ARCHITECTURAL REVIEW BOARD MUNICIPAL PLANNING COMMISSION -AGENDA- Thursday, December 8, 2016 at 7:00 P.M.

Louis J. R. Goorey Worthington Municipal Building The John P. Coleman Council Chamber 6550 North High Street Worthington, 43085

------

A. Call to Order - 7:00 pm

1. Roll Call

2. Pledge of Allegiance

3. Approval of minutes of the November 10, 2016 meeting

4. Affirmation/swearing in of witnesses

B. Municipal Planning Commission

1. Conditional Use

a. Recreational Facility in C-5 Zoning District – 679-D High St. (Shoma Jha/Centered Yoga & Movement) CU 17-16

C. Architectural Review Board

1. Unfinished

a. Sign – 882 High St. (Greg & Phil Giessler/Cam Taylor) AR 101-16

b. Holiday Inn Site Redevelopment – 7007 N. High St. (Alliance Hospitality, Inc.) AR 32-16

374 HIGHLAND AVE. • WORTHINGTON, OHIO 43085 • (614) 431-2424

2. New

a. New Gasoline/Convenience Store Station – Extension of Approval with Amendments – 2182 W. Dublin-Granville Rd. (United Dairy Farmers, Inc.) AR 128-16 (AR 45- 14)

b. Solar Panels – 661 Evening St. (Allen Eiger & Joanne Dole) AR 129-16

c. Fence – 215 E. Granville Rd. (Rebecca Ament) AR 130-16

D. Other

E. Adjournment

MEMORANDUM

TO: Members of the Architectural Review Board Members of the Municipal Planning Commission

FROM: Lynda Bitar, Planning Coordinator

DATE: December 2, 2016

SUBJECT: Staff Memo for the Meeting of December 8, 2016 ______

B. Municipal Planning Commission

1. Conditional Use

a. Recreational Facility in C-5 Zoning District – 679-D High St. (Shoma Jha/Centered Yoga & Movement) CU 17-16

Findings of Fact & Conclusions

Background & Request: This commercial building was constructed in the mid-1980’s, and has housed a mixture of retail businesses, offices, personal services and entertainment facilities over the years. This request is for approval to operate a yoga studio on the second floor at the west end of the building. The space was most recently occupied by Cut, Color, Style.

Project Details: 1. Centered Yoga and Movement would operate in the roughly 36’ x 28’ second floor space, which would also include a small office area. The first floor entrance is accessed from the courtyard at the back of the building, and leads not only to stairs but also a coatroom and restroom on the first floor. Other than the addition of the business name to the signage, no other exterior modifications are proposed. 2. The owner expects to have 10-12 people per each class, starting with a couple of classes a day. A variety of yoga and movement classes would be offered to clients of all ages.

Basic Standards and Review Elements: The following general elements are to be considered when hearing applications for Conditional Use Permits:

1. Effect on traffic pattern – Parking would be shared with the other Old Worthington businesses in the municipal parking lot. Clients should park in locations other than the spaces on High St. 2. Effect on public facilities – No effect has been identified. 3. Effect on sewerage and drainage facilities – The effect would be minimal. 4. Utilities required – No new utilities would be required. 5. Safety and health considerations – None have been identified. 6. Noise, odors and other noxious elements, including hazardous substances and other environmental hazards – None have been identified. 7. Hours of use – Varied times daily between 7:00 am to 9:00 pm. 8. Shielding or screening considerations for neighbors – Not applicable. 9. Appearance and compatibility with the general neighborhood – Signage would match the previously approved.

Land Use Plans: Worthington Conditional Use Permit Regulations The following basic standards apply to conditional uses in any "C" or "I" District: the location, size, nature and intensity of the use, operations involved in or conducted in connection with it, its site layout and its relation to streets giving access to it, shall be such that both pedestrian and vehicular traffic to and from it will not be hazardous, both at the time and as the same may be expected to increase with increasing development of the Municipality. The provisions for parking, screening, setback, lighting, loading and service areas and sign location and area shall also be specified by the applicant and considered by the Commission. Recreational Facilities are a conditionally permitted use in the C-5 Zoning District.

Worthington Design Guidelines, Architectural District Ordinance and Comprehensive Plan A good mix of restaurant and niche retail shops are appropriate for Old Worthington according to the Comprehensive Plan. Old Worthington is the heart and symbol of the Worthington community and it is one of the most successful original town centers in Ohio. Focus retail uses to the High Street corridor with particular attention on retail for first floors in Old Worthington.

Recommendations: Staff is recommending approval of the application, with a commitment by the business owner to direct clients away from the parking spaces on High St. as they should be reserved for retail and restaurant customers. The proposed use is appropriate for the second floor in this location, and meets the basic standards for conditional uses.

Motion: THAT THE REQUEST BY SHOMA JHA FOR A CONDITIONAL USE PERMIT TO OPERATE A RECREATIONAL FACILITY ON THE SECOND FLOOR AT 679-D HIGH ST., AS PER CASE NO. CU 17-16 DRAWINGS NO. CU 17-16, DATED NOVEMBER 23, 2016, BE APPROVED BASED ON THE PLANNING GOALS OF THE CITY, AS REFERENCED IN THE LAND USE PLANS AND FINDINGS OF FACT AND CONCLUSIONS IN THE STAFF MEMO AND PRESENTED AT THE MEETING.

Page 2 of 19 ARB/MPC Meeting December 8, 2016 Memo – Bitar

C. Architectural Review Board

1. Unfinished

a. Freestanding Sign Modification – 882 High St. (Greg & Phil Giessler/Cam Taylor) AR 101- 16

Findings of Fact & Conclusions

Background & Request: This building was constructed in 1987 and the property owners recently made improvements to the front entry of the building. This application is a request for approval to modify the freestanding sign. The request was originally on the September 8, 2016 agenda, but was tabled without discussion.

Project Details: 1. The plan involves replacement of the sign faces in the existing sign, and possibly repainting the sign box and post. 2. For the sign faces, three sections are proposed. The top would have Cam Taylor in bold red lettering and the web address in blue on a white background. In the middle would be the relocation network for the business, saying “Leading Real Estate Companies of the World” in 2 fonts and 3 sizes of white lettering on a red background. At the bottom, another logo comprised of white lettering on a blue background saying “Love your house; Love your neighborhood; Love Columbus” is proposed with 2 realtor symbols. 3. The sign is internally illuminated and the background, lettering and logos would be illuminated. 4. Once the graphic portion of a sign is replaced, it is supposed to be in conformance with the Code. Variances would be needed for the number of letter styles and sizes, and for having an internally illuminated background.

Land Use Plans: Worthington Design Guidelines and Architectural District Ordinance The Worthington Design Guidelines and Architectural District Ordinance recommend signs be efficient and compatible with the age and architecture of the building. While the regulations permit a certain maximum square footage of signs for a business, try to minimize the size and number of signs. Place only basic names and graphics on signs along the street so that drive-by traffic is not bombarded with too much information. Free-standing signs should be of the “monument” type (standing vertically, mounted on a ground-level base and not on a pole); they should be as low as possible. Such signs should have an appropriate base such as a brick planting area with appropriate landscaping or no lighting. Colors for signs should be chosen for compatibility with the age, architecture and colors of the buildings they serve, whether placed on the ground or mounted on the building. Signs must be distinctive enough to be readily visible, but avoid incompatible modern colors. Bright color shades generally are discouraged in favor more subtle and toned-down shades.

Page 3 of 19 ARB/MPC Meeting December 8, 2016 Memo – Bitar

Recommendation: Staff is recommending modification of this application. Basic business names, graphics and addresses on signs provide a simpler and clearer view for motorists. At the very least, matching as many fonts and sizes of lettering as possible would help to simplify the look of the sign.

Motion: THAT THE REQUEST BY GREG AND PHIL GIESSLER FOR A CERTIFICATE OF APPROPROPRIATENESS TO MODIFY THE FREESTANDING SIGN AT 882 HIGH ST., AS PER CASE NO. AR 101-16, DRAWINGS NO. AR 101-16, DATED JULY 15, 2016, BE APPROVED BASED ON THE FINDINGS OF FACT AND CONCLUSIONS IN THE STAFF MEMO AND PRESENTED AT THE MEETING.

b. Holiday Inn Site Redevelopment – 7007 N. High St. (Alliance Hospitality, Inc.) AR 32-16

Findings of Fact & Conclusions

Background & Request: This roughly 7.5 acre parcel, zoned C-4, Highway and Automotive Services, has been home to a hotel since 1975. The original approval was for a Hilton Inn. The brand has changed several times over the years with the most recent being the conversion to a Holiday Inn in 2007, which included many upgrades to the building and site.

The owner is proposing demolition of the existing hotel, and redevelopment of the site with a mix of uses. Concepts for the site were discussed at the March 10th, June 23rd, and November 10th ARB meetings, at which the applicant received feedback from the Board and the public. This submittal contains revisions of the architectural drawings; a drawing with the proposed buildings and the existing building together; and minor changes to the site plan. Changes to the lighting and landscaping have not been submitted.

Previous comments are italicized.

Project Details: 1. Uses: • Two hotels, with 110 guest rooms and 95 guest rooms, are proposed. The existing Holiday Inn has 232 guest rooms. • Other potential uses on the site are describe as restaurants and professional services. • In the C-4 Zoning District, personal and business services and hotels are Permitted Uses. Restaurants and offices (professional services) are Conditional Uses needing approval from the MPC. 2. Site Plan and Landscaping: • The proposed plan shows an entrance to the site from each of the adjacent rights-of- way. All three entrances would be situated similarly to existing site entrances. On W. Wilson Bridge Rd., the entrance is proposed at the west end; on Caren Ave. the proposed entrance is toward the middle of the site but on the eastern half; and on N. High St. the entrance would be near the middle of the site. Elimination of an existing Page 4 of 19 ARB/MPC Meeting December 8, 2016 Memo – Bitar

entrance toward the east end of the site on W. Wilson Bridge Rd. is proposed. • The buildings are laid out as in the last submission, concentrated to the north and east sides of the site, being further away from the adjacent residential than the existing hotel. • W. Wilson Bridge Rd. - Three building are proposed along W. Wilson Bridge Rd. about 36’ from the roadway and 20’ from the existing right-of-way line. The City has requested an additional 15’ of right-of-way be dedicated, so the building would be 5’ from the new line. In addition to the existing grass strip and sidewalk in the right-of- way, an area to plant street trees and a sidewalk adjacent to the buildings are proposed. Two pedestrian access points would be provided between the buildings which would also allow for restaurant seating areas. o At the west end of the site would be the drive entrance with one lane in and two lanes out, separate by an island with trees. o A small parking area with a screen wall would be adjacent to the east. Included is a service area that apparently leads to interior storage of trash, etc. Clarification of how service areas work is needed for the entire site. o Building #1 – This building would be about 158’ from the west property line, and 95’ wide. The building is designated for professional services. o Building #2 - A 140’ wide restaurant is proposed 40’ west of Building #1 with a pedestrian access, planting and seating area between the buildings. o Building #3 - At the east end would be a 131’ wide building housing a 95 key hotel, and a restaurant on the first floor. Between Buildings #2 and #3 would be a 51’ wide pedestrian access, planting and seating area. Building #3 would be 17’ from the east property, at the rear of the BP site. • Building #4 – This building would be a 110 key hotel located about 153’ from the south property line and 225’ from the west property line. A 3987 square foot restaurant would be on the first floor at the west end of the hotel. • A traffic circle denoted as the “Village Square” is proposed between Buildings #2, 3 & 4, with a fountain in the middle. The areas adjacent to the traffic lanes would provide pedestrian access, planting and seating opportunities. The road leading to the “Village Square” from the W. Wilson Bridge Rd. entrance would be tree-lined, and have sidewalks and parallel parking. From the south entrance off of Caren Ave., there would also be tree islands and a sidewalk to accommodate pedestrians. • N. High St. – Two buildings are proposed along the N. High St. frontage with a drive entrance between. The buildings are now proposed about 20’ from the existing right- of-way, which is an additional 5’ from the last proposal. Right-of-way dedication of 15’ is now shown on the plan. Both buildings would be lower than the street due to the dramatic change in grade west from N. High St. There would be sidewalks extending from both N. High St. and Caren Ave. to these buildings, with a pedestrian connection between the buildings. o Building #5 – This building is shown 16’ from the BP property line; 68’ in width; and 72’ deep. The building was reduced in size to accommodate the additional setback while retaining parking. It is designated as a restaurant. Additional accessible parking may be required in closer proximity to the building. o Building # 6 – Designated as a professional service building, this building would be 73’ wide along N. High St. and 128’ wide along Caren Ave. Page 5 of 19 ARB/MPC Meeting December 8, 2016 Memo – Bitar

• A sidewalk is shown along the southern edge of the site, with access to the public sidewalk east of the Caren Ave. entrance, and at the southwest corner of Building #6. • Stairs to the existing sidewalk west of the site are planned to allow pedestrian access for the residents. • The remainder of the site would be surface parking with tree islands added. The applicant calculates 517 parking spaces would be required on the site based on the proposed uses, and 388 spaces are being provided. Should there be any times the site could not accommodate all of the guests, parking agreements with property owners to the south may be possible. Any parking agreements obtained would be subject to approval by the Board of Zoning Appeals with the variance request. • A combination of evergreen and deciduous trees and shrubs are proposed to be densely planted along the west and south property lines adjacent to the existing residential properties. • The Arbor Advisory Committee reviewed the plans and made the following comments: o Pyrus Calleryana ( Select) Pear trees can hybridize and are now being considered an invasive species by some, and should not be used. o Street trees species recommendations: Exclamation London Plane; Espresso Coffeetree; Nyssa Sylvatica “Red Rage” or “Wildfire” – Not Tupelo Tower o Low shrubs (Taxus?) should be added along Caren Ave. o Only native species should be used in Caren lot (not sure if that is already the case). o Diversify screen planting around BP station – add arborvitae, etc. o West/southwest screening recommendations – Viburnum Prunifolium, Canadian hemlock, Cornelian Cherry Dogwood, Arborvitae, Serbian Spruce, Winterberry and ilex x meserveae Holly. The Committee thought the Blue Spruce, which needs full sun, may not be ideal for that planting in the quantities shown. o Need to see specs for planting (not sure what ODOT specs are) o Need appropriate bed depth and type of fill in parking islands o Why are there not any foundation plantings? • Consideration should be given to burying overhead utility lines at the south property line. • A storm water plan will be required. • A preliminary traffic study has been submitted, but additional information will be needed to determine the viability of installation of a traffic signal at the W. Wilson Bridge Rd. entrance. 3. Buildings: • The buildings are all shown as having four-sided architecture that is described as Colonial style. A variety of building heights, roof forms, materials and details are proposed across the site. Specific material and color combinations have been added to the submittal. The siding would be cementitious, and the proposed slate roof would be a manufactured material. Storage of mechanical equipment on the roof would likely be possible on all buildings. • Building #1 – o One-story; 6967 square feet (sf); professional services o Combination of different gabled roof lines to give the look of many different 1 ½ Page 6 of 19 ARB/MPC Meeting December 8, 2016 Memo – Bitar

story buildings; Weathered Green slate and Weathered Zinc standing seam metal roofing o South side entrance only; service door on west with screen wall at service area adjacent to parking o Four bricks Redburn, Battlecreek, Illini Commons and Ridgeland; beaded lap siding in Moir Gold, Bassett Hall Green and Chesapeake Blue; divided light windows; chimneys • Building #2 – o One story; 10,099 sf; restaurant o Combination of different roof lines to give the look of many different 1½ and 2 story buildings; Weathered Green and Slate Gray slate roofing, Medium Bronze and Colonial Red standing seam metal roofing o Entrances on the south, east and west sides; service entrances on the north side o Three bricks Redburn, Celtic Grey, Ellsworth; lap siding in Ewing Blue, Greenhow Vermillion, and Governor’s Gold; divided light windows on first and second floors, storefront windows, chimneys, dormers, awnings • Building #3 – o Four story hotel with 3264 sf restaurant space on first floor (northwest corner) o Look of hipped roof with Weathered Green slate roofing, Aged Copper standing seam metal roofing o Main hotel entrance on west side, fitness center entrance on north side; restaurant entrances on west and south sides o Four bricks Aberdeen, Celtic Grey, Rustic Burgundy, and Ashland; lap siding in Governor’s Gold; stone veneer – Bucks Country Limestone o Divided light windows with and without shutters, store front windows, trellis, brick detailing • Building #4 – o Four story hotel with 3987 sf restaurant space on first floor (west end) o Look of hipped and mansard roofs; with Weathered Green slate roofing, Weathered Zinc standing seam metal roofing o Main hotel entrance on north side; restaurant entrances on west and north sides o Three bricks Redburn, Celtic Grey, and Ellsworth; lap siding in Moir Gold, Bassett Hall Green, and Dragons Blood; stone veneer – Southern Ledgestone Aspen o Divided light windows with and without shutters, store front windows, dormers, brick detailing, arched entry for hotel and passageway between hotel and restaurant • Building #5 – o One story; 5134 sf; restaurant space o Two gabled roofs with Weathered Green slate roofing running east and west, connected with a flat roof with Aged Copper standing seam metal roofing o Entrances on the west side o Ellsworth brick, Tavern Charcoal lap siding, divided light windows on second floors, storefront windows, awnings • Building #6 – o Two story; 16,292 sf; professional services space o Combination of mansard and gabled with Weathered Zinc standing seam metal Page 7 of 19 ARB/MPC Meeting December 8, 2016 Memo – Bitar

o Entrance on the north side; service entrance on the west side o Illini Commons brick, Chesapeake Blue lap siding, divided light windows on first and second floors, two-story features 4. Lighting: • A lighting plan has been submitted, and includes photometrics and catalogue cuts of fixtures. The photometric plan shows some light level spilling onto adjacent properties. • A variety of light fixtures are proposed for the buildings. 5. Signage: • Signage review will be required. 6. Variances: • Application to the Board of Zoning Appeals would be required to approve any variances requested for the site. • The applicant is applying as part of the C-4 Zoning District, but is also trying to meet the requirements for the Wilson Bridge Corridor. Variances would likely be needed for setback, building height and parking not meeting the C-4 regulations. 7. Conditional Use Permits: • Needed for offices

Land Use Plans: Worthington Design Guidelines and Architectural District Ordinance 1. Scale, Form & Massing: Simple geometric forms and uncomplicated massing tend to make buildings more user-friendly and help to extend the character of Old Worthington into the newer development areas. Inclusion of sidewalks, pedestrian-scaled signage, and planting and lawn areas will help communicate a sense of a walkable pedestrian scale. Carefully designed building facades that employ traditional storefronts -- or similarly-sized windows on the first floor -- will help make new buildings more pedestrian-friendly. 2. Setbacks: Parking areas should be located toward the rear and not in the front setbacks if at all possible. Unimpeded pedestrian access to the front building facade from the sidewalk should be a primary goal. Building up to the required setback is desirable as a means of getting pedestrians closer to the building and into the main entrance as easily as possible. 3. Roof Shape: Generally, a traditional roof shape such as gable or hip is preferable to a flat roof on a new building. Roof shapes should be in scale with the buildings on which they are placed. Study traditional building designs in Old Worthington to get a sense of how much of the facade composition is wall surface and how much is roof. 4. Materials: Traditional materials such as wood and brick are desirable in newer areas, but other materials are also acceptable. These include various metals and plastics; poured concrete and concrete block should be confined primarily to foundation walls. Avoid any use of glass with highly reflective coatings. Some of these may have a blue, orange, or silver color and can be as reflective as mirrors; they generally are not compatible with other development in Worthington. Before making a final selection of materials, prepare a sample board with preferred and optional materials. 5. Windows: On long facades, consider breaking the composition down into smaller “storefront” units, with some variation in first and upper floor window design. Use traditional sizes, proportions and spacing for first and upper floor windows. Doing so will help link Old Worthington and newer areas through consistent design elements.

Page 8 of 19 ARB/MPC Meeting December 8, 2016 Memo – Bitar

6. Entries: Primary building entrances should be on the street-facing principal facade. Rear or side entries from parking lots are desirable, but primary emphasis should be given to the street entry. Use simple door and trim designs compatible with both the building and with adjacent and nearby development. 7. Ornamentation: Use ornamentation sparingly in new developments. Decorative treatments at entries, windows and cornices can work well in distinguishing a building and giving it character, but only a few such elements can achieve the desired effect. Traditional wood ornamentation is the simplest to build, but on new buildings it is possible to use substitute materials such as metal and fiberglass. On brick buildings substitute materials can be used to resemble the stone or metal ornamental elements traditionally found on older brick buildings. As with all ornamentation, simple designs and limited quantities give the best results. 8. Color: For new brick buildings, consider letting the natural brick color be the body color, and select trim colors that are compatible with the color of the bricks. Prepare a color board showing proposed colors. 9. Signage: While the regulations permit a certain maximum square footage of signs for a business, try to minimize the size and number of signs. Place only basic names and graphics on signs along the street so that drive-by traffic is not bombarded with too much information. Free-standing signs should be of the “monument” type; they should be as low as possible. Such signs should have an appropriate base such as a brick planting area with appropriate landscaping or no lighting. Colors for signs should be chosen for compatibility with the age, architecture and colors of the buildings they serve, whether placed on the ground or mounted on the building. Signs must be distinctive enough to be readily visible, but avoid incompatible modern colors such as “fluorescent orange” and similar colors. Bright color shades generally are discouraged in favor more subtle and toned-down shades. 10. Sustainability: The City of Worthington and its Architectural Review Board are interested in encouraging sustainable design and building practices, while preserving the character and integrity of the Architectural Review District. Energy conservation methods are encouraged. Landscape concepts often complement energy conservation and should be maintained and replenished. Utilize indigenous plant materials, trees, and landscape features, especially those which perform passive solar energy functions such as sun shading and wind breaks. Preserve and enhance green/open spaces wherever practicable. Manage storm water run-off through the use of rain gardens, permeable forms of pavement, rain barrels and other such means that conserve water and filter pollutants. Bike racks and other methods of facilitating alternative transportation should be utilized. Streetscape elements should be of a human scale. Make use of recycled materials; rapidly renewable materials; and energy efficient materials. Use of natural and controlled light for interior spaces and natural ventilation is recommended. Minimize light pollution.

Wilson Bridge Corridor Site Layout: Setbacks: Buildings and parking should be set back to provide a buffer between the sidewalk and building, with some variations in the Building Setback Line encouraged throughout the WBC.

Page 9 of 19 ARB/MPC Meeting December 8, 2016 Memo – Bitar

• Buildings 50,000 square feet in area or less shall be located between 5’ and 20’ from adjacent Right-of-Way Lines. Buildings greater than 50,000 square feet in area shall be located at least 20’ from adjacent Right-of-Way lines. • Buildings on properties abutting properties in “R” districts shall not be located closer than 50’ to the property line. Parking facilities and access drives on properties abutting properties in “R” districts shall not be located closer than 25’ to the property line. • Setback areas in front of retail uses shall be primarily hardscaped, and may be used for outdoor dining and other commercial activities. • As building height increases, the buildings should consider the relationship between the setback, the street corridor, and the building height. A variety of techniques will be implemented to mitigate any potential “canyon/tunneling” effect along the corridor, such as the use of floor terracing, changes in building massing, insertion of a green commons, recessed seating and dining areas, and lush landscaping. Right-of-Way Dedication: Dedication of Right-of-Way may be required to accommodate public improvements. Screening: All development on parcels abutting properties in “R” districts shall be permanently screened in the setback area with the combination of a solid screen and landscape screening. The solid screen shall consist of a wall or fence at least 6’ in height and maintained in good condition without any advertising thereon. Supporting members for walls or fences shall be installed so as not to be visible from any other property which adjoins or faces the fences or walls. This shall not apply to walls or fences with vertical supporting members designed to be identical in appearance on both sides. Landscape screening shall consist of one of the following options at a minimum: • One large evergreen tree with an ultimate height of 40’ or greater for every 20 linear feet, plus one medium evergreen tree with an ultimate height of 20’ to 40’ for every 10 linear feet. Evergreen trees shall be at least 6’ in height at the time of planting. Shrubs and ornamental grasses shall be incorporated into the setback area as to complement the tree plantings. A minimum of one shrub or ornamental grass, at least 24” in height, shall be provided for every 5 linear feet. Shrubs and grasses may be planted in clusters and do not need to be evenly spaced. • One large deciduous tree with an ultimate height of 50’ or greater for every 25 linear feet, plus one medium deciduous tree with an ultimate height of 20’ to 40’ for every 15 linear feet. Shrubs and ornamental grasses shall be incorporated into the setback area as to complement the tree plantings. A minimum of one shrub or ornamental grass, at least 24” in height, shall be provided for every 5 linear feet. Shrubs and grasses may be planted in clusters and do not need to be evenly spaced. Equipment: Exterior service, utility, trash, and mechanical equipment shall be located to the rear of buildings if possible and screened from view with a wall, fence or landscaping. Such equipment shall be completely screened from view. Materials shall be consistent with those used in the building and/or site. Equipment located on buildings shall match the color of the building. Tract Coverage: A maximum of 75% of the property shall be covered with impervious surfaces. Pedestrian Access: Sidewalks with a minimum width of 5’, Recreation Paths with a minimum width of 10’, or a combination of both shall be provided along all Rights-of-Way. Pedestrian

Page 10 of 19 ARB/MPC Meeting December 8, 2016 Memo – Bitar

connections from Sidewalks, Recreation Paths and parking lots to building entrances shall be provided. Landscaping: There shall be landscaping that complements other site features and creates relief from buildings, parking areas and other man-made elements. • Drought tolerant, salt tolerant, non-invasive, low maintenance trees and shrubs should be utilized. • Deciduous trees shall be a minimum of 2” caliper at the time of installation; evergreen trees shall be a minimum of 6’ in height at the time of installation; and shrubs shall be a minimum of 24” in height at the time of installation. • Parking lot landscaping shall be required per the provisions in Chapter 1171. • Seasonal plantings should be incorporated into the landscape plan. • The approved landscape plan must be maintained across the life of the development. Building Design: • A principal building shall be oriented parallel to Wilson Bridge Road (or High Street), or as parallel as the site permits, and should have an operational entry facing the street. • The height of a building shall be a minimum of 18’ for flat roof buildings measured to the top of the parapet, or 12’ for pitched roof buildings measured to the eave. • Extensive blank walls that detract from the experience and appearance of an active streetscape should be avoided. • Building Frontage that exceeds a width of 50’ shall incorporate articulation and offset of the wall plane to prevent a large span of blank wall and add interest to the facade. • Details and materials shall be varied horizontally to provide scale and three-dimensional qualities to the building. • Entrances shall be well-marked to cue access and use, with public entrances to a building enhanced through compatible architectural or graphic treatment. • When designing for different uses, an identifiable break between the building’s ground floors and upper floors shall be provided. This break may include a change in material, change in fenestration pattern or similar means. • Where appropriate, shade and shadow created by reveals, surface changes, overhangs and sunshades to provide sustainable benefits and visual interest should be used. • Roof-mounted mechanical equipment shall be screened from view on all four sides to the height of the equipment. The materials used in screening must be architecturally compatible with the rooftop and the aesthetic character of the building. Materials: • Any new building or redevelopment of a building façade should include, at a minimum, 75% of materials consisting of full set clay bricks, stone, cultured stone, wood or fiber cement board siding. Samples must be provided. • Vinyl siding and other less durable materials should not be used. • Long-lived and sustainable materials should be used. • The material palette should provide variety and reinforce massing and changes in the horizontal or vertical plane. • Especially durable materials on ground floor façades should be used. • Generally, exterior insulation finishing systems (EIFS), are not preferred material types. • A variety of textures that bear a direct relationship to the building’s massing and structural elements to provide visual variety and depth should be provided. Page 11 of 19 ARB/MPC Meeting December 8, 2016 Memo – Bitar

• The color palette shall be designed to reinforce building identity and complement changes in the horizontal or vertical plane. Windows and Doors: • Ground-floor window and door glazing shall be transparent and non-reflective. Above the ground floor, both curtain wall and window/door glazing shall have the minimum reflectivity needed to achieve energy efficiency standards. Non-reflective coating or tints are preferred. • Windows and doors shall be recessed from the exterior building wall, except where inappropriate to the building’s architectural style. • For a primary building frontage of a commercial use, a minimum of 30% of the area between the height of 2’ and 10’ above grade shall be in clear window glass that permits a full, unobstructed view of the interior to a depth of at least 4’. Lighting: All exterior lighting shall be integrated with the building design and site and shall contribute to the night-time experience, including façade lighting, sign and display window illumination, landscape, parking lot, and streetscape lighting. • The average illumination level shall not exceed 3 footcandles. The light level along a property line shall not exceed 0 footcandles. • The height of parking lot lighting shall not exceed 15’ above grade and shall direct light downward. Parking lot lighting shall be accomplished from poles within the lot, and not building-mounted lights. • For pedestrian walkways, decorative low light level fixtures shall be used and the height of the fixture shall not exceed 12’ above grade. • Security lighting shall be full cut-off type fixtures, shielded and aimed so that illumination is directed to the designated areas with the lowest possible illumination level to effectively allow surveillance. Signs: Exterior lighting fixtures are the preferred source of illumination. • Freestanding Signs o There shall be no more than one freestanding sign on parcels less than 2 acres in size, and no more than two freestanding signs on parcels 2 acres in size or greater. o Freestanding signs shall be monument style and no part of any freestanding sign shall exceed an above-grade height of 10‘. Sign area shall not exceed 50 square feet per side, excluding the sign base. The sign base shall be integral to the overall sign design and complement the design of the building and landscape. o Freestanding signs may include the names of up to eight tenants of that parcel. o Light sources shall be screened from motorist view. • Wall-mounted Signs o Each business occupying 25% or more of a building may have one wall sign and one projection sign. Wall-mounted signs shall not exceed 40 square feet in area, and projection signs shall not exceed 12 square feet in area per side. o Wall-mounted and projection signs shall be designed appropriately for the building, and shall not be constructed as cabinet box signs or have exposed raceways. Parking: • Non-residential Uses. Parking shall be adequate to serve the proposed uses, but shall in no case exceed 125% of the parking requirement in Section 1171.01. Page 12 of 19 ARB/MPC Meeting December 8, 2016 Memo – Bitar

• Bicycle Parking. Bicycle parking should be provided and adequate to serve the proposed uses.

Public Spaces: A minimum of one Public Space Amenity as approved by the Municipal Planning Commission shall be required for every 5,000 square feet of gross floor area of multi-family dwellings, commercial or industrial space that is new in the WBC. Public Space Amenities are elements that directly affect the quality and character of the public domain such as: • An accessible plaza or courtyard designed for public use with a minimum area of 250 square feet; • Sitting space (e.g. dining area, benches, or ledges) which is a minimum of 16 inches in height and 48 inches in width; • Public art; • Decorative planters; • Bicycle racks; • Permanent fountains or other Water Features; • Decorative waste receptacles; • Decorative pedestrian lighting; and • Other items approved by the Municipal Planning Commission.

Worthington Comprehensive Plan The 2005 Worthington Comprehensive Plan identifies the High Street Corridor (Extents Area) as a place where consistent site design should be encouraged such as landscape screening and interior planting of surface parking areas, and the location of large parking areas should be to the rear of the site. The corridor could accommodate redevelopment at a higher density, with such projects meeting the needs of the City, providing green setbacks and meeting the Architectural Design Guidelines. The plan recommends promoting a high quality physical environment, encouraging the City to continue to emphasize strong physical and aesthetic design, and high- quality development. Also recommended is encouraging the private market to add additional commercial office space within the City.

Staff Analysis and Recommendation: 1. The proposed site plan generally reflects the discussions at the ARB meetings, and is appropriate for the site. Elimination of the sidewalk near Wilson Bridge Rd., and widening of the sidewalk near the buildings are appropriate. The more prominent planting area would be attractive, and the distance from the road would be safer for pedestrians. 2. Right-of-way vacation along both streets is now being shown and conforms to the request of the City. 3. The following comments relate to the Worthington Design Guidelines and Wilson Bridge Corridor Development Standards regarding the buildings: • While the effort to have the development look like a village that has developed over time is honorable, some of the resultant buildings may be too complicated in their massing and form. The roof lines that are especially complex may not feel as authentic as intended. Some design elements seem out of character with the community.

Page 13 of 19 ARB/MPC Meeting December 8, 2016 Memo – Bitar

• A simpler mix of materials and colors may be warranted. The extensive use of lap siding and metal roofing, especially on the larger buildings, does not seem appropriate. The colors appear a bit more subtle than in previous submittals. • Entrances face the interior roads but do not face the public streets. 4. The Arbor Advisory Committee comments about the landscaping plan should be addressed. 5. Lighting should not spill onto neighboring properties. A different style of pole lights may be needed, especially adjacent to residential properties. LED lighting color above 2700 K is not appropriate. 6. Staff is recommending tabling of this application after discussion, to allow the applicant to make modifications and add detail based on the guidelines and any recommendations made at the meeting.

2. New a. New Gasoline/Convenience Store Station – Extension of Approval with Amendments – 2182 W. Dublin-Granville Rd. (United Dairy Farmers, Inc.) AR 128-16 (AR 45-14)

Findings of Fact & Conclusions

Background & Request: A new UDF convenience store and gas station at the northeast corner of W. Dublin-Granville Rd. and Linworth Rd. was approved by the Architectural Review Board in September of 2014. ARB approvals are valid for 18 months, but can be extended by the Board. This request would not only act as an extension of the original approval, but also minor changes and clarifications are proposed.

The development would be on 2 adjacent parcels, 1 located in Columbus and 1 in Worthington. Both jurisdictions approved plans for the new station. In addition to the ARB approval, the parcel in Worthington was rezoned to the C-4 Zoning District, and a Conditional Use Permit and variances were granted to accommodate the use. The total lot size for the 2 parcels after right-of- way dedication and transfer of a portion on the north side to Linworth Baptist Church is about 1.5 acres. The Worthington lot was home to a bank building which was demolished in the last year. The Columbus lot has the existing UDF which closed a couple of weeks ago and is slated for demolition.

Project Details: 1. As part of the plan, the applicant was approved to have a right-in/right-out entrance on West Dublin Granville Road, and a full access point on Linworth Road. Also, a southbound left turn lane on Linworth Road is required to be constructed by United Dairy Farmers. The owner must also install sidewalks along both frontages and crosswalks to allow pedestrians to move about the area safely. 2. The landscape plan is not proposed to change. A 48” high black metal fence is still proposed along the east property line, including adjacent to the parking lot to the north now owned by the church. 3. Building: Page 14 of 19 ARB/MPC Meeting December 8, 2016 Memo – Bitar

• The new building continues to be proposed as all brick, with a water table with a brick pattern around the entire building (see detail on A11). • The 7/12 roof pitch with a hipped roof would remain the same with this submittal. • The proposed storefront is anodized aluminum, extending across part of the front of the building. East of the entrance, smaller windows are now proposed to accommodate an interior beverage area. The windows are proposed to be tinted. • A horizontal prefinished flush metal panel system is proposed for the gables and on the canopy. • On the east elevation the storefront windows for the seating area have shifted to the north, and the patio with pergola is proposed adjacent. • Other elements are the same as the previous approval including: wall sconces, fiberglass columns with brick bases; louvered gable vents; wood trim; fiberglass roof shingles; and roof vents. • Decorative trim is proposed around the rear service doors. • Screening for the mechanicals on the rear of the roof is proposed. 4. Twenty-nine dark brown bollards with silver reflective stripes at the top are now proposed across the front of the building. 5. A brick enclosure with high impact PVC doors with a horizontal panel design is proposed for the dumpster at the west end of the building. The enclosure shown is larger than was originally approved. 6. The applicant was proposing 2 wall signs, one on the canopy and one on the building, and a freestanding sign. The wall signs would consist of internally illuminated channel letters with white faces. The “UDF” initials on the front of canopy would be the only sign on the Worthington side of the property. The latest submittal showed additional signs on the canopy in both jurisdictions. A freestanding sign would be placed on the Columbus side of the property, likely in the right-of-way that was dedicated. Approval is needed from the City of Columbus. 7. The light poles were proposed to have a ground to fixture height of 15’, including a 2’ exposed concrete base. The detail on sheet A1 shows the fixture at 17’ above grade. Two similar fixture styles have been submitted. Both styles have optional shields for the fixtures adjacent to the east side so light would not spill onto the residential property. The LEDs for both come in 5000k or 4000k color temperature. As was approved by the ARB, the photometric drawing indicates light levels no greater than 30 footcandles in any location. 8. U-shaped pipe bollards near the pumps are shown as gray with a yellow top in the submitted material. 9. A transformer is proposed near the northeast corner of the property. A variance would be needed for its location in proximity to the property lines.

Land Use Plans: Worthington Comprehensive Plan Update & 2005 Strategic Plan A neighborhood retail service center should be established at the West Dublin-Granville Road and Linworth Road intersection to create a commercial node for the community.

