republic Phone: +420 284 813 005 http://www.arlingtonhotel.cz/en/ • Hotel Step Malletova 1141, Praha 9, Czech Republic Phone: +420 296 786 350 http://www.wellness-hotel-step.cz/index-en.php • Clarion Congress Hotel Freyova 33, Praha 9, Czech Republic Phone: +420 211 131 119 http://www.clarioncongresshotelprague.com/en/ We can not provide you with more info than tripadvisor. Keep in mind they are neither in the city center nor in a particularly interesting area for tourism, while it is a 11 minutes ride between Ceskomoravska subway station and Mustek subway station in the very hearth of Prague downtown. Vegetarians Prepare yourselves for an hard time. 7.
Recommended publications
  • Berlin by Sustainable Transport
    WWW.GERMAN-SUSTAINABLE-MOBILITY.DE Discover Berlin by Sustainable Transport THE SUSTAINABLE URBAN TRANSPORT GUIDE GERMANY The German Partnership for Sustainable Mobility (GPSM) The German Partnership for Sustainable Mobility (GPSM) serves as a guide for sustainable mobility and green logistics solutions from Germany. As a platform for exchanging knowledge, expertise and experiences, GPSM supports the transformation towards sustainability worldwide. It serves as a network of information from academia, businesses, civil society and associations. The GPSM supports the implementation of sustainable mobility and green logistics solutions in a comprehensive manner. In cooperation with various stakeholders from economic, scientific and societal backgrounds, the broad range of possible concepts, measures and technologies in the transport sector can be explored and prepared for implementation. The GPSM is a reliable and inspiring network that offers access to expert knowledge, as well as networking formats. The GPSM is comprised of more than 150 reputable stakeholders in Germany. The GPSM is part of Germany’s aspiration to be a trailblazer in progressive climate policy, and in follow-up to the Rio+20 process, to lead other international forums on sustainable development as well as in European integration. Integrity and respect are core principles of our partnership values and mission. The transferability of concepts and ideas hinges upon respecting local and regional diversity, skillsets and experien- ces, as well as acknowledging their unique constraints. www.german-sustainable-mobility.de Discover Berlin by Sustainable Transport This guide to Berlin’s intermodal transportation system leads you from the main train station to the transport hub of Alexanderplatz, to the redeveloped Potsdamer Platz with its high-qua- lity architecture before ending the tour in the trendy borough of Kreuzberg.
    [Show full text]
  • KSP 7 Lessons from Korea's Railway Development Strategies
    Part - į [2011 Modularization of Korea’s Development Experience] Urban Railway Development Policy in Korea Contents Chapter 1. Background and Objectives of the Urban Railway Development 1 1. Construction of the Transportation Infrastructure for Economic Growth 1 2. Supply of Public Transportation Facilities in the Urban Areas 3 3. Support for the Development of New Cities 5 Chapter 2. History of the Urban Railway Development in South Korea 7 1. History of the Urban Railway Development in Seoul 7 2. History of the Urban Railway Development in Regional Cities 21 3. History of the Metropolitan Railway Development in the Greater Seoul Area 31 Chapter 3. Urban Railway Development Policies in South Korea 38 1. Governance of Urban Railway Development 38 2. Urban Railway Development Strategy of South Korea 45 3. The Governing Body and Its Role in the Urban Railway Development 58 4. Evolution of the Administrative Body Governing the Urban Railways 63 5. Evolution of the Laws on Urban Railways 67 Chapter 4. Financing of the Project and Analysis of the Barriers 71 1. Financing of Seoul's Urban Railway Projects 71 2. Financing of the Local Urban Railway Projects 77 3. Overcoming the Barriers 81 Chapter 5. Results of the Urban Railway Development and Implications for the Future Projects 88 1. Construction of a World-Class Urban Railway Infrastructure 88 2. Establishment of the Urban-railway- centered Transportation 92 3. Acquisition of the Advanced Urban Railway Technology Comparable to Those of the Developed Countries 99 4. Lessons and Implications
