World Bank Document Sample Procurement Plan Public Disclosure Authorized I. General 1. Bank’s approval Date of the procurement Plan [Original: October 2016]: Revision 1 of Updated Procurement Plan, January 2017] 2. Date of General Procurement Notice: 15 July 2017 3. Period covered by this procurement plan: The procurement period of project covered from year January 2017 to December 2018 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review by the Bank as Public Disclosure Authorized stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Threshold Comments US$ 1. ICB and LIB (Goods) Above US$ 500,000 All 2. NCB (Goods) Above US$ 780,000 All 3. ICB (Works) Above US$ 10 million All 4. NCB (Works) Above US$ 476,000 First contract 5. Consultation of the suppliers (Works) Above US$ 20,000 First contract 6. (Non-Consultant Services) Above US$ 10,000 First contract 6. Individual consultants Above US$ 19,200 All [Add other methods if necessary] Public Disclosure Authorized 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project under preparation. 5. Any Other Special Procurement Arrangements: 5 ICB works packages will be financed under Project preparation advance. Public Disclosure Authorized 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness PADAP August 22, 2017 1 2 3 4 5 6 7 Ref. Description Estimated Packages Domest Review Comments No. Cost ic by Bank US$ Prefere (Prior / Post) million nce (yes/no) Summary of the ICB 0.00 0 No Prior (Works) Summary of the ICB 0.50 1 No Prior (Goods) Summary of the NCB 3.656 5 No Prior (Works) Summary of the NCB 0.78 1 No Prior (Goods) Summary of the ICB 0.00 0 No Prior (Non-Consultant Services) III. Selection of Consultants 1. Prior Review Threshold: Selection decisions subject to Prior Review by Bank as stated in Appendix 1 to the Guidelines Selection and Employment of Consultants: Selection Method Prior Review Threshold Comments 1. Competitive Methods (Firms) All 2. Single Source (Firms) All 3. Individual All 2. Short list comprising entirely of national consultants: Short list of consultants for services, estimated to cost less than $_300,000_equivalent per contract, may comprise entirely of national consultants in accordance with the provisions of paragraph 2.7 of the Consultant Guidelines. 3. Any Other Special Selection Arrangements: 4. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description of Assignment Estimated Packages Review Comments Cost by Bank US$ million (Prior / Post) Summary of number of contracts 0.00 0 Prior that will be let under QCBS Summary of number of contracts 0.00 0 Prior that will be let under other methods PADAP August 22, 2017 PROCUREMENT Madagascar : Sustainable Landscape Management Project PLAN General Information Country: Madagascar Bank’s Approval Date of the Original Procurement Plan: 2017-11-23 Revised Plan Date(s): (comma delineated, leave blank if none)2020-09-30 Project ID: P154698 GPN Date: Project Name: Sustainable Landscape Management Project Loan / Credit No: IDA / V0430, IDA / 59790, COFN / C1540 Executing Agency(ies): PADAP PROJECT UNIT MANAGEMENT WORKS Estimate Bid Evaluation Activity Reference No. Procurement Actual Draft Pre- Draft Bidding Specific Loan / Credit Market Procurement Prequalificatio High d Process Prequalification Bidding Documents Proposal Submission Report and Contract / Description Component Review Type Method Document Amount qualification Document / Procurement Notice Signed Contract No. Approach Process n (Y/N) SEA/SH Risk Amount Status Evaluation Report as Issued / Opening / Minutes Recommendation for Completion Type (US$) Documents Justification / Invitation (US$) Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planne d T 05-18/CN / Travaux de rénovation