Local Plan Part 1 Chapter 6 Apppendices Employment 66 and the Economy South Derbyshire Local Plan PART 1 THIS PAGE IS INTENTIONALLY BLANK EMPLOYMENT & THE ECONOMY Introduction 6.1 The policies in this Chapter seek to meet the employment development requirements identified in Policy S5. Strategic Employment Land Allocations Policy E1 Strategic Employment Land Allocations 2011- 2028 A Development of the following sites will not be permitted other than for new industrial and business development as defined by classes B1(b), B1(c), B2 and B8 of the Use Classes Order: B At sites allocated for strategic employment development at E1A, E1B, E1C and E1E the Council will secure provision to meet the needs of small and “grow on” businesses in the form of premises or serviced plots, to be brought forward during the course of the development, either by conditions or a legal agreement attached to a planning permission. C Further development will also be supported at Dove Valley Park and Land at Sinfin Moor, in accordance with Policies E4 and E5 Explanation 6.2 As noted in Chapter 4, net total employment land need for the plan period in the remainder of South Derbyshire, beyond the Derby Urban Area, is 42.27 ha. 6.3 New land will be at Hilton Business Park to the north for 3.7 hectares and to the east of Hilton Business Park for 3.25 hectares. Parts of the established business park are also to be retained for industrial and business use. 93 6.4 In the Swadlincote urban area new land will be at Cadley Hill (3ha) and the Woodville Regeneration Area (12 ha). The extent of the latter is subject to securing public infrastructure funding toward the development of the proposed Swadlincote Regeneration Route which will have a bearing on the mix of uses on the site. 6.5 For the remainder of the District beyond the Derby Urban Area the additional employment sites in the plan period will bring the total provision to around 82 hectares. 6.6 Development can also be expected to come forward on small unallocated sites through extensions to existing businesses and rural diversification schemes. 6.7 The remainder of the strategic allocation comprises sites with planning consent at Dove Valley Business Park, Tetron Point and the former Drakelow power station site. 6.8 Dove Valley Business Park has been successful in attracting business investment to the District, largely as a consequence of it being directly connected to the A50 trunk road. Much of the land with planning consent for industrial and business uses on this brownfield site has now been developed. However, a number of plots remain available. 6.9 In Swadlincote, provision is made for continued employment development adjacent to the A444, on land to the south of Cadley Hill Industrial Estate. 6.10 At the former Drakelow power station site, an area of 12 ha adjacent to proposed new housing development has the benefit of planning consent to be redeveloped for industrial and business purposes. 6.11 Further land has been allocated for employment-led regeneration on a regeneration site in Woodville, (see Policy E6). 6.12 As noted under Policy INF3, there is market interest in the establishment of new Strategic Rail Freight interchanges in this part of the East Midlands. The development of such a proposal within South Derbyshire would be expected to generate new employment on a significant scale, with wide ranging strategic planning implications. 