The Metra System

Total Page:16

File Type:pdf, Size:1020Kb

The Metra System THE METRA SYSTEM • 11 rail lines • 6 counties; 3,700 sq. miles • 488 route miles; 1,155 track miles • 692 weekday trains • 290,000 weekday passenger trips • Best on-time record • Lowest fares • Most complex system • 1,300-1,400 trains per day THE METRA SYSTEM • 847 Bridges • 566 Grade Crossings • 242 Stations • 24 Yard Facilities • 168 Locomotives, 854 Diesel Passenger Railcars & 186 EMU Passenger Railcars (one of the oldest fleets) CAPITAL INVESTMENTS To achieve our Strategic Goals, Metra’s capital investments will focus on the following three priorities: 1) Enhance Safety and Security 2) Create Efficiencies and Reduce Operating Costs 3) Increase Ridership and Growth All three will improve Metra’s long-term sustainability. STATE OF GOOD REPAIR • Metra’s State of Good Repair (SGR) over the next decade is estimated to be about $12 billion. • Over the past five years Metra has demonstrated its ability to reduce our SGR needs by life-extension programs designed to maximize our capital investment. • These projects will stimulate economic growth, support jobs and benefit communities and non-riders by reducing congestion and reducing emissions. • Metra will also be able to grow and enhance service on the existing system. Capital Infusion (in millions) Source 2020 2021-24 Total Federal $186.7 $775.1 $961.8 RTA 5.2 140.8 146.0 Fares 6.0 20.0 26.0 Other 3.7 0.3 4.0 State Bonds 205.2 872.1 1,077.3 “PAYGO” 73.7 295.1 368.8 Total $480.5 $2,103.4 $2,583.9 Capital Uses Category 2020 2021-24 Total Rolling Stock $239.3 $950.2 $1,189.5 Bridges, Track & Structures 68.7 340.2 408.9 Signal, Electrical & Communication 34.2 204.3 238.5 Facilities & Equipment 63.3 199.8 263.1 Stations & Parking 51.2 314.0 365.2 Support Activities 23.8 94.9 118.7 Total $480.5 $2,103.3 $2,583.9 2019 vs. 2020 Budget 2019 Budget 2020 Budget $1.008 billion $1.308 billion Capital Capital $185.6 $480.5 million Operating Operating $822.2 $827.4 million million Rolling Stock New Car Purchase • Request for Proposals issued in 2019 for base order of 200 with the option to buy up to 200 more Locomotive Purchase • 2019 Procurement to purchase 15 remanufactured Tier 3 locomotives, with an option to buy up to 27 more Car and Locomotive Rehabilitation • Program includes life-extending rehabilitation of cars and locomotives Alternative Fuel Locomotives • This is a pilot for alternative fuel locomotives such as battery powered DC to AC Conversion • This project will convert 54 existing locomotives from DC traction propulsion to AC propulsion Fleet Component Overhauls • Program includes traction motors, wheel replacements, engine upgrades, etc. Infrastructure 250 205 200 164 150 89 88 100 49 44 25 28 32 35 50 14 24 Number of Bridges 1 4 2 0 1880 1890 1900 1910 1920 1930 1940 1950 1960 1970 1980 1990 2000 2010 pre 1880 Decade Infrastructure Bridge Design: UP North Line bridges: Bridges over 11 streets from Fullerton to Lincoln/Addison North Branch Chicago River bridge A110/56: Milwaukee North Line bridge over the Chicago River north of Shermer Road in Northbrook Milwaukee District bridge A318: Milwaukee North Line bridge north of Rockland Road in Lake Bluff Hickory Creek bridge: Rock Island Line bridge in Will County Bridge 275 – Old 96th Avenue: Rock Island Line bridge over 96th Ave. in Mokena Infrastructure Bridge Construction: • 43rd Street and Root Street on Rock Island Line • 86th and Vincennes on Rock Island Line • Morgan Street on Rock Island Line • A32 Milwaukee Avenue on Milwaukee North Line Bridge A-32 District • Milwaukee North Project Budget • $ 25.0 Million Project Schedule • Design - Q1 2019 • Procurement - Q2 2020 • Construction – Q4 2020 Project Scope • Total replacement • New abutments Morgan Street Bridge District • Rock Island Project Budget • $ 7.0 Million Project Schedule • Design - Complete • Procurement - Q2 2020 • Construction – Q4 2020 Project Scope • Total replacement • New abutments • Lower roadway Bridge #275 Rehab ( 96th Ave) District • Rock Island Project Budget • $ 4.0 Million Project Schedule • Design/ Build - Q2 2020 Project Scope • Complete rebab of steel and abutments • Lower roadway RID 18th – 55th Bridges, Phase 3 District • Rock Island Project Budget • $ 2.5 Million Project Schedule • Design - Q1 2019 • Procurement – Q1 2020 Root St • Construction – Q3 2020 Project