Page 15 of 19 ARB/MPC Meeting December 8, 2016 Memo – Bitar

Worthington Design Guidelines Scale, Form & Massing: Simple geometric forms and uncomplicated massing tend to make buildings more user-friendly. Inclusion of sidewalks, pedestrian-scaled signage, and planting and lawn areas will help communicate a sense of a walkable pedestrian scale. Carefully designed building facades that employ traditional storefronts -- or similarly-sized windows on the first floor -- will help make new buildings more pedestrian-friendly. Setbacks: Unimpeded pedestrian access to the front building facade from the sidewalk should be a primary goal. Roof Shape: Generally, a traditional roof shape such as gable or hip is preferable to a flat roof on a new building. Roof shapes should be in scale with the buildings on which they are placed. Materials: Traditional materials such as wood and brick are desirable in newer areas, but other materials are also acceptable. These include various metals and plastics; poured concrete and concrete block should be confined primarily to foundation walls. Avoid any use of glass with highly reflective coatings. Some of these may have a blue, orange, or silver color and can be as reflective as mirrors; they generally are not compatible with other development in Worthington. Before making a final selection of materials, prepare a sample board with preferred and optional materials. Windows: Use traditional sizes, proportions and spacing for windows. Doing so will help link Old Worthington and newer areas through consistent design elements. Entries: Primary building entrances should be on the street-facing principal facade. Rear or side entries from parking lots are desirable, but primary emphasis should be given to the street entry. Use simple door and trim designs compatible with both the building and with adjacent and nearby development. Color: For new brick buildings, consider letting the natural brick color be the body color, and select trim colors that are compatible with the color of the bricks. Prepare a color board showing proposed colors. Signage: While the regulations permit a certain maximum square footage of signs for a business, try to minimize the size and number of signs. Place only basic names and graphics on signs along the street so that drive-by traffic is not bombarded with too much information. Free-standing signs should be of the “monument” type (standing vertically, mounted on a ground-level base and not on a pole); they should be as low as possible. Such signs should have an appropriate base such as a brick planting area with appropriate landscaping or no lighting. Colors for signs should be chosen for compatibility with architecture and colors of the buildings they serve, whether placed on the ground or mounted on the building. Signs must be distinctive enough to be readily visible, but avoid incompatible modern colors such as “fluorescent orange” and similar colors. Bright color shades generally are discouraged in favor more subtle and toned-down shades.

Recommendation: Staff is recommending approval of this application with the followings modifications: • The parking lot light fixtures should be kept to no higher than 15’ above grade, including the base. • Especially given the number of bollards by the building, the silver reflective stripes should be eliminated. The pipe bollards by the pumps should not be yellow - all white or with white tops would be more appropriate. • The window tinting should be non-reflective and as light in color as possible to achieve the desired interior effect. Page 16 of 19 ARB/MPC Meeting December 8, 2016 Memo – Bitar

• At the residential property line, the illumination should not exceed 0 footcandles. Also, color temperature is typically approved to be no greater than 2700K. Selection of different fixtures may be necessary. The color of the light poles and fixtures should be brown (bronze) or black. • Although the freestanding and wall signs are not all in Worthington, the sign package should conform to the Worthington Design Guidelines and Codified Ordinances as closely as possible. Additional signs should not be added to the canopy and the freestanding sign should be smaller (≤ 30 sf/side) with a brick base to match the building. • The transformer must be screened with landscape material and be a color to blend in with the screening.

Motion: THAT THE REQUEST BY UNITED DAIRY FARMERS, INC. TO EXTEND AND AMEND AR #45-14 TO CONSTRUCT A NEW GASOLINE/CONVENIENCE STORE STATION AT 2182 WEST DUBLIN-GRANVILLE RD., AS PER CASE NO. AR 128-16, DRAWINGS NO. AR 128-16, DATED OCTOBER 28, 2016, BE APPROVED BASED ON THE FINDINGS OF FACT AND CONCLUSIONS IN THE STAFF MEMO AND PRESENTED AT THE MEETING.

b. Solar Panels – 661 Evening St. (Allen Eiger & Joanne Dole) AR 129-16

Findings of Fact & Conclusions

Background & Request: This ranch style house was built in 1955 and is not a contributing structure in the Worthington Historic District. The homeowner would like to add solar panels to the roof.

Project Details: 1. The owner is proposing the addition of 17 solar panels – 12 on the rear of the gabled roof and 5 on the south side of the front gable above the garage. The number and placement of panels would achieve the efficiency and productivity goals of the homeowners. 2. The panels would be black, placed on the slope of the gray roof sitting several inches above the roof shingles.

Land Use Plans: Worthington Design Guidelines and Architectural District Ordinance In 2011, Sustainable Features were added as a review element in the Architectural Review District to encourage sustainable design and building practices, while preserving the character and integrity of the Architectural Review District. It is recommended to place solar panels in a location that minimizes the visual impact as seen from the right-of-way and surrounding properties. Generally, panels should be located on roofs in the following manner: the rear 50% of the roof of the main building; the rear inside quadrant of the roof of a main building on a corner lot; or on accessory structures in the rear yard. On sloped roofs, place panels flush along the roof unless visibility is decreased with other placement.

Page 17 of 19 ARB/MPC Meeting December 8, 2016 Memo – Bitar

Staff Analysis and Recommendation: Ideally all of the panels needed for this project would be placed on the rear of the house. If it is necessary to place 5 panels on the front to make the project viable, placement on the south side of the east-west gable should have the least visual impact of any location on the front of the house. Panels that have the lowest possible profile above the roof should be used. Sustainable practices were meant to be encouraged in the District, and not every property is in a position to have solar panels placed in a location that minimizes visual impact.

Motion: THAT THE REQUEST BY ALLEN EIGER AND JOANNE DOLE FOR A CERTIFICATE OF APPROPRIATENESS TO ADD SOLAR PANELS AT 661 EVENING ST., AS PER CASE NO. AR 129-16, DRAWINGS NO. AR 129-16, DATED NOVEMBER 7, 2016, BE APPROVED BASED ON THE FINDINGS OF FACT AND CONCLUSIONS IN THE STAFF MEMO AND PRESENTED AT THE MEETING.

c. Fence – 215 E. Granville Rd. (Rebacca Ament) AR 130-16

Findings of Fact & Conclusions

Background & Request: This property is 57’ wide and 192’ deep, with a two-story house built in 1853 fronting on E. Granville Rd. At the rear of the property there is a 12’ strip that gives access from Plymouth St. to a two-car detached garage constructed in the early 2000’s.

This request is to replace the existing picket fence at the rear of the property.

Project Details: 1. The fence would run from the southwest corner of the house west to the property line and head south about 71’, stopping and starting again at a tree on the property line. At the south end, the fence would go around the drive to the garage. Small sections would connect the garage and the house to the existing fence owned by the neighbors to the east. Gates are proposed at the northeast, northwest and southwest corners. 2. The proposed cedar fence would be 42” high with pickets that taper down at the posts. The picket width would be 4” and there would be 2” spacing between the pickets. The fence would be left a natural cedar color.

Land Use Plans: Worthington Design Guidelines and Architectural District Ordinance Fencing should be open in style; constructed with traditional materials; 3’ to 4’ in height; in the back yard; and of simple design, appropriate for the house style. Design and materials should be compatible with the existing structure.

Recommendation: Staff is recommending modification of this application to have the spacing between the pickets equal to the picket width to create an open style fence as is called for in the Design Guidelines. Page 18 of 19 ARB/MPC Meeting December 8, 2016 Memo – Bitar

Motion: THAT THE REQUEST BY REBECCA AMENT FOR A CERTIFICATE OF APPROPRIATENESS TO CONSTRUCT A FENCE AT 215 E. GRANVILLE RD. AS PER CASE NO. AR 130-16, DRAWINGS NO. AR 130-16, DATED OCTOBER 11, 2016, BE APPROVED BASED ON THE FINDINGS OF FACT AND CONCLUSIONS IN THE STAFF MEMO AND PRESENTED AT THE MEETING.

Page 19 of 19 ARB/MPC Meeting December 8, 2016 Memo – Bitar

City of"Worthington CONDTI10NAL USE PERMIT APPLICATION

1. Property Location ~ 1 q- D 2. Zoning District t-5 3. Applicant \~hvma Jit1. Address .g .5 w. S~.:£0-r& -A-.t-e , ) WoemVoG;m tJ ' mt ~ 30&5 Horne Phone ( (ol4) '6j(,. c0_4~ Work P_hone ((pf{) 003 ,, q509 4. Property Owner l ...~>P-..'1 - 'f. ,5;\I v.Jo (T \.,_ · ~ \...;, .... ~- hl

Address 0 . 'ct B \ 1J v._ Q\:\ U( o

PLEASE READ 11IE FOLLOWING STATEMENT AND SIGN:

The infonnation contained in this application and in all attachments is true and correct to the best of my knowledge. l further acknowledge that I have familiarized myself with all applicable of the Worthington Codified Ordinances and will comply with aU applicable

Property Owner (Signature) Abutting Property Owners List for 679-D High St.

689 North High Street LLC PO Box 221 Worthington, OH 43085 HER Realtors 681 High St. Worthington, OH 43085 The Party Studio 679-B High St. Worthington, OH 43085 The Pub Out Back 679-C high St. Worthington, OH 43085 E.F. Smith Ltd. 960 Evening St. Worthington, OH 43085 Denig Jewelers 677 High St. Worthington, OH 43085 U.S. Bank 688 High St. Worthington, OH 43085 Zettler Town & Country 621 S. Grant Ave. Columbus, OH 43206 Susan Keaton 676 Oxford St. Worthington, OH 43085 Michael & Melinda Go 682 Oxford St. Worthington, OH 43085 James Fenzl & Christine Davis 703 Wesley Ct. Worthington, OH 43085 George & Patricia Doyle 701 Wesley Ct. Worthington, OH 43085 Robert Chrisman 699 Wesley Ct. Worthington, OH 43085 Rebecca & Stephen Volkmann 697 Wesley Ct. Worthington, OH 43085 As a resident of Old Worthington since 2004, I would like to open a yoga studio, Centered Yoga and Movement, in my hometown. I am a yoga instructor and feel passionate to bring peace, calm, positive energy and a sense of well-being to the lives of others and specifically to my home community, Old Worthington. Yoga is a love of my life and has brought me these gifts that I would like to share with others.

Centered Yoga and Movement would include of variety of yoga and movement classes which may include pilates, tai chi or other forms of martial arts. Additionally, the studio would offer yoga classes to adults of all ages and ability, teenagers, as well as elementary school aged children. Essentially, the yoga studio would welcome all members of the community and beyond.

The opening of this studio would bring more people into Old Worthington. Clients would walk through downtown, shop at the boutiques, purchase a cup of coffee, or enjoy a meal at one of many fabulous restaurants. In turn, this yoga studio will increase business in Old Worthington.

The studio would not change the traffic patterns in town. The West New England Avenue municipal parking lot would be used by clients. This studio would have no effect on public facilities, sewerage and drainage facilities. Required utilities are standard: gas, electric and water. Noise and odors would not be an issue. Hours of operation would be from 7am - 9pm. The number of clients served during a class would be 1O - 12. Appearance of the site would not change and is already compatible with the general neighborhood.

I request the approval of this endeavor and feel that this will be a positive additional to the vibrant community of Old Worthington. 679-D High St.

r~ ·,,,,,_ - 100-0066 .. . . ·- -- --·- .._ __ ,__,__.- I' ·. 100-0001 oc

-- -- .... ._ __ . ,.. ••7 •,.,~ sr I

r.·~ , -..;

OS6"HmH ~7 100·000343 ., I' I 1OO·OOOJ4' i I. , I .. f·~··· - , ... : ...". ....,, ;! ··,:ell'i ,,. ; 1 ., ···--- r-1 ;~.. 1 I.'.'. ~· ·~ l . j09 \! •••.• _, l ( ·. ~·-"lOMST:~~~ rr r~·~o••• i - 1

100-000049 04/10/2014 MAP(GIS} Genmal8d on 11121/2016 Iii 01-25:08 PM Parcel ID Map Routing No Owner Location 10000004900 100N064 CRV-XIV WORTHINGTON 679 HIGH ST N 03400

GIS

··~ "'. L ___t

r----,--~ .705 WfSLEY:cr WE:SllV CT 100-00562 8

r -·-·--;,. ______·; 695 N HIGH ST 69~ HI@t ST i--- . i Ii lOO~O()l9- J 69l HIGH ST I 1 I I t'89 HIGH ST i ,------,~--~,------~ ,.~1 --~--~.; 1 ' 00- 000336 ., . ... ,I L ______j ....:... .. I ------· ---~ ..-. l 6 8 1 N HIJ ~ ST 1- -· t .-----, I i I "'"• 100-000049 i 00~000664 L """"--"' -· ------~--.. 6n HI G , ST .. , " . iI i ~ 68CN HIGH~ '' , ___J r j r·--·-·------1 ! 100~0000 7 1 I ,' 667 N HIGH ST I 669 HIGH ST ! 1- - l ; '"' J 1 -----~-- _J .. I l------i______J 1 ·----- ·- -~-, .. : •-' l i __ J I ·- I r ·-- 100-0062 k'c.· ~ : E:;;ri, HEHE, L;eL:=r:m~ US~S. l ~ IE<".nai:. l!{CRG.\','lt 'T F; N.fCa l', l Esri..;s.~.9.~. METI. E3ri C~ir

This drawing is prepared for the real property inventory within this county. It is compiled from recorded deeds, survey plats, and other public records and data. Users of this drawing are notified that the public primary information source should be consulted for verification of the infofmation contained on this drawing. The county and the mapping companies assume no legal responsibilities for the information contained on this drawing. Please notify the Franklin County GIS Division of any discrepancies.

Tiie information on this web "'le is prepall!d tor the real property inwntory within lhis county. Users ol lhis dale are notified Iha! the pub~c prim"'}' information source should be consulted for verification of the information contained on this site. The county and YendDfll assume no legal responsibilities for lhe if1folm;mon con1ained on lhis site. Please notify the Franklin County AudilOl's Real Estate Division of any discrepi!ncies.

;~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

{;!TY OF WORTHINGTON C \·1 - \lo ORAW~ NO. ·

DATE \\ ft ·-;;_3- \le --1 I -- ·-·l · -·-l I f 0... !. COAT: :J ~OOM .-LANDING AREA I 1 1?):2 I l 01 I

UNI&!>< L.AVATO~'r I 1?)3 I

( FLOOR FLAN- GROU~!D LEVEL i

CITY OFLATHING N t.L\ \l- \ DRAWING NO. DATE \\,. Ql.3- ftR WJ~OW WIN ~o N ·······-··-·.. ·-·-- ...... ~------·--~, l I 1~1-- --·------.. -···· r----__,,..----TTJ.....-?rr------'· ... ""'' ...... L.--__.______...... " ...... '------,.-\- ______,, ____...JL_ .3

n

Yoe;,.\ i>fLA"•·-r1~e­ 11 A~A I !

i I <( ,.,.. z -~ n '> &! 0 -<[ I • f ------··-· · : ~1 [511 I '.2 ' ~ ~ I- 3 0.. w IDOD 0 ---'··· - ~ I i ...... : ' I ~-=--- - ~

- I_ -l"t CITY OF WORTHINGTON C...U. \I - 1ilo DRAWING NO. I DATE \' -~-- \lp

\/ :'/ / City of Worthington ARCHITECTURAL REVIEW BOARD Certificate of Appropriateness Application

1. Property Location 88Z: L-f ·:::sl $nEE"[1 \v'oR-~ ·-,~~ i OHro 4:S08S-

2. Present/Proposed Use °'e£6i T->F"-'' 1 ..1- ~t=vc1- G-~-n:t~~iZDl.!.c=e~ 3. Zoning District 0-J'

4. Applicant &~-PL , l Gl~~l <;;R.

Address 88Z. I~ ·t ~~ceT ) Wa;rrtt-1.... ~i, 01-/tt> 4lo8S:

Phone Number(s) {,, 1'1, 888. o'3.cl'7 ( o«t=1c..eJ J G. l"i. a~z. 7 <.:,, 79 Ct.<::,,_)

Address 88l.

Phone N umber(s) __c..::;_ · _1_,,.._;_·...;;: 8;_;:8;;...;8:::....;_, =o_,,,3=0_..-,_G....,o<--•""_..~_·c:=ii:..)'----..-.-....::G._•_"-t=, ...... a..... -s=- ?=-c._7-=<.,_..'7_c:i...__....,{(_,__,,e-s..'""""<..."-),,,__

7. Project Details:

a) Design ______~

b) Color ------~ c) Size ------~ d) Approximate Cost ______Expected Completion Date ______

PLEASE READ THE FOLLOWING STATEMENTAND SIGN YOUR NAME: The information contained in this application and in all attachments is true and correct to the best of my knowledge. I further acknowledge that I have familiarized myself with all applicable sections of the Worthington Codified Ordinances and will comply with all applicable regulations. Tct"ti

7. ,!:, l.ol(.. Date

7- iS'. l()fl Date Abutting Property Owners List for 882 High St.

Herbert Vaughan 888 High St. Worthington, OH 43085 Dirk & Linda Smith 8 Hartford Ct. Worthington, OH 43085 Connie Queeney 7 Hartford Ct. Worthington, OH 43085 Alto Inc. Barrister's Inc. 3363 Tremont Rd . Columbus, OH 43221 Kernos LLC 879 High St. Worthington, OH 43085 Providential Properties LLC 1601 W. 5th Ave., Suite 193 Columbus, OH 43212 Back when the sign was made our relocation Network named "Leading Real 11 11 11 Estate Companies of the World did not exist, only as a company called relo • So the network would like for us to incorporate the branding into our sign. In essence we are just adding their logo and replicating our yard sign which the design professional we used to do our branding is recommending.

Our old sign has a message of we are Cam Taylor-with a house. It shows MLS which I don1t think is clear. It gives a telephone number which would just be switched to a website instead of telephone number. To me our new sign inserts are updated, it shows our colors, our local brand, our international brand, a point of contact, and our purpose. When that sign was made the internet did not exist and as mentioned earlier we were not part of the Leading RE network. The message now is 1. We are still here. We are Columbus real estate 2. We are visible online 3. We are a member of Leading Real Estate Companies of the World. 4. We believe in fair housing. We cannot change the Leading RE logo but could try to match the font of the www.camtavlor.com with the Block portion of the Leading RE and/or remove Love Columbus etc.

The sign is illuminated as we will just be switching out to the two sides of the sign. We would like to paint the exterior of the sign, that is currently white, either leave it white and paint it or paint it black to match the yard sign, or a dark tan or something. The building was built around that sign back in 1988. The colors of the sign are still red, white, and blue as the current sign just slightly different shades. 1 do not think our paint colors are too modern or anything different than what we see in other downtown Worthington shops like Igloo Press etc. u " ~ cnv ~F WORTHINGTON ~L \0\- \kJ DRAWING NO.

DATE { -- \ 5 r- ) .b u .. 1 .!. oi.tUl o i'. t\.i. J.1,1>: «:> l""AA t.14 4j6 5318 HOLIO.!\Y INN WORTH INGTON ldJO Ol/00 1

City of Worthington ARCHITECTURAL REVIEW BOARD Certificate of Appropriateness Application

1. Property Location 7007 N. High Street

2. Present/Proposed Use Hotel / Multi-Use Development

3. Zoning District C-4

4. Applicant Alliance Hospi tali ty, Inc.

Address 600 Enterprise Dr, Lewis Center, Ohio 43035

Phone Number(s) 614-846-6600

5. Property Owner HE HAR! INC

Address 7007 N High Street, Worthington, Ohio 43085

Phone Number(s) 614-436 - 0700

two (2) new hotels and buildings

7. Project Details:

a) Design see architectural sketches and imagery

b) Color see architectural sketches and imagery

c) Size __s::..e=e=-=a.::.r.::.c.::h:=i :..::t:..::e:..::c:..:t:...:u::r:...:a::.:l::.._.:s:..:k~e=-t.::..c.::..h::.e.:....=.s__:.:an::..::...:.d_i_m....:.a....::::g::....e_r_,,y.______

d) ApproximateCost $40 Million Expected Completion Date June 2o19

PLEASE READ THE FOLLOWING STATEMENTAND SIGN YOUR NAME: The information contained in this application and in all attachments is true and correct to the best of my knowledge. I further acknowledge that l have familiarized myself with all applicable sect1ons of the Worthington Codified Ordinances and will comply with all applicaJ,le . ~ , regula~ raw . ?,;10/lr,,/-prq'l/i1 ~ "d,\d-

The Shops at Worthington Place 7227 N. High St. Worthington, OH 43085 Chase Bank 50 W. Wilson Bridge Rd . Worthington, OH 43085 Worthington Duchess LLC 7141 N. High St. Worthington, OH 43085 Worthington Duchess LLC 447 James Parkway Newark, OH 43056 Park National Bank 7140 N. High St. Worthington, OH 43085 Middleton Place Ltd 7100 N. High St. Worthington, OH 43085 CF Bank 7000 N. High St. Worthington, OH 43085 Fifth Third Bank 6895 N. High St. Worthington, OH 43085 T & S Realty Venture LLC PO Box 24550 Columbus, OH 43224-4550 Carol Meehan 130 Caren Ave. Worthington, OH 43085 Steven & Jayne Rosandich 140 Caren Ave. Worthington, OH 43085 Kristin Spyker Scott Kyser 6917 Hayhurst St. Worthington, OH 43085 Heather Monroe 135 Greenglade Ave. Worthington, OH 43085 Shellie & Andrew Smith 1500 Glenn Ave. Columbus, OH 43212 Resident 130 Greenglade Ave. Worthington, OH 43085 Towne Properties Joseph Swartz 777-A Dearborn Park Ln Worthington, OH 43085 Stephen Lewis 126 Saint Andre St. Worthington, OH 43085 The Village at Wonhington Square wonhington, Ohio

October 28, 2016

Brie! Supporting Statement

The Village at Worthington Square is comprised of 6 individual buildings arranged on a sloping site with 3 convenient entrances off the bordered Wilson Bridge Road to the north, North High Street fo the east and Caren Avenue to the south. The buildings are arranged aiong internal streets and a village square. The hotels are placed on opposite corners of the village square, which creates a sense of enclosure and reinforces the place making aspects of a village or town center. Two areas off of Wilson Bridge Road provide outdoor dining as well as pedestrian access and views into the village. The parking iots are located to the south and west of the buildings and provide conver.ient access to the buildings. Internal sidewalks will provide easy access to all buildings from the parking areas as well as from the bordering streets ar:d neighborhoods.

The architecture of the village is a traditional Colonial Style. All buildings explore the use of many root forms from Mansard, Gabel, Hip, Etc. Each building is unique in massing, form, fenestration, and material selections. The hotels are expressed as a collection of buildings with varying roofs and materials thus breaking down the scale and reinforcing the village aesthetic. Architectural detailing will include cornice lines, moidings, brackets, traditional windows and doors, brick soldiers and rowlocks, chimneys, awnings, canopies, etc.

The overall idea of this development is to evoke the nature of a village that has developed over a period of time and not as a singular development. The site has incorporated the recommendations from the Wilson Bridge Road Corridor Study to help achieve the City's redevelopment goals tor this area.

TECHNICAL SKILL. ~ f .J. f~ ·~ . ;.·:

815 Grandview Avrnue, Suite 65(), Columbus, Ohio 43215 Tel: 614.441.4122 F~x: 888. 488 .7340 www .Mann ikSmithGro up.com 7007 N. High St.

100-001218 04/07/2014 WALL FINISHES ROOF FINISHES

BRICKS PAINT STANDING SEAM 26HB REDBURN CW-585 EWING BLUE CW-90 TAVERN CHARCOAL METAL ROOF B1 P1 P7 MR1 MR4

ABERDEEN CW-280 MOIR GOLD MR2 B2 P2

CELTIC GREY CW-340 GREENHOW VERMILLION MR3 B3 P3

ELLSWORTH CW-480 BASSETT HALL GREEN B4 P4

ILLINI COMMONS CW-395 GOVERNOR’S GOLD B5 P5

RUSTIC BURGUNDY CW-595 CHESAPEAKE BLUE B6 P6

ASHLAND B7 STONE VENEER SIDING ROOFING TILES BORAL- BUCKS COUNTRY LIMESTONE LAP SIDING - SELECT CEDARMILL MULTI-WIDTH SLATE - WEATHERED GREEN ST1 S1 RT1

RIDGELAND B8

BORAL- SOUTHERN LEDGESTONE ASPEN LAP SIDING - BEADED CEDARMILL MULTI-WIDTH SLATE - SLATE GRAY ST2 S2 RT2

BATTLECREEK B9

PROJECT NO. 20150241.00 REVISION NO. 000 DATE 11/21/2016 Notes MATERIAL LEGEND The Village at Worthington Square Worthington, Ohio

© 2016 Cooper Carry, inc. 625 North Washington Street, Suite 200, Alexandria, Virginia 22314 tel 703 519 6152 fax 703 519 7127 S2 P4

B8 B1 MR2 RT1

S2 P2 B9 B5

NORTH ELEVATION

B8 B5 B9 B5 MR2 MR2 RT1 RT1

B9 B1 B8 S2 P2 B5 S2 P2

EAST ELEVATION WEST ELEVATION

S2 P6

B5 B8 MR2 RT1

S2 P2 B1 B8

SOUTH ELEVATION

BRICKS PAINT ROOFING TILES 26HB REDBURN RIDGELAND CW-280 MOIR GOLD MULTI-WIDTH SLATE - WEATHERED GREEN B1 B8P2 RT1

BATTLECREEK CW-480 BASSETT HALL GREEN B9 P4

SIDING ST. SEAM METAL ROOF ILLINI COMMONS LAP SIDING - SELECT CEDARMILL, BEADED CW-595 CHESAPEAKE BLUE WEATHERED ZINC B5 S2 P6 MR2

PROJECT NO. 20150241.00 REVISION NO. 000 DATE 11/21/2016 Notes BUILDING-1 - WEST OFFICE The Village at Worthington Square Worthington, Ohio

© 2016 Cooper Carry, inc. 625 North Washington Street, Suite 200, Alexandria, Virginia 22314 tel 703 519 6152 fax 703 519 7127 MR4 S1 P5 RT1

RT1 B4 MR1 MR1 B3 S1 P1 S1 P3 S1 P1

NORTH ELEVATION

MR1 B3 B4 MR1 S1 P1 S1 P1

B1 EAST ELEVATION WEST ELEVATION

RT1 S1 P5 MR4

RT2 RT1 MR1 MR1 B3 B4 S1 P1 S1 P3

B1

SOUTH ELEVATION

BRICKS SIDING PAINT ROOFING TILES 26HB REDBURN LAP SIDING - SELECT CEDARMILL CW-585 EWING BLUE MULTI-WIDTH SLATE - WEATHERED GREEN B1 S1 P1 RT1

CELTIC GREY ST. SEAM METAL ROOF CW-340 GREENHOW VERMILLION MULTI-WIDTH SLATE - SLATE GRAY MEDIUM BRONZE B3 MR1 P3 RT2

ELLSWORTH COLONIAL RED CW-395 GOVERNOR’S GOLD B4 MR4 P5

PROJECT NO. 20150241.00 REVISION NO. 000 DATE 11/21/2016 Notes BUILDING-2 - NORTH RESTAURANT The Village at Worthington Square Worthington, Ohio

© 2016 Cooper Carry, inc. 625 North Washington Street, Suite 200, Alexandria, Virginia 22314 tel 703 519 6152 fax 703 519 7127 MR 3 RT1 B6 MR 3 B2 B2 S1 P5

EAST ELEVATION MR 3 ST1 RT1 S1 P5 B2 MR 3 B7 B7 B3 B3 RT1

B6 NORTH ELEVATION SOUTH ELEVATION

B2 B6 S1 P5 RT1

MR 3

B2

B7

B3 ST1

WEST ELEVATION

BRICKS STONE VENEER ROOFING TILES ABERDEEN ASHLAND BORAL- BUCKS COUNTRY LIMESTONE MULTI-WIDTH SLATE - WEATHERED GREEN B2 B7 ST1 RT1

CELTIC GREY B3

SIDING PAINT ST. SEAM METAL ROOF RUSTIC BURGUNDY LAP SIDING - SELECT CEDARMILL CW-395 GOVERNOR’S GOLD AGED COPPER B6 S1 P5 MR3

ASHLAND

PROJECT NO. 20150241.00 REVISION NO. 000 DATE 11/21/2016 Notes BUILDING-3 - EAST HOTEL The Village at Worthington Square Worthington, Ohio

© 2016 Cooper Carry, inc. 625 North Washington Street, Suite 200, Alexandria, Virginia 22314 tel 703 519 6152 fax 703 519 7127 MR2 MR2 RT 1 S2 P4 B1 S2 P2

EL. 42' - 8" ROOF

EL. 32' - 8" LEVEL 4

EL. 22' - 8" LEVEL 3

EL. 12' - 8" LEVEL 2

EL. 0' - 0" LEVEL 1

EL. -6' - 0" LOWER RESTAURANT

B3 ST2 B4 NORTH ELEVATION ST2 RT 1 S2 P2

EL. 42' - 8" EL. 42' - 8" ROOF ROOF MR2

EL. 32' - 8" EL. 32' - 8" LEVEL 4 LEVEL 4 S2 P4

EL. 22' - 8" EL. 22' - 8" LEVEL 3 LEVEL 3

EL. 12' - 8" EL. 12' - 8" LEVEL 2 LEVEL 2 ST2 B3

EL. 0' - 0" EL. 0' - 0" LEVEL 1 LEVEL 1

EL. -6' - 0" EL. -6' - 0" LOWER RESTAURANT LOWER RESTAURANT

EAST ELEVATION WEST ELEVATION RT 1 MR2 MR2 S2 P2 S2 P4

EL. 42' - 8" ROOF

EL. 32' - 8" LEVEL 4

EL. 22' - 8" LEVEL 3

EL. 12' - 8" LEVEL 2

EL. 0' - 0" LEVEL 1

EL. -6' - 0" LOWER RESTAURANT

B1 ST2 SOUTH ELEVATION B3 B4 BRICKS PAINT ROOFING TILES 26HB REDBURN ELLSWORTH CW-280 MOIR GOLD MULTI-WIDTH SLATE - WEATHERED GREEN B1 B4P2 RT1

CELTIC GREY CW-480 BASSETT HALL GREEN B3 P4

SIDING ST. SEAM METAL ROOF BORAL- SOUTHERN LEDGESTONE ASPEN LAP SIDING - SELECT CEDARMILL CW-320 DRAGONS BLOOD WEATHERED ZINC ST2 S1 P6 MR2

PROJECT NO. 20150241.00 REVISION NO. 000 DATE 11/21/2016 Notes BUILDING-4 - WEST HOTEL The Village at Worthington Square Worthington, Ohio

© 2016 Cooper Carry, inc. 625 North Washington Street, Suite 200, Alexandria, Virginia 22314 tel 703 519 6152 fax 703 519 7127 RT 1 B4

EL. 20' - 0" ROOF

EL. 13' - 6" LEVEL 2

EL. 0' - 0" LEVEL 1

NORTH ELEVATION

B4 S1 P7 B4 S1 P7 MR3

B4

EAST ELEVATION WEST ELEVATION

RT 1 B4

EL. 20' - 0" ROOF

EL. 13' - 6" LEVEL 2

EL. 0' - 0" LEVEL 1

SOUTH ELEVATION

BRICKS SIDING PAINT ROOFING TILES ELLSWORTH LAP SIDING - SELECT CEDARMILL CW-90 TAVERN CHARCOAL MULTI-WIDTH SLATE - WEATHERED GREEN B4 S1P7 RT1

ST. SEAM METAL ROOF AGED COPPER MR3

PROJECT NO. 20150241.00 REVISION NO. 000 DATE 11/21/2016 Notes BUILDING-5 - EAST RESTAURANT The Village at Worthington Square Worthington, Ohio

© 2016 Cooper Carry, inc. 625 North Washington Street, Suite 200, Alexandria, Virginia 22314 tel 703 519 6152 fax 703 519 7127 MR2 B5 S1 P6

EL. 27' - 0" ROOF

EL. 13' - 6" LEVEL 2

EL. 0' - 0" LEVEL 1

NORTH ELEVATION

MR2 MR2

B5 B5

EL. 27' - 0" EL. 27' - 0" ROOF ROOF

EL. 13' - 6" EL. 13' - 6" LEVEL 2 LEVEL 2

EL. 0' - 0" EL. 0' - 0" LEVEL 1 LEVEL 1

EAST ELEVATION WEST ELEVATION

MR2 S1 P6 B5

EL. 27' - 0" ROOF

EL. 13' - 6" LEVEL 2

EL. 0' - 0" LEVEL 1

SOUTH ELEVATION

BRICKS SIDING PAINT ILLINI COMMONS LAP SIDING - SELECT CEDARMILL CW-595 CHESAPEAKE BLUE B5 S1 P6 RT1

ST. SEAM METAL ROOF WEATHERED ZINC MR2

PROJECT NO. 20150241.00 REVISION NO. 000 DATE 11/21/2016 Notes BUILDING-6 - EAST OFFICE The Village at Worthington Square Worthington, Ohio

© 2016 Cooper Carry, inc. 625 North Washington Street, Suite 200, Alexandria, Virginia 22314 tel 703 519 6152 fax 703 519 7127 ISSUANCES No. Drawing Issue Description Date 1 PRELIMINARY ARB 10/28/2016 2 ARB SUBMISSION 2 11/23/2016

Principal-in-Charge Project No.

Project Manager Date

Project Architect

Staff Architect

Drawing No. L:\Projects\Projects A-E\A2620007\CAD\SITE PLANS\ARB\Worthington ARB 01 SITE PLAN.dwgL:\Projects\Projects A-E\A2620007\CAD\SITE - Last printed 11/23/2016 1:29 PM ISSUANCES No. Drawing Issue Description Date 1 PRELIMINARY ARB 10/28/2016 2 ARB SUBMISSION 2 11/23/2016

Principal-in-Charge Project No.

Project Manager Date

Project Architect

Staff Architect

Drawing No. L:\Projects\Projects A-E\A2620007\CAD\SITE PLANS\ARB\Worthington ARB 02 SITE OVERLAY.dwgL:\Projects\Projects A-E\A2620007\CAD\SITE - Last printed 11/23/2016 1:28 PM L

L

K

K

1 23456789101112131415

J

J

THE CENTER FOR CONNECTIVE ARCHITECTURE

WILSON BRIDGE ROAD

ATLANTA NEW YORK WASHINGTON

© 2015 COOPER CARRY

H

H SCOPE DOCUMENTS WEST ENTRY The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of BLDG# 3 the Project. The Contractor is responsible for complete and coordinated pricing and BLDG# 1 BLDG# 2 Work, and shall include all items necessary for the proper execution and completion RESTAURANT of the Project, whether indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors in the WEST PASSAGE EAST PASSAGE information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items of Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project. SERVICE PARKING EAST HOTEL

G

G

,668$1&(6

SERVICE STATION STREET NORTH HIGH RESTAURANT PROF SERVICE VILLAGE STREET (WEST) 1R 'UDZLQJ,VVXH'HVFULSWLRQ 'DWH  35(/,0,1$5<$5%   $5%68%0,66,21  BLDG# 4 VILLAGE SQUARE RESTAURANT

PARKING WEST HOTEL BLDG# 5

F

F SERVICE PARKING SERVICE

SERVICE FAST CASUAL RESTAURANT PARKING PARKING PARKING BLDG#VILLAGE 6 STREET (EAST) EAST ENTRY

E

E

SERVICE

PROF SERVICE VILLAGE BLVD.

D D SOUTH ENTRY

E

R

A

U

Q

S

N

O

T THE VILLAGE AT

G

N

I WORTHINGTON SQUARE 123456789101112131415

H

T

R

C CAREN AVENUE

C

O 7007 N. HIGH ST

W WORTHINGTON, OHIO T Ƈ

A

E Owner

G

A

L

L

I

V HAYHURST STREET HAYHURST

E

H SITE PLAN

T

:

E

M

A

N

N

T

A

C

L

B

E

B

P

J

O

E

T R

I

P

S

1

- Designer 20150241 4 1 SITE PLAN Principal-in-Charge Project No.

2

1

- 0 EX-ARB-1 SCALE: 1/32" = 1'-0"

B Approver 10/28/2016

5

1 R Project Manager Date

0

A

M

2 - Checker

P

:

X

R

9

E Project Architect 3

:

E Author

:

R B

2

0

E

M

:

B

2

U

A Staff Architect

1

M

N

6 U EX-ARB-1

T

1

N

C

0

2

T

E

/

J

E

3

A

E O 2

/

H R 1 Drawing No.

