170 Bus Time Schedule & Line Route

Total Page:16

File Type:pdf, Size:1020Kb

170 Bus Time Schedule & Line Route 170 bus time schedule & line map 170 Garden City - City Express Via Newnham Road View In Website Mode The 170 bus line (Garden City - City Express Via Newnham Road) has 2 routes. For regular weekdays, their operation hours are: (1) Garden City Interchange: 7:05 AM - 11:20 PM (2) Queen Street Station: 6:10 AM - 10:00 PM Use the Moovit App to ƒnd the closest 170 bus station near you and ƒnd out when is the next 170 bus arriving. Direction: Garden City Interchange 170 bus Time Schedule 15 stops Garden City Interchange Route Timetable: VIEW LINE SCHEDULE Sunday 12:39 AM - 8:39 PM Monday 7:05 AM - 11:20 PM Queen Street Station, 1g Queen Street Bus Station, Brisbane City Tuesday 7:05 AM - 11:20 PM Cultural Centre Station, Platform 2 Wednesday 7:05 AM - 11:20 PM South East Busway, South Brisbane Thursday 7:05 AM - 11:20 PM South Bank Busway Station, Platform 2 Friday 7:05 AM - 11:20 PM South Bank Platform 2, South Brisbane Saturday 12:20 AM - 11:39 PM Mater Hill Station, Platform 2 12 Water Street, South Brisbane Buranda Busway, Platform 2 Buranda Platform 2, Woolloongabba 170 bus Info Direction: Garden City Interchange Greenslopes Station, Platform 2 Stops: 15 Greenslopes Platform 2, Woolloongabba Trip Duration: 39 min Line Summary: Queen Street Station, 1g, Cultural Birdwood Rd at Wellers Hill Centre Station, Platform 2, South Bank Busway Station, Platform 2, Mater Hill Station, Platform 2, Logan Rd at Holland Park South, Stop 31 Buranda Busway, Platform 2, Greenslopes Station, 1056 Logan Road, Holland Park Platform 2, Birdwood Rd at Wellers Hill, Logan Rd at Holland Park South, Stop 31, Logan Rd at Mt Logan Rd at Mt Thompson, Stop 34 Thompson, Stop 34, Logan Rd at Mt Gravatt Central, 1226A Logan Road, Mount Gravatt East Stop 37, Broadwater Rd at Hillgrove, Stop 40, Newnham Rd at Civic Fair, Stop 73, Newnham Rd at Logan Rd at Mt Gravatt Central, Stop 37 Wishart West, Stop 76, Newnham Rd at Delavan, 1480 Logan Road, Mount Gravatt East Stop 78, Garden City Shopping Centre Station, Stop A Broadwater Rd at Hillgrove, Stop 40 2-12 Broadwater Road, Mount Gravatt East Newnham Rd at Civic Fair, Stop 73 301A Newnham Road, Upper Mount Gravatt Newnham Rd at Wishart West, Stop 76 424 Newnham Road, Upper Mount Gravatt Newnham Rd at Delavan, Stop 78 516 Newnham Road, Macgregor Garden City Shopping Centre Station, Stop A Direction: Queen Street Station 170 bus Time Schedule 15 stops Queen Street Station Route Timetable: VIEW LINE SCHEDULE Sunday 7:56 AM - 5:56 PM Monday 6:10 AM - 10:00 PM Garden City Shopping Centre Station, Stop H 16F Macgregor Street, Macgregor Tuesday 6:10 AM - 10:00 PM Newnham Rd at Delavan, Stop 78 Wednesday 6:10 AM - 10:00 PM 2 Everett Street, Macgregor Thursday 6:10 AM - 10:00 PM Newnham Rd at Wishart West, Stop 76 Friday 6:10 AM - 10:00 PM 419 Newnham Road, Upper Mount Gravatt Saturday 6:56 AM - 9:56 PM Newnham Rd at Civic Fair, Stop 73 301A Newnham Road, Upper Mount Gravatt Broadwater Rd at Hillgrove, Stop 40 105 Broadwater Road, Mount Gravatt East 170 bus Info Direction: Queen Street Station Logan Rd at Mt Gravatt Central, Stop 37 Stops: 15 Logan Road, Mount Gravatt East Trip Duration: 42 min Line Summary: Garden City Shopping Centre Logan Rd at Mt Thompson, Stop 34 Station, Stop H, Newnham Rd at Delavan, Stop 78, 1167B Logan Road, Mount Gravatt East Newnham Rd at Wishart West, Stop 76, Newnham Rd at Civic Fair, Stop 73, Broadwater Rd at Hillgrove, Logan Rd at Holland Park South, Stop 31 Stop 40, Logan Rd at Mt Gravatt Central, Stop 37, 1063 Logan Road, Holland Park Logan Rd at Mt Thompson, Stop 34, Logan Rd at Holland Park South, Stop 31, Birdwood Rd at Wellers Birdwood Rd at Wellers Hill, Stop 2 Hill, Stop 2, Greenslopes Station, Platform 1, Buranda Busway, Platform 1, Mater Hill Station, Greenslopes Station, Platform 1 Platform 1, South Bank Busway Station, Platform 1, 25A Paciƒc Motorway, Woolloongabba Cultural Centre Station, Platform 1, Queen Street Station Buranda Busway, Platform 1 0 South East Freeway, Woolloongabba Mater Hill Station, Platform 1 546A Stanley Street, South Brisbane South Bank Busway Station, Platform 1 98 Colchester Street, South Brisbane Cultural Centre Station, Platform 1 Melbourne Street, South Brisbane Queen Street Station 60 Queen Street, Brisbane City 170 bus time schedules and route maps are available in an o«ine PDF at moovitapp.com. Use the Moovit App to see live bus times, train schedule or subway schedule, and step-by-step directions for all public transit in Brisbane. Check Live Arrival Times About Moovit MaaS Solutions Supported Countries Mooviter Community © 2021 Moovit - All Rights Reserved.
