Date of Acceptance of Contract Period of Completion Of

Total Page:16

File Type:pdf, Size:1020Kb

Date of Acceptance of Contract Period of Completion Of Page 1 (SENSITIZING REPORT) SENSITIZING THE PUBLIC ABOUT CORRUPTION - DISPLAY OF STANDARD NOTICE BOARD BY DEPARTMENTS/ORGANISATION REGARDING : 764 BRTF (P) SWASTIK : JULY 2012 (CONTRACT MORE THAN 50 LAKHS) (Reference HQ CE (P) Swastik letter No.16500/Policy/69/Vig dated 10 Dec 2009) S/ CA No Name of work Name of contractor CA Amount Date of Period of Actual date Actual Date Reason for Remarks No /Firm (In Lacs) acceptance completion of starting of delay, if any of contract of contract work completion 1 2 3 4 5 6 7 8 9 10 11 1 CE(P)/SW Handling & conveyance of cement, The G.M Sikkim Rs. 01.04.2008 1 year 01.04.2008 31.03.2009 Completed TK/ bitumen, steel etc Nationalised 8.17/MT/Km MOT-01/ Transport, Gangtok 08-09 2 CE (P) Construction of Toe walls and RCC M/S Shiv Shakti 2891.21/ 28.08.2008 15 months 02.09.2008 - Extended upto SWTK/02/ retaining walls from Km 24.00 to Km 51.00 Enterprises, A-340/2, 1792.50 31.03.2012 2008-09 on Road Gangtok-Nathula (JNM) under Near P & T Colony, 764 BRTF sector of project Swastik In Shastri Nagar, Sikkim State. Jodhpur-342003 3 CE (P) Supply and stacking of coarse river sand M/s Anil Steel 92.57 29.08.2008 120 days 02.09.2009 15.04.2009 Completed SWTK/03/ between km 24.00 to 51.00 on road Furniture, Shop 2008-09 Gangtok-Nathula No.150, Sector 7C, Chandigarh-160026 4 CE (P) Design & construction of 110 m long major M/S Poddar 892/ 25.10.2008 24 months 24.11.2008 23.11.2010 Completed SWTK/07/ pmt bridge over river Dikchu-Khola at km Construction 899.5 2008-09 31.103 on road Singtham-Dikchu Co;Engineers & Contractors, E-98, Prem Kutir Appartment, Plot No 25/1, Sector 09, Rohini, Delhi 5 CE (P) Design & construction of 50 m single span M/S Mohan Bajaj, PS 332.50/ 31.10.2008 24 months 05.01.2009 Extended upto SWTK/09/ major pmt bridge with steel truss Road, Gangtok 377.03 30.06.2012 2008-09 superstructure over Siyam-Nallah at km 6.9 on road R-D Road 6 CE (P) Providing and laying WMM 100 mm and 75 M/S Mohan Bajaj, PS 1873.046 17.12.2008 15 months 19.01.2009 Extended upto SWTK/19/ mm consolidated thick DBM 60 mm and Road, Gangtok 31.03.2012 2008-09 AC 40 mm consolidated thick between km 38.50 to 51.385 on Gangtok-Nathulla road 7 CE (P) Providing and laying WMM 100 mm and 75 M/S Mohan Bajaj, PS 937.947 17.12.2008 344 days 19.01.2009 Extended upto SWTK/20/ mm consolidated thick DBM 60 mm and Road, Gangtok 31.03.2012 2008-09 AC 40 mm consolidated thick between km 0.00 to 5.66 on Sherathang-Nathulla road Page 2 1 2 3 4 5 6 7 8 9 10 11 8 CE (P) Providing and laying WMM 100 mm and 75 Shiv Shakti 2069.977 17.12.2008 15 months 19.01.2009 Extended upto SWTK/21/ mm consolidated thick DBM 60 mm and Enterprises, A-340/2, 31.03.2012 2008-09 AC 40 mm consolidated thick between km Near P&T Colony, 24.25 to 38.5 on Gangtok-Nathulla road Shastri Nagar, Jodhpur, Rajasthan- 342003 9 CE (P) Construction of HB living shelters, HN M/s Mk Infrastructure 482.26/ 23.03.2009 80 days 01.04.2009 Extended upto SWTK/30/ structures, HB Sheds in 130 RCC secotor Pvt Ltd, 04- Agrasen 500.77 31.03.2011 2008-09 under 764 BRTF (against Part II of Sch 'A') Roads, Siliguri 734005 (SOC fwded Project Swastik on Jawaharlal Nehru Marg (West Bengal) for foreclosing) (GN road) in the state of sikkim 10 CE (P) Transportation of Cement, Bitumen, Steel, The G.M Sikkim Rs. 01.04.2009 1 year 01.04.2009 31.03.2010 Completed SWTK/ Bridging Stores, Steam Coal and any other Nationalised 8.33/km/MT MOT-I/ stores from 532 SSTC Siliguri/SD Transport, Gangtok 2009-10 BENGDUBI to any point within Sikkim and vice versa. 