Annexure: a DETAILS of CONTRACTS PLACED by OPEN TENDER (For Civil Engg

Total Page:16

File Type:pdf, Size:1020Kb

Annexure: a DETAILS of CONTRACTS PLACED by OPEN TENDER (For Civil Engg Annexure: A DETAILS OF CONTRACTS PLACED BY OPEN TENDER (For Civil Engg. /Elect. Engg. /S & T/Mech. etc works) (Status for the Month of APRIL 2016 - FEBURARY 2017) Works Awarded : APRIL 2016 Quantity Rate Scheduled S. Tender Date of LOA No. Contractor’s Name and (for supply contract)/ (for supply contract)/ Value of Description of Item/ Work Estimated Cost (For Tendered Cost (For completion N. No. opening and date address Contract Engg./Elect. /S&T/ Mech. Engg./Elect./S&T/ date etc Works) Mech. etc Works) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 1 e-Tender 16.12.2015 Supply, installation, testing & IRCON/J&K- M/s Hitech-JK Engineers ` 4,26,56,056.82 7.25% below ` 3,95,63,493/- 12 months IRCON/J&K- commissioning of 33/11KV, Cell/JAT/15//1014/ JV from the Cell/JAT/15//1 014/Package- 2X1000 KVA Conventional & Package-SS-1/967 Hall No. 112-B2, date of SS-1/967 11/.433 KV 2X1000 KVA Dated 14.04.2016 1st Floor, South Block, issue of Dated Package type Sub-station Bahu Plaza, LOA 04.11.2015 along with HT panel, LT panel, Jammu - 180 012 APFC panel, Metering panel, DG set etc. and other auxiliary works for Sumber Railway Station on Dharam- Qazigund Section of USBRL Project (J&K) (Package: SS-01) 2 e-Tender 13.04.2016 Supply of DG Set for 11 IRCON/9041/BD- M/s Elmech Engineers ` 39,60,000 Item Rate ` 35,09,000 01 month IRCON/9041/ Stations of Ishurdi - Darsana S&T/SIG.SUPPLY 1402, Chiranjiv Tower, Contract from the BD- S&T/SIG.SU section of Bangladesh Railway /13(R)/05/682 43, Nehru Place, date of PPLY/13(R)/ Dated 25.04.2016 New Delhi - 110 019 issue of 05 Dated LOA 07.04.2016 Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 3 IRCON/J&K 08.02.2016 Detailed Design Construction IRCON/J&K- M/s Italferr S.P.A. - - ` 12,22,00,000/- 36 months Cell/JAT/14/ Supervision of Important Bridge Cell/JAT/14/ Via Vito Giuseppe Galati from the 1014/K-B/ DDC-Anji across river Anji Khad between Km 1014/K-B/ 71, 00155 Rome Italy date of Bridge/337/ 38.430 to Km 39.087 on Katra- DDC Anji issue of Dated Banihal Section of Udhampur – Bridge/337/ LOA 31.12.2015 Srinagar – Baramulla New BG 18388 Railway Line Project, J&K State, Dated India (Package DDC - Anji Khad) 26.04.2016 4 e-Tender 22.04.2016 Supply of S&T materials & Tools/Test IRCON/9041 M/s General Auto Electric ` 36,99,611 9% ` 40,32,576 01 month IRCON/9041/ Equipment for 11 Stations of Ishurdi - /BD-S&T/ Corporation Above from the BD- S&T/TOOLS Darsana section of Bangladesh TOOLS & D-207, date of & TEST Railway TEST Ansa Industrial Estate, issue of EQPT/70 EQPT/70 Sakinaka, Andheri (E), LOA Dated Dated Mumbai - 400 072 13.04.2016 27.04.2016 5 e-Tender 22.03.2016 Works Contract for Maintenance of IRCON/J&K M/s Gh. Nabi Giri & Sons ` 1,74,83,400/- 3.40% ` 1,80,77,835.60 12 months IRCON/ J&K NR/IRCON’s establishments (office & Cell/JAT/14/ H.O.: Near Tehsil Office, Above from