Black Granite
Total Page:16
File Type:pdf, Size:1020Kb
FOREST DIVERSION PROPOSAL OF GRANT OF QUARRY LEASE FOR BLACK GRANITE Area APPlied for Q.L. : 35'9428 Ha Beat TallapusaPalle Range IVlahabubabad Compt Nos 1171 &1172 R.F Dhanasari Reserved Forest Division South Warangal Village TallapusaPalle IVlandal Kesamudram District tVlahabubabad '1980) (Under Section 2 of the Forest Conservation Act' NAME OF THE APPLICANT: M/S- TELI\NGANA STATE MINERAL I'EVELOPMENT COBPONATION LIMITED #6-2-915, HMWSSB Premises, Rear Block,3'd Floor, Khairtabad' Hyderabad, Telangana State-500004 S.P. Road, Secunderabad - 500 003 \J, Annexure - VII (a) CHECK LIST (Check list for the proposal for diversion of Forest lands for non-forestry purpose under the Forest Conservation Act, 1980 for Ouarry Proiects) State S. No. of Project: Date of receipt in Nodal Officer-PCCF,s office: Name of the Project: Quarry Lease Application for BLACK GRANITE over an extent of 35.9428 Ha in South Warangal Division User Agency : M/S TSMDC LIMITED Area for divers in Ha: 35.9428 Ha Type of work: 9pqn Cast Quarry Name of Division: SOUTH WARANGAL Division Provided Page SN Name of Document (s) or Not Remarks No (Yes/ No) B PART-I (To be filled in by the UA) I Main application Form from Parl-l to V as prescribed in the rules under Forest (Conservation) Act, 1980 with all its columns duly filled up and signed by the competent authority with date, place and Yes 4-12 their official seal. All the inforrnation of Part-I of the Form A including Item-wise Breakup of the forest area required must be given in the Fonn itself by expanding the columns. 2 Detailed note on the project and Profile of the User Agency. Yes l3 3 Full Justification for locating the project in forest Yes 4 area (un-avoidance ofthe forest area for the purpose) 4 Map of the project site in forest area clearly showing forest bor:ndaries and adjoining areas with Yes their land use in distinct colors in 1:50000 or any other suitable scale on !urvey of India topo-sheet. 5 Index Map, if the area is very small, showing forest boundaries and a location map on a larger scale with Yes land use ofthe area ru ired. 6 DGPS Survey of the area Geo-referenced digital data of proposed forestland proposed for diversion to be diverted (e00 format, Geographic co-ordinate was authenticated. Ietter system WGS 84 datum, readings up to 8 decimal was issued by PCCF, places in degrees) of the boundary/ies of the proposed Telangana State, FL for diversion in Shape file (Soft copy in a DVD Hyderabad vide along with RAW & post-processed data) and digital Rc.No. I 9000/20 I 8-FCA- map in hard copy duly authenticated by competent Yes 2dt:12.02.2019 is for an authority. extent of 35.9428Ha * The survey shall be performed using DGPS in real- (33.9426 Ha for time or post-processed mode. However the survey Quarry Area +0.0921 Ha for may be performed using TS in GPS shadow areas, and Approach Road+ 1.9081 data shall be duly geo-referenced using GCPs Ha of Forest Land for collected by dual frequency DGPS receivers. Safety Zone area). 7 Lay-out plan of proiect site. Yes 25 Break up given 8 Statement showing the details of forest area involved Yes 25 2 i.e. RF Block & Compartment No. and item -n ise breal<up of thc forest arca proposed for diversion. 9 Mininrum distance of the proposed site from Wildlife and National Park. No Not Applicable t0 Statement giving th e details of non-forestry activities involved in the osal No Not Applicable ll Cost Benefit (CB) analysis in prescribed format, 29- wherever requ ired .(For projects involving area of >20 Yes I-la in lains & >5 FIa in hills 3l t2 No Objection Certificate from local bodies, Iike Grarn Sabha etc.. except in cases of linear diversiorr No Will be subrnitted in due course arrd public utiliry projects. l3 Status of clearance under Environment (Protection) Will be submined Act, 1986 & Rules 2006, wherever required. If No in due course received Copy of the same to be enclosed. I5 Detail scheme for rehabilitation of project affected No Not Applicable persons! wlrerever req u i red. 16 Willbe Detailed Reclamation PIan, wherever required. No t4 submitted in due course (Undertaking given) 17 The details of Zone Area for the min Yes Map enclosed t8 The undertaking frorn the project authority to bear the Yes 17 cost of fencing of the safetv zone area t9 The undertaking from the project authority to bear the cost of Afforestatiolt over one and half tirnes of Yes 28 degraded forest area, 20 Underlaking by User Agency to bear the cost of Compensatory Af{orcstation Yes t8 2l Undertaking by User Agerrcy to pay the Net Present Value (NPV), Addl. NPV (if levied) of the forest land Yes r6 involved. 