S

P 3\20150241_2015_option3_jackson01431.rvt revit\users\option P:\2015\20150241\d-7 drawings\d-7-1 1 NOT ISSUED FOR CONSTRUCTION L

L

K

K

1 23456789101112131415

NORTH HIGH STREET SERVICE STATION BLDG. # 3, HOTEL BLDG. # 4, HOTEL

J J BLDG. # 5, RESTAURANT LEASE BLDG. # 2, RESTAURANT LEASE BLDG. # 1, PROF. SERVICE THE CENTER FOR CONNECTIVE ARCHITECTURE

NORTH WEST ENTRY

ATLANTA NEW YORK WASHINGTON

© 2015 COOPER CARRY

H

H SCOPE DOCUMENTS

The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible for complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, whether indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors in the 1 SITE ELEVATION NORTH information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items of Work included in the EX-ARB-2 SCALE: 1" = 30'-0" scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project.

G

G

BLDG. # 5, RESTAURANT LEASE SERVICE STATION ,668$1&(6 EAST ENTRY BLDG. # 3, HOTEL 1R 'UDZLQJ,VVXH'HVFULSWLRQ 'DWH  35(/,0,1$5<$5%   $5%68%0,66,21  BLDG. # 6, PROF. SERVICE

NORTH HIGH STREET WILSON BRIDGE ROAD

F

F

3 SITE ELEVATION EAST EX-ARB-2 SCALE: 1" = 30'-0"

BLDG. # 6, PROF. SERVICE

SERVICE STATION BEYOND

E

E BLDG. # 4, HOTEL BLDG. # 3, HOTEL

BLDG. # 1, PROF. SERVICE EAST ENTRY

NORTH WEST ENTRY

D

D

t

v

r

. E 2 SITE ELEVATION SOUTH

1

R

3

A EX-ARB-2 SCALE: 1" = 30'-0"

4

1

U

0

Q

n

S

o

s

N

k

c O BLDG. # 1, PROF. SERVICE BLDG. # 3, HOTEL BLDG. # 5, RESTAURANT LEASE

a

j T THE VILLAGE AT

_

G

3

N

n

I WORTHINGTON SQUARE

o

i 123456789101112131415VILLAGE STREET EAST ENTRY

H

t

T

p

o

R

C

C

_

O 7007 N. HIGH ST

5

1

W VILLAGE SQUARE BLDG. # 6, PROF. SERVICE

0 WORTHINGTON, OHIO

T

2

_ Ƈ

A WILSON BRIDGE ROAD

1

E 4 BLDG. #4, HOTEL Owner

2

G

0

A

5

L

1

L

0

I

2

V

\

3

E

n

H

o SITE ELEVATIONS

i T CAREN AVE.

t

S :

p

E

N

o

\

O M

s

I

r

A

T

e

N

s

A

u

V

\

T

t

i

E

C

v

L

B

E

e

B

r

E

J

1

O

E

-

T R

7

I

-

P

S

d

\

1

s

- Designer 20150241

4 Principal-in-Charge Project No.

g

2

2

n

-

i

0

B Approver 10/28/2016

5

w

1

a

R

r Project Manager Date

0

A

d

M

2 - Checker

P

:

7

X

-

R

3

E

d 4 SITE ELEVATION WEST

\ Project Architect 0

:

E Author

:

1

R B EX-ARB-2 SCALE: 1" = 30'-0"

4

4

0

E

2

M

:

B 0

2

U

A Staff Architect

5

1

M

N

1

6

U

0 EX-ARB-2

T

1

2

N

\

C

0

5

2

T

E

/

1

J

E

3

0

A

E O 2

2

/

\

H : R 1 Drawing No.

S 1 P P NOT ISSUED FOR CONSTRUCTION L

L

K

K

1 23456789101112131415

BLDG. # 6, PROF. SERVICE

J J BLDG. # 5, RESTAURANT LEASE THE CENTER FOR CONNECTIVE ARCHITECTURE

ATLANTA NEW YORK WASHINGTON

© 2015 COOPER CARRY

H

H SCOPE DOCUMENTS

The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible for complete and coordinated pricing and BLDG. # 3, HOTEL Work, and shall include all items necessary for the proper execution and completion of the Project, whether indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors in the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items of Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project. NORTH HIGH STREET

EXISTING SERVICE STATION

G

G

EAST ENTRY BLDG. # 2, RESTAURANT LEASE ,668$1&(6 1R 'UDZLQJ,VVXH'HVFULSWLRQ 'DWH  35(/,0,1$5<$5%   $5%68%0,66,21 

WILSON BRIDGE ROAD

F

F

PARKING

CAREN AVENUE BLDG. # 1, PROF. SERVICE

E

E

SOUTH ENTRY

PARKING

WEST ENTRY PARKING

D

D

t

v

r

.

E

1

R 3 PARKING

A

4

1

U

0

Q

n

S

o

s

N

k

c

O

a

j T THE VILLAGE AT

_

G

3

N

n

I WORTHINGTON SQUARE

o

i 123456789101112131415

H

t

T

p

o

R

C

C

_

O 7007 N. HIGH ST

5

1

W

0 WORTHINGTON, OHIO

T

2

_ Ƈ

A

1

E 4 Owner

2

G

0

A

5

L

1

L

0

I

2

V

\

3

E

n

H

o SITE AXON NE

i

T

t

:

p

E

o

\

M

s

E

r

A

e

N

N

s

u

N

\

T

t

i O BLDG. # 4, HOTEL

C

v

X

B

E

e

B

r

A

J

1

O

E

-

T R

7

I

-

P

S

d

\

1

s

- Designer 20150241

4 Principal-in-Charge Project No.

g

2

3

n

-

i

0

B Approver 10/28/2016

5

w

1

a

R

r Project Manager Date

0

A

d

M

2 - Checker

P

:

7

X

-

R

5

E

d

\ Project Architect 5

:

E Author

:

1

R B

4

4

0

E

2

M

:

B 0 1 (S) AXON (NE)

2

U

A Staff Architect

5

1

M

N 1 EX-ARB-3 SCALE:

6

U

0 EX-ARB-3

T

1

2

N

\

C

0

5

2

T

E

/

1

J

E

3

0

A

E O 2

2

/

\

H : R 1 Drawing No.

S 1 P P NOT ISSUED FOR CONSTRUCTION L

L

K

K

1 23456789101112131415

J

J

THE CENTER FOR CONNECTIVE ARCHITECTURE

ATLANTA NEW YORK WASHINGTON

© 2015 COOPER CARRY

H

H SCOPE DOCUMENTS

The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible for complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, whether indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors in the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items of Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project.

BLDG. # 4, HOTEL

G G BLDG. # 3, HOTEL PARKING ,668$1&(6 1R 'UDZLQJ,VVXH'HVFULSWLRQ 'DWH VILLAGE SQUARE NORTH WEST ENTRY  35(/,0,1$5<$5%   $5%68%0,66,21 

PARKING

F

F SOUTH ENTRY PARKING BLDG. # 6, PROF. SERVICE

CAREN AVENUE PARKING

E

E

BLDG. # 1, PROF. SERVICE EAST ENTRY

D D WEST PASSAGE EXISTING SERVICE STATION WILSON BRIDGE ROAD

t

v

r

.

E

1

R

3

A

4

1

U

0

Q

n

S

o

s

N

k

c

O

a

j T THE VILLAGE AT

_

G

3

N

n

I WORTHINGTON SQUARE

o

i 123456789101112131415

H

t

T

p

NORTH HIGH STREET o

R

C

C

_

O 7007 N. HIGH ST

5

1

W

0 WORTHINGTON, OHIO

T

2

_ Ƈ

A

1

E BLDG. # 2, RESTAURANT LEASE 4 Owner

2

G

0

A

5

L

1

L

0

I

2

V

\

3

E

n

H

o SITE AXON SW

i

T

t

:

p

E

o

\

M

s

W

r

A EAST PASSAGE

e

S

N

s

u

N

\

T

t

i

O

C

v

X

B

E

e

B

r

A

J

1

O

E

-

T R

7

I

-

P

S

d

\ BLDG. # 5, RESTAURANT LEASE

1

s

- Designer 20150241

4 Principal-in-Charge Project No.

g

2

4

n

-

i

0

B Approver 10/28/2016

5

w

1

a

R

r Project Manager Date

0

A

d

M

2 - Checker

P

:

7

X

-

R

9

E

d

\ Project Architect 4

:

E Author

:

1

R B

5

4

0

E

2

M

:

B 0 1 (S) AXON (SW)

2

U

A Staff Architect

5

1

M

N 1 EX-ARB-4 SCALE:

6

U

0 EX-ARB-4

T

1

2

N

\

C

0

5

2

T

E

/

1

J

E

3

0

A

E O 2

2

/

\

H : R 1 Drawing No.

S 1 P P NOT ISSUED FOR CONSTRUCTION L

L

K

K

1 23456789101112131415

J

J

THE CENTER FOR CONNECTIVE ARCHITECTURE

ATLANTA NEW YORK WASHINGTON

© 2015 COOPER CARRY

H

H SCOPE DOCUMENTS

The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible for complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, whether indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors in the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items of Work included in the WILSON BRIDGE ROAD scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project.

G

G

,668$1&(6 WEST PASSAGE EAST1R 'UDZLQJ,VVXH'HVFULSWLRQ PASSAGE 'DWH  35(/,0,1$5<$5%   $5%68%0,66,21  139' - 11"

SERVICE BUILDING #1 BUILDING #2

F RESTAURANT F PROF. SERVICE RESTAURANT LEASE

PROF SERVICE RESTAURANT 75' - 0" - 75' 75' - 0" - 75' PARKING

E

E

VILLAGE SQUARE

VILLAGE STREET (WEST)

W.C.

D

D

STORAGE

QQ QQ QQ POOL FITNESS W.C.

VESTIBULE

t W.C. v PARKING

r

.

E

1 WORK MANAGER

R 3 RESTAURANT AREA

A 4 FRONT

1 U DESK SALES

0

Q n LOBBY

S o SUITE STOR. CPU/ s BREAKFAST SHOP

N LOBBY PBX k BREAKROOM AREA STOR. MECH

c

O

a

j T THE VILLAGE AT

_

G

3

N

n

I WORTHINGTON SQUARE

o

i 123456789101112131415

H

t

T

p

o

R

C

C

_

O 7007 N. HIGH ST

5 STORAGE CENTER

1

W

0 WORTHINGTON, OHIO

T

2

T

_ Ƈ

A

N

1

A

E 4 Owner

R

2

G

0

U

A

5

A

L

1

L

T

0

I

S

2

V

\

E

C

3

I

E

R

V

n

H

2

o BLDG #1 PROF.SERVICE, BLDG

R

i

T

t #

E :

p

S

E

G o #2 RESTAURANT

.

\

D

M

s

F

r

L

A

O

e

B

N

s

R

,

u

P

\

T

E

t

i

C

1

v

#

B

E

e

B

r

J

G

1

O

-

D

R

7

L 1 (1,2) LEVEL 1 FLOOR PLAN

-

P

B

d

\

1 EX-ARB-5 SCALE: 1/16" = 1'-0"

s

- Designer 20150241

4 Principal-in-Charge Project No.

g

2

5

n

-

i

0

B Approver 10/28/2016

5

w

1

a

R

r Project Manager Date

0

A

d

M

2 - Checker

P

:

7

X

-

R

6

E

d

\ Project Architect 5

:

E Author

:

1

R B

5

4

0

E

2

M

:

B 0

2

U

A Staff Architect

5

1

M

N

1

6

U

0 EX-ARB-5

T

1

2

N

\

C

0

5

2

T

E

/

1

J

E

3

0

A

E O 2

2

/

\

H : R 1 Drawing No.

S 1 P P NOT ISSUED FOR CONSTRUCTION L

L

K

K

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

J

J CHIMNEY GABLE END CHIMNEY THE CENTER FOR CONNECTIVE ARCHITECTURE WINDOW OPENING

ATLANTA NEW YORK WASHINGTON

© 2015 COOPER CARRY

H

H SCOPE DOCUMENTS

30' - 0" - 30' EL. 13' - 6" ROOF SCREEN WALL AT SERVICE AREA The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible for complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, whether indicated or not. All components of the Project shall comply

13' - 6" - 13' with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors in the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items of Work included in the scope shall be binding on the Contractor, when consistent with the general scope and EL. 0' - 0" quality of the Project. LEVEL 1

1 (1) ELEVATION NORTH G

G EX-ARB-6 SCALE: 1" = 10'-0"

,668$1&(6 1R 'UDZLQJ,VVXH'HVFULSWLRQ 'DWH  35(/,0,1$5<$5%  WINDOW OPENING GABLE END  $5%68%0,66,21 

CHIMNEY WINDOW OPENING CHIMNEY

F

F

EL. 13' - 6" EL. 13' - 6" ROOF ROOF SERVICE DOOR

E

E

EL. 0' - 0" EL. 0' - 0" LEVEL 1 LEVEL 1

2 (1) ELEVATION EAST 4 (1) ELEVATION WEST EX-ARB-6 SCALE: 1" = 10'-0" EX-ARB-6 SCALE: 1" = 10'-0"

D D WINDOW OPENING COLUMN AT ENTRY

GABLE END ROOF AT ENTRY

E

R

A CHIMNEY U ENTRY DOORS

Q

S

N

O

T THE VILLAGE AT

G

N

I WORTHINGTON SQUARE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

H

T

R

C

C

O 7007 N. HIGH ST

W WORTHINGTON, OHIO T Ƈ

A

E Owner

G

A

L EL. 13' - 6"

L ROOF

I

V

I

T

E

A

H

V WEST OFFICE ELEVATIONS

T

E

:

L

E

E

M

E ELEVATION DIMENSIONS

A

S

C

N

I N EL. 0' - 0" F ARE APPROXIMATE

T O LEVEL 1

F

C

O

E B

B

J

T

O

S

E R

P W 3 (1) ELEVATION SOUTH 1 ELEVATION DIAGRAMS,

- Designer 20150241 4 SCALE: 1" = 10'-0" Principal-in-Charge Project No.

2 EX-ARB-6

6

-

0 COLORS MAY NOT

B Approver 10/28/2016

5

1 R Project Manager Date 0 REFELECT ACTUAL

A

M

2 - Checker

P

:

X

R MATERIAL SELECTIONS

1

E Project Architect 2

:

E Author

:

R B

0

4

E

M

:

B

2

U

A Staff Architect

1

M

N

6 U EX-ARB-6

T

1

N

C

0

2

T

E

/

J

E

3

A

E O 2

/

H R 1 Drawing No.

S

P 3\20150241_2015_option3_jackson01431.rvt revit\users\option P:\2015\20150241\d-7 drawings\d-7-1 1 NOT ISSUED FOR CONSTRUCTION L

L

K

K

1 23456789101112131415

J

J

THE CENTER FOR CONNECTIVE ARCHITECTURE PARKING

PARKING ATLANTA NEW YORK WASHINGTON WEST ENTRY © 2015 COOPER CARRY

H

H SCOPE DOCUMENTS

The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible for complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, whether indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors in the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items of Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project.

VILLAGE STREET

G

G

,668$1&(6 1R 'UDZLQJ,VVXH'HVFULSWLRQ 'DWH  35(/,0,1$5<$5%  BLDG. # 1, PROF. SERVICE  $5%68%0,66,21 

F

F

WILSON BRIDGE ROAD WEST PASSAGE

1 (1) AXON (NE) EX-ARB-7 SCALE:

E

E

WEST PASSAGE

BLDG. # 1, PROF. SERVICE

D

D

t

v

r

.

E

1

R

3

A

4

1

U

0

Q

n

S

o

s

N

k

c

O

a

j T THE VILLAGE AT

_

G

3

N

n

I WORTHINGTON SQUARE

o WILSON BRIDGE ROAD

i 123456789101112131415

H

t

T

p

o

R

C

C

_

O 7007 N. HIGH ST

5

1

W

0 WORTHINGTON, OHIO

T

2

_ Ƈ

A

1

E 4 Owner

2

G

0

A

5

L

1

L

0

I

2

V

\

3

E

S

n

H

N

o WEST OFFICE AXONS

i

T

O

t

:

p

X

E

o

A

\

M

s

r

E

A

e

C

N

s

I

u

F

\

T

t

F

i

C

v

O VILLAGE STREET

B

E

e

B

r

J

T

1

O

S

-

E R

7

-

P

W

d

\

1

s

- Designer 20150241

4 Principal-in-Charge Project No.

g

2

7

n

-

i

0

B Approver 10/28/2016

5

w

1

a

R

r Project Manager Date

0

A PARKING

d

M

2 - WEST ENTRY Checker

P

:

7

X

-

R

1

E

d

\ Project Architect 5

:

E Author

:

1

R B

6

4

0

E

2

M

:

B 0

2

U

A Staff Architect

5

1

M

N

1

6 2 (1) AXON (SW)

U

0 EX-ARB-7

T

1

2

N

\

C 0 EX-ARB-7 SCALE:

5

2

T

E

/

1

J

E

3

0

A

E O 2

2

/

\

H : R 1 Drawing No.

S 1 P P NOT ISSUED FOR CONSTRUCTION L

L

K

K

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

HIGH WINDOW OPENING

J J LOWER WINDOW OPENING AT RESTAURANT LEASE THE CENTER FOR CONNECTIVE ARCHITECTURE

DORMER WITH WINDOW

HIGH WINDOW OPENING ATLANTA NEW YORK WASHINGTON DORMER BEYOND © 2015 COOPER CARRY

H

H SCOPE DOCUMENTS 44' - 8" - 44' EL. 20' - 0" The Construction Documents have not been completed therefore this drawing may be ROOF incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible for complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, whether indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors in the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items of Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project. 20' - 0" - 20'

T.O.

EL. 0' - 0" T.O. LEVEL 1

G

G

SERVICE DOOR SERVICE DOOR TENANT OPENING 1 (2) ELEVATION NORTH ,668$1&(6 EX-ARB-8 SCALE: 1" = 10'-0" 1R 'UDZLQJ,VVXH'HVFULSWLRQ 'DWH  35(/,0,1$5<$5%   $5%68%0,66,21  CHIMNEY DORMER WITH WINDOW

HIP ROOF

CHIMNEY

F

F

HIP ROOF

HIGH WINDOW OPENING

EL. 20' - 0" EL. 20' - 0" ROOF ROOF

E

E

T.O. T.O. T.O. T.O.

T.O. T.O. T.O. T.O.

EL. 0' - 0" EL. 0' - 0" LEVEL 1 LEVEL 1

2 (2) ELEVATION EAST 4 (2) ELEVATION WEST EX-ARB-8 SCALE: 1" = 10'-0" EX-ARB-8 SCALE: 1" = 10'-0"

D

D

CHIMNEY

E

R HIGH WINDOW OPENING

A

U

Q

S

N

O

T DORMER WITH WINDOW THE VILLAGE AT

G

N

I WORTHINGTON SQUARE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

H

T

R

C

C

O 7007 N. HIGH ST

W WORTHINGTON, OHIO T Ƈ

A

E Owner

G

A

L

L

I

L

V

E

E

T

N H S NORTH RESTAURANT

T

A

N

:

R O EL. 20' - 0"

I E ELEVATIONS U ROOF

T

M

A

A

A

T

V

S N ELEVATION DIMENSIONS ARE

E

E

T

R

C APPROXIMATE

E B

H

B

J

T

O T.O.

R

R O T.O. P T.O. N T.O.

1

- Designer 20150241

4 T.O. T.O. T.O. Principal-in-Charge Project No.

2

8

-

0 ELEVATION DIAGRAMS,

B Approver 10/28/2016

5

1 R Project Manager Date

0 EL. 0' - 0" COLORS MAY NOT

A

M

2 - LEVEL 1 Checker

P

: X REFELECT ACTUAL

R

E

3 Project Architect 5

:

E Author

:

R B 3 MATERIAL SELECTIONS

4

E

M : 3 (2) ELEVATION SOUTH

B

2

U

A Staff Architect

1

M

N EX-ARB-8 SCALE: 1" = 10'-0"

6 U EX-ARB-8

T

1

N

C

0

2

T

E

/

J

E

3

A

E O 2

/

H R 1 Drawing No.

S

P 3\20150241_2015_option3_jackson01431.rvt revit\users\option P:\2015\20150241\d-7 drawings\d-7-1 1 NOT ISSUED FOR CONSTRUCTION L

L

K

K

1 23456789101112131415

J

J

THE CENTER FOR CONNECTIVE ARCHITECTURE

ATLANTA NEW YORK WASHINGTON VILLAGE STREET © 2015 COOPER CARRY

H

H SCOPE DOCUMENTS

The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible for complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, whether indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors in the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items of Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project.

G

G

,668$1&(6 VILLAGE SQUARE 1R 'UDZLQJ,VVXH'HVFULSWLRQ 'DWH  35(/,0,1$5<$5%   $5%68%0,66,21  WEST PASSAGE WILSON BRIDGE ROAD

F

F BLDG. # 2, RESTAURANT LEASE

EAST PASSAGE

1 (2) AXON (NE) EX-ARB-9 SCALE:

E

E

EAST PASSAGE

BLDG. # 2, RESTAURANT LEASE

D

D

t

v

r

. E VILLAGE SQUARE

1

R

3

A

4

1

U

0

Q

n

S

o

s

N

k

c

O

a

j T THE VILLAGE AT

_

G 3 WEST PASSAGE

N

n

I WORTHINGTON SQUARE

o

i 123456789101112131415

H

t

T

p

o

R

C

C

_

O 7007 N. HIGH ST

5

1

W

0 WORTHINGTON, OHIO

T

2

_ Ƈ

A

1

E 4 Owner

2

G

0

A

5

L

1

L

0

I

X

2

V

A

\

3

E

T

n

N H

o NORTH RESTAURANT AXONS

i

T

A

t

:

R

p

E

o

U

\

M

s

A

S

r

A

T

N

e

S N WILSON BRIDGE ROAD

s

O

u

E

\

T

t

i

R

C

v

B

E

e

H

B

r

J

T

1

O

R

-

R

7

O

-

P

N

d

\

1

s

- Designer 20150241

4 Principal-in-Charge Project No.

g

2

9

n

-

i

0

B Approver 10/28/2016

5

w

1

a

R

r Project Manager Date

0

A

d

M

2 - Checker

P

:

7

X

-

R

E

5

d

\ Project Architect 2

:

E Author

:

1

R B

8

4

0

E

2

M

:

B 0

2

U

A Staff Architect

5

1

M

N 1 2 (2) AXON (SW)

6

U

0 EX-ARB-9

T

1

2

N

\

C 0 EX-ARB-9 SCALE:

5

2

T

E

/

1

J

E

3

0

A

E O 2

2

/

\

H : R 1 Drawing No.

S 1 P P NOT ISSUED FOR CONSTRUCTION L

L

K

K

1 23456789101112131415

J

J

THE CENTER FOR CONNECTIVE ARCHITECTURE

ATLANTA NEW YORK WASHINGTON WILSON BRIDGE ROAD WILSON BRIDGE ROAD © 2015 COOPER CARRY

H

H SCOPE DOCUMENTS

The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible for complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, whether indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors in the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items of Work included in the EAST scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project. PASSAGE

127' - 7 1/4"

G

G

,668$1&(6 KING 1R 'UDZLQJ,VVXH'HVFULSWLRQ 'DWH QQ QQ KINGKING KING KING KING  35(/,0,1$5<$5%  60' - 0 1/4" FITNESS  $5%68%0,66,21  LAUNDRY STORAGE QQ RESTAURANT LEASE

GUEST LAUND. RESTAURANT CORRID. QQ W.C. 54' - 4 3/4" - 4 54' LAUNDRY CHUTE BOH STAIR QQ ELEV. VEST. MAINT. ELEV. EQUIP. W.C. KING XWIDE CORRIDOR QQ CORRIDOR

F

F STAIR ELEV. QQ MECH/ELEC ELEV. LOBBY ELEV. LOBBY

KING SUITE QQ SUITE MEETING

KING SUITE QQ SUITE

LOBBY VILLAGE SQUARE VILLAGE SQUARE KING SUITE QQ SUITE

RECEPTION

KING KING

E E STORAGE BREAKFAST CORRIDOR KING ADMIN QQ

175' - 4 1/8" 4 - 175' PANTRY

KING KING KING KING

KING KING LOBBY ENTRY KING KING

KING QQ KING FOUNTAIN BOH BOH

D STAIR

D STAIR

WORK MANAGER AREA

SALES KING

t

v KING STUDIO

r

. SUITE STOR. E CPU/

1 SHOP

R PBX 3 MECH

A

4

1

U

0

Q

n

S o BOH

s BOH

N

k

c

O

a

j T MEETING ROOM KING STUDIO THE VILLAGE AT

_

G 3 STAIRS

N

n

I WORTHINGTON SQUARE

o

i 123456789101112131415

H

t

T

p

o

R

C

C

_

O 7007 N. HIGH ST

5

1

W

0 WORTHINGTON, OHIO

T

2

_ Ƈ

A

1

E 4 Owner

2

G

0

A

5

L

1

L

0

I F SERVICE

2

V

\ 65' - 10 1/8"

L

S

3

E

E

N

n

T

H

A

o BLDG #3 EAST HOTEL FLOOR

i

T

L

O

t

:

P

p

H

E

o PLANS

\

R

T

M

s

S

r

O

A

e

A

O

N

s

E

L

u

\

T

3 t

i

C

# PARKING

v

B

E

e

B

r

G

J

D

1

O

-

L

R

7

B

-

P

d

\

-

1

s Designer 20150241

4 0 Principal-in-Charge Project No.

g

2

1

n

-

i

0

B Approver 10/18/2016

5

w

1

a

R

r Project Manager Date

0

A

d

M

2 - Checker

P

:

7 X 1 (3) LEVEL 1 FLOOR PLAN 2 (3) LEVEL 2 FLOOR PLAN

-

R

7

E

d

\ Project Architect 3 : SCALE: 1/16" = 1'-0" SCALE: 1/16" = 1'-0" E EX-ARB-10 EX-ARB-10 Author

:

1

R B

8

4

0

E

2

M

:

B 0

2

U

A Staff Architect

5

1

M

N

1

6

U

0 EX-ARB-10

T

1

2

N

\

C

0

5

2

T

E

/

1

J

E

3

0

A

E O 2

2

/

\

H : R 1 Drawing No.

S 1 P P NOT ISSUED FOR CONSTRUCTION L

L

K

K

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

HIP ROOF WINDOW AT GUEST ROOM HIP ROOF

J J CANOPY AT TENANT OPENING WINDOW AT GUEST ROOM THE CENTER FOR CONNECTIVE ARCHITECTURE

EL. 42' - 8" EL. 42' - 8" ROOF ROOF 10' - 0" - 10'

ATLANTA NEW YORK WASHINGTON EL. 32' - 8" EL. 32' - 8" LEVEL 4 LEVEL 4 62' - 8" - 62' © 2015 COOPER CARRY

H

H

10' - 0" - 10' SCOPE DOCUMENTS

EL. 22' - 8" EL. 22' - 8" The Construction Documents have not been completed therefore this drawing may be LEVEL 3 LEVEL 3 incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible for complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, whether indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall 10' - 0" - 10' inform the Owner and Architect of any omissions, inconsistencies or errors in the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items of Work included in the EL. 12' - 8" EL. 12' - 8" scope shall be binding on the Contractor, when consistent with the general scope and LEVEL 2 LEVEL 2 quality of the Project.

T.O. T.O. T.O. 8" - 12'

G

G T.O. T.O. EL. 0' - 0" EL. 0' - 0" LEVEL 1 LEVEL 1

FITNESS CENTER TENANT OPENING SERVICE ENTRANCE ,668$1&(6 1 (3) ELEVATION NORTH 3 (3) ELEVATION SOUTH 1R 'UDZLQJ,VVXH'HVFULSWLRQ 'DWH EX-ARB-11 SCALE: 1" = 10'-0" EX-ARB-11 SCALE: 1" = 10'-0"  35(/,0,1$5<$5%   $5%68%0,66,21 

WINDOW AT GUEST ROOM

F

F

EL. 42' - 8" ROOF

EL. 32' - 8" LEVEL 4

EL. 22' - 8" E

E LEVEL 3

EL. 12' - 8" LEVEL 2

FITNESS CENTER

EL. 0' - 0" LEVEL 1

D D SERVICE ENTRANCE WINDOW AT LOBBY 2 (3) ELEVATION EAST EX-ARB-11 SCALE: 1" = 10'-0"

E

R WINDOW AT GUEST ROOM

A

U

Q

S

N

O

T THE VILLAGE AT

G

N

I WORTHINGTON SQUARE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

H

T

R

C C EL. 42' - 8" O 7007 N. HIGH ST ROOF W WORTHINGTON, OHIO T Ƈ

A

E Owner

G

A

L EL. 32' - 8"

L

I LEVEL 4

V

I

T

E

A

H

V EAST HOTEL ELEVATIONS T ELEVATION DIMENSIONS

E

:

L

E E ARE APPROXIMATE M EL. 22' - 8"

L

A LEVEL 3

S

E

N

N

T

T

O

O

C

H

E B

B

T

J

S

O

A

R EL. 12' - 8"

E

P LEVEL 2 ELEVATION DIAGRAMS,

- 1 Designer 20150241

4 1 COLORS MAY NOT Principal-in-Charge Project No.

2

1

-

0

B Approver 10/28/2016 5 REFELECT ACTUAL

1 R Project Manager Date

0

A

M

2 - Checker

P

: MATERIAL SELECTIONS

X

R

4

E Project Architect 3

:

E Author : T.O. T.O. T.O. EL. 0' - 0"

R B 6 LEVEL 1

4

E

M

:

B

2

U

A Staff Architect

1

M

N

6 U EX-ARB-11

T

1

N

C 0 TENANT OPENING CANOPY ENTRY AT LOBBY FOUNTAIN AT VILLAGE SQUAREPLAZA TRELLIS

2

T

E / 4 (3) ELEVATION WEST

J

E

3

A

E O 2

/ EX-ARB-11 SCALE: 1" = 10'-0"

H R 1 Drawing No.

S

P 3\20150241_2015_option3_jackson01431.rvt revit\users\option P:\2015\20150241\d-7 drawings\d-7-1 1 NOT ISSUED FOR CONSTRUCTION L

L

K

K

1 23456789101112131415

J

J

THE CENTER FOR CONNECTIVE ARCHITECTURE

VILLAGE STREET BLDG. # 3, EAST HOTEL

ATLANTA NEW YORK WASHINGTON

© 2015 COOPER CARRY

H

H SCOPE DOCUMENTS

The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of VILLAGE SQUARE the Project. The Contractor is responsible for complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, whether indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors in the PARKING information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items of Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project.

G

G

,668$1&(6 1R 'UDZLQJ,VVXH'HVFULSWLRQ 'DWH  35(/,0,1$5<$5%   $5%68%0,66,21 

EXISTING SERVICE STATION EAST PASSAGE

WILSON BRIDGE ROAD

F

F

RESTAURANT LEASE

1 (3) AXON (NE) EX-ARB-12 SCALE:

E

E

LOBBY ENTRY

BLDG. # 3, EAST HOTEL WILSON BRIDGE ROAD

D

D EXISTING SERVICE STATION

t

v

r

.

E

1

R

3

A 4 RESTAURANT LEASE

1

U

0

Q

n

S

o

s

N

k

c

O

a

j T THE VILLAGE AT

_

G

3

N

n

I WORTHINGTON SQUARE

o

i 123456789101112131415

H

t EAST PASSAGE

T

p

o

R

C

C

_

O 7007 N. HIGH ST

5

1

W

0 WORTHINGTON, OHIO

T

2

_ Ƈ

A

1

E 4 Owner

2

G

0

A

5

L

1

L

0

I

2

V

\

3

E

S

n

H

N

o EAST HOTEL AXONS

i

T

t

O

:

p

X

E

o

\

A

M

s

r

L

A

e

E

N

s

T VILLAGE SQUARE

u

\

T

O

t

i

C

H

v

B

E

e

B

T

r

J

S

1

O

- PARKING

A

R

7

E

-

P

d

\

-

1

s Designer 20150241

4 2 Principal-in-Charge Project No.

g

2

1

n

-

i

0

B Approver 10/28/2016

5

w

1

a

R

r Project Manager Date

0

A

d

M

2 - Checker

P

:

7

X

-

R

4

E

d

\ Project Architect 3

:

E Author

:

1

R B

0

4

1

E

2

M

:

B 0

2

U

A Staff Architect

5 1 2 (3) AXON (SW)

M

N

1

6

U

0 EX-ARB-12

T EX-ARB-12 SCALE:

1

2

N

\

C

0

5

2

T

E

/

1

J

E

3

0

A

E O 2

2

/

\

H : R 1 Drawing No.

S 1 P P NOT ISSUED FOR CONSTRUCTION L

L

K

K

1 23456789101112131415

J J VILLAGE STREET (WEST) VILLAGE SQUARE THE CENTER FOR CONNECTIVE ARCHITECTURE

FOUNTAIN

KING

198' - 8 1/16" KING ATLANTA NEW YORK WASHINGTON

PARKING STORAGE LOBBY ENTRY © 2015 COOPER CARRY

H H W.C. QQ QQ QQ POOL FITNESS BOH 13' - 2 15/16" W.C. SCOPE DOCUMENTS

54' - 0 1/8" VESTIBULE W.C. STAIR The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of MANAGER the Project. The Contractor is responsible for complete and coordinated pricing and RESTAURANT Work, and shall include all items necessary for the proper execution and completion of the Project, whether indicated or not. All components of the Project shall comply BOH with any and all requirements of national, state, and local codes. The Contractor shall RESTAURANT LEASE WORK ELEVATOR EQUIP inform the Owner and Architect of any omissions, inconsistencies or errors in the LOBBY AREA information provided. If no notice is given and any omissions, inconsistencies or ELEV. FRONT errors are discovered, the Architect's decisions on items of Work included in the EMPLOYEE DESK SALES scope shall be binding on the Contractor, when consistent with the general scope and QQ QQ QQ LAUNDRY quality of the Project. SUITE STOR. CPU/ LOBBY BREAKFAST SHOP PBX BREAKROOM AREA STOR. MECH BOH

PANTRY 6" FOOD PREP MEETING ROOM 78' - 6 7/16" 78' FOOD

G

G

STORAGE BUS. COVERED PASSAGE CENTER 52' - 8 1/16" 52' ,668$1&(6 SERVICE 1R 'UDZLQJ,VVXH'HVFULSWLRQ 'DWH  35(/,0,1$5<$5%   $5%68%0,66,21  PARKING

264' - 1 1/8"

F

F

1 (4) LEVEL 1 FLOOR PLAN EX-ARB-13 SCALE: 1/16" = 1'-0"

E

E

VILLAGE STREET (WEST) KING VILLAGE SQUARE KING

KING

KING

KING SOFA KING SOFA KING SOFA KING SOFA QQ QQ QQ QQ QQ QQ QQ QQ KING SOFA

D

D KING

KING STUDIO

STAIR

t

v CORRIDOR

r

. E BOH 1 KING KING

R 3 KING STUDIO KING STUDIO

A

4 BOH BOH

1

U

0

KING STUDIOQ BOH

n

S o KING KING KING QQ QQ QQ QQ QQ QQ

s

N k STAIRS

c

O

a

j T BOH THE VILLAGE AT

_

G

3

N

n

I WORTHINGTON SQUARE

o KING STUDIO KING STUDIO KING STUDIO

i 123456789101112131415

H KING STUDIO t

T p KING STUDIO STAIRS

o

R

C

C

_

O 7007 N. HIGH ST

5

1

W

0 WORTHINGTON, OHIO

T

2

_ Ƈ

A

1

E 4 Owner

2

G

0

A

5

L

1

L

F

0

I

2

V

L

\

S

3

E

N

E

T

n

A

H

o BLDG #4 WEST HOTEL FLOOR

O

L

i

T

t

P

H :

p

E

o PLANS

T

R

\

M

s

S

O

r

A

E

e

O

N

s

L

W

u

\

T

4 t

i

C

#

v

B

E

e

B

r

G

J

D

1

O

-

L

R

7

B

-

P

d

\

-

1

s Designer 20150241

4 3 Principal-in-Charge Project No.

g

2

1

n

-

i

0

B Approver 10/18/2016

5

w

1

a

R

r Project Manager Date

0

A

d

M

2 - Checker

P

:

7

X

-

R

9

E

d

\ Project Architect 4

:

E Author

:

1

R B

0

4

1

E

2

M

:

B 0

2

U

A Staff Architect

5

1

M

N

1

6

U

0 EX-ARB-13

T

1

2

N 2 (4) LEVEL 2 FLOOR PLAN

\

C

0

5

2

T

E

/ EX-ARB-13 SCALE: 1/16" = 1'-0"

1

J

E

3

0

A

E O 2

2

/

\

H : R 1 Drawing No.

