IFAC and CIGRE/CIRED Workshop on ControlIFAC and of CIGRE/CIRED Transmission Workshop and Distribution on Smart Grids ControlIFAC and of CIGRE/CIRED Transmission Workshop and Distribution on Smart Grids IFACOctober and 11-13, CIGRE/CIRED 2016. Prague, Workshop Czech on RepublicAvailable online at www.sciencedirect.com OctoberControl of 11-13, Transmission 2016. Prague, and DistributionCzech Republic Smart Grids OctoberControl of 11-13, Transmission 2016. Prague, and DistributionCzech Republic Smart Grids October 11-13, 2016. Prague, Czech Republic ScienceDirect

IFAC-PapersOnLine 49-27 (2016) 218–223 Process and Features of , Micro Grid and in South Korea Process and Features of Smart Grid, Micro Grid and Super Grid in South Korea Process and Features of Smart Grid, Micro Grid and Super Grid in South Korea Process and Features of SmartJaeseok Grid, Choi*. MicroDuy - PhuongGrid andN. Do* Super* Grid in South Korea Jaeseok Choi*.Duy -Phuong N. Do** Jaeseok Choi*.Duy -Phuong N. Do** * Department of Electrical EngineeringJaeseok, RIGET, Choi*. ERI,Duy Gyeongsang-Phuong N. Do*National* University, Republic of Korea * Department of Electrical Engineering, RIGET, ERI, Gyeongsang National University, Republic of Korea * Department of Electrical Engineering(Tel:82-55,- 772RIGET,-1715; ERI, e-mail:[email protected]) Gyeongsang National University, Republic of Korea * Department of Electrical Engineering(Tel:82-55,- 772RIGET,-1715; ERI, e-mail:[email protected]) Gyeongsang National University, Republic of Korea * Department** Department of Electrical of Electrical Engineering(Tel:82 Engineering-55,- 772RIGET,-1715;, GyeonsangERI, e-mail:[email protected]) Gyeongsang National National University, University, Republic Republic of Korea of Korea ** Department of Electrical(Tel:82 Engineering-55-772-1715;, Gyeonsang e-mail:[email protected]) National University, Republic of Korea ** Department of Electrical(Tel:82 Engineering-(e55-mail:[email protected];, Gyeonsang e-mail:[email protected]) National). University, Republic of Korea ** Department of Electrical Engineering(e-mail:[email protected], Gyeonsang National). University, Republic of Korea ** Department of Electrical Engineering(e-mail:[email protected], Gyeonsang National). University, Republic of Korea (e-mail:[email protected]). Abstract: This paper describes the processes and features of Smart Grid, Micro Grid and Super Grid in Abstract: This paper describes the processes and features of Smart Grid, Micro Grid and Super Grid in AbstractSouth Korea: This briefly. paper describesIn Korea, thesmart processes grid, microand features grid and of superSmart gridGrid, are Micro very Grid hot andissues Super and Grid active in AbstractSouth Korea: This briefly. paper describesIn Korea, thesmart processes grid, microand features grid and of superSmart gridGrid, are Micro very Grid hot andissues Super and Grid active in AbstractSouthbusiness Korea model: This briefly. andpaper attractive describesIn Korea, topic thesmart inprocesses Korean grid, microasand same features grid as otherand of super Smartcountries gridGrid, nowadays are Micro very Grid . hot andissues Super and Grid active in Southbusiness Korea model briefly. and attractive In Korea, topic smart in Korean grid, microas same grid as otherand super countries grid nowadays are very . hot issues and active businessKeywords model: smart and grid, attractive micro grid,topic super in Korean grid, poweras same IT as. other countries nowadays. businessKeywords© 2016, IFAC model: smart (International and grid, attractive micro Federation grid,topic super in Korean of grid,Automatic poweras same Control) IT as. other Hosting countries by Elsevier nowadays Ltd.. All rights reserved. Keywords: smart grid, micro grid, super grid, power IT. Keywords: smart grid, micro grid, super grid, power IT.  transmission lines. This provision aims at preventing further 1. INTRODUCTION  transmission lines. This provision aims at preventing further 1. INTRODUCTION  transmissionaccidents from lines. occurring This provision in the future, aims as at well preventi as acceleratingng further 1. INTRODUCTION transmissionaccidents from lines. occurring This provision in the future, aims as at well preventi as acceleratingng further Korean Smart Grid 1.is, INTRODUCTION maybe alternatively, called as Power accidentsthe development from occurring of renewable in the future, energy as wellsources as accelerating to reduce Korean Smart Grid 1.is, INTRODUCTION maybe alternatively, called as Power accidentsthe development from occurring of renewable in the future, energy as wellsources as accelerating to reduce KoreanIT originally Smart in Grid Korea. is, maybeAfter poweralternatively, system calledderegulation as Power in therelianceaccidents development upon from nuclearoccurring of renewablepower, in the reducefuture, energy theas well sourcescost as of accelerating renewableto reduce KoreanIT originally Smart in Grid Korea. is, maybeAfter poweralternatively, system calledderegulation as Power in thereliance development upon nuclear of renewablepower, reduce energy the sourcescost of renewableto reduce ITKorean originally SmartElectricity in Grid Korea. in is, 15 maybeAfter years power alternatively,ago, Koreasystem electricity calledderegulation as Powerpower in relianceenergies,the development uponand providenuclear of energyrenewablepower, security reduce energy tothe Japan. sourcescost Thisof renewableto network reduce ITKorean originally Electricity in Korea. in 15 After years power ago, Koreasystem electricity deregulation power in relianceenergies, uponand providenuclear energypower, security reduce tothe Japan. cost Thisof renewable network marketKoreanIT originally Electricityhas beenin Korea. searchingin 15 After years forpower ago, new Koreasystem business electricity deregulation issues power and in energies,willreliance be called uponand provide nuclearAsia Super energypower, Grid security reduce (ASG) tothe Japan. orcost Northeast Thisof renewable network Asia marketKorean Electricityhas been searchingin 15 years for ago, new Korea business electricity issues power and energies,will be called and provide Asia Superenergy Grid security (ASG) to Japan. or Northeast This network Asia marketkeywords.Korean Electricityhas A beennew business searchingin 15 years model for ago, callednew Korea business“Power electricity IT” issues in powerKorea and will(NEA)energies, be Interconnection.called and provide Asia Superenergy Ten Grid securityyears (ASG) ago,to Japan. orbefore Northeast This the network JREFAsia marketkeywords. has A beennew businesssearching model for callednew business“Power