des locaux de l'UGP (Unité de Gestion Component 3: Project Single Stage - 2018-11- 2018-10- 2018-11- 2018-12- 2018-11- 2018-12- 2018-12- 2019-02- 2019-02- 2019-07- du Projet) du PADAP à la IDA / 59790 Management Coordination A posteriori Appel d'offres Open - National 50,000.00 69,010.77 Signé One Envelope 13 13 18 18 14 28 20 01 11 01 direction du Génie rural - and M&E MINAE à Nanisana Antananarivo. T 01-19/SAV / Travaux de réhabilitation de deux (02) bâtiments de la DRAEP : Component 3: Project Single Stage - 2019-03- 2019-04- 2019-03- 2019-04- 2019-05- 2019-05- 2019-06- 2019-06- 2019-06- 2019-08- Lot 01 : sis à Sambava, COFN / C1540 Management Coordination A posteriori Appel d'offres Open - National 65,000.00 55,651.97 Signé One Envelope 15 11 26 25 13 05 17 09 28 18 Commune Sambava, and M&E District Sambava Lot 02 : à Sahamazava Andapa, Commune Andapa, District Andapa T 03-19/SOF / Travaux de réhabilitations des Component 3: Project Single Stage - 2019-05- 2019-08- 2019-05- 2019-06- 2019-09- 2019-07- 2019-10- 2019-08- 2019-11- 2020-01- bureaux de la DRAEP COFN / C1540 Management Coordination A posteriori Appel d'offres Open - National 100,000.00 80,022.23 Signé One Envelope 24 14 29 28 16 08 25 12 14 09 Sofia : and M&E Lot 01 : Antsohihy Lot 02 : Bealanana T 01-19/ANJ / Travaux de réhabilitation des Component 2: Investments Single Stage - 2019-02- 2019-02- 2019-02- 2019-03- 2019-03- 2019-04- 2019-04- 2019-05- 2019-04- 2019-08- ouvrages sur canaux COFN / C1540 and capacity building in A posteriori Appel d'offres Open - National 427,520.00 239,627.26 Achevé One Envelope 21 14 21 23 18 07 03 02 19 30 d'irrigation dans le the selected landscapes périmètre de Sahavaviana- Iazafo. T 02-19/ANJ / Travaux de réhabilitation des Component 2: Investments Single Stage - 2019-02- 2019-02- 2019-02- 2019-03- 2019-03- 2019-04- 2019-04- 2019-05- 2019-04- 2019-08- barrages de dérivation COFN / C1540 and capacity building in A posteriori Appel d'offres Open - National 427,520.00 328,571.95 Signé One Envelope 21 14 21 23 18 07 03 02 19 30 dans le périmètre de the selected landscapes Sahanofia-Iazafo. T 02-19/SOF / Travaux d'aménagement du périmètre de Bealanana I Lot 01 : La partie amont Component 2: Investments Single Stage - 2019-03- 2019-03- 2019-03- 2019-04- 2019-04- 2019-05- 2019-04- 2019-06- 2019-05- 2019-11- du PM 580 sur le canal COFN / C1540 and capacity building in A posteriori Appel d'offres Open - National 756,250.00 500,253.01 Signé One Envelope 11 05 21 20 04 05 24 05 24 02 principal de la rive droite. the selected landscapes Lot 02 : La partie aval du PM 580 sur le canal principal de la rive droite. T 01-19/SOF / Construction des ouvrages hydraulique et piste d'entretien dans le PI Mangindrano: Lot 1:BARRAGE Component 2: Investments ANTAFIANAMALONA Single Stage - 2,188,071.8 1,599,522. 2019-03- 2019-03- 2019-03- 2019-04- 2019-04- 2019-05- 2019-04- 2019-06- 2019-05- 2019-11- COFN / C1540 and capacity building in A posteriori Appel d'offres Open - National Signé Lot 2:CANAL CPRD DU One Envelope 7 67 11 05 21 20 04 05 24 05 24 02 the selected landscapes PM 2153 - BOUT DU RESEAU Lot 3:CANAL CPRG 1er TRONÇON DE 2921 ML Lot 4:CANAL CPRG 2ème TRONÇON DE 3261 ML Lot 5:PISTE-PONT T 01-20/SOF / Travaux En d'aménagement du Component 2: Investments Single Stage - 1,600,000.0 attente 2020-07- 2020-07- 2020-08- 2020-08- 2020-09- 2021-06- périmètre irrigué de COFN / C1540 and capacity building in A posteriori Appel d'offres Open - National 0.00 One Envelope 0 d'exécutio 01 11 10 30 30 07 Beandrarezona dans le the selected landscapes n Paysage de Bealanana. T 03-20/SOF / Travaux d'aménagement du Component 2: Investments En cours Single Stage - 2020-04- 2020-05- 2020-05- 2020-06- 2020-06- 2020-08- 