Recommended publications
  • 160 Bus Time Schedule & Line Route
    160 bus time schedule & line map 160 Garden City - City View In Website Mode The 160 bus line (Garden City - City) has 2 routes. For regular weekdays, their operation hours are: (1) Garden City Depot: 7:02 AM - 9:00 PM (2) Queen Street Station: 6:35 AM - 6:25 PM Use the Moovit App to ƒnd the closest 160 bus station near you and ƒnd out when is the next 160 bus arriving. Direction: Garden City Depot 160 bus Time Schedule 10 stops Garden City Depot Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday Not Operational Queen Street Station, 1i Queen Street Bus Station, Brisbane City Tuesday 7:02 AM - 9:00 PM Cultural Centre Station, Platform 2 Wednesday 7:02 AM - 9:00 PM South East Busway, South Brisbane Thursday 7:02 AM - 9:00 PM South Bank Busway Station, Platform 2 Friday 7:02 AM - 9:00 PM South Bank Platform 2, South Brisbane Saturday Not Operational Mater Hill Station, Platform 2 12 Water Street, South Brisbane Buranda Busway, Platform 2 Buranda Platform 2, Woolloongabba 160 bus Info Direction: Garden City Depot Greenslopes Station, Platform 2 Stops: 10 Greenslopes Platform 2, Woolloongabba Trip Duration: 22 min Line Summary: Queen Street Station, 1i, Cultural Holland Park West Station, Platform 2 Centre Station, Platform 2, South Bank Busway Holland Park West Platform 2, Tarragindi Station, Platform 2, Mater Hill Station, Platform 2, Buranda Busway, Platform 2, Greenslopes Station, Gri∆th University Station, Platform 2 Platform 2, Holland Park West Station, Platform 2, Gri∆th University Platform 2, Nathan Gri∆th University
    [Show full text]
  • Qns on Notice 29 Feb 2000
    29 Feb 2000 Questions on Notice 1 QUESTIONS ON NOTICE such as educational, personal and crisis 1889. Education Queensland counselling, behaviour management interventions, assessments, and special needs Mr HEGARTY asked the Minister for programs. Education (30/11/99)— (b) Three Hundred (300) Behaviour Management What was the Queensland Department of Education's personnel, including teachers, aides, youth and total Budget (and expenditure, where available) for social workers and psychologists located in school capital works for each financial year from teams across the state to work with schools in 1990-91 to 1999-2000? the area of preventing and dealing with Mr WELLS (10/2/00): The information the violence. This support is also within a context Honourable Member seeks is already published and of both proactive and reactive work. Such as publicly available in Budget Papers and Annual assisting schools with Behaviour Management Reports for the relevant years. Plans, addressing issues of violence through classroom teaching, intervention processes for students with behaviour problems, such as the 1909. Adopt-A-Cop setting up of alternative programs and running Mr FELDMAN asked the Minister for Education individual anger management programs for (1/12/99)— students. With reference to knowledge gained as an adopt-a- (c) All Guidance Officers, many Behaviour cop and seeing first hand the increase in incidents of Management staff and other school personnel violence in schools and being called to deal with the are trained in conflict resolution and resolution of conflict situations— professional counselling. (1) What programs and policies has the Education Since coming to office, I have also initiated a number Department developed, or he as Minister, put in of measures to combat bullying in schools.
