October 2010 State Election to Test Transport Policy As November’S State Election Approaches, Calls for the Area Having No Regular Transport Service

Total Page:16

File Type:pdf, Size:1020Kb

October 2010 State Election to Test Transport Policy As November’S State Election Approaches, Calls for the Area Having No Regular Transport Service N e w s Public Transport Users Association www.ptua.org.au ISSN 0817–0347 Volume 34 No. 4 October 2010 State election to test transport policy As November’s State election approaches, calls for the area having no regular transport service. Local me- an overhaul of public transport management are dia report that schoolchildren waiting to catch the new growing in volume, and still more stories of failure service on the first day of term were left stranded as a are biting the government. result of this bureaucratic bungle. The PTUA’s long-standing call for an independent pub- Apparently, the local community had been forced into lic authority to plan public transport is now firmly en- convincing the private operator to run the service (at its trenched in the political and news agenda, ever since own risk) after failing to get action from DoT bureau- the Victorian Greens pledged in August to create such crats. This is another case where a planning authority, an authority as part of their election platform. Trans- with a set of universally applicable service standards port spokesman and upper house MP Greg Barber is and a board that meets in public, would have produced regularly quoted raising the issue of a planning author- an outcome better reflecting the community’s wishes. ity in the media, alongside calls for services every 10 Meanwhile, there is no danger of any risk being faced minutes, and pointing out—along with the Liberal / Na- by the private consortium building the Peninsula Link tional opposition—the need for trains and buses to co- motorway. In return for funneling more cars onto the ordinate as a multimodal network. Peninsula, the Southern Way consortium is guaranteed It is a sign that the political focus in the public trans- $2.3 billion in taxpayer funds. A fraction of that sum port crisis has moved on from being simply about over- would have given the Peninsula a world-beating public crowded peak hour trains. As we forecast in May this transport network; as it is, action on the region’s woe- year, performance on the train network has improved as ful bus services has been mired in bureaucratic inertia a result of new train timetables that make better use of while the government boosts car travel. the system’s inherent capacity. In September, operator Public transport now rivals hospitals and schools as an Metro finally reached its official punctuality target for election issue for a reason. November’s election will be the first time since taking over from Connex last year. fought on choices of policy direction which will shape Of course, crowding problems are far from solved. Pa- the way we travel in Victoria in decades to come. tronage on all modes of public transport is still growing strongly, just not at the extraordinary levels seen prior Roads get rich, buses suffer =) Page3 to the global financial crisis. Thanks to the lack of for- Our demands =) Page4 ward planning, we will still have to wait years before our train and tram fleet is back at levels commensurate In this issue with the size of our system. And bureaucrats seem to have no answers for the crowding problem emerging on State election..................... 1 buses, even on weekends—see our Page3 article. Keeping in touch................... 2 Our system still manages to combine the worst as- Notice of AGM: 2 December............ 2 pects of public-sector bureaucratic management with Westerfield destroyed for tourist road....... 3 903 SmartBus stuck in traffic............. 3 the worst aspects of private-sector fragmentation. The PTUA's State election vision............. 4 latest in a litany of system failures is a new bus route Metro rail tunnel................... 5 from Hurstbridge to St Andrews, negotiated between RRL from bad to worse............... 5 the community and the private bus operator, which had Geelong Branch.................... 6 to be scrapped at the last minute on 4 October because Stud Road bus lanes.................. 6 the operator had not lodged competition policy paper- 901 SmartBus not so smart............. 