Gist of Decisions

Total Page:16

File Type:pdf, Size:1020Kb

Gist of Decisions Gist of Decisions 627th Metro Planning Committee Meeting Date : 17.5.2019 Time : 9:00 a.m. Venue : Conference Room (Room 1537) 15/F, North Point Government Offices 333 Java Road, North Point, Hong Kong Confirmation of Minutes of the 626th (3.5.2019) meeting Matters Arising General Decision Review of Sites Designated “Comprehensive Development Area” on Statutory Plans in the Metro Area for the Years 2017/2019 (Open Agreed Meeting) Tsuen Wan & West Kowloon District Proposed Amendments to the Approved Tsing Yi Outline Zoning Agreed Plan No. S/TY/28 (Open Meeting) Section 16 Application No. A/K5/805 (Request for Deferral) Shop and Services in “Other Specified Uses” annotated “Business Deferred (2)” Zone, Portion of Workshop C4, G/F, Block C, Hong Kong Industrial Centre, 489-491 Castle Peak Road, Kowloon (Open Meeting) - 2 - Section 16 Application No. A/TWK/12 Temporary Public Vehicle Park (Excluding Container Vehicle) for a Period of 5 Years (Surplus Car Parking Spaces Only) in “Residential (Group A)” and “Government, Institution or Community” Zones, Approved with Condition on a Temporary Basis for (a) Lei Muk Shue Estate, Tsuen Wan a Period of 5 Years (b) Kwai Shing West Estate, Kwai Chung (c) Lai King Estate, Kwai Chung (d) Lai Yiu Estate, Kwai Chung (e) Cheung Ching Estate, Tsing Yi (Open Meeting) Hong Kong District Section 16 Application No. A/H15/280 Proposed Minor Relaxation of Building Height Restriction (from 80mPD to 91mPD) for Permitted School Use in “Government, Deferred Institution or Community” Zone, Campus for “Preparatory Years and Primary Section” of Singapore International School (Hong Kong), 23 Nam Long Shan Road, Aberdeen, Hong Kong (Open Meeting) Section 16 Application No. A/H15/281 Temporary Public Vehicle Park (excluding container vehicle) Approved with Condition on a Temporary Basis for (surplus monthly vehicle parking spaces only) for a Period of 5 Years a Period of 5 Years in “Residential (Group A)” Zone, Shek Pai Wan Estate, Aberdeen, Hong Kong (Open Meeting) - 3 - Section 16 Application No. A/H19/78 (Request for Deferral) Proposed Minor Relaxation of Building Height Restriction for Permitted Commerical Development within “Commercial (1)” Zone Deferred and Proposed Eating Place and Shop and Services Uses within an area shown as Pedestrian Precinct/Street, 7 Stanley Market Road and 78 & 79 Stanley Main Street, Stanley (Stanley Inland Lot 124 and Stanley Lot 427 and 428), Hong Kong (Open Meeting) Section 16 Application No. A/H3/440 Proposed Minor Relaxation of Building Height Restriction for Flat (Government Staff Quarters) use from 80mPD to 104mPD in Approved with Conditions “Government, Institution or Community” Zone and an area shown as ‘Road’, Western Police Married Quarters, 280 Des Voeux Road West, Sai Ying Pun, Hong Kong (Open Meeting) Kowloon District Section 16 Application No. A/K10/261 (Request for Deferral) Proposed Social Welfare Facility (Residential Care Home for the Deferred Elderly) in “Residential (Group B)” Zone, 349 Prince Edward Road West, Kowloon (Open Meeting) Section 16 Application No. A/K14/770 Shop and Services (Money Exchange) in “Other Specified Uses” Approved with Conditions annotated “Business” Zone, Workshop No. 1, G/F, Crown Industrial Building, 106 How Ming Street, Kwun Tong, Kowloon (Open Meeting) - 4 - Section 16 Application No. A/K7/117 Approved with Condition Proposed School (Tutorial School) in “Residential (Group B)” Zone, G/F, 1A La Salle Road, Kowloon (Open Meeting) Section 16 Application No. A/K9/274 Proposed Minor Relaxation of Plot Ratio Restriction for Permitted Approved with Conditions Office and Shop and Services/Eating Place Uses in “Other Specified Uses” annotated “Business” Zone, 13 Hok Yuen Street, Hung Hom, Kowloon (Open Meeting) Any Other Business The above information is provided for easy reference of the general public. Under no circumstances will the Town Planning Board accept any liabilities for the use of the above information nor for any inaccuracies or discrepancies of the information provided. In case of doubt, clarification should always be sought from the Secretariat of the Town Planning Board..
