JAPAN INTERNATIONAL COOPERATION AGENCY (JICA) MINISTRY OF WORKS, TRANSPORT AND COMMUNICATIONS REPUBLIC OF MINISTRY OF WORKS AND SUPPLY REPUBLIC OF

THE FEASIBILITY STUDY ON THE PROPOSED KAZUNGULA BRIDGE OVER THE ZAMBEZI RIVER BETWEEN THE REPUBLIC OF BOTSWANA AND THE REPUBLIC OF ZAMBIA

FINAL REPORT APPENDICES

MARCH 2001

NIPPON KOEI CO., LTD ORIENTAL CONSULTANTS CO., LTD. THE FEASIBILITY STUDY ON THE PROPOSED KAZUNGULA BRIDGE OVER THE ZAMBEZI RIVER BETWEEN THE REPUBLIC OF BOTSWANA AND THE REPUBLIC OF ZAMBIA

FINAL REPORT APPENDICES

List of Contents

A. MINUTES OF MEETING

A-1 Minutes of Meeting of the Joint Steering Committee for the Proposed Kazungula Bridge Project and Japan International Cooperation Agency held in Gaborone on 30-31 August 2000 (Inception Report) ...... 1 A-2 Minutes of Meeting of the Technical Sub-committee on the Kazungula Bridge Project: Feasibility Study, 9th October 2000, Longacres Lodge, Lusaka, Zambia (Technical Sub-committee Meeting) ...... 10 A-3 Minutes of Meeting of the Joint Steering Committee (Botswana, Zambia, and ) for the Proposed Kazungula Bridge Project with Japan International Cooperation Agency held in Livingstone, Zambia on 18-19 October 2000 (Interim Report) ...... 17 A-4 Minutes of Meeting of the Joint Steering Committee (Botswana, Zambia, Zimbabwe and Namibia) for the Proposed Kazungula Bridge Project with Japan International Cooperation Agency held in Gaborone, Botswana on 6-8 March 2001 (Draft Final Report)...... 30

B. LETTERS & MEETING MINUTES (ZAMBIA)

B-1 Request Letter on the Navigational Clearance, KZB/27/S-00, 26 October 2000, JICA Study Team ...... 40 B-2 Replied Letter on the Navigational Clearance, MWS/103/1/50, 1 November 2000, Zambia ...... 43 B-3 Request Letter on the Technical Criteria, KZB/26/S-00, 26 October 2000, JICA Study Team...... 46 B-4 Meeting Minutes, Lusaka, Zambia, 14th November 2000 ...... 47 B-5 Overall Comments on the JICA Sponsored Feasibility Study of Kazungula Bridge Design, Approaches and the Border Control Facilities (BCF), MWS/103/1/50, 17th November 2000, Zambia ...... 49 B-6 Comments on the One Stop Border Post Facility, MWS/103/1/50, 23rd November 2000, Zambia...... 51 B-7 Final Bridge Type for the Kazungula Bridge Project, accepted on 22 November, Zambia...... 54 B-8 Further Information for Finalizing the Draft Final Report for the Kazungula Crossing 15th March 2001, JICA Study Team ...... 55

C. LETTERS & MEETING MINUTES (BOTSWANA)

C-1 Request Letter on the Navigational Clearance, KZB/28/S-00, 26 October 2000, JICA Study Team...... 57 C-2 Replied Letter on the Navigational Clearance, RD3/1 II (36), November 22,2000, Botswana ...... 60 C-3 Request Letter on the Technical Criteria, KZB/25/S-00, 26 October 2000, JICA Study Team...... 61 C-4 Meeting Minutes (Draft), Gaborone, Botswana, 9th November 2000 ...... 62 C-5 Comments on Minutes of the 9th November 2000, RD3/1 II (37), 22nd November 2000, Botswana...... 66 C-6 Comments on Interim Report, RD3/1 II (34), November 20, 2000,Botswana ...... 67 C-7 Seminar Program 8th March 2001, Gaborone, Botswana...... 69 C-8 Further Information for Finalizing the Draft Final Report for the Kazungula Crossing 15th March 2001, JICA Study Team ...... 72

D. LETTERS & MEETING MINUTES (ZIMBABWE)

D-1 Coordinates of International Boundary, 8 March 2001, JICA Study Team...... 73

E. TECHNICAL REFERENCES & DATA

E-1 Wind Speed ...... 77 E-2 Monthly Mean Temperature...... 78 E-3 Rainfall Totals ...... 79 E-4 Earthquake Data ...... 80 E-5 Boundary Data...... 87 E-6 Borehole Log...... 90 E-7 Map of Chobe District ...... 100 E-8 Chobe District Administration Boundaries...... 101 E-9 Map of Kazungula District ...... 102 E-10 Traffic Zones (Outer )...... 103 E-11 Traffic Zones (inner)...... 104 E-12 Origin Destination Matrix (Year 2000) ...... 105 E-13 Origin Destination Matrix (Year 2015) (High Case and Low Case) ...... 107 E-14 Proportional Change in Generalised Cost of Travel due to Bridge at Kazungula ...... 109 E-15 Summary of Vehicle Operation Cost ...... 110 E-16 Notice of the Maximum Vehicles Dimension and Maximum Axle Loading Permissible on the Zambia Roads, Gazette Notice No. 1374 of 1993...... 111 E-17 Traffic Count Survey ...... 112 E-18 Origin and Destination and Border Facilities Survey...... 121 E-19 Location of Bench Mark and Gauge-station...... 126 E-20 Location of Cross-section for Hydraulic Survey...... 127 E-21 Cross-section of River Channel...... 128 E-22 Survey Data of Hydraulic Survey...... 131 E-23 Flow Velocities Measured ...... 134 E-24 Riverbed Levels Observed by Hydraulic Survey...... 135 E-25 Locations of Machine Boring ...... 136 E-26 Locations of Quarry Site...... 137 E-27 Structural Analysis of Superstructure for Kazungula Bridge ...... 138 E-28 Structural Analysis of Superstructure for Kazungula Bridge ...... 150 E-29 Coordinates Data of Kazungula Bridge...... 154 E-30 Future Economic Framework High Growth Scenario ...... 155 E-31 Model of relation between Toll Rate and Traffic Volume ...... 157