BIHAR FLOOD SITUATION REPORT 2Nd August, 2009

Total Page:16

File Type:pdf, Size:1020Kb

BIHAR FLOOD SITUATION REPORT 2Nd August, 2009 BIHAR FLOOD SITUATION REPORT 2nd August, 2009 Current Situation: Parts of Sitamarhi district of Bihar is under the grip Flood Affected District in Bihar of floods with a major breach of 60 meters on the right embankment of Bagmati river near Tajpur village of Runnisyedpur block on 1st August’ 09. The breach which is about 6 km up stream of Kataunjha Road Bridge on National Highway-77 has disrupted the road communication between Muzaffarpur and Sitamarhi near Koati (about 17 km from in Sitamarhi) due to overflowing of flood water. The flood affected villages under Runnisyedpur block are - Tilaktajpur, Maanpur Ratnawali, Rupauli, Raipur , Hardiya, Govind Pithaujiya, Mahesha Phadakpur, Kohahi, Badheta, Bishunpur, Siskhiriya, Neuri, Batrauli, Hazipur Basant, Bishanpur, Korlahiya, Moran, Olipur & Gaus Nagar. Govt Response : Approximately one lakh people are reported to be affected and state govt. has initiated its actions to plug the damaged portion. Principal Secretary, Water Resources Dept., along with senior officials are camping at the site. In addition to it, state govt. has engaged around 90 members of National Disaster Response Force (NDRF) team to carry out the relief & rescue operations in the affected areas. 23 nos. of boats have also been mobilized from Kolkotta to expedite the rescue operations. Two relief camps are also reported to shelter the flood victims. In view of the rising water level in major rivers, state government has alerted the district administrations of flood-prone districts. Bagmati river is flowing above danger level at Sonakhan (68.95 m against the danger level of 68.80 m), Dubbadhar (61.2 m against the danger level of 62.60 m), Kansar (59.06 m against the danger level of 60.45 m), and Benibad (48.6 m against the danger level of 49.2 m). There is a likely possibility of the rise of rivers as IMD has forecasted of isolated heavy to very heavy rainfall over North Bihar in the next 48 hours. The status of the major rivers of Bihar as on 2nd August, 2009 is as follows: River name District Wl (M) Dl Al Difference Forecast Time Trend (M) (M) (AL-DL) M Kosi Khagharia 32.85 33.85 33.68 -0.17 33.79 06:00 AM Rising Kosi Supaul 46.75 47.75 47.93 .18 47.86 10:00 PM Steady Kamla Balan Madhubani 49 50 50.5 .5 49.85 04:00 PM Falling Mahanada Katihar 30.4 31.4 30.58 -0.82 30.45 10:00 PM Steady Mahanada Purniya 34.65 35.65 35.00 -0.65 35.9 06:00 AM Steady Bagmati Muzzafarpu 47.68 48.68 49.29 0.61 49.29 06:00 AM Steady r Ghaghra Siswan 56.04 57.04 56.06 -0.02 55.94 04:00 AM Falling Adhwara Darbhanga 49 50 49.51 -0.51 50 6:00 AM Rising Group Ganga Muzzafarpu 53.41 54.41 53.38 -0.03 53.45 4:00 AM Falling r Wl = Warning Level; Dl = Danger Level; Al = Actual Level Sphere India Secretariat Page 1 Sources: • Sphere Humanitarian Coordinators • Central Water Commission : www.cwc.nic.in • Media Report: Hindustan Times : www.hindustantimes.com • Flood Management Information System (FMIS) : http://fmis.bih.nic.in • India Meteorological Department : www.imd.gov.in For more information, Contact : Sl no. NAME DESIGNATION CONTACT DETAILS EMAIL ID 1. VIKAS GORA FOCAL POINT, URS NEW DELHI +91- 9958699913 [email protected] 2. SANDEEP PATHAK URS COORDINATOR, NEW DELHI +91- 9015555523 [email protected] Sphere India Secretariat Page 2 .
