Salisbury Central Area Framework Public Consultation

Total Page:16

File Type:pdf, Size:1020Kb

Salisbury Central Area Framework Public Consultation Salisbury Central Area Framework Public Consultation Report (Jan - Feb 2020) 1 1. Introduction 1.1. Wiltshire Council has produced a Salisbury Central Area Framework (CAF) which makes a series of recommendations for future development in Salisbury’s city centre area. 1.2. The CAF project was borne out of the recovery work in the city following the nerve agent attack in March 2018, which had a profoundly damaging impact on the city centre economy. At the time of writing Salisbury, along with the rest of the world, is now in the midst of the Covid-19 crisis. While the impact of the pandemic has delayed the work on the CAF, the shutdown and economic fallout has made the need to plan proactively for the city centre even more acute. It has accelerated the urgency to deliver the recommendations of the CAF in order to support Salisbury in its long-term recovery from both tragic events. The plans and projects within the CAF form an essential part of Salisbury's bounce back from these events. 1.3. The CAF makes a series of recommendations for deliverable development initiatives within the city centre area to help aid the city’s recovery. It is intended to serve as an evidence-based document to inform the Wiltshire Local Plan Review, the emerging Salisbury Neighbourhood Plan and future planning guidance documents as appropriate. 1.4. The council has undertaken two stages of in-depth public consultation on the CAF. The first was a consultation on a series of broad themes for the CAF between Thursday 27th June and Friday 9th August 2019 and the second was on a draft CAF between Thursday 16th January and Friday 28th February 2020. This report summarises the consultation on the draft CAF in January – February 2020. Details about the first stage of public consultation can be found on the Council’s website1. 1.5. The purpose of this document is to explain how the consultation process was carried out; to summarise the issues arising; and to provide a response to the issues raised highlighting how these have shaped the final CAF document. 2. How to use this document 2.1. This Consultation Report is broken down into a series of sections and appendices, as follows: • Section 3 sets out the methodology that has been undertaken in carrying out the consultation. • Section 4 sets out a summary of the consultation responses, and the council’s responses. • The appendices to the Consultation Report set out further details in respect of the consultation process. 3. Methodology for the consultation 3.1. In January 2020 the council embarked on a period of consultation on a draft CAF document that had been prepared following analysis of the responses received to the first public consultation. This second stage of consultation gave members of the public and other interested parties a further opportunity to have meaningful input in shaping the CAF. 1 Salisbury Central Area Framework: Report on summer 2019 public consultation http://www.wiltshire.gov.uk/downloads/21279 2 3.2. The consultation was comprehensive and followed the prescription outlined for the preparation of Supplementary Planning Documents in Wiltshire Council's Statement of Community Involvement (SCI)2. The council invited consultation responses between Thursday 16th January and Friday 28th February 2020. Who was consulted? 3.3. Organisations, groups and individuals set out within the Regulations3 and the SCI were notified of the start of the consultation period and how to comment. 3.4. Because the CAF relates to Salisbury only, it was decided that the consultation should be focussed only on parts of Wiltshire that are likely to be affected by the project. As such, the consultation outreach was focussed on the Salisbury, Wilton, Amesbury and Southern Wiltshire Community Areas. 3.5. Due to the geographic location of Salisbury – being relatively close to the administrative boundaries of Dorset Council, New Forest District Council, New Forest National Park and Test Valley District Council – notifications were also sent to parish councils in these areas that were considered likely to have an interest in the CAF. How were people consulted? 3.6. Consultees were made aware of the consultation through a variety of means, including direct notifications by email or post to relevant consultees on the council’s consultation database. A copy of the letter and email that was sent out to consultees can be viewed at Appendix A. 3.7. Opportunities for engagement with the consultation process were also widely advertised prior to commencement and included: • Announcements / articles about the CAF on the Wiltshire Council website, Salisbury City Council website, Salisbury Journal newspaper website, Spire FM website and Wiltshire Life website. See Appendix B. • Announcements through Wiltshire Council e-newsletters. See Appendix C. • Social media communications. See Appendix D. 3.8. Consultees were informed that the consultation