S 1 P P NOT ISSUED FOR CONSTRUCTION L

L

K

K

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

GABLE END ROOF WINDOW AT GUEST ROOM HIP ROOF MANSARD ROOF DORMER WITH WINDOW CANOPY AT LOBBY ENTRY

J

J

THE CENTER FOR CONNECTIVE ARCHITECTURE EL. 42' - 8" ROOF 10' - 0" - 10'

EL. 32' - 8" LEVEL 4

10' - 0" - 10' ATLANTA NEW YORK WASHINGTON 54' 3 7/16"-

EL. 22' - 8" LEVEL 3 © 2015 COOPER CARRY

H

H SCOPE DOCUMENTS 10' - 0" - 10' 51' - 6 31/32" - 51' The Construction Documents have not been completed therefore this drawing may be EL. 12' - 8" incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible for complete and coordinated pricing and LEVEL 2 Work, and shall include all items necessary for the proper execution and completion of the Project, whether indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors in the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items of Work included in the 12' - 8" - 12' scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project.

T.O. T.O. EL. 0' - 0" LEVEL 1

EL. -6' - 0"

G LOWER RESTAURANT

G

TENANT OPENING AT WINDOW AT BREAKFAST ROOM WINDOW AT POOL OPEN PASSAGE 1 (4) ELEVATION NORTH RESTAURANT LEASE ,668$1&(6 EX-ARB-14 SCALE: 1" = 10'-0" 1R 'UDZLQJ,VVXH'HVFULSWLRQ 'DWH  35(/,0,1$5<$5%  GUEST ROOM WINDOW DORMER WITH WINDOW  $5%68%0,66,21  MANSARD ROOF HIP ROOF MANSARD ROOF

EL. 42' - 8" EL. 42' - 8" ROOF

ROOF F

F

EL. 32' - 8" EL. 32' - 8" LEVEL 4 LEVEL 4

GUEST ROOM WINDOW EL. 22' - 8" EL. 22' - 8" LEVEL 3 LEVEL 3

E

E EL. 12' - 8" EL. 12' - 8" ELEVATION DIMENSIONS LEVEL 2 LEVEL 2 ARE APPROXIMATE WINDOW AT BREAKFAST ROOM CANOPY AT LOBBYT.O. ENTRY T.O. T.O. T.O.

EL. 0' - 0" EL. 0' - 0" ELEVATION DIAGRAMS, LEVEL 1 LEVEL 1 COLORS MAY NOT REFELECT ACTUAL EL. -6' - 0" EL. -6' - 0" LOWER RESTAURANT LOWER RESTAURANT MATERIAL SELECTIONS

D

D 2 (4) ELEVATION EAST 3 (4) ELEVATION WEST TENANT OPENING AT RESTAURANT LEASE EX-ARB-14 SCALE: 1" = 10'-0" EX-ARB-14 SCALE: 1" = 10'-0"

E

R MANSARD ROOF DORMER WITH WINDOW HIP ROOF GUEST ROOM WINDOW HIGH ROOF AT LOBBY ENTRY BEYOND

A

U

Q

S

N

O

T THE VILLAGE AT

G EL. 42' - 8"

N

I ROOF WORTHINGTON SQUARE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

H

T

R

C

C

O 7007 N. HIGH ST

W WORTHINGTON, OHIO T EL. 32' - 8" Ƈ A LEVEL 4

E Owner

G

A

L

L

I

I

V

T

E A EL. 22' - 8"

H V LEVEL 3 WEST HOTEL ELEVATIONS

T

E

:

L

E

E

M

L

A

S

E

T N

N

O

O T EL. 12' - 8"

H T.O. C LEVEL 2

E B

T

B

J

S

O

E

R

W

P

- 1 Designer 20150241

4 4 Principal-in-Charge Project No.

2

1

-

0

B Approver 10/28/2016 5 EL. 0' - 0"

1 R Project Manager Date

0 LEVEL 1

A

M

2 - Checker

P

:

X

R

E

4 Project Architect 1

:

E Author

: EL. -6' - 0"

R B 9 LOWER RESTAURANT

4

E

M

:

B

2

U

A Staff Architect

1

M

N

6 U EX-ARB-14

T

1

N

C 0 SERVICE ENTRY OPEN PASSAGE

2

T

E

/ 4 (4) ELEVATION SOUTH

J

E

3

A

E O 2 EX-ARB-14 SCALE: 1" = 10'-0"

/

H R 1 Drawing No.

S

P 3\20150241_2015_option3_jackson01431.rvt revit\users\option P:\2015\20150241\d-7 drawings\d-7-1 1 NOT ISSUED FOR CONSTRUCTION L

L

K

K

1 23456789101112131415

J

J

THE CENTER FOR CONNECTIVE ARCHITECTURE

WEST HOTEL PARKING

ATLANTA NEW YORK WASHINGTON

© 2015 COOPER CARRY

H

H SCOPE DOCUMENTS RESTAURANT LEASE The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible for complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, whether indicated or not. All components of the Project shall comply CAREN AVENUE with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors in the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items of Work included in the scope shall be binding on the Contractor, when consistent with the general scope and PARKING quality of the Project.

G

G SOUTH ENTRY VILLAGE STREET

,668$1&(6 1R 'UDZLQJ,VVXH'HVFULSWLRQ 'DWH  35(/,0,1$5<$5%   $5%68%0,66,21 

PARKING

F

F

VILLAGE SQUARE WILSON BRIDGE ROAD LOBBY ENTRY

1 (4) AXON (NE) EX-ARB-15 SCALE:

E

E

WILSON BRIDGE ROAD VILLAGE SQUARE

D

D

t

v

r

.

E PARKING

1

R

3

A

4

1

U

0

Q

n

S

o

s

N

k

c

O

a

j T THE VILLAGE AT

_

G

3

N

n

I WORTHINGTON SQUARE

o

i 123456789101112131415

H

t

T

p

o

R

C

C

_

O 7007 N. HIGH ST

5

1

W

0 WORTHINGTON, OHIO

T

2

_ Ƈ

A

1

E 4 Owner

2

G

0

A

5 SOUTH ENTRY

L

1

L

0

I

2

V

\ WEST HOTEL

3

S

E

n

N

H

o WEST HOTEL AXONS

i

O T

t

:

X

p

E

A

o \ CAREN AVENUE

M

s

L

r

A

E

e

T

N

s

u

O

\

T

t

i

H

C

v

B

E

e

T

B

r VILLAGE STREET

J

S

1

O

E

-

R

7

W

-

P

d

\

-

1

s Designer 20150241

4 5 Principal-in-Charge Project No. g PARKING

2

1

n

-

i

0

B Approver 10/28/2016

5

w

1

a

R

r Project Manager Date

0

A

d

M

- 2 PARKING Checker

P

:

7

X

-

R

E 4 RESTAURANT LEASE

d

\ Project Architect 0

:

E Author

:

1

R B

3

4

1

E

2

M

:

B 0

2

U

A Staff Architect

5

1

M

N

1

6

U 2 (4) AXON (SW)

0 EX-ARB-15

T

1

2

N

\

C 0 EX-ARB-15 SCALE:

5

2

T

E

/

1

J

E

3

0

A

E O 2

2

/

\

H : R 1 Drawing No.

S 1 P P NOT ISSUED FOR CONSTRUCTION L

L

K

K

1 23456789101112131415

SERVICE STATION J

J

THE CENTER FOR CONNECTIVE ARCHITECTURE

ATLANTA NEW YORK WASHINGTON

© 2015 COOPER CARRY

H

H SCOPE DOCUMENTS

The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible for complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, whether indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors in the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items of Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project.

SERVICE PATIO BUILDING # 5

G G RESTAURANT LEASE

,668$1&(6 1R 'UDZLQJ,VVXH'HVFULSWLRQ 'DWH  35(/,0,1$5<$5%   $5%68%0,66,21 

PARKING STREET NORTH HIGH

FAST CASUAL RESTAURANT

F

F

VILLAGE STREET (EAST)

PARKING

SERVICE BUILDING # 6

E E PROF. SERVICE

PROF SERVICE

D

D

t

v

r

.

E

1

R

3

A

4

1

U

0

Q

n

S

o

s

N

k

c

O

a

j T THE VILLAGE AT

_

G

3

N

n

I WORTHINGTON SQUARE

o

i 123456789101112131415

H

t

T

p

o

R

C

C CAREN AVENUE

_

O 7007 N. HIGH ST

5

1

W

E 0 WORTHINGTON, OHIO

T

2

C

I

_ Ƈ

A

V

1

E

4

R Owner

2

G

E

0

A

S

5

L

.

1

L

F

0

I

2

T

V

O

\

N

3

R

E

A

P

n

H

R

o BLDG #5 RESTAURANT, BLDG

6

i

T

t

U

#

:

p

A

E

o #6 PROF. SERVICE

G

\

T

M

s

D

S

r

A

L

e

E

N

s

B

R

u

,

\

T

5

t

i

C

#

v

B

E

e

B

r

G

J

D

1

O

-

L

R

7

B

-

P

d

\

-

1

s Designer 20150241

4 6 Principal-in-Charge Project No.

g

2

1

n

-

i

0

B Approver 10/28/2016

5

w

1

a

R

r Project Manager Date

0

A

d

M

2 - Checker

P

:

7

X

-

R

0

E

d

\ Project Architect 1

:

E Author

:

1

R B

3

4

1

E

2

M

:

B 0

2

U

A Staff Architect

5

1

M

N

1

6

U

0 EX-ARB-16

T

1

2

N

\

C

0

5

2

T E 1 (5,6) LEVEL 1 FLOOR PLAN

/

1

J

E

3

0

A

E O 2 EX-ARB-16 SCALE: 1/16" = 1'-0"

2

/

\

H : R 1 Drawing No.

S 1 P P NOT ISSUED FOR CONSTRUCTION L

L

K

K

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

GABLE END ROOF AWNING AS PROVIDED BY TENANT, OPTIONAL

J J HIGH WINDOW OPENING THE CENTER FOR CONNECTIVE ARCHITECTURE

COLUMN AND BEAM TRIM AT TENANT OPENING

EL. 20' - 0" ATLANTA NEW YORK WASHINGTON ROOF

© 2015 COOPER CARRY 6' - 6" - 6'

H

H EL. 13' - 6" SCOPE DOCUMENTS LEVEL 2

The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible for complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion

13' - 6" - 13' of the Project, whether indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors in the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items of Work included in the EL. 0' - 0" scope shall be binding on the Contractor, when consistent with the general scope and LEVEL 1 quality of the Project.

1 (5) ELEVATION NORTH TENANT OPENING EX-ARB-17 SCALE: 1" = 10'-0"

G

G

,668$1&(6 SERVICE ENTRY GABEL END 1R 'UDZLQJ,VVXH'HVFULSWLRQ 'DWH  35(/,0,1$5<$5%  TENANT OPENING  $5%68%0,66,21  HIGH WINDOW OPENING

TENANT OPENING WINDOW OPENING

F

F

EL. 20' - 0" EL. 20' - 0" ROOF ROOF T.O. T.O. EL. 13' - 6" EL. 13' - 6" LEVEL 2 T.O. LEVEL 2 T.O. T.O.

E

E

EL. 0' - 0" EL. 0' - 0" LEVEL 1 LEVEL 1

2 (5) ELEVATION EAST 4 (5) ELEVATION WEST EX-ARB-17 SCALE: 1" = 10'-0" EX-ARB-17 SCALE: 1" = 10'-0"

D

D

E

R

A

U

Q

S

N

O

T THE VILLAGE AT

G

N

I WORTHINGTON SQUARE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

H

T

R

C

C

O 7007 N. HIGH ST

W WORTHINGTON, OHIO T Ƈ A EL. 20' - 0"

E ROOF Owner

G

A

L

L

I

L EL. 13' - 6"

V

E LEVEL 2

E

T

H

S EAST RESTAURANT

N

T

N

A

:

R

O E ELEVATIONS

I

U

M T ELEVATION DIMENSIONS

A

A

A

T

V

N

S ARE APPROXIMATE

E

T

E

C

R EL. 0' - 0"

E B

B LEVEL 1

T

J

S

O

A

R

E

P

- 1 3 (5) ELEVATION SOUTH Designer 20150241

4 7 ELEVATION DIAGRAMS, Principal-in-Charge Project No.

2 1 EX-ARB-17 SCALE: 1" = 10'-0"

-

0

B Approver 10/28/2016 5 COLORS MAY NOT

1 R Project Manager Date

0

A

M

2 - REFELECT ACTUAL Checker

P

:

X

R

E

2 MATERIAL SELECTIONS Project Architect 0

:

E Author

:

R B

3

5

E

M

:

B

2

U

A Staff Architect

1

M

N

6 U EX-ARB-17

T

1

N

C

0

2

T

E

/

J

E

3

A

E O 2

/

H R 1 Drawing No.

S

P 3\20150241_2015_option3_jackson01431.rvt revit\users\option P:\2015\20150241\d-7 drawings\d-7-1 1 NOT ISSUED FOR CONSTRUCTION L

L

K

K

1 23456789101112131415

J

J

THE CENTER FOR CONNECTIVE ARCHITECTURE

PARKING

ATLANTA NEW YORK WASHINGTON

© 2015 COOPER CARRY

H

H SCOPE DOCUMENTS

The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible for complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, whether indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors in the information provided. If no notice is given and any omissions, inconsistencies or EAST ENTRY errors are discovered, the Architect's decisions on items of Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project.

G

G

,668$1&(6 EXISTING SERVICE STATION 1R 'UDZLQJ,VVXH'HVFULSWLRQ 'DWH  35(/,0,1$5<$5%   $5%68%0,66,21  NORTH HIGH STREET

F

F

BLDG. # 5, RESTAURANT LEASE

1 (5) AXON (NE) EX-ARB-18 SCALE:

E

E

BLDG. # 5, RESTAURANT LEASE

D D NORTH HIGH STREET

t

v

r

.

E

1

R

3

A

4

1

U

0

Q

n

S

o

s

N

k

c

O

a

j T THE VILLAGE AT

_

G

3

N

n

I WORTHINGTON SQUARE

o

i 123456789101112131415

H

t

T p EXISTING SERVICE STATION

o

R

C

C

_

O 7007 N. HIGH ST

5

1

W

0 WORTHINGTON, OHIO

T

2

_ Ƈ

A

1

E 4 EAST ENTRY Owner

2

G

0

A

5

L

1

L

0

I

X

2

V

\

A

3

E

T

n

H

o EAST RESTAURANT AXONS

N

i

T

t

A

:

p

R

E

o

\

U

M

s

r

S

A

A

e

T

N

N

s

S

O

u

\

T

E

t

i

C

R

v

B

E

e

B

T

r

J

S

1

O

-

A

R

7

E

-

P

d

\

-

1

s Designer 20150241

4 8 Principal-in-Charge Project No.

g

2

1

n

-

i 0 PARKING

B Approver 10/28/2016

5

w

1

a

R

r Project Manager Date

0

A

d

M

2 - Checker

P

:

7

X

-

R

E

4

d

\ Project Architect 5

:

E Author

:

1

R B

3

4

1

E

2

M

:

B 0

2

U

A Staff Architect

5

1

M

N

1

6

U

0 EX-ARB-18

T

1

2

N

\

C 0 2 (5) AXON (SW)

5

2

T

E

/

1

J

E EX-ARB-18 SCALE:

3

0

A

E O 2

2

/

\

H : R 1 Drawing No.

S 1 P P NOT ISSUED FOR CONSTRUCTION L

L

K

K

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

GABEL END WINDOW OPENING AT LEVEL 2

GLASS ENTRY DOORS WINDOW OPENING AT LEVEL 1 J

J

MANSARD ROOF THE CENTER FOR CONNECTIVE ARCHITECTURE

EL. 27' - 0" ROOF ATLANTA NEW YORK WASHINGTON

42' - 6" - 42' © 2015 COOPER CARRY

H 13' - 6" - 13'

H SCOPE DOCUMENTS

EL. 13' - 6" LEVEL 2 The Construction Documents have not been completed therefore this drawing may be

27' - 0" - 27' incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible for complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, whether indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors in the information provided. If no notice is given and any omissions, inconsistencies or 13' - 6" - 13' errors are discovered, the Architect's decisions on items of Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project.

EL. 0' - 0" LEVEL 1

G G 1 (6) ELEVATION NORTH EX-ARB-19 SCALE: 1" = 10'-0"

,668$1&(6 1R 'UDZLQJ,VVXH'HVFULSWLRQ 'DWH  35(/,0,1$5<$5%   $5%68%0,66,21 

F

F

EL. 27' - 0" EL. 27' - 0" ROOF ROOF

EL. 13' - 6" EL. 13' - 6" LEVEL 2 LEVEL 2

E

E

EL. 0' - 0" EL. 0' - 0" LEVEL 1 LEVEL 1

2 (6) ELEVATION EAST 4 (6) ELEVATION WEST EX-ARB-19 SCALE: 1" = 10'-0" EX-ARB-19 SCALE: 1" = 10'-0"

D

D

E

R

A

U

Q

S

N

O

T THE VILLAGE AT

G

N

I WORTHINGTON SQUARE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

H

T

R

C

C

O 7007 N. HIGH ST

W EL. 27' - 0" ROOF WORTHINGTON, OHIO T Ƈ

A

E Owner

G

A

L

L

I

V

T

E

A

V H EL. 13' - 6" EAST OFFICE ELEVATIONS

T E LEVEL 2

: L ELEVATION DIMENSIONS

E

E

M

E

S A ARE APPROXIMATE

C

I

N

N

F

O

T

I

F

C

O

E B

B

T

J

S O EL. 0' - 0"

A

R LEVEL 1

E

P

- ELEVATION DIAGRAMS, 1 Designer 20150241

4 9 Principal-in-Charge Project No.

2

1

- COLORS MAY NOT

0

B Approver 10/28/2016

5

1 R 3 (6) ELEVATION SOUTH REFELECT ACTUAL Project Manager Date 0

A

M

2 - Checker

P : EX-ARB-19 SCALE: 1" = 10'-0" X MATERIAL SELECTIONS

R

E

7 Project Architect 2

:

E Author

:

R B

4

5

E

M

:

B

2

U

A Staff Architect

1

M

N

6 U EX-ARB-19

T

1

N

C

0

2

T

E

/

J

E

3

A

E O 2

/

H R 1 Drawing No.

S

P 3\20150241_2015_option3_jackson01431.rvt revit\users\option P:\2015\20150241\d-7 drawings\d-7-1 1 NOT ISSUED FOR CONSTRUCTION L

L

K

K

1 23456789101112131415

J

J

THE CENTER FOR CONNECTIVE ARCHITECTURE

BLDG. # 6, PROF. SERVICE ATLANTA NEW YORK WASHINGTON CAREN AVENUE © 2015 COOPER CARRY

H

H SCOPE DOCUMENTS

The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible for complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, whether indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall PARKING inform the Owner and Architect of any omissions, inconsistencies or errors in the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items of Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project.

G

G

,668$1&(6 1R 'UDZLQJ,VVXH'HVFULSWLRQ 'DWH  35(/,0,1$5<$5%   $5%68%0,66,21 

EASTNORTH ENTRY HIGH STREET

F

F

1 (6) AXON (NE) EX-ARB-20 SCALE:

E

E

NORTH HIGH STREET

BLDG. # 6, PROF. SERVICE

D

D

EXISTING SERVICE STATION

t

v

r

.

E

1 EAST ENTRY

R

3

A

4

1

U

0

Q

n

S

o

s

N

k

c

O

a

j T THE VILLAGE AT

_

G

3

N

n

I WORTHINGTON SQUARE

o

i 123456789101112131415

H

t

T

p

o

R

C

C

_

O 7007 N. HIGH ST

5

1

W

0 WORTHINGTON, OHIO

T

2

_ Ƈ

A

1

E 4 Owner

2

G

0

A CAREN AVENUE

5

L

1

L

0

I

2

V

\

3

S

E

N

n

H

o EAST OFFICE AXONS

O

i

T

t

:

X

p

E

A

o

\

M

s

E r PARKING

A

C

e

I

N

s

F

u

\

T

F

t

i

C

O

v

B

E

e

B

T

r

J

S

1

O

-

A

R

7

E

-

P

d

\

-

1

s Designer 20150241

4 0 Principal-in-Charge Project No.

g

2

2

n

-

i

0

B Approver 10/28/2016

5

w

1

a

R

r Project Manager Date

0

A

d

M

2 - Checker

P

:

7

X

-

R

E

1

d

\ Project Architect 3

:

E Author

:

1

R B

4

4

1

E

2

M

:

B 0

2

U

A Staff Architect

5

1

M

N

1

6

U 0 2 (6) AXON (SW) EX-ARB-20

T

1

2

N

\

C 0 EX-ARB-20 SCALE:

5

2

T

E

/

1

J

E

3

0

A

E O 2

2

/

\

H : R 1 Drawing No.

S 1 P P NOT ISSUED FOR CONSTRUCTION L

L

K

K

1 23456789101112131415

J

J

THE CENTER FOR CONNECTIVE ARCHITECTURE

ATLANTA NEW YORK WASHINGTON

© 2015 COOPER CARRY

H

H SCOPE DOCUMENTS

The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible for complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, whether indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors in the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items of Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project.

G

G

,668$1&(6 1R 'UDZLQJ,VVXH'HVFULSWLRQ 'DWH  35(/,0,1$5<$5%   $5%68%0,66,21 

F

F

1 CAM/NORTH WEST ENTRY EX-ARB-21 SCALE:

E

E

D

D

t

v

r

.

E

1

R

3

A

4

1

U

0

Q

n

S

o

s

N

k

c

O

a

j T THE VILLAGE AT

_

G

3

N

n

I WORTHINGTON SQUARE

o

i 123456789101112131415

H

t

T

p

o

R

C

C

_

O 7007 N. HIGH ST

5

1

W

0 WORTHINGTON, OHIO

T

2

_ Ƈ

A

1

E 4 Owner

2

G

0

A

5

L

1

L

0

I

Y

2

V

\

R

3

E

T

n

N H

o CAMERA VIEWS ENTRY

i

T

E

t

:

p

S

E

o

\

W

M

s

r

E

A

I

e

N

s

V

u

\

T

A

t

i

C

R

v

B

E

e

E

B

r

J

M

1

O

-

A

R

7

C

-

P

d

\

-

1

s Designer 20150241

4 1 Principal-in-Charge Project No.

g

2

2

n

-

i

0

B Approver 10/28/2016

5

w

1

a

R

r Project Manager Date

0

A

d

M

2 - Checker

P

:

7

X

-

R

4

E

d

\ Project Architect 2

:

E Author

:

1

R B

8

4

1

E

2

M

:

B 0

2

U

A Staff Architect

5

1

M

N

1

6

U

0 EX-ARB-21

T

1

2

N

\

C 0 2 CAM/EAST ENTRY

5

2

T

E

/

1

J E EX-ARB-21 SCALE:

3

0

A

E O 2

2

/

\

H : R 1 Drawing No.

S 1 P P NOT ISSUED FOR CONSTRUCTION L

L

K

K

1 23456789101112131415

J

J

THE CENTER FOR CONNECTIVE ARCHITECTURE

ATLANTA NEW YORK WASHINGTON

© 2015 COOPER CARRY

H

H SCOPE DOCUMENTS

The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible for complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, whether indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors in the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items of Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project.

G

G

,668$1&(6 1R 'UDZLQJ,VVXH'HVFULSWLRQ 'DWH  35(/,0,1$5<$5%   $5%68%0,66,21 

F

F

1 CAM/NORTH WEST PASSAGE EX-ARB-22 SCALE:

E

E

D

D

t

v

r

.

E

1

R

3

A

4

1

U

0

Q

n

S

o

s

N

k

c

O

a

j T THE VILLAGE AT

_

G

3

N

n

I WORTHINGTON SQUARE

o

i 123456789101112131415

H

t

T

p

o

R

C

C

_

O 7007 N. HIGH ST

5

1

W

0 WORTHINGTON, OHIO

T

2

_ Ƈ

A

1

E 4 Owner

2

G

0

A

5

L

1

L

0

I

A

2

V

\

S

3

E

S

n

A H

o CAMERA VIEWS PASSAGE

i

T

P

t

:

p

S

E

o

\

W

M

s

r

E

A

I

e

E

N

s

V

G

u

\

T

A

t

i

C

R

v

B

E

e

E

B

r

J

M

1

O

-

A

R

7

C

-

P

d

\

-

1

s Designer 20150241

4 2 Principal-in-Charge Project No.

g

2

2

n

-

i

0

B Approver 10/28/2016

5

w

1

a

R

r Project Manager Date

0

A

d

M

2 - Checker

P

:

7

X

-

R

4

E

d

\ Project Architect 3

:

E Author

:

1

R B

1

4

2

E

2

M

:

B 0

2

U

A Staff Architect

5

1

M

N

1

6

U

0 EX-ARB-22

T

1

2 2 CAM/NORTH EAST PASSAGE

N

\

C

0

5

2

T E EX-ARB-22 SCALE:

/

1

J

E

3

0

A

E O 2

2

/

\

H : R 1 Drawing No.

S 1 P P NOT ISSUED FOR CONSTRUCTION L

L

K

K

1 23456789101112131415

J

J

THE CENTER FOR CONNECTIVE ARCHITECTURE

ATLANTA NEW YORK WASHINGTON

© 2015 COOPER CARRY

H

H SCOPE DOCUMENTS

The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible for complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, whether indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors in the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items of Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project.

G

G

,668$1&(6 1R 'UDZLQJ,VVXH'HVFULSWLRQ 'DWH  35(/,0,1$5<$5%   $5%68%0,66,21 

F

F

1 CAM/PLAZA/EAST HOTEL EX-ARB-23 SCALE:

E

E

D

D

t

v

r

.

E

1

R

3

A

4

1

U

0

Q

n

S

o

s

N

k

c

O

a

j T THE VILLAGE AT

_

G

3

N

n

I WORTHINGTON SQUARE

o

i 123456789101112131415

H

t

T

p

o

R

C

C

_

O 7007 N. HIGH ST

5

1

W

0 WORTHINGTON, OHIO

T

2

_ Ƈ

A

1

E 4 Owner

2

G

0

A

5

L

1

L

0

I

2

A

V

\

Z

3

E

A

n

L H

o CAMERA VIEWS PLAZA

i

T

P

t

:

p

S

E

o

\

W

M

s

r

E

A

I

e

N

s

V

u

\

T

A

t

i

C

R

v

B

E

e

E

B

r

J

M

1

O

-

A

R

7

C

-

P

d

\

-

1

s Designer 20150241

4 3 Principal-in-Charge Project No.

g

2

2

n

-

i

0

B Approver 10/28/2016

5

w

1

a

R

r Project Manager Date

0

A

d

M

2 - Checker

P

:

7

X

-

R

0

E

d

\ Project Architect 0

:

E Author

:

1

R B

5

4

2

E

2

M

:

B 0

2

U

A Staff Architect

5

1

M

N

1

6

U

0 EX-ARB-23

T

1

2

N

\ 2 CAM/PLAZA/WEST HOTEL

C

0

5

2

T

E

/

1 EX-ARB-23 SCALE:

J

E

3

0

A

E O 2

2

/

\

H : R 1 Drawing No.

S 1 P P NOT ISSUED FOR CONSTRUCTION L

L

K

K

1 23456789101112131415

J

J

THE CENTER FOR CONNECTIVE ARCHITECTURE

ATLANTA NEW YORK WASHINGTON

© 2015 COOPER CARRY

H

H SCOPE DOCUMENTS

The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible for complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, whether indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors in the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items of Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project.

G

G

,668$1&(6 1R 'UDZLQJ,VVXH'HVFULSWLRQ 'DWH  $5%68%0,66,21 

F F 2 CAM/SITE/HAYHURST EX-ARB-24 SCALE:

E

E

D

D

t

v

r

.

E

1

R

3

A

4

1

U

0

Q

n

S

o

s

N

k

c

O

a

j T THE VILLAGE AT

_

G

3

N

n

I WORTHINGTON SQUARE

o

i 123456789101112131415

H

t

T

p

o

R

C

C

_

O 7007 N. HIGH ST

5

1

W

0 WORTHINGTON, OHIO

T

2

_ Ƈ

A

1

E 4 Owner

2

G

0

A

5

L

T

1

L

S

0

I

H

2

R

V

\

T

3

U

U

E

H

n

O

H

o CAMERA VIEWS SOUTH AND

Y

i

T

S

t

A

:

p

S

H

E

o HAYHURST

\

W

M

s

D

r

E

A

I

N

e

N

s

V

A

u

\

T

A

t

i

C

R

v

B

E

e

E

B

r

J

M

1

O

-

A

R

7

C

-

P

d

\

-

1

s Designer 20150241

4 4 Principal-in-Charge Project No.

g

2

2

n

-

i

0

B Approver 10/28/2016

5

w

1

a

R

r Project Manager Date

0

A

d

M

- 2 Checker

P

:

7

X

-

R

E

1

d

\ Project Architect 4

:

E Author

:

1

R B

7

4

2

E

2

M

:

B

0

2

U

A Staff Architect

5

1

M

N

1

6

U

0 EX-ARB-24

T

1

2

N

\

C

0

5

2 1 CAM/SOUTH ENTRY

T

E

/

1

J

E

3 0 EX-ARB-24 SCALE:

A

E O 2

2

/

\

H : R 1 Drawing No.

S 1 P P NOT ISSUED FOR CONSTRUCTION L

L

K

K

1 23456789101112131415

J

J

THE CENTER FOR CONNECTIVE ARCHITECTURE

ATLANTA NEW YORK WASHINGTON

© 2015 COOPER CARRY

H

H SCOPE DOCUMENTS

The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible for complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, whether indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors in the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items of Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project.

G

G

,668$1&(6 1R 'UDZLQJ,VVXH'HVFULSWLRQ 'DWH  35(/,0,1$5<$5%   $5%68%0,66,21 

F

F

E

E

D

D

E

R

A

U

Q

S

N

O

T THE VILLAGE AT

G

IN WORTHINGTON SQUARE 123456789101112131415

H

T

R

C

C

O 7007 N. HIGH ST

W WORTHINGTON, OHIO T Ƈ

A

E Owner

G

A

L

IL

V

E

H RENDERINGS

T

: RENDERINGS

E

M

S

A

G

N

IN

T

R

C

E

B

E

B

D

J

N

O

E

R

R

P

- 1 Designer 20150241

4 3 Principal-in-Charge Project No.

2

-3

0

B Approver 10/28/2016

5

1 R Project Manager Date

0

M

2 -A Checker

A

:

X

R

E

0 Project Architect

:

E Author

:1

B R

4

E

M

:5

B

1

U

A Staff Architect

1

M

N

6 U EX-ARB-33

T

1

N

C 0 EX-ARB-25

2

T E NORTHWEST ENTRY, WILSON BRIDGE ROAD

/

J

E

3

A

O E

/2

R H 1 Drawing No.

P 3\20150241_2015_option3_jackson01431.rvt revit\users\option P:\2015\20150241\d-7 drawings\d-7-1 1 S NOT ISSUED FOR CONSTRUCTION L

L

K

K

1 23456789101112131415

J

J

THE CENTER FOR CONNECTIVE ARCHITECTURE

ATLANTA NEW YORK WASHINGTON

© 2015 COOPER CARRY

H

H SCOPE DOCUMENTS

The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible for complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, whether indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors in the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items of Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project.

G

G

,668$1&(6 1R 'UDZLQJ,VVXH'HVFULSWLRQ 'DWH  35(/,0,1$5<$5%   $5%68%0,66,21 

F

F

E

E

D

D

E

R

A

U

Q

S

N

O

T THE VILLAGE AT

G

IN WORTHINGTON SQUARE 123456789101112131415

H

T

R

C

C

O 7007 N. HIGH ST

W WORTHINGTON, OHIO T Ƈ

A

E Owner

G

A

L

IL

V

E

H RENDERINGS

T

: RENDERINGS

E

M

S

A

G

N

IN

T

R

C

E

B

E

B

D

J

N

O

E

R

R

P

- 1 Designer 20150241

4 3 Principal-in-Charge Project No.

2

-3

0

B Approver 10/28/2016

5

1 R Project Manager Date

0

M

2 -A Checker

A

:

X

R

E

0 Project Architect

:

E Author

:1

B R

4

E

M

:5

B

1

U

A Staff Architect

1

M

N

6 U EX-ARB-33

T

1

N EAST ENTRY, NORTH HIGH STREET

C 0 EX-ARB-26

2

T

E

/

J

E

3

A

O E

/2

R H 1 Drawing No.

P 3\20150241_2015_option3_jackson01431.rvt revit\users\option P:\2015\20150241\d-7 drawings\d-7-1 1 S NOT ISSUED FOR CONSTRUCTION L

L

K

K

1 23456789101112131415

J

J

THE CENTER FOR CONNECTIVE ARCHITECTURE

ATLANTA NEW YORK WASHINGTON

© 2015 COOPER CARRY

H

H SCOPE DOCUMENTS

The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible for complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, whether indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors in the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items of Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project.

G

G

,668$1&(6 1R 'UDZLQJ,VVXH'HVFULSWLRQ 'DWH  35(/,0,1$5<$5%   $5%68%0,66,21 

F

F

E

E

D

D

E

R

A

U

Q

S

N

O

T THE VILLAGE AT

G

IN WORTHINGTON SQUARE 123456789101112131415

H

T

R

C

C

O 7007 N. HIGH ST

W WORTHINGTON, OHIO T Ƈ

A

E Owner

G

A

L

IL

V

E

H RENDERINGS

T

: RENDERINGS

E

M

S

A

G

N

IN

T

R

C

E

B

E

B

D

J

N

O

E

R

R

P

- 1 Designer 20150241

4 3 Principal-in-Charge Project No.

2

-3

0

B Approver 10/28/2016

5

1 R Project Manager Date

0

M

2 -A Checker

A

:

X

R

E

0 Project Architect

:

E Author

:1

B R

4

E

M

:5

B

1

U

A Staff Architect

1

M

N

6 U EX-ARB-33

T

1

N

C 0 EX-ARB-27

2

T

E

/

J

E NORTHWEST PASSAGE, WILSON BRIDGE ROAD

3

A

O E

/2

R H 1 Drawing No.

P 3\20150241_2015_option3_jackson01431.rvt revit\users\option P:\2015\20150241\d-7 drawings\d-7-1 1 S NOT ISSUED FOR CONSTRUCTION L

L

K

K

1 23456789101112131415

J

J

THE CENTER FOR CONNECTIVE ARCHITECTURE

ATLANTA NEW YORK WASHINGTON

© 2015 COOPER CARRY

H

H SCOPE DOCUMENTS

The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible for complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, whether indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors in the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items of Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project.

G

G

,668$1&(6 1R 'UDZLQJ,VVXH'HVFULSWLRQ 'DWH  35(/,0,1$5<$5%   $5%68%0,66,21 

F

F

E

E

D

D

E

R

A

U

Q

S

N

O

T THE VILLAGE AT

G

IN WORTHINGTON SQUARE 123456789101112131415

H

T

R

C

C

O 7007 N. HIGH ST

W WORTHINGTON, OHIO T Ƈ

A

E Owner

G

A

L

IL

V

E

H RENDERINGS

T

: RENDERINGS

E

M

S

A

G

N

IN

T

R

C

E

B

E

B

D

J

N

O

E

R

R

P

- 1 Designer 20150241

4 3 Principal-in-Charge Project No.

2

-3

0

B Approver 10/28/2016

5

1 R Project Manager Date

0

M

2 -A Checker

A

:

X

R

E

0 Project Architect

:

E Author

:1

B R

4

E

M

:5

B

1

U

A Staff Architect

1

M

N

6 U EX-ARB-33

T

1

N

C 0 EX-ARB-28

2

T E NORTHEAST PASSAGE, WILSON BRIDGE ROAD

/

J

E

3

A

O E

/2

R H 1 Drawing No.

P 3\20150241_2015_option3_jackson01431.rvt revit\users\option P:\2015\20150241\d-7 drawings\d-7-1 1 S NOT ISSUED FOR CONSTRUCTION L

L

K

K

1 23456789101112131415

J

J

THE CENTER FOR CONNECTIVE ARCHITECTURE

ATLANTA NEW YORK WASHINGTON

© 2015 COOPER CARRY

H

H SCOPE DOCUMENTS

The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible for complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, whether indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors in the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items of Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project.

G

G

,668$1&(6 1R 'UDZLQJ,VVXH'HVFULSWLRQ 'DWH  35(/,0,1$5<$5%   $5%68%0,66,21 

F F SOUTH ENTRY, CAREN AVENUE, looking EASTWARD

E

E

D

D

E

R

A

U

Q

S

N

O

T THE VILLAGE AT

G

IN WORTHINGTON SQUARE 123456789101112131415

H

T

R

C

C

O 7007 N. HIGH ST

W WORTHINGTON, OHIO T Ƈ

A

E Owner

G

A

L

IL

V

E

H RENDERINGS

T

: RENDERINGS

E

M

S

A

G

N

IN

T

R

C

E

B

E

B

D

J

N

O

E

R

R

P

- 1 Designer 20150241

4 3 Principal-in-Charge Project No.