Recommended publications
  • Note :- in Case of Any Clarification /Objection of Below Mentioned List
    INDUSTRIAL TRAINING INSTITUTE, MUZAFFARPUR (Provisional Application List of Guest Faculty) Note :- In case of any clarification /objection of below mentioned List Please provide a written objection with necessary doccument in any working day upto 02-03-2017 at office of Principal, I.T.I Muzaffarpur, Gannipur, Near kalambag chowk, (contact no. 9504694156). No clarification/ Objection will considered after 02-03-2017. Doccument verification and viva will scheduled from 06-03-2017 of District Muzaffarpur Candidates only. CATEGORY - B (RETIRED EMPLOYEE LIST) DISTRICT - MUZAFFARPUR TECH. OTHER BRANCH/ EXPERIE REMARK Sl No. Diary No. / Date Name Father's Name Parmanant Adress QUALIFICATIO QUALIFICAT MARKS % D.OB DISTRICT CATEGORY BRANCH TRADE NCE S N ION 1 425/06-09-2016 ANIL KUMAR HARI SHANKAR VILL+PO - BISHNUPUR B TECH MMV 01-05-1969 MUZAFFARPUR B ex. Army MISHRA MISHRA BAGHANAGARI VIA- DHOLI PS- SAKRA DIST- MUZAFFARPUR 843105 MOB -9931161254 2 1709-16-09-16 SAYED KAISER SAYED AHMAD MOH -KAMRA CHANDWARA ELCTRICAL 54.33 15/08/1947 MUZAFFARPUR B MATH RETIERE IMAM KAJMI HASAN KAJMI MUZAFFARPUR 842001 MOB DIPLOMA IN DIPLOMA IN D - 9835827204 ELEC.ENG. ELEC.ENG. INSTRUC TOR 3 436/07-09-2016 REHAN AHMAD MD. ANAS AT- SIRSAIDYAD COLONEY CTI DMM 01-03-1954 MUZAFFARPUR B RETIRED SIDDIQUE SIDDIQUE NEAR DAV PUBLIC SCHOOL ITI A.S. BEHIND BMP -6 MALIGHAT PO - H.P.O. PS - AHIYAPUR ITI DIST - MUZAFFARPUR 842001 MOB- 9470601665 4 437/07-09-2016 REHAN AHMAD MD. ANAS AT- SIRSAIDYAD COLONEY CTI DMM 01-03-1954 MUZAFFARPUR B DMM RETIRED SIDDIQUE SIDDIQUE NEAR DAV PUBLIC SCHOOL ITI A.S.
    [Show full text]
  • A Report on the Survey of North Bihar In·Relation To
    leAk A REPORT ON THE SURVEY OF NORTH BIHAR IN· RELATION TO ..~;EFFECTS OF GANDAK & KOSI RIVER VALLEY PROJECTS ON THE FISHERIES OF THE AREA SU"'VEY RE.PORT I JAN.19SS NO.-? _ CENTRAL INLAND FISHER.IES RESEARCH INSTITUTE (fNOIAN COUNCfL OF AGAICULTUAAL RESEARCH) aA~RACI(PORE • W£st BENGAL. INDIA A REpORT ON THE SURVEY OF NORTH BIHAR IN RELATION TO EFFECTS OF GA~JDAK AND KOSI RIVER VALLEY PROJECTS ON THE FISHERIES OF THE AREA ----------- by H.P.C. Shetty & J.C. Malhotra CENTRAL INLAND FISHERIES RESEARCH SUBSTATION ALLAHABAD ,i~~ .~- ~ ONTE NTS ''''i, L.. '~ Page 1. INTRODUCTION 1 " 2. FIELD SURV EY 2 2.1 Man 2 2.1.1 Champaran district 2 2.1.2 Muzaffarpur district 10 2.1.3 Other districts 10 2.2 Riverin8 fisheries 11 2.3 Tank and pond fisheries 14 3 DISCUSSION 16 3 •.1 Effect of river valley projects 16 3.2 Destruction of fry and fingerlings 18 f.rection of barriers ('bundhs') across inflow and outflow nalas 18 Effect of stagnant conditions due to lack of flushing 18 4 RE C OMf·'ENOA II ONS 18 5 ACKNOWLEDGEMENTS 23 6 REFERENCES 23 c. 1 INTRODUCTION Th~ Gandak and Kosi river ~yst~ms form an extensive network in North Bihar, in the districts of Saran, Champaran, MuzafTafpur, Sahersa, Darbhanga, Monghyr and Purnea. North Bihar as a whole may be treated as a vast inland delta, as all the principal rivers emer• ging from the Himalayas debouch in the plains and ultimately flow into the Ganga on the south. The process of this delta formation has been in pruYJ.:t;i:;;dlor -chousands of years by principal rivers like the Ghaghara, the Gandak, the Kamla and the Kosi by their h~avy silt and detritus load from the Himalayas.