IT” issues in Korea and will(NEA) be Interconnection.called Asia Super Ten Grid years (ASG) ago, orbefore Northeast the JREFAsia keywords.ismarket generally has A beennewand businesswidelysearching knownmodel for callednewbefore business“Power the smart IT” issues in grid Korea and is (NEA)willsuggestion be Interconnection.called was Asiaput forward,Super Ten Grid Southyears (ASG) Koreaago, or beforeand Northeast Russia the JREFhaveAsia keywords.is generally A newand businesswidely knownmodel calledbefore “Power the smart IT” in grid Korea is (NEA)suggestion Interconnection. was put forward, Ten Southyears Koreaago, beforeand Russia the JREFhave isintroducedkeywords. generally Ain new andKorea. businesswidely Because knownmodel IT called (Informationbefore “Power the smart IT”Technology) in grid Korea is (NEA)suggestiondiscussed Interconnection. thewas practical put forward, andTen theoreticalSouthyears Koreaago, implications beforeand Russia the of JREFhave an isintroduced generally in andKorea. widely Because known IT (Informationbefore the smart Technology) grid is suggestiondiscussed thewas practical put forward, and theoreticalSouth Korea implications and Russia of have an introducedismaybe generally was in the andKorea. best widely futureBecause known business IT (Informationbefore model the in smart KoreaTechnology) gridat that is discussedinterconnectionsuggestion thewas practical betweenput forward, Koreaand theoreticalSouth (South Korea Kor implicationsea and & NorthRussia Korea)of have an introducedmaybe was inthe Korea. best futureBecause business IT (Information model in KoreaTechnology) at that discussedinterconnection the practical between Koreaand theoretical (South Kor implicationsea & North Korea)of an introducedmaybetime. Several was inthe Korea.kinds best offutureBecause attractive business IT events(Information model have in KoreabeenTechnology) openedat that interconnectionanddiscussed Russia the targeted practical between for Korea and2012. theoretical (South Three Kor scenarios implicationsea & North have Korea) ofbeen an maybetime. Several was the kinds best offuture attractive business events model have in Koreabeen openedat that interconnectionand Russia targeted between for Korea 2012. (South Three Kor scenariosea & North have Korea) been time.aftermaybe smartSeveral was gridthe kinds bestin Korea. offuture attractive Especially,business events model launching have in Koreabeen smart openedat gridthat anddeeplyinterconnection Russia considered. targeted between Theoretically,for Korea 2012. (South Three approximately Kor scenariosea & North have 3Korea) beenGW time.after smartSeveral grid kinds in Korea.of attractive Especially, events launching have been smart opened grid anddeeply Russia considered. targeted Theoretically,for 2012. Three approximately scenarios have 3 beenGW aftertesttime. bed smartSeveral town grid inkinds inJeju Korea.of Island attractive Especially, was ableevents to launching makehave citizenshipbeen smart opened grid to deeplyHVDCand Russia passingconsidered. targeted North Theoretically,forKorea 2012. or servicingThree approximately scenarios its electrical have 3energy beenGW aftertest bed smart town grid in inJeju Korea. Island Especially, was able to launching make citizenship smart grid to deeplyHVDC passingconsidered. North Theoretically,Korea or servicing approximately its electrical 3energy GW understandtestafter bed smart town gridsmart in inJeju grid.Korea. Island Additional Especially, was ablely, to launching Koreamake citizenshipSmart smart Gridgrid to HVDCwasdeeply suggested passingconsidered. Northto maximize Theoretically,Korea or servicingthe capacityapproximately its electrical at that 3 energy time.GW understandtest bed town smart in Jeju grid. Island Additional was ablely, to Koreamake citizenshipSmart Grid to HVDCwas suggested passing Northto maximize Korea or servicingthe capacity its electrical at that energytime. Associationunderstandtest bed town (KSGA)smart in Jeju grid. andIsland KoreaAdditional was Smart ablely, to Grid Koreamake Institute citizenshipSmart (KSGI) Grid to wasHowever,HVDC suggested passing the pla Northton wasmaximize Korea called or servicingoffthe becausecapacity its electricalof atunfavourable that energytime. Associationunderstand (KSGA)smart grid. and KoreaAdditional Smartly, GridKorea Institute Smart (KSGI) Grid wasHowever, suggested the pla ton wasmaximize called offthe becausecapacity of atunfavourable that time. hostedAssociationunderstand 2010 (KSGA)smart World grid. andSmart KoreaAdditional Grid Smart ly,Forum, GridKorea Institutesponsored Smart (KSGI) Grid by However,politicalwas suggested conditions, the pla ton waswhichmaximize called presented offthe because acapacity good opportunityof atunfavourable that time.for a hostedAssociation 2010 (KSGA) World andSmart Korea Grid Smart Forum, Grid Institutesponsored (KSGI) by However,political conditions, the plan waswhich called presented off because a good opportunityof unfavourable for a hostedMinistryAssociation 2010 of (KSGA) WorldKnowledge andSmart Korea EconomyGrid Smart Forum, Grid and Institute sponsoredPresidential (KSGI) by politicalmoreHowever, stable conditions, the andpla ncheaper waswhich called presentedenergy off becausesupply. a good opportunityTheof unfavourable Fukushima for a hostedMinistry 2010 of WorldKnowledge Smart EconomyGrid Forum, and sponsoredPresidential by politicalmore stable conditions, and cheaper which presentedenergy supply. a good opportunityThe Fukushima for a MinistryCommitteehosted 2010 ofon WorldGreenKnowledge GrowthSmart EconomyGridin last Forum, government and sponsoredPresidential has been by moreNuclearpolitical stable Accidentconditions, and incheaper whichJapan presentedpromptedenergy supply. athe good ASG opportunityThe to interconnectFukushima for a MinistryCommittee ofon GreenKnowledge Growth Economyin last government and Presidential has been moreNuclear stable Accident and incheaper Japan promptedenergy supply. the ASG The to interconnectFukushima CommitteeopenedMinistry very ofon successfully GreenKnowledge Growth on starting Economyin last stage. government and This Presidentialwas has a goodbeen Nuclearstrategicmore stable Accidentcountries and incheaper Japanin the promptedenergy Northeast supply. the ASGAsi Thea to(NEA) interconnectFukushima with Committeeopened very on successfully Green Growth on starting in last stage. government This was has a goodbeen Nuclearstrategic Accidentcountries in Japanin the prompted Northeast the ASGAsia to(NEA) interconnect with chanceopenedCommittee veryfor on announcingsuccessfully Green Growth featureson starting