Mechanical (Wind and Water, the Modern Version) Can’T Wring More Power out of Existing Consumption of Coal

Total Page:16

File Type:pdf, Size:1020Kb

Mechanical (Wind and Water, the Modern Version) Can’T Wring More Power out of Existing Consumption of Coal GEOS 24705 / ENST 24705 Lecture 11: mechanical -> mechanical (wind and water, the modern version) Can’t wring more power out of existing consumption of coal Electricity production is growing… but steam turbines no longer growing in efciency Note: * exponential growth in several stages * topping-out of steam P and T ca. 1960 * Still well below Carnot limit - intrinsic to Rankine cycle? - unnecessary waste heat in condensation stage? - turbine design? From Vaclav Smil, “Energy at the Crossroads” … but steam turbines no longer increasing in efciency From Vaclav Smil, “Energy at the Crossroads” Hydro close to maxed out Largest renewable but not much room for growth, efciencies optimized by mid-1800s EIA, DOE Use: Right now hydro is ~3 QuadBTU/~100 = 3% of U.S. energy use So 300 W / person (given that average power use is 10,000 W Each U.S. person has > 5 acres ~ 20,000 m2, lets say ~30,000 m2 Hydro use is therefore right now ~ 1 W/1000 m2 = .01 W/m2 Total possible in extreme unrealistic conditions (trap every raindrop in U.S.): 1 m rain/yr = 1 m3/m2 rain @ 1g/cm3 = 1M g/m3 = 1000 kg/m3 -> rainfall is 1000 kg/m2*yr Potential energy of 1 kg water behind 100 m dam is mgh = 1000 J Power = 106 J/m2 in 1 yr or 106/(365.*24*3600.) W/m2 = (1/3)*106/107 = .03 W/m2 Wind increasing sharply Far less important at present, but more potential growth World Resources Institute, from IEA data Pros and cons of hydro Pros • CO2-free (nearly) • Low maintenance over long life • .. and zero fuel cost.. • … means in long term is extremely cheap and simple energy source • Infinitely schedulable – fast turn-on • Reliable (compared to e.g. wind, solar) Cons • Environmentally destructive • Socially destructive • Capacity not ultimately great enough to meet all world’s energy needs Hydro has high capital cost (> $1000/kW) but long life and low operating costs Can go even higher, to $3000/ kW for dam and hydro system. So hydro install cost is $1-3/W, more than most fossil plants. But given hydro stations’ long life and low operating cost, hydro has lowest average cost of electricity of all generation options. Figure: source unknown No hydro or wind turbine looks like a gas turbine Why not? Physics of hydro and wind turbines All designed to use flowing fluid to rotate something Yet enormous diversity of designs – what governs the choice? Criteria driving turbine design • Velocity (v) • And/or initial pressure of fluid (P) • (and whether you can control fluid pressure) • And/or density of fluid (ρ) v, P, and ρ all contribute to energy density of fluid Turbines can extract energy via: • Changing speed of fluid – “impulse” • Changing pressure of fluid – “reaction” … and in fact you can trade of between these when you manipulate your flow … or can design a turbine that combines strategies Why are dams so important in hydro power? Because raising head allows harnessing energy that is otherwise lost during flow of river Entire Amazon in run- of-river mode would produce 10x less power than single dam on Columbia River Hydro turbine design set by flow rate and pressure Note that you can “head” = dam height. get the same amount of power All these turbines from high head and are used with dams low flow (a small or other confining amount of high- structures to energy fluid), or from increase pressure, low head and high as opposed to free flow (a large amount “run-of-river” of low-energy fluid). Three main types of hydro turbines 1. Pelton 2. Francis 3. Kaplan 4. plus various free-stream turbines (very low head) Pelton, Kaplan, and Francis turbines HydroTurbineAnimation 1. Pelton wheel: impulse turbine (high head: up to 1000 m) The direct descendent of the water wheel… Turbine turns in air, impelled by water from nozzle – same principle as steam or gas turbine, except the nozzle sprays a liquid (water) instead of a gas (steam or air) Direct heritage from water-wheel, but uses nozzle rather than just falling water Can be quite large, up to 300 MW (vs. 1 GW for Francis) 1. Pelton wheel: impulse turbine (high