Recommended publications
  • Authorization for Temporary Closure
    RAILWAYS ORDINANCE (Chapter 519) (Order under section 22(1)) SOUTH ISLAND LINE (EAST) AUTHORIZATION FOR TEMPORARY CLOSURE OF THE OPEN SPACE OF THE SITTING-OUT AREA ON THE SOUTHERN SIDE OF WONG CHUK HANG ROAD NEAR WONG CHUK HANG ROAD GARDEN; PART OF THE OPEN SPACE IN WONG CHUK HANG ROAD GARDEN; PART OF THE OPEN SPACE IN ABERDEEN SPORTS GROUND; A SECTION OF OCEAN PARK ROAD; A FOOTPATH NEAR THE JUNCTION OF ABERDEEN TUNNEL APPROACH ROAD AND THE SLIP ROAD FROM WONG CHUK HANG ROAD TO ABERDEEN TUNNEL; A FOOTPATH ON THE NORTHERN SIDE OF WONG CHUK HANG ROAD GARDEN; SECTIONS OF WONG CHUK HANG ROAD, ABERDEEN TUNNEL APPROACH ROAD, NAM FUNG ROAD, SLIP ROADS NEAR ABERDEEN TUNNEL APPROACH ROAD, HEUNG YIP ROAD; THE OPEN SPACE IN NAM LONG SHAN ROAD SITTING-OUT AREA, NAM LONG SHAN ROAD CHILDREN’S PLAYGROUNDAND REST GARDEN; SECTIONS OF POLICE SCHOOL ROAD, NAM LONG SHAN ROAD, YIP KAN STREET, TONG BIN LANE, YIP FAT STREET, WELFARE ROAD AND SHUM WAN ROAD; A FOOTPATH BETWEEN WONG CHUK HANG ROAD AND HEUNG YIP ROAD; A FOOTPATH BETWEEN YIP KAN STREET AND WONG CHUK HANG ROAD; A FOOTPATH BETWEEN NAM LONG SHAN ROAD COOKED FOOD MARKET AND TAI WONG YE TEMPLE; PART OF THE OPEN SPACE IN KWUN HOI PATH SITTING-OUT AREA; AND SECTIONS OF KWUN HOI PATH AND ABERDEEN PRAYA ROAD In exercise of the powers delegated by the Secretary for Transport and Housing, I, by this order made under section 22(1)(a) of the Railways Ordinance (Chapter 519), authorize – (I) the temporary closure of the open space of the Sitting-out Area on the southern side of Wong Chuk Hang Road near Wong Chuk
    [Show full text]
  • 2. Project Description
    Consultancy Agreement No. NEX/2301 South Island Line (East) Environmental Impact Assessment 2. Project Description 2.1 Project Background The South Island Line (SIL) was originally proposed as part of the Second Railway Development Study (RDS-2) completed in May 2000 as an extension to the existing railway network to serve the Southern District of Hong Kong. In June 2002, MTRCL submitted a preliminary proposal for a medium-capacity SIL, which involved a monorail system looping from University Station of the planned West Island Line (WIL) to the southern part of Hong Kong Island and back to Wanchai Station of the existing Island Line (ISL). The study identified that SIL would not be commercially viable without Government’s funding support. Subsequently, MTRCL further developed the proposed SIL as part of a Feasibility Study (FS) entitled “West Island Line and South Island Line Feasibility Study” which was completed in March 2004. After an evaluation of various alternative options, the FS recommended the implementation of the proposed SIL(E) from South Horizons to Admiralty, via intermediate stations at Lei Tung, Wong Chuk Hang and Ocean Park, for serving the Southern District and provision of a necessary depot at Wong Chuk Hang to support the operation of SIL, amongst other recommendations related to WIL. The FS also evaluated the feasibility of providing additional intermediate stations at Happy Valley and Wanchai. In February 2005, MTRCL submitted a project proposal to the Government for phased implementation of the SIL and WIL. In December 2007, the Executive Council gave the green light for MTRCL to proceed with preliminary planning and design of the SIL(E), which will be a medium capacity railway line running from Admiralty to South Horizons, with three intermediate stations at Ocean Park, Wong Chuk Hang and Lei Tung.