2

-3

0

B Approver 10/28/2016

5

1 R Project Manager Date

0

M

2 -A Checker

A

:

X

R

E

0 Project Architect

:

E Author

:1

B R

4

E

M

:5

B

1

U

A Staff Architect

1

M

N

6 U EX-ARB-33

T

1

N

C 0 EX-ARB-29

2

T E SOUTH ENTRY, CAREN AVENUE

/

J

E

3

A

O E

/2

R H 1 Drawing No.

P 3\20150241_2015_option3_jackson01431.rvt revit\users\option P:\2015\20150241\d-7 drawings\d-7-1 1 S NOT ISSUED FOR CONSTRUCTION L

L

K

K

1 23456789101112131415

J

J

THE CENTER FOR CONNECTIVE ARCHITECTURE

ATLANTA NEW YORK WASHINGTON

© 2015 COOPER CARRY

H

H SCOPE DOCUMENTS

The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible for complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, whether indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors in the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items of Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project.

G

G

,668$1&(6 1R 'UDZLQJ,VVXH'HVFULSWLRQ 'DWH  35(/,0,1$5<$5%   $5%68%0,66,21 

F

F

E

E

D

D

E

R

A

U

Q

S

N

O

T THE VILLAGE AT

G

IN WORTHINGTON SQUARE 123456789101112131415

H

T

R

C

C

O 7007 N. HIGH ST

W WORTHINGTON, OHIO T Ƈ

A

E Owner

G

A

L

IL

V

E

H RENDERINGS

T

: RENDERINGS

E

M

S

A

G

N

IN

T

R

C

E

B

E

B

D

J

N

O

E

R

R

P

- 1 Designer 20150241

4 3 Principal-in-Charge Project No.

2

-3

0

B Approver 10/28/2016

5

1 R Project Manager Date

0

M

2 -A Checker

A

:

X

R

E

0 Project Architect

:

E Author

:1

B R

4

E

M

:5

B

1

U

A Staff Architect

1

M

N

6 U EX-ARB-33

T

1

N

C HAYHURST STREET LOOKING EAST 0 EX-ARB-30

2

T

E

/

J

E

3

A

O E

/2

R H 1 Drawing No.

P 3\20150241_2015_option3_jackson01431.rvt revit\users\option P:\2015\20150241\d-7 drawings\d-7-1 1 S NOT ISSUED FOR CONSTRUCTION L

L

K

K

1 23456789101112131415

J

J

THE CENTER FOR CONNECTIVE ARCHITECTURE

ATLANTA NEW YORK WASHINGTON

© 2015 COOPER CARRY

H

H SCOPE DOCUMENTS

The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible for complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, whether indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors in the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items of Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project.

G

G

,668$1&(6 1R 'UDZLQJ,VVXH'HVFULSWLRQ 'DWH  35(/,0,1$5<$5%   $5%68%0,66,21 

F

F

E

E

D

D

E

R

A

U

Q

S

N

O

T THE VILLAGE AT

G

IN WORTHINGTON SQUARE 123456789101112131415

H

T

R

C

C

O 7007 N. HIGH ST

W WORTHINGTON, OHIO T Ƈ

A

E Owner

G

A

L

IL

V

E

H RENDERINGS

T

: RENDERINGS

E

M

S

A

G

N

IN

T

R

C

E

B

E

B

D

J

N

O

E

R

R

P

- 1 Designer 20150241

4 3 Principal-in-Charge Project No.

2

-3

0

B Approver 10/28/2016

5

1 R Project Manager Date

0

M

2 -A Checker

A

:

X

R

E

0 Project Architect

:

E Author

:1

B R

4

E

M

:5

B

1

U

A Staff Architect

1

M

N

6 U EX-ARB-33

T

1

N

C EAST HOTEL AT VILLAGE SQUARE 0 EX-ARB-31

2

T

E

/

J

E

3

A

O E

/2

R H 1 Drawing No.

P 3\20150241_2015_option3_jackson01431.rvt revit\users\option P:\2015\20150241\d-7 drawings\d-7-1 1 S NOT ISSUED FOR CONSTRUCTION L

L

K

K

1 23456789101112131415

J

J

THE CENTER FOR CONNECTIVE ARCHITECTURE

ATLANTA NEW YORK WASHINGTON

© 2015 COOPER CARRY

H

H SCOPE DOCUMENTS

The Construction Documents have not been completed therefore this drawing may be incomplete or not coordinated. The documents issued indicate the general scope of the Project. The Contractor is responsible for complete and coordinated pricing and Work, and shall include all items necessary for the proper execution and completion of the Project, whether indicated or not. All components of the Project shall comply with any and all requirements of national, state, and local codes. The Contractor shall inform the Owner and Architect of any omissions, inconsistencies or errors in the information provided. If no notice is given and any omissions, inconsistencies or errors are discovered, the Architect's decisions on items of Work included in the scope shall be binding on the Contractor, when consistent with the general scope and quality of the Project.

G

G

,668$1&(6 1R 'UDZLQJ,VVXH'HVFULSWLRQ 'DWH  35(/,0,1$5<$5%   $5%68%0,66,21 

F

F

E

E

D

D

E

R

A

U

Q

S

N

O

T THE VILLAGE AT

G

IN WORTHINGTON SQUARE 123456789101112131415

H

T

R

C

C

O 7007 N. HIGH ST

W WORTHINGTON, OHIO T Ƈ

A

E Owner

G

A

L

IL

V

E

H RENDERINGS

T

: RENDERINGS

E

M

S

A

G

N

IN

T

R

C

E

B

E

B

D

J

N

O

E

R

R

P

- 1 Designer 20150241

4 3 Principal-in-Charge Project No.

2

-3

0

B Approver 10/28/2016

5

1 R Project Manager Date

0

M

2 -A Checker

A

:

X

R

E

0 Project Architect

:

E Author

:1

B R

4

E

M

:5

B

1

U

A Staff Architect

1

M

N

6 U EX-ARB-33

T

1

N

C WEST HOTEL AT VILLAGE SQUARE 0 EX-ARB-32

2

T

E

/

J

E

3

A

O E

/2

R H 1 Drawing No.

P 3\20150241_2015_option3_jackson01431.rvt revit\users\option P:\2015\20150241\d-7 drawings\d-7-1 1 S NOT ISSUED FOR CONSTRUCTION City of Worthington ARCHITECTURAL REVIEW BOARD Certificate of Appropriateness Application

1. Property Location 2182 W. Dubli.o Gt:_aJ}ville Road. f3=0=S=5______itS-14-

2. Present/Proposed Use A vacant bank/cmwenicnce stor~. w.\t"""h_.,g"'"'a""""s =sa_le_.s_ _ ___

3. Zoning District --"'C--4"------

4. Applicant l,;nitc

Address 423 E. T9wn St.• FL 2, Columbus,J)_I-1~43~2__..l._..5______

Phone J\umbcr(s) _{QL4) 947-8600 ------

5. Property O'wner Unit~.~LD.airy rarm~."'""rs~, =In=c~.------

Address 395~.M.ontgomery Road.L..Cincinn~J.i.. OH 45212

Phone Number(s) Timothy A. Kling (513) 396-8744

6. Project Description _l?en~glish existiQg _l;>Jtil

gasoline sale~ and ice crc~p1 parlor on t;wo properties

7. Project Details:

a) Design ~£id5:.ntial Style... - - - '" --·------"

b) Color Prim'!!.UY- earth toncs."w."""it=h"""'a=c~ce"'""1,1...,t"""s______

c) Size__i,~S-~36"-=s .f=· ------~-----~------~

d) Approximatl' Cost $3.000.0.Q..._O_ _ _ ~:xpected Completion Date Summer 2017

PLEASE READ THE FOLLO\VING STATEMENTAND SIGN YOUR NAME: The infonnation contained in this application and in all attachments is true and correct to the best of my knowledge. I further acknowledge that 1 have familiarized myself with all applicable sections of the Worthington Codified Ordinances and will comply with all applicable regulations. ·---;> -~ ·~ d' &. I . ·' ef/?w,/-'d:, . / / « t t /c::_... {_l- > ?Jt~~.. / 6 ,...,. { /I?· Apj;Ji

It 0 /. --..,,.--&" k:.r-r/- /· .;,~/ l"'(..i-J(. -({_I - ,,d(j "~,...... ~ / j,I -~~~ r v · Property Owner (Signature) ·- Date SUPPORTING STATEMENT 2182 W. Dublin Granville Road Submitted 10/28/16

In 2014, the City of Worthington granted a number of approvals to permit the redevelopment of the property at 2182 W. Dublin Granville Road, for a United Dairy Farmers store with gasoline sales and ice cream parlor. One of those approvals was the Architectural Review Board's granting of a Certificate of Appropriateness. Since receiving the approvals, obtaining other development entitlements has been quite difficult.

Because the property is in two municipal jurisdictions, a joint municipal agreement had to be entered into with the City of Worthington and the City of Columbus. An access easement had to be obtained from the adjacent property owner. A storm sewer easement was obtained from the church. The City of Columbus required site plan approval which included significant engineering of the intersection. A portion of Linworth Road had to be annexed into the City of Worthington, etc.

For all these reasons, an extension of the Certificate of Appropriateness is being requested by this application.

115 .41 I Architectural Review Board/Suppo1ting Staternent ( l 0-28-16) Worthington 11/16/2016 Comment Response

Drawing Al: • Bollard color has been noted on updated plan. Detail revised. Photo attached to note unit installed at recent UDF site. • Light pole detail changed to note height and fixture. Photo attached to note unit installed at recent UDF site. • Cutoff fixture location noted on light pole detail and related Drawings.

Drawing A2: • We are reviewing options available for the freestanding (monument type) for installation at the SW corner of the property. Sample photo of recent monument sign provided for style and information we like to provide. Base of this sign would be brick detailing same as building. • AEP has been contacted. Their intent is to install the unit where shown and consider they have jurisdiction to install within granted easement they will request/receive. All new installations normally fall within building setbacks. This has never been a problem at new construction sites. Natural shrub screening would be provided on Condo side of transformer. • New fence noted with comment that UDF will work with Condo group and church regarding specifics of placement. Photo attached to note fence style and detail from recent UDF site. • Flag pole height and flag size has been noted on plan. Photo attached to note unit installed at recent UDF site . • DrawingA3: • Photo of UDF typical gas protection pipe guard provided shows placement and finish. Yellow placed at top of guard for visual clarity and awareness to customer of its location.

Drawing A4: • Signage on canopy has been corrected to note two units total.

Drawing A6.1: • Outdoor eating canopy has been relocated. Photo attached to note unit installed at recent UDF site. Drawing AlO: • Front elevation brick wainscot corrected to show consistency. All other sides of building will continue this detail. • As noted above, all bollards, protection pipes will be finished in a matching format. • The east elevation has been changed to show the correct location of the patio canopy and table placements as noted on A2 and A6.1. Photo attached to note unit installed at recent UDF site.

Drawing All: • As referenced above, the brick detailing and pattern of wainscot will continue on this elevation. • Placement of service doors has been changed to support the new interior design of the store. This change in design has occurred since the original ARB submittal.

• Flag Pole - Commented on above and noted on Drawing A2. • Dumpster enclosure larger due to UDF policy of recycling cardboard at its stores. • Driveway design and widths are ODOT approved.

...- ut=•:.111\.Y... \..-onne-+ II \..\. '1on-I:> 11avcL.-.. ~ L.ee-u II al-'1-''----~· uvcu ·~..J by +L..-LllC r:+\..ILY .. o'I rol·\... UI ,_ llUU:> ..... ·~ a11u--..J arc--~ noted on their CC and EE documents.

• Other drawings have been revised and are also submitted for replacement in the Building Permit Application sets. These note and incorporate the above comment changes and other minor corrections to errors found, for clarification of the intended work.

Drawings Included: Drawings 7, 9, 12, 19, 20. r--: i i

)l _ _\ ,

,I :' ,"__ .I'.

-\ ---.../ _-;~\;, ------1'I 0 \ OF WO~RTt:tlNC f\Q..\J.-€- RAWJNG N • ATE \9-:)8 -)\2 - - .. ---...... _

Clf( OF W(lRTHINGTOI ~R\~ -- 'w DRAWING NO. . .: • < • ' · "'- .· ______..;;.._,. ___;_...... :.i DATE l~) - m~ \lo ~~D - AREAUGHTS - LSI SllCE MEDIUM_(X.._L_C_M..._) ------us & lnt'L palanls pending SMIUUTEC'M • LSI drivers feature integral sensor which reduces drive current, when ambient temperatures exceed rated temperature, providing typical operation for 100.000 hours (contact factory for TM-21 life estimate for specific configuration). ENERGY SAVING CONTROL OPTION ·DIM - 0· 10 volt dimming enabled with controls by others .. LEDS· Select high-brightness LEDs in SOOOK, or 4000K color temperature. 70 CRI. DISTRIBUTIONft'ERFORMANCE ·Types 3, FT, FT·L. FT-R, 5, and enhanced SE and FTE. FT-L and FT-R allow for D180 mounting configurations with factory set optics for applications such as automotive front rr:rw. Excep1ional unifonnlty creates bright environment at lower light levels. Internal Louver (IL) option available for improved bacldi11ht control without sacrificin11 street side perfo nnance for FT distribution. Consult factory for internal louver for FH and FT-R applications. HOUSING - One-piece, die-fanned aluminum housing contains factory prewired driver. Wiring DOE LIGHTING FACTS access door (with safety lanyard) located underneath. D11p1Ttment of Energy has verified representallve product last OPTICAL UNIT· Clear tempered flat glass lens permanently sealed to weather-tight aluminum data and results In accordance with ils lighting Facts Prograni. optic frame creates an IP65 rated optical unit (includes pressure-stabilizin11 breather). Visit www.fiVhllntlacts.com lor specific catalog slringa. MOUNTING ·Tapered rear design allows fixtures to be mounted in 90° and 120• LIGHT OUTPUT • XLCM configurations without the need for extension arms. Use with 3" reduced drining pattern. A LamtJll JNomina~ wa111 round pole plate is required for mountin11 to round poles. Wall mount available by ordering Type3 Type FT Tvoe Tvae5 TvpeFTE (Nominal) wall mounting bracket (BKS·XBO-WM-·-CLR). Proprietary pole quick mount accessories -o,1! SS 19900 22800 22900 15500 15800 193 avaiable with horizonlal mounting or fixed 15° angled mounting (POMH-KIT-CLR and ~j HO 27500 30900 31100 21200 21100 278 POM15-KIT-GLR) for mounting to square poles. Top mounted reinforcement bracket for ]~ SS 19300 20000 20600 15000 15000 193 high wind or vibration (up to 36) applications available as installed option or field-mount HD 26700 27800 28500 20100 20400 278 accessory. LEO~- Clltps are frequently updaledt herelore values may ll'ICrease. ELECTRICAL· Two-sta11e surge protection (including separate surge protection built into electronic driver) meets IEEE C62.41 .2-2002, Location category C. Available with universal voltage power supply 120-277 VAC (50/60Hz input), and 347-480 VAC. Optional button­ type photocells (PCI) are available in 120, 208, 240, 277 or 347 volt (supply voltage must be specified). DRIVER ·Available in SS (Super Saver) and HO (High Output) drive currents. Components are fully encased in potting material for moisture resistance. Driver complies with FCC standards. Driver and key electronic components can easily be accessed. OPERATING TEMPERATURE. -40°C to +50°C (-40°F to+ 122°F) FINISH - Fildures are finished with LSl's DuraGrip® polyester powder coat finishing process. The DuraGrip finish withstands extreme weather changes without cracking or peeling. Available in black, bronze and white. Other standard LSI finishes available. Consult factory. WARRANTY • LSI LED fixtures carry a limited 5-year warranty. PHOTOMETRICS • Please visit our web site at www.lsHndustries,com tor detailed photometric data. SHIPPING WEIGHT (in carton)· One fixture: 25.25 lbs. (11.5 kg). Packed two per carton: 43.5 lbs. (19.7 kg). LISTING - UL Usted to U.S. and international safety standards. Suitable for wet locations. For a list of the specific products in this series that are DLC listed, please consult the LED Lighting section uf our website or the Design Lights website at www.designlights.oro.

This product, or cele~tad versions of this product, meel the standards listed below. Please consul! factory fer your speclllc require111ents. 01 C~OF WORTHlNGTON ARRA - ~® R6HS ( E A ~ IP65 \~-\~ f..,jloQ~• ~ -~ COOPltANT o:2) J"'b- Fix!"'es cornpl{wil!! ANSI C136,31·2010 American NaMonat SUndard for Roadway lighting Eqolpmenl · l\minaireVibratio n 1.SG ORA ING NO. re!JUinrnents. _DATE )Q ·-JS - \la

ProjeclNa11e ______~ Fixture Type------~ 0712811 6 ©2016 Catalogl ·_ ------LSI INDUSTRIES INC. LED AREA LIGHTS - LSI SLICE MEDIUM (XLCM) LUMINAIRE ORDERING INFORMATION

l m1CALORDEREXAMPLE· XLCM 5 LED SS 50 UE BLK PCl120

Prefix Dislributlon LI Ohl Drive Colo1 Input Vollaoe Finish Options Source Current Temoeralure XLCM 3·Typelll LED SS • Super S

LUMINAIRE EPA CHART· XLCM ACCESSORY ORDERING INFORMATION (Accessories are field installed) . - ~ Sintl• 0.5 Description Order N•mber Dewlpllon Order Nu111ber 2 .... 0180" 1.0 1-'Bl ~~:f 1-'(c=:IB!adt~cMll;::i_· slde""""mo!fll=::ledl::L--:------...... :::60:::,;31C!-61:=BL~K1 POMH·KIT·CLR Square Pole Quid< Mount Horiz

DIMENSIONS

19·5116" (49Dmm) ~-34·5n6___. J. HOUSE SIDE SHIELD (rear mount) ~ ('71mm) (

~-{191mm)··· l 4-- WlmrL 15·19116 .. __ .. J ) ~ (396mm) LEFT AND RIGHT VERSIONS OF TYPE FT REFLECTORS (TOP VIEW)

Area to be Lit

Note: Optics are not field-rotatable. For 0180 Forward Throw instaffations specify left (FT-l) and/or right USB Type Un Type (FT-R) side mounting. Orientation Is baseil on s1anding CllY OF WORTHINGTON FH FT-R at the pole and looking out at the area to be tit. ~ \~-\'