head: up to 1000 m... ...or low flow in “run-of-river” mode) Note that even in micro-hydro use (defined as < 1 KW), control fluid pressure and velocity with inlet nozzles. Although used as a “run-of- river” turbine, don’t just put it in the water and let it spin. Spinning in air is much more efficient, so needs sealed box. Nozzles and a box are fairly cheap and simple. For electric generation, micro- hydro can’t generate 60 Hz AC but is OK for DC generation. Can’t generate enough power to match American lifestyle but can bring some power to areas where there is none. 2. Francis turbine: reaction turbine (medium head: 10 - 500 m) Design – 1848, James Francis, for Lowell Mills. 90% efciency First hydroelectric plant in U.S. was a waterwheel in New York, 1869.. But 25 years later the Niagara Falls plant (where Tesla established primacy of AC power) used Francis turbines Francis turbines are now the workhorse of modern hydro – overwhelming majority Vertical axis, like oldest of waterwheels Radial (inwards) flow into runner Energy extracted via drop in pressure. Velocity ~ constant in turbine til draft tube Hydro is topped out in efciency but getting bigger for cost… Efciency of scale lowers cost Francis turbine runner from Three Gorges Dam project, China (900 MW) Runner is only small part of entire turbine assembly Francis turbine runner from Grand Coulee Dam (L) Design questions: Why does input spiral decrease in radius? Because flow is radial – water is flowing in to center and actually lost What is function of draft tube? Why does that fan outwards? To produce slow-down of motion and drop in pressure (it’s an anti-nozzle), which cutaway from Voith-Siemens extracts last possible energy from fluid. Runner is only small part of entire turbine assembly Francis turbine intake spiral from Grand Coulee Dam Hydro power plant operation Three Gorges Dam Animation Three Gorges: Currently largest hydropower system in operation: 2 dams, > 21 GW total capacity now, to exceed 25 GW China is already largest hydropower producer in the world Most of new mega-size hydropower projects under construction are in China Why? Lots of people, low (current) per capita energy use, limited energy sources – already buy coal from Australia. 3. Kaplan turbine: reaction turbine (low head: 2-30 m) Vertical axis, inward radial flow like Francis … but starts to look like a propeller Granite Canal Hydroelectric Project, Newfoundland Running wheel of a Kaplan turbine made by Tampella, year 1950, photograph V.O. Kanninen 4. Free-stream: impulse turbines If have a casing, can get a bit of p control, but pressure changes are small. Fully impulse turbines start to look a lot like wind turbines…since they operate similarly, extracting kinetic energy only from a low-energy-density fluid Bulb turbine, La Rance tidal plant, St. Malo, France (Research Institute for Sustainable Energy, figure originally from Boyle, 1996). Here there may be some pressure control via the casing, making this a mixed impulse-reaction turbine (both p and v drop across the turbine). Artist’s rendition of marine current turbine for extracting energy from tidal flows (Tidal Stream Inc.). No casing, so no control of pressure at all. Note that is turning in water, unlike Pelton wheel – simpler but less efficient. 4. Free-stream turbine: impulse only If no casing, no pressure-sealed box, then really start to look a lot like wind turbines… but seem 10 x less powerful Vertical axis wind turbine with permanent-magnet DC generator: 500 W, 24 Volt VAWT Darrieus variant known as a Giromill. 4 foot diameter, 20.8A, 24 V. Start up wind speed is 3 m/s (around 7mph), and the rated “EnCurrent” in-stream run-of-river hydro turbine with wind speed is 13 m/s. $1500 permanent-magnet DC generator, 5 kW, optional grid tie AC converter, for sale by ABS Alaskan, $28,000 ($3/W rated before installation, and that is for rated wind only – actual capacity will be much much less, pushing to $10-100/W… ($6/W purchase cost before installation – not a cheap option) see wind lecture to follow) Questions: Why does a similar wind turbine seem lower-power than a similar hydro turbine? Why are most powerful wind turbines in general so much smaller than biggest hydro? (7 MW vs. > 1 GW) Why are wind turbines so large in size? .
