Hen Chennai Central Becomes the City's Transport

Total Page:16

File Type:pdf, Size:1020Kb

Hen Chennai Central Becomes the City's Transport hen Chennai Central becomes the city's transport hub Urban intermodal integration will become a reality at the station when Metro Ra il becomes fu lly operational in a few years Sunttha Sekar these corridors. ''We aTe expecting the CH ENNAI: When the Metro PUBLIC TRANSPORT N'ET WORK foo tfall at the station to run Skywalk Rai l is ready to run, the Nearly every form of public ground transport - buses and trains (suburban, inter-State and mass rapid transit system) - will be to several lakhs," says an­ Chennai Central station lin ked to the Metro Ra il stat ion at Chennai Central other official. junction will be a classic case In a joint venture, Afoons closer to of urban intermodal and Transtonnelstroy integration. bagged the contract worth reality now Nearly every form of pub­ Rs. 1.566 crore from CMRL lie ground transport - buses to construct Chennai Cen­ Special Correspondent and trains (suburban, inter­ tral Metro along with eight State and mass rapid transit other stations. CHENNAI : The city's first pe· destrian skyw-dlk is closer system-MRTS) - will be AiqlOrl check-in linked to the Metro Rail sta­ to reality wit~ the first tion at Chennai Central. ulslatiOIl phase connecting six A few years down the line, This apart, CMRL also points geltin" clearance. when Metro Rail becomes plans to introduce airport The skywalk will come operational, this point will check-in facili ty at Central UI) along Poonamallee be the ideal interconnect fo r Metro station. According to Jligb Road and connect public transport in the city, CMRL offici als. passengers fo ur points inside Govern· say Metro Rail officials. can complete check-in pro­ ment General liospital, The pace of construction cedures, collect their board· Pa rk Town railway station of Chennai Central Metro ing passes at this station, on the MRTS line. and station - the largest of the take the Metro to the air­ Evening Bazaar Road. underground stations, port, get security clearance The L·shaped facility sprawling 70,000 sq. m. al a at the terminal and board will be 600 metre!> long deplhof25 metres- isgain· the flight. and cut across Poonamal· ingground. There is a five-levellermi­ lee Il igb Road at one point. ''We arc currently con­ s.u.: SuburlHln r.1I nal Metro Rail station, The construction is ex· 1.5.: Int,r·St.t, r.1I structing the diaphragm spread over 17,300 sq. m., pected to commence in March next year. and on wall (a box-like concrete Entry/ bit to coming up at the airport. But structure around the sta­ m.t,.. st. tlon Metro Rail work at the air· completion, wiD help the tion). Simultaneously, exca­ port stands suspended as large number of patients vation work and CM RL terminated the con­ and visitors to the ho~pi­ tal. Over 13,000 pedestri. canst ruction of roof slab and • tract awarded to Lanco In· one entry/exit are also tak­ fratech Limited due to delay ans cross the road at ing place," says an official of in execution orthe work. Chennni Central during • If the work resumes soon rush hour. Chennai Metro Rail Limited (CM HL). at airport Metro station and The skywalk hIlS already its progresses as per sched­ received clearance from ~ l lIJlip l c po ints ban and MRTS stations, Ri· nience of pedestrians who parking. over three layers, built at a cost or Rs. 14,600 and the other from Chennai ule at Chennai Central Met­ Southern RailwlY, and on­ ofact."CSS pon Buildings and Rajiv may want to switch from for about 500 cars and 1,000 crore, will have two corri­ Central to st. Thomas ro station, then the ly recently, hospital au· The station will have six Gandhi Government Gener­ one mode of transport to an­ two-wheelers, according to dors - one, connecting Mount. Chennai Central airport-rail link will be a re­ thorities ga\'e in-principle entry/exit points for access al Hospital. "We will create other," the official says. officials. Washermenpet to the air­ Met ro station will be the ality in Chennai by 2015, of­ approval for the proposal. to Southern Railway, subur- foo tpaths for the conve- There will be adequate Chennai Metro Rail, being port via Chennai Central hub that will connect both ficials say. .