material was available to view throughout the consultation period at the following locations: • In electronic format on the council’s website • In paper format at the following locations: o Salisbury Library (including exhibition board display) o Wilton Library o Downton Library o Amesbury Library o Durrington Library o Five Rivers Leisure Centre, Salisbury (including exhibition board display) o Wiltshire Council Bourne Hill offices in Salisbury o Wiltshire Council County Hall offices in Trowbridge 2 Wiltshire Council Statement of Community Involvement (SCI), July 2015, available at: http://www.wiltshire.gov.uk/downloads/9895 3 The Town and Country Planning (Local Planning) (England) Regulations 2012 3 3.9. In addition, there were two extensive full day public exhibitions about the CAF. The first was held on Tuesday 21st January 2020 at Salisbury City Hall and the second was held on Thursday 29th January 2020 at the United Reformed Church on Fisherton Street. The two exhibitions were also used as an opportunity to inform the public about some of the details of projects emerging from the CAF and were being progressed in tandem. Approximately 40 exhibition boards were on display and Wiltshire Council officers, various consultant colleagues and officers from the Environment Agency were in attendance to answer questions from members of the public. Both exhibitions were very well attended. A copy of the CAF exhibition boards can be found at Appendix E. CAF exhibition at Salisbury City Hall, 21st January 2020 3.10. Representors were offered several ways to respond to the consultation. A survey could be completed and submitted via Wiltshire Council’s consultation portal4. Alternatively, surveys and other comments could be submitted by email or post or could be submitted by hand at either of the public exhibitions. A copy of the survey can be viewed at Appendix F. 3.11. The consultation was widely accessible to a broad range of people, thereby offering ample scope for all those with an interest in developing the proposals for the CAF to comment. 4 Consultation portal, available at https://consult.wiltshire.gov.uk/portal/majorprojects/salisbury_central_area_framework_jan-feb_2020_1 4 4. Summary of responses and issues arising 4.1. Over the consultation period 312 duly made representations were received. 4.2. The representations were processed, logged with unique ID numbers, and made anonymously available to view on the council’s consultation portal. Respondents could also log in to the council’s consultation portal to view the answers they had given to the survey. Analysis of consultation topics 4.3. The following section sets out a summarised analysis of the consultation responses that were received, set out in question order as appeared in the consultation survey. A more detailed set of summarised responses, along with Wiltshire Council officer responses can be found at Appendix G. 5 Question 1 4.4. Question 1 asked: In order to improve the local environment and air quality in the city centre, the CAF proposes to develop a ‘street hierarchy’ that prioritises streets and spaces for pedestrians and cyclists over cars. To what degree would you support such proposals? 100% 90% 84% 80% 70% 60% 50% 40% 30% 20% 10% 10% 6% 0% Overall support Don't know Overall opposition 4.5. Of those responding to Question 1, a significant majority were in support of the development of a street hierarchy to prioritise streets and spaces for pedestrians and cyclists over cars. 4.6. A number of additional issues were raised, including: • Keep free access for those with poor mobility, the elderly etc. and not only blue badge holders. • The needs of disabled people must be considered from an early stage of developing proposals. • Must consider the needs of those with mental health conditions cannot use busy areas and rely on private car access. • Access is needed by residents, healthcare worker, businesses/shops. Some businesses require car access for appointments/ visits, deliveries, bulky items. • There would need to be another way for through traffic and deliveries. • Set up specified times for goods deliveries. • Ban cars (excluding buses/blue badge holders) for specified times of the day. • Concern that reducing access will harm viability of businesses. • Making it less convenient for people to access the city and park may put people off from visiting. • Ban lorries/HGVs from the centre. • Salisbury’s air quality needs improving, introduce more electric cars / buses / tuk-tuk rickshaws. • Introduce more trees/greenery, e.g. like on Winchester Street. • Introduce ‘City Trees’ - permanent installations of moss planting which improve and monitor air quality - could be sponsored by business. • Exeter Street and Southampton Road need landscaping and trees. • Continued access for buses in the centre is essential. 6 • Support for introducing pedestrian areas it will make the city more attractive, safe, and clean. • Pedestrianise Fisherton Street. • Concern about creating rat runs in other parts of the area, e.g.