    [Show full text]
  • Physico-Chemical Analysis of Two Fresh Water Ponds of Hajipur, Vaishali District of Bihar
    Bulletin of Pure and Applied Sciences Print version ISSN 0970 0765 Vol.39A (Zoology), No.1, Online version ISSN 2320 3188 January-June 2020: P.137-142 DOI 10.5958/2320-3188.2020.00016.9 Original Research Article Available online at www.bpasjournals.com Physico-chemical Analysis of Two Fresh Water Ponds of Hajipur, Vaishali District of Bihar Vijay Kumar* Abstract: The present study was conducted to assess the Author’s Affiliation: physico–chemical analysis of the two fresh water Associate Professor, Department of Zoology, ponds located in Hajipur, Vaishali, Bihar and R.N. College, Hajipur, Vaishali, Bihar 844101, effects of sewage pollution from the drains of India surrounding areas. The study was carried on from January 2018 to December 2018. The range *Corresponding author: of variation for some physico – chemical Vijay Kumar, Associate Professor, Department of parameters like dissolved O2, free CO2, Zoology, R.N. College, Hajipur, Vaishali, Bihar Carbonate, Bicarbonate, Alkalinity, Calcium, 844101, India Chloride Phosphate, Nitrate and BOD was studied for both the ponds. These parameters E-mail: show a marked difference between two fresh [email protected] water ponds depending upon the quality and nature of sewage pollution. Received on 23.01.2020 Accepted on 28.04.2020 Keywords: Water bodies, Sewage pollution, Hydrological Status, Dissolved Oxygen. INTRODUCTION Ponds are considered to be one of the most productive and biologically rich inland surface water ecosystems. It represents a complete self-maintaining and self-regulating ecosystem. The dominating characteristics of aquatic environment result from the physical properties of water. A water molecule is composed of oxygen atom which is slightly negatively charged bounded with two hydrogen atoms, which are slightly positive charged.
    [Show full text]
  • North Bihar Power Distribution Company Limited, Patna
    BEFORE THE HON’BLE BIHAR ELECTRICITY REGULATORY COMMISSION FILING OF THE PETITION FOR TRUE UP FOR FY 2016-17, ANNUAL PERFORMANCE REVIEW (APR) FOR FY 2017-18 AND ANNUAL REVENUE REQUIREMENT (ARR) FOR FY 2018-19 FILED BY, NORTH BIHAR POWER DISTRIBUTION COMPANY LIMITED, PATNA CHIEF ENGINEER (COMMERCIAL), NBPDCL 3rd FLOOR, VIDYUT BHAWAN, BAILEY ROAD, PATNA - 800 001 Petition for True up for FY 2016-17, APR for 2017-18 and ARR for FY 2018-19 BEFORE THE BIHAR ELECTRICITY REGULATORY COMMISSION, PATNA IN THE MATTER OF: Filing of the Petition for True up for FY 2016-17, Annual Performance Review (APR) for FY 2017-18, Annual Revenue Requirement (ARR) for FY 2018-19 under Bihar Electricity Regulatory Commission (Multi Year Distribution Tariff) Regulations, 2015 and its amendments thereof along with the other guidelines and directives issued by the BERC from time to time and under Section 45, 46, 47, 61, 62, 64 and 86 of The Electricity Act, 2003 read with the relevant guidelines. AND IN THE MATTER OF: North Bihar Power Distribution Company Limited (hereinafter referred to as "NBPDCL” or “Petitioner” which shall mean for the purpose of this petition the Licensee),having its registered office at Vidyut Bhawan, Bailey Road, Patna. The Petitioner respectfully submits as under: - 1. The Petitioner was formerly integrated as a part of the Bihar State Electricity Board (hereinafter referred to as “BSEB” or “Board”) which was engaged in electricity generation, transmission, distribution and related activities in the State of Bihar. 2. The Board is now unbundled into five (5) successor companies – Bihar State Power (Holding) Company Limited, Bihar State Power Generating Company Limited (hereinafter referred to as “BSPGCL”), Bihar State Power Transmission Company Limited (hereinafter referred to as “BSPTCL”), North Bihar Power Distribution Company Limited and South Bihar Power Distribution Company Limited (hereinafter referred to as “Discoms”) as per Energy Department, Government of Bihar Notification no: under The Bihar State Electricity Reforms Transfer Scheme 2012.