Recommended publications
  • Vol2 Case History English(1-206)
    Renewal & Upgrading of Hydropower Plants IEA Hydro Technical Report _______________________________________ Volume 2: Case Histories Report March 2016 IEA Hydropower Agreement: Annex XI AUSTRALIA USA Table of contents㸦Volume 2㸧 ࠙Japanࠚ Jp. 1 : Houri #2 (Miyazaki Prefecture) P 1 㹼 P 5ۑ Jp. 2 : Kikka (Kumamoto Prefecture) P 6 㹼 P 10ۑ Jp. 3 : Hidaka River System (Hokkaido Electric Power Company) P 11 㹼 P 19ۑ Jp. 4 : Kurobe River System (Kansai Electric Power Company) P 20 㹼 P 28ۑ Jp. 5 : Kiso River System (Kansai Electric Power Company) P 29 㹼 P 37ۑ Jp. 6 : Ontake (Kansai Electric Power Company) P 38 㹼 P 46ۑ Jp. 7 : Shin-Kuronagi (Kansai Electric Power Company) P 47 㹼 P 52ۑ Jp. 8 : Okutataragi (Kansai Electric Power Company) P 53 㹼 P 63ۑ Jp. 9 : Okuyoshino / Asahi Dam (Kansai Electric Power Company) P 64 㹼 P 72ۑ Jp.10 : Shin-Takatsuo (Kansai Electric Power Company) P 73 㹼 P 78ۑ Jp.11 : Yamasubaru , Saigo (Kyushu Electric Power Company) P 79 㹼 P 86ۑ Jp.12 : Nishiyoshino #1,#2(Electric Power Development Company) P 87 㹼 P 99ۑ Jp.13 : Shin-Nogawa (Yamagata Prefecture) P100 㹼 P108ۑ Jp.14 : Shiroyama (Kanagawa Prefecture) P109 㹼 P114ۑ Jp.15 : Toyomi (Tohoku Electric Power Company) P115 㹼 P123ۑ Jp.16 : Tsuchimurokawa (Tokyo Electric Power Company) P124㹼 P129ۑ Jp.17 : Nishikinugawa (Tokyo Electric Power Company) P130 㹼 P138ۑ Jp.18 : Minakata (Chubu Electric Power Company) P139 㹼 P145ۑ Jp.19 : Himekawa #2 (Chubu Electric Power Company) P146 㹼 P154ۑ Jp.20 : Oguchi (Hokuriku Electric Power Company) P155 㹼 P164ۑ Jp.21 : Doi (Chugoku Electric Power Company)
    [Show full text]
  • Assessing Hydraulic Conditions Through Francis Turbines Using an Autonomous Sensor Device
    Renewable Energy 99 (2016) 1244e1252 Contents lists available at ScienceDirect Renewable Energy journal homepage: www.elsevier.com/locate/renene Assessing hydraulic conditions through Francis turbines using an autonomous sensor device * Tao Fu, Zhiqun Daniel Deng , Joanne P. Duncan, Daqing Zhou, Thomas J. Carlson, Gary E. Johnson, Hongfei Hou Pacific Northwest National Laboratory, Energy & Environment Directorate, Richland, WA 99352, United States article info abstract Article history: Fish can be injured or killed during turbine passage. This paper reports the first in-situ evaluation of Received 6 February 2016 hydraulic conditions that fish experienced during passage through Francis turbines using an autonomous Accepted 9 August 2016 sensor device at Arrowrock, Cougar, and Detroit Dams. Among different turbine passage regions, most of Available online 19 August 2016 the severe events occurred in the stay vane/wicket gate and the runner regions. In the stay vane/wicket gate region, almost all severe events were collisions. In the runner region, both severe collisions and Keywords: severe shear events occurred. At Cougar Dam, at least 50% fewer releases experienced severe collisions in Francis turbine the runner region operating at peak efficiency than at the minimum and maximum opening, indicating Turbine evaluation Fish-friendly turbine the wicket gate opening could affect hydraulic conditions in the runner region. A higher percentage of Turbine passage releases experienced severe events in the runner region when passing through the Francis turbines than Turbine operations through an advanced hydropower Kaplan turbine (AHT) at Wanapum Dam. The nadir pressures of the three Francis turbines were more than 50% lower than those of the AHT.
