Press Releases Gov. Malloy, CTDOT Indefinitely Postpone Hundreds Of

Total Page:16

File Type:pdf, Size:1020Kb

Press Releases Gov. Malloy, CTDOT Indefinitely Postpone Hundreds Of Press Releases 01/10/2018 Gov. Malloy, CTDOT Indefinitely Postpone Hundreds of Transportation Projects Across Connecticut Malloy Administration Will Work With Legislature to Identify New Funding and Save Projects (HARTFORD, CT) – Governor Dannel P. Malloy and Connecticut Department of Transportation (CTDOT) Commissioner James P. Redeker today released a full list of projects totaling $4.3 billion that are postponed indefinitely until new revenue is appropriated for the Special Transportation Fund (STF). The Governor made clear that his administration will announce detailed proposals this month that, if adopted by the General Assembly, would bring the projects back online. The STF finances the state’s transportation system, including the operating costs of the CTDOT and all of the services it provides. Last month, Governor Malloy reiterated and increased his warnings on the solvency of the fund following the release of a report showing that without prompt action, the STF will be in deficit by fiscal year 2019, which begins July 1, 2018. **Download the list of CTDOT projects now postponed indefinitely here** Hundreds of projects across the state, such as critical improvements to the I-91/Route 15 interchange on the Charter Oak Bridge, the replacement of the Waterbury Mixmaster, and the widening of I-95 from Bridgeport to Stamford, are postponed indefinitely, or until resources are identified to allow projects to continue. Even routine highway maintenance and transportation aid to cities and towns are seriously jeopardized. “If Connecticut does not take the necessary action to allow us to restart these vital projects, not only will it put the state’s infrastructure into a further state of disrepair, it will hurt our economy,” Governor Malloy said. “If we want to compete in the 21st century economy, we need a transportation system that works for people and businesses, and we need to invest in transit-oriented development to build the communities where people and businesses want to be. I want to be very clear – this is preventable, but it requires immediate action. The legislature must act this year to avoid potentially devastating setbacks to our transportation system.” “This isn’t a problem that can be punted until future years. Connecticut needs immediate action,” Commissioner Redeker said. “As Governor Malloy noted last month, the solvency of the Special Transportation Fund is in doubt without new revenues. In real terms, that means we need to postpone indefinitely important projects today.” “The cupboard is bare. Without a dedicated, stable stream of revenue to the Special Transportation Fund, our infrastructure will continue to rot and decay,” State Representative Tony Guerrera, co-chair of the legislature’s Transportation Committee, said. “We sit at the precipice of a transportation tragedy that can be avoided by investing in roads and bridges. We must act immediately in the 2018 legislative session and institute tolls or another revenue stream to avert the oncoming crisis.” The Governor will be releasing his recommendations to ensure the solvency of the STF in advance of the 2018 legislative session. CT Dept. of Transportation - Capital Plan Projects Postponed Indefinitely as of 1/10/18 $4,247,404,868.93 TOWN ROUTE DESCRIPTION FFY Start Year TOTAL COST Andover Various * See Regional and Statewide Section for Additional Projects * Various $ - Ansonia Various * See Regional and Statewide Section for Additional Projects * Various $ - Ashford Various * See Regional and Statewide Section for Additional Projects * Various $ - Ashford/Pomfret/Thompson Replace Salt Shed Roofs, Ashford, Pomfret & Thompson 2018 $ 700,000.00 Avon Various * See Regional and Statewide Section for Additional Projects * Various $ - Avon Renovation of the Avon Maintenance Facility 2021 $ 6,440,000.00 Avon Renovation of the Avon Maintenance Facility 2020 $ 560,000.00 Barkhamsted Various * See Regional and Statewide Section for Additional Projects * Various $ - Beacon Falls Various * See Regional and Statewide Section for Additional Projects * Various $ - Beacon Falls Local Road Lopus Road over Hemp Swamp Brook 2019 $ 1,900,775.17 Beacon Falls Local Road Beacon Valley Road over Beacon Hill Brook 2019 $ 885,054.22 Berlin Various * See Regional and Statewide Section for Additional Projects * Various $ - Berlin Local Road Spruce Brook Road over Spruce Brook 2019 $ 578,886.30 Berlin Local Road Burnham Street over Mattabesset River 2019 $ 1,077,442.35 Bethany Various * See Regional and Statewide Section for Additional Projects * Various $ - Bethel Various * See Regional and Statewide Section for Additional Projects * Various $ - Bethlehem Various * See Regional and Statewide Section for Additional Projects * Various $ - Bethlehem/Danbury/Cornwall Replace Salt Shed Roofs, Cornwall, Bethlehem & Danbury 2019 $ - Bloomfield Various * See Regional and Statewide Section for Additional Projects * Various $ - Bloomfield Local Road Mountain Avenue over Tumbledown Brook 2019 $ 414,317.96 Bolton Various * See Regional and Statewide Section for Additional Projects * Various $ - Bozrah Various * See Regional and Statewide Section for Additional Projects * Various $ - Branford Various * See Regional and Statewide Section for Additional Projects * Various $ - Branford Local Road Harbor Street over Tidal Channel 2019 $ 952,020.00 Bridgeport Various * See Regional and Statewide Section for Additional Projects * Various $ - Bridgeport NHL Barnum Station 2020 $ 100,000,000.00 Bridgeport Local Road Cleveland Avenue over Rooster River 2019 $ 221,548.48 Bridgeport CT 130 Rehab Br 02475 o/ Pequonnock Rv (Phase 2) 2019 $ 30,000,000.00 Bridgeport I-95 Rehab Br 00105A o/ M-N RR & streets 2020 $ 21,700,000.00 Bridgeport/Stamford I-95 Widen I-95 between Stamford to Bridgeport (funded over 18 thru 21) 2018 $ - Bridgewater Various * See Regional and Statewide Section for Additional Projects * Various $ - Bridgewater Local Road Cascade Road over Town Farm Brook 2019 $ 199,452.50 Bristol Various * See Regional and Statewide Section for Additional Projects * Various $ - Bristol Local Road Memorial Boulevard over Pequabuck River 2019 $ 1,383,953.79 Brookfield Various * See Regional and Statewide Section for Additional Projects * Various $ - Brookfield US 202 Intersection Improvements at Various SLOSSS Locations 2021 $ 5,840,000.00 Brooklyn Various * See Regional and Statewide Section for Additional Projects * Various $ - Burlington Various * See Regional and Statewide Section for Additional Projects * Various $ - Canaan Various * See Regional and Statewide Section for Additional Projects * Various $ - Canterbury Various * See Regional and Statewide Section for Additional Projects * Various $ - Canterbury Construction of a new Maintenance Facility 2020 $ 8,580,000.00 Canterbury Construction of a new Maintenance Facility 2019 $ 643,500.00 Canton Various * See Regional and Statewide Section for Additional Projects * Various $ - Chaplin Various * See Regional and Statewide Section for Additional Projects * Various $ - Cheshire Various * See Regional and Statewide Section for Additional Projects * Various $ - Cheshire CT 10 - CC Traffic Signal Replacements to Accommodate Pedestrians 2019 $ 966,000.00 Cheshire CT 10 - CC Traffic Signal Replacements to Accommodate Pedestrians (RW) 2018 $ 30,000.00 Chester Various * See Regional and Statewide Section for Additional Projects * Various $ - Clinton Various * See Regional and Statewide Section for Additional Projects * Various $ - Clinton SLE Clinton RR Station 2018 $ 18,000,000.00 Clinton Local Road Pleasant Valley Road over Menunketesuck River 2019 $ 780,652.00 Colchester