7 work with the Department of Transport. This is despite Tollways on the nose................. 7 PTUA News—October 2010—Page 1 Keeping in touch: Committee Member Meetings Melbourne PTUA Office Daniel Bowen—President Tony Morton—Secretary Dates / times as advised Ross House Kerryn Wilmot—Treasurer Ross House 247 Flinders Lane, Melbourne Michael Galea 247 Flinders Lane, City Telephone (03) 9650 7898 Myles Green More details: see below Email: [email protected] Ian Hundley Eastern Suburbs Membership Enquiries Mark Johnson Third Tuesday of every month, 7pm Call or email the office (see above). Jason King ‘The Barn’ (behind Box Hill Baptist Commuter Club Tim Long Church) PTUA members can obtain cheap Rob Meredith 3 Ellingworth Parade (off Station St) yearly Metcards. See www.ptua. Tim Petersen Box Hill org.au/members/offers. David Robertson Geelong Vaughan Williams Internet First Saturday of every month (except Our website is at www.ptua.org.au. Branch convenors Jan), 10:30am The PTUA runs email lists for mem- Paul Westcott—Geelong Multimedia Room ber discussions, and to stay up to date Jeremy Lunn—Eastern Suburbs Courthouse Youth Arts Centre with PTUA events. Members can Contact Corner Gheringhap and Little Malop also view archived newsletters online. All committee members can be Streets, Geelong See: www.ptua.org.au/members/ emailed using the format firstname. resources. [email protected]. Notice of Annual General Meeting The Annual General Meeting of the nominator and the candidate, both of lor’s electoral staff, or a candidate for PTUA will be held on Thursday 2 whom must be current financial mem- election to political office. (General December at 6:30pm, in the Ground bers of the PTUA. council employees not directly em- Floor Back Meeting Room, Ross In accordance with the PTUA’s rules, to ployed by councillors are exempt.) House, 247 Flinders Lane Melbourne. be eligible for election a candidate: Finger food and light refreshments will Nominations must reach the PTUA Sec- • must not be a sitting MP; be provided for members. retary by hand or by mail (Ross House, The election procedure allows for the • must be a member of at least 12 247 Flinders Lane, Melbourne 3000) by AGM to elect a President, Secretary and months’ standing, and must not be a 4:00pm on Friday 26 November. Nom- Treasurer and up to nine ordinary Com- local councillor (unless the Commit- inations will not be called for at the mittee members. Nominations must be tee waives this requirement); and AGM unless nominations are insuffi- on the form attached below (a photo- • must disclose to the Secretary if they cient to fill all positions. There is no copy is acceptable) and signed by the are a member of an MP’s or council- proxy voting in the event of an election. PTUA Committee Nomination Form I, of (nominator) nominate of (candidate) for election to the position of: President Secretary Treasurer Committee Member I declare that the candidate is not a current Member of Parliament; is / is not a Mayor, Councillor or equivalent office holder of a municipality; is / is not employed by a sitting MP or Local Councillor; and is / is not currently a candidate for a political office. (delete as appropriate) Signed: (nominator) (candidate) / / (date) PTUA News—October 2010—Page 2 First the police, then the taxpayer bill for Peninsula Link Police intervened at Victorian gov- This is about $93 million per year for And of course a lot can change in ernment direction in late Septem- a road, in a region where a bus every twenty-five years. There is a seri- ber to break the community picket 70 minutes and a train every two hours ous risk that, after assigning a very which was protecting the bush- is held up as acceptable public trans- substantial flow of taxpayer funds to land of the heritage listed Wester- port. Last year the Victorian govern- unsustainable transport activity on the field property against the bulldozers ment could only find an extra $1 mil- Peninsula and severely damaging the clearing land for the Peninsula Link lion to boost bus services on the Penin- natural environment in the process, freeway. sula and in Frankston. when peak oil and carbon pricing hits In an intimidating display, about 100 These lucrative financing arrange- we will find the Victorian government police showed up on 28 September ments reflect the fact that the project has handed us a white elephant. to confront 20 or so mainly elderly would never have been viable as a toll In the meantime, there are signs that protesters. Five arrests were reported. road: there simply isn’t enough traf- the road lobby is girding its loins to The picket was established in July to fic. Despite the periodic traffic jams have the freeway extended to Rye. protect the Frankston South property. in Frankston, much of this travel is In another twist, the actual level of tax- local in nature, fed by a lack of public payer funds committed to the project transport alternatives. As with Eastlink over its life has been reported (The and Stud Road traffic, this Peninsula Age, 29/9) at $2.3 billion. These Link is unlikely to ‘solve’ congestion “availability payments” (the purpose in Frankston either. Meanwhile we are of which is to guarantee a risk-free privatising roads and subsidising oper- cash flow to the private operator) will ator profits with public money, without reportedly be made in 98 quarterly in- even a pretence at transferring ‘risk’ to stalments over 25 years. the private sector. SmartBus caught by dumb traffic planning The Government’s Smartbus pro- The main reason for the crowding on slight improvement for buses heading gramme is again failing to keep up weekends is the lack of frequency, re- north into Chadstone, but the biggest with its name, with growing prob- sulting from the failure of the gov- delays are to buses heading south.