    [Show full text]
  • Integrated Transport Network Accessible to Everyone Our People Our Organisation Financial Statements Appendices
    Introduction Integrated transport network Accessible to everyone Our people Our organisation Financial statements Appendices Integrated Transport Network • Completed construction of the Veloway1 (V1) Cycleway Highlights (Stage E) project between Birdwood Road in Holland Park • Released the Queensland Transport Strategy, which West and Gaza Road at Tarragindi. provides a 30 year vision for the transformation of the • Continued delivering the Ipswich Motorway (Rocklea– state’s transport system to provide flexibility in Darra) (Stage 1) project, to upgrade the motorway responding to customer preferences, global trends, from four to six lanes from just east of the Oxley Road and emerging technologies. roundabout to the Granard Road interchange at Rocklea. • Continued to address sustainability by targeting • Completed construction of additional southbound lanes maintenance to the highest priority needs and on the merge between the Gateway Motorway and the making better use of the existing transport network Pacific Motorway at Eight Mile Plains and Rochedale. (a priority Queensland Government directive in the State Infrastructure Plan). • Completed widening of the Pacific Motorway, from four to six lanes, between Mudgeeraba and Varsity Lakes. • Established a special Queensland Ministerial Freight Council to engage directly with the freight industry. • Continued widening of the Bruce Highway, from four to six lanes, between Caloundra Road and the Sunshine • Developed Regional Transport Plans supporting the Motorway, and upgrading interchanges at Caloundra Road department’s vision of ‘creating a single integrated and Sunshine Motorway. transport network accessible to everyone’. • Completed installing barriers on various sections of the • Partnered with CSIRO’s Data61 to develop sophisticated, Bruce Highway between Brisbane and Gympie. quantitative, evidence-based scenarios of what transport could look like out to 2048.
    [Show full text]
  • New City Centre Master Plan
    DRAFT BRISBANE CITY CENTRE MASTER PLAN 2013 A VISION FOR OUR OPEN CITY LORD MAYOR’S FOREWORD Brisbane is on the brink of an exciting period of transformation and unprecedented economic opportunity. As Australia’s New World City and gateway to Asia, Brisbane is emerging as a thriving hub for business and innovation. The Draft Brisbane City Centre Master Plan 2013 has been developed to ensure we capitalise on this vast potential and seize today’s opportunities. Brisbane’s economy is predicted to double over the next 20 years, with demand for office, retail, residential and hotel space in the city centre expected to equate to around 50 new towers. Brisbane City Council’s master plan sets the vision for an open city – open for business, an open outdoor lifestyle and a vibrant heart that’s open for all to enjoy. A thriving city centre is vital to Brisbane’s continued prosperity and the quality of life we enjoy. This plan delivers a coordinated strategy to guide future growth and investment in our city centre over the next 20 years, while ensuring a safe and attractive city heart is a continuing source of pride. The plan promotes Brisbane’s continued maturation as an energetic, subtropical city with the public spaces, transport and infrastructure necessary to support the expansion of business and lifestyle precincts. I thank the residents, industry experts and members of the business community who have provided valuable input into this important plan for the future of Australia’s New World City. Graham Quirk LORD MAYOR DRAFT BRISBANE CITY CENTRE MASTER PLAN 2013 MASTER PLAN 2013 IN BRIEF 1 1 VISION 5 STRATEGIES CITY- 10 MAKING MOVES 35 TRANSFORMATIVE PROJECTS STRATEGIC CONTEXT How to use this document STRATEGIC CONTEXT ...........................
    [Show full text]
  • SEB Case Study Report for QU
    This may be the author’s version of a work that was submitted/accepted for publication in the following source: Widana Pathiranage, Rakkitha, Bunker, Jonathan M.,& Bhaskar, Ashish (2014) Case study : South East Busway (SEB), Brisbane, Australia. (Unpublished) This file was downloaded from: https://eprints.qut.edu.au/70498/ c Copyright 2014 The Author(s) This work is covered by copyright. Unless the document is being made available under a Creative Commons Licence, you must assume that re-use is limited to personal use and that permission from the copyright owner must be obtained for all other uses. If the docu- ment is available under a Creative Commons License (or other specified license) then refer to the Licence for details of permitted re-use. It is a condition of access that users recog- nise and abide by the legal requirements associated with these rights. If you believe that this work infringes copyright please provide details by email to [email protected] Notice: Please note that this document may not be the Version of Record (i.e. published version) of the work. Author manuscript versions (as Sub- mitted for peer review or as Accepted for publication after peer review) can be identified by an absence of publisher branding and/or typeset appear- ance. If there is any doubt, please refer to the published source. Case Study: South East Busway (SEB), Brisbane, Australia CASE STUDY: SOUTH EAST BUSWAY (SEB), BRISBANE, AUSTRALIA By Rakkitha Widanapathiranage Jonathan M Bunker Ashish Bhaskar Civil Engineering and Built Environment School, Science and Engineering Faculty, Queensland University of Technology, Australia.