    [Show full text]
  • Disaster Management Division)
    SITREP NO-67/2009 32-20/2009-NDM-I Ministry of Home Affairs (Disaster Management Division) Dated, 6th August, 2009 Subject: SOUTHWEST MONSOON-2009: DAILY FLOOD SITUATION REPORT SUMMARY OF IMPORTANT EVENTS AS ON 06.08.2009 RAINFALL/FLOOD SITUATION IN THE COUNTRY BIHAR • Moderate to heavy rainfall has been reported in some parts of the State during last 24 hours. • About 1.68 lakh people in 107 villages are reported to have been affected. • 10156 people have been evacuated so far. • In Sitamari district , a breach in the embankment of river Bagmati near Runi Saidpur has been reported due to which, about 1.00 lakh people , 40 villages in 7-8 Panchayat are reported to have been affected. About 40,000 people in 20 villages are reported to have been badly affected. • 200 people have been accommodated in 02 relief camps. • 06 health centers have also been opened. • 131 Private boats , 18 government boats and 22 NDRF boats have been pressed into service for rescue and relief operations. • 03 NDRF coys continue to be deployed alongwith equipment in the district. ORISSA • Light rainfall has been reported in some parts of the States during last 24 hours. • 19454 livestock have been perished so far. • About 3,84,000 people are reported to have been affected. • 1,26,000 ha cropped area have been affected. • 7127 houses have been damaged. • 62200 people have been evacuated so far. KERALA • Light rainfall has been reported in some parts of the State during last 24 hours. • 175 cattle/livestock have been perished. • About 1220297 people are reported to have been affected.
    [Show full text]
  • Conference Proceedings
    Conference Proceedings Texas Water Resources Institute Technical Report – TR-472 JULY 30 - AUGUST 1, 2014 – ARMAÇÃO HOTEL, PORTO DE GALINHAS, BRAZIL The Soil and Water Assessment Tool (SWAT) is a public domain model jointly developed by USDA Agricultural Research Service (USDA-ARS) and Texas A&M AgriLife Research, part of The Texas A&M University System. SWAT is a small watershed to river basin-scale model to simulate the quality and quantity of surface and ground water and predict the environmental impact of land use, land management practices, and climate change. SWAT is widely used in assessing soil erosion prevention and control, non-point source pollution control and regional management in watersheds. Contents Foreword Organizing Committee Scientific Committee Papers by Conference Session: Session A1: Large Scale Applications The SWAT Literature Database: Overview of Database Structure and Key SWAT Literature Trends Philip W. Gassman*, Curtis Balmer, Mark Siemers, Raghavan Srinivasan Session A2: Hydrology The SWAT model and a web-based information system to assess the water balance of Sardinia (Italy) P. A. Marras, D. Muroni, S. Manca, C. Soru, G. Pusceddu, M. Marrocu, P. Cau* Session C3: Environmental Applications Territorial planning in River Uberaba’s Watershed, MG, Brazil Gildriano Soares de Oliveira*, Janaína Ferreira Guidolini, Andréa de Oliveira Passos, Franciele Morlin Carneiro, Beatriz de Oliveira Costa, Michele Cláudia da Silva, Teresa Cristina Tarlé Pissarra Session E2: Database and GIS Application and Development Web-based Real Time Flood Forecasting using SWAT model N.K.Tiwary, A.K.Gosain*, A.K.Keshari* Session F1: Climate Change Applications Drought assessment of future streamflow over the Dakbla river basin in Vietnam Minh Tue Vu*, V.
