SCARBOROUGH SUBWAY EXTENSION & Transit Corridor
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Systems & Track: What to Expect
IT’S HAPPENING, TODAY Forum Eglinton Crosstown LRT Metrolinx’s Core Business – Providing Better, Faster, Easier Service We have a strong connection with our Adding More Service Today Making It Easier for Our customers, and a Customers to Access Our great understanding Service of who they are and Building More to Improve Service where they are going. Planning for New Connections Investing in Our Future MISSION: VISION: WE CONNECT GETTING YOU THERE COMMUNITIES BETTER, FASTER, EASIER 3 WELCOME Our Central East Open House will feature the following stations and stops: • Eglinton • Mt Pleasant • Leaside • Laird • Sunnybrook Park • Science Centre Read more about how Eglinton Crosstown will change Toronto’s cityscape here. Train Testing Video: Click Here Eglinton Crosstown PROJECT UPDATE • The Eglinton Crosstown project is now 70% complete • By the end of 2020, three stations – Mount Dennis, Keelesdale and Science Centre – will be largely complete • 69% of track has been installed • Vehicle testing is now underway Eglinton Crosstown What to Expect: Systems & Track 2020 Progress to-date Remaining Work in 2020 Remaining Work for 2021 • Track installed between Mount Dennis Station • Track installation between Wynford Stop to • Track installation between Fairbank Station to and Fairbank Station Sloane Stop track split and from Birchmount Laird Station, and Kennedy Station tail tracks • Track installed between East Portal Stop to Kennedy Station (excluding tail tracks) • Traction power cables installation from (Brentcliffe Rd) and Wynford Stop and -
Scarborough Centre on the Move
PILLAR TWO SUPPORT TRANSIT & INNOVATIVE MOBILITY SOLUTIONS Scarborough Centre on the Move Transportation6 Master Plan 97 Pillar Two Support Transit & Innovative Mobility 6 Solutions The second study pillar is the promotion of transit and innovative mobility solutions to move more people through the transportation system efficiently. Transit-oriented development and support of transit investment in key areas is emphasized in planning and policy documents including provincial plans such as the Regional Transportation Plan (The Big Move) and the Growth Plan for the Greater Golden Horseshoe, municipal plans such as the City of Toronto Official Plan and City of Toronto Complete Streets Guidelines (CSG), and local policies such as the Scarborough Centre Secondary Plan and McCowan Precinct plan. The benefits of transit are described in this chapter, along with details on the existing and proposed transit network and supporting strategies. This chapter includes mobility options such as local buses, subways, rapid transit (RT), autonomous vehicles, and other “smart” technologies that improve network efficiency. 6.1 Benefits Social Equity The regional transportation plan, the Big Move, envisions that 80% of residents will live within two kilometres of rapid transit, citing that access to frequent, fast, and affordable transit is crucial for social equity and cohesion. Transit provides access to society and the economy, particularly for those with low incomes who cannot afford to own and maintain a personal vehicle, as well as individuals unable to operate a vehicle, including the youth or elderly. Transit service helps integrate individuals into communities and regions to allow overall participation in employment opportunities and other activities. -
Bloor-Danforth Subway Extensions to Kipling and Kennedy
Bloor-Danforth Subway Extensions to Kipling and Kennedy UPPER CANADA RAILWAY SOCIETY BOX 122 TERMINAL "A" TORONTO, ONTARIO 2 DECEMBER 1980 The Newsletter is published monthly by the Upper Canada Railway Society, Box 122, Terminal "A", Toronto, Ont. M5W 1A2. Editor: Stuart I. Westland, 78 Edenbridge Dr., Islington, Ontario, Canada M9A 3G2 Telephone (416) 239-5254 Assistant Editor: John D. Thompson (416) 759-1803 Activities Editor: Ed Campbell 251-8356 Please address all correspondence relative to the Newsletter to the Editor at the above address. The Newsletter is mailed monthly to members of the Society in good standing. Membership fee is .