11 CE (P) Supply and stacking of dry coarse sand for M/s CM Agarwal & Co, 201.79 02.05.2009 150 days 02.05.2009 30.07.2010 Completed SWTK/02/ pmt works on road Gangtok-Sherathang- RC Mintri Road, 2009-10 Nathula between km 24.250 to 51.385 and Kalimpong km 0.00 to 5.66 under 764 BRTF (P) Swastik in the State of Sikkim 12 CE (P) Construction of river training works at k M/s Pave 813.57/ 12.05.2009 1 year 21.05.2009 31. 01.2012 Completed SWTK/03/ specified location along road side banks of Infrastructures, 10/3, 822.06/ 2009-10 river Teesta between km 0.00 to 81.00 on Baliadas Chatterjee 762.66 road sector Sevoke-Ranipul under 764 road, Siliguri, WB- BRTF (P) Swastik in the State of West 734001 Bengal and Sikkim 13 CE (P) Supply and stacking of stone metal, stone M/s Om Prakash 59.45 13.05.2009 180 days 21.05.2009 15.03.2010 Completed SWTK/04/ chips and coarse sand dry for resurfacing Anand & Co. 3rd Mile, 2009-10 works between km 7.5 to 25.00, km 29 to Sevoke Road, Siliguri 30, 34.00 to 42.5, 63.760 to 66.250 and 69.90 to 70.60 on road Damdim-Alagrarah for the year 2009-10 under 764 BRTF (P) Swastik in the State of West Bengal and Sikkim Page 3 1 2 3 4 5 6 7 8 9 10 11 14 CE (P) Supply and stacking of stone metal 90-45 M/s Harbhaj Dass 92.43/ 24.06.2009 90 days 01.07.2009 Extended upto SWTK/06/ mm, stone metal 63-45 mm, stone metal Agarwal, C/O Avishek 98.82 31.01.2012. 2009-10 40 mm, stone chips 20 mm, stone chips Enterprises, Binda SOC submitted 13.20 mm, stone screening 11.20 mm, Jayanti Building, 31, for cancellation stone chips 11.20 mm and coarse sand for Sevoke Road, Siliguri, surfacing and permanent works between West Bengal, Pin: Km 0 and Km 20.00 on road Sevoke- 734001 Ranipul under 764 BRTF (P) Swastik in the state of West Bengal. 15 CE (P) Supply and stacking of stone metal 90-45 M/s Harbhaj Dass 167.69 24.06.2009 90 days 01.07.2009 Extended upto SWTK/07/ mm, stone metal 63-45 mm, stone metal Agarwal, C/O Avishek 31.03.2012. 2009-10 40 mm, stone chips 20 mm, stone chips Enterprises, Binda SOC submitted 13.20 mm, stone screening 13.20 mm, Jayanti Building, 31, for cancellation stone chips 13.20 mm, stone screening Sevoke Road, Siliguri, 11.20 mm, stone chips 11.20 mm and West Bengal, Pin: coarse sand for surfacing and permanent 734001 works between Km 22.65 and Km 52.10 on road Sevoke-Ranipul under 764 BRTF (P) Swastik in the state of West Bengal. 16 CE (P) Execution of WBM 7.5 cm consolidate MK Infrastructure (P) 459.33 11.09.2009 90 days 13.10.2009 Extended upto SWTK/13/ thick for correction work before providing Ltd, 4, Agrasen Road, 28.02.2011 and 2009-10 and laying of dense bituminous macadam Siliguri-734005 (West Contract was 7.5 cm thick and asphalt concrete 2.5 cm Bengal) cancelled on thick all consolidated with HMP mix 28.02.2011 including cleaning of road surface, laying of primer/tack coat, laying by paver between km 27.40 to km 32.705 on Singtham-Dikchu road and between km 0.00 to km 7.30 on road Dikchu-Rangrang under 764 BRTF in the State of Sikkim 17 CE (P) Hiring of hydraulic excavator