Scope • Rehab of existing bridges 43rd St UPW 3rd MAIN, WEST SEGMENT District Project Schedule Project Scope • Design - Complete • UPW • 6.1 Miles Kress to Peck • Procurement - Q1 2020 • New Fox River bridge Project Budget • Construction – Q3 2020 • New Route 31 bridge • $ 90.5 Million • Parking at Geneva CREATE P2 75th Street Corridor Improvement Project CREATE EW2 bridge Project Engineering and construction for a project to lift a bridge between 78th and 79th on Rock Island Line CREATE P2 Engineering for the flyover to connect SouthWest Service to Rock Island Line. CREATE P2 . District • Southwest Service & Rock Island Project Budget • $ 28.0 Million Design • $ 227 Million Construction Project Schedule • Design - Q4 2020 • Procurement - TBD • Construction – TBD Project Scope • Grade separation • SWS to Rock Island District • SWS trains to route to LSS Infrastructure Bridge Protective Coating • Repairs and abatement of the Dempster Avenue and Davis Street bridges on the Union Pacific North Line Roundout Track • Track renewal and track reconfiguration as part of the on- going Rondout interlocking project, replacing track and switches in the Rondout Interlocker on the Milwaukee North Line. Rails, Undercutting, Surfacing • Installation of continuous welded rail as well as the removal of all fouled track ballast Crossings • The renewal of rail highway grade crossings at various locations including replacement of cross ties, crossing material, and ballast, as well as the surfacing of the track Ties & Ballast • Replacement of cross ties, switch ties and ballast Catenary Structures • Rehabilitation of various catenary structures on ME Facilities and Equipment Western and California Yard Expansions • Renovate and add new tracks and space for more trains 14th Street Yard Fueling Facility • Replacement of old underground diesel fuel storage tank with overhead, bridge mounted fueling lines Crew Facilities • Design and renovate crew and training facilities Control Center • Consolidation of police, train tracking, media and operations for more efficient communications both internally and externally RID Yard – 47th Transfer Table District • Rock Island Project Budget • $ 2.0 Million Project Schedule • Design – Q1 2020 • Procurement - Q2 2020 • Construction - Q4 2020 Project Scope • Rehab / Replacement of transfer table Signal and Electrical Oak Lawn Crossings • Grade crossing signal improvements along the SouthWest Service in Oak Lawn Traction Power Substations • Replaces existing traction power substations along the Metra Electric Lake Forest Crossovers • Installation of universal crossovers on the Milwaukee North line to allow for trains to change tracks Western Interlocking • Funds design for Rock Island Line interlocking at Vermont & Grove in Blue Island Morgan Interlocking • Construction of Morgan Street interlocking on Milwaukee C&M subdivision and the signal system infrastructure between Canal Street and A-2 interlocking Signal and Electrical Lake Street & CUS interlocking The modernization and upgrading of the Lake Street interlocking at the north end of the Ogilvie Transportation Center (OTC) and the interlocking on at the north and south ends of Chicago Union Station (CUS) Signal Standards Design services for Centralized Train Control north of A5 on the Milwaukee District North Line Milwaukee West Signal Project Joint Metra/CP project to upgrade seven signal on the Milwaukee West Line Electrical Components at Facilities Design and construction funds for electrical engineering projects in yards including overhead piping, fuel line replacement, cable reels and shore power work HVAC Replacements Replacement of HVAC units at Milwaukee District yards. Communication Improvements and Video Storage Installation of cameras, video equipment, video back-up 16th Street Interlocker District • Rock Island Project Budget • $ 4.7 Million Project Schedule • Design - Q2 2020 • Procurement - Q3 2020 • Construction - Q1 2021 Project Scope • Complete interlocker to be replaced Milwaukee District Fiber Optics District • Milwaukee North and West Project Budget • $ 28.0 Million Project Schedule • Design - Q1 2020 • Procurement - Q1 2021 • Construction - Q3 2021 Project Scope • Complete Fiber Optic backbone along Milwaukee North and West right of way Support Activities Program Management • Funds professional services fees to hire a consultant team to