$17 for January 1981 to December 1981 inclusive. COVER- A pair of TTC H5 subway cars were appropriately decorated for the official opening of the Bloor-Danforth Subway extensions, on Friday, Nov. 21, 1980. —TTC photos by Ted Wickson QUOTE OF THE MONTH- (Extracts from an editorial in the Toronto Star of November 5, chosen by the Newsletter particularly to mark the completion of the Kennedy and Kipling extensions): "In the past two years the politicians... have ducked the hard decision about investing in the TTC as a force that could determine the future development of Metro—the fastest, — most convenient form of public transit is the kind that runs on fixed rail such as the subway or LRT—Even in the fitful economy of the '80's, a new transit line can have a stimulating effect. Metro needs more of them. The next obvious one is an east-west line along Eglinton, Sheppard or Finch Avenues—If politicians show a bit of nerve and build fixed rail transit into thinly populated areas, experience has shown these soon become thickly populated areas. -
Assessment of Provincial Proposals Line 2 East Extension
EX9.1 Attachment 5 – Assessment of Provincial Proposals Line 2 East Extension As directed by City Council in April 2019, City and TTC staff have assessed the Province’s proposed 3-stop Line 2 East Extension. The details of this assessment are provided in this attachment. 1. Project Summary 1.1 Project Description The Line 2 East Extension (L2EE), as proposed by the Province, is an approximately 8 kilometre underground extension of Line 2 Bloor-Danforth from Kennedy Station that will have three stations – at Lawrence and McCowan, Scarborough Centre and Sheppard and McCowan, as shown in Figure 1. The Province's plan for the L2EE is similar to what was being planned by the City and TTC prior to 2016. Figure 1 - Line 2 East Extension Reference Map Note: Map produced by City/TTC based on current understanding of project Attachment 5 – Assessment of Line 2 East Extension Page 1 of 9 As proposed, the extension will be fully integrated with the existing Line 2 and have through service at Kennedy Station. A turn-back may be included east of Kennedy Station to enable reduced service to Scarborough Centre, subject to demand and service standards. The extension will require approximately seven additional six-car, 138-metre-long trains to provide the service. The trains would be interoperable with the other trains on Line 2. With the station at Sheppard and McCowan supporting storage of up to six trains, there is sufficient storage and maintenance capacity existing at the TTC’s Line 2 storage and maintenance facilities to accommodate this increase in fleet size. -
Eglinton Crosstown West Extension Initial Business Case February 2020
Eglinton Crosstown West Extension Initial Business Case February 2020 Eglinton Crosstown West Extension Initial Business Case February 2020 Contents Executive Summary 1 Scope 1 Method of Analysis 1 Findings 3 Strategic Case 3 Economic Case 3 Financial Case 4 Deliverability and Operations Case 4 Summary 4 Introduction 7 Background 8 Business Case Overview 10 Problem Statement 13 Case for Change 14 Problem Statement 14 Opportunity for Change 15 Key Drivers 16 Strategic Value 18 iv Investment Options 24 Introduction 25 Study Area 25 Options Development 25 Options for Analysis 27 Assumptions for Analysis and Travel Demand Modelling 33 Strategic Case 34 Introduction 35 Strategic Objective 1 – Connect More Places with Better Frequent Rapid Transit 38 Criterion 1: To provide high quality transit to more people in more places 38 Criterion 2: To address the connectivity gap between Eglinton Crosstown LRT and Transitway BRT 40 Strategic Objective 2 – Improve Transit’s Convenience and Attractiveness 42 Criterion 2: To provide more reliable, safe and enjoyable travel experience 42 Criterion 2: To boost transit use and attractiveness among local residents and workers 45 Strategic Objective 3 – Promote Healthier and More Sustainable Travel Behaviours 52 Criterion 1: To improve liveability through reduction in traffic delays, auto dependency and air pollution 52 Criterion 2: To encourage use of active modes to access stations 53 v Strategic Objective 4 – Encourage Transit-Supportive Development 57 Criterion 1: Compatibility with Existing Neighbourhood -