Various * See Regional and Statewide Section for Additional Projects * Various $ - Colchester Various Rehab/Replace Culverts for Bridges 06696, 06781 & 06820 2021 $ 2,415,000.00 Colebrook Various * See Regional and Statewide Section for Additional Projects * Various $ - Columbia Various * See Regional and Statewide Section for Additional Projects * Various $ - Page1 1/10/2018 CT Dept. of Transportation - Capital Plan Projects Postponed Indefinitely as of 1/10/18 $4,247,404,868.93 TOWN ROUTE DESCRIPTION FFY Start Year TOTAL COST Columbia/Coventry Trail Hop River State Park Trail 2019 $ 3,634,000.00 Cornwall Various * See Regional and Statewide Section for Additional Projects * Various $ - Cornwall/Bethlehem/Danbury Replace Salt Shed Roofs, Cornwall, Bethlehem & Danbury 2019 $ 800,000.00 Coventry Various * See Regional and Statewide Section for Additional Projects * Various $ - Coventry US 44 Rehab/Replace Br 06851 o/ Olson's Brook 2021 $ 400,000.00 Coventry/Columbia Trail Hop River State Park Trail 2019 $ - Cromwell Various * See Regional and Statewide Section for Additional Projects * Various $ - Danbury Various * See Regional and Statewide Section for Additional Projects * Various $ - Danbury I-84 Reconstruction between Exits 3 & 8 (funded over 19,20,21) 2019 $ 57,500,000.00 Danbury Construction of Danbury Repair Facility 2018 $ 11,500,000.00 Danbury CT 53 Int. Impr. @ Coal Pit Hill & Triangle St 2019 $ 9,700,000.00 Danbury/Cornwall/Bethlehem Replace Salt Shed Roofs, Cornwall, Bethlehem & Danbury 2019 $ - Darien Various * See Regional and Statewide Section for Additional Projects * Various $ - Darien Renovate Darien Maintenance & Repair 2019 $ 6,500,000.00 Deep River Various * See Regional and Statewide Section for Additional Projects * Various $ - Derby Various * See Regional and Statewide Section for Additional Projects * Various $ - Derby Bluff Street Rehab Br 00578 o/ Rt 8 2020
Recommended publications
  • Transit Oriented Development Final Report | September 2010
    FTA ALTERNATIVES ANALYSIS DRAFT/FINAL ENVIRONMENTAL IMPACT STATEMENT DANBURY BRANCH IMPROVEMENT PROGRAM TRANSIT ORIENTED DEVELOPMENT FINAL REPORT | SEPTEMBER 2010 In Cooperation with U.S. Department CONNECTICUT South Western Regional Planning Agency of Transportation DEPARTMENT OF Federal Transit TRANSPORTATION Administration FTA ALTERNATIVES ANALYSIS DRAFT/FINAL ENVIRONMENTAL IMPACT STATEMENT DANBURY BRANCH IMPROVEMENT PROGRAM TRANSIT ORIENTED DEVELOPMENT FINAL REPORT | SEPTEMBER 2010 In Cooperation with U.S. Department CONNECTICUT South Western Regional Planning Agency of Transportation DEPARTMENT OF Federal Transit TRANSPORTATION Administration Abstract This report presents an evaluation of transit-oriented development (TOD) opportunities within the Danbury Branch study corridor as a component of the Federal Transit Administration Alternatives Analysis/ Draft Environmental Impact Statement (FTA AA/DEIS) prepared for the Connecticut Department of Transportation (CTDOT). This report is intended as a tool for municipalities to use as they move forward with their TOD efforts. The report identifies the range of TOD opportunities at station areas within the corridor that could result from improvements to the Danbury Branch. By also providing information regarding FTA guidelines and TOD best practices, this report serves as a reference and a guide for future TOD efforts in the Danbury Branch study corridor. Specifically, this report presents a definition of TOD and the elements of TOD that are relevant to the Danbury Branch. It also presents a summary of FTA Guidance regarding TOD and includes case studies of FTA-funded projects that have been rated with respect to their livability, land use, and economic development components. Additionally, the report examines commuter rail projects both in and out of Connecticut that are considered to have applications that may be relevant to the Danbury Branch.