Recommended publications
  • Travelling on Public Transport to Melbourne University – Parkville Campus
    Travelling on public transport to Melbourne University – Parkville Campus myki Concession travel myki is your reusable travel card for trains, If you’re under 19 you can travel on a concession trams and buses in Melbourne and some regional fare with a Child myki. If you’re 17 or 18, you must services across Victoria. Choose myki Money carry government issued proof of age ID (such if you travel occasionally, and top up as you go. as a passport, drivers licence, proof of age card), Choose myki Pass if you travel often, and top or proof of another concession entitlement up with consecutive days. (such as a Health Care Card). For information on public transport fares, and to If you're a tertiary student studying a full time use the fare calculator, visit ptv.vic.gov.au/myki undergraduate course on campus, you can apply for a PTV Tertiary Student ID. This costs $9 Buy your myki and top up at: and allows you to use a Concession myki until 28 February next year. Download an application − over 800 myki retail outlets including all at ptv.vic.gov.au/students 7-Eleven stores − myki machines at train stations, and premium If you’re an international undergraduate student, tram and bus stops (full fare card sales only) you may be eligible to buy an annual iUSEpass which gives you half-price myki fares in the zones − PTV Hubs where you study. Visit ptv.vic.gov.au/iuse for − train station ticket offices more information. − on board a bus ($20 max) If you're a postgraduate or part-time student, − at the Melbourne University Campus Pharmacy you're not eligible for concession fares.
    [Show full text]
  • Visit Us at Metro Tunnel HQ
    Tunnelling with tunnel boring machines Artist impression of The Metro Tunnel Project’s first tunnel boring machine The Metro Tunnel Constructing the tunnels Project will deliver twin nine kilometre Tunnelling between North Tunnelling between the Domain Melbourne and Kensington, and Precinct and South Yarra, and rail tunnels from North Melbourne to the CBD the Domain Precinct to the CBD Kensington to Two tunnel boring machines (TBMs) Two TBMs are assembled in the South Yarra as part are assembled in the station box at station box at the Anzac Station site the Arden Station site. The TBMs in the Domain Precinct (Domain). of a new end-to-end are launched separately, and tunnel The TBMs are launched separately towards the new tunnel entrance and tunnel towards the new tunnel Sunbury to Cranbourne/ at Kensington. entrance at South Yarra. Pakenham line. During tunnelling, the TBMs pipe During tunnelling, the TBMs pipe In addition to the the excavated material (slurry) the excavated material (slurry) back back to the Arden Station site and to site at Edmund Herring Oval in tunnel, five new line the new tunnel with curved Domain, and line the new tunnel underground stations concrete segments. with curved concrete segments. will be built. The TBMs arrive at Kensington The TBMs arrive at South Yarra and are transported back to the and are transported back to the Arden Station site. The TBMs are Anzac Station site. The TBMs are reassembled in the station box reassembled in the station box and and relaunched towards Parkville, relaunched towards the CBD, under before tunnelling towards the CBD.
    [Show full text]
  • A City-Shaping Project for Melbourne and Victoria
    A city-shaping project for Melbourne and Victoria The Metro Tunnel Transforming public transport will bring more trains to your suburb and The Metro Tunnel will create The project includes: reduce travel times a new end-to-end rail line • Twin 9km rail tunnels from from Sunbury in the west to the west of the city to the to key destinations Cranbourne/Pakenham in the south-east by running the south-east, with bigger and • Five new underground stations busy Cranbourne, better trains, next generation at Arden, Parkville, State Library, signalling technology and Town Hall and Anzac Pakenham and five new stations. • Passenger connections to Flinders Street and Melbourne Sunbury lines Expanding our public transport Central stations for easy through a new tunnel. network will allow extra train interchange with the City Loop services to be added to the • Train/tram interchange between Craigieburn, Cranbourne, Anzac Station and the Domain By untangling the Frankston, Pakenham, Interchange City Loop, more trains Sandringham, Sunbury, Upfield, Werribee and Williamstown lines. • High capacity signalling to can run more often enable more frequent services The Metro Tunnel is the first step across Melbourne. towards a metro-style rail network • Upgrades on other suburban for Melbourne, with the ‘turn up rail lines with benefits across and go’ rail services that are the the network hallmark of the world’s great cities. • Safety features including platform screen doors. Melbourne Airport Rail services will run through the Metro Tunnel to take passengers from the airport to the CBD in under 30 minutes. Construction is underway on five new stations, and we’ve finished digging twin 9km tunnels.