provide additional program management capacity Transit Asset Management • Consultant assistance for asset assessments and support to develop FTA- mandated Transit Asset Management (TAM) Plan Infrastructure Engineering • Design engineering and/or construction management in the areas of civil, structural, electrical, mechanical, signal, communications and environmental engineering Customer Experience Systemwide Station Enhancements Shelters: Adding heated shelters Signage: Enhanced track/platform identifiers, wayfinding, etc. Other Station Improvements: Lighting, stairs, roofs, windows, ceilings, etc. Elevator Replacements: Replace existing elevators Platform Upgrades: Upgrades to make accessible Parking Lot Improvements: Lot renovation and collection equipment Reverse Commute Service Weekend Service Stations Within two years: Within five years: 59th/60th Street
Recommended publications
  • Union Depot Tower Interlocking Plant
    Union Depot Tower Union Depot Tower (U.D. Tower) was completed in 1914 as part of a municipal project to improve rail transportation through Joliet, which included track elevation of all four railroad lines that went through downtown Joliet and the construction of a new passenger station to consolidate the four existing passenger stations into one. A result of this overall project was the above-grade intersection of 4 north-south lines with 4 east-west lines. The crossing of these rail lines required sixteen track diamonds. A diamond is a fixed intersection between two tracks. The purpose of UD Tower was to ensure and coordinate the safe and timely movement of trains through this critical intersection of east-west and north-south rail travel. UD Tower housed the mechanisms for controlling the various rail switches at the intersection, also known as an interlocking plant. Interlocking Plant Interlocking plants consisted of the signaling appliances and tracks at the intersections of major rail lines that required a method of control to prevent collisions and provide for the efficient movement of trains. Most interlocking plants had elevated structures that housed mechanisms for controlling the various rail switches at the intersection. Union Depot Tower is such an elevated structure. Source: Museum of the American Railroad Frisco Texas CSX Train 1513 moves east through the interlocking. July 25, 1997. Photo courtesy of Tim Frey Ownership of Union Depot Tower Upon the completion of Union Depot Tower in 1914, U.D. Tower was owned and operated by the four rail companies with lines that came through downtown Joliet.
    [Show full text]
  • December 2020 Project Management Oversight Report
    Project Management Oversight December 2020 REPORT ON PROJECT MANAGEMENT OVERSIGHT – DECEMBER 2020 Executive Summary This semi‐annual Report on Project Management Oversight details Service Board efforts in implementing their capital programs. Included are details on all state‐funded projects, regardless of budget, and all systemwide projects with budgets of $10 million or more, regardless of funding source. Information in this report was collected by direct , interviews project meetings, and documented submissions from Service Board project management teams. The RTA’s 2018‐2023 Regional Transit Strategic Plan, Invest in Transit, highlights $30 billion of projects that are needed to maintain and modernize the region’s transit network. To maintain and preserve the current system in a State of Good Repair (SGR), as well as address the backlog of deferred SGR projects, requires a capital investment of $2 to $3 billion per year. The Rebuild Illinois funding is planned to expedite overdue repair and replacement projects, reduce the backlog of deferred improvements, and move the system toward a state of good repair. It nearly doubles the previous five‐year regional capital program of $4.3 billion. The funds enable real progress on the state of good repair, by allowing improvements and in some cases replace aging system assets. Although this has been a difficult year due to operating funding shortfalls related to COVID‐19, the Service Boards are continuing with the implementation of their capital programs. This report includes, for the first time, 13 Rebuild Illinois projects representing $655 million in Rebuild Illinois funding. The 13 projects reported on have begun during this reporting period and have ongoing activities.