    [Show full text]
  • Danbury Branch Improvement Program Task 5
    W FTA ALTERNATIVES ANALYSIS DRAFT/FINAL ENVIRONMENTAL IMPACT STATEMENT DANBURY BRANCH IMPROVEMENT PROGRAM TASK 5 ENVIRONMENTAL TECHNICAL MEMORANDUM STATE PROJECT 302-008 SECTION 18: VISUAL RESOURCES MAY 2009 State Project No. 302-008 Connecticut Department of Transportation Danbury Branch Improvement Program AA/DEIS SECTION 18. VISUAL RESOURCES INTRODUCTION This section describes the visual resources in the study corridor. Visual resources contribute greatly to environmental quality, shaping the views and aesthetic experiences of people’s daily lives. Visual resources include natural landscape elements as well as features of the built environment. The quality of the visual experience depends on many factors, including the physical attributes of objects, the combination of objects and features in view, the location of visual elements in relation to the viewer, the condition of the elements, their uniqueness, viewer perceptions, and cultural connotations, among many others. Descriptions of landscape characteristics and features under existing conditions lay the groundwork for evaluating the effects of a project on the visual environment. Regulatory Context There are no federal and state laws that specifically protect visual resources across the board. There are, however, several important references to visual resources within the context of historic preservation and coastal zone management statutes. The implications of these legal protections are described below. At the Federal level, the following legislation is relevant to the project:
    [Show full text]
  • Traffic Impact Study Proposed Ipark Expansion
    Traffic Impact Study Proposed iPark Expansion 761 Main Avenue City of Norwalk/Town of Wilton, CT PREPARED FOR: iPark II Norwalk, LLC 485 West Putnam Avenue Greenwich, CT PREPARED BY: Kimley-Horn and Associates, Inc. 1 North Lexington Avenue, Suite 505 White Plains, NY 10601 914.368.9200 March 2021 Revised May 2021 Project Number 112093000 Proposed iPark Expansion Traffic Impact Study Traffic Impact Study Proposed iPark Expansion 761 Main Avenue City of Norwalk/Town of Wilton, CT PREPARED FOR: iPark II Norwalk, LLC 485 West Putnam Avenue Greenwich, CT PREPARED BY: Kimley-Horn and Associates, Inc. 1 North Lexington Avenue, Suite 505 White Plains, NY 10601 914.368.9200 Kimley‐Horn and Associates, Inc. _________________________________ March 2021/Revised May 2021 John Canning Date 1120933000 CT PE Number: 0028017 05/24/21 The entirety of this document, including text and images, is property of Kimley‐Horn and Associates, Inc., protected under U. S. copyright law. Copyright © 2017 Kimley‐Horn and Associates, Inc. 112093000 Page ii March 2021, Revised May 2021 Proposed iPark Expansion Traffic Impact Study TABLE OF CONTENTS 1.0 EXECUTIVE SUMMARY ................................................................................................................. 1 1.1 Project Description .................................................................................................................... 1 1.2 Study Methodology .................................................................................................................... 1 1.3
    [Show full text]
  • Customer Opinion Survey Final Report
    Task 1.2: Customer Opinion Survey Final Report URBITRANR EPORT URBITRAN Prepared to Connecticut Department of Transportation S ubmitted by Urbitran Associates, Inc. May 2003 Task 1.2:Technical Memorandum Customer Opinion Survey TABLE OF CONTENTS INTRODUCTION AND SUMMARY OF FINDINGS ............................................................................................1 BACKGROUND AND PURPOSE ....................................................................................................................................1 METHODOLOGY.........................................................................................................................................................1 FINDINGS ..................................................................................................................................................................1 EXHIBIT 1: SURVEY SAMPLE.....................................................................................................................................2 COMPARISON TO METRO-NORTH RAILROAD CUSTOMER OPINION SURVEY ...........................................................10 CHAPTER ONE: GENERAL PROFILE OF SURVEY RESPONDENTS.........................................................12 SYSTEM-WIDE ANALYSIS OF SURVEY QUESTIONS 1, 2, AND 3 .................................................................................13 SYSTEM-WIDE ANALYSIS OF SURVEY QUESTIONS 4, 5, 6, AND 7 .............................................................................15 SYSTEM-WIDE ANALYSIS OF SURVEY
    [Show full text]
  • New Haven Line Capacity and Speed Analysis
    CTrail Strategies New Haven Line Capacity and Speed Analysis Final Report June 2021 | Page of 30 CTrail Strategies Table of Contents Executive Summary........................................................................................................................ 1 1. Introduction ............................................................................................................................. 2 2. Existing Conditions: Infrastructure, Facilities, Equipment and Services (Task 1)............... 2 2.1. Capacity and Speed are Constrained by Legacy Infrastructure .................................... 3 2.2. Track Geometry and Slow Orders Contribute to Reduced Speeds ............................... 4 2.3. State-of-Good-Repair & Normal Replacement Improvements Impact Speed .............. 6 2.4. Aging Diesel-Hauled Fleet Limits Capacity ..................................................................... 6 2.5. Service Can Be Optimized to Improve Trip Times .......................................................... 7 2.6. Operating Costs and Revenue ........................................................................................ 8 3. Capacity of the NHL (Task 2)................................................................................................. 8 4. Market Assessment (Task 3) ............................................................................................... 10 4.1. Model Selection and High-Level Validation................................................................... 10 4.2. Market Analysis..............................................................................................................