    [Show full text]
  • GEO REPORT No. 146
    FACTUAL REPORT ON HONG KONG RAINFALL AND LANDSLIDES IN 2001 GEO REPORT No. 146 T.T.M. Lam GEOTECHNICAL ENGINEERING OFFICE CIVIL ENGINEERING AND DEVELOPMENT DEPARTMENT THE GOVERNMENT OF THE HONG KONG SPECIAL ADMINISTRATIVE REGION FACTUAL REPORT ON HONG KONG RAINFALL AND LANDSLIDES IN 2001 GEO REPORT No. 146 T.T.M. Lam This report was originally produced in May 2002 as GEO Special Project Report No. SPR 2/2002 - 2 - © The Government of the Hong Kong Special Administrative Region First published, July 2004 Prepared by: Geotechnical Engineering Office, Civil Engineering and Development Department, Civil Engineering and Development Building, 101 Princess Margaret Road, Homantin, Kowloon, Hong Kong. - 3 - PREFACE In keeping with our policy of releasing information which may be of general interest to the geotechnical profession and the public, we make available selected internal reports in a series of publications termed the GEO Report series. The GEO Reports can be downloaded from the website of the Civil Engineering and Development Department (http://www.cedd.gov.hk) on the Internet. Printed copies are also available for some GEO Reports. For printed copies, a charge is made to cover the cost of printing. The Geotechnical Engineering Office also produces documents specifically for publication. These include guidance documents and results of comprehensive reviews. These publications and the printed GEO Reports may be obtained from the Government’s Information Services Department. Information on how to purchase these documents is given on the last page of this report. R.K.S. Chan Head, Geotechnical Engineering Office July 2004 - 4 - FOREWORD This report presents the factual information on rainfall and landslides in Hong Kong in 2001.
    [Show full text]
  • Aberdeen & Ap Lei Chau Area
    TERM CONSULTANCY FOR AIR VENTILATION ASSESSMENT SERVICES Cat. A1 – Term Consultancy for Expert Evaluation and Advisory Services on Air Ventilation Assessment (PLNQ 37/2007) TERM CONSULTANCY FOR AIR VENTILATION ASSESSMENT SERVICES Cat. A1– Term Consultancy for Expert Evaluation and Advisory Services on Air Ventilation Assessment (PLNQ 37/2007) Final Report Aberdeen & Ap Lei Chau Area April 2010 ………………………………………. by Professor Edward Ng School of Architecture, CUHK, Shatin, NT, Hong Kong T: 26096515 F:26035267 E: [email protected] W: www.edwardng.com Final Report Page 1 of 33 20 April 2010 TERM CONSULTANCY FOR AIR VENTILATION ASSESSMENT SERVICES Cat. A1 – Term Consultancy for Expert Evaluation and Advisory Services on Air Ventilation Assessment (PLNQ 37/2007) The Study Area Final Report Page 2 of 33 20 April 2010 TERM CONSULTANCY FOR AIR VENTILATION ASSESSMENT SERVICES Cat. A1 – Term Consultancy for Expert Evaluation and Advisory Services on Air Ventilation Assessment (PLNQ 37/2007) Expert Evaluation Report of Aberdeen & Ap Lei Chau Area Executive summary 0.1 Wind Availability (a) Based on the available wind data, one may conclude that the annual wind of the study area is mainly from the East and North-East. The directions of summer winds are ranging from the East, Southerly quarters, and the West. There is a strong east-west channeling at/near ground level due to the surrounding topography. 0.2 Topography (a) For background wind coming from the northeast and southeast, the wind profiles and characteristics will be affected by hills. Turbulence and re-circulation of wind when it moves downhill towards the study area is expected.