in lastof stage. Koreangovernment This smart was has grida goodbeen to strategicelectricityNuclear Accident countriesgeneration in Japan inareas the prompted in Northeastthe Gobi the Desert.ASGAsia to (NEA) Ainterconnect super withgrid chanceopened veryfor announcingsuccessfully featureson starting of stage.Korean This smart was grida good to strategicelectricity countriesgeneration inareas the in Northeastthe Gobi Desert.Asia (NEA)A super withgrid chanceforeignersopened veryfor and announcingsuccessfully overseas policy featureson starting makers of stage.Korean as well This smartas wasrechecking grida good to electricityimpliesstrategic technical countriesgeneration and inpoliticalareas the in Northeastchallengesthe Gobi Desert. becauseAsia (NEA)A of super the large withgrid chanceforeigners for and announcing overseas policyfeatures makers of Korean as well smartas rechecking grid to electricityimplies technical generation and politicalareas in challengesthe Gobi Desert. because A of super the large grid foreignersidentificationchance for and announcing andoverseas business policyfeatures model makers of development Korean as well smartas recheckingof gridKorean to impliesgeographicalelectricity technical generation extent. and Thepoliticalareas project in challengesthe remainsGobi Desert. because under A negotiation,of super the large grid foreignersidentification and andoverseas business policy model makers development as well as recheckingof Korean impliesgeographical technical extent. and Thepolitical project challenges remains because under negotiation,of the large identificationstyleforeigners smart andgrid. andoverseas business policy model makers development as well as recheckingof Korean geographicalalthoughimplies technical the advantagesextent. and Thepolitical are project that challenges demand remains andbecause under supply negotiation,of thecould large be identificationstyle smart grid. and business model development of Korean geographicalalthough the advantagesextent. The are project that demand remains and under supply negotiation, could be styleidentification smart grid. and business model development of Korean althoughbalancedgeographical themore advantagesextent. easily The are becauseproject that demand remainsregional and under differencessupply negotiation, could arebe Micro grid in Korea is processed two kinds. One is energy althoughbalanced themore advantages easily arebecause that demand regional and differencessupply could arebe Microstyle smart grid grid.in Korea is processed two kinds. One is energy balancedlevelledalthough outthemore byadvantages theeasily size ofarebecause the that system. demand regional However, and differencessupply the could success arebe Microself (standing grid in alone)Korea systemis processed style intw smallo kinds. island. One Another is energy is balancedlevelled out more by theeasily size ofbecause the system. regional However, differences the success are Microself (standing grid in alone)Korea systemis processed style intw smallo kinds. island. One Another is energy is levelledof ASG outor NEAby the program size of thein Asiasystem. depends However, entirely the successon the selfcampus (standing micro alone)grid which system is stylefocused in smallon not island. only energyAnother self is levelledof ASG outor NEAby the program size of thein Asiasystem. depends However, entirely the successon the selfcampus (standing micro alone)grid which system is stylefocused in smallon not island. only energyAnother self is politicalof ASG conditionor NEA programrather than in Asiathe monetary depends investmententirely on andthe campussystem butmicro also grid higher which energy is focused efficiency. on not Aonly several energy small self politicalof ASG conditionor NEA programrather than in Asiathe monetary depends investmententirely on andthe campussystem butmicro also grid higher which energy is focused efficiency. on not Aonly several energy small self politicalbenefit analysis. condition rather than the monetary investment and systemislands inbut Korea also arehigher opened energy as test efficiency. bed level. A An several example small of politicalbenefit analysis. condition rather than the monetary investment and systemislands inbut Korea also arehigher opened energy as test efficiency. bed level. A An several example small of benefit analysis. campusislands inmicro Korea grid, are openedSeoul Nationalas test bed University level. An exa(SNU)mple has of benefit2. POLICY analysis. DRIVERS AND PROMOTION LAW FOR campusislands inmicro Korea grid, are openedSeoul Nationalas test bed University level. An exa(SNU)mple has of 2. POLICY DRIVERS AND PROMOTION LAW FOR campusrecentlyislands in decidedmicro Korea grid, areto adopt openedSeoul micro Nationalas test-grid bed technologyUniversity level. An onexa(SNU) Gwanakmple has of 2. POLICY DRIVERSSMART GRIDAND PROMOTIIN KOREAON LAW FOR campusrecently decidedmicro grid, to adopt Seoul micro National-grid technologyUniversity on(SNU) Gwanak has 2. POLICY DRIVERSSMART GRIDAND PROMOTIIN KOREAON LAW FOR Campus.recentlycampus decidedmicroA micro grid, to -adoptgrid Seoul is micro Nationalan -independentgrid technologyUniversity and on (SNU)intelligent Gwanak has 2. POLICY DRIVERSSMART GRIDAND PROMOTIIN KOREAON LAW FOR Campus.recently decidedA micro to -adoptgrid is micro an -independentgrid technology and on intelligent Gwanak The Korean governmentSMART announcedGRID IN KOREA its CO2 reduction target energyCampus. system A micro that maximizes-grid is an the independent efficiency ofand electricity intelligent use The Korean government announced its CO2 reduction target energyCampus. system A micro that maximizes-grid is an the independent efficiency ofand electricity intelligent use Thefor 2020. Korean Among government the three announced options itits had CO considered,2 reduction Seoultarget energythrough system big data, that Internet maximizes of Things the efficiency (IoT) and of Energy electricity Storage use Thefor 2020. Korean Among government the three announced options itits had CO considered,2 reduction Seoultarget energythrough system big data, that Internet maximizes of Things the efficiency (IoT) and of Energy electricity Storage use forchose 2020. the Amongmost stringentthe three goaloptions of itcutting had considered,2 greenhouse Seoul gas throughSystem (ESS).big data, A Internettotal of 22of businessesThings (IoT) and and organizations, led forchose 2020. the Amongmost stringentthe three goaloptions of itcutting had considered, greenhouse Seoul gas throughSystem (ESS).big data, A Internettotal of 22of businessesThings (IoT) and and