    [Show full text]
  • Resilient Connecticut Phase II Workshop to Discuss Potential Regional Adaptation/Resilience Opportunity Areas
    Resilient Connecticut Phase II Workshop to Discuss Potential Regional Adaptation/Resilience Opportunity Areas • SCRCOG ✓ May 24, 2021 • MetroCOG ✓ May 25, 2021 • WestCOG ✓ May 26, 2021 • NVCOG ✓ May 27, 2021 Resilient Connecticut Phase II Potential Regional Adaptation/Resilience Opportunity Areas Team Present Today Individual Role Victoria Vetre, CFM, SLR Consulting Presenter and Breakout Room Facilitator David Murphy, PE, CFM, SLR Consulting Presenter and Breakout Room Facilitator Scott Choquette, CFM, Dewberry Breakout Room Facilitator Johanna Greenspan-Johnston, Dewberry Breakout Room Facilitator Noah Slovin, CFM, SLR Consulting Zoom Logistics and Breakout Room Controller John Truscinski, CFM, CIRCA Facilitator Joanna Wozniak-Brown, PhD, CIRCA Facilitator Yaprak Onat, PhD, CIRCA Facilitator Katie Lund, CIRCA Facilitator Alex Felson, PhD, for CIRCA Facilitator Resilient Connecticut Phase II Potential Regional Adaptation/Resilience Opportunity Areas Workshop Objectives • Review Methods to Identify Potential Opportunities ✓ What is a potential adaptation/resilience opportunity area? ✓ How did we link vulnerability mapping with zones of shared risk and regional assets/infrastructure? • Breakout Rooms for Discussion about Specific Opportunity Areas ✓ What does the general profile of areas look like in the region or community that you represent? ✓ Do you have any thoughts about specific areas? • Report Out ✓ What is your impression of the potential opportunity areas? ✓ Did we miss anything? • Open Discussion and Next Steps ✓ What types of
    [Show full text]
  • South Western Region Long Range Transportation Plan 2007-2035 Update Schedule
    SouthSouth Western RegionRegion LongLong RangeRange TransportationTransportation PlanPlan 20072007--20352035 Endorsed by: South Western Region Metropolitan Planning Organization May 8, 2007 Prepared by: South Western Regional Planning Agency 888 Washington Blvd. 3rd Floor Stamford, CT 06901 203.316.5190 SOUTH WESTERN LONG RANGE TRANSPORTATION PLAN 2007-2035 CONTENTS Guide to the Plan – Frequently Asked Questions………….. FAQ1- FAQ9 Introduction ......................................................................................... 1 The South Western Region ................................................................... 17 Regional Characteristics ....................................................................... 23 Transportation Inventory and Travel Characteristics............................ 28 Long Range Transportation Plan 2007 – 2035 ..................................... 39 Transportation Plan Update Components……………………………... 48 Regional Transportation Plan References……………………………... 50 The Transportation Planning Process ................................................... 51 Goals and Objectives ............................................................................ 53 Highway Systems and Operations ........................................................ 56 Transportation Systems Management and Operations.......................... 62 Safety ................................................................................................... 64 Road Condition....................................................................................