6.13 The South Derbyshire Economic Development Strategy identifies a shortage of start-up and grow-on business accommodation in the District. To help meet this need, conditions will be attached to future planning consents for development of the strategic employment sites at Hilton, Cadley Hill, Dove Valley Park and the Woodville Regeneration Area requiring the provision of an element of smaller units of up to 100m2 in size and “grow-on” units of up to 500m2 in size, and/or small, serviced plots allowing owner occupiers to develop bespoke 94 South Derbyshire Employment Policy 1: Strategic Employment Land Allocations - District Council E1D TETRON POINT AND E1A & E1G CADLEY HILL WAY DIN M NA WILLIA A514 E1D E1D A 4 4 4 B U R T O C A N D L R E O R Y Y H A D IL E L D R R O AD C A O LO D R ILL S Y H E LE AD C 14 A5 SE O CL YDER E R D A L G Y B E L P A P 4 A 4 4 B E1A E U N R A L T E O T O N C IN R L O D E1G A A W D S D A O R N TO LU E N A L E T O B C R N U I L N D E L A W W S A Y Crown copyright. All rights reserved. Scale: 1:5000 at A4 100019461 2013. NORTH South Derbyshire Employment Policy 1: Strategic Employment Land Allocations - E1B HILTON BUSINESS PARK District Council Y D A A W IS Y O IS R A S W S A VO O N N W F O AY V A D A O R D N A L L E W A 5 1 D 3 OA 2 R D E N G LA EL G W IN G T O D N A O R N R O E N A E D D W R A FO Y H WAS SE EA E M TH Hilton Business Park THE MEASE Egginton Crossing Crown copyright. All rights reserved. Scale: 1: 5000 at A4 100019461 2013. NORTH South Derbyshire Employment Policy 1: Strategic Employment Land Allocations - District Council E1C Woodville Regeneration Area St Stephens Church P D O A D RO O N L STR O M OA R E M ET O A C V IC MOIR ARA G E R LINE OF WOODVILLE OAD REGENERATION ROUTE TO BE ADDED B R ID G E1C E S ET T RE RE ST HN E O T J C H APEL ST SOUTH R E E DERBYSHIRE ( T R IV O LI D NORTH WEST R IV LEICESTERSHIREBOUNDARY OF EMPLOYMENT SITE E TO BE AMENDED TO FOLLOW M SOUTH DERBYSHIRE DISTRICT BOUNDARY H AIN STR E PW OR A TH NE R R E LA L O I E N S A T IO T D T O A N OCCUP Crown copyright. All rights reserved. Woodville Regeneration Route Scale: 1: 5000 at A4 100019461 2013. NORTH South Derbyshire Employment Policy 1: Strategic Employment Land Allocations - E1E & E5 DOVE VALLEY District Council BUSINESS PARK, FOSTON E N A L HEATHTOP Y G G O B Conygree Wood E5 Airfield B E N T Rough L Wood A N E1E E Heath Top Business Park D R A V E L U O B E N M A A H E1E L N D E K R E1E C A A Y P D O O D R E W A V N E L M A U L I O R B E1E Y Y M L A A E A H H N N NU E E E K V C A A K P R A B P R Pennywaste O U 1 Wood G 1 HT 5 ON A HE U ATH TT ROAD OX ETE E1E R A5 50(T) ROAD A 1 1 A50(T) C H U R C H B R A O E 5 U N 0 G A U H L T T T O Y O R XE N E TER T R A ROAD O A E LAN W A H D AC 5 BRE 1 1 Crown copyright. All rights reserved. Scale: 1:10000 at A4 100019461 2013. NORTH South Derbyshire Employment Policy 1: Strategic Employment Land Allocations - District Council E1E FORMER DRAKELOW POWER STATION D A B5018 BURTO O N ROAD R E ID S D R A E T RO A EAST W ON D AD E Y U O A STAFFORDSHIRE R ING N T E W K V R N I U A CUM OL E A H F L F R A B O D E N K RL R A I N B SOUTH D DERBYSHIRE RO AD Branston Gof & Country Cub AD O R N TO AL W E1E Barn Farm Park Farm Crown copyright. All rights reserved. Scale: 1:10000 at A4 100019461 2013. NORTH South Derbyshire Employment Policy E4: Land at Sinfin Moor District Council C O L T S F O O T D R I V E E DERBY V A LOMOND CITY SOUTH DERBYSHIRE D E E P D A L E L A N E MO O R LANE Ashlea Farm A50(T) L O W E S L A N E Hill Farm D EE P DA LE LA NE E AN L IN F N SI Crown copyright. All rights reserved. Scale: 1:10000 at A4 100019461 2014. NORTH accommodation to meet their needs. Such provision will help support the establishment, expansion and retention of businesses within the District. As a minimum, ten percent of the land/floorspace within the total area of each site should be developed for these purposes. 6.14 New housing at Hilton (Policy H7) and the Woodville Regeneration Area (Policy E6) will be tied, through planning conditions, to the provision of business accommodation, including small business units and serviced plots, to ensure the timely delivery of balanced, sustainable development. Such provision will also be required by condition in relation to any applications for the renewal of planning consent at the former Drakelow power station site (Policy H6) and Cadley Hill (Policy H5).