    [Show full text]
  • Program and Budget Book
    2016 Program and Budget Book Revised 11/11/2015 metrarail.com UP-N o T ILLINOIS / WISCONSIN STATE LINE Kenosha Winthrop Harbor METRA BOARD McHENRY Antioch NCS LAKE Zion OF DIRECTORS MD-N Lake Villa UP-NW Fox Lake Harvard Ingleside Round Lake Beach Martin J. Oberman Long Lake Washington St. Waukegan Chairman McHenry Round Lake (Grayslake) Grayslake Prairie Crossing North Chicago N Chicago Prairie Crossing Great Lakes Woodstock Libertyville Lake Bluff LAKE Jack E. Partelow Mundelein MICHIGAN Lake Forest Vice Chairman Crystal Lake Cary Lake Will County Pingree Rd. Vernon Hills Forest Fort Sheridan Prairie View Highwood Fox River Grove Buffalo Grove Highland Park Deerfield Ravinia John Plante Barrington Braeside Lake Cook Wheeling Treasurer Rd. Glencoe Northbrook Hubbard Woods KANE COOK Palatine Suburban Cook County Prospect Winnetka Heights N. Glenview Indian Hill Arlington Park Kenilworth MD-W Arlington Heights Glenview Wilmette Big Timber Central St.(Evanston) Rodney S. Craig Mt. Prospect Golf Elgin Cumberland Des Plaines Davis St.(Evanston) O Dee Road Morton Grove Secretary National St. 'Ha Main St.(Evanston) re Trans Park (Elgin) Bartlett fe Ridge Edgebrook Rogers Park Hanover Park Schaumburg r Suburban Cook County Roselle Edison Park Medinah R Forest Glen Itasca ood Dale osemon Norwood Park t W Schiller Par Gladstone Park Mayfair Bensenville Jefferson Park Frankli k k Ravenswood n r Irving Par a DU PAGE k P Park Manuel Barbosa n Grayland River Grove Elmwood Park so ve. Mont Clare n Mars A d Clybourn Galewood o Healy Ha Director o n UP-W t r est Chicago e r Elmhurst t Franklin Park Villa Park Mannheim k k Berkeley r es CHICAGO W a Lombard Grand/ W Mayw Oa P Rive Fores Kane County Glen Ellyn Cicero Winfield k d College Elburn r Wheaton o a o ve.
    [Show full text]
  • Northbrook 1361 Shermer Flyer Copy
    Northbrook, Illinois 2ND GENERATION RESTAURANT 1363 Shermer Road Available for Retail, Office, Gym, Etc N PROPERTY HIGHLIGHTS • 2,500 SF fully equipped restaurant for lease in beautiful, upscale downtown DEMOGRAPHICS Northbrook. 1 Mile 3 Mile 5 Mile Population 10,397 64,809 194,773 • This restaurant features a unique layout with bar suitable for several concepts. Total Households 4,030 26,375 76,470 Avg. HH Income $216,812 $195,392 $187,826 • This property is located next to the Metra Northbrook station • Ample opportunity to serve commuters traveling to and from work. Brad Belden CORE phone: 312.881.6469 A S S E T cell: 773.531.6886 SERVICES email: [email protected] 2211 N. Elston | Chicago, IL 60614 | www.coreassetservicesre.com Core Asset Services is a Core Equities LLC Company Northbrook, Illinois 2ND GENERATION RESTAURANT 1363 Shermer Road Available for Retail, Office, Gym, Etc AERIAL Northbrook Waukegan Rd Pubic Library Village Hall Shermer Rd (11,000 VPD) SITE Northbrook Junior High School Brad Belden CORE phone: 312.881.6469 A S S E T cell: 773.531.6886 SERVICES email: [email protected] 2211 N. Elston | Chicago, IL 60614 | www.coreassetservicesre.com Core Asset Services is a Core Equities LLC Company Northbrook, Illinois 2ND GENERATION RESTAURANT 1363 Shermer Road Available for Retail, Office, Gym, Etc SITE PLAN Brad Belden CORE phone: 312.881.6469 A S S E T cell: 773.531.6886 SERVICES email: [email protected] 2211 N. Elston | Chicago, IL 60614 | www.coreassetservicesre.com Core Asset Services is a Core Equities LLC Company Northbrook, Illinois 2ND GENERATION RESTAURANT 1363 Shermer Road Available for Retail, Office, Gym, Etc INTERIOR PICTURES Brad Belden CORE phone: 312.881.6469 A S S E T cell: 773.531.6886 SERVICES email: [email protected] 2211 N.