Recommended publications
  • Press Release NCC to Construct Public Transport Hub by E18 and Arninge
    Press release August 2, 2019 NCC to construct public transport hub by E18 and Arninge Station NCC has been commissioned by the Swedish Transport Administration to construct a weather-protected pedestrian walkway over European route E18 and the Roslagsbanan light rail line connecting the new Arninge Station with Arninge retail park. The assignment also includes redevelopment of the Arninge interchange, several new bus stops, bus lanes and water and wastewater works. The contract is valued at SEK 355 million. Arninge Station will become a public transport hub for the northeastern municipalities in Stockholm County and connect the Roslagsbanan light rail line, and the new Arninge station, with bus rapid transit (BRT) to Stockholm, Norrtälje and Vaxholm and local bus routes to Åkersberga, Vallentuna and Danderyd Hospital. Parking for bicycles and park- and-ride facilities will be build adjacent to the Arninge travel hub. NCC’s assignment includes the construction of a weather-protected pedestrian walkway over European route E18 and the Roslagsbanan light rail line, including elevators and escalators for easy and safe access to bus stops adjacent to the E18 and local buses as well as to the new Arninge station on the Roslagsbanan light rail line. “We are looking forward to a productive partnership with the Swedish Transport Administration and will place great emphasis on minimizing disruption during the construction phase. The contract encompasses the construction of new infrastructure, which will benefit public and sustainable transportation, as well as water and wastewater works, and is well aligned with the expertise we possess,” says Ingegerd Simonsson, Regional Manager NCC Infrastructure.
    [Show full text]
  • Berlin by Sustainable Transport
    WWW.GERMAN-SUSTAINABLE-MOBILITY.DE Discover Berlin by Sustainable Transport THE SUSTAINABLE URBAN TRANSPORT GUIDE GERMANY The German Partnership for Sustainable Mobility (GPSM) The German Partnership for Sustainable Mobility (GPSM) serves as a guide for sustainable mobility and green logistics solutions from Germany. As a platform for exchanging knowledge, expertise and experiences, GPSM supports the transformation towards sustainability worldwide. It serves as a network of information from academia, businesses, civil society and associations. The GPSM supports the implementation of sustainable mobility and green logistics solutions in a comprehensive manner. In cooperation with various stakeholders from economic, scientific and societal backgrounds, the broad range of possible concepts, measures and technologies in the transport sector can be explored and prepared for implementation. The GPSM is a reliable and inspiring network that offers access to expert knowledge, as well as networking formats. The GPSM is comprised of more than 150 reputable stakeholders in Germany. The GPSM is part of Germany’s aspiration to be a trailblazer in progressive climate policy, and in follow-up to the Rio+20 process, to lead other international forums on sustainable development as well as in European integration. Integrity and respect are core principles of our partnership values and mission. The transferability of concepts and ideas hinges upon respecting local and regional diversity, skillsets and experien- ces, as well as acknowledging their unique constraints. www.german-sustainable-mobility.de Discover Berlin by Sustainable Transport This guide to Berlin’s intermodal transportation system leads you from the main train station to the transport hub of Alexanderplatz, to the redeveloped Potsdamer Platz with its high-qua- lity architecture before ending the tour in the trendy borough of Kreuzberg.