    [Show full text]
  • BUILDING for TOMORROW #Allcommitted the Men and Women of VINCI Construction
    BUILDING FOR TOMORROW #AllCommitted The men and women of VINCI Construction VINCI Construction — 2021 VINCI Construction — 2021 VINCI Construction — 2021 02 TALK WITH THE CHAIRMAN 06 INTERNATIONAL PRESENCE 07 ECONOMIC PERFORMANCE 08 OUR ORGANISATION 10 OUR COMMITMENTS 12 MANAGEMENT TEAM CONTENTS 14 EXPER TISE AND SKILLS 16 Buildings 24 Structures 32 Infrastructure 44 FOR TOMORROW 46 Envir onment 52 Innovation VINCI Construction — 2021 2 3 Our ambition in response Talk with Pierre Anjolras, Chairman of to a changing world VINCI Construction A new organisational structure The move also boosts our collective at VINCI, combining the activities innovation capacity, which will be critical of VINCI Construction and Eurovia in accelerating the transformation of our within a single business line, businesses, products, services and solutions was announced in January 2021; in response to the ecological transition, it is headed by Pierre Anjolras. in which we play a leading role. Why are Eurovia and VINCI How is VINCI Construction Construction joining forces? now organised? This move is all about preparing We are organised into three pillars, for the future. We live in a world with leading positions in each. The first, where transformations are accelerating. which most clearly sets us apart from The ecological transition, the digital our competitors, is our Speciality Network; revolution... These far-reaching changes it brings together our subsidiaries that are leading us to rethink the assets specialise in soil technologies, structures, that need to be built and how we build them. nuclear engineering and digital solutions This presents both a fantastic opportunity for the construction sector, with skills and and an immense challenge for all our brands that set the standard worldwide.
    [Show full text]
  • Transport Strategy Refresh
    Transport Strategy refresh Background paper Public Transport Network March 2018 Dr John Stone (University of Melbourne) Dr Ian Woodcock (RMIT) 1 This report has been prepared by Dr John Stone (University of Melbourne) and Dr Ian Woodcock (RMIT) as independent advice for the City of Melbourne. The aim of the report is to encourage public conversation and to inform the City of Melbourne’s forthcoming Transport Strategy refresh. 2 Contents 1. Introduction ......................................................................................................................................... 5 2. Current performance ........................................................................................................................... 6 2.1. Mode share ................................................................................................................................... 6 2.2. Overcrowding ................................................................................................................................ 9 2.3. Reliability and speed ..................................................................................................................... 9 3. Better public transport for the City of Melbourne: Key issues in brief ............................................... 10 4. Public transport issues & options ...................................................................................................... 11 4.1. Significant growth is expected in public transport demand ........................................................
    [Show full text]
  • The Greens' Transport Master Plan for the West Will Deliver Fast, Frequent Public Transport and Provide Real Solutions To
    MOVING PEOPLE, NOT CARS THE GREENS’ PLAN TO FIX TRANSPORT IN THE WEST The Greens’ Transport Master Plan for the West will deliver fast, frequent public transport and provide real solutions to reduce truck pollution. Real solutions for people: Real solutions for freight: ● ‘Turn up and go’ train services ​with trains at ● Building the ​Port Rail Shuttle least every 10 minutes, 7 days a week, from ● Getting the worst polluters off the roads​ by Watergardens and Werribee phasing out old port trucks ● Replacing V/Line services with Metro​ for ● Implementing inner west truck bans sooner passengers in the outer west instead of waiting for the West Gate Tunnel to ● More peak hour train services be built, and providing a truck alternative to ● More frequent, direct buses Millers Road. ● Planning for ​a second Metro Tunnel ​from ● Strict and immediate enforcement of existing Clifton Hill to Newport via Fishermans Bend truck curfews​ across the inner west. ● Creating a long overdue ​integrated transport ● Working with Greens in federal parliament to plan for Victoria cut diesel pollution​ through better truck ● Conducting a feasibility study for ​a new Inner emissions standards. West Orbital passenger rail route​ from Newport to Sunshine to Broadmeadows ● Conducting a feasibility study for ​new light rail routes​ for cross-suburban connections MOVING PEOPLE, NOT CARS THE GREENS’ PLAN TO FIX TRANSPORT IN THE WEST Victoria’s transport system is becoming increasingly THE WEST GATE TUNNEL TOLL ROAD IS expensive, congested and polluting. We have an urgent REDUNDANT and overdue need for an integrated transport plan for Victoria to strategically connect our regions and The Greens are calling for the full implementation of our properly account for unprecedented population growth.