Recommended publications
  • Neighbourhood Plan: Submission Draft Pimperne Neighbourhood Plan
    Pimperne Neighbourhood Plan: Submission draft Pimperne Neighbourhood Plan Prepared by: Pimperne Neighbourhood Plan Group, on behalf of Pimperne Parish Council, North Dorset Version: Submission draft Plan period: 2016 to 2031 Date of publication: April 2018 April 2018 Pimperne Neighbourhood Plan: Submission draft Contents Summary: why this Neighbourhood Plan is important ............................................................ 1 Introduction ..................................................................................................................... 2 Why do we need a Neighbourhood Plan? ........................................................................... 2 What difference will a Neighbourhood Plan make? .............................................................. 2 How this Plan was prepared ............................................................................................. 2 With thanks to… ............................................................................................................. 3 About the area .................................................................................................................. 4 What do we want for Pimperne’s future? .............................................................................. 5 Vision and objectives ...................................................................................................... 5 Plan period and future reviews ......................................................................................... 5 The character
    [Show full text]
  • (Public Pack)Agenda Document for Weymouth & Portland Borough
    Public Document Pack PLANNING COMMITTEE Members of Planning Committee are invited to attend this meeting at Commercial Road, Weymouth, Dorset to consider the items listed on the following page. Matt Prosser Chief Executive Date: Wednesday, 10 January 2018 Time: 9.00 am Venue: Council Chamber - WPBC Members of Committee: M Tewkesbury (Chairman), M Leicester (Vice-Chairman), K Brookes, H Bruce, I Bruce, J Ellis, C James, O Kanji, P Kimber, C Page-Nash, A Weaving and S West USEFUL INFORMATION For more information about this agenda please telephone Elaine Tibble, 01305 838223 email [email protected] This agenda and reports are also available on the Council’s website at www.dorsetforyou.com/committees/ Weymouth and Portland Borough Council. Mod.gov public app now available – Download the free public app now for your iPad, Android and Windows 8.1/10 tablet from your app store. Search for Mod.gov to access agendas/ minutes and select Dorset Councils Partnership. Members of the public are welcome to attend this meeting with the exception of any items listed in the exempt part of this agenda. Disabled access is available for all of the council’s committee rooms. Hearing loop facilities are available. Please speak to a Democratic Services Officer for assistance in using this facility. Recording, photographing and using social media at meetings The council is committed to being open and transparent in the way it carries out its business whenever possible. Anyone can film, audio-record, take photographs, and use social media such as tweeting and blogging to report the meeting when it is open to the public, so long as they conform to the Council’s protocol, a copy of which can be obtained from the Democratic Services Team.
    [Show full text]
  • Bath & North East Somerset Bristol
    Archaeological Investigations Project 2004 Field Evaluations South West Bath & North East Somerset Bath & North East Somerset 2 /824 (C.47.S001) ST 76556663 BA1 7HZ BAILBROOK 1, BATH Bailbrook 1, Bath, Bath and North-East Somerset. Archaeological Evaluation Evans, D Cirencester : Cotswold Archaeology, 2004, 10pp, figs, tabs, refs Work undertaken by: Cotswold Archaeology An archaeological evaluation was undertaken in advance of a proposed residential development. The evaluation identified a single ditch and associated recuts. Although undated, the ditch correlated closely with the location of a former field boundary depicted on late 19th century cartographic sources. [Au(adp)] Archaeological periods represented: UD 2 /825 (C.47.T001) ST 76656705 BA1 7AE BAILBROOK 2, BATH Bailbrook 2, Bath, Bath and North-East Somerset: Archaeological Evaluation Evans, D Cirencester : Cotswold Archaeology, 2004, 12pp, figs, tabs, refs Work undertaken by: Cotswold Archaeology 11 evaluation trenches were excavated but no archaeology was encountered. [AIP] 2 /826 (C.47.S002) ST 76556663 BA1 7HZ BAILBROOK 4 (THE ELMS), BATH Bailbrook 4 (The Elms), Bath, Bath and North-East Somerset. Archaeological Evaluation Evans, D Cirencester : Cotswold Archaeology, 2004, 11pp, figs, tabs, refs Work undertaken by: Cotswold Archaeology An archaeological evaluation was undertaken in advance of a proposed development. The evaluation identified two undated, intercutting ditches/gullies and a probable post-medieval land drain. [Au(abr)] Archaeological periods represented: UD, PM 2 /827 (C.47.S003) ST 75476544 BA2 6NX GIBBS GARAGE, BATHWICK STREET, BATH Gibbs Garage, Bathwick Street, Bath. An Archaeological Evaluation Wallis, S Reading : Thames Valley Archaeological Services, 2004, 27pp, colour pls, figs, refs Work undertaken by: Thames Valley Archaeological Services Evaluation trenches were excavated and observation of geo-technical pits was carried out on the site of a proposed residential development.
