TANZANIA ELECTRIC SUPPLY COMPANY LIMITED ENVIRONMENTAL IMPACT STATEMENT FOR PROPOSED MALAGARASI STAGE III 44.8MW HYDROPOWER PLANT AT IGAMBA FALLS ON THE MALAGARASI RIVER IN KAZURAMIMBA WARD, KIGOMA REGION FINAL REPORT Non-Technical Summary – English Version PROJECT PROPONENT: Tanzania Electric Supply Company LTD P.O. Box 9024 Dar Es Salaam Phone : +255 22 2451131 – 9 Fax : +255 22 2451206 Email:
[email protected] CONSULTANT: Dr. Flora Ismail Tibazarwa ESBI Engineering & Facility Management Ltd P.O. Box 105810 Dar Es Salaam Phone : +255 22 2451738/1744 Fax : +255 22 2451748 Email :
[email protected] SUBMITTED TO : National Environmental Management Council (NEMC) P.O. Box 63154 Dar Es Salaam Phone : + 255 22 2127817 Fax : + 255 22 2134603 Email :
[email protected] October 2012 Malagarasi ESIA Non-Technical Summary 1. Non-Technical Summary 1.1 Introduction TANESCO is proposing to develop a new hydropower plant at Igamba Falls on the Malagarasi River, to serve Kigoma-Ujiji Municipality and the surrounding towns of Kasulu and Uvinza with an affordable and reliable supply of electricity. Earlier feasibility studies have indicated that there are three potential hydropower projects that could be undertaken in the Igamba Falls area. This description is for Stage III of the potential three-stage Igamba Falls development which is the most downstream dam site and hydro-power station (Figure 2). The power generated from the project will be distributed to a number of communities in western Tanzania with approximately 1.3 million persons with increased access to electricity. Recently TANESCO has preceded with a number of interconnecting transmission lines and Kigoma should be linked to the national grid by 2015.