    [Show full text]
  • Building a Train Network for the Future.Pdf Pdf 219.86 KB
    Tuesday, 1 December 2020 BUILDING A TRAIN NETWORK FOR THE FUTURE Victorian passengers will benefit from an extra 450 train services every week under a timetable redesign which will boost capacity and seize the benefits of the Victorian Government’s major transport infrastructure projects. Minister for Public Transport Ben Carroll today announced that an extra 280 new metropolitan train services and 170 regional services will be added to the network each week from 31 January 2021, giving Victorians more options on their journeys and providing more space for physical distancing. The coronavirus pandemic has dramatically changed the way Victorians use public transport, and with more people now moving around the state, these services will help reduce crowding. The new timetable will deliver more trains during the peak on many regional lines, and greater frequency around the peak in metropolitan Melbourne – increasing trains during busy morning and afternoon periods to encourage passengers to stagger their weekday travel. To make it easier for metropolitan passengers to travel during quieter times and physically distance as Victoria recovers from the coronavirus pandemic, off-peak fares will be discounted for three months. From 31 January 2021, anyone using myki money between 9.30am and 4pm or after 7pm on weekdays will receive a 30 per cent discount. The community will experience the benefits of the Government’s major transport projects like the Ballarat Line Upgrade and Cranbourne/Pakenham Line Upgrades – with dramatically increased regional frequency and bigger, better metropolitan trains entering service. The Ballarat Line Upgrade will be complete once the new timetable begins – adding an additional 125 new services each week to deliver 20-minute frequency during busy morning and afternoon periods and 40 minutes in the off- peak.
    [Show full text]
  • SPECIAL Victoria Government Gazette
    Victoria Government Gazette No. S 258 Wednesday 26 June 2019 By Authority of Victorian Government Printer Transport Integration Act 2010 TRANSPORT RESTRUCTURING ORDER (ROADS CORPORATION) NO. 1/2019 Order in Council This Order may be cited as the Transport Restructuring Order (Roads Corporation) No. 1/2019. The Governor in Council under Division 2 of Part 4A of the Transport Integration Act 2010 orders that: 1. Commencement This Order comes into operation on 1 July 2019. 2. Definitions 2.1 In this Order – ‘conferred functions’ means the functions conferred on the Head, Transport for Victoria by paragraph 3 of this Order. 2.2 Terms used in this Order have the same meaning as that term has in the Transport Integration Act 2010, unless the context otherwise requires. 3. Conferred functions The functions specified in Part A of Schedule 1 are conferred on the Head, Transport for Victoria. 4. Ongoing and concurrent conferral 4.1 The conferred functions are conferred on the Head, Transport for Victoria on an ongoing basis. 4.2 The conferred functions are to be performed or exercised concurrently by the Head, Transport for Victoria and the Roads Corporation (meaning that each of the Head, Transport for Victoria and the Roads Corporation may exercise the functions independently of the other). 5. Effect of conferral on the Head, Transport for Victoria The conferred functions are conferred on the Head, Transport for Victoria only to the extent that the exercise or performance of the function does not require the exercise of a function, power or duty conferred exclusively on another person or body by or under another Act.
    [Show full text]
  • Suburban Rail Loop Stage One Project Outline
    Suburban Rail Loop Stage One Project Outline 10/11/2020 Table of Contents Executive Summary .......................................................... 3 1. Introduction ................................................................. 5 2. SRL ............................................................................... 5 2.1. Need for SRL ................................................................................ 6 2.2. Strategic Context .......................................................................... 8 3. Project Description ................................................... 10 3.1. Proposed Works ......................................................................... 10 3.2. Other Works ............................................................................... 14 3.3. Project Schedule and Delivery ................................................... 16 4. Relevant Legislation ................................................. 18 4.1. Commonwealth Legislation ........................................................ 18 4.2. State Approvals .......................................................................... 18 5. Preliminary Evaluation ............................................. 19 5.1. Summary of further investigations .............................................. 31 6. Community and Stakeholder Engagement ............. 33 6.1. Objectives and Principles ........................................................... 33 6.2. Stakeholder Identification and Engagement ............................... 34 6.3.
