Map.Pdf 120KB

Total Page:16

File Type:pdf, Size:1020Kb

Map.Pdf 120KB ® TEL: +86-21-61948810 WESTINGAREA FAX: +86-21-61948803 Add: WESTINGAREA Building MRO·LAB·MEDICAL No.1 Meisheng Road, Waigaoqiao Free Trade Zone The future is now! Shanghai 200131, P.R.C. SHANGHAI WESTINGAREA M&E SYSTEM CO., LIMITED Welcom e to WESTINGAREA Dear Sir/Madam, We sincerely welcome you to visit WESTINGAREA Shanghai Head Office; Honored us with your presence. To facilitate the smooth arrival at WESTINGAREA building please refer to the following guideline, for any other questions please call +86-21-61948810. We wish you a safe journey! WESTINGAREA Map Guide˖ Traffic Departure Nearby Metro Station Distance Time Way Point Take a taxi to Songhong Road metro station of Line 2; from there take Line 2 to the Metro Hongqiao C e n tu r y Avenue metro station and transfer to 37.9 1.5 Train Air Port Line 6 to Hangjin Road metro station in the K.M. Hours direction of Gangcheng Road metro station. Take the Airport Bus No. 3 to the Longyang Road metro station of Line 2; from there take Pudong the train to Century Avenue metro station 47.4 1.5 Int’l then transfer to Line 6 to Hangjin Road metro K. M. Hours Air Port station in the Gangcheng Road metro station. Take the Line 4 metro train to Century Shanghai Avenue metro station; from there transfers to 27.2 1.3 Railway Line 6 to Hangjin Road metro station in the K. M. Hours Station direction of Gangcheng Road metro station. Take the Line 1 metro train to Shanghai Shanghai Stadium station; from there transfer to line 4 South to Century Avenue metro station. Then 27.3 1.3 Railway transfer to line 6 to Hangjin road metro K. M. Hours Station station in the direction Gang Cheng Road metro station. WESTINGAREA TH E FU TU RE IS NO W WESTINGAREA M RO gLABgM ED ICAL Take the train from nearby metro station; then transfer to line 6 to Other Hangjin road metro station in the direction Gang Cheng Road metro station. Drive to the nearby middle ring road of Pudong direction. Go straight along the Xiangyin Road Tunnel and Wuzhou Avenue then From turn left on the North Yanggao Road and go straight. Now turn right Puxi, at Gate No. 4 of Waigaoqiao Free Trade Zone. After entering the Shanghai Gate turn right on No.1 West Fute Road then turn left on Meisheng Self road. Drive From Drive along North Yanggao Road in the North direction, turn right at Pudong, Gate No. 4 of Waigaoqiao Free Trade Zone. After entering the Gate Shanghai turn right on No.1 West Fute Road then turn left on Meisheng road. WESTINGAREA Building GPS Coordinate: 31.335039Nˈ121.594978E WESTINGAREA Customer Care Center WESTINGAREA Building, No. 1 Meisheng Road, Waigaoqiao Free Trade Zone, Shanghai, 200131, PRC (100 meters from Hangjing Road metro station) Tel: +86-21-61948810; 021-61948803 Website: www.westingarea.com Attachment: WESTINAREA Traffic Direction Map WESTINGAREA M AKE LIFE M O RE PRETTY .
Recommended publications
  • Study Away Student Handbook
    NYU Shanghai STUDY AWAY STUDENT HANDBOOK Summer 2017 Shanghai Global Affairs [email protected] https://shanghai.nyu.edu/summer-admitted Table of Contents Welcome 1.Important Dates ​ 2. Contacts 2.1 NYU Shanghai Staff and Offices Academics Global Affairs Chinese Language Clinic Student Life Ner Student Programs Student Mobility Residential Life Health and Wellness IT Services 2.2 Emergency Contacts 3. Academic Policies & Resources Academic Requirements & Registration Guidelines Courses Learning Chinese Language Academic Support Academic Advising Textbook Policy at NYU Shanghai Attendance Policy Religious Holidays and Attendance Academic Integrity Examination and Grades Policies on Examinations Makeup Examinations Grades Policies on Assigned Grades Grade of P 1 Grade of W Grade of I Incompletes Pass/Fail Option Withdrawing from a Course Program Withdrawal Tuition Refund Schedule 4. Student Life Policies & Resources Student Conduct Policies and Process Residential Life Residence Hall Policies Resource Center How to Submit a Facilities Work Order Fitness Center Health and Wellness Health Insurance 5. Arriving in Shanghai Arrival Information Transportation to NYU Shanghai Shanghai Airports and Railway Stations Traveling from the Airport Move-In Day Arrangement Move-In Day 6. Life in Shanghai Arranging Your Finance Living Cost in Shanghai Banking and ATMs Exchanging Money Getting Around Dining Shopping Language Tips Religious Services Shanghai Attractions 2 Travel 7. Information Technology (IT) Printing IT FAQ – Setup VPN 8. Be Safe Public Safety Crime Prevention Safety in Shanghai Emergency Medical Transport NYU Shanghai Card Services Lost and Found Services Shuttle bus Safety Tips Safety on Campus Regulations Tips for Pickpocket Prevention If You Already Have Been Pickpocketed Information alert 3 Welcome ​ On behalf of the entire NYU Shanghai team, congratulations on your acceptance to NYU Shanghai’s Summer Program.