air M/S Mohan Bajaj, PS 316.82/ 22.09.2009 150 days 20.10.2009 14.09.2010 Completed SWTK/14/ compressor HMP and Tata Tipper Road, Gangtok 293.21 2009-10 including operator and POL for works under 87 RCC against Part I and under 130 RCC against Part II both under 764 BRTF road sector of Project Swastik in the State of Sikkim and West Bengal Page 4 1 2 3 4 5 6 7 8 9 10 11 18 CE (P) Supply and stacking of stone metal 90-45 M/S GH Enterprises, 122.8 05.10.2009 100 days 09.11.2009 05.07.2011 Completed. SWTK/15/ mm, stone metal 63-45mm, stone metal 40 SCO 80-81, Sector 2009-10 mm, stone chips 20 mm, stone screening 15D, Chandigarh 13.2mm, stone chips 13.2mm, stone screening 11.2mm, stone chips 11.2mm and coarse sand for surfacing and permanent works between km 52.10 and 81.10 on road Sevoke-Ranipul under 764 BRTF Project Swastik in the State of West Bengal and Sikkim. 19 CE (P) Providing and laying of dense bituminous M/s Mk Infrastructure 690.99 10.10.2009 90 days 13.10.2009 Extended upto SWTK/17/ macadam 7.5 cm thick and asphalt Pvt Ltd, 04- Agrasen 15.02.12 2009-10 concrete 2.5 cm thick and consolidated Roads, Siliguri 734005 with HMP mix including cleaning of road (West Bengal) surface, laying of primer/tack coat laying by paver finisher and rolling for surfacing works to specified thickness between km 14.00 to 28.180 on Sevoke Rangpo road in 764 BRTF under Project Swastik in the State of West Bengal 20 CE (P) Engagement of consultant for feasibility Euphoria Engineering 59.50 31.12.2009 175 days 09.01.2010 Extended upto SWTK/26/ study for construction of existing Solutions Pvt Ltd, 30.04.2011 2009-10 MDR/class 5/earthen road to NHDL Consultants, specifications (formation width 12 mtr and Contractors & carriage way width 7.00 mtr) geometric Engineers, improvement/ realignment and preparation TG Kaleon’s Building, of detailed project report (DPR) from km Ground Floor, 0.00 to km 70.00 on road Khuniamore to Syari School Road, Tangta in West Bengal under 764 BRTF Upper Syari, (P) Swastik, obtaining land acquisition & Gangtok, forest clearance (LA&FC) from land PIN - 737102 revenue department and forest department from the govt of West Bengal 21 CE (P) Design & constr of 60 m span Major Pmt M/S Poddar 414/ 17.12.2009 2 years 09.01.2010 SWTK/22/ bridge with PSC box girder superstructure Construction 432.45/ 2009-10 on open foundation over Kalikhola at km Co;Engineers & 447.21 15.985 on road Singtham-Dikchu under (P) Contractors, E-98, Swastik in Sikkim State Prem Kutir Appartment, Plot No 25/1, Sector 09, Rohini, Delhi Page 5 1 2 3 4 5 6 7 8 9 10 11 22 CE (P) Handling & conveyance of cement, The G.M Sikkim 8.75/MT/km 01.04.2010 1 year 02.04.2010 30.04.2011 Completed SWTK/M bitumen, steel etc Nationalised OT-01/ Transport, Gangtok 2010-11 23 CE (P) Design and construction of 60 mtr single Vij Engineers & 369.00 21.05.2010 2 years 01.06.2010 SWTK/03/ span (c/c of abutment bearings) major pmt Consultant Pvt Ltd, 2010-11 bridge with steel truss superstructure (deck B-68, Swami Nagar type) on open foundation over Namak (North), Nallah at km 4.154 on road Rangrang- Near Chirag Delhi Fly Dikchu under Project Swastik In Sikkim Over, State Outer Ring Road, New Delhi-110017 24 CE (P) Design and construction of 70 m single M/s Nar Bahadur 421.00 10.06.2010 24 months 25.06.2010 SWTK/04/ span (c/c of abutment bearings) major pmt Dahal, PO.