the Cell/JAT/14/ 1014/ D-Q/ camp up keeping and other misc) 1014/D-Q/ Banihal, date of Utility Works/ and assisting IRCON’s Engineers Utility Works/ Distt. Ramban, issue of M-39/168 during supervision of works & survey M-39/168 J&K - 182 146 LOA works as required at various Dated locations along the project alignment 30.04.2016 from Reasi to Banihal covering Ramban, Sangaldan, Sumber, Kohli, Dharam, Khari, Banihal, Reasi etc. in connection with Reasi - Banihal section of USBRL Project (Package: M-39) Contd.../- Works Awarded : MAY 2016 Quantity Rate Scheduled S. Tender Date of LOA No. Contractor’s Name (for supply contract)/ (for supply contract)/ Value of Description of Item/ Work Estimated Cost (For Tendered Cost (For completion N. No. opening And date and address Contract Engg./Elect. /S&T/ Mech. Engg./Elect./S&T/ Mech. Date etc Works) etc Works) (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 1 IRCON/2063/ 10.03.2016 Cast-in-situ bored piling work for IRCON/2063/ M/s Civcon ` 4,40,00,000/- ` 4,40,00,000/- ` 3,45,02,831.23 6-months DROB/HOWR New Howrah Divisional Railway DROB-HOWRAH/ Construction Pvt. Ltd. AH/TENDER/ PILE/15 Office Building at Howrah in PILE/CCPL/90 21A Shakespeare Dated West Bengal Dated 03.05.2016 Sarani, 17.02.2016 Kolkata - 700 017 2 e-Tender 22.03.2016 Hiring of Survey Team on Team IRCON/JK M/s Skylark Designer & ` 94,37,574/- 3.50% Above ` 97,67,889.09/- 10 months IRCON/JK Month Basis for Survey Works Cell/JAT/14/1014/ Engineers Pvt. Ltd from the Cell/JAT/14/1 of R-D & D-B Sections in D-Q/Survey team B-48, IInd Floor, date of 014/D- Q/Survey connection with the Construction – K-B Section/ Sector-63, issue of team – R-B of Reasi-Dharam-Banihal S-2/274 Noida (UP) LOA Section/S-2/ Section of USBRL New Rail Link Dated Dated Project (Package: S-2) 10.05.2016 26.02.2016 3 IRCON/PO/ 28.03.2016 Construction of Staff Quarters, IRCON/2050/ M/s Om Construction ` 35,298,807.56 19.80% above ` 42,287,971.46 15 months TN/Jaynagar- Station Building, Services BGL.JBB/Tender/ At+Po-Bihat, form the 2050/16/40 Buildings, Platform, Roads & Pkg.-Bldg-06 Tola-Gurudaspur, date of other structures at Janakpur (Nepal)/175 Sunderban, issue of Halt (Nepal) in connection with Dated 10.05.2016 Dist. - Begusarai LOA “Gauge Conversion & (Bihar) PIN - 851 135 Construction of New Broad Mob.: 9934469716 Gauge Railway Line from Jaynagar (India) to Bardibas (Nepal). Pkg.-Bldg.-06 (Nepal) Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 4 IRCON/2062/N03.03.2016 Earthwork in formation (Cutting IRCON/2062/NMD M/s NSPR RCPL JV, 8- `41.03Crores As Per BOQ `34,31,92,768 08 MDC/NISP/Rly & Filling), morum, Blanketing, C/NISP/LOA/EW & 2-12086/5-B, 2nd Floor Months Siding/EW & BR/PKG-II construction of new culverts BR/PKG-II Sneha House, Road No - (RT), Dated alng loading platforms drains, (RT)/438, 3, Banjara Hills, 10.02.2016 pathways etc. Pkg.