    [Show full text]
  • Final Merit List, Panchayt-Nist, Block
    FINAL MERIT LIST, PANCHAYT-NIST, BLOCK-SINGHWARA, DISTRICT-DARBHANGA, SUBJECT- GENERAL PANCHAYT-NISTA SUBJECT-GENERAL DIST.- DARBHANGA MATRIC INTER TRAINED PASSIN TET SL DATE OF CATEG GEN NAME OF TRAENING A. NO. APPLICANT NAME FATHERS NAME ADDRESS SESSION G MERIT % NO. BIRTH ORY DER FM M.O % FM M.O % FM M.O % COLLEGE R. N F.M M.O % WETAGE YEAR 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 1 NP202 KUMARI SHIKHA PANDEY RAVIKANT PANDEY 26/06/1999 UR F DUMRIYA, BALIYA 600 500 83.33 500 426 85.20 1400 1144 81.71 D.EL.ED NIOS 2017-19 2019 195032617 150 94 62.67 2 85.42 2 NP232 HEBA ASHRAF ABDUL MATEEN ASHRAF 31/01/1992 UR F KUMHRAULI, DARBHANGA 700 516 73.71 700 611 87.29 1400 1063 75.93 D.EL.ED NIOS 2017-19 2019 7102178001 150 86 57.33 2 80.98 3 NP201 JAINAB JABEEN JAINUL ABDEEN 08/10/1995 UR F PURANI MUNSAFEE, Dbg 10 8.6 86.00 500 345 69.00 1400 1062 75.86 D.EL.ED NIOS 2017-19 2019 202011399 150 106 70.67 4 80.95 4 159 DEEPA KUMARI SURESH CHAUDHARY 16/09/1994 G F JARANG, MUZAFFARPUR 600 460 76.67 600 515 85.83 2300 1708 74.26 SCERT, NEW DELHI 2017-19 2019 C-16022924 150 102 68.00 2 80.92 5 NP47 KUNAL KISHAN SHANDILYA MITHILESH KUMAR THAKUR 05/01/1994 EWS M JALWARA, DARBHANGA 500 399 79.80 500 352 70.40 1400 1057 75.50 D.EL.ED NIOS 2017-19 2019 107066329 150 114 76.00 4 79.23 6 129 MD RAHMATULLAH MD SHAFIQUE 08/07/1995 EWS M BAIRIYA MUZAFF.
    [Show full text]
  • 41626-013: Bihar Power System Improvement Project
    Social Monitoring Report Project Number: 41626-013 June 2019 Period: January 2015 – November 2018 IND: Bihar Power System Improvement Project Submitted by Bihar State Power Holding Company Limited, Patna This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Social Monitoring Report Loan 2681-IND Period: January 2015 – November 2018 IND: BIHAR POWER SYSTEM IMPROVEMENT PROJECT (BPSIP) Prepared by: Bihar State Power Holding Company Limited for Asian Development Bank Implementing Agencies: Bihar State Power Transmission Company Limited, North Bihar Power Distribution Company Limited, South Bihar Power Distribution Company Limited Executing Agency: Bihar State Power Holding Company Limited TABLE OF CONTENTS ABBREVIATIONS ADB Asian Development Bank AP Affected Person BPSIP Bihar Power System Improvement Project BSEB Bihar State Electricity Board BSPTCL Bihar State Power Transmission Co. Ltd BSPHCL Bihar State Power Holding Co. Ltd ESMU Environment & Social Management Unit GoB Government of Bihar GoI Government of India GRC Grievance Redress Committee GRM Grievance Redress Mechanism NBPDCL North Bihar Power Distribution Co. Ltd PD Project Director PMU Program Management Unit RF Resettlement Framework ROW Right of Way RP Resettlement Plan SBPDCL South Bihar Power Distribution Co. Ltd Project Fact Sheet Loan LOAN NO.