organizations, Energy Storage led (GHG)chose theemissions most stringent that repre goalsents ofa 30%cutting reduction greenhouse from gasthe Systemby LS (ESS).Industrial A total Systems, of 22 businesses a Korean and organizations,corporation thatled (GHG)chose theemissions most stringent that repre goalsents ofa 30%cutting reduction greenhouse from gasthe Systemby LS (ESS).Industrial A total Systems, of 22 businesses a Korean and organizations,corporation thatled (GHG)estimated emissions level ofthat 2020.repre sentsThis a 30%goal reductionis deemed from very the bymanufactures LS Industrial and suppliesSystems, electric a Korean power corporationequipment, willthat (GHG)estimated emissions level ofthat 2020.repre sentsThis a 30%goal reductionis deemed from very the bymanufactures LS Industrial and suppliesSystems, electric a Korean power corporationequipment, willthat challengingestimated levelsince of Korean2020. Thisindustry goal hadis deemeddoubled veryits manufacturesinvite. and supplies equipment, will challengingestimated levelsince of Korean2020. Thisindustry goal hadis deemeddoubled veryits manufacturesinvite. and supplies electric power equipment, will challenginggreenhouse gassince emissions Korean between industry 1990 andhad 2005, doubled the fastest its invite. challenginggreenhouse gassince emissions Korean between industry 1990 andhad 2005, doubled the fastest its Superinvite. Grid in Korea has a long history. After the Fukushima greenhousegrowth in thegas OECD.emissions Korea between has 1990voluntarily and 2005, set the its fastest 2020 Super Grid in Korea has a long history. After the Fukushima greenhousegrowth in thegas OECD.emissions Korea between has 1990voluntarily and 2005, set the its fastest 2020 SuperNuclear Grid Accident, in Korea the has Japan a long Renewable history. After Energy the FoundationFukushima growthemission in r eductionthe OECD. target. Korea With hasthis pledge,voluntarily Seoul set seeks its 2020to be SuperNuclear Grid Accident, in Korea the has Japan a long Renewable history. After Energy the FoundationFukushima growthemission in r eductionthe OECD. target. Korea With hasthis pledge,voluntarily Seoul set seeks its 2020to be SuperNuclear(JREF) Grid putAccident, inforward Korea the ahas proposalJapan a long Renewable tohis interconnecttory. After Energy the Japan, FoundationFukushima Korea, emissiona model forreduction other countriestarget. With including this pledge, China Seoul and seeksIndia towho be Nuclear(JREF) putAccident, forward the a proposalJapan Renewable to interconnect Energy Japan, Foundation Korea, emissiona model forreduction other countriestarget. With including this pledge, China Seoul and seeksIndia towho be (JREF)China,Nuclear Mongolia, putAccident, forward and the a RussiaproposalJapan withRenewable to interconnecthigh-voltage Energy Japan,direct Foundation- currentKorea, aare model categorized for other as countries developing including countries China under and theIndia Kyoto who (JREF)China, Mongolia,put forward and a Russiaproposal with to interconnecthigh-voltage Japan,direct- currentKorea, aare model categorized for other as countries developing including countries China under and theIndia Kyoto who China,(JREF) Mongolia,put forward and a Russiaproposal with to interconnecthigh-voltage Japan,direct- currentKorea, are categorized as developing countries under the Kyoto China, Mongolia, and Russia with high-voltage direct-current are categorized as developing countries under the Kyoto Copyright © 2016 IFAC 218 Copyright2405-8963 © 2016,2016 IFAC (International Federation of Automatic Control)218 Hosting by Elsevier Ltd. All rights reserved. CopyrightPeer review © under 2016 responsibilityIFAC of International Federation of Automatic218 Control. Copyright10.1016/j.ifacol.2016.10.686 © 2016 IFAC 218

IFAC and CIGRE/CIRED Workshop on IFAC and CIGRE/CIRED Workshop on IFACControl and of CIGRE/CIRED Transmission Workshop and Distribution on Smart Grids IFACOctoberControl and of 11-13, CIGRE/CIRED Transmission 2016. Prague, Workshop and DistributionCzech on Republic Smart Grids Control of Transmission and Distribution Smart Grids 2016 IFAC CTDSG ControlOctober of 11-13, Transmission 2016. Prague, and DistributionCzech Republic Smart Grids October 11-13, 2016. Prague, Czech Republic October 11-13, 2016. Prague, Czech RepublicJaeseok Choi et al. / IFAC-PapersOnLine 49-27 (2016) 218–223 219 October 11-13, 2016. Prague, Czech Republic

Process and Features of Smart Grid, Micro Grid and Super Grid in South Korea Protocol. The two countries thus have no binding obligation individuals wishing to initiate a business for managing and Process and Features of Smart Grid, Micro Grid and Super Grid in South Korea but to announce its reduction target by 2030. supporting of smart grid industry may register via Minister of Process and Features of Smart Grid, Micro Grid and Super Grid in South Korea Ministry of Knowledge Economy (MKE). It supports smart Process and Features of Smart Grid, Micro Grid and Super Grid in South Korea Korea is also pursuing sustainable development while dealing Jaeseok Choi*.Duy -Phuong N. Do** grid investment (Article 14th). This Article provides a basis Jaeseok Choi*.Duy -Phuong N. Do** with . At the same time, it is shifting toward a Jaeseok Choi*.Duy-Phuong N. Do** for companies to receive subsidy in the case that they are * Department of Electrical EngineeringJaeseok, RIGET, Choi*. ERI,Duy Gyeongsang-Phuong N. Do*National* University, Republic of Korea low carbon economy and a society capable of recovering * Department of Electrical Engineering, RIGET, ERI, Gyeongsang National University, Republic of Korea making business investment for the benefit of the public. It * Department of Electrical Engineering(Tel:82-55,- 772RIGET,-1715; ERI, e-mail:[email protected]) Gyeongsang National University, Republic of Korea from climate change. As part of these efforts, Korea launched th * Department of Electrical Engineering(Tel:82-55,- 772RIGET,-1715; ERI, e-mail:[email protected]) Gyeongsang National University, Republic of Korea also select smart pilot city (article 18 ). If necessary, smart * Department** Department of Electrical of Electrical Engineering(Tel:82 Engineering-55,- 772RIGET,-1715;, GyeonsangERI, e-mail:[email protected]) Gyeongsang National National University, University, Republic Republic of Korea of Korea a smart grid national project to achieve green growth in a ** Department of Electrical(Tel:82 Engineering-55-772-1715;, Gyeonsang e-mail:[email protected]) National University, Republic of Korea pilot city will be selected for the wide deployment and ** Department of