Caledonia Station Preliminary Design Online Consultation Please Review the Presentation and Complete the Survey
Welcome to the Caledonia Station Preliminary Design Online Consultation Please review the presentation and complete the survey. May 14th to May 28th, 2012 Caledonia Station Preliminary Design The Purpose of this Online Consultation • Provide a brief Crosstown project update • Present the Crosstown station design philosophy • Explain the anatomy of the station components and challenges • Visualize the preliminary design of Caledonia Station Most importantly: * Get your input on the Preliminary Design, early in this process. • Architectural station design will be prepared for Open House #2 in Summer 2012. • Significant public outreach will follow on construction. Caledonia Station Preliminary Design Online Consultation Overview Part 1 • Introduction • Crosstown Update • Station Design 101 - Guiding Principles of a Crosstown Station Part 2 • Caledonia Station Preliminary Design * Our partners in City Planning are here if you have questions about existing development applications at Caledonia or the future Land Use Study around Crosstown Stations Caledonia Station Preliminary Design Caledonia Station Design Process Open House #1 — May 14, 2012 Online Consultation — May 14 to May 28, 2012 Open House #2 — Summer 2012 • Response to Open House #1 input • Architectural Treatments • Final Station Design Open House Open House #3 — Early 2013 (TBD) • Construction staging • Ongoing outreach on construction Tunnelling Construction — Fall 2012 (TBD) Caledoina Station Construction Start — 2014 (TBD) Caledonia Station Preliminary Design Format for Feedback -
Guest Accessibility Package
Guest Accessibility Package Copyright: October 2018, Accessibility Professionals of Ontario Table of Contents Guest Accessibility Package 1 Closing the GAP (Guest Accessibility Package) 1 Accessible Customer Service Policies, Practices and Procedures 3 Safety and Security 5 Emergency Evacuation Procedures 6 Fire Alarms 6 Maps 6 Written Description and Directions for Orientation 6 General Description 6 Queens Quay and TTC 7 TTC to Harbourfront Centre 7 Eastbound Streetcar 8 To Find the centre and Main Building 8 Westbound Streetcar 8 To find the Main Building 8 Boardwalk 9 Main Building 9 General Description 10 Lobby 10 Lobby Elevator and Stairs 10 Gift Shop 10 Marilyn Brewer Community Space and Brigantine Room 11 Studio Theatre 11 West Corridor 11 South Corridor 12 South Extension Corridor 13 East Corridor 13 Harbourfront Arts Complex 13 Lobby 13 Upper Lobby 14 Power Plant Gallery Lobby 14 Harbourfront Centre Theatre 15 Concert Stage 15 Queens Quay Terminal and Fleck Dance Theatre 15 From North Access Point: 16 From Southwest Access Point 16 Queens Quay Terminal Elevators 17 Fleck Dance Theatre 17 Stage in the Round 18 Western Campus 18 Amsterdam Brewhouse 18 Canoe and Kayak Rentals, Disabled Sailing Association and Power Boat Centre 19 Pond/Rink 19 The Slip 20 To find The Slip: 20 Boxcar Social 20 Washrooms 21 Descriptions for Public Washrooms 22 Main Building 22 West Corridor Accessible Washroom 22 East Corridor Universal Accessible Washroom Main Building Ground floor Men’s Washroom 22 Main Building Ground floor Women’s Washroom 23 -
Model City Hall 2018 City Planning and Sustainability Selina Hsu and Sajid Mahmud
Model City Hall 2018 City Planning and Sustainability Selina Hsu and Sajid Mahmud Greetings Delegates, It is our pleasure to welcome you to Model City Hall 2018. As the world changes more rapidly, we must step up to address the many old and new issues that will affect our way of life. Toronto has long been lumbering and suffering with the congestion on the Line 1 Yonge-University subway; we are under pressure to make our urban environments more sustainable and healthy for ourselves and future generations; and we are look to problems of the future, such as great climate change and natural disasters. Things care constantly changing in our city, and although shovels are in the ground on Eglinton and we have weathered the storms before, the Torontonians of tomorrow must