    [Show full text]
  • FY 2020 Unified Work Program (UWP) for Northeastern Illinois Competitive Projects Proposal Form State Fiscal Year (July 1, 2019 – June 30, 2022)
    FY 2020 Unified Work Program (UWP) for Northeastern Illinois Competitive Projects Proposal Form State Fiscal Year (July 1, 2019 – June 30, 2022) Local Technical Assistance and Community Project Title Planning Programs CMAP, with sub-allocation to RTA Sponsoring Agency depending on projects Federal $560,000 Amount Requested Local Match Amount $140,000 Total Project Cost (Local Match Amount $700,000 must be at least 20% of Total Project Cost) Description and Justification Brief Description (please provide information so that all relevant Committee, CMAP/MPO Policy Board members, and the public are able to understand the general scope and goals of the project) This project will provide grants and consultant assistance to local governments to undertake planning activities that integrate transportation with land use, housing, economic development, governance, and environment. These grants will be available for planning activities. Projects have been, and future projects will be identified through a competitive application process administered jointly by CMAP and the RTA each year. The 2018 call for projects occurred between September 6, 2018, and October 26, 2018. If the full requested level of funding and match is awarded it will support in whole or in part approximately 5 local plans led by CMAP and 1 plan let by RTA. The project selection process is still underway however, it is anticipated that the CMAP projects will include two transportation plans, a transit area land use plan, and two comprehensive plans; and the RTA projects will include a transit corridor assessment. Major Tasks (up to 20) Pre-Proposal Tasks: 1. Hold an application process for new projects.
    [Show full text]
  • Go to 2040 Update Appendix
    GO TO 2040 UPDATE APPENDIX Major Capital Projects October 2014 Table of Contents Introduction ................................................................................................................................................ 1 Major Capital Projects ............................................................................................................................... 2 Expressway Additions: Express Toll Lanes ....................................................................................... 2 I-55 Stevenson Express Toll Lanes ................................................................................................... 2 I-290 Eisenhower Express Toll Lanes .............................................................................................. 3 Expressway Additions: Interchanges and Improvements ............................................................... 4 Circle Interchange .............................................................................................................................. 5 I-294/I-57 Interchange ........................................................................................................................ 5 I-190 Access and Capacity Improvements ...................................................................................... 5 Jane Addams Tollway (I-90) ............................................................................................................. 6 Transit Improvements ..........................................................................................................................
    [Show full text]
  • Metra's 2002 Program and Budget Has Been Reformatted for The
    Metra’s 2002 Program and Budget has been reformatted for the Web 547 West Jackson Boulevard Chicago, Illinois 60661-5717 Phone (312) 322-6900 Web http://www.metrarail.com CREATING CAPACITY FOR GROWTH FINAL 2002 PROGRAM AND BUDGET NOVEMBER 2001 Board of Directors Jeffrey R. Ladd, Chairman Appointing Authority: County Board Chairmen, Kane, Lake, McHenry and Will Counties Lowell E. Anderson, Treasurer Appointing Authority: Suburban Members, Cook County Board Larry A. Huggins, Director Appointing Authority: City of Chicago W. Warren Nugent, Secretary Appointing Authority: Suburban Members, Cook County Board Gerald L. Porter, Vice-Chairman Appointing Authority: County Board Chairman, DuPage County Joseph A. Tecson, Director Appointing Authority: Suburban Members, Cook County Board Donald A. Udstuen, Director Appointing Authority: County Board Chairmen, Kane, Lake, McHenry and Will Counties Philip A. Pagano, Executive Director TO FRIENDS OF COMMUTER RAIL: Chairman’s Welcome to Metra’s 2002 Program and Budget. It Message describes good news such as further ridership growth, steady progress on our three New Start projects, and ongoing capital improvements including orders for badly needed new cars and locomotives. Meanwhile, the costs of providing safe, reliable, convenient and comfortable commuter rail service have steadily increased. Thus, our proposed 2002 operating budget envisions our first fare increase in six years, 5%, which will likely take effect June 1. I think it’s important to note that this will be only the fourth fare increase in the 18 years of Metra’s management of the Northeast Illinois commuter rail system. And it will be only the third one for operations. A fare hike that took effect in 1989 was dedicated solely to capital projects, namely the physical improvements that preserve and improve our serv- ice — and in turn reduce operating costs.