    [Show full text]
  • Hydropower Technologies Program — Harnessing America’S Abundant Natural Resources for Clean Power Generation
    U.S. Department of Energy — Energy Efficiency and Renewable Energy Wind & Hydropower Technologies Program — Harnessing America’s abundant natural resources for clean power generation. Contents Hydropower Today ......................................... 1 Enhancing Generation and Environmental Performance ......... 6 Large Turbine Field-Testing ............................... 9 Providing Safe Passage for Fish ........................... 9 Improving Mitigation Practices .......................... 11 From the Laboratories to the Hydropower Communities ..... 12 Hydropower Tomorrow .................................... 14 Developing the Next Generation of Hydropower ............ 15 Integrating Wind and Hydropower Technologies ............ 16 Optimizing Project Operations ........................... 17 The Federal Wind and Hydropower Technologies Program ..... 19 Mission and Goals ...................................... 20 2003 Hydropower Research Highlights Alden Research Center completes prototype turbine tests at their facility in Holden, MA . 9 Laboratories form partnerships to develop and test new sensor arrays and computer models . 10 DOE hosts Workshop on Turbulence at Hydroelectric Power Plants in Atlanta . 11 New retrofit aeration system designed to increase the dissolved oxygen content of water discharged from the turbines of the Osage Project in Missouri . 11 Low head/low power resource assessments completed for conventional turbines, unconventional systems, and micro hydropower . 15 Wind and hydropower integration activities in 2003 aim to identify potential sites and partners . 17 Cover photo: To harness undeveloped hydropower resources without using a dam as part of the system that produces electricity, researchers are developing technologies that extract energy from free flowing water sources like this stream in West Virginia. ii HYDROPOWER TODAY Water power — it can cut deep canyons, chisel majestic mountains, quench parched lands, and transport tons — and it can generate enough electricity to light up millions of homes and businesses around the world.
    [Show full text]
  • Low Head Hydro Market Assessment Volume 1
    Natural Resources Canada Hydraulic Energy Group Renewable Energy Technologies Sustainable Buildings and Communities CANMET Energy Technology Centre (CETC) 580 Booth Street, 13th Floor Ottawa, Ontario K1A 0E4 Low Head Hydro Market Assessment Volume 1 - Main Report Final H-327842 Rev 0 March 2008 Natural Resources Canada - Low Head Hydro Market Assessment Volume 1 - Main Report Volume 2 - Appendices H-327842.201.01, Rev. 0 Low Head Market Assess - Mainreport.Doc © Hatch 2006/03 a Natural Resources Canada - Low Head Hydro Market Assessment Main Report Table of Contents Report and Estimate Disclaimer List of Acronyms/Abbreviations Hydropower Glossary List of Tables List of Figures 1. Introduction ......................................................................................................................................... 1-1 1.1 Background................................................................................................................................. 1-2 2. Small and Low Head Hydro ................................................................................................................. 2-1 2.1 Small Hydro Defined .................................................................................................................. 2-1 2.2 Low Head Hydro Defined........................................................................................................... 2-1 2.3 Run-of-River Defined .................................................................................................................. 2-2
    [Show full text]
  • TURBOMACHINE NOTES 15ME53 TURBO MACHINES Subject Code
    TURBOMACHINE NOTES 15ME53 TURBO MACHINES Subject Code: 15ME53 IA Marks: 20 Hours/Week: 05 Exam Hours: 03 Total Hours: 50 Exam Marks: 80 Module - I Introduction: Definition of turbo machine, parts of turbo machines, Comparison with positive displacement machines, Classification, Dimensionless parameters and their significance, Effect of Reynolds number, Unit and specific quantities, model studies. (Note: Since dimensional analysis is covered in Fluid Mechanics subject, questions on dimensional analysis may not be given. However, dimensional parameters and model studies may be given more weightage.) Thermodynamics of fluid flow: Application of first and second law of thermodynamics to turbo machines, Efficiencies of turbo machines, Static and Stagnation states, Incompressible fluids and perfect gases, overall isentropic efficiency, stage efficiency (their comparison) and polytropic efficiency for both compression and expansion processes. Reheat factor for expansion process. 10 Hours expansion process Module –II Energy exchange in Turbo machines: Euler’s turbine equation, Alternate form of Euler’s turbine equation, Velocity triangles for different values of degree of reaction, Components of energy transfer, Degree of Reaction, utilization factor, Relation between degree of reaction and Utilization factor, Problems. General Analysis of Turbo machines: Radial flow compressors and pumps – general analysis, Expression for degree of reaction, velocity triangles, Effect of blade discharge angle on energy transfer and degree of reaction, Effect of blade discharge angle on performance, Theoretical head – capacity relationship, General analysis of axial flow pumps and compressors, degree of reaction, velocity triangles, Problems. 10 Hours Module –III Steam Turbines: Classification, Single stage impulse turbine, condition for maximum blade efficiency, stage efficiency, Need and methods of compounding, Multi-stage impulse turbine, expression for maximum utilization factor.