2021-01- périmètre d'Anjohibe- COFN / C1540 and capacity building in A posteriori Appel d'offres Open - National 375,000.00 0.00 d'exécutio One Envelope 30 15 10 09 29 04 01 Ambatosia dans le the selected landscapes n Paysage de Bealanana. T 04-20/SOF / Travaux En de stabilisation des lavaka Component 2: Investments Single Stage - attente 2020-05- 2020-05- 2020-06- 2020-07- 2020-08- 2021-01- dans le sous-paysage COFN / C1540 and capacity building in A posteriori Appel d'offres Open - National 220,000.00 0.00 One Envelope d'exécutio 01 16 15 05 10 07 Ambatoriha Est, the selected landscapes n Bealanana et Ambatosia. T 02-20/ANJ / Travaux de réhabilitation des Component 2: Investments infrastructures Single Stage - 2020-02- 2020-02- 2020-03- 2020-04- 2020-03- 2020-05- 2020-03- 2020-06- 2020-04- 2021-02- COFN / C1540 and capacity building in A posteriori Appel d'offres Open - National 340,000.00 193,722.01 Signé hydroagricoles dans le One Envelope 28 01 14 13 10 03 24 03 27 08 the selected landscapes périmètre d'Iazafo- Mahatsara - Andapatsara T 05-19/ANJ / Travaux de réhabilitation des Component 2: Investments infrastructures Single Stage - 2019-09- 2019-10- 2019-10- 2019-11- 2019-11- 2019-12- 2020-01- 2020-01- 2020-06- COFN / C1540 and capacity building in A posteriori Appel d'offres Open - National 340,000.00 0.00 Annulé hydroagricoles dans le One Envelope 30 10 15 14 19 04 23 04 02 the selected landscapes périmètre d'Iazafo- Mahatsara - Andapatsara T 04-19/SOF / Travaux de réhabilitation route non revêtue (RIP 117M) reliant Bealanana à Ambatoriha District Bealanana, Région Sofia Component 2: Investments En cours Single Stage - 4,600,000.0 2020-05- 2020-06- 2020-06- 2020-07- 2020-08- 2020-07- 2020-09- 2021-03- repartis en trois (03): COFN / C1540 and capacity building in A posteriori Appel d'offres Open - National 0.00 d'exécutio One Envelope 0 29 20 08 08 04 28 01 30 Lot1:du PK 0+000-PK the selected landscapes n 18+000.
Recommended publications
  • Sample Procurement Plan
    Sample Procurement Plan Public Disclosure Authorized I. General 1. Bank’s approval Date of the procurement Plan [Original: October 2016]: Revision 1 of Updated Procurement Plan, January 2017] 2. Date of General Procurement Notice: 15 July 2017 3. Period covered by this procurement plan: The procurement period of project covered from year January 2017 to December 2018 II. Goods and Works and non-consulting services. 1. Prior Review Threshold: Procurement Decisions subject to Prior Review Public Disclosure Authorized by the Bank as stated in Appendix 1 to the Guidelines for Procurement: Procurement Method Prior Review Comments Threshold US$ 1. ICB and LIB (Goods) Above US$ 500,000 All 2. NCB (Goods) Above US$ 780,000 All 3. ICB (Works) Above US$ 10 million All 4. NCB (Works) Above US$ 476,000 First contract 5. Consultation of the suppliers Above US$ 20,000 First contract (Works) 6. (Non-Consultant Services) Above US$ 10,000 First contract 6. Individual consultants Above US$ 19,200 All Public Disclosure Authorized [Add other methods if necessary] 2. Prequalification. Bidders for _Not applicable_ shall be prequalified in accordance with the provisions of paragraphs 2.9 and 2.10 of the Guidelines. 3. Proposed Procedures for CDD Components (as per paragraph. 3.17 of the Guidelines: 4. Reference to (if any) Project Operational/Procurement Manual: Project Implementation Manual for World Bank Loan Project under preparation. Public Disclosure Authorized 5. Any Other Special Procurement Arrangements: 5 ICB works packages will be financed under Project preparation advance. 6. Summary of the Procurement Packages planned during the first 18 months PADAP August 22, 2017 after project effectiveness 1 2 3 4 5 6 7 Ref.