07128116 Project fleme ------' Fixture Type ______, ~201 6 Catalog •------__l LSI INDUSTRIES INC. LED AREA LIGHTS - AEROMAX™ SMA...;.;,LL'-l(.__XA...... ;;SU;...;;.£,...) ------us patent 7828456, 7952293, 8002426 and CAN 2693131 & 2701653 and US & lnt'I. patents pending SMARTIEC™ • LSI drivers feature integral sensor which reduces drive current, when ambient temperatures exceed rated temperature. ENERGY SAVING CONTROL OPTIONS - DIM- 0· 10 volt dimming enabled with controls by others. BLS - Bi-level switching responds to a 120·277V signal from separate controller or sensor (by others). with low light level decreased to 30% maximum drive current. OCCUPANCY SENSOR (IMS) • Optional internal passive infrared motion sensor activates switching of luminaire light levels. High level light is activated and increased to full bright in 1-2 seconds upon detection of motion. Low light level (30% maximum drive current) is activated when target zone is absent of motion activity for - 2 minutes and ramps down (10-15 sec.) to low level to allow eyes time to adjust. Sensor is located on the front of optical assembfY. Sensor optic has a detection cone of approximately 45°. Examples of detection • occurs 30' out from a 30' mounting height pole; occurs 20' out from a 20' mounting height pole. LEDS • Select high-brightness LEDs in Cool White (SOOOK} or Neutral White ( 4000K) color DOE LIGHTING FACTS temperature. 70 CRI. Department ol EnertY has verified representative product lest data alll resulh in accordance with ils Llghtll!V Fads Pr0911111. DISTRIBUTION/PERFORMANCE · Types 3, FT and 5. Exceptional uniformity creates bright Vi5it www.llghtingfacts.com for specilic catalog strings. environment at lower light levels. Improved backlight cutoff minimizes light trespass. HOUSING • One-piece, die-formed aluminum. Weather-tight housing contains factory prewired driver and field connections. Extruded one-piece EPDM gasketed wiring access door (with safety lanyard) is located undernP.ath and utilizes tool-less thumbscrew fastener. Fixture is IP65 rated. OPTICAL UNIT - Clear tempered optical grade flat glass lens sealed to aluminum optics housing creates a sealed optical unit (includes pressure-stabttizing breather). Optical unit is recessed into housing cavity and sealed to the housing with extruded one-piece EPDM gasket. Optical unit lanyard serves dual purposes of safety and provides positive ground between unit and housing. MOUNTING - Tapered rear design alows fixtures to be mounted In a quad pattern without the need for extension arms. Use with 3" reduced drilling pattern on round and square poles. A round pole plate (X4RPP, XSRPP) is required for mounting to round poles. Wall mount available by ordering wall moonting bracket (BKS-XBO·WM·*-CLR). See Accessory Ordering Information chart for all brackets. ELECTRICAL· A terminal block for attachment of incoming primary wiring is supplied. Two­ stage surge protection (including separate surge protection built into electronic driver) LIGHT OUTPUT • XASU meets IEEE C62.41.2·2002, Location Category C. Available with universal voltage power f of lumens (Nominal) Watts supply 120·277VAC (50/60Hz input), and 347-480 VPC. Optional twistlock photocell LEDS Type3 I T~Ff Tvee 5 111om1nan receptacle is available. Photocen must be ordered separately. ;s.:1 SS 64 7000 I 6200 6100 69 ~~ HO 64 8500 7650 7500 89 DRIVER " Available in SS (Super Saver) and HO (High Output) drive currents (Drive currents i! SS 64 6700 'i 5700 5600 69 are factory programmed). Components are fuly encased in potting material for moisture =;r: HO 64 7900 I 6700 6700 89 resistance. Oliver complies with IEC and FCC standards. Driver and key electronic LED Chips are frequettl)I updated therefore values may increase. components can easily be accessed. OPERATING TEMPERATURE- -40°C to +50•c (·40°F to +122°F).

~~~~~~~~~~~~~~~~- This prodHI, or selected versions el this product, meet the standards FINISH • Rxtures are finished with LSl's OuraGrip® polyester powder coat finishing process. listed ~el1w. Please consul! factory for vour lflBtiflc requirements. The DuraGrip finish withstands extreme weather changes without cracking or peeling. AR RA ~ ·~- Ro'HS fC WARRANTY· LSI LED fixtures carry a limited 5-year warranty. f!llldi'g~ ~ ,..t.=ion COMPLIANT PHOTOMETRICS • Please visit our web site at www.lsi-industries.com for detailed CE & IP65 photometric data. SHIPPING W8GHT (In carton)- 31 lbs./ 14.1 Kg Fino"" CUTIJiy will ANSI C\36.31·2010Anmk:an rwoo.t S!arn1inl to< Roidwl\' lightin(J Equipm~l\ • LIJ1linlirn Voll~ JG reQ

DATE l.Q-~ #' \\e ·------· ---~---~,.---- Proiect Name ______. Fixlure Type ______J 10/19/16 ©2016 Catalog# ------~------~ LSI INDUSTRIES INC. LED AREA LIGHTS - AEROMAX™ SMALL (XASU) LUMINAIRE ORDERING INFORMATION llYPICl\LORDER El

Staod-Alpne Control (blank} - None DIM - 0-1 ovolt dimming3 (from external signal) BLS - Bi-level Switchlng4 (from external signal - required f 20-277V controls system voltage)

1 LUMINAIRE EPA CHART • XASU ACCESSORY ORDERING INFORMATION (Accessories are field installed~ .. Sinole 0.9 ll9scrlpllon Order Number Descripllon Drdtr Numbar .... 0180" 2.0 BM-XBO-EC-6-CLR 6' Extensioo Arm 38213SCLR lK120 Single fusing 1120VJ fK120' BKS-YRO-WM·'-CI R waU Mo1n1tino Bracket 'Ul9132CLA .!'!1177 Sing!~ EuiiJJg 127ti'.l FK277' 090• 1.ti v.011~ H•u<~ Side Shield tBlack onlvl - ;J.. c;dd103BLK' ~FK22~. 21\! QQuble Fusillo !~~v. 24Q'lJ OFK2~ '· T90" 2.7 X4RPP Boynd PQl!l Plate mr 4' Eoles 3Z9007CLR Jltl!.4§!1 Qooble Fy~lng {4BQ~l DFK480' XSRPP BQu!l!! Po~ rl~!!l !or~· !'.\lies J79968CLR FKH7 S ing!~ f~iing {~47Vl FK317' TN120' 2.8 ·- * .. PCl 20 Photoed for use with PCR option !120\/} 122514' PMOS120 120VPole-Moont Occupancy Sensor 51 ~R' ' Q9D0 3.1 PC20ll·277 Photor.J>ll tor use with PCR ootion (2081/, 240V, 277~ 1225151 PMOS208/2«J 208V, 240V Pole·Moun1 Occ u~(!'i Sensor 534239GLR" + PC347 PhotoceU tor use with PCR o~tlon j347V) 159516' PMOS277 2771/ Pole-Moulll 0cCUPifltY Sensor 518029ClR" Note: House Side Shield adds to fixture PC480 Photocel for use with PCR option (48-0V) 122511\a; ·· EPA. Consutt Factory. PMOS480 480V Pole-Mount Occupancy Sensor 534240CLR'''

FOOTNOTES: 1- for wireless controls information and accessories, see Controls section. &- Photocell must be ordered separately. See A.ccessorics. 2- ReQuires a SiteManager and override sw~ch. Not compatible with BLS or IMS option. 7- House Side Shields add to lixlure EPA. Consult factory. 3- Not COl11!lBtible with IMS or BLS option. 8· Faelory installed PCR nplion required. See Options. 4- Not compatible with wireless controls system. DIM or IMS option. 9· Fusing must be located in the hand hote of pole. 5· Not compatible with wireless controls system, DIM or BLS option. 1O· To be used in conjunction with any of the PCM/GCM wireless controls systems In fixture. Consult factory.

DIMENSIONS "~~- (f(;)g I . 18·318" (466 mm) ~r--~1~/j (674 IMI) - 18·3/8" Front View._ Side View {486mm) D ----- Bottom Vtew

CITY OF WORTHINGTON O~G\ w.r- \\e

DATE \Q · Jf?··· \p

10/19!16 Project Name ------' Filture Type ©201 5 Catalog It ______LSI INOUSTRIES lt!C. " . . .. ·' .· . •...... ~ ·.. ' . ~ .. •* .. • •• . • .:- :':.•.••• - ~ ·.. :_ ;·. cnv OF WORTHINGTON -A. Q \ ;:)~ - \\? DRAWINGNlf. DATE \Q-J2-\k; ..... -,:- ~ ...

W\~~H\'o oRAwnmNo.· O~T~ ~ - ~i3 ~\\o CllY Of WQRTHINGTON ~\'J8-\\o ~ DRAWING NO • ..... "'°AtE \Q ~ JZ- lb Cm' Of WORTHINGTON1 P\\l \~8 ·- \ k> DRAWlt·m NO, __ DAT~ \()? J8 -~ \b. CITY OF WORTHINGTON P\\J \ ~ - \lp 1lRAWffl G NO. . DATE le; ' . \0 -:1f3-· \ CITY OF WORTHINGTO~ 'NZ_ YJ8 ·- \ ~ DRAWING NO. DA'FE )Q. 9§·-}6 CITY OF WORTHINGTOt-c AR_ \Q8- t~ DRAWING NO. &>ATf 10 · J8-fu ---···------·····-- ·-~------~------

12'x1&' J.IANDICAP &AWCUT CONTF

    F&I CONC;; li:l)/li:l) IU.LM TURNED \ OR EQUAL A& l', OHIO 45212 J "· 'r ' ,' )'·' ·~: o ·":"""'· __ ~./ -~ c~ > r: 4' PIPE eoLLARD ., ... i ='IT II 111-=1.:·11 · ------FAINTED TRAFFIC •4 EIARS CONT _J~m:~~'f/'':::'fF---4.. Yl!!LLOUJ, FILLED '·· I !,1··1Ll·1·1··1· I 11 . • : .•.IW-1 ·I·~ • o'':6;: ,jd--rr;, 88. ~, §) f'J AT TOP AND BOTT WITJ.1 CONCll!ETE -1 --~ ... -----[ -- -·- rfj) }~ . o5'\Y r('<1._,. .{:! OJ i-) Ol' CUR6 COMPACTED GRAVEL BASE 1 &LOFE TOFOF SITE I?' MINIMUM COMP. _, -111 .• 111 =I ·-~fr / ··Jt! ·~· (§' - 311!)(!)€) PSI CONTINUOUS 1 CONCRETE G!FaAVEL FILL UNDER WALK ' = I ' .J ! =:=: I z '' SLA6 TO REST ON CONCRETE CURSING 2204 WEST DUBLIN GRANVILLE ROAD •4 6ARS CONTINUOUS AT I l j · 1· COMPACTED <:iRAVEL ~/FAYING. Ii>' 3/4'=1'-0' DETAIL 3/4'=1'-0' euF!!=AcE TOP AND SOTTOM . FILL-MINIMUM Tl-llCK DETAIL , DET@C\2 COLUMBUS, OHIO 43085 CURB AT PLANTED AREA/ASPHALT PAVING CURB AT PLANTED AREA/CONCRETE PAV G 30rZ>rZ> PSI CONTINUOUS ---J I I CONC CUF CC-2 a.ENERAL NOTES AND QUANTITIES L-1 LANDSCAPE FLAN \') CC-3 OFFSITE &TORM SEWER PLAN 1 OR PAVINC:. NYLON 6 !'! DETAILS Z CC-!; STORM &eWER AND GRADING FLAN 6' DIA &TEEL FIFE CC·E> STORM &EWER PROFILES 1 !'ILL.ED WITl-l CONCRET!!!­ (;;:;\ LIMITS OF U.IOFlK q) A-4 C#A& CANOPY ELEVATIONS 4 DETAILS 3 V:::./ PROVIDED 6Y 6X6 6/6 lilLM @ ~!,~~~~ &k#Nl/2'•'',:~~ ~ A-!; FOUNDATION FLAN 4 DETAILS <[ CC-i STORM &E!WEF< PROFILES 2 DOME TOP OF CONC REINFORCING! TO Sl-lED WATER ENTIRE 61TUMINOU5 Z A-6 ROOF FRAMING PLAN 4 DETAIL& ll'. cc-& &TOF ';._J _J A·ll EXTERIOR ELEVATIONS 0 CC-14 SITE &URVEY PREPARED EIY MS CON&UL TANT& ..... ~ cSv' rr) ___ :L <( A-12 WALL SECTIONS llZl' COMPA-::;TED 311!)4 6ASE \ L ~VEL A-13 WALL SECTIONS CT-DIM SITE DIMENSION PLAN , / ll'. &LA6 TO REST ON , :J A-14 WALL SECTIOHS CT-DEMO SITE DEMOLITION PLAN UNDISTU!1<6ED OR COMPACTED SOIL NOTE• ~ COMPACTED <:iRAVEL 1-lj A-1& 6UILDINGI SECTION CT·UTIL·I SITE UTILITY PLAN FILL-MINIMUM&' THICK etrr OFF ACCESSORY CT-UTIL-2 LED FIXT\..'li!E - eEE -"" FOR EA!IT F'ROFERTY A-16 STOREFRONT DETAILS 4 DOOi'< ecl-EDULE WATER NOTES LSI XLCM WlTl-l CUT OFF LINE Ul A-11 ELECTRIC LIG!l-!TINGI PLAN 4 FIXTt.IRIE 5Cl-lED'JLE I- A-11.1 3/4 11 =I' -tZ>' &1-llELD ELECTRIC PANEL SCl-lEDULE& < SERVICI: DIAG!RAM E DOCUl"ENTS v I l' DETAIL DETAIL 314" =l'-e>" :t A-18 ELECTRIC PO!LEF< PLAN DETCO('> APPROVED D1"AWINGS INCLUDED HEREIN. TO l9E •t I TYPICAL NEW ASFl-lAL T PAVING NOTE, ~ A-l'i'l 1-l.VA.C. PLAN SIGINED EIY COC AND !"ROVIDE!D Ol.INER UPON DATE . I I . OFF61TE ILLUMINATION IL A-212> PLUMelNGI FLAN OF FUEL STO!' FC AT F'ROFERTY E -1 COV!:R 61-lEET EM6ED PIPE IN MINIMUM I&' elTE Fl-AN - COOFilDINATE LOCATION OF RAMF$ !'!ELATIVE INT.·1 INTERIOR ELEVATIONS ·I I · . TO LOCATION OF LOADING. Ali$LEe LINE Q E-2 <:iENERAL NOTES AND QUANTITIES DIA 6Y 24' DEEP CONC '------' P-1 P!-IOTOMETRICS 4-----~~--1--~ I.. .,,-.J . E-ll STANDARI:> DETAILS CYLINDcl'< LOCATED 6ELOUJ ii> E-1 GAS CANOPY PLANS E-4 PLAN AND PROFILE& - LINU.IORTl-l ROAD G!RAVEL 6A&E COURSE F-1 GAe CANOFY FOUNDATION SD-I GAe CANOPY DEtAIL& E!-& PLAN AND PROFILES - STATE ROUTE 161 INDICATEe FACE OF eu!LDINGI OR EDGI: OF SIDEWALK E-6 &IGINAGIE AND STRIPING FLAN E-1 MAINTENANCE OF TRAFFIC - FLAN ANCl401'< 60LTS AS a E-& MAINTENANCE OF TRAl'FIC - NOTES 3/4'=1'-0' fEQIJlfED FER LICOl-lT E-1 CIRCUIT MANAGIER PAN!:LBOARD &CJ.l!:DULE&, @DETAIL POLE MANUFACTUfEFO! lit CA61NET LAYOUT A-I P~OTECTION 60LLARD <[ E-2 CIRCUIT MANAGIER WIRING! DIAGIRAM TYP. l-IANDIC7 PARKING SIGN NOTE• ~ !:-.:> CIRCUIT MANAGl!:R DISFEN&ER CONTROL& 5EE 1/AI IF Tl-IE LIC0!4T POLE OCCIJR& IN A a.f'-'..=.2'_,·lc..l'--;c­ 4'-10' '-!:>' ·•' CUR6 SEE D!:TAIL VEHICULAR CONT ACT, "' I TOP OF CCNCFETE J FIER To er: E>'ABOYE _ __,. _ __,I ru=----- <:OAADE. IN ALL OTl-IE!lt r. '. I \"-- ::114' CONDUIT TYPE ANP LOCATION5 MAINTAIN - L I DEPTl-l PER NATIONAL ELEC CODE 2'-e>' HEICOl-!T ABOVE ~ · Gfll?ADE A5 51-!0U.N ' I ' I 18' DIAMETER CONC FOUNDATION ,.,\) I ·I PIER W (6) •4 BA~ YERTICALL Y I ,'j 4' DIA. C#ALV. &TEEL I POST SET IN Iii>' D!A. BUILDING CODE REVIEW 21!'11 06C =Ne. FOOTING! - " ZONING!, cc-A TYP. EACH &IDE DETAI AREA OF UDF DEVELOPMENT• 0.91 ACRES (39,!;11& SGl. FT .J TYPICAL LIGl-IT FOLE ElUILD ING use GiROUP. STORE

    r;TYFICAL Ull-lEN NEAR GAS CANOPY 'M'- M!:RCANTILE FACI: OF BUILDING! OF< I 'Plc!'1 SF!;i:l)= 6$ l 4' DIA &TEEL PIPE WITJ.I I I R!:LIANCE! FOUNDRY - FLA&TIC &TORAC:.El5TOCK 2,1&84 l!:J!/S== 'i'l I- ~: •; u.~ • 'c i 60LLARD R• 11~ COV!:R ACCESSORY USE 'A-2' 2!;0 SF/I&= 11 ' ' '" • !'ILL FIFE WI Tl-l CONCRETE TOTAL, &'i'l FERSONS ' i PARKING l"ROVIDED• 3S TOTAL &PACES FFilOVIDED ' .f ~ CONCRETE ORGIRA&& 2S PAFlKING SPACE& FLUS I f FOR LOCATION& 1" GIAS FUELING! STATION& ( ~ i "*~· \:&EE PLAN r. I"' PARKING REQUIRED• 3rZ> &FACE& (1 &FACE FER ISO SF> ' ' ~ ! r I SIGNAGIE, a.ROUND Sla.N UNDER SEPARATE PERMIT J,. ',{;' Q;: !Li' u -)o 1U5' ~_, 6UILDINGI MARQUEE % SQUARE FEET ,, 1[~ : 0 0-1()". ~2_'));;r ~- I._ ' C#AS CANOF"r' LOOO 12 SQUARE FEET (2 SIDES " 2i:l) l!:J!/SIGIN 4 . ' <2 SIDE& AT II> Sl'J51a.N) 10'-!0" e'-S' VERTICAL GIALV. 1-lAT SECTIONS PER DOOR UNIT ON FIFE :gd··.. , - -"- EMeED FIPE IN MINIMUM 10' FRAMES FOR ANCl-IORAGIE OF 1-llGl-l IMPACT HORIZONTAL PVC 3 ROUie OF VERTICAL 1-!AT i I~ DIA BY 24' DE EP CONC SIDING, COMPLETE WITH CAPS, SILL& AND &IDE TRIMS. SECTIONS SECURED CYLINDER LOCATED EIELOW TO C#AL V. PIPE FRAME. FINISl-l Gl'i!ADE OR SIDEWALK SIGNAGE ~ FFilOJECT &IC#NAGIE WILL l9E APPLIED FOR UNDER SEPARATE PEF

    - ! ~~ I !11 I ...... J?' .. 0'____ . ll-23-21?)10 ARCH. ll!EVIEW eQAFilD UPDATE UNITED DAIRY FARMERS DRAWN BY 18' CANE 60L TS 2204 WEST DUBLIN GRANVILLE ROAD A 4' DIA. <:.ALV. S~S. ~l INTO PIF'E SLEEVE POST SET IN Iii>' DIA. IN CONCRETE. UNITS COLUMBUS, OHIO 43086 CIEC!W BY CONC. FOOTING!. 190LTED Tl-lRU FRAMES 1 DETAIL 1/4' = l'-tZ>' JOHN D. JOHNSTON ARCHITECTS DATI! STORE NO. p;:::r 390 llONTGOlllRY ROAD 11.17.16 DUMPSTER ENCLOSURE CINCINNATI, OHIO 45212 513•898•8743 DETAIL Ol' D'JMPSTER a.ATE& TO l9E REPEATED IN COH&TF

    --..------··----

    11-- 6EE &ITE F'l..AN FOR 6ACKFILL W/ C!..EAN FEAa.FIAVEL TANK VSNT LOCATION (If&' (!) MIN., 3/&' (!) MAXJ OR &TONE CF

    -~·---····· _.:j ___ o_ ..... t;_ __ ·- .. ~ - COMPACTED 3til4 Gifl

    4' U-&HAPED I' -JZ:'' FIFE BOLLARD

    FAYING!/ 2'·1Zi" 2' ... -0". - .______..._ _ __.,. ·-----'C-~l CONC.FAD 2-0· -i!'i Ii ! b" .., .. + . ~ --""-----ti;;.·l~ ....,..,.._..,. ·I I == -0 0 - $(!)tel(!) Fol CONC 2' FISEF

    PEA Cill' U-5HAFED PIPE GUARD !NeTALLATION ~- l'ULL LENGil-1 OF EACH TAN!<, (I) FE!'! SIDS, WITf.I SEE FLAN FOR LOCATION (2) "6 BAR& CENTERED IN EACH DEADMAN. TOTAL DEADMAN YOL. MU&T EQUAL MIN. I CU. YD. FER I~ GALO. POUeLE Dl!ADMAN WIDTJ.I WHEN e!-!ARED 6ETlllEEN TWO TANK5 AND PROVIDE i>Tl' 1-@,...,:..,...+-D_E_T_A_l_L ______114'=~~:~~ A& FE~ MA~. f'. FROFOSED UNITED DAIRY FARMERS &'~0 ALL TO ELECTl"!IC ------b'J PANEL IN 2·-e:i· 2''-~11 I 1·-~· --- .e- ~ ' ' 6ACKF \ I U ___ ,_:J I I I I I ___ _j I l I I '--i-r- • • N I I I I .._ I I \\ • !/ I j L Dl5FEN5ER ~ - f------._ - MOUNTING. FORM CON c/ Z'-4' ' '3" -- - FOR.> OR 4 VEF

    POSOl6l..E ElRICK COLUMN ----~ ENCLOSURE - !EE a.AS CANOPY ELEVATIONS I DETAIL

    AC f>ERVICE IN I' CONDUIT WIRING! COLOR G!UIDE• 6PAl'IE ~2 NO COLOR SFAl'IE ~2 6ROl1N POJASR (2 WIRE5> ~2 el-ACK A"ID UMITE G!FEL "14 AJRF'LE 6PARE ~4 NC COLOR CA"1D READER CONTROL SERVICE 4 "14'• IN f>AME !' CONDUIT ( AJ WIRING! COLOR GUIDE• TALK TO CONf>OLE BLACK "14 TALK TO Dl&f'ENeER RED "14 DC CCMMON IDCCJ YE!..!..Oll! ~4 eFARE 6LUE '14 FULL f>TRIN(; CONDUIT 6 --- INTERCOM IN !" CONDUIT G!ENERAL CA6LE "231141Z> 18 GIA_ 13 CONDUCTOR 5!-llELDED ENERAL CABLE '28114'Z> te. GA l\ CONDUCTO~ &HIELDEO (UJST CONDITICNS!

    2. AC ANO IN11Efi1!COM WIRING< !HALL NOT eE FllJN ~ THI: &AME CONDUIT OR @GAS PIPING PLAN 1'=1iZ'' GAS TANK AREA WIRING REQUIREMENTS TROIJGl.I UJl.IEN f>TUBBED INTO THE BUILDINCi. CONDUIT c ~--- 3. PROVIDE INf>TALLATICN WITH ~CY eHUT-Cff FOWER $Y611EM, WHERE A-3 GAS PIPING LEGEND SRINE MONITOR WIRING! IN 3/4' CONDUIT FROM 6UILDiNG RECOMMENDED/FilEQUIREP, SY LOCAL FIRE MAl'CSHALL. TO EAC!-1 TANK !i>RINE MONITOR:NG ACCES6 F'OINT UNLEADED PREMIUM I - GENERAL CA6LI: "25114e> le GIA. !TOTAL CF 4) 4. ALL SGUIFHENT, F1Ttl"""6 TO EIE ULINl'FINEC l'FENSINGI ANO $1ii~VICE DIESEL &TATIONe f>HALL MEET THE REQUIREMENT& OF ARTICLE &14 NEC. A WIRING AND EGlUIFMENT ASOVE CLA55 1 LOCATIONS WILL CONDUIT D COM!"-Y WIT14 eECTION& !114.1 AND !111.1 NEC. REFERENCE SSCTION !'>14-4 NEC MONITOR,TRANf>DUCER WIRING. &IMP F'l'!Oe IN >;/4' CONDUIT TO EACH TANK 6. EACH Cl!' I& GIA !"ROVIDED WITi-1 A $WITCH 0!'11 OTi-!E~ ACCEPTA6LE MEAN$ TO DISCONNECT 3 CONDUCTOR eHIELDED Ui"'FL y ALL. CONDUCT~ OF Tl-IE CIRCUIT, INCl..UDING Tl-IE GROUNDED NEUTRAL, IF REFERENCE 5ECTION I - ~4 CU WIRE - GREEN ANY. I - PULL STRING &14.Q NEC- C. AN APPROVED f>EAL WILL eE PROVIDED It-I EACH CONDUIT !'-1 FUMP 13! FITTING AFTER Tl-IE CONDUIT EMER:ilE& Ffl!CM THI: EAATl4 OR CONCl'lETE. REFERENCE eECTION &14.& NEC. ADDITIONAL 5EAL5 WILL EIE FROV1DEP 4 · •2 CU WIRE - 6LACK, RED, 01'1AN4E AND GREEN IN ACCOl1.1 AND 5ECTION 5'2'1J!lJI!!) WILL I · f'ULL 5 TR!NG AFFLY TO HORIZONTAL Ae ll.ELL Ae TO VERTICAL !!IOUNDARIE& Rl!Y18IOll8 A CONVl!PPNCI! STORE FOR OF THI: DEFINED CLAeo I 1-0CATION. REFERENCE 5ECTION 5'2'lJ5 AND Sl4.4 NEC. ..IOI! NO. 811111' NO. D. METAL FOIUION OF Dlf>FEN&ING FIJ'1F&, MSTAL !-2e>l6 ARCH. REVIEW ElOAl'14 f.lf' DIESEL FUMF IN Jl/4' CONDl.llT SHALL Eli: a.ROUNDED Ae F'. REFEl' l. PROVIDE ~PEP 19U5!-!ING AT EACJ.I END OF FIFE&. CINCINNATI, OHIO 48212 813•398-8743 I • ~4 CU WIRE - .:.REEN I - FULL 5TR!NC:. 613 ------

    FOLYURETi-lANI: LOUvER E> r-!!'I' WOL vERINI: Tl:Ci-1. I MOPE!.. "l'' ______18' 1-llGI-! INDIVIDUAi..!.. 'I' ------~--~~------+---l-~- 1x8 RE::DWOOD TRIM 4'x2' DMP Dl:NTIL MOULDING INTEF CONTINUOUS N ON lx4 FRIMEP REDUIOOD TRIM 1-tORIZONTAL ~FINIS>-ll:D 1..l:TTER1Na.- vER!F'I' POSITION METAL COFING !!OARD - !"RIMED~ AND FAINTED '• ' 60ARD - FAINTED METAL Fl..USl-l SEAMED SIDING W/ OWN5R FRIOR TO IN&TA!.LATION I (2.z> ea. FT. &IGNAGI: FER SIDE)

    ______,,. --~-----···­

    CONTINUOU& lx8 __,,

    12'-0' SA~E MOULD 34'-<'" 12'~0· 3'4'-0' ' ------3:.;,4_'--"1---"------~- .-,, .. ,, ...... ------,'

    -- T'l'F.&TRJ.iCTUFitAL STEEL POST 6RICK COLUMN ENCLOSURE ~~~6'1' CANOPY MANUFACTURER -6RICK COLOR TO MATc;.i---e= TYFICAI.. 4'-2' Ul!DE BRICK ON 6UILD!NG PIFE GUARD - SEE 6RICK eioND STYLE '6' DETAIL~ 6RICK60ND - STYLE '.6'=~ (j} 6RICKROWL~ • SILL ~ FIEIE~l..ASS ROOF ei-llNGLE& r TO MATCl4 BUILDING l'" {' 2 ' 1/8' = I' -'2'' I . v ,....._,,./ GA5 ISLAND CANOPY - FACING DUBLIN ROAD IXS REDWOOD----+_,,/ / 1 A·4 GA5 151..AND CANOPY - e.tDEo CA'•EL"B - PRIMED •FAINTED ~· - FACING LINLUO!'<:Tf..l ROAD ll/4'x2' DMD DeNTIL --;" MOULDING ON lx4 PRIMED ~- FASTEN 2X4 P.T. 6EAR!NG PLATE TO REDWOOD TRIM BOARD BEAM WITl-l 112' 60LTS AT 3©' o.c.. TO eE PAINTED STAGit'.l!ERED ACROSS BEAM WE6

    FAST!:N WOOD TRUSSES TO Bl:ARING PLATE Ul!Tl-l SIMFSON STFtONG-TIE "!-!&

    - '".

    11'-1' A69vE SLAB ,.I:) 1-tOl'ltlZONT Al. --- STEEL BEAM AND ~ Pfi!EFINISl-leD -<----- UJOOD TRUSSES FLUSi-1 SEAM 5UPFO!'.C. 6EAAING 1-lelGMT CF STANC>-llONS VARY TO METAL SIDING SUFFORT TO eE 34'-0" 34'-0' INSURE TOP CF 6EAM STAYS LEvEL DESIGNED 6Y ---~- AT l!Z'' 6ELOW TOP CF FASCIA CANOPY MFG. 11'_:__ 1_' _____ .!.0 __ ' ~ GAS ISLAND CANOPY a DISFENSER ~--- ,.; :V->hA TYPICAL. KNEE LUA!..L 5UFFO~T

    CONTINUOUS --~ ~---- METAL COFING CEILING PANeL SY ' TOP CF CANOFT' 6EYOND '- CANOPY MANUFACTURER - . "--- ROOF DRAIN COLLECTOF! 3/4'x2 DMD DENTIL F~ eox SY CANOPY MFG. + MOULDING ON 1x4 Fl' AND 6ACK OF PARAPET _,-- MORTAR NeT TYPICAL ~ 11 WIT!-1 !i<:3'xl8 GA. GALV. ANGLE PROVIDE Ti-IROLIGI-! Tl-lE ilJALL 6Y SAME. I COORDINATE WIT!-! ei-IOF DFitAWINGS A I BY CANOPY MFG. TOFOF MEMeFi!ANE FLASl-llNG Iii ISLAND PROVIDE FtOFI: IJ.IEEFS AT 48' 1'-6' 1-llGsl-l ~ I I [_ URL_ IN BY CANOPY MFG., SIZE VARIES ..t-'i<-;i~..:JiOF""RL"f4~N.fl'""'°EAM-r;;:::iliH+------'r ~~::J7"------COORDINATE WITl-l ei-IOP DRAWINGS O.C.-T'l'PICA!. ALL WALLS 1-lOl' vERTICAL I I WITl-l WELDED NUT AT END OF EACl-I REBAR 1.z>'-4' LONG '~• Jl-~+--- DETAIL 1-1/Z'=l'-e>' _!_ _,'.__,_-:- SOLT (J-60LT$ MAY BE eueSTITUTEDJ EVENLY &FACED ~:- -~ , 6 , 1-11z·=1'-rz>" AROUND PERIMETER DETAIL CANOPY SIDE SECTION 4 I '" <: NOTE, DIMENSIONS MARKED BY AN ('•) INDICATE DIMENSIONS Tl-lAT CHANGE AS ~..A- 4 'CANOPY SIDE SECTION AT GA6LE GEM0 A "' 4 • I I ' " I,],'---- ( 4) "4 !40RIZONTAl.. 6ARS $lZI: OF FURL.IN Cl-lANGES. - NOTE, DIMENSIONS MAl'-lANGE Ae I I I AT 14' o.c. EACI-! WAY Tl-lE INSIDE DIMENSION FROM T!-IE BOTTOM OF F~IA TO 60TTOM CF ROOF SIZE OF FURL.IN Cl-I ARE BASED ON A WI© FURLINJ •) T I " I (:3 LAYERS) PANELS re 6 114' AT Ti-IE i-llc:.1-1 POINT CF TJ..!E FURLIN DOu.N TO ll 114' AT Ti-IE LOW T'-IE INSIDE DIMEN&ION FROM Ti-IE BOTTOM OF FASCIA TO BOTTOM OF fi'x4'-lii:>'x4'-6' FUFfl PSI CONCRETE v Fl!'· COLUMBUS, OHIO 43085 BY 112' = 1'-0' 1 ~ I TYPICAL. GA6 CANOPY FOOTING DETe&c< 4 OPTIONAL GA6 CANOPY FOOTING DE'"'*" NOTE: 5EE CANOPY MANUFACTUr<:ER JOHN D. JOHNSTON ARCHITECTS DATii STORE NO. - LUf..JEN SOIL CONDITION 16 NOT 3911 MONTGOMERY ROAD 11.17.16 r<:ECOMMENDED FOOTING DETAIL CINCINNATI, OHIO 41212 113•399·8743 ACCEPTABLE FOR ST ANDAr<:D DETAIL FOR SPECIFIC DIMENSIONS 613 ------

    the geotechnical engineers ieport shall be subrritted to 9. Reinforce all interior slabs on grade Vvith 6x6- 4. Unless noted otherwise on plans, under lintels, bearing rich paint complying with DCP-P--21035 or MIL-P- ' Hudepohl Engineering, LLC. W2.9xW2.9 (42") mesh. Lap welded wire mesh plates, and beams, fill cells with grout, 3 courses 26915, multiple coats to dry film thickness of 8 nils. GENERAL S1RUCIURALNOIES I 2. Bottom of foundation elevation indicated on the minimum eight inches. minimum below bearini. 7. The co1rtractor shall subrrit erection shop drawings for ' construction drawngs are for bidding purposes and may 10. See architectural drawings and specifirations for vapor S. All reinforcing steel shall be supported and fastened to review by engineer prior to fabrication. Notations made Governing Code on the shop drawings do not authorize additional 2011 Ohio Btrilding Code vary to sult sub-surface soil conditions. Bearing strata barrier requirements. Vap:>r barrier, vklere required, approved positioners located at 192 bar diameters shall be approved by the geotechnical engineer prior to shall be placed over compacted granular base. maximum spacing to prevent displacement during the compensation for the contractor v.itthout the issuance o1 Special Inspedioos placement of concrete. 11. Control joints in slabs on grade shall be looated at 10 placement of grout. a formal change order. (2) F.T. 2x12'S 1. Sp€cial inspections shall be performed by a qualified 3. Footings and grade beams may be placed without side feet maximum spacing and shall create sections of slab 6. Provide 48 bar diaireter lap splice for all reinforcing -ElOLTED TO POST Steel Joists testing agenty approved by the architect andthe forms if walls af excavation stand approximately vertical. \~4th a maximum aspect ratio of l.S to 1. C.Ontrol joints unless noted otherwise. 12'-!Zl' 1. The design, fabrication, and erection of steel joists and 1-IC:.H I structural engineer and paid for by the owner. 4. The contractor shall contact utility rorrpanies for shall be sawn and shall be a minimum of 1/4 of the slab 7. Grout all cells containing reinforcing steel. I ElO'LA~ joist girders shall conform to the requirements of the 4'-0" \ 0'-0'i' 2. contact special inspectors at appropriate intervals so locating underground services and is resJX>nsib1e for thickness. Cut e;ery other mesh wire at control joints 8- Grout all cells solid below grade. latest edition of the specification adopted by the Steel that inspections can be scheduled and work can be their protection. prior to concrete placement. \Nhere brittle finishes are 9. Running bond pattern shall be used for all masonry b y Joist Institute (Sil). I inspected. Oontractor is solely responsible for ensuring 5. All footings shall bear on level (within 1 in 12) to be applied at fioor slabs, coordinate control joints work. 2. Cortractor shall subnit shop dra\Mngs for review by the \ / \iiffij)x Special Inspections have been completed prior to undisturbed soil or approved engineered fill. with floor ti nish joints. 10. See architectural drawngs for locations and = engineer prior to fabrication. proceeding with additional work that would prevent Fo1.11dations have been designed for a rreximum soil specifications of fire rated masonry. 3. In addition to the loads indicated in the loads section of proper inspection. bearing pressure of 1500 PSF below strip footings and Medtaniad Anchors 11. Place horizontal joint reinforcement at 16 inch centers 1. Expansion anchors to be one of the following: these general notes, the joists shall be designed for a net = 3. Th€ inspector shall observe work for conformance Wth 150J PSF below isolated column footings. vertically for concrete masonry. Lap horizontal joint A K\MK Bolt TZ expansion anchor as manufactured by uplift of 5 PSF. / SSOLID ROWS 6LOCKING OF the approved construction documents and prepare 6. Provide engineered fill or low strength concrete (f'c = reinforce1112nt 6 inches minimum. Horizontal joint = :~=~~==i::-ti~::e12- ElETUJEEN 2xl0'S the Hilti Corporation. 4. Connections: (Sl inspections reports stating his/her observations. Copies 500 psi) under foundation at soft spots and for extending reinforcerrent shall be discontinuous across nuverrent ' = B. Strong-Bolt expansion anchor as nnanufactured by A. LH joists and Joist girders: Weld each side of joists to of the inspection reports shall be subrritted to the excavation to adequate bearing material. Install joints. the Simpson Strong Tie Oompany supporting steel with 2 inches of Jj4 inch fiHet weld. = contractor, the architect and the structural engineer. foundations at design elevations. 12. Provide prefabricated L and T shaped horizontal joint 2. Sleeve anchors to be one of the follolMng : Joists at columns shall also have (2) 3/4 inch 4. All discrepancies ile1:11Ren the construction documents 7. Proof roll soils below slabs on grade to locate soft spots. reinforcerrent at wall comers and intersections.. A. HLC sleeve anchors as manufactured by the Hilti diameter erection bolts. and the \MJrk being performed shall be brought to the Rem:ive and replace with engineered fill or low strength 13. Provide brick veneer anchors IAlith maximum horizontal Corporation s_ Joists shall have ninimum bridging as required by the Sil imrffi:liate attention of the contractor for correction. If concrete. spacing of 24 inches and maximum vertical spacing of 16 El ICYCLE B. Sleeve-All sleeve anchors as manufactured by the and as otherwise noted on the structural dra\ivings. lJ."-=-+- the discrepancies are not corrected, the discrepancies I I\ RACKS 8. All areas within the footprint of the building, including inches. Brick veneer anchors shall be embedded 2 Simpson Strong Tie Company Place additional x-bridging at the end of each horizontal (} LIGl-IT shall be brouglt to the attention of the architect and the utility trenches, must be free of - anq/or soft areas inches minimum Into brick. \-F.T. 2xl0'S AT 12' OC. ElOLLARD 3. Heavy duty screw anchors to be one of the following: bridging run in last joist space \\tlere bridging cannot be c,' 'ilf structural engineer prior to the completion of that phase prior to place of fill material or concrete slab. Seal utility 14. Provide rmvement (control and expansion) joints in A K\MK HUS-EZ as manufactured by the Hilti connected to a masonry wall. of \M'.Jrk trenches at the exterior foundation walls using a walls where indicated on the architectural dra\,;ngs. CDrporation. 5. The special inspector shall subnit a final report of compacted clayey backfill or low strength concrete till. Bond beams shall be discontinuous across rrovement Mia! Decking ll Trten HD as manufactured by the Simpson Strong Tie "'-PATIO~ ( 4) 1e• DIA CONCRETE inspectipns dorumenting completion of all required 9. Finshgradeshall ~opeawayfromtheperiireterofthe joints unless noted otherwise. 