    [Show full text]
  • Chicago to St. Louis High-Speed Rail Tier 1 Final Environmental Impact Statement: Volume I
    Section TRANSPORTATION 6 IMPACTS 6. Transportation Impacts6. Transportation 6.0 Transportation Impacts This section describes the transportation impacts expected with the No‐Build and Build Alternatives. The Service Development Plan and expected travel benefits are presented. Year 2030 ridership projections and operating revenues for passenger rail service are presented for each alternative. Projected annual person trips for air, bus, and automobile intercity travel are also presented. In addition to the intercity passenger information, impacts to future freight and commuter rail operations and vehicular traffic are discussed, including impacts from construction and vehicular impacts associated with the changes proposed at the highway‐railroad at‐grade crossings in the corridor. Generally, transportation impacts are expected to be the same for the Build Alternatives (Alternatives A and B and Preferred Alternatives C and D). Therefore, much of the discussion in this chapter compares impacts between the No‐Build and Build Alternatives. Where there are expected differences amongst the Build Alternatives, additional documentation is provided for each of the four Build Alternatives. 6.1 Service Development Plan In accordance with FRA High Speed Rail guidance referred to in 74 Fed. Reg. 29900 (June 23, 2009), this section outlines the Service Development Plan (SDP) for the Build Alternatives (Alternatives A and B and Preferred Alternatives C and D) for the Chicago – St. Louis corridor described by this Tier 1 Environmental Impact Statement. The following items are addressed within this subsection: Intercity travel options Service levels/frequencies Capital program needs Ridership/revenue forecasted, including number of passengers and boardings/disembarking at stations 6.1.1 Intercity Travel Options Intercity travel by auto, bus, and air represent alternative travel options to high‐speed intercity rail.
    [Show full text]
  • Downtown Transit Account on a Ventra Card Or Attraction Take Bus Or Train: North Michigan Avenue, and a Few Places Beyond
    All Aboard! Buses Trains Fares* Quick Ride Guide Chicago Transit Authority This guide will show you how to use Chicago Transit Riding CTA Buses Riding CTA Trains Base/Regular Fares From the Loop 151511 SHERIDIDANAN Deducted from Transit Value in a Ventra Authority (CTA) buses and trains to see Downtown Chicago, CTA buses stop at bus shelters or signs Each rail line has a color name. All trains operate Downtown Transit Account on a Ventra Card or Attraction Take Bus or Train: North Michigan Avenue, and a few places beyond. that look like this. Signs list the service TOTO DEEVO VO NN daily until at least midnight, except the Purple Line Express (see contactless bankcard Full Reduced** Art Institute, Chicago Cultural Ctr. Short walk from most buses and all rail lines days/general hours, route number, name map for hours). Trains run every 7 to 10 minutes during the day ♦ The CTA runs buses and elevated/subway trains (the ‘L’) and destinations, and the direction of travel. and early evening, and every 10 to 15 minutes in later evening. ‘L’ train fare $2.25 $1.10 FirstMerit Bank Pavilion at 146 south on State or 130 (Memorial Day Northerly Island Park weekend thru Labor Day) east on Jackson that serve Chicago and 35 nearby suburbs. From Here’s a quick guide to boarding in the Downtown area: Bus fare† $2 $1 When a bus approaches, look at the sign Chinatown Red Line train (toward 95th/Dan Ryan) Downtown, travel to most attractions on one bus or train. 22 Clark above the windshield.
    [Show full text]
  • I&M Canal National Heritage Corridor Interpretive Plan 2005
    I&M Canal National Heritage Corridor Interpretive Plan 2005 Prepared by: Canal Corridor Association Primary Author: Ron Vasile, Historian Contributors: Diane Banta Ana B. Koval Laurie Scott Acknowledgements Funding for this report has been provided by the I&M Canal National Heritage Corridor Commission through the Department of Interior. The views and conclusions contained in this document are those of the authors and should not be interpreted as representing the opinions or policies of the U. S. Government. Mention of trade names and commercial products does not constitute their endorsement by the U. S. Government. The staff of the former I&M Canal National Heritage Corridor Commission (Phyllis Ellin, Mary Tano, Roger Gasa, Connie Piazza) were helpful in gathering materials for this report. A draft of the corridor themes was produced by Canal Corridor Association