    [Show full text]
  • Hen Chennai Central Becomes the City's Transport
    hen Chennai Central becomes the city's transport hub Urban intermodal integration will become a reality at the station when Metro Ra il becomes fu lly operational in a few years Sunttha Sekar these corridors. ''We aTe expecting the CH ENNAI: When the Metro PUBLIC TRANSPORT N'ET WORK foo tfall at the station to run Skywalk Rai l is ready to run, the Nearly every form of public ground transport - buses and trains (suburban, inter-State and mass rapid transit system) - will be to several lakhs," says an­ Chennai Central station lin ked to the Metro Ra il stat ion at Chennai Central other official. junction will be a classic case In a joint venture, Afoons closer to of urban intermodal and Transtonnelstroy integration. bagged the contract worth reality now Nearly every form of pub­ Rs. 1.566 crore from CMRL lie ground transport - buses to construct Chennai Cen­ Special Correspondent and trains (suburban, inter­ tral Metro along with eight State and mass rapid transit other stations. CHENNAI : The city's first pe· destrian skyw-dlk is closer system-MRTS) - will be AiqlOrl check-in linked to the Metro Rail sta­ to reality wit~ the first tion at Chennai Central. ulslatiOIl phase connecting six A few years down the line, This apart, CMRL also points geltin" clearance. when Metro Rail becomes plans to introduce airport The skywalk will come operational, this point will check-in facili ty at Central UI) along Poonamallee be the ideal interconnect fo r Metro station. According to Jligb Road and connect public transport in the city, CMRL offici als.
    [Show full text]
  • Why Some Airport-Rail Links Get Built and Others Do Not: the Role of Institutions, Equity and Financing
    Why some airport-rail links get built and others do not: the role of institutions, equity and financing by Julia Nickel S.M. in Engineering Systems- Massachusetts Institute of Technology, 2010 Vordiplom in Wirtschaftsingenieurwesen- Universität Karlsruhe, 2007 Submitted to the Department of Political Science in partial fulfillment of the requirements for the degree of Master of Science in Political Science at the MASSACHUSETTS INSTITUTE OF TECHNOLOGY February 2011 © Massachusetts Institute of Technology 2011. All rights reserved. Author . Department of Political Science October 12, 2010 Certified by . Kenneth Oye Associate Professor of Political Science Thesis Supervisor Accepted by . Roger Peterson Arthur and Ruth Sloan Professor of Political Science Chair, Graduate Program Committee 1 Why some airport-rail links get built and others do not: the role of institutions, equity and financing by Julia Nickel Submitted to the Department of Political Science On October 12, 2010, in partial fulfillment of the Requirements for the Degree of Master of Science in Political Science Abstract The thesis seeks to provide an understanding of reasons for different outcomes of airport ground access projects. Five in-depth case studies (Hongkong, Tokyo-Narita, London- Heathrow, Chicago- O’Hare and Paris-Charles de Gaulle) and eight smaller case studies (Kuala Lumpur, Seoul, Shanghai-Pudong, Bangkok, Beijing, Rome- Fiumicino, Istanbul-Atatürk and Munich- Franz Josef Strauss) are conducted. The thesis builds on existing literature that compares airport-rail links by explicitly considering the influence of the institutional environment of an airport on its ground access situation and by paying special attention to recently opened dedicated airport expresses in Asia.