Recommended publications
  • Darjeeling Himalayan Railway
    ISSUE ONE Darjeeling Himalayan Railway - a brief description Locomotive availability News from the line Chunbhati loop 1943 Birth of the Darjeeling Railway Agony Point, sometime around the 1930's Chunbhati loop - an early view Above the clouds Darjeeling Himalayan Railway Society ISSUE TWO News from the line Darjeeling, past and present Darjeeling station Streamliner Himalayan Mysteries The Causeway Incident Tour to the DHR A Way Forward ISSUE THREE News from the line To Darjeeling - February 98 Locomotive numbers Timetable Vacuum Brakes To Darjeeling in 1966 Darjeeling or Bust Covered Wagons ISSUE FOUR Report: Visit to India in September 1998 Going Loopy (part 1) Loop No1 Loop No2 Chunbhati loop Streamliner (part 2) Jervis Bay Darjeeling's history To School in Darjeeling ISSUE FIVE News from the line Going Loopy (part 2) Batasia loop Gradient profile Riyang station Zigzag No1 In Search of the Darjeeling Tanks Gillanders Arbuthnot & Co Tank Wagon ISSUE SIX News from the line Repairing the breach Going Loopy (part 3) Loop No2 Zigzag No1 to No 6 Tour - the DHRS Measuring a railway curve David Barrie Bullhead rail ISSUE SEVEN News from the line First impressions Bogies Bogie drawing New Jalpaiguri Locomotive and carriage sheds New Jalpaiguri Depot Going Loopy (part 4) Witch of Ghoom Colliery Engines Buffing gear ISSUE EIGHT May 2000 celebrations News from the line Best Kept Station Competition Impressions of Darjeeling - Mary Stickland Tindharia (part1) Tindharia Works Garratt at Chunbhati Going Loopy – Postscript In And Around Darjeeling
    [Show full text]
  • Status of USG Clinic of Darjeeling District Sl
    Status of USG Clinic of Darjeeling District Sl. Name of the USG Clinic Address Contact No. License No. License issued License valid Name of the Sonologist Status of the Remarks No. on upto Clinic 1. Mariam Nursing Home N.B. Singh Road, Darjeeling 0354-2254637 CE-17-2002 24-11-1986 31-12-2009 Dr. S. Siddique Functional 2. Anandalok Medical & Hill Cart Road, Siliguri 0353-2510010 CE-18-2002 29-03-2001 31-12-2009 Dr. Shusanta Roy Functional Research Centre Pvt. Ltd. 3. Mitra`s Clinic & Nursing Hakimpara, Siliguri 0353-2431999 CE-23-2002 24-12-2001 31-12-2008 Dr. P. Reddy Functional Home 4. Paramount Hospital Pvt. Ltd. Mangal Panday Road, Khalpara, 0353-2530320 CE-19-2002 28-12-2001 31-12-2009 Dr. J.P. Tayung Functional Siliguri 5. D.D.M.A. Nursing Home 7, Nehru Road, Darjeeling 0354-2254337 CE-16-2002 02-01-2002 31-12-2009 Dr. K. Saha Functional 6. B.B.S. Mediscanner Pvt. Ltd 3, Rashbehari Sarani, Siliguri 0353-2434230 CE-20-2002 09-01-2002 31-12-2009 Dr. Mintu Saha Functional 7. Sono Diagnostic Sagarmatha 7/2/2 Robertson Road, Darjeeling 9832063347 CE-2-2002 13-12-2002 31-12-2009 Dr. Chayanika Nandan Functional Health Enclave 8. Omkar Ultrasonography Anjuman-E-Islamia Building, 0354-2252490 CE-3-2002 05-03-2002 31-12-2009 Dr. K Saha Functional Centre Botanical Garden Road, Darjeeling 9. Suraksha Diagnostic & Eye Ashrampara, Sevoke Road, Siliguri 0353-2530640 PNDT/CE- 28-05-2002 31-12-2009 Dr. Mukti Sarkar Functional Clinic Pvt.
    [Show full text]
  • November 26 0 20191126.Pdf
    SIkKIM HERALD Vol. 63 No. 75 visit us at www.ipr.sikkim.gov.in Gangtok (Tuesday) November 26, 2019 Regd. No.WB/SKM/01/2017-19 th Sikkim Legislative Assembly Secretariat Governor attends 50 Governor’s Sonam Tshering Marg, Gangtok, Sikkim, 737101 No.259/L&PA Dated:20/11/2019 Conference NOTIFICATION the country was concerned In exercise of the power conferred under Rule16 of the Rules of Governor stressed on its up Procedure and Conduct of Business in Sikkim Legislative Assembly, gradation and expediting Shri L.B.Das, Hon’ble Speaker Sikkim Legislative Assembly has been construction of alternate highway pleased to reconvene a sitting of the House in the Assembly Hall, to Sikkim. This is necessary in view Gangtok on 28th November, 2019 at 11:00 a.m. of Sikkim’s developmental needs, The Hon’ble Members are notified accordingly. tourism and above all, the national security, he said. By order Railway Connectivity: Sd/- Expressing concern and Dr.(Gopal Pd. Dahal) SLASS displeasure about the slow pace Secretary of construction of the much awaited Sevoke-Rangpo Rail Link project, Governor drew the attention of Railway Ministry and Sikkim receives India stressed on its early completion for the benefit of the State and the country as a whole. Today 2019 Awards Air Connectivity: Governor while highlighting the issues and bottlenecks which has halted the flight operations at Pakyong President, Mr. Ram Nath Kovind, Governor Mr. Ganga Prasad, Airport from June 1 this year and th respective Governors and Lt. Governors during the 50 Governor’s the obvious sense of Conference at Rashtrapati Bhawan, New Delhi.