Recommended publications
  • Planning Supporting Statement
    Branston Locks Employment Land Statement November 2012 Employment Land Statement Nurton Developments (Quintus) Limited Branston Locks, Burton upon Trent November 2012 Branston Locks – Employment Land Statement Contents 1 Introduction ............................................................................................................................................................ 2 2 Communications and Site Characteristics .......................................................................................................... 3 3 Relevant Planning Policy and Supporting Evidence Base................................................................................. 4 4 Market Overview for Burton ................................................................................................................................ 10 5 Assessment of Demand ...................................................................................................................................... 16 6 Conclusions ......................................................................................................................................................... 18 Appendix 1 – Schedule of Occupiers and Map of Centrum ........................................................................................ 19 Appendix 2 – Schedule of Available Industrial Floor Space in Burton Upon Trent .................................................. 20 Appendix 3 – Schedule of Available Office Floor Space in Burton Upon Trent .......................................................
    [Show full text]
  • East Midlands Intermodal Park SCOPING OPINION
    East Midlands Intermodal Park SCOPING OPINION September 2014 Scoping Opinion for the East Midlands Intermodal Park: Strategic Rail Freight Interchange CONTENTS EXECUTIVE SUMMARY 1.0 INTRODUCTION .................................................................... 1 2.0 THE PROPOSED DEVELOPMENT ............................................ 4 3.0 EIA APPROACH AND TOPIC AREAS ..................................... 11 4.0 OTHER INFORMATION ........................................................ 23 APPENDIX 1 – LIST OF CONSULTEES APPENDIX 2 – RESPONDENTS TO CONSULTATION AND COPIES OF REPLIES APPENDIX 3 – PRESENTATION OF THE ENVIRONMENTAL STATEMENT Scoping Opinion for the East Midlands Intermodal Park: Strategic Rail Freight Interchange EXECUTIVE SUMMARY This is the Scoping Opinion (the Opinion) provided by the Secretary of State in respect of the content of the Environmental Statement for the Proposed East Midlands Intermodal Park: Strategic Rail Freight Interchange (SRFI). This report sets out the Secretary of State’s opinion on the basis of the information provided in Goodman Shepherd (UK) Limited’s (‘the applicant’) report entitled ‘Environmental Impact Assessment Scoping Report’ (August 2014) (‘the Scoping Report’). The Opinion can only reflect the proposals as currently described by the applicant. The Secretary of State has consulted on the Scoping Report and the responses received have been taken into account in adopting this Opinion. The Secretary of State is satisfied that the topic areas identified in the Scoping Report encompass those
    [Show full text]
  • International Passenger Survey, 2008
    UK Data Archive Study Number 5993 - International Passenger Survey, 2008 Airline code Airline name Code 2L 2L Helvetic Airways 26099 2M 2M Moldavian Airlines (Dump 31999 2R 2R Star Airlines (Dump) 07099 2T 2T Canada 3000 Airln (Dump) 80099 3D 3D Denim Air (Dump) 11099 3M 3M Gulf Stream Interntnal (Dump) 81099 3W 3W Euro Manx 01699 4L 4L Air Astana 31599 4P 4P Polonia 30699 4R 4R Hamburg International 08099 4U 4U German Wings 08011 5A 5A Air Atlanta 01099 5D 5D Vbird 11099 5E 5E Base Airlines (Dump) 11099 5G 5G Skyservice Airlines 80099 5P 5P SkyEurope Airlines Hungary 30599 5Q 5Q EuroCeltic Airways 01099 5R 5R Karthago Airlines 35499 5W 5W Astraeus 01062 6B 6B Britannia Airways 20099 6H 6H Israir (Airlines and Tourism ltd) 57099 6N 6N Trans Travel Airlines (Dump) 11099 6Q 6Q Slovak Airlines 30499 6U 6U Air Ukraine 32201 