    [Show full text]
  • 1 COAG No. 72068718CA00001
    COAG No. 72068718CA00001 1 TABLE OF CONTENT I- EXECUTIVE SUMMARY .................................................................................................................................................. 6 II- INTRODUCTION ....................................................................................................................................................... 10 III- MAIN ACHIEVEMENTS DURING QUARTER 1 ........................................................................................................... 10 III.1. IR 1: Enhanced coordination among the public, nonprofit, and commercial sectors for reliable supply and distribution of quality health products ........................................................................................................................... 10 III.2. IR2: Strengthened capacity of the GOM to sustainably provide quality health products to the Malagasy people 15 III.3. IR 3: Expanded engagement of the commercial health sector to serve new health product markets, according to health needs and consumer demand ........................................................................................................ 36 III.4. IR 4: Improved sustainability of social marketing to deliver affordable, accessible health products to the Malagasy people ............................................................................................................................................................. 48 III.5. IR5: Increased demand for and use of health products among the Malagasy people
    [Show full text]
  • Socio-Economic, Land Use and Value Chain Perspectives on Vanilla Farming in the SAVA Region (North-Eastern Madagascar): the Dive
    Department of Agricultural Economics and Rural Development Socio-economic, land use and value chain Georg-August Universität Göttingen perspectives on vanilla farming in the SAVA Region (north-eastern Madagascar): The Diversity Turn Baseline Study (DTBS) Discussion Paper 1806 Hendrik Hänke, Jan Barkmann, Lloyd Blum, Yvonne Franke, Dominic A. Martin, Janna Niens, Kristina Osen, Viviana Uruena, S. Annette Witherspoon, Annemarie Wurz Department of Agricultural Economics and Rural Development University of Goettingen D 37073 Göttingen ISSN 1865-2697 Diversity turn in land use science, the importance of social diversity for sustainable land use innovations using the example of vanilla farming in Madagascar. WP1: Project Management, Coordination, Theoretical Advancement Prof. Dr. Andrea D. Bührmann1), Dr. Yvonne Franke1), Prof. Dr. Rainer Marggraf2), Dr. Hendrik Hänke2) 1) Göttingen Diversity Research Institute, Faculty of Social Sciences, University of Goettingen 2) Research Unit Environmental-and Resource Economics, Department of Agricultural Economics and Rural Development, University of Goettingen WP2: PhD program "Diversity Turn in Sustainability Science" Prof. Dr. Andrea D. Bührmann, Dr. Yvonne Franke Göttingen Diversity Research Institute, Faculty of Social Sciences, University of Goettingen WP3: Social Diversity and Power Relations Prof. Dr. Andrea D. Bührmann1), Annette Witherspoon1), Raozivelo Ony Solomampionona2) 1) Göttingen Diversity Research Institute, Faculty of Social Sciences University of Goettingen 2) Department of Sociology,
    [Show full text]
  • Endemic Chromoblastomycosis Caused Predominantly By
    Endemic Chromoblastomycosis Caused Predominantly by Fonsecaea nubica, Madagascar1 Tahinamandranto Rasamoelina, Danièle Maubon, Malalaniaina Andrianarison, Irina Ranaivo, Fandresena Sendrasoa, Njary Rakotozandrindrainy, Fetra A. Rakotomalala, Sébastien Bailly, Benja Rakotonirina, Abel Andriantsimahavandy, Fahafahantsoa R. Rabenja, Mala Rakoto Andrianarivelo, Muriel Cornet, Lala S. Ramarozatovo Chromoblastomycosis is an implantation fungal infec- plant material from thorns or wood splinters or by soil tion. Twenty years ago, Madagascar was recognized as contamination of an existing wound (1,2). The causative the leading focus of this disease. We recruited patients agents are mainly Fonsecaea spp., Cladophialophora spp., in Madagascar who had chronic subcutaneous lesions and Rhinocladiella spp. However, rare cases caused by suggestive of dermatomycosis during March 2013– other genera, such as Phialophora spp. or Exophiala spp., June 2017. Chromoblastomycosis was diagnosed in 50 have been reported (1,3). As is the case for other implan- (33.8%) of 148 patients. The highest prevalence was in tation mycoses, chromoblastomycosis lesions are locat- northeastern (1.47 cases/100,000 persons) and southern ed mainly on the lower limbs, particularly on the dorsal (0.8 cases/100,000 persons) Madagascar. Patients with face of the feet, ankles, and legs (1,4–6). chromoblastomycosis were older (47.9 years) than those Infection is caused by a lack of protective clothing without (37.5 years) (p = 0.0005). Chromoblastomyco- or shoes for persons working in rural areas in which sis was 3 times more likely to consist of leg lesions (p = 0.003). Molecular analysis identifiedFonsecaea nubica spiny plants are common. Chromoblastomycosis is in 23 cases and Cladophialophora carrionii in 7 cases.