    [Show full text]
  • (Public Pack)Agenda Document for North Dorset District Council Full
    Public Document Pack FULL COUNCIL Members of North Dorset District Council are invited to attend this meeting at Durweston Village Hall, Church Road, Durweston, Blandford Forum, Dorset, DT11 0QA, to consider the items listed on the following page. Stuart Caundle Head of Paid Service Date: Friday, 25 January 2019 Time: 10.00 am Venue: Durweston Village Hall - NDDC Members of Committee: P Batstone, B Batty-Smith MBE, D Beer, P Brown, A Burch (Vice-Chairman), G Carr- Jones, A Cattaway, A Chase, B Cooper, D Croney, C Dowden, V Fox, J Francis, M Gould, T Handford, G Jefferson, S Jespersen, A Kerby, N Lacey-Clarke, C Langham, E Parker, V Pothecary (Chairman), S Pritchard, B Ridout, M Roake, D Skipwith, J Somper, Jackie Stayt, John Stayt, J Tanner, D Walsh, J Westbrook and P Williams MBE USEFUL INFORMATION For more information about this agenda please telephone Sandra Deary 01258 484370 email [email protected] This agenda and reports are also available on the Council’s website at www.dorsetforyou.com/committees/ North Dorset District Council. Members of the public are welcome to attend this meeting with the exception of any items listed in the exempt part of this agenda. Please note that if you attend a committee meeting and make oral representations to the committee your name, together with a summary of your comments will be recorded in the minutes of the meeting. The minutes, which are the formal record of the meeting, will be available to view in electronic and paper format, as a matter of public record, for a minimum of 6 years following the date of the meeting.
    [Show full text]
  • 8 Cultural Heritage Final FINAL
    Bake Farm Environmental Statement Chapter 8 CULTURAL HERITAGE INTRODUCTION 8.1. This chapter provides an assessment of the potential archaeological and heritage implications of a proposed solar energy farm at Bake Farm, Coombe Bissett, Wiltshire (Site centre SU 113 277; Fig. 8.1). It has been prepared by Archaedia. Site context 8.2. Chapter two and three of this ES provide a detailed description of the application site and the proposed development. In summary, the application site is within four agricultural fields to the north east of the village of Coombe Bissett (The Site; Fig. 8.1) and extends over an area of 40.2 hectares. The proposed development comprises a solar farm, access track, cable trench and related development. 8.3. This chapter aims to establish the presence or absence, character and extent, date, integrity, state of preservation and relative value of the known or potential heritage assets within the Site. In order to understand the context of the Site, it aims to establish the history and land-use development of the area and its environs, thereby allowing an assessment and quantification of the relevant impact of the proposed development on this resource. In addition it considers the impact on the settings of designated assets in the wider area. Finally, the effects of the proposed development and the need for and scope of any mitigation required to address such effects are set out. Planning context 8.4. Chapter five of this Environmental Statement (ES) sets out the full planning policy context at the national and local levels. The paragraphs below identify guidance and planning policy relevant to archaeology and cultural heritage.
    [Show full text]
  • Channel Islands from the English Crown
    JOURNAL June 38 2011 Well Turned Out, Shell Turned Out! Please note that Copyright for any articles contained in this Journal rests with the Authors as shown. Please contact them directly if you wish to use their material. 1 Hello All In recent months there has been the news of the deaths of two further Great War veterans, Frank Buckles in the USA, and former Royal Navy man, Claude Choules in Australia, both having reached the grand old age of 110 years. One cannot be too sad, for both had clearly enjoyed long lives, certainly way past the ‘three score and ten’. But, another death that had also occurred recently was that of Professor Richard Holmes, the military historian, at the comparatively young age of 65, a somewhat sadder event. Probably more than any other historian in the last twenty or so years, he had helped to bring to the fore the Great War, thanks to his lectures, television programmes and books. The memsahib and I attended a talk of his at the Royal Marines’ Museum in the former RM Officers’ Mess at Eastney some fifteen years ago, and he demonstrated his outstanding ability to talk without notes for an hour or so, holding a 300+ audience in thrall throughout. In retrospect, he may not have been as prolific as others in terms of the number of books produced, for he had a day job as well, but, he was a communicator without equal, and from several obituaries in the press and related comments, it is clear that he was widely regarded.