7B 7B Kras Air (Dump) 30999 7G 7G MK Airlines (Dump) 01099 7L 7L Sun d'Or International 57099 7W 7W Air Sask 80099 7Y 7Y EAE European Air Express 08099 8A 8A Atlas Blue 35299 8F 8F Fischer Air 30399 8L 8L Newair (Dump) 12099 8Q 8Q Onur Air (Dump) 16099 8U 8U Afriqiyah Airways 35199 9C 9C Gill Aviation (Dump) 01099 9G 9G Galaxy Airways (Dump) 22099 9L 9L Colgan Air (Dump) 81099 9P 9P Pelangi Air (Dump) 60599 9R 9R Phuket Airlines 66499 9S 9S Blue Panorama Airlines 10099 9U 9U Air Moldova (Dump) 31999 9W 9W Jet Airways (Dump) 61099 9Y 9Y Air Kazakstan (Dump) 31599 A3 A3 Aegean Airlines 22099 A7 A7 Air Plus Comet 25099 AA AA American Airlines 81028 AAA1 AAA Ansett Air Australia (Dump) 50099 AAA2 AAA Ansett New Zealand (Dump)
    [Show full text]
  • Nottingham-Derby Green Belt Review
    Nottingham-Derby Green Belt Review Lynette Hughes Nottinghamshire County Council and Steve Buffery Derbyshire County Council 24 August 2006 This is an information and discussion paper. It is the work of officers and has not been formally considered by any authority. It therefore does not represent the views of any authority or other body. Comments on the paper are welcome and can be forwarded to [email protected] or [email protected]. Executive Summary Page 1 of 4 EXECUTIVE SUMMARY The review comprises: 1. The working paper drafted in March 2006 and finalised in April 2006 2. The assessment paper drafted in July 2006 and finalised in August 2006 3. The implications paper produced in August 2006 The review is the work of officers and has not been formally considered by any authority. The findings of the review have been considered in the formulation of the draft 3 Cities SRS and the draft Northern SRS which will form part of the Regional Plan to be published on 28 September 2006 and tested at a public examination in 2007. A project plan produced and agreed in December 2005 and added to in April 2006 have guided the review work. The review has started from the point that the principle of the green belt is well established and will remain. However, the review is related to the needs of development in the areas where there is green belt at present. General areas for possible extensions to the green belt have also been considered. The government's sustainable communities plan requires that the current area of green belt land within each region should be maintained or increased.
    [Show full text]
  • 29Th July Agenda Prelim
    REPORT OF THE HEAD OF PLANNING SERVICES SECTION 1: Planning Applications SECTION 2: Appeals In accordance with the provisions of Section 100D of the Local Government Act 1972, BACKGROUND PAPERS are the contents of the files whose registration numbers are quoted at the head of each report, but this does not include material which is confidential or exempt (as defined in Sections 100A and D of that Act, respectively). -------------------------------- 1. PLANNING APPLICATIONS This section includes reports on applications for: approvals of reserved matters, listed building consent, work to trees in tree preservation orders and conservation areas, conservation area consent, hedgerows work, advertisement consent, notices for permitted development under the General Permitted Development Order 1995 (as amended) and responses to County Matters. Reference Item Place Ward Page 9/2009/0951 1.1 Shardlow Aston 1 9/2009/1067 1.2 Willington Willington/Findern 6 9/2010/0153 1.3 Burnaston Etwall 20 9/2010/0476 1.4 Swadlincote Newhall 26 9/2010/0482 1.5 Egginton Etwall 31 9/2010/0582 1.6 Smisby Hartshorne/Ticknall 39 9/2010/0512 2.1 Sutton on the Hill North West 41 When moving that a site visit be held, Members will be expected to consider and propose one or more of the following reasons: 1. The issues of fact raised by the Head of Planning Services’ report or offered in explanation at the Committee meeting require further clarification by a demonstration of condition of site. 2. Further issues of principle, other than those specified in the report of the Head of Planning Services, arise from a Member’s personal knowledge of circumstances on the ground that lead to the need for clarification that may be achieved by a site visit.