1. The design, fabrication, and erection of all steel deck - PIER FOOTING TO Company inspections and correction and any c&screpancies noted building. A. Movement joints in concrete block: Sash block unit shall conform to the requirements of the latest edition 6' AElOvE G~DE TYP. 4. Diameter and embedment of anchor as indicated on the in the during the inspection process. with prefonned shear key. Caulk both faces. of the specmcations of the Steel Deck lnst~ute. Cast-in-l'lace Oincrete construction draYllings Alternate details for control joints may be 2 M3terials: Design 1-oads 1. Ooncrete 'MJrk and testing shall confmmto all the 5. Install anchors according to the manufacturer's acceptable-submit details for approval. A. Deck for roof: 1.5 inch x 22 gage wide rib style, 0 !4! E>xb f'T_ 1. Roof Live Loads: 20 PSF (reduced where aJJi>icable) requirements of AO 301, "Specifications for Structural instructions B. Movement joints in brick: 3/8 inch wide clean joint painted with standard shop coat. -----i-IU::loD POST 2. Roof Snow Loads: concrete Buildings'', except as modified by the following 6. Anchors by other mmufacturers may be acceptable. filled with expansion joint material per ASlM 01056, 3. Deckconnections: A. Ground Snow Load, Pg= 20 PSF supplerrental requirements. Reports from texts SUbmit manufacturer's data to engineer for approval class RE 41. Caulk exterior face. A. Connect roof deck to supports with 5/8 inch ll Importance Factor, I = 1.0 required by ACI 301 shall be subnitted to structural prior to installation. TAElLE C. Provide building paper bond break below lintel diaireter puddle v,elds or 11W Buildex BX14 po¥.der w/IJMElRELLA C Snow Exposure Factor, Ce= 1.0 engineer, architect, owner, contractor, concrete supplier bearing adjacent to control joints. actuated fasteners at 12 inches on center, 6 inches D. Thermal Factor, Ct = 1.0 and building official. Acrvlic Adhesive Anchoi"S 1. Acrylic adiesive shall be one of the following: on center at ends of sheets and perirreter. Screw E. Flat Roof Snow Load, Pl= 20 PSF 2. Ooncrete work in cold weather shall conform to all -~-----'~~ Structurnl Stea G A HIT-HY 150 Ml'X-SD adhesive manufactured by the side laps at midspan or th~e feet maximLrn spacing F. Snow Load has been increase for drifting where requirements of ACI 306.1 "Standard Speciation for Cold 1. Detailing. fabrication, and erection shall conform to AISC [ ;J Hilti Oorporation with #lOTEK screws. applicable Weather Concreting" and ACI 306R "Cold Weather Specifications for "Design, Fabrication, and Erection of PROTECTION B. Aaylic-11e adhesive manufactured by the Simpson 4. Metal deck shall be provided to run continuous rnter at 3. llvlnd Loads: Ooncreti ng". Structural Steel Buildings'', and the AISC "Gode of -~ElOLLA~­ Strong Tie Company least three spans except VIAiere framing !ayout does not TYFICAL A. Basic llvlnd Speed= 90 MPH 3. Concrete Vlquare may be cut through D. \/vlndExpusurec.ategory=C terrperature and wind velocity shall be used with figure requested, submit calrulations to aid the engineer in 3. Adhesives by other manufacturers may be acceptable. metal deck without reinforcing. Openings between 6 E. Internal Pressure Ooeff1Cient =+I- 0.18 2.1.S to detennine if precautions against plastic review. Unless specific end mnm2nts and reactions are L~ Submit manufacturer's data to engineer for approval and 18 inches square shall be reinforced with L2x2xl/4 ElOLLA~ 4. Earthquake Design Data shrinkage are required. indicated on the drawings, design and fabricated priorto installation. puddle welded to metal deck and oriented perpendicular A. Importance Factor= 1.0 4. Material: connections to resist shear based on maximum uniform to the flutes. The steel reinforcing angies shall extend a 4'-0" 3'-0' l'-0' ll Occupancy Category= Use Group I A. All mixes shall have normal weight aggregate. The load capacity of the irerrber for the span increased by 1"1lsomy minimum of two flutes on each side of the opening. 0 0 0 C M3ppedSpectral Response: Ss =0.17, Sl= 0.07 specified rorrpressive strength, f c, is based Oil 28 1. Masonry construction and rn3terials shall conform to all 15% but no more than the shear capacity of the CONCRETE D. Design Spectral Response Coefficient: Sds = 0.19, Sdl days unless noted. requirements of the "Specification for Masonry member. Light Cooe Mia! Framing SIDEWALK =0.12 B. Allwatershall beaddedattheplant. No water is Structures {ACI 503.JjASCE6)" except as modified by the 3. Field connections shall be bolted except where welded 1. M3terials: E. Site dass = D pennittedto be added at the site unless approved . following suppleirental requi reirents. connections are indicated on the structural dralAlings. A. Structural framng merrbers: ASTM A1003, grade H, F. Seismic Design category = B by the eajneering prior to placing concrete. 2. Materials 4. Welding shall be in accordance \\Ith the American Fy minimum = 50 KSI, galvanized grade G60 per G. Basic Seismic Force Resisting System: Ordinary C Ooncreteunlessnoted: fc=4000PSI. A Concrete masonry construction: fm = 15CXJ PSI at 28 Welding Society (AWS Dl.1, latest edition). ASTMA653. reinforced masonry shear111alls D. Ooncrete for interior fioor ~abs: f c = 4000 PSI, days 5. Materials; B. !Vletal studs at brick veneer backup: 43 mil minimum CONCRETE H. Seismic Response Coefficient, Cs= 0.09 (1800 PSI at 3 days), ninimm cement content per A. Rolled shapes and plates: thickness. l\ll>mbers shall be galvanized grade G90 SIDEWALK B. Compressive strength shall be determined for each ---- I. Response Modification Factor, R= 2 ACI 301 table4.2.2.l. Entrained air content shall not type of misonry by the unit strength method. i. L shapes and plates: ASlM A36 per ASTM A653. Reid 1M'!lding not permitted. I-- --- J. Analysis Procedure= Equivalent Lateral Force exceed 30/t~ maximum VJater/cementitious ratio= C Ooncrete masonry units: ASlM C90 type I, ii. W shape.s: A.~TM A992 C. Track and bridging: Fy; 33 KSI, ASTM A1003, grace l\ll>thod 050. lightweight aggregate per ASTM C331 or normal B. Square/rectangular tubular shapes: ASTM ASOO, H, galvanized grade G60 per ASTM A653. S. Roof Dead Loads: E. Concrete for exterior flat mrk: f c ~ 4500 PSI, 5%to weight aggregate per ASlM C33. grade B D. Vertical strap bracing: Fy = 50 KSI. Size and gage as A. Roof Manbrane and Insulation= 3 PSF ?016 entrained air, minimum port land cerrlffit content C. Bolts: ASTM A325-N PATIO PLAN 114' = D. Facing brick: ASTM Q16 grade SW. Color and size as noted on plan, ASTM A1003, grade H, galvanized B. l\lletal Deck = 2 PSF = 520 LB/CY, maximumwater/cerrentitious ratio= noted on the architectural drawings. D. Anchor Bolts: grade G60 per AS1MA653. C Job1 Framing= 3 PSF 0.45. E. Mortar: i. Threaded anchor rods: l\STM A36, plain finish E. Welding electrodes: E60XX D. Beam/Clrder=4PSF F. Ooncrete for footings: f c = 3000 PSI, iraximum i. ASlM C270, types with nut and washer tack ""lded at errbedded 2. Cut all franing components so that they fit squarely E. Ceiling= 3 PSF water/cementitious ration= 055. ii. Portland cement-lirre mortar end. \Nashersshall have minimum diameter of2 together. Studs must bear tight against track "4. F. Sprinklers= 3 PSF G. Reinforcing steel: ASlM A615, 60 KSI yield deformed 1. Portland cement: Type I times the bolt diaireter. Members shall be held positively in place until properly G. Ducts, Lights and Misc. Mechanical = 7 PSF bars and ASlM A185 rresh, flat sheets only. 2. Hydrated lime: Type S ii. Provide an embedment of 12 bolt diaireters for fastened. Brace will conµinents as required during

    l-1/2'DIA METAL FIFE~IL H. Fly Ash: ASlM C618, type For C, rotio of fly ash to Iii. Masonry cement rmrtar may be used at anchor bolts unless noted otherwise on the erection to prevent racking and distortion. C.Mth brick iii. At general contractor's option, acrylic adhesive 4. Mnimum bridging requirements for bearing and exterim -----7------2. The engineer shall not be responsiblelorthemeans, otherwise. I I -Tl'3.s, 12 OUTLINE OF veneer cavity wall: 9 gage truss type placed in anchors may be substituted for cclurrn anchor walls: 1.5 inch C channel with 1.Sx2x54 mil clip angies at --- --u I '3.s,121 mF.thods, techniques, sequences or procedures of I I 6UILDINGs 6. At corners and intersections of footings, provide bent concrete masonry with projecting eyes for 3/16 inch bolts shrnMl on drawings. Provide ASTM A193 or each stud. Space ro\N'; at 4 feet an center for a!I bearing I Elj:LOW construction selected by the contractor. bars of equal size and sarre spacing as typical reinforcing diameter pintle. All parts to be hot dip g;ilvaniz@d ASTM REJ, 36 KSI yield stre11;th, plan finish W1llls and 5feet on center for extelior non-tearing w.ills. I ALUMINUM 3. The contractor will be solely and completely responsible I I around corner and into abutting footing. Bars shall have per ASlM A153 class B2. Ladder type tri-rod may be threaded rods. PRESSURE TREATEID OUJNSFOUT for conditions of the job site including safety of all 4'-0' I I 4xb'S, '3'-0' LONG ~ASl-IED errtiedment of 30 bar diameters {18 inches rrinimum). used if both w;thes are laid simultaneously. E. Field welds: AWS E70XX, Low hydrogen electrodes. 3'-~11· INTO SINGLE FLY OOF FOR persons and property during the performance of the 4' DIA. Tl-IRIJ 7. Machine trowel finish floor slab and cure using "Cure I. Brick veneer anchors for metal stud and VvOod stud F. Non-shrink nm-metallic grout: CRD-G-621 and ASTM J'-'~----¥CONDENSER SUPP TS ROOF vENT \M'.Jrk. fhis requirement \\ill apply continuously and not __J and Seal" type curing cmrpound rreeting federal backup: Dur-Q.\Nal D/A 213 or livire-Bond RJ-711 C1107 for interior and exterior applications. 4'lD . Tf.!RIJ.___-=o=-1,1------' lirrited to normal working hours. When on the site, the o specification VOC compliant, minimum FOUJER ROOF TT-C-OJSOO, 3GYo \Mth 3/16 inch diaireter pintle hot dipped galvanized 6. Paint and protection Rd>OF NT--<> D engineer is responsible for his/her 01Ml safety but has no VENT - TYF. ( 4! solids content. For applications exposed to sunlight, use per ASTM A153 class B2. Vertical distance be!Meen A- Structural steel unle_ss noted: fabrioator' s standard responsibility for the safety of other personnel or safety light brocm finish and a~ic based curing rompourd. pintle wire and clip plate shall not exceed 3/4 inch. prime coat DRAFTSTOP NOTE• ALL FLIJM61NG VENTS conditions of the site. TO ElE ON 6ACK SIDE OF 8. Floor slab on grade shall conform to the following B. Lintels supporting exterior masonry wythes and PARTITION (ElELOWJ D~FT5TOF --...... _ Rat corrugated ties are not permitted. Screws shall RIDGE MAX. D~FTSTOF PARTITION ers exposed to weather in finished stru:tures: 1 12 AREA = 3,000 S.F. MAX DRAFTSTOP 1. Per the client's request, the foundaton design and Ff (flatness) = 25 for specified overall value and 18 for or hot dipped galvanized. Stainless steel and mpper­ hot dip galvanize per ASlM A123 after fabrication. AREA = 3,000 S.F. general foundation notes are based on the assumption minimum local value; Fl (levelness) = 20 for specified coated scre\rvs are not pemitted. Ooating weight per paragraph 5.1 of ASTM Al23 and of favorable soil condition~ The general contractor shall overall value and 13 for ninimum looal value. Maximum 3. MJrtar prof:XJ11ions must te accurately IY6lsure prior to A153. Fabrioate assemblies per ASlM A143, A384, TYPICAL, retain a geotechnical engineer to verify design gap under ten foot unleveled straight edge= 0.25 inch. rrixing. Add cement to mix in full bag quantities. and A385. Touch up after erection 'With organic zinc MECi-1. FASTENED SINGLE-FLY Fl6El'4• EXTERIOR PLYUJOOD Sl-IEATi-llNG TYPICAL MEC!-1. FASTENED Rl!Vl810N8 SEAL A CONVl!tllENCE STORE FOR .108 NO. 8hEET NO. 1 ' 12 1 , 12 SINGLE FLY ROOF -~- A-12 UNITED DAIRY FARMERS DRAWN BY 11-23-2/Z>IE> ARC!-!. REVIEW BOARD UFDATE 2204 WEST DUBLIN GRANVILLE ROAD A CHECKED BY ALUMINUM COLUMBUS, OHIO 43085 6.1 DOUJNSPOUT S' O.G. x .021 ALUMINUM JOHN D. JOHNSTON ARCHITECTS DATI! STORE NO. TYPICAL, PROVIDE GALV. METAL DOUJNSFOUT FLASHING AT ALL VALLEYS. GA. ALUM. GUTTER 3955 MONTGOMERY ROAD 11.17.16 FAINT TO MATCl-I ROOF COLOR ROOF PLAN 11e· = 1·-0· CONTINUOUS CINCINNATI, OHIO 45212 513-398-8743 613 (i\ 6111 P""'\l.. 1-. ..-11 (4\ . 112'-0' .- 6PLLARD see DE:TAIL ~ bb'-0' 3'-4' 42'-B" \_A.1s) ;------,------.-_- -,------"""---"'------,1-----l-0-'-- ~ -.------;o-'--1-1"+-r----_--=-=--+------41'-8" -- I 6UILDINc:;. PROTECTION 48 10 1

    ~------~------~------1~t~:t~~-,---~------r"- 1;.r,;~~5~~--- "-~ ~1-'-1~t~~~~~·f~~~~:r:------=-=~=---=-=------=-=------!-----~r 60LLA(i) DETAIL .~TF_"_T"'::=lr~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~;;;;;;;;~~,:~o~l;:~~:;::::;~l::;:::;~l:;:4:t;::;~l~:;;;:;l~l!1:--:~=ep~'~~o~·o~~i~~~~o~o~~~o~~c::::::~:::J~l==:._J~11======~;:=====~==F=1=~1F=ii~(;)F~T,;O~UT;S;ID~e~1N~c:;,ROUNDc:;.Re;:ASe 11 Du,, " ;r;" TYPICAL I' Sl-llM 1 '/' "=J,,,,~=i!LJ!.=!d WATER ·~------~ I' TRAP Size FER LOCAL ~~tg~ &FACE 6ETWEEN _I E-2_1_ __ __ i Flf'!TOl"lAGIE jeT~E l!T E l!TO~_J fb, ~ • SERVICE TELEPHONE ELECTRIC ~ (' FLUM61Nc:;./l-IEALTl-I AUTl-IORITY I' /A-11 I ------I ------COOLEC ------I I 6ULK co: WATER MOP E-~ 4 METER& &E~CE &~~fl I Re;:QUIRE:MENTS 1/2" ' !'>'-!'>" I in 9'-11 3/4' in 3'-4' 11'-2 !'>/8" 11' I~ ' ' I • DETAIL& ON® I ljl D 01 ·- ----"--"--~1f--+---"+-"--~"--"'-'---'9-I=---e-l+---"--'--f------'-'--"--""-"'------t+------"-lofc,,,,,JJR------.rl1 ' 1-r---.. Ti-115 51-!EET 546

    : U\ I ~ 13EEl~3c'AvE I - ~ ------f4\- - - - -1i-,t==IY-ITT~=-ll=n""1=j=11:::'.:1=11=J:::;:::1=rn==1::n,! ~o § L"'-! .._ie=-3±1E1,1jo-:asl lriT~·~.·'- ~ ,_i__ , ~ ' - i - ~ : i ~~~&) A-SJ 2 5 I I 1-.... L - l:O - &' DOOR ~-!} ! I I I I , , D · 0 •~ _ ; J ~...... ,, / t 0~ (5\ \ GJ ~T~_J 'l/ I ~-.'.-rDe APPROPRIATE i I ~~E~ .[ =~~:::fi::/:~::/:~::~:::fi::/:fi:::,::~.::~:::fi~-}==)1=~~~~~~~~~~w~~v~~vlvtt~iv~~1·~-~8~~1;=4~·!~~~~0~3=·=-0~·~~~-::!:t~9~~-~~~~~~~~·~~~~~~=c=~=A=Re~n~E=e~~~~~5 rJ ~ ~ 0 j 2~· c:[ ::D 1) i ~~ 1 1 5 5 :1 I '"'-8 314' ' /// ~,v/ ~~// ~~/ l~/ l~// l~/ l~/ l~// l~// [~// l~/ l~v/ l~/ ~// I 1'-4 1/2" I Ei-58 j / rn, 'f ' 10'-3 3/4' // @ '-' ~E-44y'-' ~ c ~·,"·11~'"'.-__,__-'EE-·4 2 ·~-•• ~...... I: :1"-·Q, A=eseoRIEeJFIXTURE:e I 1 A // "i',1>__ ~ 5EE DETAIL 51,A1 "' I E-51 FAoT FOOD AREA ~ IE-46r o"'\ rfli:L, l~e-'--43~ c '" ' 1 ~ ~ &EE ENLARGIED DIFLINE FLAN c... ""E-451 ~ 0. I Io.,,. !'£OEIV1NG I u:: ,._,, ,~. . i- ...,. - -~ • : "" ,- ';· ' - ....,. °"""" , ~: . ~ ,_,, w"" '""'"'°"-A~; Dl""LL WOH 5-40 OJI 'M& ~ ' i i'

    U\ s s , E-Bo:i '?! ' e-5-:il , 1 Q 11 ' ~ : I ', ' ! !! ! !! ! ! ! ~ ""i-~r -- ~-=J~_:_:""L.Wt====!::;;==:!:===~W-_..., F~LOR : I 1 11 0 2 13 1 " , 1 • I ',' ""·\\ ~ SALES AREA :,_ u \_i u !II ' ' .I '- ' I ' ' · ~coNr= cAe = 1e-:i i F. ~._,,!,, _ _ , "' , ;> ~CONE cAeE eee >1-1eer A-/';A\:i 1 .. 1' I ~ L see s1-1eer A-o:i • -...$ 38'-'-' IA I I ,b 1 \ ~ ! I 1 11'-8" i I --- ...... , S'-!Zl' ~ IO ' 1 \'" ·1 \ '"' 1 ' ' 1 le-14 e-1&-17 E-11> ~ ·~ I TYFflCAl ,. e1-11M &FACE i ' \ "' "~l\C\01'.~=t:~:r==rrr=ll;::=::::jj FAoT FOOD AREA t\l ' / I I ~ 6EtWEE 6EER FREEZER r i ey.1,~-C> : :'©- ~-ORD,.FCAY 7 ! -- e-11 Ss~i~i~~is~::e IE-211 14'-~ 8'-2 3/4' ', 2'-10' MAc:;.~~ z ~-~~~l~A~TM~==il i I I :;r '-... 'f 61-lEL vlNc:;, uNrre 6Y "~ -- &ELECTION aY OWNeR / Ir -1 · 0 \ r - I I 1 11 --, 1 S IE- MARKED 'ENTRANCE ONLY' IN LETTER& 3-~ 3'-4114" WP.MEN '• ,\ ; - MEN '· 1 1 131 s 1 6Y OWNER I ;. \ '.:!: 1 NOT Lese THAN b • 1-11c:;,1-1 AND LEc:;.16LE 16 ,_ 1 112 " 0 --- -- I \ I I , \ "' (iA\ ~ "' ~OM eorH INSIDE AND ouTe1De. f-==~--==="-''===-===---=''"'T------t e:- 2-:11 1 1'-8 114· ,,,. z~ , 1'-8 114" I I ._ .. 1e; ' • f IC \ ,,-....,,,, el-IOFFINa. I E-26l e-2e'k E-211-i E-5"*1 o 1 / I =~ , 10 0 ~ r 12 1 1 1 .~.D I I I : --"\ " 0>/1-1,A-1& ~ \A-lh s &T~T-~YSTEMl~•/ 4 11 ,,-....,,,, ~16 -~ ( IC \ 6AeKETe \ J \ E-31 /(/ -;- ·•••. ~D- r 0 "&ll'' DIA 1-1.0. I

    1 I: ·\\ -\\ "-___:/ ::!: "' IN5ULATED LOW 'E' c:;.LA5& f IC ·, - 0.1-1~- f-llDD-'.",_ ' ~ r / Q ,,.~-"'1f-~->;i;A;,;-~"'

    1 -+--~1 _ ·-=, '-V _.. ~.. '<:: 7 __ ~ g ,,_(7\~~.M~-§.·~·-~- ~~~===:::=j~§~~iR~~~~~~~~~i~~~~~~~===~~~==~~1-.....~~LllU 1 1 0 ~ "- ---\~7·~-~'~'~;___ ~_J:''-l 11011 ~'":·,~· - ,,_,~ -0' ~ ,,,,,,.__ ~: •"''(;;_·__ -_·-- -~--;~ ~zU.ILDIN~FR<~CTION- Qt-~· -rt~·· ~-e------€7---~-- r=-=-~]";:;:;~-=----~2~ x6'aATTACl-IED_JJ1k~""~::_~_;:-_~_~_~_~_~_:.::-:_~I

    \L_6UrLDfNc:;, PROTECTION I L ------,-.--,---:------__ ,;, ------L ------~OLLA~ e11EI DETAl.1::_ _ i'I-:__ ------~ .--' ------___ _: ~-1 - -- J ro 1:>1pe COLUMN ~~--=---=--: " . . b'-6112' I 0 0 ~~ --@, 1'-1 114" \A-I 14'-!'> 3/4' . 4" l'- " 1-j--+ CONCRE:Te LIMIT OF RANSOM WINDOW5 see Ali:!' elDE:WALK :0-112 x 5-112 x 114 --1114~.....,,_ Q ,, ' /3~' ~·· ~Cit _._._l"'..~~"'-----11'-1" __-~l!'_-1_·· ______------+-.2_1'-~3_1~/2_" ______5TEE:L TU6e COLUMN --.. U\ ANCl-IOR 60LT& ALL lllil~_l~==;:ijll; ' ' ' ! 16'-8' I!'>' -8 114" 1!'>'-8 1/4. /30' ~ II!'. "" 19'-il 1/4" 12'-0" Ti-15 WAY TO FOOTINc:;. ~~~><~~~ (221!?>1Zl Ibo UFLIFTJ ~~~ ~~~ ' ' / - ' '

    NOTE, THIS IS A COMPLETE EQUIR'1ENT Ll&T, ALL EQUIP, EQUIPMENT SCHEDULE Ll&TED 16 NOT NECE!l&AF LIKIVIDURN LIQUID DleFENeER 2x4 WOOD STUDe AT I&' O.C. WITl-I R-1-:1 Fl6E~LA55 6ATT IN6ULATION AND WITl-I I .I) \' / 6Fl.IE5 TO COMFLY WITM CLA66 Ill 7 ==:.,.--1 CAULK ALON& Tl-IE JOINT a: ~ E-5 UPRIGHT PIZZA Fl'1Zl-6 c:;.ALV. E-10 FOUNTAIN DRINK MACl-llNE (2 UNJT5J E-3S CAllH REGISTER ELEMENT& ELECTRIC 5ERVICE nsv. 21l' AMF. NOTE, PROVIDE ceRAMIC Tile 6AeE IN ALL FU6LIC ARE:A5. PROVIDE: ' r: & X • Z - lz 8'' \ b' CLEARANCE: ..,..I __,, ~ "' ~~ ME:TAL TRIM 65AD ON E-11 Fee MACHINE 4 FLAVOR E-40 4' DIF CA61NET 13 EACHJ 2641l' UJAns. A& MANUFACTURED 6Y 4' VINYL COVE eAee IN 5TO~ ROOM AND 6ACKROOM. "'a:~lh ARC!-!. REVIEW 60AF

    NOTE. me le A COMF'J..ETE EGl.llf"MENT Ll&T. ALL EGIJIP. ;I\ EQUIPMENT SCHEDULE 1.l&TED I& NOT NEc:ElieA!tll.,. uea::> IN ALL em::•RE&.

    ;>'-4" -+------~·c__· ,,,.;±£:,":e::._"-----,------·------""'r------t"'"'-•" \A1S) ,,_.__~~-- ______I WALK-IN FREEZER eax ~ou1evlLLE (22 GA ~ALY. PANl!l.6 WITH 2rtl AMF., '°· 244> Y. llllTH AR!:>CO DOGlliiS. 4' URETHANE FOAM - '15 Fe RATINGJ 2" AMI". I!>, IW Y, !'------...J;le>2_·.:_·1L' ______, .. ~------"11Z'"'-'_:_·1,,_l'_H+---...._--"'~--!---t------.. -- ..... ______.... ------~-~------····----.------·------f WALl<·IN COOi.El'< eo>< LOUl&YILLE 122 a.A ~Y. PANEl.6 WITM 4.ti -· 3'1l>, 24.ti Y. WITH AR!:>CO i:>o0R&. 4' - l'OAM - ii; Fe f'lo\TINGI 20 .oMP. ID, 120 Y. "\ 1.0Ul6YIL.l.E <22 GA «AJ,.V. F'ANEl-6 WrtH 4rtl AMP. Jilil>, 2.olrtl Y. TSS 3.E>x.3.Sx25 ..., 1 , ..... T55 3.5x3.5x.25 4' Ultl!THANI! FOAM - , Fe AATINGJ W AMP. It>, 12<11 Y. tr T55 3.5x3.ox.:25 f4\ STL. TUBE COL. \ JD 5TL. TUBE COL. Jn=------ltt=~ \2) \~\~~5~T~L-=T=U~B~E==C=O~L=-::!:::t======il======;i=~o+= I

    MOP MK MUeTEE 101 I I I ~ _____ i,~l~/=~··o~Q""::::=:::::r~~~l/~~~Fo~l\=o~~=or=ii~~-===-=J=n=::::_=__ .::.~:r~=-=_=_=_=_=_===_=_=_=_=_=_=::_::rr-~~~~_11.--~-r~---i I ;;. ., 2rtl AMP, lit>, 1211> v. ' F!fsTo~E I STORAGE: I STo~E I STORAGE _J '1' Fb. . . . l/N WATER TELEPHONE ELECTRIC 'fl I --~- ~- ,-~ -'. K " \ SERVICE SERVICE SERVICE ,_.. -- - ~---IJ--:::::.-+!f--=, - -- I Ek L co. WATER MOP I E- I '*METERS PANEL PANELS

    TA'!'L~ C314 ,----,"'-,...._,, ! e_Ac_K_R_o_o_M_ I ' I - i li-12 ICE MAKEi'! <2 UNIT&J ~ Tc~9 ~,~~j : '°~~~I GJ I: - ~

    ~ 1Meeeifec-3 I \\ I - EX!-IAU&T Ti-ll'

    11 I 1

    i : .. - 1, '"Ill i - - I }1...... -.__ FC ·1.. : I fl~i I I 'I I I II I !I "'cl ___~ ~ STORAG!: I -._J~------L-~-J I I , I I 1 ! I , i I I - .... - .... - . - ...... I I ~-All'! J e%16 ..,.--,-- : ' ' ,. ' ' 1-r-Tr '1 I~ I !\PECIALT'I' FIX1IJ!lill!& -10-1 I i J I l!-21 - I I I 20 AMP. kl>, 120 Y. I I I ~: ' 1 .4 112• ,--;, ,~ n n IT" I I : -~,--1rt::'.c===:::;:==~;:===::;;:::::;f:::\;l';:±;;J:::.\:;'if!il~-. I 11 i I I i I I I I I I f I I I iii I I I I I I LJ·JLJw. .. I 5UNN ICl!l·DY 20 .oMP. 14>, 12e> Y. " I I E-29 DUMP l>INK ~ ie-&a:>I I 'i't'1 I 1 i /j·jjl I 2e> AMP., le>, 12'2> Y. I i ! I! ! I Ii I I I 1 ii ! i I ! I I 20 AMP. iZ>, 1W v. i I ' ; Ii - i I i ; i :I i.._'__._ \_} \_j \__ j l=+-1-- -CONE cAee 1 i t---... I~ I i G i ('...... -

    Q E!-3'> cat.INTE!I" TOP = !I IERCIAL Ov&I 1-.-;1------1------t-----.--·- r-'

    14'-2 114'' e._ '-2 314" )'-'------~~~----- _,. ____,__~~~----~----..ll !!·311' - &ANDWICl-I CONDM. UNIT AF'W COLD II.ELL CW·I 2'2> AMP. lrti, 12e> v. ATM! MAGAZINI: ~·-10· ·- RACK ' '" ~r..-·-- ..-----~'----i E·.olrtl 4' PIP CAl:llNET 13 ISACHJ 2'1> AMI". le>, 12e> v. • • / 1!·41 \ I \ I E-42 &ODA FOUNTAIN \ / / / 1!·4! MALT MIXER 121.WITSJ 20 AHP., 10, 120 ______, v. ········--··--·------· ------

    1'-0 112' ···~------

    W AMP. 1'1>, 120 Y.

    ' 1-iAND I-I.AND DF Al"F'. llZ>, 24.tl v. / r \ ....,..,.·l Q/ F.D. I \ O \ b AMP. !+,!WY ;1".D. . TUriN-AROUND / ...... r T.PA~ -~ ' ti> T. PAPER ;, MOLDER HOLOl:R I --- .,__ ...... n n l"liOVIDEP, !"LACED 8'1' UDF a==.·:.·. --IL .. :· ::U ,...... :·:··.--:::--JH i "" I Tl'Y l!MFLOYEES .AND HANGER • 441-UL4A G!Zl ec RATING NOTES: ALL INTERIOR FAF<:TITIONS TO 6E 3 S/8' WOOD (3) REQUIRED IN STORE, <1> REQUIRED AT HEAL TH DEPARTMENT INFORMATION 4. ti-II: ONLY FOOD ITEM TO 6E COOKED IN Tl-IE OR METAL STUDS UNLES5 NOTED DIFFERENTLY. C'.:iA5 ISLAND. DESlt:::;NATED BY-$- STORE Aflill! HOT DOGS. OTHER ITEMS CAF. CEILING PANEL& DIECTL.Y A60YE ALL FOOD WOfilK 51-iALL l!ll: R.lfilNl&l-IED AND IN&T ALLl:D FLAM!: &F!' TILE, COFl!P. OR EQUAL. 4. ALL JOINTS, CAACKS, AND Cl'

    '

    ~ LA$$ $1-!INGLE:S POL TURETl-!ANE LOUYER ~ :-\ F

    TRL 55 !3R'G. 6RICK MASONRY PRIVACY \-TYPICAL '"-..... UJALL Afi ------·- ·-· ------~ .. " .,,,.. " ...... ~------l.k..J. .. -C>. -- f __ ,,,_ -= ·- ----·· ...... I C..::"'"""" ------·- ' .. -- ·---- " . " - -·-·-·-is: 3Wfl!'5' ,, ' .. ' ' .. t------·····~ l -G'F. iifii~----- TO BE A MIN. OF ANOPIZ!'.D ALUMINUM STOREFRONT SYSTEM WI I' ----' TUSCAN DESIGN/PLAIN &!4AFT/12' DIA. INSULATED LOW GIL.ASS PANELS' COLOR TO COLUMNS - COMF'LETE STRUCTURAL 2'·8' 6ELOUJ GRADE l2'x24" CONT. CONCFLA5e COLUMN UJITH CAF' FOOTINa. 1il MIN. 2'-8' 6ELOUJ ~GLAS$ IN AREA$ INDICATED 6T NOTE T.C:.. AND BASE AS MANJ=_ 6Y =OCAL GRADE OR A& REGlUIF'!ED 6Y NOTE, ALL G.LA5S FACINa. SOUTI-! OR WE5T 51-!ALL F'OINT INC. CODE, UJ/ CV •4 CONTINUOU5 6ARS eE TINTED, COLOR eY ARCl-!ITECT, ALL OTl-!ER Gil-AS& MAY eE CLEAR ,,, ELEVATION 1/4'=1'-0' \.Al0.J FRONT OF $TORE FACING DUBLIN ROAD ($R lt:>D - NOTE: GAF 'TIM6EF<8xl,t;2 wA"OIL FACE 6ACKING COOF

    --··-----,7 "/ ~ ft i 1--··· a.AeLED ENCLOetJF TUSCAN DESIC:.NIPLAIN t>l-!AFT/12' DIA / &EL.ECTED 6Y AF -~1-~I~-- i -- FF~ SELECTED 6Y ARCHITECT. PROVIDE TEMPERED DUMF$TcF< GATES TO 6E BELOW GRADE OR AS REQD' BY CODE, a.LA5S IN .AREAS INDICATED 6'r NOTE T.U. WI (:2) to 4 CONTINUOUS BARS NOTE, ALL G!LA56 FACING! SOUTH OR UJEST 51-!ALL 6E TINTED, COLOR eY ARCl-!ITECT, ALL OTl-lefi< a.LAS& MAY 6E CLeAR

    A CONVENIENCE 8TORE FOR JOB NO. 81BTNO.

    114'=1'-""' ELEVATION I 11-2.3-2016 ARC!-!. REVIEW 60ARD UFDATE UNITED DAIRY FARMERS DRAWN BY SIDE FACING! RESIDENTIAi.. PROPERTIES 2204 WEST DUBLIN GRANVILLE ROAD A COLUMBUS, OHIO 43086 CllECICllD BY 10 JOHN D. JOHNSTON ARCHITECTS DATE 81'0f1Et·NO. 8911 MONTGOMERY ROAD 11.17.16 CINCINNATI, OHIO 48212 118•8H·8743

    . 613 -'------

    FAINTED MET AL PROTECTION EXHAUST CHIMNEY FOR RAILING AT MECH. FLATFO~S WITH ROOF NOT TO EXCEED / HVAC SYSTEM VENTILATION FREFINISHED METAL PRIVACY PANELS (4) FOWER ATTIC VENTS ON / 21'-8' ABOVE FINl&i-lED r-:;::=====::t TO MATCH SHINGLE COLOF< TO CONCEAL 7 12 ROOF - FAINT TO MATCH FLOOR I- LOW PROFILE MECHANICAL EQUIPMENT COLOR OF ROOF~ ,~"==-~------j------:----... ~~~,.--~~~L_~~~,~~~~~ ~ ~ i PROVIDE REMOVA6LE SECTION 11/ 1 1 RAILING IN THIS AREA 12 er.AF 'TIM6ERLINE' Fl6ERGILAeS Sl-llNC!oLES I ~ ~ ~~' 12 &' O.C:.. X .!Zl21' a.A. ALUM. SANDWICH COUNTER AF

    12 ROOF OVEF< HVAC EQUIPMENT / / .'1 ~1 lxb PRIMED REDWOOD TYPICAL ICE ' SNOW ~ I [iB/ ~~~GsA6LED OOTTER60ARP-PAINTED lllm/ " - (2!2'-~'xh'-8' l-llNcr.ED SCF

    I , - ___ ------DUMPSTER ENCLOSUF

    II 1 ' ! 1 11 11 11 . I 1· " I I 1 I 11 ·I 11 •I I I 11 I TT 11 I I 11 I I I II l l 11 I I 11 I • 11 I 11 11 I I 11 ! I I I I! 11 11 I ! I I I 11 I 11 I r 11 11 ' I 11 I I 11 I 11 11 I ! 11 i 1 I T 11 'I I I 11 I ill / - --f-- /

    ' ' / 11 I 1 II II I 1 11 II 11 11 l ~~llgl~l~ll~::~ff~.1~~11~~-1~1~11~~11~1~1~1~1~~~1~11~1~1~~~11~~1~11~1~11~11~11~~11~11~ll*1~l~~~ll~~ll~~~ll~l~lll~l~li~~l~-~-.~~~~ll~ I II I 11 n 11 11 I' 11 111 I 11 11 I " TI I 11 ' I I 11 I I I 11 11 I ; I I 11 '/ I I 12'x24' CONT. CONCRETE FOOTINGs e MIN. 2'-6' ~ 6ELOW GsRADE OR AS REQD' 6Y CODE, ~ ..____ _ ~ W/ (2) CONTINUOUS 6ARS ~ "4 ~- I I

    ELEVATION l/4"=1'-0" I I I I I I REAR OF STORE f'ROJECTED

    I !", NOTE: I !'-- ALL ROOF S!-IEATl-llNC!o TO eE RADIANT BARRIER TYPE 4x8xl&/32 w/FOIL FACE BACKINC!o \ 6' D e.· ~ PLACE FOIL DOWN 4 INSTALL FER HANF. LATEST WRITTEN ®IDEL !Nee NOTE, CARPENTRY CONTRACTOR SHALL COORDINATE FINAL SIZE OF C!oUTTER BOARD WITH SIZE OF TRUSS CORD MEMBERS TO INSUF

    -----'"--,-- 1 er.AF 'TIMBERLINE' FIBERG.LA5S Sl-llNcr.LES @DETAIL l'=l'-!Z1 ' INSTALLED OYER ONE LAYER IS•FELT ELEVATION NOTES MATERIALS AND COLORS ------l >------i L ______J~::;- ;,,.y C!oABLED ENCLOSURE UNDERLAYMENT -~""' I OF HVAC EQUIPMENT ~~ v I. ALL FAINTED TRIM TO BE PRIMED l'

    ---=------VENTILATION/MECHANICAL CONCEALMENT LOUVERS 3' x 4' x .JZ>21' C!oAUcr.E ALUM. 4. ALL FACE BRICK SHALL BE STANDARD SIZE ELEMENTS TO MATCH DRYVIT SASE COLOR NO. l.S2 MOUNTAIN Focr. , 6RICK LAID IN COMMON RUNNINC!o eoND WITH 1- DOWNSPOUT-COLOR TO eE ROOF ELEMENTS AND PENETRATIONS

    ' ' TOOLED JOINTS UNLESS NOTED DIFFERENTLY / I/ SELECTED 6Y ARCHITECT ELEMENTS TO CLOSELY MATCH COLOR OF ASFHAL T Sl-llNC!oLES ,------/ (TYPICAL! ON Tl-IE DRAWINC!oS. BRICK SHALL BE OJ SELECTED BY Tl-IE ARCHITECT. MET AL DOORS AND FRAMES --'--- FAINTED TO MATC!-1 6RICK VENEER S. ROOF TO BE TEXTUF

    REVl8IONS BEAL A CONVENIENCE STORE FOR JOB NO. SHEET NO. f2"\ ELEV A TION 114'=1'-0" \All 7 SIDE FACING! LINLUORTH ROAD I 11-23-2016 ARCH. REVIEW BOARD UFDATE, UNITED DAIRY FARMERS DRAWN BY - 2204 WEST DUBLIN GRANVILLE ROAD A JOHN COLUMBUS, OHIO 43085 CHECKED BY 11 JOHN D. JOHNSTON ARCHITECTS DATE STORE NO. 3955 MONTGOMERY ROAD 11.17.16 CINCINNATI, OHIO 45212 613·398·8743 613 ------·

    IXll> !"RIMED f'!EDWOOD fllAKE !SOAF

    112' PLYWOOD SHEATHING --~-.:--- TO FORM DFitAFTeTOF FAATITION A5 PE!'< 06C

    11'.2' FLYWOOD &MEAT+.!ING TO FORM A Dl'i1AFT5TOF ------++----, 5EFARATING GABLE t=ROJECTION FFi10M MAIN &TORE • FFitOVIDE 22:.GO LINE OF FitOOF DRYYIT FINISH OVE!lll ,__ \ I IN&Ul.ATION eoAF' O.G. X £>21' GA. ALUM. - - - - ' ,\ I/ ~-,_ ~, GUTTER MOUNTED ON A •ei i _,-- VENTED VINYL SOF!"IT T0 1"6 PRIMED FEDUJOOD PF' o.c. ~I JNv1e1veNT "l'i!SCW6V 6Y FAeTeN TO TOP PLATE WIT+.! I, '• .LINE OF ROOl't ~ I IN&TALL 1-IORl:Z:ONTA!. BLOCKING VENTED VINY!. SOF!"IT TO WO!. VE!ll?INE TECM, _,, \/ .; - PROVIDE JOl&T HANGER!> SIMFOON &TRONG·TIE '!-!!> '~ ' 19E..YOND '::'. / \ FOR &MEAR RESISTANCE, FASTEN =;;;:::::;:=· tJ BE 6EADED FANEL! AT END&· SIMF&ON TO TOF Pl.ATE WITl-1 SIMP&ON ""-,,,--- INVJSIVENT 'R&CW6V 6Y 10' l'<-31Z> Fl6EFIGLA55 IN&ULATICJtt-, _ r _, w~~?I ' • ••, ! ST;;f. ~WO!. VERINE TEC+.i, SUFPOF!TED 6Y CHICKEN UJIF< WOOD FRAMING ON JSOTTOM OF WOOD Tf ' ,J _J _J ~ ,J r s.~ ' (2) 1-3/4'x12' MICFwJ..'AM - ,//'~ . AT 111!>' OC. I ACOUSTICAL Tl!.E CSILING &U5F'E DE¢> 6EARING ,J-:_.r _JSS ., X • WOOD , X / / PROVIDE 6!.0CKING AT I ~~~:,~~DA=~,~~ 4':> muee ~f,J-~r~ J"-1- ~ ~AM& eEY~ FROM 1);E WOOD TRUSSES AEIO ! ~ I -····· I ...... ~~~.:-.:t:: =~::::....~;::::_;::::_::;,:'7-/~-=-=-+r:--:+:tl':::"'.": ~ix;.6~1. CO!.UMN AS REQUIRED FA&CIA !SOARD WJTM FOR PROPER 6EARING 1 .3/4'x2' DMD DENTIL MOULDING UJll&x21& 5TEE!. BEAM CENTERED i I j ! ! 1~.I ~--~.,.__·---t-- 6EADED PANEL/ ON lx4 PRIMED REDWOOD TRIM CUT +.!OLE IN SOFFIT COLUMN - &EE FOUNDATION PL 60Al'i10 TO 6E FAINTED PFitOVIDE 2x WOOD B!.OCKING TO ALI IrS ',i 1i ., iNVISIYENT ~V MATERIAL FOl'it VENTING DRYWALL ON IN&IDE WITH ADJAC NT f!JA'-4 1'~2 l/4' 10" OUNER OPTION TO USE AZEK / lc"_f- :i 1/ • ) 6Y WOLVERINE TECH. OUINEl'it OPTION TO USE AZEK OF COLUMN AND DO I PROVIDE 2x UJOOD 6!.0CKING TO ALI . MATERIAL FOi'< ALL TRIM . MATEFitlAL FOR A!.L TRIM NOT BLOCK 1-IO!.E WITH I E>PE'iDED/ I~ I, )1 I:~J'.rs'~ -, v \ p - '~I;;;:::=-_=r- f[cicE: VENEER TO BE PAINTED. 0 Fl'IVENT "Fi15CW6V 6Y I / : I /-- ~~'< -~. ~ ~ -~. K'\ ~~ ~Mf:6: l· PANELfl>, COi.OR TO eE 6EYOND WOLVERINE TECH. INSTAl.!. HOFitl:Z:ONT Al. 6!.0CKIN~ v IJ / ....____,4 112' Fitl~ ED DOUN \ I ~i--i---- IXllZ> PRIMED l'EDUJOOD eE!.ECTED BY ARCHITECT. -.\); COLOR BY AFitCl-llTECT. FOR 51-IEAA F' !( 314'x2 DMD DENTIL SOUTH OFit WEST &+.!ALL 6E Si I ~~~~:it~M LANT~ ~ COLUMN 6EARJNG -PROVIDE ANCl-IOR AT TOP AND eo M SIDEe ~ TRI 1 eoA""-' \ , ' MOU!.DiNG ON lx4 PFitlMED TINTED, COLOR SY • I ill• BAeE OF =!.UMN PER COLUMN Wlhx211> STEEL BEAM CENTERED ON .. ,_____ .3'.4': ,' _ _ REDWOOD TRIM 60Al"l0 AFitCMITECT, ALL OTMER ' COLUMN - eEE FOUNDATION PL.AN. -- - ...... · TO eE PAiNTED GLA&& MAy ee CLEAR MFG, SPECIFICATION& t=ROVIDE 2x WOOD 6LOCKING TO ALIGN --- ~ ------6Ul!.DING FFitO. TECTION 1----- ALUMI f.IUM ENTRY ®l DRYWALL ON INSIDE WITl-I ADJACENT UJALL. OOLLARD e:::E DETAIL A-·· POOl' W/ TEMFEFi D ~ NIFl~fl-rr1-r'I~~?rd=r~-"""il~--- I 1 PROVIDE 2x WOOD 6!.0CK!Na. TO ALIGN ti) ' a.I.AZ .,._ OF=LUMN -+,, EXTSl'i INSTAl.I.ED OYER (I) !.AYER OF 4' CONC FLOOFit SL.A6 WITl-I \ i 1:;,o UNDERLAYMENT FELTS 6X6 10110 WUJM I \ !;>' O.G. >< "'21' GA ALUM. --t "4 eENT 6AR -----, GUTTER MOUNTED ON A IS'>' SRiCK CAP 5LOF'E lxE> PRIMED l'EDUJOOD /AWAY FFi10M COLUMN OOTteFi160ARD-FAINTED J18' . IN ALL DIRECTIONe