    [Show full text]
  • Chapter 6 Forest Communities & Cprs in the Hill Region
    Chapter 6 Forest Communities & CPRs in the Hill Region 6.1 Introduction The region to be studied lies within the Eastern Himalaya which is a biodiversity hotspot little explored as yet by Government scientific agencies like the Botanical Survey of India [BSI] and the Zoological Survey of India [ZSI]. This makes it an important conservation zone, with an approximate area of 15000 sq. km. of forests having already been committed to designated Protected Areas. However imposition of statutory control over regional forests has been accompanied by large scale diversion of forest lands to plantations, agriculture and urban settlement. Economic development has also been accompanied by high levels of immigration which have brought forests in the region under extreme pressure, threatening their very survival. Study of the status of property rights and the patterns of use of CPRs, woodfuels and other forest resources is thus expected to throw light on the interdependence of human communities, economic development and natural resources in a region of the Himalaya where significant forests still survive. By documenting forest access and CPR-use by the communities that live on the very edge of subsistence at the forest fringe~ we make an attempt to meaningfully contribute towards the operationalisation of sustainable development through the means of self-governing social control systems. The present chapter and the next are based on the case-studies undertaken in the two northern districts of Darjeeling and Jalpaiguri in West Bengal respectively. 6.1.1 Geographical Description and Position of the Darjeeling district. Darjeeling is a small district that lies between 26°31' and 27°13' North latitude and between 87° 59' and 88° 53' East longitude in the extreme north of the state of West Bengal in India.
    [Show full text]
  • A Detailed Report on Implementation of Catchment Area Treatment Plan of Teesta Stage-V Hydro-Electric Power Project (510Mw) Sikkim
    A DETAILED REPORT ON IMPLEMENTATION OF CATCHMENT AREA TREATMEN PLAN OF TEESTA STAGE-V HYDRO-ELECTRIC POWER PROJECT (510MW) SIKKIM - 2007 FOREST, ENVIRONMENT & WILDLIFE MANAGEMENT DEPARTMENT GOVERNMENT OF SIKKIM GANGTOK A DETAILED REPORT ON IMPLEMENTATION OF CATCHMENT AREA TREATMENT PLAN OF TEESTA STAGE-V HYDRO-ELECTRIC POWER PROJECT (510MW) SIKKIM FOREST, ENVIRONMENT & WILDLIFE MANAGEMENT DEPARTMENT GOVERNMENT OF SIKKIM GANGTOK BRIEF ABOUT THE ENVIRONMENT CONSERVATION OF TEESTA STAGE-V CATCHMENT. In the Eastern end of the mighty Himalayas flanked by Bhutan, Nepal and Tibet on its end lays a tiny enchanting state ‘Sikkim’. It nestles under the protective shadow of its guardian deity, the Mount Kanchendzonga. Sikkim has witnessed a tremendous development in the recent past year under the dynamic leadership of Honorable Chief Minister Dr.Pawan Chamling. Tourism and Power are the two thrust sectors which has prompted Sikkim further in the road of civilization. The establishment of National Hydro Project (NHPC) Stage-V at Dikchu itself speaks volume about an exemplary progress. Infact, an initiative to treat the land in North and East districts is yet another remarkable feather in its cap. The project Catchment Area Treatment (CAT) pertains to treat the lands by various means of action such as training of Jhoras, establishing nurseries and running a plantation drive. Catchment Area Treatment (CAT) was initially started in the year 2000-01 within a primary vision to control the landslides and to maintain an ecological equilibrium in the catchment areas with a gestation period of nine years. Forests, Environment & Wildlife Management Department, Government of Sikkim has been tasked with a responsibility of nodal agency to implement catchment area treatment programme by three circle of six divisions viz, Territorial, Social Forestry followed by Land Use & Environment Circle.