-2 (RT) in Dated: 12.05.2016 Hyderabad - 500 034 connection with Construction of Private Railway Siding for NMDC’s Integrated Steel Plant at Nagarnar near Jagdalpur in Chhattisgarh 5 IRCON/2057/ 13.4.2016 Construction of Private Railway IRCON/2057/ M/s Hari Construction & `30,52,89,615.00 ` 30,52,89,615.00 ` 33,42,92,128.00 09 NSTPP/EW& Siding with all Contractor’s NSTPP/ Associates Pvt. Limited, Months P.Way/Pkg.- 2b./2016/01 Materials (Except Rails for EW & P.way/ At & P.O - Keshawe, Dated Plain Track issued Free of Pkg. -2b./e-Tender/ P.S- Barauni, 22.03.2016 Cost) For Coal transportation LOA/1280 Begusarai, system for Nabinagar Super Dated 13.05.2016 Bihar - 851 134 Thermal Power Project of NPGC Limited, near Ankohara Railway Station, Distt. Aurangabad, Bihar – Civil works From Ch. 0.972 to Ch. 5.320 & P. Way works In entire Siding System (Pkg. - 2b) 6 IRCON/PO/ 28.03.2016 Construction of Staff Quarters, IRCON/2050/ M/s Rajesh Kr. Singh ` 20,379,450.72 19.85 % above ` 24,42,4771.69 15 TN/Jaynagar- Station Building, Services BGL. JBB/Tender/ Vill+Po - Chhatauni, months 2050/16/41 Buildings, Platform, Roads & Pkg.-Bldg-09 P. S. - Basopatti, form other structures at Loharpatti (Nepal)/187 Dist.- Madhubani (Bihar) issue of Halt (Nepal) in connection with Dated 17.05.2016 Mob.: 9934949478 LOA “Gauge Conversion & Construction of New Broad Gauge Railway Line from Jaynagar (India) to Bardibas (Nepal). Pkg.-Bldg.-09 (Nepal) Contd.../- (1) (2) (3) (4) (5) (6) (7) (8) (9) (10) 7 IRCON/PO/ 28.03.2016 Construction of Staff IRCON/2050/ M/s Om Construction ` 32,269,722.94 19.90% above ` 15 months TN/Jaynagar Quarters, Station Building, BGL.JBB/Tender/ Ram Chowk, 38,691,397.81 form issue -2050/16/42 Services Buildings, Platform, Pkg.-Bldg-10 P. O. - Bhawara, of LOA Roads & other structures at (Nepal)/188 Dist. - Madhubani (Bihar) Singyahi Station (Nepal) in Dated 17.05.2016 Pin - 847 212 connection with “Gauge Mob.: 9431202889 Conversion & Construction of New Broad Gauge Railway Line from Jaynagar (India) to Bardibas (Nepal). Pkg.-Bldg.-10 (Nepal) 8 IRCON/2048/ 06.05.2016 Providing and fixing IRCON/2048/ M/s S.N. Marketing ` 95,00,000/- ` 94,90,000/- ` 99,81,500.00 4-months ISC- Aluminum Composite Panels ISC-BEHALA/ Sharada Complex, BEHALA/ TENDER/ for External Wall Cladding ACP/SNM/25406/ Sevoke Road, ACP/2016/20 including supply, fabrication 148 Silliguri - 734 001 Dated and erection of structural Dated 18.05.2016 14.04.2016 steel with necessary aluminum framework for New Sports Complex of Eastern Railway at Gholsapur (Behala), Kolkata, W.B. 9 IRCON/Civil/5 05.11.2015 Design & Construction of IRCON/Civil/ M/s Premco Rail Engineers Ltd. ` 11,94,91,794/- ` 11,87,11,952/- ` 15,02,10,791/- 11 Months 019/NELS.BN Flooring, Embedded Track, 5019/NELS. Axis Mall, CF-9, 3rd Floor, DM/ e-Tender/ Pit Track of various sheds BNDM/ 1C - Rajarhat, New Town, OT/11 and balance Service e-Tender/OT/ KOLKATA-700 156 (WB) Dated Buildings for Setting up of 11/54 Tel: 033-40230000-199 14.10.2015 Second Electric Loco Shed Dated 20.05.2016 Fax: 033-40230110 at Bondamunda, Rourkela E-mail: [email protected] (ODISHA) 10 IRCON/2048/ 18.05.2016 HVAC System for Indoor IRCON/2048/ M/s Unique Engineers Pvt.