    [Show full text]
  • World Bank Document
    MADAGASCAR – P149323 – PROJET DE FILET SOCIAUX DE SECURITE (FSS) PLAN DE PASSATION DES MARCHES (MIS À JOUR) – NOVEMBRE 2018 Public Disclosure Authorized I. GÉNÉRAL 1. Titre du Projet : Projet de Filet Sociaux de Sécurité (FSS) - Cameroun – Crédit IDA No 5708 MG-Don D145 - Projet ID No P149323 2. Date d’approbation par la Banque du Plan de Passation des Marchés : Original 13 Mai 2016 ; version révisée Novembre 2018 3. Date de publication de l’avis Général de Passation des Marchés 4. Période couverte par le PPM : 12 mois Public Disclosure Authorized II. TRAVAUX ET BIENS ET SERVICES HORS CONSULTANT 1. Dispositions relatives aux seuils de revue préalable : Décisions de marchés soumis à la revue préalable de la Banque, tel que prévu dans l’annexe 1 des “Directives de passation des marchés financés par les prêts de la BIRD et les crédits de l’AID : Méthode de passation des Seuils pour la revue Observations marchés préalable (USD équivalent) Appel d’offres international Tout montant inférieur au seuil 1. (Fournitures et Services non ≥ 500 000 de revue de la banque sera revu à intellectuels) postériori Public Disclosure Authorized Appel d’offres national 2. (Fournitures et Services non Néant ≥50 000 et < 500 000 intellectuels) 3. Cotation Néant < 50,000$ 4. Entente directe ≥ 500 000 ≥ 500 000 2. Préqualification. Les offres seront pré-qualifiées en accord avec les dispositions des paragraphes 2.9 et 2.10 des directives : Non applicable 3. Dispositions spéciales sur les marchés : Non applicable 4. Liste des marchés avec les méthodes de passation et les dates de mise en œuvre Public Disclosure Authorized Page 1 of 9 II-1 TRAVAUX 1 2 3 4 5 6 7 8 9 Réf.
    [Show full text]
  • World Bank Document
    Plan de Passation de marchés I. Généralités 1. L'information sur le projet : Pays : Madagascar ; Public Disclosure Authorized Emprunteur : République de Madagascar ; Nom de projet : Projet Filets Sociaux de Sécurité – Financement Additionnel (P160 544) ; Numéro du Crédit : D1450-MG ; Agence d’exécution du Projet : Unité Programme National de Nutrition Communautaire. 2. Date d’approbation du Plan de passation de marchés par la Banque : - ; Révision : - ; 3. Date de notification du Plan Général de Passation de marchés : - ; Public Disclosure Authorized 4. Période couverte par le Plan de Passation de marchés : DOUZE (12) mois. II. Biens et Travaux et Services hors consultants 1. Seuil de Revue préalable : Les décisions de passation de marchés sujet aux revues préalables de la Banque comme indiqué dans le paragraphe 3.1 de l'Annexe II du Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Financement de Projets d’Investissement (Juillet 2016) et sur la base de l'évaluation de la capacité de l'agence d’exécution : Public Disclosure Authorized Seuil de revue à Méthode de Passation de marchés Commentaires priori (USD) Les montants 1 Biens : AOI/AON/UN/ED 2 000 000 estimatifs des marchés prévus sont 2 Travaux : AOI/AON/ED 10 000 000 au-dessous des seuils. Services autres que consultants : Niveau de risque : 3 2 000 000 AOI/AON/UN/ED « SUBSTANTIEL » 2. Pré-qualification (selon les dispositions des paragraphes 6.19 à 6.24 de la Section VI du Règlement de Passation des Marchés pour les Emprunteurs sollicitant le Public Disclosure Authorized Financement de Projets d’Investissement (Juillet 2016)) : Non Applicable.
