File OF-AF-ACE 01 19 December 2018 To: Group 2 Pipeline
Total Page:16
File Type:pdf, Size:1020Kb
File OF-AF-ACE 01 19 December 2018 To: Group 2 Pipeline Companies Review of Abandonment Cost Estimates (ACE) for Group 2 Pipeline Companies (Group 2 ACE Review) On 8 June 2018, the National Energy Board (NEB or Board) issued a letter to all Group 2 pipeline companies informing them that the Board would commence its review of their ACE. The Board directed all Group 2 pipeline companies to file for approval by noon, 20 July 2018: • a copy of the last approved ACE (blacklined to show changes) and a clean copy of the updated ACE for approval, using the tables and instructions provided in the attached Appendix III; or • the information found in Appendix II of the 8 June 2018 letter which the Board would use to determine the ACE amounts. On 6 November 2018, the Board issued a letter to Group 2 Pipeline Companies that had not filed an updated ACE. The companies identified in the letter were to file their ACE by 20 November 2018. Board Assessment of Group 2 pipeline companies’ ACE The Board has considered the ACE filings that were filed in response to the Board’s 8 June 2018 letter, and has separated them into three categories: Category A, Category B and Category C. Category A For those Group 2 pipeline companies listed in Category A, the Board is satisfied with the cost estimates as filed, at this time. A list of those Group 2 pipeline companies in Category A is found in Appendix I. The Board does not require anything further from these Group 2 companies with respect to this Group 2 ACE Review proceeding. …/2 -2- Category B The Board has determined that further information is required about the ACE filings for those Group 2 pipeline companies listed in Category B. A list of these Group 2 pipeline companies is found in Appendix II. The Board’s Information Requests (IRs) No. 1 to companies in Category B are contained in one document and are grouped by company. Companies need only respond to the IRs specifically directed to them. The IRs are found in Appendix V. The responses to the IRs are due by noon, Calgary time, on 16 January 2019. Category C The information provided by Group 2 pipeline companies in Category C listed in Appendix III requires further assessment by the Board. These companies will receive a Board letter regarding the ACE amounts, or IRs, as determined by the Board at a later date. Late submissions in response to the 6 November 2018 letter For those Group 2 pipeline companies that filed their updated ACE late in accordance with the Board’s 6 November 2018, the Board is presently reviewing these filings and therefore, the Board’s decisions regarding to those Group 2 pipeline companies’ ACE filings are not included in this letter. The Board will subsequently issue a decision letter in regard to these filings. A list of these companies can be found in Appendix IV. If you have any questions regarding this letter, please contact the Board and ask for the ACE Review contact at toll free 1-800-899-1265, or email: [email protected]. Yours truly, Original signed by L. George for Sheri Young Secretary of the Board Attachments Attachment to Board Letter Dated 19 December 2018 Page 1 of 1 Appendix I Category A – Group 2 Pipeline Companies with Approved ACE 1057533 Alberta Ltd. (Harvest Operations Corps) Aurora Pipeline Company Ltd. Blackbird Energy Inc. Centra Transmission Holdings Inc. Corporation Champion Pipe Line Limited Emera Brunswick Pipeline Company Ltd. Enbridge Bakken Pipeline Company Inc. Enbridge G and P Canada Pipelines Inc. Enbridge Southern Lights GP Inc. Express Pipeline Limited Genesis Pipeline Canada Ltd. Great Lakes Pipeline Canada Ltd. Kinder Morgan Utopia Ltd. Manitoba Hydro on behalf of Minell Pipelines Ltd. Many Islands Pipe Line (Canada) Limited Montreal Pipe Line Limited NOVA Chemicals (Canada) Ltd. Omimex Resources Inc. Pembina Prairie Facilities Pembina Energy Services Inc. Pouce Coupe Pipe Line Ltd. Shiha Energy Transmission Ltd. Spectra Energy Midstream Canada Partner Corporation St Clair Management Inc. Vector Pipeline Limited Veresen Midstream Limited Partnership Veresen Pipeline Inc. Windmill Dream Attachment to Board Letter Dated 19 December 2018 Page 1 of 1 Appendix II Category B – Companies where further information is required Altagas Holdings Inc. ARC Resources Ltd. Bonavista Energy Corporation Canadian-Montana Pipe Line Corporation (Northwestern Energy) Canadian Natural Resources Limited Enbridge Gas Distribution Inc. on behalf of Niagara Gas Transmission Limited Enbridge Gas Distribution on behalf of 2193914 Canada Limited FortisBC Huntingdon Inc. (HIPCO) Glenogle Energy Inc. Husky Oil Operations Limited Husky Oil Operations Limited on behalf of LBX Pipeline Ltd. OneOK Rockies Processing Company (Canada) Ltd. Pine Cliff Energy Ltd. Shell Canada Products Souris Valley Pipeline Limited Strategic Transmission Ltd. Sunoco Logistic Partners Operations GP LLC Tamarack Acquisition Corp. Union Gas Ltd. Attachment to Board Letter Dated 19 December 2018 Page 1 of 1 Appendix III Category C - Companies where Board is to determine ACE Crescent Point Energy Corporation Encana Corporation ExxonMobil Canada Properties Plains Midstream Canada ULC Tundra Oil & Gas Limited Attachment to Board Letter Dated 19 December 2018 Page 1 of 1 Appendix IV 6720471 Canada Ltd. (Nottingham Midstream Limited) Bellatrix Exploration Ltd. Bow River Energy Ltd. Caltex Resources Canada Border Services Agency Cenovus Energy Inc. Chief Mountain Gas Co-op Ltd. Ikkuma Resources Corp. ISH Energy Ltd. Obsidian Energy Inc. Twin Rivers Paper Company Venturion Oil Limited Whitecap Resources Inc. .