    [Show full text]
  • Hutong 28/F One Peking Tsim Sha Tsui, Hong Kong From
    Hutong 28/F One Peking Tsim Sha Tsui, Hong Kong From InterContinental Hong Kong From street level, find the escalators (entrance on Kowloon Park Drive) that lead up to the Mezzanine level. Turn right to find the first lift well. Then take the lift to the 28th Floor. Getting There There are a number of easy options to reach Hutong. Taxi drivers will know the name One Peking (or show them the address in Chinese: 尖沙咀北京道 1 號), a building near Victoria Harbour in Tsim Sha Tsui. Once you get to One Peking in Tsim Sha Tsui, there are 2 ways up to the Hutong. From street level, find the escalators (entrance on Kowloon Park Drive) that lead up to the Mezzanine level. Turn right to find the first lift well. Then take the lift to the 28th Floor. Via the underground at MTR Exit L5. Take the lift up to the Mezzanine level. Make your way around to the first lift well to your right. Then take the lift to the 28th Floor. From Central Via the MTR (Central Station) (10 minutes) 1. Take the Tsuen Wan Line [Red] towards Tsuen Wan 2. Alight at Tsim Sha Tsui Station 3. Take Exit L5 straight to the entrance of One Peking building 4. Take the lift to the 28th Floor Via the Star Ferry (Central Pier) (15 mins) 1. Take the Star Ferry toward Tsim Sha Tsui 2. Disembark at Tsim Sha Tsui pier and follow Sallisbury Road toward Kowloon Park 3. Drive crossing Canton Road 4. Turn left onto Kowloon Park Drive and walk toward the end of the block, the last building before the crossing is One Peking 5.
    [Show full text]
  • Germany Berlin Tiergarten Tunnel Verkehrsanlagen Im Zentralen
    Germany Berlin Tiergarten Tunnel Verkehrsanlagen im zentralen Bereich – VZB This report was compiled by the German OMEGA Team, Free University Berlin, Berlin, Germany. Please Note: This Project Profile has been prepared as part of the ongoing OMEGA Centre of Excellence work on Mega Urban Transport Projects. The information presented in the Profile is essentially a 'work in progress' and will be updated/amended as necessary as work proceeds. Readers are therefore advised to periodically check for any updates or revisions. The Centre and its collaborators/partners have obtained data from sources believed to be reliable and have made every reasonable effort to ensure its accuracy. However, the Centre and its collaborators/partners cannot assume responsibility for errors and omissions in the data nor in the documentation accompanying them. 2 CONTENTS A PROJECT INTRODUCTION Type of project Project name Description of mode type Technical specification Principal transport nodes Major associated developments Parent projects Country/location Current status B PROJECT BACKGROUND Principal project objectives Key enabling mechanisms Description of key enabling mechanisms Key enabling mechanisms timeline Main organisations involved Planning and environmental regime Outline of planning legislation Environmental statements Overview of public consultation Ecological mitigation Regeneration Ways of appraisal Complaints procedures Land acquisition C PRINCIPAL PROJECT CHARACTERISTICS Detailed description of route Detailed description of main
    [Show full text]
  • Railway Stations Adapting to Future Society Railway Stations Adapting to Future Society
    Railway Stations ADAPTING TO FUTURE SOCIETY Railway Stations ADAPTING TO FUTURE SOCIETY CONTENTS 3 FOREWORD BY UIC DIRECTOR-GENERAL 5 UIC STATION MANAGERS GLOBAL GROUP 7 HISTORY OF STATIONS: EVOLUTION OF THE CONCEPT 03 MODEL OF STATION CONCEPT 11 OPERATION faCELIFT: MAJOR PROJECTS STATION RENOvaTION POLICIES, TRENDS AND CHALLENGES 60 A QUICK LOOK AT SOME STATIONS AROUND THE WORLD... 70 BIBLIOGRAPHY Railway Stations ADAPTING TO FUTURE SOCIETY FOREWORD BY UIC DIRECTOR-GENERAL JEAN-PIERRE LOUBINOUX tations emerged alongside railways, as the Stations have gradually become organised, transfor- In the visual representations you will see the chan- staging-posts of this new industrial era. med and developed to host all those passing through ging relationships between station stakeholders. They increased in number as railways deve- – whether travellers or not – and to offer board, lod- As well as a depiction of how the concept of a “sta- loped into networks that, in turn, could only ging, or other everyday services. And since we must tion” has changed over time and the interaction Sdevelop alongside stations. From the outset, stations always go via somewhere in order to go anywhere, between stations and their urban environment, two 3 have been essential to the departure, the passage stations have become an interface between all the slides explain complex phenomena which vary ac- and the arrival of trains, and to the ebb and flow of various modes of mobility – trains, metro, buses, cars cording to the context and reality of each country all the travellers they carry. A railway network can and bicycles. They have thus become mediators and and even each station, all focusing on a complex web be seen as lines irrigating a geographical area in the organisers of daily mobility.
