On track GLIMPSES OF JERNBANEVERKET'S ACTIVITIES IN 2015 Jernbaneverket is adopting new technology and new working methods in an increasing number of fields. A Norwegian railway tunnel is now being bored for the first time using TBM. Contact us Jernbaneverket units are located at several sites in the country. For more detailed information, visit our website or call our nationwide telephone service: 05280 From abroad (+47) 22 45 50 00 Postal address Jernbaneverket, Postboks 4350, NO-2308 Hamar Email
[email protected] www.jernbaneverket.no “The major basic route change from December 2012 has resulted in formidable growth of passenger rail traffic in Eastern Norway, and the final pieces of the puzzle fell into place when Høvik station became fully operational by the time Contents of the timetable change in December 2015.” Editorial 3 Kjell Rune Pettersen Photo: Rail traffic 4 A glimmer of light for freight and rail services 4 12 CargoNet in the black 7 New tender 8 Timber on the increase 8 Punctuality approaching European peak 9 Maintenance and renewals 10 The beginning of a new era 11 Exciting times Firmly raising the standard at many stations 12 Rail initiative employed thousands 14 Hilde Lillejord Photo: A new era for tunnel building in Norway 16 In June 2015, the Parliament of Norway made to pave the way for further ERTMS development a decision to reform the railway sector. Work and digitalised infrastructure monitoring. Groundbreaking 18 relating to that reform has characterised the past year, and will do so to an even greater extent in In December, 17 km of new double track on the Ready for railway technology 18 Herrenknecht AG Photo: From concrete and ballast to steel and cables 19 2016.