    [Show full text]
  • A Case Study of Darjeeling Hill, West Bengal
    International Journal of Humanities and Social Science Invention ISSN (Online): 2319 – 7722, ISSN (Print): 2319 – 7714 www.ijhssi.org Volume 4 Issue 6 ǁ June. 2015ǁ PP.40-48 Landslide along the Highways: A Case Study of Darjeeling Hill, West Bengal. CHIRANJIB NAD. ABSTRACT: Out of the total landslide occurrences, nearly 20% are found in North Eastern region of India. The official figures of United Nations International Strategy for Disaster Reduction (UN/ISDR) and the Centre for Research on the Epidemiology of Disasters (CRED) for the year 2006 also states that landslide ranked third in terms of number of deaths among the top ten natural disasters, as approximately 4 million people were affected by landslides. Unless human death it poses serious damage on roadways, railways, buildings, dams and many natural resources with untold measure of ecosystem and human society. As transportation is a lifeline of a civilization and lack of self sufficiency of a region it hold an important place to meet daily needs of human beings of a region. The study route (NH 31 A, NH 55 and SH 12 A) of landlocked Darjeeling district is very much prone to landslide vulnerability. The black memories of previous massive landslide hazard took large impression on the inhabited society. Sometime the district remains isolated island due to breakdown of transportation for a stretch of days in the time of massive landslide along study route. The main objective of the study is to highlight/describe the present situation of landslide zone along three study route. The study also highlight the nature of landslide took place according to their vulnerability scale, type of movement, type of activity, type of distribution and lastly type of style for further management.
    [Show full text]
  • List of Bridges in Sikkim Under Roads & Bridges Department
    LIST OF BRIDGES IN SIKKIM UNDER ROADS & BRIDGES DEPARTMENT Sl. Total Length of District Division Road Name Bridge Type No. Bridge (m) 1 East Singtam Approach road to Goshkan Dara 120.00 Cable Suspension 2 East Sub - Div -IV Gangtok-Bhusuk-Assam lingz 65.00 Cable Suspension 3 East Sub - Div -IV Gangtok-Bhusuk-Assam lingz 92.50 Major 4 East Pakyong Ranipool-Lallurning-Pakyong 33.00 Medium Span RC 5 East Pakyong Ranipool-Lallurning-Pakyong 19.00 Medium Span RC 6 East Pakyong Ranipool-Lallurning-Pakyong 26.00 Medium Span RC 7 East Pakyong Rongli-Delepchand 17.00 Medium Span RC 8 East Sub - Div -IV Gangtok-Bhusuk-Assam lingz 17.00 Medium Span RC 9 East Sub - Div -IV Penlong-tintek 16.00 Medium Span RC 10 East Sub - Div -IV Gangtok-Rumtek Sang 39.00 Medium Span RC 11 East Pakyong Ranipool-Lallurning-Pakyong 38.00 Medium Span STL 12 East Pakyong Assam Pakyong 32.00 Medium Span STL 13 East Pakyong Pakyong-Machung Rolep 24.00 Medium Span STL 14 East Pakyong Pakyong-Machung Rolep 32.00 Medium Span STL 15 East Pakyong Pakyong-Machung Rolep 31.50 Medium Span STL 16 East Pakyong Pakyong-Mamring-Tareythan 40.00 Medium Span STL 17 East Pakyong Rongli-Delepchand 9.00 Medium Span STL 18 East Singtam Duga-Pacheykhani 40.00 Medium Span STL 19 East Singtam Sangkhola-Sumin 42.00 Medium Span STL 20 East Sub - Div -IV Gangtok-Bhusuk-Assam lingz 29.00 Medium Span STL 21 East Sub - Div -IV Penlong-tintek 12.00 Medium Span STL 22 East Sub - Div -IV Penlong-tintek 18.00 Medium Span STL 23 East Sub - Div -IV Penlong-tintek 19.00 Medium Span STL 24 East Sub - Div -IV Penlong-tintek 25.00 Medium Span STL 25 East Sub - Div -IV Tintek-Dikchu 12.00 Medium Span STL 26 East Sub - Div -IV Tintek-Dikchu 19.00 Medium Span STL 27 East Sub - Div -IV Tintek-Dikchu 28.00 Medium Span STL 28 East Sub - Div -IV Gangtok-Rumtek Sang 25.00 Medium Span STL 29 East Sub - Div -IV Rumtek-Rey-Ranka 53.00 Medium Span STL Sl.