    [Show full text]
  • Bihar Towards a Development Strategy Public Disclosure Authorized Public Disclosure Authorized
    Bihar Towards a Development Strategy Public Disclosure Authorized Public Disclosure Authorized The challenge of development in Bihar is enormous due to persistent poverty, complex social stratification, unsatisfactory infrastructure, and weak governance; these problems are well known, but not well understood. The people of Bihar civil society, businessmen, government officials, farmers, and politicians also struggle against an image problem that is deeply damaging to Bihars growth prospects. An effort is needed to change this perception, and to search for real solutions and strategies to meet Bihars development challenge. The main message of this report is one of hope. There are many success stories not well known outside Bihar that demonstrate its strong potential, and could in fact provide lessons for other regions. A boost to economic growth, improved social indicators, and poverty reduction will require a multi-dimensional development Public Disclosure Authorized strategy that builds on Bihars successes and draws on the underlying resilience and strength of its people. Public Disclosure Authorized The World Bank, New Delhi Office 70 Lodi Estate, New Delhi - 110 003 Tel: 24617241 X 286; Fax: 24619393 http://www.worldbank.org.in http://www.vishwabank.org (Hindi website) http://www.vishwabanku.org (Kannada website) http://prapanchabank.org (Telugu website) A World Bank Report Bihar Towards a Development Strategy A World Bank Report ACKNOWLEDGEMENTS This report was prepared by a team led by Mark Sundberg and Mandakini Kaul, under the overall guid- ance of Sadiq Ahmed and Michael Carter, and with the advice of Stephen Howes and Kapil Kapoor. The peer reviewers were Sanjay Pradhan, Martin Ravallion, and Nicholas Stern.
    [Show full text]
  • Social Changes Among the Scheduled Caste Population of the Vaishali District: a Geographical Study
    IOSR Journal Of Humanities And Social Science (IOSR-JHSS) Volume 22, Issue 7, Ver.13 (July.2017) PP 34-41 e-ISSN: 2279-0837, p-ISSN: 2279-0845. www.iosrjournals.org Social Changes among the Scheduled Caste Population of the Vaishali District: A Geographical Study. * Sanjay Kumar Corresponding Author: Sanjay Kumar *UGC (NET) Qualified Research Scholar, College of Commerce, Arts & Science (Magadh University), Patna-20 Abstract: Change in social conditions concerns; transformation of culture, behaviour, social institutions and social structure of a society over time . It has taken place in most areas but as far as the less developed areas are concerned these have recorded phenomenal changes during the recent years due to improved educational facilities, economic conditions, mass- media communication, efforts of the social reformers, government policies, etc. So also the less developed areas of the State of Bihar have experienced significant social changes. The district of Vaishali, one of the country's 250 most backward districts, as by the ministry of Panchayati Raj identified in 2006, has also recorded considerable changes in the attitudinal, behavioural and structural features of the Scheduled Castes. The present paper aims to highlight the changes which have taken place among different Scheduled Castes of the selected villages of the Vaishali district. The paper highlights the changes in the social conditions of the migrant and non-migrant Scheduled Caste people with special reference to some of the social features like family structure, housing conditions, educational development, religious activities, dress pattern, changes in food habit & socialization pattern, etc. Keywords: Social change, Migration. Social change: Social change is an alteration in the Cultural, Structural, Population or Ecological characteristics of a social system.