22 Undertaking to pay the Extraction Charges of the Yes trees to be removed front the forest land involved t9 ZJ Details of non-forest land identified for Compensatory Afforestation viz. Survey No., Will be submitted in due Village, Tehsil / Mandal, District etc. along with map No coLlrse in l:50,000 or suitable scale, along with the boundaries of adjoining forest in distinct colors. 24 Geo-referenced digital data of CA land (e00 format, Geographic co-ordinate system WGS 84 datum, readings up to 8 decimal places in degrees) of the boundary/ies of the proposed FL for diversion in Shape file (Soft copy in a DVD along rvith RAW & post-processed data) and digital map in hard Will be submitted in due No copy duly authenticated by competent authority. course * The survey shall be performed using DGPS in real- time or post-processed mode. However the survey rnay be perforrned Lrsing TS in GPS shadow areas, and data shall be duly geo-referenced using GCPs collected by dual frequency DGPS receivers. 25 DGPs make-Spectra Make & Model of the DGPS equipment used, Model-SP80, Agency- Name/s of the Agency/persons involved in the Surnadhura Georlatica DGPS survey, pcriod of survey, name of the Yes Pvt. Ltd, One dav sLlrve\,. authenticating agency for the accuracy of the survey. Authenticating agency' - PCCF Offlce,'l'elangana. 26 Soft copy of the complete proposal in soft copy in pdf format. Yes J APPENDEX v (See Rule 6) FORM -'A' Form for seekinq prior approval under section-2 of the proposals by the state Government and other authorities PART.1 (TO BE FTLLED BY USER AGENCY) 1 Project Details Diversion of 35.9428 Ha of Forest i) Short narrative of the proposal and Land in Compt No. 1171 & 1172 of project / scheme for which the Dhanasari Reserve Forest Block, forestland is required Beat : Tallapusapalle, Range : lVlahabubabad of South Warangal Division of tMahabubabad District for Quarry Lease for BLACK GRANITE lVineral by M/S TELANGANA STATE MINERAL DEVELOPMENT CORPORATION LIMITED, # 6-2-915, HIvIWSSB Premises, Rear Block,3rd Floor, Khairlabad, Hyderabad, Telangana State-S00004 The applied area falls in Survey of lndia Topo Sheet No. 56 0114. The applied area is situated towards North East side of Tallapusapalle Village at a distance of around 1.Skms. The applied area is therefore 1.5Kms from Tallapusapalle village which is having Communication facilities. The applied area BLACK GRANITE deposit of this category is presently not available in the surrounding / nearby non-forest areas. The BLACK GRANITE deposit of this quality and bulk deposit available in the applied area may yield good quality of BLACK GRANITE. 4 I Map showing the reserve forest area i) Map showing the required forest proposed for diversion is enclosed. DGPS Survey of the area proposed for and boundary of adjoining forest on diversion was authenticated.Letter was 1:50,000 scale map. issued by PCCF, Telangana, Hyderabad.vide. Rc.No 1 9000/201 8-FCA-2, dt: 12.02.2019 is for an extent of 35.9428 Ha (33.9426 Ha for Quarry Area + 0.092'l Ha for Approach Road + 1.908'1 Ha of Forest Land for Safety Zone area Rs.7 to 10.0 Crores which is excluding of iii) Cost of the project the cost towards Net Present Value of forest land proposed for diversion, Cost towards procurement of non-forest land for Compensatory Afforestation, Compensatory Afforestation Scheme Cost, Cost towards Safety Zone and any other cost that to be Paid to forest Department. The Good Quality BLACK GRANITE iv) Justification for locating the project fvlineral is available in this sector and in the forest area in the designated forest area only. Hence, there is no alternative but to locate project in the forest aroa.r v) Cost-benefit analysis (to be Annexure is enclosed vide enclosed) Annexure - V Directly and lndirectly lot of skilled and vi) Employment likely to be generated un-skilled personnel will be employed at the time of Quarry operations Ce r.rcy Further during execution of the proposed Quarry Lease certain employment will be generated'- 2 Quarry Area : 33.9426 Ha Purpose wise break-up of the land Approach Road : 0,0921 Ha required Safety Zone Area : 1.9081 Ha Total Area : 35.9428 Ha Over Burden Dump Area : '18.00 Ha people 3. Details of displacement of the Not applicable due to the proiect, if any i) Number of families Not applicable ii) Number of Scheduled Castes I Not applicable Scheduled Tribes families 4 Whether Clearance under Yes this fresh QL applied area, it is Environment (Protection) Act 1 986 required Environment (Protection) Act, required?(Yes/No). 1 986.