    [Show full text]
  • Schedule of Routes (Citybus Limited) Order 2018
    《2018 年路線表 ( 城巴有限公司 ) 令》 Schedule of Routes (Citybus Limited) Order 2018 2018 年第 83 號法律公告 L.N. 83 of 2018 B1076 第 1 條 Section 1 B1077 2018 年第 83 號法律公告 L.N. 83 of 2018 《2018 年路線表 ( 城巴有限公司 ) 令》 Schedule of Routes (Citybus Limited) Order 2018 ( 由行政長官會同行政會議根據《公共巴士服務條例》( 第 230 章 ) (Made by the Chief Executive in Council under section 5(1) of the 第 5(1) 條作出 ) Public Bus Services Ordinance (Cap. 230)) 1. 生效日期 1. Commencement 本命令自 2018 年 7 月 31 日起實施。 This Order comes into operation on 31 July 2018. 2. 指明路線 2. Specified routes 現指明附表所列的路線為城巴有限公司有權經營公共巴士服 The routes set out in the Schedule are specified as the routes on 務的路線。 which the Citybus Limited has the right to operate a public bus service. 3. 廢 除《 2017 年路線表 ( 城巴有限公司 ) 令》 3. Schedule of Routes (Citybus Limited) Order 2017 repealed 《2017 年路線表 ( 城巴有限公司 ) 令》(2017 年第 1 號法律公告 ) The Schedule of Routes (Citybus Limited) Order 2017 (L.N. 1 現予廢除。 of 2017) is repealed. 《2018 年路線表 ( 城巴有限公司 ) 令》 Schedule of Routes (Citybus Limited) Order 2018 2018 年第 83 號法律公告 附表——第 1 部 Schedule—Part 1 L.N. 83 of 2018 B1078 B1079 附表 Schedule [ 第 2 條 ] [s. 2] 指明路線 Specified Routes 第 1 部 Part 1 港島路線 Hong Kong Island Routes 半山區路線第 1 號 Mid-levels Route No. 1 跑馬地 ( 上 )——摩星嶺 ( 福利別墅 ) Happy Valley (Upper)—Mount Davis (Felix Villas) 跑馬地 ( 上 ) 往摩星嶺 ( 福利別墅 ):途經藍塘道、成和道、 HAPPY VALLEY (UPPER) to MOUNT DAVIS (FELIX 景光街、山光道、黃泥涌道、摩理臣山道、灣仔道、菲林明 VILLAS): via Blue Pool Road, Sing Woo Road, King Kwong 道、軒尼詩道、金鐘道、德輔道中、摩利臣街、干諾道中、 Street, Shan Kwong Road, Wong Nai Chung Road, Morrison 干諾道西、德輔道西、堅彌地城海旁、山市街、卑路乍街及 Hill Road, Wan Chai Road, Fleming Road, Hennessy Road, 域多利道。 Queensway, Des Voeux Road Central, Morrison Street, Connaught Road Central, Connaught Road West, Des Voeux 摩星嶺 ( 福利別墅 ) 往跑馬地 ( 上 ):途經域多利道、加多近街、 Road West, Praya, Kennedy Town, Sands Street, Belcher’s 吉席街、堅彌地城海旁、德輔道西、干諾道西、干諾道中、 Street and Victoria Road.
    [Show full text]
  • Handbook 2017–2018
    ParentInformation Handbook 2017–2018 Parent Information Handbook 2017–2018 Handbook Information Parent Interim Head of School Welcome General Inquiries Canadian International School of Hong Kong 36 Nam Long Shan Road Aberdeen, Hong Kong Dear Parents, Phone (852) 2525 7088 I would like to extend a warm welcome to all Fax (852) 2525 7579 of our new and returning families as we begin E-mail [email protected] the 2017-2018 school year! We have an exciting year planned at Canadian International School of Important Dates Hong Kong. 2017 Aug 10 Upper School starts The purpose of the Parent Information Handbook Aug 14 Lower School starts is to provide you with a comprehensive overview of our policies and procedures. It is a handy 2018 June 8 Last day for students and teachers day-to-day reference, as well as a source of Aug 16 Upper School starts information about the philosophy underlying our Aug 20 Lower School starts curriculum and student life programmes. This year, we combined the Start of School Guide 2019 and Parent Handbook into one guide in an effort June 14 Last day for students and teachers Aug 15 Upper School starts to streamline information for parents. This Aug 19 Lower School starts handbook is updated and revised annually and is provided to all CDNIS families as a downloadable PDF on the Parent Portal and mobile app. Holidays and Breaks There is no school for students on the following days. A strong partnership between the school and 2017 our parents makes a difference in every child’s Sept 15 Professional Learning Day education as we share the responsibility for our Oct 2 – 6 Mid-Term Break 1 students’ successes.