    [Show full text]
  • Ministry of Road Transport & Highways Government of India
    Ministry of Road Transport & Highways Government of India Consultancy Services for preparation of Feasibility Study and Detailed Project Report for Improvement to Two Lane with Paved shoulder of “ In Principle” NH (i) Benibad on NH-57 (NH-27 New) Katra-Aurai-Runisaidpur-Belsand-Parsauni NH-104 (NH-22 New). (ii) Turki on NH-77 (NH-27 New) to Motipur NH-28 (NH-722 New) via Saraiya NH-102 (NH-27 New). (iii) Kalyanpur on SH-50 Dholi-Muzaffarpur-Deoria on SH-74 (iv) Motihari(NH-527D) Dhaka - Belwaghat - Sheohar Road (NH-227) in Bihar on EPC Mode. Package No.-DPR/BIHAR/NH Div-MUZ/01. REQUEST FOR PROPOSAL (RFP) JULY,2017 MoRT&H through Chief Engineer (N.H Wing), Road Construction Department, Govt. of Bihar, Patna. 1 INDEX Sl. No. Content PageNo. s 1 Notice Inviting Tender (NIT) As per Original NIT 3 2 Letter of Invitation 5-19 3 Annex -I:Listof Projects along with Package Nos. 20 4 Annex-II: Procedure of Assessment of Least Cost to MoRT&H under special circumstances 21-25 5 Data Sheet 26-35 6 Appendix-I: Terms of Reference 36-82 7 Supplement-I: Additional Requirements for Hill Roads 83-87 8 Supplement-II: Additional Requirements for Bridges 88-90 9 Supplement–III: Additional requirement for safety audit 91-95 10 Enclosure-I: Manning Schedule 96 11 Enclosure-II: Qualification Requirements of Key Personnel 97-104 12 Enclosure-III: Schedule for Submission of Reports and Documents 105-106 13 Appendix–II: Formats for Eligibility 107-112 14 Appendix-III: Formats for Technical Proposals 113-127 15 Appendix-IV: Formats for Financial Proposals 128-137 16 Appendix-V: Detailed Evaluation Criteria 138-156 17 Appendix-VI: Draft Contract Agreement 157-206 2 Ministry of Road Transport &Highways Government of India NOTICE INVITING TENDER(NIT) 1.
    [Show full text]
  • Situation: Bihar Flood Page 1 of 8 Approximately 16 Million People Have Been Displaced by Flood in Bihar, Where 351 People Have
    Situation: Bihar Flood SITREP 26/08/2002 NATURE OF THE DISASTER: FLOOD Approximately 16 million people have been displaced by flood in Bihar, where 351 people have died so far and about 338,000 houses have collapsed. The worst affected districts are Sitamarhi, Darbhanga, Khagaria, Madhubani, Gopalganj The map below shows the partial and fully flooded districts of Bihar as of date. AREA AFFECTED: • Number of District: 24 (Sitamarhi, Nalanda, Muzaffarpur, Darbhanga, Patna, Katihar, E.Champaran, W. Champaran, Sheohar, Gopalganj, Smastipur, Madhubani, Saharsa Supaul, Shekhpura, Siwan, Araria, Kishanganj, Purnea, Madhepura and Khagaria, Begusarai, Saran, Lakheesarai) out of 38 districts. • Numbers of Blocks Affected: 203 • No of Panchayats :2,242 • Numbers of Villages affected: 8,150 • Life loss: 351 [Govt. sources ] • Cattle Loss: 1366 • Population affected: 15.44 million • Houses damaged: 372,009 estimated value is Rs.4,390.2 million • Total Area affected: 1.84 million hac. DISTRICT DETAILS : Districts Numbers of Blocks affected in district Sitamarhi 17 Nalanda 9 Muzaffarpur district has suffered a loss of more than Rs 42,430 million due to the floods, 8 which damaged standing crops and houses and affected more than a million people. The floodwaters have receded from a major area of the district now, but a large part of Aurai and Katra blocks remains inundated by the Bagmati river and the situation is unlikely to improve before September 15. Darbhanga: 18 Patna 4 Page 1 of 8 Situation: Bihar Flood SITREP 26/08/2002 East Champaran 19 Seohar: 4 Goplalganj 8 Samastipur: 9 Madhubani: 19 Saharsa 1 Sekhpura 6 West Champaran 7 Supaul 8 Araria: 9 Kathiar 10 Khagaria : 6 Saran 5 Siwan 5 Madhepura 3 Purnea 8 Kisanganj 7 Begusarai 4 Lak heesarai 4 Nalanda 9 Sheikhpura 6 IMPACT: (DAMAGE BY SECTOR) Lifeline and critical facilities: Public Utilities: Estimated Value of damaged public properties – 2,914.6 million Agriculture: • Cropped area affected: .8 million hactare • Estimated value of crop loss: 3,963.7 million • Standing crops in 0.2 million hectares worth 1,730 million.
    [Show full text]