    [Show full text]
  • FLUKA Meeting at ELI-Beamlines Info
    FLUKA meeting at ELI-Beamlines Info Prague, November 21-22, 2013 Arrival at the airport When entering the airport arrival hall you will find on the left a kiosk where you can buy tickets for the public transport. On the right you will find the taxi kiosk. Leaving the hall you will be on the sidewalk for the taxi, cross the street to get on the bus-stop sidewalk. Ticket vending machines are available on the sidewalk. Three buses are available to reach the city center: • 100 Has its terminus at the Zličín terminus of subway B (yellow). It makes 4 stops in between. • 119 Has its terminus at the Dejvická terminus of subway A (green). It makes 14 stops in between. • AE Goes directly from the airport to the Dejvická terminus of subway A (green) and continues to the city center with stops in Náměstí Republiky, Masarykovo nádraží, and Hlavní nádraží (central station). The AE bus requires a special ticket that can be bought on board from the driver. A 90 minutes ticket should be adequate to reach your hotels using buses 100 or 119. Please check on the Public Transport web page, www.dpp.cz/en, for more details and for an estimate of the travel time. 1 Public Transport in Prague Public transport in Prague is highly reliable. Dopravni Podnik Prahy (the transport company) has a nice web site that easily allows to look for the connection. The English version of the page can be found on the page: www.dpp.cz/en. The last metro ride leaves the terminal at midnight, after midnight only night buses are available.
    [Show full text]
  • KSP 7 Lessons from Korea's Railway Development Strategies
    Part - į [2011 Modularization of Korea’s Development Experience] Urban Railway Development Policy in Korea Contents Chapter 1. Background and Objectives of the Urban Railway Development 1 1. Construction of the Transportation Infrastructure for Economic Growth 1 2. Supply of Public Transportation Facilities in the Urban Areas 3 3. Support for the Development of New Cities 5 Chapter 2. History of the Urban Railway Development in South Korea 7 1. History of the Urban Railway Development in Seoul 7 2. History of the Urban Railway Development in Regional Cities 21 3. History of the Metropolitan Railway Development in the Greater Seoul Area 31 Chapter 3. Urban Railway Development Policies in South Korea 38 1. Governance of Urban Railway Development 38 2. Urban Railway Development Strategy of South Korea 45 3. The Governing Body and Its Role in the Urban Railway Development 58 4. Evolution of the Administrative Body Governing the Urban Railways 63 5. Evolution of the Laws on Urban Railways 67 Chapter 4. Financing of the Project and Analysis of the Barriers 71 1. Financing of Seoul's Urban Railway Projects 71 2. Financing of the Local Urban Railway Projects 77 3. Overcoming the Barriers 81 Chapter 5. Results of the Urban Railway Development and Implications for the Future Projects 88 1. Construction of a World-Class Urban Railway Infrastructure 88 2. Establishment of the Urban-railway- centered Transportation 92 3. Acquisition of the Advanced Urban Railway Technology Comparable to Those of the Developed Countries 99 4. Lessons and Implications
    [Show full text]
  • Loan 2915-Prc: Jiangxi Fuzhou Urban Integrated Infrastructure Improvement
    LOAN 2915-PRC: JIANGXI FUZHOU URBAN INTEGRATED INFRASTRUCTURE IMPROVEMENT BUS RAPID TRANSIT (BRT)/ NON-MOTORIZED TRANSPORT (NMT) DESIGN, IMPLEMENTATION AND OPERATION SUPPORT I. INTRODUCTION 1. Sustainably supporting rapid urbanization is a key development challenge for the PRC, where 300 million people are expected to move to cities by 2020. Such mass migration will require a major expansion of second-tier cities such as Jiangxi Fuzhou to relieve pressure on existing urban centers and provide economic opportunities for vast numbers of people now engaged in agriculture. Major investments in urban infrastructure, transport, and related services will be necessary to accommodate development in second-tier cities and support sustainable urbanization and inclusive growth. 2. Fuzhou is a prefectural level city in Jiangxi Province. It has a total population of 3.8 million, of which 1.0 million is urban. The Fuzhou urban district where the project is located has a current population of about 500,000 and is expected to grow to 750,000 by 2020. In 2012, the Asian Development Bank (ADB) approved a loan to support the city (i) inclusive growth and balanced development by promoting sustainable urbanization and (ii) resource efficiency and environmental sustainability by promoting efficient and sustainable urban transport. 3. The project includes the following five main outputs intended to substantially improve the urban transport system in Fuzhou. Output 1: Bus rapid transit system Output 2: Urban transport hub Output 3: Fenggang River greenway Output 4: Station access roads Output 5: Institutional strengthening and capacity building 4. Output 1: Bus rapid transit system. The BRT corridor will extend 12.2 km from the north of Fuzhou through the central business district to the urban transport hub at the new railway station (output 2).