    [Show full text]
  • (For Official Use Only) PUBLIC PETITION NO. PE1188 Should You Wish to Submit a Public Petition for Consideration by the Public P
    (For official use only) PUBLIC PETITION NO. PE1188 Should you wish to submit a public petition for consideration by the Public Petitions Committee please refer to the guidance leaflet How to submit a public petition and the Guidance Notes at the back of this form. 1. NAME OF PRINCIPAL PETITIONER Nick Dekker 2. TEXT OF PETITION Nick Dekker calling on the Scottish Parliament to urge the Scottish Government to investigate the circumstances whereby it agreed that 60 hydro-power stations could be accredited for subsidy under the Renewables Obligation scheme and that generation capacity could be cut to below the 20megawatt qualification threshold at others to enable accreditation and whether, in the interests of electricity consumers, it will rescind these accreditations. 3. ACTION TAKEN TO RESOLVE ISSUES OF CONCERN BEFORE SUBMITTING THE PETITION I have contacted and have been in correspondence with AuditScotland, OFGEM, Scottish & Southern Energy PLC and ScottishPower PLC. Alex Neil MSP also corresponded with Scottish & Southern Energy. 4. ADDITIONAL INFORMATION See— “The war on climate change – A licence to print money?” “Subsidies and Subterfuge – Hydro-power and the Renewables Obligation” (also on www.swap.org.uk) “ROCs earned by Alcan, SSE and ScottishPower from 'old build' hydro, April 2002 to December 2007” (a report by the petitioners); “Renewable Energy Data for Scotland (Hydro), May 2008” Correspondence generally pertinent to the petition but esp to Question 3 OFGEM’s “Annual Reports on the Renewables Obligation” 2004 to 2008; Press releases and other material referred to in “The war on climate change – a licence to print money?” and elsewhere 5.
    [Show full text]
  • Report Template
    Roger Tym & Partners t: 0116 249 3970 3 Museum Square e: 0116 249 3971 Leicester e: [email protected] LE1 6UF w: www.tymconsult.com Part of Peter Brett Associates LLP East Staffordshire Borough Council Infrastructure Delivery Study Part 1 Growth options assessment Final Report June 2012 PP26486 CONTENTS 1 INTRODUCTION ................................................................................................................. 1 Study approach ................................................................................................................... 3 The key study questions ...................................................................................................... 3 2 TRANSPORT ...................................................................................................................... 5 Context ................................................................................................................................ 5 Current and future transport capacity and impact for Burton ................................................ 6 Transport growth options assessment for Burton ................................................................. 7 Transport growth options review for Uttoxeter ................................................................... 12 Growth options RAG assessment ...................................................................................... 15 3 EDUCATION ....................................................................................................................
    [Show full text]
  • E.ON 2003 Annual Report
    Financial Calendar 2003 Annual Report E.ON Group Financial Highlights in millions 2003 20021 +/– % Electricity sales volume (in billion kWh)2 387.6 333.6 +16 Gas sales volume (in billion kWh)2 803.7 721.3 +11 April 28, 2004 2004 Annual Shareholders Meeting Sales 46,364 36,624 +27 April 29, 2004 Dividend Payment EBITDA3 9,458 7,558 +25 EBIT3 6,228 4,649 +34 May 13, 2004 Interim Report: January–March 2004 Internal operating profit4 4,565 3,817 +20 Income/(loss) from continuing operations August 12, 2004 Interim Report: January–June 2004 before income taxes and minority interests 5,538 –759 – November 11, 2004 Interim Report: January–September 2004 Income/(loss) from continuing operations 3,950 –720 – Income/(loss) from discontinued operations 1,137 3,306 –66 March 10, 2005 Annual Press Conference, Net income 4,647 2,777 +67 Release of 2004 Annual Report Investments 9,196 24,159 –62 Cash provided by operating activities 5,538 3,614 +53 March 10, 2005 Annual Analysts Conference Stockholders’ equity 29,774 25,653 +16 Total assets 111,850 113,503 –1 April 27, 2005 2005 Annual Shareholders Meeting ROCE6 (in %) 9.9 9.2 +0.75 Cost of capital (in %) 9.5 9.5 – Return on equity after taxes7 (in %) 16.8 11.1 5.75 Employees at year end 66,549 101,336 –34 Earnings per share from (in ) on•top continuing operations 6.04 –1.10 – discontinued operations 1.74 5.07 –66 cumulative effect of changes in accounting principles, net –0.67 0.29 – net income 7.11 4.26 +67 2003 Annual Report Per share (in ) Dividend 2.00 1.75 +14 Stockholders’ equity8 45.39 39.33 +15 1Adjusted for discontinued operations (see commentary on pages 133–141).