    [Show full text]
  • LTOA-Minutes
    Minutes of Meeting in regard to Connectivity / Open Access with constituents of Eastern Region held on 08-02-2012 at NRPC, Delhi List of participants is enclosed at Annexure-1. OPTCL initiated the discussion regarding the transmission system planned under open access/connectivity for generation projects in Orissa and stated that the transmission system need to be planned in a coordinate manner in order to take care of evacuation arrangement for delivery of the States’ share from the generation projects. After several rounds of discussion, it was concluded that there would be no change in the transmission system planned for Phase-I generation projects in Orissa which is already under implementation. The transmission system for phase-II generation projects in Orissa is being reviewed in consultation with OPTCL. Accordingly, it was decided that the Open Acess/LTA cases for the generation projects other than Orissa Phase-II projects would be discussed in the present meeting. The details of the deliberation in this regard is given below : 1.0 Connectivity / Open Access for Phase-II Generation Projects in Jharkhand, Bihar and West Bengal of Eastern Region POWERGRID explained the details of the Phase-II generation projects in Jharkhand, Bihar and West Bengal who have applied for connectivity/open access for transfer of power to various beneficiaries. The status of above projects was discussed in a meeting for Connectivity and Long Term Access held on 29-07-2011 at POWERGRID office, Gurgaon. Keeping in view the progress of above projects, it was decided to discuss some of the projects in the present Standing Committee meeting.
    [Show full text]
  • Darjeeling.Pdf
    0 CONTENT 1. INTRODUCTION............................................................................ Pg. 1-2 2. DISTRICT PROFILE ……………………………………………………………………….. Pg. 3- 4 3. HISTORY OF DISASTER ………………………………………………………………… Pg. 5 - 8 4. DO’S & DON’T’S ………………………………………………………………………….. Pg. 9 – 10 5. TYPES OF HAZARDS……………………………………………………………………… Pg. 11 6. DISTRICT LEVEL & LINE DEPTT. CONTACTS ………….……………………….. Pg. 12 -18 7. SUB-DIVISION, BLOCK LEVEL PROFILE & CONTACTS …………………….. Pg. 19 – 90 8. LIST OF SAR EQUIPMENTS.............................................................. Pg. 91 - 92 1 INTRODUCTION Nature offers every thing to man. It sustains his life. Man enjoys the beauties of nature and lives on them. But he also becomes a victim of the fury of nature. Natural calamities like famines and floods take a heavy toll of human life and property. Man seems to have little chance in fighting against natural forces. The topography of the district of Darjeeling is such that among the four sub-divisions, three sub-divisions are located in the hills where disasters like landslides, landslip, road blockade are often occurred during monsoon. On the other side, in the Siliguri Sub-Division which lies in the plain there is possibility of flood due to soil erosion/ embankment and flash flood. As district of Darjeeling falls under Seismic Zone IV the probability of earthquake cannot be denied. Flood/ cyclone/ landslide often trouble men. Heavy rains results in rivers and banks overflowing causing damage on a large scale. Unrelenting rains cause human loss. In a hilly region like Darjeeling district poor people do not have well constructed houses especially in rural areas. Because of incessant rains houses collapse and kill people. Rivers and streams overflow inundating large areas. Roads and footpaths are sub merged under water.
    [Show full text]
  • An Assessment of Dams in India's North East Seeking Carbon Credits from Clean Development Mechanism of the United Nations Fram
    AN ASSESSMENT OF DAMS IN INDIA’S NORTH EAST SEEKING CARBON CREDITS FROM CLEAN DEVELOPMENT MECHANISM OF THE UNITED NATIONS FRAMEWORK CONVENTION ON CLIMATE CHANGE A Report prepared By Mr. Jiten Yumnam Citizens’ Concern for Dams and Development Paona Bazar, Imphal Manipur 795001 E-add: [email protected], [email protected] February 2012 Supported by International Rivers CONTENTS I INTRODUCTION: OVERVIEW OF DAMS AND CDM PROJECTS IN NORTH EAST II BRIEF PROJECT DETAILS AND KEY ISSUES AND CHALLENGES PERTAINING TO DAM PROJECTS IN INDIA’S NORTH EAST SEEKING CARBON CREDITS FROM CDM MECHANISM OF UNFCCC 1. TEESTA III HEP, SIKKIM 2. TEESTA VI HEP, SIKKIM 3. RANGIT IV HEP, SIKKIM 4. JORETHANG LOOP HEP, SIKKIM 5. KHUITAM HEP, ARUNACHAL