Recommended publications
  • Darjeeling Himalayan Railway
    ISSUE ONE Darjeeling Himalayan Railway - a brief description Locomotive availability News from the line Chunbhati loop 1943 Birth of the Darjeeling Railway Agony Point, sometime around the 1930's Chunbhati loop - an early view Above the clouds Darjeeling Himalayan Railway Society ISSUE TWO News from the line Darjeeling, past and present Darjeeling station Streamliner Himalayan Mysteries The Causeway Incident Tour to the DHR A Way Forward ISSUE THREE News from the line To Darjeeling - February 98 Locomotive numbers Timetable Vacuum Brakes To Darjeeling in 1966 Darjeeling or Bust Covered Wagons ISSUE FOUR Report: Visit to India in September 1998 Going Loopy (part 1) Loop No1 Loop No2 Chunbhati loop Streamliner (part 2) Jervis Bay Darjeeling's history To School in Darjeeling ISSUE FIVE News from the line Going Loopy (part 2) Batasia loop Gradient profile Riyang station Zigzag No1 In Search of the Darjeeling Tanks Gillanders Arbuthnot & Co Tank Wagon ISSUE SIX News from the line Repairing the breach Going Loopy (part 3) Loop No2 Zigzag No1 to No 6 Tour - the DHRS Measuring a railway curve David Barrie Bullhead rail ISSUE SEVEN News from the line First impressions Bogies Bogie drawing New Jalpaiguri Locomotive and carriage sheds New Jalpaiguri Depot Going Loopy (part 4) Witch of Ghoom Colliery Engines Buffing gear ISSUE EIGHT May 2000 celebrations News from the line Best Kept Station Competition Impressions of Darjeeling - Mary Stickland Tindharia (part1) Tindharia Works Garratt at Chunbhati Going Loopy – Postscript In And Around Darjeeling
    [Show full text]
  • Status of USG Clinic of Darjeeling District Sl
    Status of USG Clinic of Darjeeling District Sl. Name of the USG Clinic Address Contact No. License No. License issued License valid Name of the Sonologist Status of the Remarks No. on upto Clinic 1. Mariam Nursing Home N.B. Singh Road, Darjeeling 0354-2254637 CE-17-2002 24-11-1986 31-12-2009 Dr. S. Siddique Functional 2. Anandalok Medical & Hill Cart Road, Siliguri 0353-2510010 CE-18-2002 29-03-2001 31-12-2009 Dr. Shusanta Roy Functional Research Centre Pvt. Ltd. 3. Mitra`s Clinic & Nursing Hakimpara, Siliguri 0353-2431999 CE-23-2002 24-12-2001 31-12-2008 Dr. P. Reddy Functional Home 4. Paramount Hospital Pvt. Ltd. Mangal Panday Road, Khalpara, 0353-2530320 CE-19-2002 28-12-2001 31-12-2009 Dr. J.P. Tayung Functional Siliguri 5. D.D.M.A. Nursing Home 7, Nehru Road, Darjeeling 0354-2254337 CE-16-2002 02-01-2002 31-12-2009 Dr. K. Saha Functional 6. B.B.S. Mediscanner Pvt. Ltd 3, Rashbehari Sarani, Siliguri 0353-2434230 CE-20-2002 09-01-2002 31-12-2009 Dr. Mintu Saha Functional 7. Sono Diagnostic Sagarmatha 7/2/2 Robertson Road, Darjeeling 9832063347 CE-2-2002 13-12-2002 31-12-2009 Dr. Chayanika Nandan Functional Health Enclave 8. Omkar Ultrasonography Anjuman-E-Islamia Building, 0354-2252490 CE-3-2002 05-03-2002 31-12-2009 Dr. K Saha Functional Centre Botanical Garden Road, Darjeeling 9. Suraksha Diagnostic & Eye Ashrampara, Sevoke Road, Siliguri 0353-2530640 PNDT/CE- 28-05-2002 31-12-2009 Dr. Mukti Sarkar Functional Clinic Pvt.