    [Show full text]
  • The Impact of Flooding and Storms on Western Dorset Between December 2013 and February 2014
    Flooding and Storms The Impact of Flooding and Storms on Western Dorset between December 2013 and February 2014 (Observer Newspaper taken 6th Feb 2014) 1. Met Office - National Weather Picture December 2013 to January 2014 The first storm of 5 December brought very strong winds to Scotland and northern England, and a major storm surge affecting North Sea coasts. A week of quieter weather then followed, but from mid-December there was a succession of further major winter storms that continued into early January. Initially most of the weather impacts related to the strong winds, first across the north of the UK and then affecting exposed areas further south. However, as rainfall totals accumulated the focus of concern shifted from strong winds to flooding, including large river catchments such as the Severn and Thames. Finally, in early January, strong winds, combining with high spring tides and river flows, resulted in high water levels and large waves affecting exposed coastal communities in the south and west, causing coastal flooding. January to Feb 2014 Around 6 major storms hit through this period, separated by intervals of 2 to 3 days. The sequence of storms followed an earlier stormy period from mid-December 2013 to early January 2014. Taken individually, the first two storms were notable but not exceptional for the winter period. However, the later storms from early to mid-February were much more severe. Overall, the period from mid- rep_20140603_flooding and storms_2 1 Flooding and Storms December 2013 to mid-February 2014 saw at least 12 major winter storms, and, when considered overall, this was the stormiest period of weather the UK has experienced for at least 20 years.
    [Show full text]
  • Strategic Environmental Assessment for the Portland Neighbourhood Plan
    Strategic Environmental Assessment for the Portland Neighbourhood Plan Environmental Report to accompany the submission version of the Neighbourhood Plan Portland Neighbourhood Plan Steering Group May 2019 Strategic Environmental Assessment for the Environmental Report to accompany the Portland Neighbourhood Plan submission version of the Neighbourhood Plan Quality information Prepared by Checked by Approved by Ryan Putt Nick Chisholm-Batten Steve Smith Environmental Associate Director Technical Director Consultant Revision History Revision Revision date Details Authorized Name Position V2.0 09/05/19 Submission 09/05/19 Nick Chisholm- Associate version Batten Director Prepared for: Portland Neighbourhood Plan Steering Group Prepared by: AECOM Limited Plumer House Third Floor, East Wing Tailyour Road Crownhill Plymouth PL6 5DH United Kingdom T: +44 (1752) 676700 aecom.com © 2019 AECOM Limited. All Rights Reserved. This document has been prepared by AECOM Limited (“AECOM”) for use of Locality (the “Client”) in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AECOM and the Client. Any information provided by third parties and referred to herein has not been checked or verified by AECOM, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AECOM. Prepared for: Portland Neighbourhood Plan Steering Group AECOM Strategic Environmental Assessment for the Environmental Report to accompany
    [Show full text]
  • Bournemouth Dorset Poole Workspace Strategy and Delivery Plan
    South West Regional Development Agency Bournemouth Dorset Poole Workspace Strategy and Delivery Plan October 2008 GVA Grimley Ltd 10 Stratton Street London W1J 8JR 08449 02 03 04 www.gvagrimley.co.uk This report is designed to be printed double sided. South West Regional Development Agency Bournemouth Dorset Poole Workspace Strategy and Delivery Plan Final Report October 2008 Reference: 07A800547 Contact: Robert Salkeld Tel: 020 7911 2147 Email: [email protected] www.gvagrimley.co.uk South West Regional Development Agency Bournemouth Dorset Poole Workspace Strategy CONTENTS 1. INTRODUCTION............................................................................................................................1 A – THE WORKSPACE STRATEGY 3 2. POLICY CONTEXT........................................................................................................................7 3. COMMERCIAL PROPERTY MARKET REVIEW.........................................................................31 4. SOCIO-ECONOMIC CONTEXT...................................................................................................47 5. EMPLOYMENT LAND DEMAND PROJECTIONS ......................................................................63 6. EMPLOYMENT LAND SUPPLY..................................................................................................77 7. BALANCING DEMAND AND SUPPLY .......................................................................................85 8. SUMMARY AND RECOMMENDATIONS....................................................................................95
    [Show full text]
  • Scoping Report
    Strategic environmental assessment for the Portland Neighbourhood Plan: Scoping Report Quality information Document name Ref Prepared for Prepared by Date Reviewed by Scoping Report for Portland Graham McGrath Nick Chisholm- the Portland DR-00832 Neighbourhood Environmental 15 August 2016 Batten Neighbourhood Plan Plan Consultant Revision history Revision Revision date Details Name Position Nick Chisholm- 2 15 August 2016 Consultation Principal Consultant Batten AECOM Infrastructure & Environment UK Limited (hereafter referred to as “AECOM”) has prepared this Report for the sole use of Portland Town Council in accordance with the Agreement under which our services were performed. No other warranty, expressed or implied, is made as to the professional advice included in this Report or any other services provided by AECOM. This Report is confidential and may not be disclosed by the Client or relied upon by any other party without the prior and express written agreement of AECOM. The information contained in this Report is based upon information provided by others and upon the assumption that all relevant information has been provided by those parties from whom it has been requested and that such information is accurate. Information obtained by AECOM has not been independently verified by AECOM, unless otherwise stated in the Report. The method adopted and the sources of information used by AECOM in providing its services are outlined in this Report. The work described in this Report is based on the conditions encountered and the information available during the said period of time. The scope of this Report and the services are accordingly factually limited by these circumstances.