    [Show full text]
  • Download 3.94 MB
    Environmental Monitoring Report Semiannual Report (March–August 2019) Project Number: 49469-007 Loan Number: 3775 February 2021 India: Mumbai Metro Rail Systems Project Mumbai Metro Rail Line-2B Prepared by Mumbai Metropolitan Development Region, Mumbai for the Government of India and the Asian Development Bank. This environmental monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. ABBREVATION ADB - Asian Development Bank ADF - Asian Development Fund CSC - construction supervision consultant AIDS - Acquired Immune Deficiency Syndrome EA - execution agency EIA - environmental impact assessment EARF - environmental assessment and review framework EMP - environmental management plan EMR - environmental Monitoring Report ESMS - environmental and social management system GPR - Ground Penetrating Radar GRM - Grievance Redressal Mechanism IEE - initial environmental examination MMRDA - Mumbai Metropolitan Region Development Authority MML - Mumbai Metro Line PAM - project administration manual SHE - Safety Health & Environment Management Plan SPS - Safeguard Policy Statement WEIGHTS AND MEASURES km - Kilometer
    [Show full text]
  • Integrating CBTC Green Field and Re-Signalling Experience IRSTE/ IRSE International Convention, New Delhi April 27 Th & 28 Th 2012
    www.thalesgroup.com/canada Integrating CBTC Green Field and Re-signalling Experience IRSTE/ IRSE International Convention, New Delhi April 27 th & 28 th 2012 Hugo Ramos Transportation Systems - Signalling for Urban Rail 2 / Agenda Communication Based-Train Control Market requirements & implementation challenges Sharing experiences – project challenges & achievements Transportation Systems - Signalling for Urban Rail 3 / Thales signalling solutions for urban rail A complete portfolio of systems and related services enabling urban rail operators to take full advantage of the most advanced signalling solutions Centralise & automate the operation of Rail network the rail network management Operation & Control Centre (OCC) Route control Train control Set dedicated routes within the rail network to Supervise & control safely train movement and ensure train movement speed with on-board & trackside equipment Electronic interlocking Communications Based Train Control (CBTC) Rail field equipment Trackside equipment installed in the rail network Axle counter, point machine, signal Transportation Systems - Signalling for Urban Rail 4 / Communications Based Train Control (CBTC) The most advanced signalling solution available today for metros and people movers CBTC as defined in IEEE 1474.1 Train location determination to a high precision, independent of track circuits Continuous , bi-directional Radio Frequency (RF) communications between train and wayside, to permit the transfer of significantly more control and status data than is possible
    [Show full text]
  • The Urban Rail Development Handbook
    DEVELOPMENT THE “ The Urban Rail Development Handbook offers both planners and political decision makers a comprehensive view of one of the largest, if not the largest, investment a city can undertake: an urban rail system. The handbook properly recognizes that urban rail is only one part of a hierarchically integrated transport system, and it provides practical guidance on how urban rail projects can be implemented and operated RAIL URBAN THE URBAN RAIL in a multimodal way that maximizes benefits far beyond mobility. The handbook is a must-read for any person involved in the planning and decision making for an urban rail line.” —Arturo Ardila-Gómez, Global Lead, Urban Mobility and Lead Transport Economist, World Bank DEVELOPMENT “ The Urban Rail Development Handbook tackles the social and technical challenges of planning, designing, financing, procuring, constructing, and operating rail projects in urban areas. It is a great complement HANDBOOK to more technical publications on rail technology, infrastructure, and project delivery. This handbook provides practical advice for delivering urban megaprojects, taking account of their social, institutional, and economic context.” —Martha Lawrence, Lead, Railway Community of Practice and Senior Railway Specialist, World Bank HANDBOOK “ Among the many options a city can consider to improve access to opportunities and mobility, urban rail stands out by its potential impact, as well as its high cost. Getting it right is a complex and multifaceted challenge that this handbook addresses beautifully through an in-depth and practical sharing of hard lessons learned in planning, implementing, and operating such urban rail lines, while ensuring their transformational role for urban development.” —Gerald Ollivier, Lead, Transit-Oriented Development Community of Practice, World Bank “ Public transport, as the backbone of mobility in cities, supports more inclusive communities, economic development, higher standards of living and health, and active lifestyles of inhabitants, while improving air quality and liveability.