    [Show full text]
  • Mta Property Listing for Nys Reporting
    3/31/2021 3:48 PM MTA PROPERTY LISTING FOR NYS REPORTING COUNTY SECTN BLOCKNO LOTNO Property_Code PROPERTYNAME PROPERTYADDDRESS AGENCY LINE PROPERTYTYPE limaster LIRR Customer Abstract Property LIRR Customer Abstract Property LIR Main Line Station Bronx bbl05200 Bronx Whitestone Bridge Hutchson River parkway BT Block/Lot Bridge Bronx 9 mha04650 ROW b 125th & Melrose XXX St MN Harlem ROW Bronx 9 mha06600 ROW b 125th & Melrose Milepost 5,Sta-Mon# 31.5 MN Harlem ROW Bronx 12 mha09500 FORDHAM STATION Fordham Rd (Fordham U) MN Harlem Station Bronx mhu00343 Perm E'ment at Yankee Stadium Sta-mon 30.5 MN Hudson Payable Easement Bronx mhu06251 Spuyten Duyvil Substation Sta-Mon# 68.5 MN Hudson Payable Easement Bronx 19 mhu06301 Parking at Riverdale Milepost 12 , Sta-Mon# 68.5 MN Hudson Parking Bronx tbl03600 Unionport Shop Unionport Rd. NYCT White Plains Road Shop Bronx tbl65340 Con Edison Ducts East 174 St NYCT Block/Lot Ducts Bronx tbw32500 231ST 231 St-Broadway NYCT Broadway/7th Avenue Station Bronx tbw32600 238 ST 238 St-Broadway NYCT Broadway/7th Avenue Station Bronx tbw32700 242 ST 242 St-Van Cortlandt Pk NYCT Broadway/7th Avenue Station Bronx tco21000 161 ST Yankee Stadium 161 St/River Ave NYCT Concourse Station Bronx tco21100 167 ST 167 St/Grand Concourse NYCT Concourse Station Bronx tco21200 170 ST 170 St/Grand Concourse NYCT Concourse Station Bronx tco21300 174 175 STs 174-175 Sts/Grand Concourse NYCT Concourse Station Bronx tco21400 TREMONT AVE Tremont Ave/Grand Concourse NYCT Concourse Station Bronx tco21500 182 183 STs 183 St/Grand
    [Show full text]
  • Information Packet.Pdf
    Resilient Connecticut Phase II Potential Regional Adaptation/Resilience Opportunity Areas Information Packet for WestCOG and Chief Elected Officials Thank you for following progress of Phase II of the Resilient Connecticut planning process. We have enjoyed presenting Resilient Connecticut to you at the monthly WestCOG meetings of fall 2020 and winter 2021. Now that spring has arrived, we are pleased to present another project milestone. • The information sheets following this page include the following: ✓ The “Terms to Understand” page provides a list of terms and their meanings on the left side, and a list of project resources with hyperlinks on the right side. ✓ Each potential regional adaptation/resilience opportunity area identified in the WestCOG region is described on an individual page. Regional adaptation/resilience opportunity areas are the geographic locations that our team has identified based on overlays of flood vulnerability, heat vulnerability, social vulnerability, zones of shared risk, and regional assets and infrastructure. • Here are some helpful hints when reviewing information sheets: ✓ The numbers associated with the flood, heat, and social vulnerabilities are relative scores between zero and one. This means that a score of “0.9”in one opportunity area demonstrates higher vulnerability than a score of “0.5” in a nearby opportunity area. ✓ The ID numbers for the zones of shared risk include a four-digit watershed identification number developed by the State. For example, “7300” is the Norwalk River watershed. ✓ The “areas of planned development” have been gathered from community plans, but the names that we selected for these information sheets are a work in progress. We plan to revise these as needed.
    [Show full text]
  • Norwalk's Innovation Places Plan
    Norwalk Innovation Places Strategic Plan / March 2017 Acknowledgments Northeast Community Innovation Corp. Barry Schwimmer, President Peter Propp, Managing Director Regional Plan Association Melissa Kaplan-Macey, Connecticut Director Sarah Serpas, Associate Planner Ben Oldenburg, Senior Graphic Designer Kellan Cantrell, Intern Planner Renae Widdison, Intern Planner Kevin Dwarka LLC, Land Use & Economic Consulting Kevin Dwarka, Managing Principal Natalie Quinn, Associate Robert Joseph, Planner City of Norwalk Mayor Harry Rilling Laoise King, Chief of Staff Norwalk Redevelopment Agency Tim Sheehan, Executive Director Elizabeth Stocker, Director of Economic Development Tami Strauss, Director of Community Planning Development Norwalk Community College Ann Rogers, Executive Director, Norwalk College Community Foundation Kathryn Senie, Director of Institutional Advancment and Strategic Planning Norwalk Public Library Christine Bradley, Director Community Partners CPTV Fairfield County Makers Guild Norwalk Chamber of Commerce Norwalk Maritime Aquarium Stepping Stones Museum for Children Wall Street Theater 2 Norwalk Innovation Places | March 2017 Inspired by the City of Norwalk’s outstanding physical, Vision economic, social and educational resources, the Norwalk Innovation District will support development of entrepreneurs, Statement business start-ups, job training programs and creative projects in the food and beverage, digital marketing, media production, making/light manufacturing industries. Introduction / 5 Contents Why SoNo? Why Now?