work together to improve the place we call home. We look forward to reading your position papers, listening to your thoughts and ideas, and reading the resolutions that you put forth to deal with these pressing issues. We will be judging delegates and selecting the Best Delegate, Outstanding Delegate, and Honorable Mention based on knowledge, diplomacy, problem-solving skills, and leadership qualities. It is encouraged that delegates have done ample research so that they can offer interesting solutions and generate dynamic, interesting debate. We hope to provide you all with an enjoyable experience that will give you some perspective. Welcome to Model City Hall 2018! With warmest regards, Selina Hsu and Sajid Mahmud Chairs of the City Planning and Sustainability Committee 1 Model City Hall 2018 City Planning and Sustainability Selina Hsu and Sajid Mahmud TOPIC 1: Livable and Sustainable Streets Around the world, there is an increasing emphasis on developing livable and sustainable city streets. -
Optimized Transit-Oriented Development at Kennedy Station
192 Spadina Ave. #300 June 11, 2020 Toronto, ON M5T 2C2 647-687-4474 Optimized Transit-Oriented Development at Kennedy Station [email protected] 2438-2450 Eglinton Avenue East, Toronto Existing Context (Image 1) Parkland Dedication West Hydro corridor next to the site and single-storey commercial The project is located within a parkland acquisition priority area, and it is buildings further west subject to parkland dedication at an alternative rate. Based on the site’s expected net area of less than 1 hectare after road conveyances, the Rail Corridor South Eglinton Avenue East with six lanes of traffic and two service roads, and the Kennedy Mobility Hub further south required dedication rate will be 10% for the relative portion of residential uses (excluding non-profit housing) and 2% for non-residential uses. East Rail corridor adjacent to the site, and an 18-storey residential building further east Cultural Heritage Per the Toronto Heritage Register online mapping, the only heritage listed North Hydro corridor, and single-family detached houses further north or registered properties in the area are the listed Bethel Cemetery at 741 Transportation Kennedy Road and Thomas Ionson House at 12 Iondale Place, which are located 550 m and 1.1 km from the site, respectively. Because of the large The site is very well served by existing and future transit, as it is located Hydro Corridor distance, the development on the site is not likely to have an impact on directly across from the Kennedy Mobility Hub. The Hub includes the Eglinton Ave East their heritage value. -
SCARBOROUGH SUBWAY EXTENSION VIRTUAL Q&A Scarborough Subway Extension
WELCOME Heading 2 SCARBOROUGH SUBWAY EXTENSION VIRTUAL Q&A Scarborough Subway Extension The Scarborough Subway Extension will provide seamless travel between Scarborough and the downtown core. It will improve access to transit for area residents, reduce daily travel times for commuters and also create job opportunities. Number of mer !! proposed 3 Scarborough Subway Extension stations FINCH AVENUE EAST Finch-Kennedy • Lawrence Avenue and McCowan Road Proposed station • Scarborough Centre Line 4 404 locations Sheppard • Sheppard Avenue and McCowan Road PHARMACYAVENUE WARDEN AVENUE WARDEN ! MIDLANDAVENUE T Sheppard Subway Extension MARKHAMROAD E E Agincourt R (Pre-planning) D ! T A Stouffville GO at Kennedy Station ! S SHEPPARD AVENUE EAST O E Sheppard I R L N S D O E A S L O L I R E S N Future Durham Region Bus at Scarborough L L I 401 M N Connections to Rapid Transit Centre Station O D KENNEDY ROAD transit YORK MILLS ROAD Scarborough Centre ELLESMERE ROAD Future Eglinton Crosstown LRT at Kennedy Station SCARBOROUGH SUBWAY EXT. Scarborough Subway Ext. E U N E MCCOWANROAD Line 3 Scarborough Rapid Various bus connections at all stations V A Transit K R BIRCHMOUNTROAD A P Existing GO Rail Existing Line 3 A I Approximate R O Future Finch-Kennedy GO 7.8 km T LAWRENCE AVENUE EAST C I Lawrence Station length V — Existing Subway Anticipated Future Subway 105,000 daily boardings Guildwood boardings Eglinton Crosstown LRT Future LRT EGLINTON AVENUE EAST BRIMLEY ROAD (in Construction) Kennedy Greenspace Access to transit 38,000 more people within walking distance to transit Ontario Line Eglinton Greenbelt Area More than 34,000 jobs within a 10-minute walk from a Kennedy Access to jobs Built-Up Area D new Scarborough Subway Extension station A Line 2 O Built-Up Area in R H T Bloor-Danforth R O Urban Growth Centre Anticipated NF KINGSTON ROAD Approximately $5.5 billion DA capital costs O'CONNOR DRIVE Scarborough All alignments/stations are conceptual and subject to change. -