and Barbara Levy and Associates. People throughout the corridor sent information on their sites and or programs as noted on the site inventory forms. These include: The Canallers in the Corridor; Lake Katherine Nature Preserve; Midewin National Tallgrass Prairie; Isle a la Cache Museum; Joliet Iron Works Historic Site; Hogan Grain Elevator; Illinois Waterway Visitor Center; Slovenian Heritage Museum; Worth Park District Historical Museum; Hegeler Carus Mansion; Little Red Schoolhouse Nature Center and others. I&M Canal NHC Interpretive Plan, Canal Corridor Association, 2005 Table of Contents Part I: Status of Interpretation.........................................................................................1
    [Show full text]
  • Chicago Downtown Chicago Connections
    Stone Scott Regional Transportation 1 2 3 4 5Sheridan 6 7 8 9 10 11 12 13 14 Dr 270 ter ss C en 619 421 Edens Plaza 213 Division Division ne 272 Lake Authority i ood s 422 Sk 422 u D 423 LaSalle B w 423 Clark/Division e Forest y okie Rd Central 151 a WILMETTE ville s amie 422 The Regional Transportation Authority r P GLENVIEW 800W 600W 200W nonstop between Michigan/Delaware 620 421 0 E/W eehan Preserve Wilmette C Union Pacific/North Line 3rd 143 l Forest Baha’i Temple F e La Elm ollw Green Bay a D vice 4th v Green Glenview Glenview to Waukegan, Kenosha and Stockton/Arlington (2500N) T i lo 210 626 Evanston Elm n (RTA) provides financial oversight, Preserve bard Linden nonstop between Michigan/Delaware e Dewes b 421 146 s Wilmette 221 Dear Milw Foster and Lake Shore/Belmont (3200N) funding, and regional transit planning R Glenview Rd 94 Hi 422 221 i i-State 270 Cedar nonstop between Delaware/Michigan Rand v r Emerson Chicago Downtown Central auk T 70 e Oakton National- Ryan Field & Welsh-Ryan Arena Map Legend Hill 147 r Cook Co 213 and Marine/Foster (5200N) for the three public transit operations Comm ee Louis Univ okie Central Courts k Central 213 93 Maple College 201 Sheridan nonstop between Delaware/Michigan Holy 422 S 148 Old Orchard Gross 206 C Northwestern Univ Hobbie and Marine/Irving Park (4000N) Dee Family yman 270 Point Central St/ CTA Trains Hooker Wendell 22 70 36 Bellevue L in Northeastern Illinois: The Chicago olf Cr Chicago A Harrison 54A 201 Evanston 206 A 8 A W Sheridan Medical 272 egan osby Maple th Central Ser 423 201 k Illinois Center 412 GOLF Westfield Noyes Blue Line Haines Transit Authority (CTA), Metra and Antioch Golf Glen Holocaust 37 208 au 234 D Golf Old Orchard Benson Between O’Hare Airport, Downtown Newberry Oak W Museum Nor to Golf Golf Golf Simpson EVANSTON Oak Research Sherman & Forest Park Oak Pace Suburban bus.
    [Show full text]
  • Downtown Transit Sightseeing Guide
    All Aboard! Buses Trains Fares* Quick Ride Guide Chicago Transit Authority This guide will show you how to use Chicago Transit Riding CTA Buses Riding CTA Trains Base/Regular Fares From the Loop 151511 SHERIDIDANAN Deducted from Transit Value in a Ventra Authority (CTA) buses and trains to see Downtown Chicago, CTA buses stop at bus shelters or signs Each rail line has a color name. All trains operate Downtown Transit Account on a Ventra Card or Attraction Take Bus or Train: North Michigan Avenue, and a few places beyond. that look like this. Signs list the service TOTO DEEVO VO NN daily until at least midnight, except the Purple Line Express (see contactless bankcard Full Reduced** days/general hours, route number, name map for hours). Trains run every 7 to 10 minutes during the day Art Institute, Chicago Cultural Ctr. Short walk from most buses and all rail lines ♦ Chinatown Red Line train (toward 95th/Dan Ryan) The CTA runs buses and elevated/subway trains (the ‘L’) and destinations, and the direction of travel. and early evening, and every 10 to 15 minutes in later evening. ‘L’ train fare $2.50 $1.25 in the State Street Subway south to that serve Chicago and 35 nearby suburbs. From Here’s a quick guide to boarding in the Downtown area: Bus fare† $2.25 $1.10 When a bus approaches, look at the sign Cermak-Chinatown X or bus 62 South on State Downtown, travel to most attractions on one bus or train. 22 Clark above the windshield. It will first show the 22 Clark Blue Line Dearborn Street subway Transfer (up to two additional ‘L’ train or bus 25¢ 15¢ DuSable Museum 4 south on Michigan (starts at Randolph) Downtown route number and route name, then change rides within two hours) FirstMerit Bank Pavilion at 146 south on State or 130 (Memorial Day 24 Wentworth Brown Line Loop elevated Northerly Island Park weekend thru Labor Day) east on Jackson We Have Answers to show the destination.
    [Show full text]