Electrical(Tel:82 Engineering-(e55-mail:[email protected];, Gyeonsang e-mail:[email protected]) National). University, Republic of Korea transparent, comprehensive, effective, and efficient way. This (e-mail:[email protected]). dissemination of smart grid. The government will manage ** Department of Electrical Engineering, Gyeonsang National University, Republic of Korea project envisions laying the foundation for a low carbon, (e-mail:[email protected]). portion of the required expense. The Article 10th, R&D (e-mail:[email protected]). green-growth economy by building a smart grid. Thus, it can Abstract: This paper describes the processes and features of Smart Grid, Micro Grid and Super Grid in support, provides administrative, financial support regarding Abstract: This paper describes the processes and features of Smart Grid, Micro Grid and Super Grid in serve as a yardstick to evaluate the future of Korea’s green- AbstractSouth Korea: This briefly. paper describesIn Korea, thesmart processes grid, micro and features grid and of superSmart gridGrid, are Micro very Grid hot andissues Super and Grid active in technology development, demonstration, policies and AbstractSouth Korea: This briefly. paper describesIn Korea, thesmart processes grid, micro and features grid and of superSmart gridGrid, are Micro very Grid hot andissues Super and Grid active in growth economy. In light of this, Korea came up with a SouthbusinessAbstract Korea model: This briefly. andpaper attractive describesIn Korea, topic thesmart inprocesses Korean grid, microasand same features grid as otherand of super Smartcountries gridGrid, nowadays are Micro very Grid . hot andissues Super and Grid active in workforce development. And International collaboration Southbusiness Korea model briefly. and attractive In Korea, topic smart in Korean grid, microas same grid as otherand super countries grid nowadays are very . hot issues and active proactive and ambitious plan to build a smart grid test-bed on st businessSouth Korea model briefly. and attractive In Korea, topic smart in Korean grid, microas same grid as otherand super countries grid nowadays are very . hot issues and active (Article 11 ) provides technological and resourcing support Keywords: smart grid, micro grid, super grid, power IT. Jeju Island to prove its determination in the low carbon, Keywordsbusiness model: smart and grid, attractive micro grid,topic super in Korean grid, poweras same IT as. other countries nowadays. regarding international standard, R&D collaboration to help Keywords: smart grid, micro grid, super grid, power IT. green-growth strategy. Keywords: smart grid, micro grid, super grid, power IT. domestic companies to penetrate into international market.  transmission lines. This provision aims at preventing further The Articles 15th and 17th, technology verification and 1. INTRODUCTION  transmission lines. This provision aims at preventing further 1. INTRODUCTION  transmissionaccidents from lines. occurring This provision in the future, aims as at well preventi as acceleratingng further standardization, enforce technology verification and 1. INTRODUCTION transmissionaccidents from lines. occurring This provision in the future, aims as at well preventi as acceleratingng further Korean Smart Grid 1.is, INTRODUCTION maybe alternatively, called as Power accidentsthe development from occurring of renewable in the future, energy as wellsources as accelerating to reduce technology standardization to secure safety of smart grid and Korean Smart Grid 1.is, INTRODUCTION maybe alternatively, called as Power accidentsthe development from occurring of renewable in the future, energy as wellsources as accelerating to reduce KoreanIT originally Smart in Grid Korea. is, maybeAfter poweralternatively, system calledderegulation as Power in therelianceaccidents development upon from nuclearoccurring of renewablepower, in the reducefuture, energy theas well sourcescost as of accelerating renewableto reduce its compatibility with related equipment and products. KoreanIT originally Smart in Grid Korea. is, maybeAfter poweralternatively, system calledderegulation as Power in thereliance development upon nuclear of renewablepower, reduce energy the sourcescost of renewableto reduce ITKorean originally SmartElectricity in Grid Korea. in is, 15 maybeAfter years power alternatively,ago, Koreasystem electricity calledderegulation as Powerpower in relianceenergies,the development uponand providenuclear of energyrenewablepower, security reduce energy tothe Japan. sourcescost Thisof renewableto network reduce ITKorean originally Electricity in Korea. in 15 After years power ago, Koreasystem electricity deregulation power in relianceenergies, uponand providenuclear energypower, security reduce tothe Japan. cost Thisof renewable network Finally, there are some Articles in the compiling, applying & KoreanmarketIT originally Electricityhas beenin Korea. searchingin 15 After years forpower ago, new Koreasystem business electricity deregulation issues power and in energies,willreliance be called uponand provide nuclearAsia Super energypower, Grid security reduce (ASG) tothe Japan. orcost Northeast Thisof renewable network Asia Koreanmarket Electricityhas been searchingin 15 years for ago, new Korea business electricity issues power and energies,will be called and provide Asia Superenergy Grid security (ASG) to Japan. or Northeast This network Asia securing information. The Article 22nd, compiling personal marketkeywords.Korean Electricityhas A beennew business searchingin 15 years model for ago, callednew Korea business“Power electricity IT” issues in powerKorea and will(NEA)energies, be Interconnection.called and provide Asia Superenergy Ten Grid securityyears (ASG) ago,to Japan. orbefore Northeast This the network JREFAsia marketkeywords. has A beennew businesssearching model for callednew business“Power IT” issues in Korea and will(NEA) be Interconnection.called Asia Super Ten Grid years (ASG) ago, orbefore Northeast the JREFAsia information for smart grid, rules that compiling private keywords.ismarket generally has A beennewand businesswidelysearching knownmodel for callednewbefore business“Power the smart IT” issues in grid Korea and is (NEA)suggestionwill be Interconnection.called was Asiaput forward,Super Ten Grid Southyears (ASG) Koreaago, or beforeand Northeast Russia the JREFhaveAsia keywords.is generally A newand businesswidely knownmodel calledbefore “Power the smart IT” in grid Korea is (NEA)suggestion Interconnection. was put forward, Ten Southyears Koreaago, beforeand Russia the JREFhave information for smart grid cannot occur without the