Investors Fact Sheet
Live As One. A City Park Community on the New Dupont. Located in one of the few areas of the city that’s a multi-modal transit hub with a variety of transit options, Galleria brings TRANSIT HUB convenience to your doorstep. The Dufferin subway station, buses, streetcars, GO Transit and the UP Express are all within reach. Vaughan Unionville Metropolitan Centre Finch York University Downsview Park Leslie Sheppard Don Mills Yonge York Mills Yorkdale Scarborough Centre Weston Eglinton Pearson Airport West Eglinton Kennedy Matheson/Airport Science Coporate Centre Centre Gunns Loop St. Clair West St. Clair Dupont Pape Kipling Dundas Duerin Spadina St. George Bloor Main Street Scarborough West Yonge Queen/Spadina Osgoode Queen Line 1 Yonge-University Line 2 Bloor-Danforth Line 3 Scarborough Line 4 Sheppard Eglinton Crosstown LRT Liberty Village Union Ontario Place/ Duerin Bus Line Exhibition St Clair Streetcar Line Proposed SmartTrack Proposed South Relief Line Proposed Ontario Line INVESTMENT POTENTIAL INVESTMENT Now is the time to invest in this RENTAL UPSWING TH booming area where there is PLACE more value and potential than 4 TORONTO’S RANKING in the downtown core. 9.2% IN TOP 50 TECH TALENT GTA Condo Rent Growth MARKETS4 in Q4-2018 2 A GROWING NEIGHBOURHOOD 7.7% Per square foot increase in 4.0% Toronto is growing, Q1 2019 residential rent 2 DOWNTOWN TORONTO and Toronto West is growing JOB GROWTH INCREASE along with it. IN 2018 ⁵ NEW DEVELOPMENT 2.8M - PRICE GROWTH 565,000+ Toronto Population PEOPLE EMPLOYED IN 13,000 DOWNTOWN TORONTO OFFICE Estimated new residential units on the JOBS IN 20185 3.4M market in the next 5 to 10 years ³ Project population increase by 2041 1 12.4% 572,415 Year over year price appreciation in Toronto W02, compared to 7.3% in INTERNATIONAL STUDENTS ENROLLED IN CANADIAN 1. -
TTC 2022 Annual Service Plan Stakeholder Meeting 1 Summary Thursday, June 24, 2021 2:00 – 4:00 Pm Meeting Held Online
TTC 2022 Annual Service Plan Stakeholder Meeting 1 Summary Thursday, June 24, 2021 2:00 – 4:00 pm Meeting held online Overview On Thursday, June 24th, 2021, the TTC hosted the first of two planned rounds of stakeholder consultation about its 2022 Annual Service Plan. The stakeholder group engaged includes representatives of city-wide and area-specific organizations with an interest in transit and service planning (see Participant List attached). This first round of consultation included both an afternoon session and an evening session, both of which covered the same material and discussion questions, and, due to the COVID-19 pandemic, took place via web conferencing software. This stakeholder meeting summary covers the afternoon session, which ran from 2:00 – 4:00 p.m. Approximately 8 participants attended the afternoon stakeholder meeting, along with staff from the TTC and Swerhun Inc., the third-party facilitation and engagement team retained by the TTC to support the consultation process on the 2022 Annual Service Plan. The purpose of the meeting was to share and seek feedback on the draft initiatives and priorities for the 2022 Annual Service Plan. The meeting included an overview presentation, question and answer period, and a facilitated, plenary discussion. Attachments included: Attachment 1. Agenda and Attachment 2. Participant List Swerhun Inc. prepared this meeting summary. A draft of the summary was subject to participant review before being finalized. The intent of this summary is to capture the range of feedback shared at the workshop; it is not intended to serve as verbatim transcript. The TTC will also post the final summary on the project website, along with summaries from other engagement activities.