    [Show full text]
  • Tuřany Prague Other Cities
    How do you get to the Hotel Internations? The hotel is located in the center of Brno, accessible by all means of transport. By car, it is only 15 minutes and less than 12 kilometers from Tuřany Airport, or 10 minutes walk to the main train or bus station. From Tuřany Airport Tuřany STOPS Airport — before the departure hall Brno, Central station (CZ Hlavní nádraží) — bus stop in front of the Grand Hotel SALES OF TICKETS BUS automatic in the arrival hall newspaper and magazine store E76 Airport Brno — Central station (AirportShop) (CZ Hlavní nádraží) (driving time 20 in the bus with a contactless credit card minutes) Driver (payment in Euro) N89 Airport Brno — Central station TICKET PRISE (CZ Hlavní nádraží) - (Night line, traffic the ticket price for an adult is 25 CZK from 23:00 to 5:00 (driving time 20 minutes) Click for TAXI order a taxi City Taxi Brno https://www.citytaxibrno.cz/en/ From Prague Airport to Brno Prague BUS https://www.regiojet.com INFO The RegioJet and Flixbus buses stop directly in front of Terminal 1 (underneath the link to Terminal 2). https://global.flixbus.com BUS Airport Express The Airport Express buses provide a direct TRAIN connection between Prague Airport and Prague Central Station, where they stop right Connection from the Airport 1 in front of the station building. to Prague Central Station driving time 25 minutes direct transfer to trains 2 From Prague Main Station you will continue by train to Brno. 3 Carrier: https://www.cd.cz/en/ https://www.leoexpress.com/en Connections from other cities FlixBus GoEuro CheckMyBus Leo Express RegioJet České dráhy Other cities WELCOME TO BRNO CREDIT MATTERS VIII .
    [Show full text]
  • Boston-Montreal High Speed Rail Project
    Boston to Montreal High- Speed Rail Planning and Feasibility Study Phase I Final Report prepared for Vermont Agency of Transportation New Hampshire Department of Transportation Massachusetts Executive Office of Transportation and Construction prepared by Parsons Brinckerhoff Quade & Douglas with Cambridge Systematics Fitzgerald and Halliday HNTB, Inc. KKO and Associates April 2003 final report Boston to Montreal High-Speed Rail Planning and Feasibility Study Phase I prepared for Vermont Agency of Transportation New Hampshire Department of Transportation Massachusetts Executive Office of Transportation and Construction prepared by Parsons Brinckerhoff Quade & Douglas with Cambridge Systematics, Inc. Fitzgerald and Halliday HNTB, Inc. KKO and Associates April 2003 Boston to Montreal High-Speed Rail Feasibility Study Table of Contents Executive Summary ............................................................................................................... ES-1 E.1 Background and Purpose of the Study ............................................................... ES-1 E.2 Study Overview...................................................................................................... ES-1 E.3 Ridership Analysis................................................................................................. ES-8 E.4 Government and Policy Issues............................................................................. ES-12 E.5 Conclusion..............................................................................................................
    [Show full text]
  • Urban and Architectural Revival for Public Transport Infrastructure in the Netherlands Corinne Tiry
    F Railway Universal Designs and Architectural Features eature Urban and Architectural Revival for Public Transport Infrastructure in The Netherlands Corinne Tiry Two major rail infrastructure projects in the Rotterdam, The Hague and Utrecht). Both However, the high population density and Netherlands are now moving ahead projects mesh with the Dutch government’s close proximity of cities in the Randstad rapidly, changing cityscapes by the end of energetic strategy to improve national actually represent an asset for development the decade. The first is an extension of the mobility and promote transportation modes of transit networks, explaining why the North European high-speed link (HSL) rail other than the automobile. The high urban Ministry of Transport, Public Works and network for major cities within the country, concentration in the centre of the country Water Management has decided to invest with the southern part of the network is one reason why congestion has gradually in an exciting light rail project that can planned to begin operations in April 2007 grown to a critical level on trunk roads in compete well with the automobile over (Fig. 1 and Table 1). The second, expected this small area—the Randstad conurbation short distances of around 10 to 20 km. The to be in service in 2008, is the RandstadRail alone has a population of 7.3 million, Ministry signed an agreement with the urban tram–train rail network (Fig. 2) in the representing 46% of the nation’s region of Rotterdam and the Haaglanden southern part of the Randstad conurbation population in just 25% of the total area conurbation to establish RandstadRail (metropolitan region of Amsterdam, (Tables 2 and 3).