    [Show full text]
  • Guideline and Manual for Hydropower Development Vol. 2 Small Scale Hydropower
    Guideline and Manual for Hydropower Development Vol. 2 Small Scale Hydropower March 2011 Japan International Cooperation Agency Electric Power Development Co., Ltd. JP Design Co., Ltd. IDD JR 11-020 TABLE OF CONTENTS Part 1 Introduction on Small Scale Hydropower for Rural Electrification Chapter 1 Significance of Small Scale Hydropower Development ..................................... 1-1 Chapter 2 Objectives and Scope of Manual ......................................................................... 2-1 Chapter 3 Outline of Hydropower Generation ..................................................................... 3-1 Chapter 4 Rural Electrification Project by Small-Scale Hydropower ................................. 4-1 Part 2 Designation of the Area of Electrification Chapter 5 Selection of the Area of Electrification and Finding of the Site .......................... 5-1 Part 3 Investigation, Planning, Designing and Construction Chapter 6 Social Economic Research .................................................................................. 6-1 Chapter 7 Technical Survey ................................................................................................. 7-1 Chapter 8 Generation Plan ................................................................................................... 8-1 Chapter 9 Design of Civil Structures ................................................................................... 9-1 Chapter 10 Design of Electro-Mechanical Equipment .........................................................
    [Show full text]
  • Renewable Electricity Generation and Storage Technologies Futures Study
    Volume 2 of 4 Renewable Electricity Renewable Electricity Generation and Storage Technologies Futures Study Volume 1 Volume 2 Volume 3 Volume 4 PDF PDF PDF PDF NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. Renewable Electricity Futures Study Edited By Hand, M.M. Baldwin, S. DeMeo, E. National Renewable U.S. Department of Renewable Energy Energy Laboratory Energy Consulting Services, Inc. Reilly, J.M. Mai, T. Arent, D. Massachusetts Institute of National Renewable Joint Institute for Strategic Technology Energy Laboratory Energy Analysis Porro, G. Meshek, M. Sandor, D. National Renewable National Renewable National Renewable Energy Laboratory Energy Laboratory Energy Laboratory Suggested Citations Renewable Electricity Futures Study (Entire Report) National Renewable Energy Laboratory. (2012). Renewable Electricity Futures Study. Hand, M.M.; Baldwin, S.; DeMeo, E.; Reilly, J.M.; Mai, T.; Arent, D.; Porro, G.; Meshek, M.; Sandor, D. eds. 4 vols. NREL/TP-6A20-52409. Golden, CO: National Renewable Energy Laboratory. http://www.nrel.gov/analysis/re_futures/. Volume 2: Renewable Electricity Generation and Storage Technologies Augustine, C.; Bain, R.; Chapman, J.; Denholm, P.; Drury, E.; Hall, D.G.; Lantz, E.; Margolis, R.; Thresher, R.; Sandor, D.; Bishop, N.A.; Brown, S.R.; Cada, G.F.; Felker, F.; Fernandez, S.J.; Goodrich, A.C.; Hagerman, G.; Heath, G.; O’Neil, S.; Paquette, J.; Tegen, S.; Young, K. (2012). Renewable Electricity Generation and Storage Technologies. Vol 2. of Renewable Electricity Futures Study. NREL/TP-6A20-52409-2. Golden, CO: National Renewable Energy Laboratory. Chapter 6.