    [Show full text]
  • Transportation the Conference Will Be Held in North Zhongshan Road
    Transportation The conference will be held in North Zhongshan Road campus of East China Normal University (ECNU). The address is: No. 3663, North Zhongshan Road, Putuo, Shanghai. The hotel where all participants will stay is Yifu Building (逸夫楼) located on the campus. Arrival by flights: There are two airports in Shanghai: the Pudong Airport in east Shanghai and the Hongqiao Airport in west Shanghai. Both are convenient to get to the North Zhongshan Road campus of ECNU. At the airport, you can take taxi or metro to North Zhongshan Road Campus of ECNU. Taxi is recommended in terms of its convenience and time saving. Our students will be there for helping you to find the taxi. By taxi From Pudong Airport: about one hour and 200 CNY when traffic is not busy. From Hongqiao Airport: about 30 minutes and 60 CNY when traffic is not busy. Please print the following tips if you like “请带我去华东师范大学中山北路校区正门” in advance and show it to the taxi driver. The Chinese words in tips mean "Please take me to the main gate of North Zhongshan Road Campus of ECNU". By metro From Pudong Airport: 1. Metro Line 2 (6:00 - 22:00)->Zhongshan Park (中山公园) station (Note: exchange at Guanglan Road station(广兰路)), then take taxi for about 10 minutes and 14 CNY cost to North Zhongshan Road Campus of ECNU, or take the bus 67 for 2 stops and get off at ECNU station(华东师大站)instead. 2. Metro Line 2->Jiangsu Road (江苏路) station-> Metro Line 11->Longde Road (隆德路) station->Metro Line 13-> Jinshajiang Road (金沙江路) Station->10 minutes walk.
    [Show full text]
  • Development of High-Speed Rail in the People's Republic of China
    A Service of Leibniz-Informationszentrum econstor Wirtschaft Leibniz Information Centre Make Your Publications Visible. zbw for Economics Haixiao, Pan; Ya, Gao Working Paper Development of high-speed rail in the People's Republic of China ADBI Working Paper Series, No. 959 Provided in Cooperation with: Asian Development Bank Institute (ADBI), Tokyo Suggested Citation: Haixiao, Pan; Ya, Gao (2019) : Development of high-speed rail in the People's Republic of China, ADBI Working Paper Series, No. 959, Asian Development Bank Institute (ADBI), Tokyo This Version is available at: http://hdl.handle.net/10419/222726 Standard-Nutzungsbedingungen: Terms of use: Die Dokumente auf EconStor dürfen zu eigenen wissenschaftlichen Documents in EconStor may be saved and copied for your Zwecken und zum Privatgebrauch gespeichert und kopiert werden. personal and scholarly purposes. Sie dürfen die Dokumente nicht für öffentliche oder kommerzielle You are not to copy documents for public or commercial Zwecke vervielfältigen, öffentlich ausstellen, öffentlich zugänglich purposes, to exhibit the documents publicly, to make them machen, vertreiben oder anderweitig nutzen. publicly available on the internet, or to distribute or otherwise use the documents in public. Sofern die Verfasser die Dokumente unter Open-Content-Lizenzen (insbesondere CC-Lizenzen) zur Verfügung gestellt haben sollten, If the documents have been made available under an Open gelten abweichend von diesen Nutzungsbedingungen die in der dort Content Licence (especially Creative Commons Licences), you genannten Lizenz gewährten Nutzungsrechte. may exercise further usage rights as specified in the indicated licence. https://creativecommons.org/licenses/by-nc-nd/3.0/igo/ www.econstor.eu ADBI Working Paper Series DEVELOPMENT OF HIGH-SPEED RAIL IN THE PEOPLE’S REPUBLIC OF CHINA Pan Haixiao and Gao Ya No.