    [Show full text]
  • The Royal Oak Milborne St Andrew, Blandford Forum, Dorset, DT11 0JG
    The Royal Oak Milborne St Andrew, Blandford Forum, Dorset, DT11 0JG The Royal Oak Milborne St Andrew, Blandford Forum, Dorset, DT11 0JG WELL ESTABLISHED AND SUCCESSFUL ‘FAMILY FRIENDLY’ VILLAGE INN WITH STRONG TURNOVER Award winning pub, operating at the heart of the community and offering a welcoming atmosphere CHARACTER MAIN BAR & RESTAURANT • ‘JUG & BOTTLE’ SPORTS BAR • FUNCTION ROOM/SKITTLE ALLEY • FULLY EQUIPPED COMMERCIAL KITCHEN • DELIGHTFUL 4 BED OWNERS ACCOMMODATION • TRADE BEER GARDEN • PRIVATE OWNERS GARDEN • CAR PARK • COURTYARD LOCATION The property lies in the centre of the village of Milborne St Andrew. Milborne St Andrew is a central Dorset village situated in the Winterbourne valley on the Dorset Downs on the A354 road between Blandford and the busy A35 Dorset link road, 9 miles south west of Blandford. The village has a population of just over a thousand. Dorchester is the county town of Dorset, England and is situated between Poole and Bridport on the A35 trunk road, approximately 8 miles South West of the Royal Oak. A historic market town, Dorchester is on the banks of the river Frome to the north of the South Dorset Ridgeway which separates the area from Weymouth, 7 miles to the south. The area is popular with tourists, and particularly walkers and cyclists, throughout the year and is within easy driving distant of many tourist attractions and historic places of interest. The South Coast is only 12 miles from the pub. DESCRIPTION The property comprises of a two-storey detached property built in the late 18th century with a more recent extension to the east wing.
    [Show full text]
  • A WALK in VERNDITCH CHASE 1. a Tale of Two Long Barrows
    FOUNDATIONS OF ARCHAEOLOGY ‐ A WALK IN VERNDITCH CHASE 1. A Tale of two Long Barrows ‐ Long barrows were constructed as earthen or drystone mounds with flanking ditches and acted as funerary monuments during the Early and Middle Neolithic periods (3400‐ 2400 BC). They represent the burial places of Britain's early farming communities and, as such, are amongst the oldest field monuments surviving visibly in the present landscape. Where investigated, long barrows appear to have been used for communal burial, often with only parts of the human remains having been selected for interment. Certain sites provide evidence for several phases of funerary monument preceding the barrow and, consequently, it is probable that long barrows acted as important ritual sites for local communities over a considerable period of time. Some 500 long barrows are recorded in England. As one of the few types of Neolithic structure to survive as earthworks, and due to their comparative rarity, their considerable age and their longevity as a monument type, all long barrows are considered to be nationally important. 1 The 180 long barrows of Hampshire, Wiltshire and Dorset form the densest and one of the most significant concentrations of monuments of this type in the country. Such clusters are of great significance as they give an indication of the intensity with which areas were settled during the Neolithic period. Long barrow south‐west of Vernditch Chase – SAM No 1,012,945 The monument includes a long barrow set below the crest of a gentle south‐ facing slope in an area of undulating chalk downland.
    [Show full text]