    [Show full text]
  • November 26 0 20191126.Pdf
    SIkKIM HERALD Vol. 63 No. 75 visit us at www.ipr.sikkim.gov.in Gangtok (Tuesday) November 26, 2019 Regd. No.WB/SKM/01/2017-19 th Sikkim Legislative Assembly Secretariat Governor attends 50 Governor’s Sonam Tshering Marg, Gangtok, Sikkim, 737101 No.259/L&PA Dated:20/11/2019 Conference NOTIFICATION the country was concerned In exercise of the power conferred under Rule16 of the Rules of Governor stressed on its up Procedure and Conduct of Business in Sikkim Legislative Assembly, gradation and expediting Shri L.B.Das, Hon’ble Speaker Sikkim Legislative Assembly has been construction of alternate highway pleased to reconvene a sitting of the House in the Assembly Hall, to Sikkim. This is necessary in view Gangtok on 28th November, 2019 at 11:00 a.m. of Sikkim’s developmental needs, The Hon’ble Members are notified accordingly. tourism and above all, the national security, he said. By order Railway Connectivity: Sd/- Expressing concern and Dr.(Gopal Pd. Dahal) SLASS displeasure about the slow pace Secretary of construction of the much awaited Sevoke-Rangpo Rail Link project, Governor drew the attention of Railway Ministry and Sikkim receives India stressed on its early completion for the benefit of the State and the country as a whole. Today 2019 Awards Air Connectivity: Governor while highlighting the issues and bottlenecks which has halted the flight operations at Pakyong President, Mr. Ram Nath Kovind, Governor Mr. Ganga Prasad, Airport from June 1 this year and th respective Governors and Lt. Governors during the 50 Governor’s the obvious sense of Conference at Rashtrapati Bhawan, New Delhi.
    [Show full text]
  • Chapter 6 Forest Communities & Cprs in the Hill Region
    Chapter 6 Forest Communities & CPRs in the Hill Region 6.1 Introduction The region to be studied lies within the Eastern Himalaya which is a biodiversity hotspot little explored as yet by Government scientific agencies like the Botanical Survey of India [BSI] and the Zoological Survey of India [ZSI]. This makes it an important conservation zone, with an approximate area of 15000 sq. km. of forests having already been committed to designated Protected Areas. However imposition of statutory control over regional forests has been accompanied by large scale diversion of forest lands to plantations, agriculture and urban settlement. Economic development has also been accompanied by high levels of immigration which have brought forests in the region under extreme pressure, threatening their very survival. Study of the status of property rights and the patterns of use of CPRs, woodfuels and other forest resources is thus expected to throw light on the interdependence of human communities, economic development and natural resources in a region of the Himalaya where significant forests still survive. By documenting forest access and CPR-use by the communities that live on the very edge of subsistence at the forest fringe~ we make an attempt to meaningfully contribute towards the operationalisation of sustainable development through the means of self-governing social control systems. The present chapter and the next are based on the case-studies undertaken in the two northern districts of Darjeeling and Jalpaiguri in West Bengal respectively. 6.1.1 Geographical Description and Position of the Darjeeling district. Darjeeling is a small district that lies between 26°31' and 27°13' North latitude and between 87° 59' and 88° 53' East longitude in the extreme north of the state of West Bengal in India.
    [Show full text]
  • Date of Acceptance of Contract Period of Completion Of
    Page 1 (SENSITIZING REPORT) SENSITIZING THE PUBLIC ABOUT CORRUPTION - DISPLAY OF STANDARD NOTICE BOARD BY DEPARTMENTS/ORGANISATION REGARDING : 764 BRTF (P) SWASTIK : JULY 2012 (CONTRACT MORE THAN 50 LAKHS) (Reference HQ CE (P) Swastik letter No.16500/Policy/69/Vig dated 10 Dec 2009) S/ CA No Name of work Name of contractor CA Amount Date of Period of Actual date Actual Date Reason for Remarks No /Firm (In Lacs) acceptance completion of starting of delay, if any of contract of contract work completion 1 2 3 4 5 6 7 8 9 10 11 1 CE(P)/SW Handling & conveyance of cement, The G.M Sikkim Rs. 01.04.2008 1 year 01.04.2008 31.03.2009 Completed TK/ bitumen, steel etc Nationalised 8.17/MT/Km MOT-01/ Transport, Gangtok 08-09 2 CE (P) Construction of Toe walls and RCC M/S Shiv Shakti 2891.21/ 28.08.2008 15 