    [Show full text]
  • (Presentation): Improving Railway Technologies and Efficiency
    RegionalConfidential EST Training CourseCustomizedat for UnitedLorem Ipsum Nations LLC University-Urban Railways Shanshan Li, Vice Country Director, ITDP China FebVersion 27, 2018 1.0 Improving Railway Technologies and Efficiency -Case of China China has been ramping up investment in inner-city mass transit project to alleviate congestion. Since the mid 2000s, the growth of rapid transit systems in Chinese cities has rapidly accelerated, with most of the world's new subway mileage in the past decade opening in China. The length of light rail and metro will be extended by 40 percent in the next two years, and Rapid Growth tripled by 2020 From 2009 to 2015, China built 87 mass transit rail lines, totaling 3100 km, in 25 cities at the cost of ¥988.6 billion. In 2017, some 43 smaller third-tier cities in China, have received approval to develop subway lines. By 2018, China will carry out 103 projects and build 2,000 km of new urban rail lines. Source: US funds Policy Support Policy 1 2 3 State Council’s 13th Five The Ministry of NRDC’s Subway Year Plan Transport’s 3-year Plan Development Plan Pilot In the plan, a transport white This plan for major The approval processes for paper titled "Development of transportation infrastructure cities to apply for building China's Transport" envisions a construction projects (2016- urban rail transit projects more sustainable transport 18) was launched in May 2016. were relaxed twice in 2013 system with priority focused The plan included a investment and in 2015, respectively. In on high-capacity public transit of 1.6 trillion yuan for urban 2016, the minimum particularly urban rail rail transit projects.
    [Show full text]
  • How to Get There
    SECTION I EXHIBITION GUIDELINE How to Get There 12 SECTION I EXHIBITION GUIDELINE How to Get There (cont’d) Shanghai Metro Map 13 SECTION I EXHIBITION GUIDELINE How to Get There (cont’d) SNIEC is strategically located in Pudong‘s key economic development zone. There is a public traffic interchange for bus and metro, , one named “Longyang Road Station“ about 10-min walk from the station to fairground, and one named “Huamu Road Station“ about 1-min walk from the station to fairground. By flight The expo centre is located half way between Pudong International Airport and Hongqiao Airport, 35 km away from Pudong International Airport to the east, and 32 km away from Hongqiao Airport to the west. You can take the airport bus, maglev or metro directly to the expo center. From Pudong International Airport By taxi By Transrapid Maglev: from Pudong International Airport to Longyang Road Take metro line 2 to Longyang Road Station to change line 7 to Huamu Road Station, 60 min. By Airport Line Bus No. 3: from Pudong Int’l Airport to Longyang Road, 40 min, ca. RMB 20. From Hongqiao Airport By taxi Take metro line 2 to Longyang Road Station to change line 7 to Huamu Road Station, 60 min. By train From Shanghai Railway Station or Shanghai South Railway Station please take metro line1 to People’s Square, then take metro line 2 toward Pudong International Airport Station and get off at Longyang Road Station to change line7 to Huamu Road Station. From Hongqiao Railway Station, please take metro line 2 to Longyang Road Station and change line 7 to Huamu Road Station.
    [Show full text]
  • The Research About Line 3 and Line 4 Run Independently Transformed of Shanghai Urban Rail Transit
    International Journal of Business and Social Science Vol. 5 No. 1; January 2014 The Research about Line 3 and Line 4 run Independently Transformed of Shanghai Urban Rail Transit Aiqin Sun School of Management Shanghai University of Engineering Science Shanghai, China Zhigang Liu Vice-President of School of Urban Rail Transit Professor, Postdoctoral School of Urban Rail Transit Shanghai University of Engineering Science Shanghai, China Hua Hu Deputy Director of Rail Transport Operations Management Department Associate Professor, Doctor School of Urban Rail Transit Shanghai University of Engineering Science Shanghai, China Abstract As Shanghai rail network has been basically completed and its growth in passenger traffic, the situation about Line 3 and Line 4 collinear run has become a bottlenecks that constraint to improve overall network transport. This paper will be based on the analysis of the basic situation of Shanghai Rail Transit Network and Line 3 and Line 4 collinear running status, pointing out the drawbacks of Collinear run, which proposed the necessity and importance of the transformation to change the situation that Line 3 and Line 4 operate independently. And it will give the corresponding suggestions and measures. Key Words: Shanghai rail transit; Line 3; Line 4; run independently 1. The Status Quo of Development of Shanghai Rail Transit Network and Collinear Operation of Line3 and Line 4 1.1 Development of Shanghai Rail Transit Network With the rapid expansion of Shanghai urban rail transit network, the benefit of rail network passenger flow is increasingly prominent. The proportion of network passenger continues to rise, and enter the period of growing leaps and bounds with geometric growth.