PRADESH 6. LOKTAK HEP, MANIPUR 7. CHUZACHEN HEP, SIKKIM 8. LOWER DEMWE HEP, ARUNACHAL PRADESH 9. MYNTDU LESHKA HEP, MEGHALAYA 10. TING TING HEP, SIKKIM 11. TASHIDING HEP, SIKKIM 12. RONGNINGCHU HEP, SIKKIM 13. DIKCHU HEP, SIKKIM III KEY ISSUES AND CHALLENGES OF DAMS IN INDIA’S NORTH EAST SEEKING CARBON CREDIT FROM CDM IV CONCLUSIONS V RECOMMENDATIONS VI ANNEXURES A) COMMENTS AND SUBMISSIONS TO CDM EXECUTIVE BOARD ON DAM PROJECTS FROM INDIA’S NORTH EAST SEEKING REGISTRATION B) MEDIA COVERAGES OF MYNTDU LESHKA DAM SEEKING CARBON CREDITS FROM CDM OF UNFCCC GLOSSARY OF TERMS ACT: Affected Citizens of Teesta CDM: Clean Development Mechanism CC : Carbon Credits CER: Certified Emissions Reductions CWC: Central Water Commission DPR: Detailed Project Report DOE: Designated Operating Entity DNA: Designated Nodal Agency EAC:
    [Show full text]
  • GANGTOK (Civil Extraordinary Jurisdiction)
    THE HIGH COURT OF SIKKIM : GANGTOK (Civil Extraordinary Jurisdiction) ------------------------------------------------------------------------------------------ D.B.: THE HON’BLE MR. JUSTICE JITENDRA KUMAR MAHESHWARI, C.J. THE HON’BLE MR. JUSTICE BHASKAR RAJ PRADHAN, JUDGE ---------------------------------------------------------------------------------------------------------------------- W.P. (PIL) No. 04 of 2017 In Re: Release of Water from Dikchu Hydelpower Project. .... Petitioner. Versus 1. The Chief Secretary, Government of Sikkim, Gangtok. 2. The Home Secretary, Government of Sikkim, Gangtok. 3. The District Collector, East District, Gangtok. 4. Mr. Niladri Mondal, Plant Head, Sneha Kinetic Power Project Ltd., D.H.E.P. 96 MW East Sikkim. 5. National Hydroelectric Power Corpn. Ltd., Teesta Stage-V Balutar, Sirwani Singtam, East Sikkim. 6. General Manager, Teesta State III. Hydro Power at Chungthang, North Sikkim 7. The Director, Shiga Energy Ltd., Implementing company of Tashiding, Hydroelectric Project at Lower Kabithang, Labing, West Sikkim. 8. The General Manager, National Hydroelectric Power Project at Hingdam, Tashiding Road, South Sikkim. 2 W. P. (PIL) No. 04 of 2017 In Re: Release of Water from Dikchu Hydelpower Project v. Chief Secretary & Ors. 9. Site Incharge/Plant Incharge, O and M, Dans Energy Private Limited, Chisopaney, South Sikkim. 10. Site Incharge/Plant Incharge, O and M. Chuzachen Hydro Electric Project At Rangpo and Rongli, East Sikkim. 11. Site Incharge/Plant Incharge, O and M. Rongli Dam at Rongli, East Sikkim. ….. Respondents. ---------------------------------------------------------------------------- Appearance: Mr. N. Rai, Senior Advocate as Amicus Curiae. Dr. Doma T. Bhutia, Additional Advocate General with Mr. S. K. Chettri, Government Advocate for the Respondent nos.1 to 3. Mr. Tashi Rapten Barfungpa, Advocate for the respondent no.4. Mr. A. K.
    [Show full text]
  • Minutes of Mom Rangpo SPS Review 290317
    Eastern Regional Power Committee, Kolkata Minutes of Special Meeting to review the limit of maximum power flow through 400kV Rangpo – Siliguri D/c line in respect of Rangpo SPS held on 29th March, 2017 at ERPC, Kolkata List of participants is at Annexure-A. Member Secretary, ERPC welcomed all the participants to the special meeting. He informed that this special meeting was convened in continuation to the special meeting held on 14.10.2016 and 30.11.2016 at ERPC, Kolkata to review the limit of maximum power flow through 400kV Rangpo – Siliguri D/c line in respect of SPS at 400kV level at Rangpo S/s for reliable power evacuation. It was informed that the meeting was convened on the request of Teesta Urja after the declaration of COD of their all six units. Following issues were discussed: 1. Progress of Rangpo – Kishanganj 400kV D/c (Quad) line: Teesta valley Power Transmission Ltd. (TPTL) updated the progress of Rangpo – Kishanganj 400kV D/c (Quad) line as given below: Total Completed Locations/Foundation 591 521 Erection 591 511 Stringing 215km 145km It was informed that the work is getting delayed due to severe ROW issues nearby Darjeeling (Gorkhaland) area. During the meeting held on 30.11.2016, it was intimated that the line would be completed by March 17. However, the line is now expected to be commissioned by October, 2017 as mentioned by TPTL. On query, it was informed that contract was awarded in November, 2009 but the work got delayed due to land issues and finally the work started in 2012 after the MoU with Govt.
    [Show full text]