months 02.09.2008 - Extended upto SWTK/02/ retaining walls from Km 24.00 to Km 51.00 Enterprises, A-340/2, 1792.50 31.03.2012 2008-09 on Road Gangtok-Nathula (JNM) under Near P & T Colony, 764 BRTF sector of project Swastik In Shastri Nagar, Sikkim State. Jodhpur-342003 3 CE (P) Supply and stacking of coarse river sand M/s Anil Steel 92.57 29.08.2008 120 days 02.09.2009 15.04.2009 Completed SWTK/03/ between km 24.00 to 51.00 on road Furniture, Shop 2008-09 Gangtok-Nathula No.150, Sector 7C, Chandigarh-160026 4 CE (P) Design & construction of 110 m long major M/S Poddar 892/ 25.10.2008 24 months 24.11.2008 23.11.2010 Completed SWTK/07/ pmt bridge over river Dikchu-Khola at km Construction 899.5 2008-09 31.103 on road Singtham-Dikchu Co;Engineers
    [Show full text]
  • A Case Study of Darjeeling Hill, West Bengal
    International Journal of Humanities and Social Science Invention ISSN (Online): 2319 – 7722, ISSN (Print): 2319 – 7714 www.ijhssi.org Volume 4 Issue 6 ǁ June. 2015ǁ PP.40-48 Landslide along the Highways: A Case Study of Darjeeling Hill, West Bengal. CHIRANJIB NAD. ABSTRACT: Out of the total landslide occurrences, nearly 20% are found in North Eastern region of India. The official figures of United Nations International Strategy for Disaster Reduction (UN/ISDR) and the Centre for Research on the Epidemiology of Disasters (CRED) for the year 2006 also states that landslide ranked third in terms of number of deaths among the top ten natural disasters, as approximately 4 million people were affected by landslides. Unless human death it poses serious damage on roadways, railways, buildings, dams and many natural resources with untold measure of ecosystem and human society. As transportation is a lifeline of a civilization and lack of self sufficiency of a region it hold an important place to meet daily needs of human beings of a region. The study route (NH 31 A, NH 55 and SH 12 A) of landlocked Darjeeling district is very much prone to landslide vulnerability. The black memories of previous massive landslide hazard took large impression on the inhabited society. Sometime the district remains isolated island due to breakdown of transportation for a stretch of days in the time of massive landslide along study route. The main objective of the study is to highlight/describe the present situation of landslide zone along three study route. The study also highlight the nature of landslide took place according to their vulnerability scale, type of movement, type of activity, type of distribution and lastly type of style for further management.
    [Show full text]
  • Darjeeling.Pdf
    0 CONTENT 1. INTRODUCTION............................................................................ Pg. 1-2 2. DISTRICT PROFILE ……………………………………………………………………….. Pg. 3- 4 3. HISTORY OF DISASTER ………………………………………………………………… Pg. 5 - 8 4. DO’S & DON’T’S ………………………………………………………………………….. Pg. 9 – 10 5. TYPES OF HAZARDS……………………………………………………………………… Pg. 11 6. DISTRICT LEVEL & LINE DEPTT. CONTACTS ………….……………………….. Pg. 12 -18 7. SUB-DIVISION, BLOCK LEVEL PROFILE & CONTACTS …………………….. Pg. 19 – 90 8. LIST OF SAR EQUIPMENTS.............................................................. Pg. 91 - 92 1 INTRODUCTION Nature offers every thing to man. It sustains his life. Man enjoys the beauties of nature and lives on them. But he also becomes a victim of the fury of nature. Natural calamities like famines and floods take a heavy toll of human life and property. Man seems to have little chance in fighting against natural forces. The topography of the district of Darjeeling is such that among the four sub-divisions, three sub-divisions are located in the hills where disasters like landslides, landslip, road blockade are often occurred during monsoon. On the other side, in the Siliguri Sub-Division which lies in the plain there is possibility of flood due to soil erosion/ embankment and flash flood. As district of Darjeeling falls under Seismic Zone IV the probability of earthquake cannot be denied. Flood/ cyclone/ landslide often trouble men. Heavy rains results in rivers and banks overflowing causing damage on a large scale. Unrelenting rains cause human loss. In a hilly region like Darjeeling district poor people do not have well constructed houses especially in rural areas. Because of incessant rains houses collapse and kill people. Rivers and streams overflow inundating large areas. Roads and footpaths are sub merged under water.