    [Show full text]
  • Why Some Airport-Rail Links Get Built and Others Do Not: the Role of Institutions, Equity and Financing
    Why some airport-rail links get built and others do not: the role of institutions, equity and financing by Julia Nickel S.M. in Engineering Systems- Massachusetts Institute of Technology, 2010 Vordiplom in Wirtschaftsingenieurwesen- Universität Karlsruhe, 2007 Submitted to the Department of Political Science in partial fulfillment of the requirements for the degree of Master of Science in Political Science at the MASSACHUSETTS INSTITUTE OF TECHNOLOGY February 2011 © Massachusetts Institute of Technology 2011. All rights reserved. Author . Department of Political Science October 12, 2010 Certified by . Kenneth Oye Associate Professor of Political Science Thesis Supervisor Accepted by . Roger Peterson Arthur and Ruth Sloan Professor of Political Science Chair, Graduate Program Committee 1 Why some airport-rail links get built and others do not: the role of institutions, equity and financing by Julia Nickel Submitted to the Department of Political Science On October 12, 2010, in partial fulfillment of the Requirements for the Degree of Master of Science in Political Science Abstract The thesis seeks to provide an understanding of reasons for different outcomes of airport ground access projects. Five in-depth case studies (Hongkong, Tokyo-Narita, London- Heathrow, Chicago- O’Hare and Paris-Charles de Gaulle) and eight smaller case studies (Kuala Lumpur, Seoul, Shanghai-Pudong, Bangkok, Beijing, Rome- Fiumicino, Istanbul-Atatürk and Munich- Franz Josef Strauss) are conducted. The thesis builds on existing literature that compares airport-rail links by explicitly considering the influence of the institutional environment of an airport on its ground access situation and by paying special attention to recently opened dedicated airport expresses in Asia.
    [Show full text]
  • Hutong 28/F One Peking Tsim Sha Tsui, Hong Kong From
    Hutong 28/F One Peking Tsim Sha Tsui, Hong Kong From InterContinental Hong Kong From street level, find the escalators (entrance on Kowloon Park Drive) that lead up to the Mezzanine level. Turn right to find the first lift well. Then take the lift to the 28th Floor. Getting There There are a number of easy options to reach Hutong. Taxi drivers will know the name One Peking (or show them the address in Chinese: 尖沙咀北京道 1 號), a building near Victoria Harbour in Tsim Sha Tsui. Once you get to One Peking in Tsim Sha Tsui, there are 2 ways up to the Hutong. From street level, find the escalators (entrance on Kowloon Park Drive) that lead up to the Mezzanine level. Turn right to find the first lift well. Then take the lift to the 28th Floor. Via the underground at MTR Exit L5. Take the lift up to the Mezzanine level. Make your way around to the first lift well to your right. Then take the lift to the 28th Floor. From Central Via the MTR (Central Station) (10 minutes) 1. Take the Tsuen Wan Line [Red] towards Tsuen Wan 2. Alight at Tsim Sha Tsui Station 3. Take Exit L5 straight to the entrance of One Peking building 4. Take the lift to the 28th Floor Via the Star Ferry (Central Pier) (15 mins) 1. Take the Star Ferry toward Tsim Sha Tsui 2. Disembark at Tsim Sha Tsui pier and follow Sallisbury Road toward Kowloon Park 3. Drive crossing Canton Road 4. Turn left onto Kowloon Park Drive and walk toward the end of the block, the last building before the crossing is One Peking 5.