    [Show full text]
  • Housatonic Valley Council of Elected Officials
    GREATER DANBURY COMMUTER RAIL PARKING PLAN October 2012 This document was prepared in cooperation with the Federal Transit Administration and the Connecticut Department of Transportation. The opinions, findings, and conclusions expressed in this publication are those of the Housatonic Valley Council of Elected Officials and do not necessarily reflect the official views or policies of the Connecticut Department of Transportation or the Federal Transit Administration. Prepared for HVCEO by Eric C. Bergstraesser, Chief Executive Officer Report Staff Richard A. Schreiner, Director of Service Development Paul Chenard, Transportation Planner Andrew C. O’Connell, Marketing and Public Relations Coordinator TABLE OF CONTENTS I. RAILROAD STATIONS IN THE HVCEO REGION 1 1. Introduction 1 2. Overview of Housatonic Region Railroad Stations 2 3. Expansion of the Danbury Branch Line and Parking Impacts 5 II. EXISTING HOUSATONIC REGION RAILROAD STATIONS 8 1. Branchville Railroad Station 8 2. West Redding Railroad Station 14 3. Bethel Railroad Station 18 4. Danbury Railroad Station 22 III. PROPOSED HOUSATONIC REGION RAILROAD STATIONS 25 1. Georgetown Railroad Station 25 2. Brookfield Railroad Station 28 3. New Milford Railroad Station 30 Housatonic Valley Council of Elected Officials I. RAILROAD STATIONS IN THE HVCEO REGION 1. Introduction This text is a summary of current conditions and recommended parking enhancements to Danbury Branch Line railroad stations in the Housatonic Valley (Greater Danbury) Planning Region. Note that the Branch Line extends through two of Connecticut's planning regions, from Norwalk and Wilton in the South Western Region northerly through Redding and Ridgefield to Danbury in the Housatonic Valley Region. Existing and Proposed Railroad Stations in the Housatonic Region There are seven Danbury Branch Line stations from south to north with one in Norwalk, two in Wilton, then one each in Ridgefield (Branchville), West Redding, Bethel and Danbury.
    [Show full text]
  • Individual Station Report
    Individual Station Report South Norwalk URBITRANR EPORT CONTENTS: Stakeholder Interview Customer Opinion Survey Parking Inventory & Utilization Station Condition Inspection Lease Narrative and Synopsis Station Operations Review Station Financial Review URBITRAN Prepared to Connecticut Department of Transportation S ubmitted by Urbitran Associates, Inc. July 2003 June 2003 June 2003 June 2003 June 2003 June 2003 June 2003 Stakeholder Interview URBITRANR EPORT URBITRAN Prepared to Connecticut Department of Transportation S ubmitted by Urbitran Associates, Inc. Westport According to those at the meeting, which included the First and Second Selectmen and a representative from the Police Department, who run the station, Harry Harris wants CDOT to take control of the stations and parking. This was the first issue brought up by the town representatives – that the State wants to run the stations to provide better quality control, and that the State feels that this is the only solution to improve the supply of parking along the entire line. Furthermore, the feeling was that CDOT would be exempt from local zoning and would therefore be in a position to deck parking lots without local permission. Westport feels that they do a good job with the two town stations, and that they have an excellent relationship with Carl Rosa regarding maintenance and operations and with Harry Harris regarding policy. They feel strongly that if other towns ran their stations and parking like they do CDOT would have far fewer issues to contend with. Westport understands the desire for uniformity among the stations and supports that policy, albeit with concern regarding home rule issues. Westport, ultimately, is satisfied with the status quo, and feels the working relationship is excellent, the division of responsibilities clear, and their ability to have input into the ADA design process excellent.
    [Show full text]