    [Show full text]
  • Teesta River
    Teesta River Bangladesh is a riverine country and Kurigram is a district where more than 16 rivers are criss- crossed. Even mighty Brahmaputra and flashy Teesta & Dharla rivers have flown through this district. So severe and flashy flood with a high scale of erosion is a common phenomenon near bank area of these rivers. Moreover sandy soil of the bank highly enhances the erosion. Not only that various small and high char forms at about the middle of the rivers for which river flow becomes one sided to the bank. That’s why these rivers flow with a higher thrust to the bank and its surrounded area. As a result each and every year thousands acre of paddy fields, homesteads, schools, college, mosque, local market engulfed into river. People of those localities are being poor to poorer by losing their valuable assets that washed out into the river. Especially sudden rise in water level in Teesta on 7 to 10th October 2009 caused a huge destruction to the erosion prone area at different places. Teesta river arises from the Cho Lhamu Lake at an average height of 5,330 metres (17,500 feet) above mean sea level in the majestic Himalayas. Teesta River merges with the rivulets, which arise in the Thangu, Yumthang and Donkia-La ranges. It then traverses the Rangpo town where it forms a boundary line between Sikkim and West Bengal up to Teesta Bazaar. It is at the Teesta suspension Bridge where the river meets the main tributary Rangeet River. At this level, the river changes its direction and flows southwards in West Bengal.
    [Show full text]
  • Darjeeling 2020-21
    DISTRICT DISASTER MANAGEMENT PLAN DARJEELING 2020-21 Government of West Bengal Office of District Magistrate, Darjeeling Department Of Disaster Management Tel/Fax No. : 0354-2255749 Email id.: [email protected] INDEX PAGE NOS. NOS. CONTENTS Emergency Control Numbers 1. CHAPTER I – INTRODUCTION 1-4 1.1 AIMS AND OBJECTIVES 1 1.2 AUTHORITY FOR DDMP 1 1.3 EVOLUTION OF DDMP 2 1.4 STAKEHOLDERS AND THEIR RESPONSIBILITIES 3 1.5 HOW TO USE DDMP 3 1.6 APPROVAL MECHANISM OF DDMP 4 1.7 REVIEW AND UPDATEN OD D.D.M.P 4 2. CHAPTER II – DISTRICT HAZARD RISK VULNERABILITY AND CAPACITY ASSESSMENT 5-27 (HRVCA) 2.1 DISTRICT PROFILE (GEOGRAPHICAL, ADMINISTRATIVE AND DEMOGRAPHIC) 5 a District Landuse/Landcover Map 7 b District Geological Map 8 c District Administrative Map 9 d District Mp of Transpot Lines 10 e District Map of Settlements 11 2.2 HAZARD PROFILE 12 2.3 (i) AREAS AFFECTED BY CALAMITY (2019) 13-15 Monsoon Calamity Assessment Report (2019) 16 2.3 (ii) AREAS AFFECTED BY CALAMITY (2018) 17-21 2.4 INVENTORY OF PAST DISASTERS 20-23 2.5 HVRCA ACROSS THE FOUR SUBDIVISIONS 26-27 3. CHAPTER III - INSTITUTIONAL ARRANGEMENTS FOR DISASTER MANAGEMENT 28-32 3.1 ORGANIZATIONAL STRUCTURE OF DISTRICT DISASTER MANAGEMENT AUTHORITY 28 3.2 FUNCTIONAL FLOW AND HIERARCHICAL STRUCTURE OF AUTHORITIES AND COMMITTEES 29 3.3 POWERS AND FUNCTIONS OF DDMA 29-31 3.4 STRENGTHENING DDMA 32 4. CHAPTER IV - PREVENTIVE MITIGATION MEASURES 33-34 4.1 PREVENTIVE MEASURES ADOPTED AT EACH BLOCK 33 4.2 DISTRICT LEVEL MITIGATION PROJECTS UNDER NATIONAL LEVEL 34 4.3 PREVENTIVE GUIDELINES OF N.D.M.A FOR HEALTH EMERGENCIES – COVID-19 PANDEMIC 34 5.