    [Show full text]
  • Germany Berlin Tiergarten Tunnel Verkehrsanlagen Im Zentralen
    Germany Berlin Tiergarten Tunnel Verkehrsanlagen im zentralen Bereich – VZB This report was compiled by the German OMEGA Team, Free University Berlin, Berlin, Germany. Please Note: This Project Profile has been prepared as part of the ongoing OMEGA Centre of Excellence work on Mega Urban Transport Projects. The information presented in the Profile is essentially a 'work in progress' and will be updated/amended as necessary as work proceeds. Readers are therefore advised to periodically check for any updates or revisions. The Centre and its collaborators/partners have obtained data from sources believed to be reliable and have made every reasonable effort to ensure its accuracy. However, the Centre and its collaborators/partners cannot assume responsibility for errors and omissions in the data nor in the documentation accompanying them. 2 CONTENTS A PROJECT INTRODUCTION Type of project Project name Description of mode type Technical specification Principal transport nodes Major associated developments Parent projects Country/location Current status B PROJECT BACKGROUND Principal project objectives Key enabling mechanisms Description of key enabling mechanisms Key enabling mechanisms timeline Main organisations involved Planning and environmental regime Outline of planning legislation Environmental statements Overview of public consultation Ecological mitigation Regeneration Ways of appraisal Complaints procedures Land acquisition C PRINCIPAL PROJECT CHARACTERISTICS Detailed description of route Detailed description of main
    [Show full text]
  • Railway Stations Adapting to Future Society Railway Stations Adapting to Future Society
    Railway Stations ADAPTING TO FUTURE SOCIETY Railway Stations ADAPTING TO FUTURE SOCIETY CONTENTS 3 FOREWORD BY UIC DIRECTOR-GENERAL 5 UIC STATION MANAGERS GLOBAL GROUP 7 HISTORY OF STATIONS: EVOLUTION OF THE CONCEPT 03 MODEL OF STATION CONCEPT 11 OPERATION faCELIFT: MAJOR PROJECTS STATION RENOvaTION POLICIES, TRENDS AND CHALLENGES 60 A QUICK LOOK AT SOME STATIONS AROUND THE WORLD... 70 BIBLIOGRAPHY Railway Stations ADAPTING TO FUTURE SOCIETY FOREWORD BY UIC DIRECTOR-GENERAL JEAN-PIERRE LOUBINOUX tations emerged alongside railways, as the Stations have gradually become organised, transfor- In the visual representations you will see the chan- staging-posts of this new industrial era. med and developed to host all those passing through ging relationships between station stakeholders. They increased in number as railways deve- – whether travellers or not – and to offer board, lod- As well as a depiction of how the concept of a “sta- loped into networks that, in turn, could only ging, or other everyday services. And since we must tion” has changed over time and the interaction Sdevelop alongside stations. From the outset, stations always go via somewhere in order to go anywhere, between stations and their urban environment, two 3 have been essential to the departure, the passage stations have become an interface between all the slides explain complex phenomena which vary ac- and the arrival of trains, and to the ebb and flow of various modes of mobility – trains, metro, buses, cars cording to the context and reality of each country all the travellers they carry. A railway network can and bicycles. They have thus become mediators and and even each station, all focusing on a complex web be seen as lines irrigating a geographical area in the organisers of daily mobility.