    [Show full text]
  • AGENDA Wednesday, 23 September 2020 (10.00Am – 12 Noon)
    D2N2 LEP BOARD – AGENDA Wednesday, 23 September 2020 (10.00am – 12 noon) By dial in via MS Teams (calendar invitation supplied) 1.1 Welcome and Introductions Verbal 10.00 1.2 Declarations of Interest Verbal 10.03 1.3 Minutes of meeting 08/07/20 and matters Paper 10.05 arising 2. Strategic discussion 2.1 Formal appointment of auditors Sarah Verbal 10.10 Wainwright (DCC) and Phil Handley (HSKS Greenhalgh) 2.2 Chair’s Report, including: David Williams, Paper 10.20 interim Chair a. Economic Recovery and Growth Plan (Appendix A) with presentation on the Will Morlidge Presentation Recovery Plan b. East Midlands Freeports Update c. Governance Update d. Advisory Boards Update (ToRs annexed at Appendix B) e. MPS Roundtable 2.3 D2N2 Chief Executives Report, including: Sajeeda Rose Paper 11.00 a) Skills Update (with EAN employers annexed at Appendix A) and Dan Heffernan Presentation presentation on Careers Hub activity b) Business and Innovation/Growth Hub Update c) ESIF Update d) Marketing and Comms Update 2.4 Capital programme Performance Update Sajeeda Paper 11.30 • Including ratifications of project Rose/Tom approvals Goshawk 2.5 Midlands Engine Development Corporation Adrian Smith Paper 11.45 Strategic Business Case update Exempt item under Local Government (Access to Information) Act 3. Any other business 11.55 Dates for 2021 D2N2 Boards (all 10am – 12 noon, calendar invites to follow): Wed 27/1/21 Tue 23/2/21 Wed 19/5/21 Wed 7/7/21 Tue 21/9/21 Tue 23/11/21 4. Date of next meeting: Tuesday, 24 November, 2020 (10 am – 12 noon) Item 1.3: DRAFT Key Decision/Action Points from Board D2N2 LOCAL ENTERPRISE PARTNERSHIP BOARD MEETING Wednesday, 8 July, 2020 By Teams Dial-In Interim Chair David Williams Minutes Sally Hallam 1.
    [Show full text]
  • 69: Trent Valley Washlands Area Profile: Supporting Documents
    National Character 69: Trent Valley Washlands Area profile: Supporting documents www.naturalengland.org.uk 1 National Character 69: Trent Valley Washlands Area profile: Supporting documents Introduction National Character Areas map As part of Natural England’s responsibilities as set out in the Natural Environment White Paper1, Biodiversity 20202 and the European Landscape Convention3, we are revising profiles for England’s 159 National Character Areas (NCAs). These are areas that share similar landscape characteristics, and which follow natural lines in the landscape rather than administrative boundaries, making them a good decision-making framework for the natural environment. NCA profiles are guidance documents which can help communities to inform their decision-making about the places that they live in and care for. The information they contain will support the planning of conservation initiatives at a landscape scale, inform the delivery of Nature Improvement Areas and encourage broader partnership working through Local Nature Partnerships. The profiles will also help to inform choices about how land is managed and can change. Each profile includes a description of the natural and cultural features that shape our landscapes, how the landscape has changed over time, the current key drivers for ongoing change, and a broad analysis of each area’s characteristics and ecosystem services. Statements of Environmental Opportunity (SEOs) are suggested, which draw on this integrated information. The SEOs offer guidance on the critical issues, which could help to achieve sustainable growth and a more secure environmental future. 1 The Natural Choice: Securing the Value of Nature, Defra NCA profiles are working documents which draw on current evidence and (2011; URL: www.official-documents.gov.uk/document/cm80/8082/8082.pdf) 2 knowledge.