    [Show full text]
  • M / SP / 14 / 154 M / SP / 14 / 167 Central 100 Tsuen © Prison 86 136 ¤| J¤· 3 ¤ TAI WAN Ma Hang Estate SEE PLAN REF
    “‚” 430 200 Aberdeen West Typhoon Shelter SHEK PAI WAN ˜„ Golf Course `²WÆ 400 IS 152 Marinella Police College fiv‹ » q D L TAI TAM TUK ¥D¿¥› A ncw Ocean Park N RESERVOIR BIG WAVE BAY BEACH nc Bfl D 100 Bridge v¹ SHEK O 8.3.4 Ap Lei Chau Ap Lei Chau Estate Floating Jetties Firing R D »›·m¶ł O fififi t W TAI TAM `²W Range A HK Country Club 100 COUNTRY PARK Marina Habitat D 300 fi' Sham Wan Ser 100 DEEP WATER BAY INTERMEDIATE BIG WAVE BAY O AD R SHAM WAN L 1 GE Towers Res BEACH RESERVOIR South Horizons s±x A ID 100 P L R 265 1 8.3 The Oasis n« E B fi¶ N I C U ®ºw A D H A A O 1 Broadview BRICK HILL 200 ³¶E TATHONG CHANNEL ú¤N 1 õ¤Ä Yue On M n D Court R c L ( NAM LONG SHAN ) w Court Aberdeen South Y WAN CHAM SHAN NGA YING PAI MAGAZINE ISLAND A Typhoon Shelter O 141 57 N 284 DEEP WATER BAY B ¥F 100 Q§F G E ss 100 200 êÄdª 9 Shek Chung Kok _¥ S S L†⁄ ³ Lei Tung 1 Pak Kok West Rock L Lan Nai Wan KAI YUE TAM H TSIN SHUI WAN AU [˘ y Estate U LUK KENG WAN ( Lung Shan Pai ) ¤ K a ) A Village § q ilw P KWUN YAM n F a n« N DRAGON'S BACK South Island LineS (East) Railway under Construction( E o q ¨ ) R PO CHONG 150 s SHAN u R Cable Car th ast £x› Is (E t Larvotto R t land Line n WAN 200 LAN ˆƒ⁄B un ctio Scout der Constru Ser Res O NAI Ser Res _¥¤ Sewage nc Centre A WAN Pak Kok Treatment D 100 65 AP LEI CHAU 200 Tsui Works øªs ¬½áª n«fi BRIDGE HILL 200 ¿´J CHEUNG LIN 300 196 SHAN ( LIN FA TSENG SHAN ) TSANG TSAI TAI TAM _¥¤ 344 AU n« ABERDEEN CHANNEL PAK KOK HARBOUR 256 S ·‰ Nam Tsui 300 n« SHAN ¥ H Tathong Point Ferry Pier _¥¤¨ 15 E 284 YUK KWAI SHAN [¬Åª
    [Show full text]
  • Address and Contact Numbers
    RESHUFFLE 79 2001-2002 ADDRESS AND CONTACT NUMBERS ESTABLISHMENT PRIM/ PRINCIPAL/ ADDRESS TELEPHONE/FAX SEC. CONTACT Foundation Management Office - - Secretary 43B Stubbs Road, H.K. 2574 2351 fax: 2834 6881 <[email protected]> tel. hotline : 2818 6332 E.S.F. (Building Management) - - L C Lam 43B Stubbs Road, H.K. 2919 7926 fax: 2834 6881 <[email protected]> J. C. SARAH ROE CENTRE E.S.F. - Mr C T H Smith 2A Tin Kwong Road 2760 0441 fax: 2760 0799 <[email protected]> Homantin, Kln. The Educational Psychologists <[email protected]><[email protected]> and the ESF IT Advisor <[email protected]> can be contacted at the JCSRC ESF Educational Services Ltd. - - Mrs K Valentine 2A Tin Kwong Rd. Kln. (Kln) 2760 3900 fax: 2711 2683 Mr. S Joyce (HK) 2919 7962 fax: 2572 6812 ESF INT. KINDERGARTENS - - Ms J Fieldhouse I/F Tung Fai Garden, H.K. 2540 0066 fax: 2517 0923 Ms E Randall Maritime Sq, 33 Tsing 2436 3355 fax: 2436 3105 King Rd, Tsing Yi J. C. SARAH ROE SCHOOL E.S.F. P&S Mr M J Doherty 2B Tin Kwong Road, Homantin, Kln. 2761 9893 fax: 2381 4081 <jcsrs@asiaon1ine. net> ISLAND SCH. E.S.F. S Mr D I James 20 Borrett Road, H.K. 2524 7135 fax: 2840 1673 <[email protected]> <[email protected]> confidential fax: 2524 4055 KING GEORGE VTH SCH E.S.F. S Mr D Cocks 2 Tin Kwong Road, Homantin, Kln. 2711 3029 fax: 2760 7116 <[email protected]> 2711 3028 (Prin.) SOUTH ISLAND SCH.