consent isintroducedkeywords. generally Ain new andKorea. businesswidely Because knownmodel IT called (Informationbefore “Power the smart IT”Technology) in grid Korea is suggestiondiscussed(NEA) Interconnection. thewas practical put forward, andTen theoreticalSouthyears Koreaago, implications beforeand Russia the of JREFhave an isintroduced generally in andKorea. widely Because known IT (Informationbefore the smart Technology) grid is suggestiondiscussed thewas practical put forward, and theoreticalSouth Korea implications and Russia of have an from the information provider, information provider can introducedmaybeis generally was in the andKorea. best widely futureBecause known business IT (Informationbefore model the in smart KoreaTechnology) gridat that is discussedinterconnectionsuggestion thewas practical betweenput forward, Koreaand theoreticalSouth (South Korea Kor implicationsea and & NorthRussia Korea)of have an introducedmaybe was inthe Korea. best futureBecause business IT (Information model in KoreaTechnology) at that discussedinterconnection the practical between Koreaand theoretical (South Kor implicationsea & North Korea)of an request access and deletion of his/her personal information maybetime.introduced Several was inthe Korea.kinds best offutureBecause attractive business IT events(Information model have in KoreabeenTechnology) openedat that interconnectionanddiscussed Russia the targeted practical between for Korea and2012. theoretical (South Three Kor scenarios implicationsea & North have Korea) ofbeen an maybetime. Several was the kinds best offuture attractive business events model have in Koreabeen openedat that interconnectionand Russia targeted between for Korea 2012. (South Three Kor scenariosea & North have Korea) been and the information holder is required to take appropriate time.aftermaybe smartSeveral was gridthe kinds bestin Korea. offuture attractive Especially,business events model launching have in Koreabeen smart openedat gridthat anddeeplyinterconnection Russia considered. targeted between Theoretically,for Korea 2012. (South Three approximately Kor scenariosea & North have 3Korea) beenGW time.after smartSeveral grid kinds in Korea.of attractive Especially, events launching have been smart opened grid anddeeply Russia considered. targeted Theoretically,for 2012. Three approximately scenarios have 3 beenGW action. In the Article of sharing of smart grid information aftertesttime. bed smartSeveral town grid inkinds inJeju Korea.of Island attractive Especially, was ableevents to launching makehave citizenshipbeen smart opened grid to deeplyHVDCand Russia passingconsidered. targeted North Theoretically,forKorea 2012. or servicingThree approximately scenarios its electrical have 3energy beenGW aftertest bed smart town grid in inJeju Korea. Island Especially, was able to launching make citizenship smart grid to deeplyHVDC passingconsidered. North Theoretically,Korea or servicing approximately its electrical 3energy GW (Article 23rd), provides efficient service for grid consumers. testunderstandafter bed smart town gridsmart in inJeju grid.Korea. Island Additional Especially, was ablely, to launching Koreamake citizenshipSmart smart Gridgrid to HVDCwasdeeply suggested passingconsidered. Northto maximize Theoretically,Korea or servicingthe capacityapproximately its electrical at that 3 energy time.GW testunderstand bed town smart in Jeju grid. Island Additional was ablely, to Koreamake citizenshipSmart Grid to HVDCwas suggested passing Northto maximize Korea or servicingthe capacity its electrical at that energytime. A service provider can request to share collected information understandAssociationtest bed town (KSGA)smart in Jeju grid. andIsland KoreaAdditional was Smart ablely, to Grid Koreamake Institute citizenshipSmart (KSGI) Grid to wasHowever,HVDC suggested passing the pla Northton wasmaximize Korea called or servicingoffthe becausecapacity its electricalof atunfavourable that energytime. understandAssociation (KSGA)smart grid. and KoreaAdditional Smartly, GridKorea Institute Smart (KSGI) Grid wasHowever, suggested the pla ton wasmaximize called offthe becausecapacity of atunfavourable that time. Fig. 1. Promotion law for smart grid in Korea from another service provider and request to share hostedAssociationunderstand 2010 (KSGA)smart World grid. andSmart KoreaAdditional Grid Smart ly,Forum, GridKorea Institutesponsored Smart (KSGI) Grid by However,politicalwas suggested conditions, the pla ton waswhichmaximize called presented offthe because acapacity good opportunityof atunfavourable that time.for a hostedAssociation 2010 (KSGA) World andSmart Korea Grid Smart Forum, Grid Institutesponsored (KSGI) by However,political conditions, the plan waswhich called presented off because a good opportunityof unfavourable for a information should be carried out, if not, appropriate action hostedMinistryAssociation 2010 of (KSGA) WorldKnowledge andSmart Korea EconomyGrid Smart Forum, Grid and Institute sponsoredPresidential (KSGI) by politicalmoreHowever, stable conditions, the andpla ncheaper waswhich called presentedenergy off becausesupply. a good opportunityTheof unfavourable Fukushima for a Parliament passed the bill of smart grid promotion law in hostedMinistry 2010 of WorldKnowledge Smart EconomyGrid Forum, and sponsoredPresidential by politicalmore stable conditions, and cheaper which presentedenergy supply. a good opportunityThe Fukushima for a will be taken by the Minister. Ensuring optimal use of MinistryCommitteehosted 2010 ofon WorldGreenKnowledge GrowthSmart EconomyGridin last Forum, government and sponsoredPresidential has been by moreNuclearpolitical stable Accidentconditions, and incheaper whichJapan presentedpromptedenergy supply. athe good ASG opportunityThe to interconnectFukushima for a 2011 to provide legislative support (Fig. 1). Smart grid is a MinistryCommittee ofon GreenKnowledge Growth Economyin last government and Presidential has been moreNuclear stable Accident and incheaper Japan promptedenergy supply. the ASG The to interconnectFukushima information (Article 24th), the minister of MKE advised to CommitteeopenedMinistry very ofon successfully GreenKnowledge Growth on starting Economyin last stage. government and This Presidentialwas has a goodbeen Nuclearstrategicmore stable Accidentcountries and incheaper Japanin the promptedenergy Northeast supply. the ASGAsi Thea to(NEA) interconnectFukushima with new emerging industry and needs positive participation from Committeeopened very on successfully Green Growth on starting in last stage. government This was has a goodbeen Nuclearstrategic Accidentcountries