    [Show full text]
  • Total Population in Antalaha, Maroantsetra, Andapa and Sambava Districts
    MA005 Anaborano Tsarabaria Ifasy Ambinanin'andravory 0 16,418 Andravory 11,276 Ambodimanga 4,616 Ampanefena Amboriala Ambodisambalahy 19,962 Ramena 9,800 Tanambao Manambato 12,649 10,418 Daoud Ambohitrandriana 5,237 9,106 5,358 Antananarivo Antsirabe Antsahavaribe Belambo Nord 13,390 7,632 40,146 Bevonotra Anjialava 7,716 Antindra Marotolana 12,653 16,706 11,734 Anjangoveratra Amboangibe 16,539 Ambatoafo 12,940 Marogaona Bemanevika Anjialavabe 10,453 6,813 10,447 6,621 Analamaho Nosiarina Andrembona 4,789 4,959 Mangindrano 4,930 Antananivo Anjinjaomby Sambava Cu 8,488 41,672 Haut Ambohimitsinjo 5,942 2,063 6,327 Ambohimalaza Ambovonomby Doany Andrahanjo Ambodivoara 8,208 Ambararatabe 7,364 15,569 0 9,703 Andratamarina Nord Morafeno 6,885 4,196 10,482 Farahalana Anjozoromadosy Ambodiampana 21,232 Analila 6,013 Maroambihy 11,530 Marojala 7,505 Ambalamanasy II 11,941 14,847 Bealanana 14,515 Marovato 18,603 Ambatoriha Antsambaharo Betsakotsako 4,787 Est Ankazotokana 3,593 Andranotsara Belaoka 12,737 3,978 7,472Andranomena Belaoka Lokoho Lanjarivo Ambodiangezoka 5,862 Ambinanifaho Marovato 5,828 14,813 26,294 10,451 Ambatosia Matsohely 5,662 12,796 Marotolana 5,841 Andapa Andrakata Ambodiadabo M Ankiakabe 8,133 Ambalaromba 21,952 6,750 7,851 Bealampona Nord Ambararata 5,271 13,425 7,478 Antsambalahy Ampahana Sofia 8,597 19,424 3,144 Anoviara Ambodimanga I 12,033 9,326 Tanandava 8,065 Antsahanoro Sarahandrano 12,446 Ambodisikidy 5,574 7,188 Antananambo Antalaha Ambonivohitra Matsondakana Antsahamena 13,423 Andampy 34,994 42,264 4,793
    [Show full text]
  • DISTRICT COMMUNE NOMBRE CANDIDATS ENTITE NOM ET PRENOM(S) CANDIDATS ANDAPA AMBALAMANASY II 1 INDEPENDANT RAMANANKEVITRA (Ramanan
    NOMBRE DISTRICT COMMUNE ENTITE NOM ET PRENOM(S) CANDIDATS CANDIDATS INDEPENDANT RAMANANKEVITRA ANDAPA AMBALAMANASY II 1 RAMANANKEVITRA (Ramanankevitra) IRK (Isika Rehetra Miaraka Amin'ny Andry ANDAPA AMBALAMANASY II 1 RANDRIAMINO Rajoelina) INDEPENDANT A.T.M (Ambodiangezoka ANDAPA AMBODIANGEZOKA 1 TOMBOZANANY Raziliarivony Jolin Mandroso no Tanjogno) IRK (Isika Rehetra Miaraka Amin'ny Andry ANDAPA AMBODIANGEZOKA 1 RAHARIMANANA James Willy Rajoelina) INDEPENDANT RAZAFIMANDIANINA ANDAPA AMBODIANGEZOKA 1 RAZAFIMANDIANINA (Razafimandianina) ANDAPA AMBODIMANGA I 1 AHI (Hiaraka Isika) RAZAKA Philibert IRK (Isika Rehetra Miaraka Amin'ny Andry ANDAPA AMBODIMANGA I 1 ZARASON Eric Rajoelina) ANDAPA AMBODIMANGA I 1 MMM (Malagasy Miara - Miainga) CLEMENT Théophile INDEPENDANT ANDAPA ANDAPA 1 ANDRIANAIVOMANAMANDIMBY BIEN AIME ANDRIANAIVOMANAMANDIMBY Bien Aimé (Andrianaivomanamandimby Bien Aime) INDEPENDANT MIMARA DOSY FRANCO ANDAPA ANDAPA 1 MIMARA Dosy Franco (Mimara Dosy Franco) INDEPENDANT MEVA JEAN CLAUDE (Meva Jean ANDAPA ANDAPA 1 MEVA Jean Claude Claude) IRK (Isika Rehetra Miaraka Amin'ny Andry ANDAPA ANDAPA 1 TSIMIBO Achille Rajoelina) INDEPENDANT RAMAHAVITA HENRI BRUNO ANDAPA ANDAPA 1 RAMAHAVITA Henri Bruno (Ramahavita Henri Bruno) ANDAPA ANDRAKATA 1 LEADER FANILO (Leader Fanilo) LEONG Anita IRK (Isika Rehetra Miaraka Amin'ny Andry ANDAPA ANDRAKATA 1 RAHELISON Alexandre Rajoelina) ANDAPA ANDRAKATA 1 INDEPENDANT F.H.F (STANISLAS Eniole) STANISLAS Eniole IRK (Isika Rehetra Miaraka Amin'ny Andry ANDAPA ANDRANOMENA 1 RANDRIAMANANTENA Fidelin Gitorix
    [Show full text]
  • Consultation Régionale Pour La Spatialisation Et Priorisation Des Activités En Vue De L’Élaboration De La Stratégie Régionale REDD+