    [Show full text]
  • RAMPS up Find out About Disruptions in Your Area
    NEWSLETTER ISSUE 04 MAY 2017 CONSTRUCTION RAMPS UP Find out about disruptions in your area. metrotunnel.vic.gov.au WORKS UNDERWAY FOR THE METRO TUNNEL It is a busy time on the Metro Tunnel as works ramp up. City Square is now closed to the public, Later this year contracts will be awarded construction is underway at Franklin for the main Tunnel and Stations package and A’Beckett streets near City Baths of works and the Rail Systems package and RMIT and service relocations are which includes high capacity signalling continuing in Domain. and platforms screen doors. Construction work on the 11 storey deep shafts at There will be unavoidable disruption Franklin and A’Beckett streets will for a number of years while we build the continue and building demolition to clear Metro Tunnel. Having visited Crossrail sites for major works next year will begin. in London last year, I know these major There will be further road closures to works, can be carefully managed, support works in Parkville and Domain to reduce and control impacts at and the Route 8 tram will be rerouted surface level. from Domain Road to Toorak Road West via new tracks. I also witnessed the resilience and willingness of Londoners to live with Thanks in advance for your patience disruption during Crossrail’s extended as we get on with delivering this building phase because they recognise transformation of Melbourne’s rail the long term benefits that come with network. By creating space at the heart a modern metro-style rail network. of the network, we can run more trains more often from the outer suburbs to We need to invest in Melbourne’s public where people need to go.
    [Show full text]
  • Drouin and Warragul Bus Services
    2017 - September Volume 72 Number 9 $10.00 RRP Incl. GST transit australia australia’s urban passenger transportta journal ISSN 0818 5204 Features Announcements on trams Infrastructure Australia corrridor protection The Battle of Brisbane Revised bus services in Drouin and Warragul St Kilda Road tram replacement Plus Regulars 2017 - September Volume 72 Number 9 contents transit Features australia Announcements on trams ____________________ 261 australia’s urban passenger transportta journal Infrastructure Australia corridor protection _______ 263 Managing Editor: Tony Bailey Publisher: Transit Australia Digital The Battle of Brisbane _________________________ 267 PO Box 192, BOTANY NSW 1455 Revised bus services in Drouin and Warragul ____ 269 Australia Ph: (02) 9341 8700 St Kilda Road tram replacement _______________ 271 E-mail: [email protected] Website: www.transitaustralia.com.au Transit Newsfile Editorial Advisors: Hugh Ballment, Agnes Boskovitz, International ______________________________273 V M Isaacs, Stuart Keenan, L J Pascoe, National __________________________________273 Jeremy Wainwright, R K Willson Advertising: Tony Bailey Ph: (02) 9341 8700 New South Wales ___________________________273 E-mail: [email protected] Northern Territory __________________________ 277 Website Co-ordinator: John Clifton Layout: The Little Website Company Pty Ltd Queensland _______________________________ 279 www.tlwsc.com.au South Australia ____________________________ 279 Subscriptions: Tasmania ________________________________ 280 Print Subscription 2017: Victoria __________________________________ 280 Australia Overseas Airmail, AUD Western Australia _________________________ 284 (incl. GST) Asia/Pacific Zone # Rest of the World Western Pacific ______________________________ 284 Personal $120.00 $190.00 $220.00 New Zealand _____________________________ 284 Corporate $180.00 $220.00 $250.00 South East Asia ___________________________ 285 # Asia/Pacific Zone incl. NZ, PNG, Fiji, Malaysia, India, Japan, China.
    [Show full text]
  • MCT) and Light Rail Plan
    DRAFT 59 Rail Futures Inc THE MELBOURNE RAIL PLAN Moving People in a City of 8 Million 25 May 2019 This paper has been prepared by Rail Futures Incorporated in the public interest. Rail Futures Inc is an independent non-partisan group formed to advocate cost effective rail and intermodal solutions for public transport and freight problems based on sound commercial, economic and social reasoning. Rail Futures members include experienced rail professionals, engineers, planners and economists. Melbourne Rail Plan 2019-2050, May 2019 Version 59 - DRAFT FOR COMMENT Rail Futures Institute 1 Foreword Melbourne once had one of the world’s best public transport systems. The forethought and planning of Victorians more than a century ago, and their capacity to value the welfare of Victorians of the future -us - as highly as their own, helped make Melbourne one of the world’s economically most productive and liveable cities. For the past few generations, myopia, carelessness and excessive valuation of the present over the future have been squandering that wonderful legacy. The economic and social life of this city will be deeply impaired by barriers to movement of people around the city unless chronic underinvestment over recent generations is remedied. The Melbourne Rail Plan 2019-50 demonstrates the way to correct the mistakes of recent generations, and that some contemporary Victorians are up to the challenge. The Report is comprehensive, creative and authoritative. It is an excellent foundation for rebuilding Melbourne to secure its position as one of the world’s most successful cities. Melbourne is growing more rapidly than any other large city in the developed world.
    [Show full text]