in Japanin the prompted Northeast the ASGAsia to(NEA) interconnect with enact a legislation that includes procedural and standard openedchanceCommittee veryfor on announcingsuccessfully Green Growth featureson starting in lastof stage. Koreangovernment This smart was has grida goodbeen to strategicelectricityNuclear Accident countriesgeneration in Japan inareas the prompted in Northeastthe Gobi the Desert.ASGAsia to (NEA) Ainterconnect super withgrid related industries. It needs legislative support to sustain openedchance veryfor announcingsuccessfully featureson starting of stage.Korean This smart was grida good to strategicelectricity countriesgeneration inareas the in Northeastthe Gobi Desert.Asia (NEA)A super withgrid regulation for optimal and appropriate use of collected chanceforeignersopened veryfor and announcingsuccessfully overseas policy featureson starting makers of stage.Korean as well This smartas wasrechecking grida good to electricityimpliesstrategic technical countriesgeneration and inpoliticalareas the in Northeastchallengesthe Gobi Desert. becauseAsia (NEA)A of super the large withgrid project and maintain industry participation. The promotion chanceforeigners for and announcing overseas policyfeatures makers of Korean as well smartas rechecking grid to electricityimplies technical generation and politicalareas in challengesthe Gobi Desert. because A of super the large grid information. To ensure information security for smart grid foreignersidentificationchance for and announcing andoverseas business policyfeatures model makers of development Korean as well smartas recheckingof gridKorean to impliesgeographicalelectricity technical generation extent. and Thepoliticalareas project in challengesthe remainsGobi Desert. because under A negotiation,of super the large grid law also appease constraints such as the current Electricity foreignersidentification and andoverseas business policy model makers development as well as recheckingof Korean impliesgeographical technical extent. and Thepolitical project challenges remains because under negotiation,of the large (Article 26th), smart grid business operator must install identificationstyleforeigners smart andgrid. andoverseas business policy model makers development as well as recheckingof Korean geographicalalthoughimplies technical the advantagesextent. and Thepolitical are project that challenges demand remains andbecause under supply negotiation,of thecould large be Enterprises Act restricts the diversity of businesses, which identificationstyle smart grid. and business model development of Korean geographicalalthough the advantagesextent. The are project that demand remains and under supply negotiation, could be information security system to prevent illegal information styleidentification smart grid. and business model development of Korean althoughbalancedgeographical themore advantagesextent. easily The are becauseproject that demand remainsregional and under differencessupply negotiation, could arebe means that Electricity Enterprise Act allows only monopoly Micro grid in Korea is processed two kinds. One is energy althoughbalanced themore advantages easily arebecause that demand regional and differencessupply could arebe exposure. The minister of MKE can enact information Microstyle smart grid grid.in Korea is processed two kinds. One is energy balancedlevelledalthough outthemore byadvantages theeasily size ofarebecause the that system. demand regional However, and differencessupply the could success arebe system for electricity retails. It needs to transcend current Microself (standing grid in alone)Korea systemis processed style intw smallo kinds. island. One Another is energy is balancedlevelled out more by theeasily size ofbecause the system. regional However, differences the success are security guidelines which are to be abided by business Microself (standing grid in alone)Korea systemis processed style intw smallo kinds. island. One Another is energy is levelledof ASG outor NEAby the program size of thein Asiasystem. depends However, entirely the successon the legislative constraints by establishing a law and th selfcampus (standing micro alone)grid which system is stylefocused in smallon not island. only energyAnother self is levelledof ASG outor NEAby the program size of thein Asiasystem. depends However, entirely the successon the operators. Securing compatibility for smart grid (Article 28 ), selfcampus (standing micro alone)grid which system is stylefocused in smallon not island. only energyAnother self is ofpolitical ASG conditionor NEA programrather than in Asiathe monetary depends investmententirely on andthe implementing next generation technologies to rise up the campussystem butmicro also grid higher which energy is focused efficiency. on not Aonly several energy small self ofpolitical ASG conditionor NEA programrather than in Asiathe monetary depends investmententirely on andthe the minister of MKE may advise business operators on campussystem butmicro also grid higher which energy is focused efficiency. on not Aonly several energy small self politicalbenefit analysis. condition rather than the monetary investment and freedom of market. systemislands inbut Korea also arehigher opened energy as test efficiency. bed level. A An several example small of politicalbenefit analysis. condition rather than the monetary investment and technology standard, information access, service systemislands inbut Korea also arehigher opened energy as test efficiency. bed level. A An several example small of benefit analysis. islandscampus inmicro Korea grid, are openedSeoul Nationalas test bed University level. An exa(SNU)mple has of benefit2. POLICY analysis. DRIVERS AND PROMOTION LAW FOR Firstly, the framework of smart grid policy aims to interconnection to ensure compatibility of smart grid. islandscampus inmicro Korea grid, are openedSeoul Nationalas test bed University level. An exa(SNU)mple has of 2. POLICY DRIVERS AND PROMOTION LAW FOR th campusrecentlyislands in decidedmicro Korea grid, areto adopt openedSeoul micro Nationalas test-grid bed technologyUniversity level. An onexa(SNU) Gwanakmple has of 2. POLICY DRIVERSSMART GRIDAND PROMOTIIN KOREAON LAW FOR develop/execute primary plan for smart grid by Articles 5 , Securing smart grid information and preventing violation campusrecently decidedmicro grid, to adopt Seoul micro National-grid technologyUniversity on(SNU) Gwanak has 2. POLICY DRIVERSSMART GRIDAND PROMOTIIN KOREAON LAW FOR th th th th Campus.recentlycampus decidedmicroA micro grid, to -adoptgrid Seoul is micro Nationalan -independentgrid technologyUniversity