    [Show full text]
  • To Browse the Annual Traffic Census 2018 on the Internet
    THE ANNUAL TRAFFIC CENSUS -2018- TSSD Publication No. 19CAB1 While every caution has been taken to ensure the accuracy of the information contained in this publication, the Transport Department of the Hong Kong Special Administrative Region Government is not to be held liable for any loss or damage arising from the use of these data. Acknowledgement should be made in reproducing in any manner in whole or part of this publication. TRAFFIC SURVEY AND SUPPORT DIVISION August 2019 © THE GOVERNMENT OF THE HONG KONG SPECIAL ADMINISTRATIVE REGION SUMMARY During the year 2018, the annual average daily traffic (A.A.D.T.) in the territory showed the following changes as compared with that of 2017: General There were 784 434 vehicles licensed in Hong Kong at the end of 2018, representing an increase of 2.38% when compared with the corresponding figure in 2017. This total accounted for 90.7% of the number of registered vehicles. The highest percentage increase was found in private light bus, with a growth of 9.0%. There were 565 213 private cars licensed at the end of 2018. The number of franchised buses licensed was 6 151, an increase of 2.8% over 2017. The total number of goods vehicles licensed in 2018 was 117 567, showing an increase of 2.5% over 2017. During the year, road travel in the territory amounted to 38.25 million vehicle- kilometres per day. Of this total, 6.00 million vehicle-kilometres occurred on Hong Kong Island while 8.53 million vehicle-kilometres and 23.72 million vehicle- kilometres occurred in Kowloon and the New Territories respectively.
    [Show full text]
  • LC Paper No. CB(1)221/20-21(01)
    LC Paper No. CB(1)221/20-21(01) LEGISLATIVE COUNCIL Panel on Development and Panel on Information Technology and Broadcasting Capital Works Reserve Fund Block Allocations for 2021-22, and Proposals to increase the financial ceilings of the delegated authority for Category D items in the Capital Works Programme and Block Allocation Subhead on Computerisation INTRODUCTION This paper briefs Members on the estimated funding provision required for the block allocation subheads under the Capital Works Reserve Fund (CWRF) in 2021-22, and proposals to increase the respective financial ceilings of the delegated authority for applicable Category D items in the Capital Works Programme (CWP) and the block allocation subhead on computerisation. BACKGROUND 2. Over the years, the Finance Committee (FC) has approved the establishment of block allocation subheads under different Heads of Expenditure of the CWRF, covering different types of public works, acquisition of land, capital subventions and computerisation projects. At present, there are a total of 26 block allocation subheads under the CWRF, of which 21 are subject to a financial commitment ceiling of $30 million for each item. In the case of Subhead 6101TX – Universal Accessibility Programme under Head 706 – Highways, the financial commitment ceiling is $75 million for each item. For Subhead A007GX – New administrative computer systems under Head 710 – Computerisation, the financial commitment ceiling is $10 million per project. Projects with financial commitments exceeding the above ceilings