    [Show full text]
  • Demand-Side Management Guidebook: Renewable and Distributed Energy Technologies
    enewable & Distributed Energy Tech no R lo g ie s R e n e w a b l e & D i s t r i b u t e d E n e r g y T e c h n o l o g i e s R e n e w a - b l e w & e D n i e s R t r s i b e i u g t e o l d o E n n h e c r e g T y Renewable and Distributed Energy Technologies Energy Distributed and Renewable Demand-Side Management Guidebook: Management Demand-Side enewable & Distributed Energy Tech no R lo g ie s R e n e w sarily state or reflect those of the United States government or any agency thereof. agency any or government States United the of those reflect or state sarily a b - government or any agency thereof. The views and opinions of authors expressed herein do not neces not do herein expressed authors of opinions and views The thereof. agency any or government l e not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States States United the by favoring or recommendation, endorsement, its imply or constitute necessarily not & commercial product, process, or services by trade name, trademark, manufacturer, or otherwise does does otherwise or manufacturer, trademark, name, trade by services or process, product, commercial or represents that its use would not infringe privately owned rights. Reference herein to any specific specific any to herein Reference rights.
    [Show full text]
  • Hydraulic Turbines and Auxiliary Equipment
    BR01B1848 ETDE-BR--0278 Hydraulic Turbines and Auxiliary Equipment Reporter: Mr. Luo Gaorong Deputy Director of International Centre of PCH of ONU in China .. Small Hydro Power in China L The Procedures of Small Hydro Power (SHP) Construction 1. The SHP Planning 1.1. The planning of middle and small rivers. Since all SHP stations are built on middle and small rivers, it is necessary to mnduct river planning before the SHP design, which shall be in accordance with multipurpose water resources utilization and cascade optimal development. To be more specific, river planning should take such purposes into account, namely, flood control, water supply, navigation, power generation, environmental protection, natural scene improvement, improvement of surviving conditions of human being, etc so as to develop water resources fully and rationally. At present, most rivers in China have been planned and the planning can be modified annually according to the social and economic development. The planning can be accomplished by water conse~ancy bureaus (departments) at the provincial, prefectural or county level as the river basin varies. 1.2. The planning of rural grid. Most SHP has been incorporated into the rural grid, so the electricity demand of the grid and load forecasting determine the SHP development. At present, most rural SHP grids face such a contradiction, i.e. abundant electricity during the flood season vs. electricity shortage during dry season, which can be relaxed a little bit by exchanging electricity with the national grid. So constructing SHP stations with yearly regulating reservoir has become a priority, 1.3. The SHP planning.
    [Show full text]
  • Turbine Wheel-A Hydropower Converter for Head Differences
    University of Southampton Research Repository ePrints Soton Copyright © and Moral Rights for this thesis are retained by the author and/or other copyright owners. A copy can be downloaded for personal non-commercial research or study, without prior permission or charge. This thesis cannot be reproduced or quoted extensively from without first obtaining permission in writing from the copyright holder/s. The content must not be changed in any way or sold commercially in any format or medium without the formal permission of the copyright holders. When referring to this work, full bibliographic details including the author, title, awarding institution and date of the thesis must be given e.g. AUTHOR (year of submission) "Full thesis title", University of Southampton, name of the University School or Department, PhD Thesis, pagination http://eprints.soton.ac.uk School of Civil Engineering and the Environment Turbine wheel - a hydropower converter for head differences between 2.5 and 5 m Ph.D Thesis Helmizar Supervisors: Dr.Gerald Müller February 2016 2 CONTENTS Academic Thesis: Declaration Of Authorship ......................................................................... 18 Acknowledgments.................................................................................................................... 19 Abstract .................................................................................................................................... 20 Chapter 1 .................................................................................................................................