    [Show full text]
  • Tuřany Prague Other Cities
    How do you get to the Hotel Internations? The hotel is located in the center of Brno, accessible by all means of transport. By car, it is only 15 minutes and less than 12 kilometers from Tuřany Airport, or 10 minutes walk to the main train or bus station. From Tuřany Airport Tuřany STOPS Airport — before the departure hall Brno, Central station (CZ Hlavní nádraží) — bus stop in front of the Grand Hotel SALES OF TICKETS BUS automatic in the arrival hall newspaper and magazine store E76 Airport Brno — Central station (AirportShop) (CZ Hlavní nádraží) (driving time 20 in the bus with a contactless credit card minutes) Driver (payment in Euro) N89 Airport Brno — Central station TICKET PRISE (CZ Hlavní nádraží) - (Night line, traffic the ticket price for an adult is 25 CZK from 23:00 to 5:00 (driving time 20 minutes) Click for TAXI order a taxi City Taxi Brno https://www.citytaxibrno.cz/en/ From Prague Airport to Brno Prague BUS https://www.regiojet.com INFO The RegioJet and Flixbus buses stop directly in front of Terminal 1 (underneath the link to Terminal 2). https://global.flixbus.com BUS Airport Express The Airport Express buses provide a direct TRAIN connection between Prague Airport and Prague Central Station, where they stop right Connection from the Airport 1 in front of the station building. to Prague Central Station driving time 25 minutes direct transfer to trains 2 From Prague Main Station you will continue by train to Brno. 3 Carrier: https://www.cd.cz/en/ https://www.leoexpress.com/en Connections from other cities FlixBus GoEuro CheckMyBus Leo Express RegioJet České dráhy Other cities WELCOME TO BRNO CREDIT MATTERS VIII .
    [Show full text]
  • Visual Analytics for Understanding Traffic Flows of Transport Hubs from Movement Data
    Visual Analytics for Understanding Traffic Flows of Transport Hubs from Movement Data Linfang Ding, Jian Yang, Liqiu Meng Lehrstuhl für Kartographie, Technische Universität München Abstract. Transport hubs such as airports, railway stations play an im- portant role in the transportation system and urban development. Under- standing the traffic flows of the transport hubs may help traffic engineers and policy makers to improve the transportation planning and support pas- sengers to efficiently plan their trips. However, analyzing the movement data is very challenging due to their large data volume, implicit spatiotem- poral relationship, and uncertain semantics. In this paper, we investigate effective visual analytics for exploring spatiotemporal, semantic patterns in the traffic flows in/out of the transport hubs. The contribution of this work is three fold: (1) we propose a visual analysis workflow incorporating data mining techniques and visualization methods to enable users visually ex- plore the spatiotemporal and semantic patterns in the traffic flows in/out of the transport hubs; (2) we use a spatial clustering method to extract signifi- cant places and categorize them to different functional regions based on the POI information; (3) we design a novel visual interface that enables the visual exploration of movement data at both an aggregated and an individ- ual level. The visual analytics framework is tested on a real world floating taxi data set in Shanghai. Preliminary experiments show that our proposed framework is feasible and can effectively support visual exploration and identify interesting traffic flow patterns. Keywords: Visual analytics, Traffic flow, Transport hubs 1. Introduction Transport hubs such as airports, railway stations play an important role in the transportation system and urban development.
    [Show full text]
  • Boston-Montreal High Speed Rail Project
    Boston to Montreal High- Speed Rail Planning and Feasibility Study Phase I Final Report prepared for Vermont Agency of Transportation New Hampshire Department of Transportation Massachusetts Executive Office of Transportation and Construction prepared by Parsons Brinckerhoff Quade & Douglas with Cambridge Systematics Fitzgerald and Halliday HNTB, Inc. KKO and Associates April 2003 final report Boston to Montreal High-Speed Rail Planning and Feasibility Study Phase I prepared for Vermont Agency of Transportation New Hampshire Department of Transportation Massachusetts Executive Office of Transportation and Construction prepared by Parsons Brinckerhoff Quade & Douglas with Cambridge Systematics, Inc. Fitzgerald and Halliday HNTB, Inc. KKO and Associates April 2003 Boston to Montreal High-Speed Rail Feasibility Study Table of Contents Executive Summary ............................................................................................................... ES-1 E.1 Background and Purpose of the Study ............................................................... ES-1 E.2 Study Overview...................................................................................................... ES-1 E.3 Ridership Analysis................................................................................................. ES-8 E.4 Government and Policy Issues............................................................................. ES-12 E.5 Conclusion..............................................................................................................
    [Show full text]