    [Show full text]
  • Improving and Expanding Cross Border Rail Passenger Service Through the Implementation of Pre-Clearance
    Improving and Expanding Cross Border Rail Passenger Service through the Implementation of Pre-clearance PURPOSE: This paper provides background and an overview of the issues associated with pre- clearance for passenger rail between the United States and Canada, and the potential benefits of expanding pre-clearance to international rail service that provides a direct route from the border to a clearance facility. The Eastern Border Transportation Coalition (EBTC) strongly supports the Beyond the Border Action Plan’s call to establish a pre-clearance agreement, and to expand the availability of pre-clearance where appropriate. BACKGROUND Pre-clearance makes air travel easier for the millions of passengers moving between Canada and the United States each year by allowing them to be cleared for entry to the United States before departing from Canadian airports. The United States has provided pre-clearance services in major Canadian airports for more than 50 years, operating under the provisions specified in the 1974 Canada-U.S. Air Transport Pre-clearance Agreement (last updated in 1999). Pre-clearance between Canada and the U.S. is already available at eight Canadian airports (Montreal -Trudeau, Ottawa, Toronto, Halifax, Winnipeg, Edmonton, Calgary and Vancouver) While the language in the Pre-clearance Act, the enabling Canadian legislation (see Appendix A), states in the preamble that, “it has become desirable to put into place statutory authority to facilitate the movement of travelers and goods across the border between the two counties by all means of transportation” it is currently limited to air travel only. Pre-clearance would improve cross-border travel times for rail passengers by providing advanced screening at a secure facility before they cross the international border while simultaneously improving and enhancing security processes and effectiveness.
    [Show full text]
  • Utrecht New Central Station
    International Society of City and Regional Planners - ISoCaRP in cooperation with the Ministry of Transport, Public Works and Water Management The Netherlands UTRECHT NEW CENTRAL STATION YOUNG PLANNERS’ WORKSHOP 15-18 SEPTEMBER 2004 on the occasion of the 40th International Planning Congress of ISoCaRP Geneva, Switzerland 18-22 September 2004 International Society of City and Regional Planners Association Internationale des Urbanistes Internationale Gesellschaft der Stadt- und Regionalplaner Asociación Internacional de Urbanistas P.O. Box 983 2501 CZ The Hague - The Netherlands Phone: (31-70) 346 2654 Fax: (31-70) 361 7909 e-mail: [email protected] homepage: www.isocarp.org/ The Workshop and this report have been made possible with the support of the Dutch Ministry of Transport, Public Works and Water Management. COLOPHON © ISoCaRP 2005 Young Planners’ Workshop – Utrecht New Central Station Geneva, Switzerland, 2004 ISBN 90-755-2434X Editors ISoCaRP, Dutch Ministry of Transport, Public Works and Water Management (V&W) Publishing ISoCaRP and V & W Printing and CD Rom The Printer, Voorburg, Netherlands (2005) 4 Young Planners’ Workshop, 15-18 September 2004 - ISoCaRP - V&W Young Planners’ Workshops The Young Planners’ Workshop was held for the first time on the occasion of the ISoCaRP con- gress in 1991 and has always been supported by UNESCO. The objective of this Workshop is to bring together young professional urban planners from all parts of the world. It provides them with the opportunity to work together as a closely-knit team on a specific subject, to establish a good hands-on working relationship and achieve results in a very short period of time.
    [Show full text]