    [Show full text]
  • Heavy Load Grid Routes
    HEAVY LOAD GRID ROUTES Route Category Name 1 C Staffordshire (A500/A34) to Salford (A5063/Ponoma Docks) 2 C Rudheath (A50/B5082) to Birkenhead (Docks) 2A C Lostock Gralam (A556/Manchester Rd R2/2) to M53(12) (Hoole Village R2/6) 3 B Liverpool (M57/A580) to Liverpool (Docks) 6 F Newcastle upon Tyne (A1, Tyne Bridge) to M1 (M1(J19)/M6) 6A C A1/B6267 (Ainderby Quernhow R6/7) to A1/A61 (Baldersby St James R6/7) 8A B Chingford (A110/B160 R8/31) to A406/B179 (Waltham Forest R8/36) 10A D Avonmouth (Docks(St Andrews Gates)) to Gloucester (A40/A417) 10B D Avonmouth (Docks(West Gate)) to Avonmouth (M49) 10 E Stafford (A34/Riverway) to Gloucester (A449/A38) 13 B A1 (A63/A1) to Monk Fryston (A63/Fryston Common La) 14 B Ferrybridge (A162/A1) to Ferrybridge (Power Station) 16 D A1 (A1/B1220) to Thorpe in Balne (Thorpe Bank/Thorpe La) 17 B A1 (A1/A614) to M180 (J1) 18 F A1(M) (A1(M)/M18) to Eggborough (Power Station) 19 B A1/A57 (Markham Moor) to Cottam (Power Station) 20 F A1 (B1164/A1) to High Marham (Power Station) 22 A Folkestone (Folkestone Harbour) to Dungeness (Nuclear Power Station) 24A B Aldershot (A323/A331 R24/3) to Farnham (A31/A287) 24B B Ripley (A3/B2039) to Upper Hale (A325/A3016) 27A F Mangotsfield (A432/A4174 R27/6) to Pennsylvania (A420/A46 R27/8) 29 C Backford (A5117/A41) to Ince (Substation) 30 E Backford (A5117/A41) to Ellesmere Port (Queen Elizabeth Docks) 32I D Darlington (A167/Whessoe Rd) to Middlesborough (Docks) 32C D Middlesbrough (A172/A1085 R32B/13) to Redcar and Cleveland (Lackenby Docks) 32B D Darlington (A167/Whessoe
    [Show full text]
  • E.ON 2004 Annual Report on Form 20-F Entitled “Item 3
    2004 Annual Report Growing closer. Growing together. E.ON Group Financial Highlights in millions 2004 2003 +/– % Electricity sales (in billion kWh)1 403.7 390.5 +3 Gas sales (in billion kWh)1 868.2 854.9 +2 Sales 49,103 46,427 +6 Adjusted EBITDA2 10,520 9,458 +11 Adjusted EBIT2 7,361 6,228 +18 Income/Loss (–) from continuing operations before income taxes and minority interests 6,799 5,538 +23 Income/Loss (–) from continuing operations 4,348 3,950 +10 Income/Loss (–) from discontinued operations, net –9 1,137 – Net income 4,339 4,647 –7 Investments 5,285 9,196 –43 Cash provided by operating activities 5,972 5,538 +8 Free cash flow3 3,260 2,878 +13 Net financial position4 (at year end) –5,483 –7,855 +30 Stockholders’ equity 33,560 29,774 +13 Total assets 114,062 111,850 +2 ROCE5 (in %) 11.3 9.9 +1.46 Cost of capital (in %) 9.0 9.5 –0.56 Return on equity after taxes7 (in %) 13.7 16.8 –3.16 Employees (at year end) 69,710 67,102 +4 Earnings per share (in ) from continuing operations 6.62 6.04 +10 from discontinued operations –0.01 1.74 – from cumulative effect of changes in accounting principles, net – –0.67 – from net income 6.61 7.11 –7 Per share (in ) Dividend 2.35 2.00 +18 Stockholders’ equity8 50.93 45.39 +12 1Unconsolidated figures; prior-year figure includes pro forma 12-month gas sales of E.ON Ruhrgas AG. 2Non-GAAP financial measure; see reconciliation to consolidated net income on page 25.