    [Show full text]
  • Es220061027163-3, Page 1-50 @ Normalize ( S2-27-LN163-3 )
    L. S. NO. 2 TO GAZETTE NO. 27/2006L.N. 163 of 2006 B1337 ** Journeys may be diverted via Tai Chung Kiu Road, Che Kung Miu Road, Hung Mui Kuk Road and Lion Rock Tunnel Road non-stop depending on traffic condition. Special trips are operated from Ma On Shan Town Centre Bus Terminus to Hung Hom Station, omitting slip road, Sai Sha Road, Hang Tak Street and A Kung Kok Street. HUNG HOM STATION to KAM YING COURT: via Cheong Wan Road, Chatham Road South, Salisbury Road, Nathan Road, Lai Chi Kok Road, Prince Edward Road West, Tai Nan Street, Cedar Street, Yu Chau Street, Boundary Street, Waterloo Road, Lion Rock Tunnel, Lion Rock Tunnel Road, Sha Tin Road, Tai Chung Kiu Road, Shek Mun Interchange, A Kung Kok Street, Hang Shun Street, Hang Tai Road, slip road, Ma On Shan Road, Hang Hong Street, Sai Sha Road and Kam Ying Road. Special trips are operated from the bus stop at Nathan Road north of Gascoigne Road to Kam Ying Court. Air-Conditioned New Territories Route No. 87K University KCR Station—Kam Ying Court (Circular) UNIVERSITY KCR STATION to KAM YING COURT (CIRCULAR): via Chak Cheung Street, Tate’s Cairn Highway, Ma On Shan Road, Hang Hong Street, Sai Sha Road, Ma On Shan Road, Kam Ying Road, Sai Sha Road, Ma On Shan Town Centre Bus Terminus, Sai Sha Road, (Chung On Estate access road, Chung On Bus Terminus, Chung On Estate access road)*, Hang Hong Street, Ma On Shan Road, Tate’s Cairn Highway and Chak Cheung Street.
    [Show full text]
  • Bus Routes and Costs
    Aug 2015 Bus Routes and Costs Pick-up Drop-off Areas Bus Route Time Stop No. Bus Stops (Pick-up) Time Stop No. Bus Stops (Drop-off) Costs 1 Marinella (Junction at Welfare Rd/ Nam Long Shan Road) 1 Marinella (Junction at Welfare Rd/ Nam Long Shan Road) 2 Bel-Air Phase 3 (Fountain) 2 Bel-Air Phase 3 (Fountain) Hong Kong Island Bel-Air Phase 2 (bus stop opposite to Glass Door at Cyberport 3 Bel-Air Phase 2 (Glass Door at Cyberport Road) 3 Road) $2,600 4 Victoria Garden (Bus Stop at Victoria Rd towards Central) 4 Victoria Garden (Main Entrance) Aberdeen / A 06:45-07:15 15:25-16:05 Pokfulam / Central / 5 86 Victoria Road (Carpark entrance) 5 86 Victoria Road (Bus Stop opposite to building) Wan Chai Kennedy Town Swimming Pool (Bus Stop at Kennedy Town Kennedy Town Swimming Pool (Bus Stop at Kennedy Town 6 6 Praya towards Central) Praya towards Central) 7 Central Ferry Pier No. 3 (Bus Stop) 7 Central Ferry Pier No.3 (Bus Stop) $1,900 Harbour Road (Road entrance at Convention Plaza 8 8 Harbour Road (Shui On Centre) Apartments) Pick-up Drop-off Areas Bus Route Time Stop No. Bus Stops (Pick-up) Time Stop No. Bus Stops (Drop-off) Costs Roundabout at Ap Lei Chau Drive/ Ap Lei Chau Praya Road Roundabout at Ap Lei Chau Drive/ Ap Lei Chau Praya Road 1 1 Hong Kong Island (opposite to Sham Wan Towers) (opposite to Sham Wan Towers) 145 Pokfulam Road (Bus stop outside Chinese Cuisine 2 2 Pokfulam Road (Bus Stop outside Pokfulam Village) Training Institue HK) Pokfulam Road /Smithfield Road (Bus Stop next to pedestrian Pokfulam Road /Smithfield Road (Bus
    [Show full text]