    6UILDING F'FitOTECTION 60!.LAFitD SEE DETAIL ! €l @ I I r BRICK VENEER 6~YOND ' I--- 2'-IZ>'x2'-IZ>'X2'-IZ>' !SRICK CEl'' 6EVENTED 6EADED VINYL PANEL/ &OFFIT TO _,i i 4' CONC FLOOR 5~ WITl-I \ ~ l'-0' u++- INVl&IVENT "RSCW6V BY E>Xil!> llZ>/10 WUJM ~ VENTED VINY!. SOFFIT WO!. VERINE TECH. r~=;;[ WITH E>Xll> TO 6E 6EADED PANE!./ -~---·- ... ·····"""""'"'"""'"~- . llZ>/llZ> WUJM - &LOPE TOP INVl61VENT ~v SY I 1'-2 1/4" 1XllZI PRIMED REDWOOD FASCIA EIOAF 5TANDAFi1D HOOK ---~------··------~~----- PRIMED REDWOOD FOOTING TO ReeT ON UNDl&TURE!ED --~ --- :;;• DIA FYC FIFE SLEEVE FOR SPRINKLER TRIM SOARD I' eou ... AOSUMJ;;D eE.ARING CAFACITr S'T'f>TEM AT 6UILD!NG Fl'IWNT "'-- Fl6EFIG!.Aee CO!.UMN TO 6E lt'>IZ>€> FeF JN FOREGROUND SECTION 1'=1'-0' SECTION AT &TOREFRONT 51&TEM END CONDITION AT FRONT ENTRY GA6LE

    NOTE: ALL 51-!INGLED ROOF 5!-IEAT!-llNG TO BE RADIANT BARRIER TYPE :>;kP00 PSI CONCRETE FOoTiNG 4'x8'x15/32 WITH FOIL FACE BACKING. FOIL TO FACE DOWN UJITl-1 (.3) 04 6Al'i1& EACl-I WAY AND BE INSTALLED FER MANUFACTURER'S LATEST WRITTEN GUI DEL INES.

    FOOTING TO RE&T ON UNDISTUl'i16ED --~ SOIL. AeeuMED 6EARING CAPACITY TO ee ISIZ'IZ> FeF 8EAL A CONYEflFDl't:E STORE FOR JOB RO. SIBT NO. I'" I' -0' UNITED DAIRY FARMERS DRAWN BY

    AF 11.17.16 CINCINNATI, OHIO 46212 813-398·8743 613 ------·-- -·-· -··- --- ~--- ~-~ ------· - -···-· ------·-· ------~------~ ---- -·- - ~~- - -- ·--·------. ------·· -· ---·------·--- -· ------

    EQUIPMENT SCHEDULE

    lt!IT MOPlil.. -.,Y flllllUIOIN OA &XHAU&T ""'1 lllTU lNA NIA 2 I' 2111>&/6£>13 llll> l,s,.!,6,1,9.1£>, - SMIJK£ DET£CTCIR Tll B£ l!F-l BROAN""""""' 6IM NA NA NA ,., NA 4, NIA NA NA ·-ll>ll I& INSTALLED IN RETURN AIR DUCT l!F-2 aR0.4N 6111& NA NA NA NA NIA NA NA 11&1611M 111 4. DllWNSTREAM CF AIR nt.T£RS l!F-3 %11:>&-TPA NA NA NA """ NIA 114 a& 1-ll>ll I& 4,3 AND UPSTREAM CF ANY l!F-4 ZAlll·TPA NA NA NA HIN> NIA V4 .25 11&1611M a; 4 RETURN t. SUPPLY DUCT 'JILL BRANCH CllNNECTllJN -- -··----·-•••••••--ww•---~-~----·•w•~~---•--~~ ~-~---.-~-~ ------·-·· ... ~······-····.. ·---·-···--·---··--·-----~-·-.. ·-··--.. ····-·-···-·--··-·...... ·-----···----··- -·-·------~----· ---QJNN££.T·Tll · 24'·..mii·CUS · · ..... ,...... ···:::.::·::::!.:._ ·--·· .... -· -······ N01'I!&< 1. WIT!-! OJllle. 1. WITM OJT&!PE All'! ;.!00£) ...... - . ·~ ··--· .. ·--······-. ~ ---·-······--···70··-· ··-···--·-····--·--·- ,.• 2. WITM ~LIGHT. i -~-""'""'"~'- ----"-~-,-.;, ~-~-- - '"'2--z--z-==---~-=·=.x;,,-,~ ..,,,,,,_ ____ -----"·""'=~-"""'"" '-:··-··-·t"'E'I.---·· ···-. ···~--- .•. -----··· ·--- - . .·-··--'······ ---··--·· ...... ··-··· a. c:oHllllCL& - ANAL.OG. .,, __ -- a. llrnl THE!ll10&TAT. 'IL ACQ!&&~~ i ' "" ------.. ' ----- 4. ~ DY OTl-il!N,Vl!lltll'l' Ill>. eMCl(I! Pl!Tl!CTOI'! ! I ' j : : : YOI. TAG!! Wln.I 151.EC'll'!ICIAN. lL I '' e.. GAS l"IF!l'G INCLUCHill:>. &'lltUC'!UlllAL - tlU.IG. :: I 12. Wln.I ~ vt!NT UP I ELECTRIC/GAS •• WlTi-1 fllilll'10VA9l..E PU.TI5I'!. ! SERVICE llHI NECK -"°°"' l 350 CFll I I CiENE1'tAL EQJll'l"IENT NOTE&. i j- ~ fl!IOOl'TO!" UNIT I& &c:lllll"'iic:> WfTl.l Cll.ITPOOl!l All'! ECONOMI~ &T E~iZl!l!il I I AT A MIN. O!' - QM, l'lOO!'TCt" llUl"FI.Y Alf't I& MAC>i! IJll' O!' ""1\llllN All'l ANP OllT&IC>!! AIR TAl lOlll NECJd AT UNIT& WITM ~ &TANDAlllP l'll..Tl!M. I I 10111 UP TD 375 Cfll' ECONOMl%EI'! &1-!ALL 1!!11! ~Ll!P 9Y Tl-II! !llOOPTOI" u.!IT l!NTl-!AL!"Y : l ,_ -- -· "[8], . _.,.:.. _ VENT CAP ml1""1.. Ec:oNCM!ZEl't. PAl"1F'El'!i! 8MAL.L Ol..06li! UMa-1 UNIT I& PE ENl!!lil' F Fc:>111 COOl.!Nci. I l / / I i i COMPONENT ENVELOPE CRITERIA i . ! ~~· ········-----·· .. 8 . fii - (j) ---• ...... TYPE COMPONENT 1 lf"r1"'E ~ J !I . /,t~c.:__:;::.:.....c::S.:..._.::.:;:..+~,__-__. __' _1_°",.i 1,adAcrM ~iiji+1-,m'f+, ------r--r------1!+-i--+-+H--;l'.'l~:r-:,-1211-. --...-,.....:.,,;,..;;:;-·, -;;.;.;_::_· ·;;.;.;...· __,:,;,;;.;.;_ _ __,...(, BFillCK VENEE~ I :f.ICK VENEE".'j,. ;.. : 'l fi"'i1.]J!·~-i:::-~~~~~~~~~-'--e~~~~~~~-4e.,,,.....::..~~4-4--'-:,,,..;;;;;;;!;;;...!--:...... '"1!~1'.:~F"~~~-:-~ WOOD Ffl

    l ------~ ...... ·.:..=,l.c.cr· ' "" ·~"~. 8111 ·------. --·- -- -- eoxeo 28x22 <:lUTI!IPI!! All'! Fll.M ll>.l"I o.n \ \ - ; •1 ESJltlCK -4' ll>.39 ll>.39 L c ~NECK . I '. !; - 10(11 NECK ~Sl..00<:4' .. !JI 50 CfM ' ); 375 CF'M In' GTI"eUM -ATMING llA .. __J 1 1 6 ~... Jie Pltsef'C# M ·- // ·1, \\ !NeUl.ATION )':( VD I tn• Ti-11!!\l!MAX 11>11111 &1!!11111!!& @ ~ flllG!P !NeULATION --- / ' ' ' • 112. PR'l'1llAl.L ll>A& ;41> • l D IN&IPE AIR Fll..M ll>A>& -168 ·.. I 10111 NECK 1o.t NECK lo.I NECI< ~~""f' n 275 CfM ! ·-~'·' 275 CfM 275 CfM ii 1'!•21.14 lits'29' ' lOlll U•Cl.D-46 U•O '18 ! i l WOOD~! flAAJC ~T/ '' •• el41NGLE ROOF fllJILT-1 i u i OUT61P1i All'I FILH (JI> M1"t<> ll>.11 ll>J1 DUMMY DJF"f'USER 109! NECK n l!IUILT·UF ~ -- £>.all ii @c==:i 300 CfM Fl!LT 15" ll>IDlb 11 ~& -- .. 1"1!!1111..l'll! f:lOAl'!C> "'""·- 2£>41 SALES AREA 112' 111.Q:ATl-lll'G ll>.6ll -- 100 All'! eFACE <&TlLW ll>.'1111 -- lJ Ill>' fll·llll> Fl1'l!llirlil.A&& lle>J//JI!) ·- ~ INllJLATION :W4' ACOU&TIC Tll.lil ui; IN6lPli All't eFACI! l&TILL> ll>.61 ll>.61-- 1'!•34J4 lb2ll U•d'J.a!-2 U•d'J.i04"1 i. VD 1441 I ,. . J I l' INEIU!.ATION GI.A&& U•d>-.61 @ 000!'!& U•fl>...t.i ' i HiFdl IETEI'< &LAEi INllUL.. R-10""' U•OJI) 10tl NECK 10lll NECK lOlll NECK 10lll. iNECK lOlll NECK i : 2' '&T"f1tOFOAM 68' 325 CF'M 325 CF'M 325 CFll 325 CFM 325 CF'M 10x10 SG t 90 Cfll 1016 DIFFUSER SCHEDULE 6UFPLY 0-111 TO eill!i 24"'24' UV Ill>'• NECK 15Y All'! QUIPli CCJlllF. MENS . i @ HOPl!!L'M'!E. 11.WITE -IT!ON 1!10X Irr HY.Ac CONTl'!ACTOI'!. 103

    I llUl"F'LY OIFFU&l!!I'! TO BE Ill" PIA. 36ll>' nR:1W BY l-IART f COOLlrr @ j Er-1 6iJ!"l"I.Y C>IF1'1.11!1!!1'1 TO BE 4'xlll' l!IY l-IART f COOl.l!!Y. 70 CF'H @ Fl-U&l-l MQHT WITM Cl!!ILING. I -· ·----- . ------·· ------OlilTillALL ' .------·- ' "·'·'-·-'···· -· .--,-,-"--'-·-- t .. --~------~- ""• ·--~--··· -.----"~ "'"""'""'··----·· """""-" - --~ l'l!11Jl'iN Cil'llLI- TO BE V2'xln' li ® &l-!l!!l!!T Ml!TAL, 4' Pl5El" l!IOX WlTi-1 1"''+ COLLA!'!& AND Ill>'+ LN!P Fl.El< DUCT. FfUCT UF Tl-!lllClUGIH AND Ill' ~ INEIULAT!al.

    @ Pl'ttce 'TE~' 6' OONTNJOtJ& &I.OT t>ll'l'Uel!!l't 1•&1.0T TYl•!i!-1&

    ® - &llll> IGTIJIOIN GRll-Ul SUFll'ACE MQlm - NECK H.V.A.C. NOTES l 8UF'l"LY AND~~ DUCT& TO 1-!AVI! l 112' Tl-!!CX F~ BALANCE SCHEDULE INelJLATION WITl-I YAl"OI'! - AND &1-!ALL eE l.ABEU!C> lNCICATm VENTILATION AIR SC HEDULE &YSTEM SUFFLY O.A INelJLATm VALUE, Fl..Al"E -AC> AND &MQKE P1!!"1!1LOFMENT. CICCJP-ANT A.MAO-A lJAL .,.,,.,rr ~~J~ "A '°"""""¥1.-0W ~TE R.OW AATI:$'. Rea.I~ ACTUAi. NOfEfl FIZ' 2. FUl ALL OUCT& l3l!n1El!N JOIST&!l1'ILlllSE& AND ~ UNfT" """"' l!GI FT FEOFl.E.'OGl l'T OCCOF'ANTO CR11""'FT OA ""1 CACFM MCR'1 4,- ClUCT6 ~ JOl&T&!11'1L1111'£K """"' """" """""' cm""""""' l &ALP Al' &tWe>tD 41 1.5 .12 1!le' ,_ 3,851!) 5UFFL Y AFl"fi'OXiMATeL Y l!GlUAI.. To ~ ,_ NClN·INSULATl!P OUCT ~ l!IATi-!!l!Oa'I. TO - Ml!!TAL """"1 llENT FAN l WOMAN 14'2 TOILET .e.s NIA NIA NIA NIA 12 l!Xl'I!-U1Al..Lll'!OGf' CAN. NOTE, l M!N& ldl?! TOIL.ET 65 NIA NIA NIA NIA " le ""'!1121 ALL FLEXll!3LE C>IJCT& &1-!ALL NOT EXCeEC> 1"' FEl!!T IN ll!NeiTi-1 Ale> &1-!ALL AJ..L l'll!CTANGU!.AR &UF1"L Y 4 F ~" 35" It-I~ Y LINED WITH 1' THICK INSULATION. "'· eE CF CLA6& I l'!ATm AND ~ TO A&'!l'1 l&l &TANDAl'IPS. I l'lECl:lYING le& !W NIA NIA NIA lf)6 4 le> !W H. V.A.C. PLAN 1/4' = 1'-IZl' "" ALL ~ euF'PLY 4 ~DUCT& 61Ml.I.. 6. All'! NOT IG'l1Jf'INEP - Cl:IL~ l"Ll!NIUM. l-INl!P IGTUfllN All'! 0UCT e 86(/:'i Ut!l!C> A& NOT!!:>• 83" 4,4ee ~ ~LY IN&ULATl!O Win.I I 112' THICK DUCT URAF'.

    1-1.Y.AC. COHTl'tACTOlll TO CGl-N!CT et1aKl! PET!CTION Pl!!YICI! l'l'IOYIPEP FQ!QIJlll!i!!O OA Cl'M FOR I!~ ~ACE I& CALCllLATl!O A& FOLLOlll&< •• IN RETUl'IN &!PE! CF 1-1.Y.AC. UNITo Wl!G IN &!!'!IE& Wln.I FIOCF TO!" I.NIT OA • Afl/IE.All~ X occ:upANTS/l fl!){!)f!J SQ FTJ + (A!El. 'C>i-llllli>lAC·2 ~ - reM0TE TE&T &TATION liilALAl'i!'l Ll6HT. UL Ll&TEP·2611A. llll>ll>·llll>ll>e> FPMil'llN. 1. F10CF TOI" UNIT,

    &. ALL 111iC1UNt> DUCT &flALI. 1!11i GAl..YANIZEP WIT!-! FAINT -· '.I. ALL M!!Cl-!ANICAL l!!Gllll"Hl!NT &!-!ALL - t"I!~Y -:.a:> Ml!TAL FLAT! OI'! T.ddr INC>ICATING Ai"'!"t'IOYAL Mil!NCY NUMeEflt, MANLF~ MODEL IU'tlllEflt, &l!!l'IAL NllMel!!li. TE&TN:i ..IGENCY, f\IEl. T'l'1"E, INl"UT AND Clll1"UT !'!ATING&. llZI. ALL 1-!YAC PllC11llC)!llK lll-IALL BE FAElfl!lc::ATl!P FfllCM GALY. &TEEi. 1-!AYm ZINC COAT!Nci. ALL Ml!!TAL 8flALI.. BE LOCK FQlllMING QJALITY AND Ml!!ET &TANDAN:>& FOii! A&TM ~ .4NC> A&TM A&21. l'Aefl!ICATION AND IN&TALLATION e14ALL eE IN ACCQR:>ANCE WlTl4 • l4VAC &TANPAl. ALL MAT1!1't!AL& MU&T Ell! Ll&Tl!P A& eucl-! 9Y MANLPACTUfllE!ll It ALL NEW 1-!YAC CCN&Tl'il.ICTION &1-!ALL ~ TO NEW Oi-110 Ml!Cl4.4NICAL RE¥1810N8 A COllVll ~I STORE FOR .IOB NO. 8lmET NO • CoP1: r::>ATl:C> NOvl!Ml!!l!!I'! ~ 211>!t 12. COOlllPINATE ALL Tl-!l!!fi!"IO&TAT LOCATIC'N& WITI-! OllHliR UNITED DAIRY FARMERS 13. ALL PUCTWOf'IK I& LOW I 1111181.11'111 FAel'llCATl!P TO eMAQlA !ITANP~ Afitef.I. REVIEW 60A~ UFDATE DRAWN BY 14. ALL Fl'lll&i-1 Alflt INTM:Ell llMALL eill!i MIN. Ill>' FfllCM JD

    314' WATER OUT TO IRRIGATION SYSTEM 6Cl-!EMATIC MANIFOLD ..---- I 1/2' WATER SERVICE

    FIELD LOCATION 6Y FLUM151NG CON

    c.o. ··- -- --

    lr.l'CW

    PRIMED BY CONDENSATE ·¥( /I! / I / I // ) / ! /l' I ' / I ,• 11 / I: ;11, / DRAIN UNE OFF WAl...K-IN • '\,l / .. / 'L ,/ ' , "/ / ill "/ // ; ./ ii .• " ,/-~ Ii ,- !! // : /-" eox FAN COIL UNIT , , -: \.. --~ __.~ -- ---~ ------II- -- JL __...~ .,_...... --- l-- L- -'""~ 11---- " 3'SAN 3'SAN .... 0 .ooJ \ I i I 11 'I 11··- ! I , I I 111

    I r • L___: ---··------

    QUILET END VIEW 3&'-'il'

    ' ~ETA'

    ' .' I' ' r-:r,n ;------I ' I I \ ' I !p,'===*====ii====~===-.ii ) ~--·----·-··· ____,_I ____ . ,_,_--'----···. ' ': .. L_ __ ' ii ==tl I' \ \ I L:=•. =···=~====::'.J I r=--+-····~· I I I I I L ______e!ECTION 'A·A' : [Q] [Q]/ ' L______

    BC e FER FLAN DESCRIPTION SPECIFICATION RATING, (4) REQUIRED, DESIGNATED 61W UJATER-- ! L.,__...,.,.._r+r-t SERYICE c F-1 WATER CLOSET AMERICAN STANDARD "210&.400 'CADET' ELONGATED SIPHON JET ACTION, CLOSE-COUPLED, UJl..llTE Vltfi?EOUS 3) STUB WATER UP INTO BASE CA61NET AND CAP FOR FUTURE USE, ' CHINA "34ll:'S·lf>l6 i>UFFLY STOP, BEMIS "l$S-SS/C SEAT. "" ' FVC Dfi?A IN LINE A TT ACHED ANci f'·2 LAVATOfirr CUSTOM LAVATOfirr W/ SINK e0WL. 6Y CA61NET MAKER. SUPPORTED OFf DEDUCT PLUMBER RESFONSIBLE FOR ALL HOOK.-Uf'S. FLUMeellil CA61NET ' LEGEND METER TO euF'PLy AND INST ALL HAPlDWA~, AM£!R. erANDARD 1-lERITAGE LEVER 1-!A'-COMP SINK) AMTEKO C-3-IE>llll-D. !-!AND SINK MOFSINK WILLIAMS 'MTB' TEll<24', WITH:;• vENT ______MANIFOLD ELEV A TION SS Dfi?AIN "T • 1!:>V6 SINK FAUCET. WATER FIFING TYPE 'K'COFFER MA.Nl:"OLDA ~ F-6 URINAi... AMEfi?ICAN erANDAl' COMFAF14' FOAMED PLASTIC AT ALL LOCATIONS FILTER SUPPLIED BY LI.PF., INSTALLED 6'r PLUMBER OUTSIDE INeuLATED Of'! HEATED AJl

    ELECTRIC WATER 40 GALLON ELECTRIC WATER !-!EATER - i:;:.v RHEEM, GA&FIFING SCI-I. 4" 61...ACK STEEL FER GA& COMPANY Fi?E:!s!U.ATION&. HEATER !:>YEAR ENEF!:>60 KILOWATTS TO MEET ANSI C-12-1-12. FIXTURE CONNECTION SCHEDULE CLOe!ED SYSTEM FEl"!al\leON 'THEFIM-X-Tl'

      0 PSI, TEMP 200'F MAI00-A3. F-3 (3) CCMF. SINK 2' I 112' 2' 112' 112' INSTALLED 6Y FLUM. CONn;t 2204 WEST DUBLIN GRANVILLE ROAD A &INK FU!iiNl&l-!ED 6Y UDF, CHECKED BY BATHl''a UNDERCOUNl:R STAINLESS F-& HOF SINK 3' l Ir.I' 3' 112' 1/2' JOHN D. JOHNSTON ARCHITECTS STEEL SINK WITH GOOSENECK SINGLE 1-!ANDLE CUJ FAUCET 8811 MONTGOMERY ROAD 11.17.16 F-6 Ul' l-~

      ---fl SIDE VIEWS <:::: :::;::; PERSPECTIVE VIEW END VIEW END VIEW ---1 PERSPECTIVE VIEW PERSPECTIVE VIEW I ---\\~ I ---, D / 21 I .--1( c::::i 00 O.o 'O.J t:.c O.o b [ 0.(1 O.o b.o C.i 0.1 b· b.t J.l ti.I 0.J '0.0 bo 0,0 '0.0 b.o 0.0' '0.0 '0.0 o.c' '0.0 b.o be b.o 00 '0.0 BOTTOM VIEW TOP VIEW ~or\=::o ~o ~o ~bo~f ~o SIDE VIEW SIDE VIEW ' ' • • • • • • • • '0.0 bo 0.0 c.c b.o 0.0 o.c O.o 0 - 0.1 .::.1 0.1 b1 '0.1 J,,L 0.1 0.-1 --OJ- U.1 0.1 00 [,o '0.0 '0.0 o.c b.o ;o o.o o.o o.o o.o ______°~ o.o b.o b.J b,o bo b.o

      o.o uo 1rn tu bo O.o 0.1 t: .1 b.2 b.2 b2 b.~ J.2 0.2 b.2 0.C 0.1 '0.1 b.o C.o O.o b.o b.J O.o bo \ll'O-bc b.o oo ~_J~\ o.o '0.0 b.J '0.0 O.o O,o 1 • • • n.n 00 O.o :.o '0.0 0.1 C.2 0.4 0.J 0.'J b.2 b.i b 1 b.o '.:.o '0.0 b.o b.1 '00 Oo \To~ to Oo hn jJo/___., Oo 00 'fl.] 0.0 0 0 b.o \ -- i, • - - to 00 '0.0 ~.O '00 '0.4 c 6 08 b.s 0.9 0.8 O.s ':.o 1 - l.9 '0.7 b.s 04 0.2 0.1 b.o b.o b.o b.J b.o b.o lo_ b.i b 1 0 o 0 o 1 b o O.o 'O.J O.o b.o b.o ------(

      • • • • 'o.b· '03 ' ' 'c.o O,o O,o J,O '0,0 0 1 2.6 2.i 1.5 J.3 2.J 1.8 1.2 0.9 u.2 b.o b.o 0.0 b.o 0.0 O..J C.1 b.2 .-o0.5 5 ·o ,l 'oc\. ' 1 'oo. b.o b.o c.o '0.0 0.0 ' iii E t.o U,o U.J l.1 01 7.7 i:..? lh ?.1 '1.1 1:.1 ~1.1 ?.n 1.3 0.J '0.0 O.o '0.0 b.n r1.n O.o '0.1 T":.? bo b.o C.o '0.0 '0.0

      • O.o O.o O.o oJ '.:.1 02 2.9 ls 2.4 '38 6.7 1s.3 7.9 0.0 O,o b.o C.o '0.0 0.0' b.c O.o b 1 b.2 '.:.s '16 3.9 4.7 0 1 b.o ::.c O.o b.o D • ~""-- o.c '0.0 00 b.J b,2 2.6 3.3 6.-'l + I- ' "'' I 4.: 4.s 01 '0.0 :.c '0.0 '0.0 1-1.4 23 ~-\ 3.5 '\. • • • J.c b.o oo '0.0 J.l OJ 1 ./ - Rlfl~U ,8 3.1 4.s '0.1 b.o J.c b.o 0 0

      I J,:..; ti.o •u.o '0.1 I 3 ?.1 J.::, b.1 0.0 J.C •u 0 'OU - uo 11.c 0.5 Co.lculoi;ion S1,,riM:..~y ! Lo.lit:>l Co.le_ Ty;_;'=' Uni Ls Av~ Nc..x Min Avo;J/Min Mo.x/Min - n.1 '00 '00 b.o b.c O.o 01 2.1 1.s 1:?:.o b.1 '0.0 O.o b.o b.o Co.\c_P Ls Ill urii /1c. nL e FL 2,QL 42,7 0.0 IJ.A. ~l,A , ___Co.nuµy JUl'liYLJ.'')' IllLH'li /1C.i'lLC FL 36.47 46.1 0.0 N.A. N.A Pur'1p \ler-tico.l ~llur'li,·1c.,nce Fe 12 00 14.D 9.J 1.26 1.47 ' 'O.J 'C:.O '00 '00 b.'.l b,o b 0 7.s 9.o L> .u 1.5 1.9 '0.0 b.o O.o " H"SIDE CURB .lluP1i/1c.nLc FL 8.30 42.7 0.0 N.A. i\l.A. ' ' ------I '"§? ~ ~~~ I ,., _ "'~'<·- :--.·-->:_'::-; '0,1] 0.0 •0.0 • ' ~.01 ' '0.0 t.o 0 J u.o b.o b.o :::: .1 r..::-i ~ ,,4 1J tJ i.J 1.2 12 i.1 1.o 2o 3.3 O.o b.o O.o ' ~ ~~~ ~.n '0.0 O.n b.o b.o b.o i::J.8 -~l.O ' ,L §:~' 3 '0:--:.'%.2 3.1 3.1 3.i 3.: 2.9 2 2. 23 4.1 00 '0.0 lJ 0 ' ~[

      I O.o ~.o O.o b.o b.o 'C.O '0.0 '0.0 13.4' 14,4' 20.6 26.S ls.s 12.0 '10. 7 9.9 8.9 8.s 8,6 '8.3 8.2 86' 8.s ~.o 7.s 3.3 3o 4.s o.~ 0.0 l.o bo Verticul Pur1p

      • ' 1· ') • O.o J.O 0.0 oo b.o l.o O,o 0.0 ~.c c ' L> • L • L .. _L • 6.9 J7 3,2

      U. u •u.o bo u.D :.c •0.0 '0.0 'O.J \c.1 39 2.1

      00 DC '0.0 00 '0.0 :.c b.o O.o 0.J 1o.i 3.9 '2.4 ko '.3. 13.J •](:',

      '0 0 b.c 0.0' bo 0.0' J.C b.o O.o b.o i'.J.8 13 110 '12.

      1J.o cu 00 bo J.c u.o U.o b.o '00 h4 i3 12.5 12.'

      O.o b.c t.o bo b.o lJ.o t.o b.o b.o 12.s 12 lt.9 '11.

      • 00 to 0 0 U.o O,o U.o b,o b,o J.c 0.1 'o.~ b.i i2.2 ]1.7 it.2 ' :0 ' l bo 0.J C.o 00 b.o O.o b.o 00 b.o J.c 00 01 h.6 'll.l lu 6 1U.

      bo 0.J '0.0 00 b.o 'c.o 00 '0.0 J.c '0 0 bo 0.1 J.1 '0.1 lo.J 10.1 1o o 9.~

      • • I ' O.o 0.J J.O '0.0 oo 0.1 C,o 00 b.o b.J b.o oo '0,1] 0.J 0.1 O.l OJ 02 0 2 :.2 0.2 0.2 b.2 02 0,2 J.2 0.2 0.1 0.1 C.1 0.1 O,~ '0.1 02 0.2 :.i b,o O.o b.c '0.0

      • • • • • • • • O.o O.o 1.n 0.fl to ~Ji O.o bo 1i J 0.0 00 b.n J.c 0.0 b: 'IJ, l t.1 U.i u1 '0.1 J.1 b 1 0' 1J.1 lu 0 1 0.1 J.1 U.1 b,_ OJ b._ O.i 0.1 0 1 O,i O.o 0.0 o.1 0.0

      b.o '00 b,c O.o O.o b.1 :.o '0.0 '0 0 0,J C.o b.o O.o O.c O.o 00 O.o J.o O.i 0 1 b.i 0.1 '0.1 'G.1 0.1 b.1 0.1 tJ 0: 0.1 ':.c O.o b.o b.~ 'OJI 1i 0 '0.0 Ci.o (1.0 'O.fl 01 '0.0

      I • • ' ' ' ' ' 0.0 O.o O.c b.o ·o.o b.J J.O b,o 00 b.o t.o b,o O.o b.: O.o 00 b.o 10 0.0 0.0 0.0 b.o 0.0 00 0.0 t.o O.o O.o b.c O.o '0.0 b.J '0.0 '0.0 b.1 O.o 00 O.o lJ 0 O.o (l.O 'O.J '0.0 lot0!_ 1'rcjPrt \o1otts_~ I oto.l 1,/o.-:-:s = 4?()],f, • • • • • O.o 'n.1J 11.r '0.0 O.o 0.J (J.O O.o b.o 1.o 0,0 O.o o.: l!.o bu o.u J.[J '0.0 o.o 'o.u iJ.C t.u uo b.u :.:.c O.o ·b.o b.c b.o 00 b.o J.c 0.0 b,o b.J 0.0 O.o b,o b.c 0 0 0.0 '0.0 'c.o

      JO°"O •LLlAtlOC •n. C!"Oll'IMAT! D<:D 4'2"0 USA Bo.seol on the in.:·orric tion i:roviocol, :::.ll cli"lcrsions o.n:J lur~i'lo.irc loco.tions f-----~--~---.--- -=-==='>!~='===·~=·=··='='"="'~"'=··~~=ol shown re=iresent recoriMencleol i:osi liuns -h"° Cc'ntiir·f='e>r· J.r1G/or· cu·chitec--:: 1'1ust I TrH-l'.JG PPJFDSAL LD-1?1741-4 deter-r'1ine the o.pplico.bLity ::iF the .oyout t.--: Px.stino or- ruture- rield conditions. UNITED DA=:;oy FAR,"1ERS This lighti'lg plo.n represerrts llurii1~0.-:lor Lev2ls co.,=ulo.-:eci frori lo.tore\ t:.:iry clu tu DUBLIN "'0 to.ken un:le r controll.ed Loncli Lio/is in ut_corrlonrP with ThP Tlluriirin ti no E" nginee~- ing GRAN\/ JLLI:_, JH 2 :'\oriP-ty (IFS! .1rrrovPci MPi:-toos. Actuo.L pe1~fo1~Mo.nce 0 o.ny r"""o.nufo.ctu1~er·s luri:no.ires SciEET REV:9/25/2J14 MOY vo.ry due to cho.nges i-'l electrico.l vclto.gc, tolc"o.nce in lo.Mps/LED's o.nci other OF l vo.rlo.k.lle ..=-ield cond:tions. <=:olculo. tion::; de nu L inL.udlo' ubs I.~ ·uc·I: uns such o.s buil.dings, 0 Lur··ls, lo.'ldsco.ping, o~ ony :itl-e-r· ~,rchii:Pr-tut"ol PlPriPnts uhiPSS hotec!. SCALE' ~·=20' 20 City of Worthington ARCHITECTURAL REVIEW BOARD Certificate of Appropriateness Application

      1. Property Location 661 Evening St, Worthington OH 43085

      2. Presen t!Proposed Use Residential, single family dwelling

      3. Zoning District

      4. Applicant Allen Eiger and Joanne Dole

      Address 661 Evening St, Worthington OH 43085

      Phone Number(s) 614-330-5331or614-374-5729

      5. Property Owner Allen Eiger and Joanne Dole

      Address 661 Evening St, Worthington OH 43085

      Phone Number(s) 614-330-5331 or 614-374-5729

      6. Project Description Installation of 17 Solar Panels

      7. Project Details:

      a) Design see attachment

      b) Color see attachment

      c) Size each panel is 38" x 76"

      d) Approximate Cost $15,000 Expected Completion Date March 30, 2017

      PLEASE READ THE FOLLOWING STATEMENTAND SIGN YOUR NAME: The information contained in this application and in all attachments is true and correct to the best of my knowledge. I further acknowledge that I have familiarized myself with all applicable sections of the Worthington Codified Ordinances and will comply with all applicable regulations.

      !t/z!I?,, ! Date 11b/t1e Date Abutting Property Owners List for 661 Evening St.

      David & Kathleen Griffin 669 Evening St. Worthington, OH 43085 John Moe Paula Baker 678 Evening St. Worthington, OH 43085 Pamela Smith 672 Evening St. Worthington, OH 43085 Steven & Akiko Pullen 653 Evening St. Worthington, OH 43085 Martha Lopeman 652 Sinsbury Dr. E. Worthington, OH 43085 Aaron McGreevy Molly Morris 660 Sinsbury Dr. E. Worthington, OH 43085 Allen Eiger and Joanne Dole 661 Evening St

      PLACEMENT OF SOLAR PANELS

      While deciding where to place our solar panels, we had three criteria as our guidelines:

      1. Minimizing visibility from the Historic District 2. Awareness of the AEP's need to provide a stable and reliable grid and meet the power demand during peak demand hours during late afternoon 3. Maximizing efficiency and productivity of the solar panels

      To meet the #1 objective, we chose to place !!Q panels on the East-facing (Evening St) roof. The majority of panels being placed on the backside of the house (West roof) will ensure this.

      To achieve the #2 objective, we decided to place most of our panels (1 2) on the West roof. Those panels will not be visible from the Historic District. Typically utility electricity demand loads peak in late afternoon and early evening, due to the use of lights, appliances, heating and air-conditioning systems, water heaters, etc., in homes after work and school. That's also the time of day when West facing panels will be receiving good solar exposure.

      However, going with ONLY with West-facing panels will not reach the top of their design efficiency and productivity, and won't meet our capacity goal of SkW an-ay (without significantly increasing the number of panels and making the project cost-prohibitive for us). So to help meet the #3 goal, we decided to place 5 panels on the small South-facing roof section over the garage. These 5 panels will significantly raise the overall efficiency and productivity of the entire array, increasing the weighted-average of every panel. Those panels will have limited visibility from Evening Street, but only from a small angle from the Southern direction (please see the photo below).

      This placement of panels is a good balanced approach which is a win-win-win with respect to our three goals, making the project feasible for us in terms of power production capacity and cost. Even with this placement (ensuring minimal visibility), the solar system produces extremely well and will ensure that over 350,000 pounds of C02 are not emitted into the atmosphere. Also, given the C02 absorbtion qualities of trees, installing this solar system is the equivalent of planting over 17,000 trees over the life of the system.

      661 Evening Street, Solar Panels project

      The image below is from Google Sunroof Project (with the red arrow added by us). This project uses sattelite images and computes solar exposure of roofs. The lighter the color. the better the solar exposure of the roof.

      As can be seen, the small South facing section where the red arrow points is the best part of our roof for solar panels. Utilizing this section will drastically improve the efficiency of our entire array, also allowing us to send more power to the grid when we generate more than we consume.

      Cl~OF WORTHIN~TOt f'K. \ · ::J.~- \ \Q DRAWING NO. DATE ll-J -\\a OHIO OWER ~;;;SOLUTIONS

      5.44kW Solar Project

      661 Evening Street, Worthington, Ohio 43085

      The proposed Solar System consists of the following :

      • 17 Canadian Solar 320 Watt solar panels. These will be installed on the left and backsides of the roof. • 1 SolarEdge Inverter mounted in the basement. • Iron Ridge rails and Flashed L-Feet

      A plot plan of the system is provided below.

      ~llJ ~F WORTHINGTQ~ N( \"J...Q\- \ '() DRAWING NO. DATE l\-:Z --- \\ ~

      Bob Sisco bsisco@oh iopowersol utio ns. com 740-506-0906 ;;f Ill OHIO POWER ....-II.I S 0 L U T I 0 N S

      Some sample installations are provided below.

      Specification Sheets are attached. The system is engineered for local maximum 90 MPH winds. All work is performed according to NEC 2014.

      CllY ~WORTHINR\ TTOON A1 \~C\-''O DRAWi GNO . DATE }\-J - lb

      Bob Sisco [email protected] 740-506-0906 CIIY AF WORI.HINGTUN ~\.J._ \ 'J_C\ - \ \p ORAW1NG NO. DATE \\-1-\lp CIT'( Ql WORTHINGTOh ·~R \-a.C\ .. \\,.., DRAWING NO. V DATE '\ -1-- \W - cny 0~ ORTHINGTO~ ~ \~ct-\\~ DRAW NG NO. y.; DATE )) - / - \ \a

      City of Worthington Case# ---<-++-'~....._...., ARCHITECTURAL REVIEW BOARD Certificate of Appropriateness Application

      1. Property Location

      2. Present/Proposed Use - -'1147._._r_,_6 ""-'""''-+-=--t------'Y'--'e.'-'~...... &'""' d'-"-~:....O..:...... t-'""""e.~ ------3. Zoning District S-1 '/ 4. Applicant __"Re~b~U.ca,~~ ~A~m~m~+______

      Address ~I~ £. )?~b lin GrAm{\ He l<.d. \Alo r:lban~ DH i/3oiS"'

      PhoneNumber(s) lol4- af~~ 35l£l, (H) '614 ~5;4 DSI~ (cell)

      5. Property Owner "Ke.be.c ea.. Ame.cV'-+

      Address

      Phone Number(s) ------

      1 6. Project Description Ee.pl o--c..e f X. l S 4=n \ ~ de..+e Y' i11 Y ~+i n j -fene. f.

      7. Project Details:

      a) Design a-H-~l-ieA b) Color r'\tt+u. r-oJ cecl ar

      c) Size 4~,,

      d) Approximate Cost ?> 0 Expected Completion Date I ~11 "f- / I 4->

      PLEASE READ THE FOLLOWING STATEMENTAND SIGN YOUR NAME: The information contained in this application and in all attachments is true and correct to the best of my knowledge. I further acknowledge that I have familiarized myself with all applicable sections of the Worthington Codified Ordinances and will comply with all applicable regulations.

      11/1g//h Applicant (Signature) Date I

      JI //

      Richard Yoerger Janet Mackenzie 3651 Patrick Rd. Sunbury, OH 43074 Resident 208 E. Granville Rd. Worthington, OH 43085 Robert Mora 214 E. Granville Rd. Worthington, OH 43085 Jill Lukshin Justin Hoff 220 E. Granville Rd. Worthington, OH 43085 Martin & Mary Walsh 219 E. Granville Rd. Worthington, OH 43085 Donna Sterling 698 Plymouth St. Worthington, OH 43085 Jennifer Murnane 704 Plymouth St. Worthington, OH 43085 Elizabeth Tait Ralph Leech 211 E. Granville Rd. Worthington, OH 43085

      MYERS SuRVEYlNG Co. 2740 Eul Moin S~t. Culumbu11 43200 (Healey), Ohio PART OF LOTS 11a12 MORRIS AOD'N. WORTHINGTON,OHIO FOR AMERICAN REALTY TITLE ASSUR. CO. AN9/0R MID-AMERICA FEDERAL SAVINGS8LOAN ASS'N.

      P.B. I F11&• I I 9 Flood Zone "C" as per F.I.R,M. ;; Fr~ Co. a.e. Off" 'St:tlk l"= , 390181-0:J04-B 25r-· I · 24 ·'86 I ~I -~ ·\·,' 11'i

      J ~:l• '1~ L 0 T 11 '~~- . .. ..'::> -- {, ' . -..: I -(()

      0 ti \I 0 :t: 0 .... I to :::> 0 - t.L.I ~ "" ~ ~ ...J w Q.. "'- ~ ~ 0:: \ i...i 0 ~ Q l.LJ en ::::>

      57. oo'

      C'T( Of WORlH'tiGT.ON l\V-. \~Q , \ kJ DRAWING NO. OAT£ \\- \Q ·-\\a Notes: Proposal 725 Kintner Parkway Date I- v,..;J Sunbury, OH 43074 - Wor~~ic;" f?..pv,',,_ Expiration Tel. 614.929.3526 Date Fax. 740.936.5452 c;1 l'ftJS•f C/JCt? - p~I~ Target Install ~ \ 1_ www.MaeFence.com Date ~\""'W Name Job Name

      Address Job Address

      City. State. Zip Email

      Home Phone Cell County/ Township! Subdivision "" ~-----·-- --- \).~ ------·------"'1111-'------··----· ------·-

      ----· ------·- --- -

      - J~· ------·-

      PAYMENT TERMS: Payment 1 Paymem3 TOTAL $ >!( 33 % DEPOSlT $ Date $ Date $ Date nee to be paid to lns1allatlon crew chief M D A Check M D A Check M D A Check or oflle. upon completion v v v # # # DEPOSIT $ [J % DEPOSIT BALANCE $ Terms; Exp Sec Exp Sec Exp Sec ACCEPTANCE OF PROPOSAL: YOU, THE CONSUMER, MAY CANCEL THIS TRANSACTION AT ANY TIME PRIOR TO MIDNIGHT OF THE THIRD BUSINESS DAY AFTER THE DATE OF THIS TRANSACTION The above prices. specifK:ations and conditions are satisfactory aod are hereby accepted. Payment will be make as outlined in this contract. Alt wori< is to be completed in a womnanlike manner according to standard practices. Any alteration 0< deviation from above specifications involving extra charges will be executed only upon written orders and wiU become an extra cost over and above the sale price. CanceOation of this contract after three business days win result in a 20% restoclling fee. In the event of a default payment Mae Fence may place the account with an agency and/or attorney for cottection. Mae Fence may record and enforce a mechanic's lein agamst the property on which the project was installed accordance with tllQ1"911(1Jc'f~~~ Customer agrees to pay all fees and costs associated with default payments. Our employees are fully covered my workman's compensation insurance. lil I l Ur VVUM I nll'tU Payment Is due immediately following lnatallatton. .{\Q_ \ ~0-\ \? Customer Signature

      DATt \ \ ... \B>- \k:; Name: Target Install Date: {.. )TSpaced Picket o Decorative Top Spacing ,, Board Size: __,_,,,I.--____ ~ Cedar o Solid Privacy o Board on Batton . ,, Board Cut: ('"""f.... o Treated Pine o Shadow Board o Rail )... o Other: Description: D Other

      Other: ~ lH!IU!I tllll!J I n....r lllllllllllWI'. #of Face Caps

      -l 111111t11 ! # -~-Iof Ffames I Rails Framing Cp11st.r""''n" Other. I ) ,r,::~~d ~ -;-· LJ 1 -< D Other r-...... F:ace Nail Toe Nail ..--... Mortice and Tennon I Post Size Post Top Eedar a Treated Pine B(\.) o Other c ... f~ #of Gates __....,{...__ __ . Black o Gravity Latch \ I"oots~ . . r.. a Wet Set Concrete #of Single --.1..---- r!~alva nized ¢'2 -Way Latch: J-. '1 ..,c...6ry Set Concrete # of Double _.._fr-___ o Other o Drop Rod o Other:

      #ofA~ CJ 2 - Post D Crescent CJ 4' Wide Wire \...... ~ CJ 4 - Post o Traditional o Other:

      C(Jvr""' ... 3s u ~ ~.6Sv '(P.>A {4~ ~)$ ~ ~0 ClTY AF WORT. HINGTON R~t otcA N<... \2:{)-\\o r<"'Cr DRAWING NO. OAT£ \\-\8- \1(2

      I GRAND TOTAL$ 3\ l 1(> ---- Im---- ·--· __-aca ·------~-u-- G) . --~·

      ··- - I