    [Show full text]
  • GROUND SUBSIDENCE ALONG SHANGHAI METRO LINE 6 by PS-Insar METHOD
    The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences, Volume XLII-3, 2018 ISPRS TC III Mid-term Symposium “Developments, Technologies and Applications in Remote Sensing”, 7–10 May, Beijing, China GROUND SUBSIDENCE ALONG SHANGHAI METRO LINE 6 BY PS-InSAR METHOD Jicang Wu, Minyan Liao, Naiyi Li College of Surveying and Geo-Informatics, Tongji University, Shanghai, [email protected] Commission III, WG III/3 KEY WORDS:Ground subsidence, Shanghai Metro Line 6, PS-InSAR, COSMO-SkyMed, Envisat ASAR ABSTRACT: With the rapid development of urban economy, convenient, safe, and efficient urban rail transit has become the preferred method for people to travel. In order to ensure the safety and sustainable development of urban rail transit, the PS-InSAR technology with millimeter deformation measurement accuracy has been widely applied to monitor the deformation of urban rail transit. In this paper, 32 scenes of COSMO-SkyMed descending images and 23 scenes of Envisat ASAR images covering the Shanghai Metro Line 6 acquired from 2008 to 2010 are used to estimate the average deformation rate along line-of-sight (LOS) direction by PS-InSAR method. The experimental results show that there are two main subsidence areas along the Shanghai Metro Line 6, which are located between Wuzhou Avenue Station to Wulian Road Station and West Gaoke Road Station to Gaoqing Road Station. Between Wuzhou Avenue Station and Wulian Road Station, the maximum displacement rate in the vertical direction of COSMO-SkyMed images is - 9.92 mm/year, and the maximum displacement rate in the vertical direction of Envisat ASAR images is -8.53 mm/year.
    [Show full text]
  • ISU European Figure Skating Championships® 2013
    Lexus Cup of China 2014 ISU Grand Prix of Figure Skating Lexus Cup of China 2014 ISU Grand Prix of Figure Skating Shanghai, China November 7 to 9, 2014 Media Information Lexus Cup of China 2014 ISU Grand Prix of Figure Skating The Chinese Skating Association looks forward to hosting media attending the Lexus Cup of China 2014 ISU Grand Prix of Figure Skating in Shanghai, China. The event will be held at the Shanghai Oriental Sports Center from November 7 to 9, 2014. This information will assist you in planning your trip to Shanghai and to apply for media accreditation to cover the event. Every effort will be made to ensure journalists have all the appropriate facilities necessary to work at the event. The press centre and press tribune will be open and operational for the first practice session on 7, November, 2014 at 10:30 AM. Media Accreditation Package Media Accreditation Information.................................................................................................................. 3 Media Accommodation ................................................................................................................................. 3 Official Travel Agency or Tour Operator ............................................................................................. 4 Reservation Payment Conditions .......................................................................................................... 4 Transportation & Telecommunications .......................................................................................................
    [Show full text]
  • Five New Towns in Shanghai. Present Situation and Future Perspectives
    1 3 Five new towns in Shanghai. 2 Present situation and future perspectives. 4 5 State-of-the Art 2013/2014 Ulf Ranhagen April 2014 Department of Urban Planning at the Swedish Royal Institute of Technology (KTH) © Ulf Ranhagen 2014 Graphic design Olav Heinmets Photos Ulf Ranhagen Printed by US-AB, Universitetsservice TRITA SoM 2014-04 ISSN 1653-6126 ISNR KTH/SoM/14-04/SE ISBN 978-91-7595-068-6 Contents Preface 4 Abstract 5 Introduction 6 The five selected new towns for the study trip 8 Luodian Town – the Swedish New Town 9 Gaoqiao – Holland Village 24 Anting New Town – the German New Town 27 Thames Town – the British New Town 30 Pujiang New Town – the Italian New Town 33 Summary of the analysis of the five new towns 35 Final reflections 38 References 39 Preface I am a Swedish Professor working in the Department of I warmly thank FFNS research foundation for its support of Urban Planning at the Swedish Royal Institute of Technolo- the study. I thank Leon Yu, General Manager of Shanghai gy (KTH) and as Chief Architect at Sweco. I have received Golden Luodian Development Ltd., and Professor Liu Xiao a grant from FFNS research foundation to perform an Ping and Harry den Hartog, author of Shanghai New Towns, overall diagnosis and analysis of the State-of-the-Art of the for giving me valuable information on Luodian New Town. urban environment of new towns in Shanghai, especially The information centers of Anting New Town and Holland the towns developed within the framework of the One City Village also gave me valuable, useful information material for Nine Towns, which was launched in 2001.
    [Show full text]