and on (SNU)intelligent Gwanak has 2. POLICY DRIVERSSMART GRIDAND PROMOTIIN KOREAON LAW FOR 6 , and 9 . These Articles support to develop/ execute (Article 25 and 27 ), the minister of MKE will take Campus.recently decidedA micro to -adoptgrid is micro an -independentgrid technology and on intelligent Gwanak The Korean governmentSMART announcedGRID IN KOREA its CO2 reduction target energyCampus. system A micro that maximizes-grid is an the independent efficiency ofand electricity intelligent use The Korean government announced its CO2 reduction target comprehensive plan for the deployment of smart grid and for measures to protect smart grid from outside source intrusion. energyCampus. system A micro that maximizes-grid is an the independent efficiency ofand electricity intelligent use Thefor 2020. Korean Among government the three announced options itits had CO considered,2 reduction Seoultarget energythrough system big data, that Internet maximizes of Things the efficiency (IoT) and of Energy electricity Storage use Thefor 2020. Korean Among government the three announced options itits had CO considered,2 reduction Seoultarget the fostering of correlated businesses, and periodic No individual has the right to access, manipulate, demolish, energythrough system big data, that Internet maximizes of Things the efficiency (IoT) and of Energy electricity Storage use forchose 2020. the Amongmost stringentthe three goaloptions of itcutting had considered,2 greenhouse Seoul gas throughSystem (ESS).big data, A Internettotal of 22of businessesThings (IoT) and and organizations, Energy Storage led forchose 2020. the Amongmost stringentthe three goaloptions of itcutting had considered, greenhouse Seoul gas transitioning plan for technology deployment/replacement to expose smart grid or take other violating actions without throughSystem (ESS).big data, A Internettotal of 22of businessesThings (IoT) and and organizations, Energy Storage led (GHG)chose theemissions most stringent that repre goalsents ofa 30%cutting reduction greenhouse from gasthe Systemby LS (ESS).Industrial A total Systems, of 22 businesses a Korean and organizations,corporation thatled (GHG)chose theemissions most stringent that repre goalsents ofa 30%cutting reduction greenhouse from gasthe ensure participation from electricity suppliers and users. The permission or justified reason. Systemby LS (ESS).Industrial A total Systems, of 22 businesses a Korean and organizations,corporation thatled (GHG)estimated emissions level ofthat 2020.repre sentsThis a 30%goal reductionis deemed from very the th bymanufactures LS Industrial and suppliesSystems, electric a Korean power corporationequipment, willthat (GHG)estimated emissions level ofthat 2020.repre sentsThis a 30%goal reductionis deemed from very the Article 19 , designation of Korea’s smart grid promoting bymanufactures LS Industrial and suppliesSystems, electric a Korean power corporationequipment, willthat challengingestimated levelsince of Korean2020. Thisindustry goal hadis deemeddoubled veryits 3. KOREA SMART GRID ROADMAP manufacturesinvite. and supplies electric power equipment, will challengingestimated levelsince of Korean2020. Thisindustry goal hadis deemeddoubled veryits agency, under the primary plan for Smart Grid designates one manufacturesinvite. and supplies electric power equipment, will challenginggreenhouse gassince emissions Korean between industry 1990 andhad 2005, doubled the fastest its invite. challenginggreenhouse gassince emissions Korean between industry 1990 andhad 2005, doubled the fastest its relevant institution as Korea’s smart grid promoting agency A smart grid refers to a next-generation network that Superinvite. Grid in Korea has a long history. After the Fukushima greenhousegrowth in thegas OECD.emissions Korea between has 1990voluntarily and 2005, set the its fastest 2020 Super Grid in Korea has a long history. After the Fukushima greenhousegrowth in thegas OECD.emissions Korea between has 1990voluntarily and 2005, set the its fastest 2020 and requires the institute to execute governmental policies, integrates information technology (smart) into the existing SuperNuclear Grid Accident, in Korea the has Japan a long Renewable history. After Energy the FoundationFukushima growthemission in r eductionthe OECD. target. Korea With hasthis pledge,voluntarily Seoul set seeks its 2020to be SuperNuclear Grid Accident, in Korea the has Japan a long Renewable history. After Energy the FoundationFukushima growthemission in r eductionthe OECD. target. Korea With hasthis pledge,voluntarily Seoul set seeks its 2020to be oversee R&D, smart demonstration, deployment and ensure power grid (grid) to optimize energy efficiency through a Nuclear(JREF)Super Grid putAccident, inforward Korea the ahas proposalJapan a long Renewable tohis interconnecttory. After Energy the Japan, FoundationFukushima Korea, emissiona model forreduction other countriestarget. With including this pledge, China Seoul and seeksIndia towho be Nuclear(JREF) putAccident, forward the a proposalJapan Renewable to interconnect Energy Japan, Foundation Korea, emissiona model forreduction other countriestarget. With including this pledge, China Seoul and seeksIndia towho be information security. two-way exchange of electricity information between (JREF)China,Nuclear Mongolia, putAccident, forward and the a RussiaproposalJapan withRenewable to interconnecthigh-voltage Energy Japan,direct Foundation- currentKorea, aare model categorized for other as countries developing including countries China under and theIndia Kyoto who (JREF)China, Mongolia,put forward and a Russiaproposal with to interconnecthigh-voltage Japan,direct- currentKorea, aare model categorized for other as countries developing including countries China under and theIndia Kyoto who suppliers and consumers in real time. Building a smart grid China,(JREF) Mongolia,put forward and a Russiaproposal with to interconnecthigh-voltage Japan,direct- currentKorea, are categorized as developing countries under the Kyoto Secondly, the legislative support & application provides China, Mongolia, and Russia with high-voltage direct-current are categorized as developing countries under the Kyoto register business licensing for smart grid (Article 12nd). The can induce reasonable energy consumption, enable the Copyright © 2016 IFAC 218 provision of high-quality energy, and provide a wide array of Copyright © 2016 IFAC 218 Copyright © 2016 IFAC 218 Copyright © 2016 IFAC 218 219

Download English Version: https://daneshyari.com/en/article/5002608

Download Persian Version:

https://daneshyari.com/article/5002608

Daneshyari.com