    Consultation régionale pour la spatialisation et priorisation des activités en vue de l’élaboration de la Stratégie Régionale REDD+ RAPPORT DES ATELIERS DE CONSULTATION Par Décembre 2017 1 TABLE DES MATIERES 1. INTRODUCTION _______________________________________________ 11 2. METHODOLOGIE POUR LA CONDUITE DE LA SPATIALISATION, FAISABILITE, PRIORISATION ET PLANIFICATION DES ACTIVITES _________ 12 2.1. Approche méthodologique ________________________________________________________ 12 2.1.1. Spatialisation et faisabilité des activités _________________________________________ 12 2.1.2. Priorisation et planification des activités ________________________________________ 14 3. RESULTATS DES ATELIERS REGIONAUX __________________________ 15 3.1. Région Alaotra Mangoro __________________________________________________________ 15 3.1.1. Problématique de la Région ___________________________________________________ 15 3.1.2. Potentialités de la Région _____________________________________________________ 15 3.1.3. Principales contraintes _______________________________________________________ 15 3.1.4. Activités proposées __________________________________________________________ 16 3.1.5. Priorisation des activités ______________________________________________________ 16 3.2. Région Analanjirofo ______________________________________________________________ 18 3.2.1. Problématiques de la Région __________________________________________________ 18 3.2.2. Potentialités de la Région ____________________________________________________ 18 3.2.3.
    [Show full text]
  • Enquête De Base Sur Le Travail Des Enfants Dans La Région SAVA De Madagascar
    Enquête de base sur le travail des enfants dans la région SAVA de Madagascar Rapport simplifié Août 2020 Enquête de base sur le travail des enfants dans la région SAVA de Madagascar Rapport simplifié Août 2020 Copyright © Organisation internationale du Travail 2020 Première édition 31 Août 2020 Les publications du Bureau international du Travail jouissent de la protection du droit d’auteur en vertu du protocole no 2, annexe à la Convention universelle pour la protection du droit d’auteur. Toutefois, de courts passages pourront être reproduits sans autorisation, à la condition que leur source soit dûment mentionnée. Toute demande d’autorisation de reproduction ou de traduction devra être envoyée à Publications du BIT (Droits et licences), Bureau international du Travail, CH-1211 Genève 22, Suisse, ou par courriel à [email protected]. Ces demandes seront toujours les bienvenues. Bibliothèques, institutions et autres utilisateurs enregistrés auprès d’un organisme de gestion des droits de reproduction ne peuvent faire des copies qu’en accord avec les conditions et droits qui leur ont été octroyés. Consultez le site www.ifrro.org afin de trouver l’organisme responsable de la gestion des droits de reproduction dans votre pays. ISBN Print: 9789220328842 ISBN Web PDF: 9789220328835 Egalement disponible en Anglais : ‘’Baseline survey of child labour in the SAVA Region of Madagascar : Streamlined report”, ISBN Print : 9789220327951 – ISBN Web PDF : 9789220327944. Les désignations utilisées dans les publications du BIT, qui sont conformes à la pratique des Nations Unies, et la présentation des données qui y figurent n’impliquent de la part du Bureau international du Travail aucune prise de position quant au statut juridique de tel ou tel pays, zone ou territoire, ou de ses autorités, ni quant au tracé de ses frontières.