    [Show full text]
  • 30 April 2021
    MINUTES OF 62nd MEETING OF THE STANDING COMMITTEE OF NATIONAL BOARD FOR WILD LIFE HELD ON 30th MARCH, 2021 The 62nd Meeting of the Standing Committee of National Board for Wild Life was held on 30th March, 2021 through Video Conference and chaired by the Hon’ble Minister for Environment, Forest & Climate Change. List of participants is placed at ANNEXURE-I. The Chairman welcomed all the participants to the 62nd Meeting of the Standing Committee of National Board for Wild Life and asked the Member Secretary to initiate the discussions on the Agenda Items. AGENDA ITEM No.1 62.1.1 Confirmation of the minutes of the 62nd Meeting of the Standing Committee of National Board for Wild Life held on 18th February, 2021. The Member Secretary stated that the minutes of the 61st meeting of the Standing Committee of National Board for Wild Life held on 18th February, 2021 were circulated on 08th March, 2021 amongst all the Members of the Standing Committee. No comments have been received on the minutes of the meeting from the members. Decision Taken: Based on the discussion held, the Standing Committee decided to confirm the minutes of the 61st meeting. AGENDA ITEM No.2 (Action Taken Report) 62.2.1 Proposal for use of 98.59 ha of reserve forestland from Saleki proposed reserve forest which is a part of Dehing Patkai Elephant Reserve for Tikok OCP coal mining project by North-Eastern Coal Field, Coal India Limited, Assam State (Original Agenda – 54.4.3). The Member Secretary stated that the proposal was initially considered by the Standing Committee in its 54th meeting held on 18th July 2019.
    [Show full text]
  • SYNOPSIS of DEBATES (Proceedings Other Than Questions & Answers) ______
    Not for Publication For Members only LOK SABHA ___ SYNOPSIS OF DEBATES (Proceedings other than Questions & Answers) ______ Monday, March 15, 2021 / Phalguna 24, 1942 (Saka) ______ ANNOUNCEMENT BY THE SPEAKER HON. SPEAKER: On my own behalf and on behalf of the hon. Members of the House, I have great pleasure in welcoming His Excellency, Shri Duarte Pacheco, the President of the Inter-Parliamentary Union (IPU) who is on a visit to India as our hounoured guest. He arrived in India on Sunday, 14th March, 2021. Today he is seated in the Special Box. Apart from Delhi, he will visit Agra and Goa also before departing from India on Saturday, 20th March 2021. We wish him a happy and fruitful stay in our country. Through His Excellency, we convey our greetings and best wishes to all the hon. members in the IPU, the Government and the great people of Portugal. ________ STATEMENT BY THE MINISTER Re: Recent Developments Pertaining To The Welfare Abroad Of Indians, Non-Resident Indians And Persons Of Indian Origin In The Covid Situation THE MINISTER OF EXTERNAL AFFAIRS (DR. SUBRAHMANYAM JAISHANKAR): I rise to apprise this august House of recent developments pertaining to the welfare abroad of Indians, Non-Resident Indians and Persons of Indian Origin in the COVID situation. This is a subject on which many hon. Members have expressed deep interest. We in the Ministry of External Affairs also regularly receive communications relating to individual cases and respond to the best of our ability. Such concern is natural and I take this opportunity, to place before the House a comprehensive picture on the global state of affairs as a result of COVID, its impact on our people and the Government‘s response to the challenges that have emerged.
    [Show full text]
  • Disaster Management Plan-(2020-21) East Sikkim-737101
    DISASTER MANAGEMENT PLAN-(2020-21) EAST SIKKIM-737101 Prepared by: District Disaster Management Authority, East District Collectorate, East Sichey, Gangtok 1 FOREWORD Recent disasters, including the Earthquake which occurred on 18th September 2011 have compelled us to review our Disaster Management Plan and make it more stakeholders friendly. It is true that all the disasters have been dealt significantly by the state ensuring least damage to the human life and property. However, there is a need to generate a system which works automatically during crisis and is based more on the need of the stakeholders specially the community. Further a proper co-ordination is required to manage disasters promptly. Considering this we have made an attempt to prepare a Disaster Management Plan in different versions to make it more user-friendly. While the comprehensive Disaster Management Plan based on vulnerability mapping and GIS Mapping and minute details of everything related to management of disasters is underway, we are releasing this booklet separately on the Disaster Management Plan which is basically meant for better coordination among the responders. The Incident Command System is the part of this booklet which has been introduced for the first time in the East District. This booklet is meant to ensure a prompt and properly coordinated effort to respond any crisis. A due care has been taken in preparing this booklet, however any mistakes will be immediately looked into. All the stakeholders are requested to give their feedback and suggestions for further improvements. Lastly, I want to extend my sincere thanks to the Government, the higher authorities and the Relief Commissioner for the support extended to us and especially to my team members including ADM/R, SDM/Gangtok, District Project Officer and Training Officer for the hard work they have put in to prepare this booklet.
    [Show full text]