    [Show full text]
  • Francis Turbines 1
    voith.com Francis Turbines 1 Cover picture Francis Runner, Workshop, Brazil Harnessing the power of water with engineered reliability Generating electricity from the power of water represents large amounts of clean, renewable energy. 71 percent of the earth’s surface is covered by water. The world’s hydropower potential amounts to 20 billion Megawatt hours per year and only 25 percent of this has been developed so far. 2 1 2 3 1 Xi Luo Duo, China 2 Omkareshwar, India 3 San Esteban II, Spain Engineered reliability Competence and capabilities Is our promise to our customers. Voith’s • Consulting, engineering, erection • Frequency converters, protection products and services are designed and commissioning systems, switchyards for all voltages, specifically for our customers’ needs. • System/plant assessments transformers We always work efficiently and econom- • HyService – global, fast and effective • Power plant automation, control ically and, above all, following our for modernization and rehabilitation centers for hydropower plants and values and visions for sustainable of existing hydroelectric power plants cascades, including plant manage- hydropower solutions. • Complete equipment, installation ment and diagnostic systems and services for hydroelectric power • Shut-off valves plants • Integrated Management System to • Francis, Pelton, Kaplan, Bulb /Pit / safeguard excellence and quality S-turbines, pump-turbines, standard and customized products • Storage pumps, radial, semi-axial and axial-flow pumps • Generators and motor-generators for constant and adjustable speed, excitation systems 3 Characteristics From the beginning, Francis turbine development has always been synonymous with Voith. With decades of continuous optimiza- Our Francis turbines, including the tion based on the latest hydro-dynamic world’s largest and most powerful, are research, well over half the turbines in service around the globe.
    [Show full text]
  • Utilization of Cfd Tools in the Design Process of a Francis Turbine
    UTILIZATION OF CFD TOOLS IN THE DESIGN PROCESS OF A FRANCIS TURBINE A THESIS SUBMITTED TO THE GRADUATE SCHOOL OF NATURAL AND APPLIED SCIENCES OF MIDDLE EAST TECHNICAL UNIVERSITY BY GİZEM OKYAY IN PARTIAL FULFILLMENT OF THE REQUIREMENTS FOR THE DEGREE OF MASTER OF SCIENCE IN CIVIL ENGINEERING SEPTEMBER 2010 Approval of the thesis: UTILIZATION OF CFD TOOLS IN THE DESIGN PROCESS OF A FRANCIS TURBINE submitted by GİZEM OKYAY in partial fulfillment of the requirements for the degree of Master of Science in Civil Engineering Department, Middle East Technical University by, Prof. Dr. Canan Özgen Dean, Graduate School of Natural and Applied Sciences ____________ Prof. Dr. Güney Özcebe Head of Department, Civil Engineering ____________ Assoc. Prof. Dr. İsmail Aydın Supervisor, Civil Engineering Dept., METU ____________ Prof. Dr. Metin Ger Co-Supervisor, Civil Engineering Dept., IKU ____________ Examining Committee Members Assoc. Prof. Dr. Zafer Bozkuş Civil Engineering Dept., METU ____________ Assoc. Prof. Dr. İsmail Aydın Supervisor, Civil Engineering Dept., METU ____________ Prof. Dr. Metin Ger Co-Supervisor, Civil Engineering Dept., IKU ____________ Asst. Prof. Dr. Selin Aradağ Çelebioğlu Mechanical Engineering Dept., TOBB ETU ____________ Dr. Kutay Çelebioğlu Civil Engineer, General Manager, SU-ENER ____________ Date: ____________ I hereby declare that all information in this document has been obtained and presented in accordance with academic rules and ethical conduct. I also declare that, as required by these rules and conduct, I have fully cited and referenced all material and results that are not original to this work. Name, Last name : Gizem Okyay Signature : iii ABSTRACT UTILIZATION OF CFD TOOLS IN THE DESIGN PROCESS OF A FRANCIS TURBINE OKYAY, Gizem M.Sc., Department of Civil Engineering Supervisor: Assoc.
    [Show full text]