    [Show full text]
  • World Bank Document
    MADAGASCAR – P149323 – PROJET DE FILET SOCIAUX DE SECURITE (FSS) PLAN DE PASSATION DES MARCHES (MIS À JOUR) – NOVEMBRE 2018 Public Disclosure Authorized I. GÉNÉRAL 1. Titre du Projet : Projet de Filet Sociaux de Sécurité (FSS) - Cameroun – Crédit IDA No 5708 MG-Don D145 - Projet ID No P149323 2. Date d’approbation par la Banque du Plan de Passation des Marchés : Original 13 Mai 2016 ; version révisée Novembre 2018 3. Date de publication de l’avis Général de Passation des Marchés 4. Période couverte par le PPM : 12 mois Public Disclosure Authorized II. TRAVAUX ET BIENS ET SERVICES HORS CONSULTANT 1. Dispositions relatives aux seuils de revue préalable : Décisions de marchés soumis à la revue préalable de la Banque, tel que prévu dans l’annexe 1 des “Directives de passation des marchés financés par les prêts de la BIRD et les crédits de l’AID : Méthode de passation des Seuils pour la revue Observations marchés préalable (USD équivalent) Appel d’offres international Tout montant inférieur au seuil 1. (Fournitures et Services non ≥ 500 000 de revue de la banque sera revu à intellectuels) postériori Public Disclosure Authorized Appel d’offres national 2. (Fournitures et Services non Néant ≥50 000 et < 500 000 intellectuels) 3. Cotation Néant < 50,000$ 4. Entente directe ≥ 500 000 ≥ 500 000 2. Préqualification. Les offres seront pré-qualifiées en accord avec les dispositions des paragraphes 2.9 et 2.10 des directives : Non applicable 3. Dispositions spéciales sur les marchés : Non applicable 4. Liste des marchés avec les méthodes de passation et les dates de mise en œuvre Public Disclosure Authorized Page 1 of 9 II-1 TRAVAUX 1 2 3 4 5 6 7 8 9 Réf.
    [Show full text]
  • Taxonomic Monograph of the Endemic Millipede Assassin Bug Fauna of M Adagascar (Hemiptera: Reduviidae: Ectrichodiinae)
    TAXONOMIC MONOGRAPH OF THE ENDEMIC MILLIPEDE ASSASSIN BUG FAUNA OF M ADAGASCAR (HEMIPTERA: REDUVIIDAE: ECTRICHODIINAE) MICHAEL FORTHMAN, DOMINIK CHŁOND, AND CHRISTIANE WEIRAUCH BULLETIN OF THE AMERICAN MUSEUM OF NATURAL HISTORY TAXONOMIC MONOGRAPH OF THE ENDEMIC MILLIPEDE ASSASSIN BUG FAUNA OF MADAGASCAR (HEMIPTERA: REDUVIIDAE: ECTRICHODIINAE) MICHAEL FORTHMAN Department of Entomology University of California Riverside, California DOMINIK CHŁOND Department of Zoology University of Silesia Katowice, Poland CHRISTIANE WEIRAUCH Department of Entomology University of California Riverside, California BULLETIN OF THE AMERICAN MUSEUM OF NATURAL HISTORY Number 400, 152 pp., 13 maps, 24 plates, 2 tables Issued April 15, 2016 Copyright © American Museum of Natural History 2016 ISSN 0003-0082 2 BULLETIN AMERICAN MUSEUM OF NATURAL HISTORY NO. 400 CONTENTS Abstract.............................................................................5 Introduction.........................................................................5 Material and Methods ................................................................7 Specimens and Databasing..........................................................7 Morphological Methods ............................................................7 Imaging, Distribution Maps, and Measurements .......................................8 Identification Keys .................................................................8 Molecular Data and Pairwise Genetic Distance Analysis ................................8 Terminology, Specimen
    [Show full text]