    [Show full text]
  • Final in 2008
    PROOF ISSN 1322-0330 RECORD OF PROCEEDINGS Hansard Home Page: http://www.parliament.qld.gov.au/hansard/ E-mail: [email protected] Phone: (07) 3406 7314 Fax: (07) 3210 0182 Subject FIRST SESSION OF THE FIFTY-SECOND PARLIAMENT Page Wednesday, 23 May 2007 SPEAKER’S STATEMENT ............................................................................................................................................................ 1593 The Clerk of the Parliament ................................................................................................................................................ 1593 PETITIONS ..................................................................................................................................................................................... 1593 TABLED PAPERS .......................................................................................................................................................................... 1593 MINISTERIAL PAPER .................................................................................................................................................................... 1594 Yungaba ............................................................................................................................................................................. 1594 Tabled paper: Non-conforming petition from 314 persons in relation to the proposed redevelopment of the Yungaba facility at Kangaroo Point. ..........................................................................................................
    [Show full text]
  • 4. Future Transport Conditions Without the Project
    4. Future transport conditions without the Project This chapter outlines the forecast changes in transport conditions and performance between the base year of 2012 and the future modelled years – 2021 and 2031. 4.1 Modelled transport network and operation assumptions Key assumptions incorporated into the BaT Project Model include growth in public transport fares, parking charges and road tolls, growth in the value of time as well as strategic transport network improvements. Details of these assumptions are contained in section 2.2. The rail, bus and road network infrastructure for future years is based on current TMR and local government project commitments. A full description on key project inclusions and exclusions is shown in section 2.2 but in summary, includes infrastructure projects currently under construction; infrastructure projects programmed in QTRIP; Queensland Rail (Transport Services Contract) funded projects and committed Brisbane City Council strategic road projects. For this assessment, assumptions on key future rail transport projects include: • by 2021, track duplication from Coomera to Helensvale; and rail stabling improvements • by 2031, third track from Kuraby to Loganlea; track duplication from Beerburrum to Landsborough; and Clapham Yard stabling improvements. Other key transport network planning projects within the Brisbane Statistical Division assumed to be completed: • a range of new busways/ transitways by 2021, including the Old Cleveland Road transitway, Gympie Road transitway to Chermside and an extension
    [Show full text]
  • Cross River Rail APPENDIX I Social Impact Assessment
    Appendix I Social Impact Assessment Cross River Rail APPENDIX I Social Impact Assessment JULY 2011 Appendix I-1 Demographic Characteristics Existing population Table I-1-1 Estimated Resident Population, 2004, 2008, 2009(p) Est. resident population, 30 June Average annual growth rate 2004 2008 2009(a) 2004 – 2009(p) 2008 – SLA (a)1 2009(p)2 Number Number Number % % Albion 2,327 2,635 2,686 2.9 1.9 Wooloowin 5,602 5,773 5,850 0.9 1.3 Bowen Hills 1,482 1,761 1,775 3.7 0.8 Herston 1,868 1,932 1,948 0.8 0.8 Spring Hill 4,912 5,855 5,937 3.9 1.4 City Inner 2,281 3,333 3,515 9.0 5.5 City Remainder 3,213 5,181 5,122 9.8 -1.1 Kangaroo Point 6,789 7,262 7,277 1.4 0.2 Woolloongabba 3,825 4,170 4,253 2.1 2.0 Dutton Park 1,419 1,458 1,478 0.8 1.4 Annerley 9,486 10,223 10,377 1.8 1.5 Fairfield 2,375 2,748 2,831 3.6 3.0 Yeronga 5,420 5,747 5,891 1.7 2.5 Yeerongpilly 2,441 2,615 2,800 2.8 7.1 Rocklea 1,502 1,621 1,596 1.2 -1.5 Moorooka 9,167 9,699 9,877 1.5 1.8 Salisbury 5,475 5,757 5,861 1.4 1.8 Total population in 69,584 77,770 79,074 2.6 1.7 the study corridor suburbs Brisbane LGA 957,882 1,031,297 1,052,458 1.9 2.1 Queensland 3,900,910 4,308,570 4,425,103 2.6 2.7 Source: Queensland Treasury 2010, PIFU Profiles and Queensland Regional Profiles Table Notes: 1 Average annual growth rate 2 Preliminary “Study area” is the sum of the suburbs shown individually.
    [Show full text]
  • Table Talk February 2006 Page 1 February 2006, Number 163 RRP $2.95 ISSN 1038-3697 Max Express Operated a Non-Stop Service Betw
    February 2006, Number 163 RRP $2.95 ISSN 1038-3697 Max Express operated a non-stop service between Toowoomba and Brisbane from May 2005 until, sadly, Sunday 29 January 2006, when due to rising costs and competition the service ceased. Max Express was a joint venture between the McCafferty and Nesbitt families. Table Talk February 2006 Page 1 Top Table Talk: • V/Line Passenger Commonwealth Games timetable alterations – page 5 • New town services in Pakenham – page 12 • Trouble on the ferries in Williamstown – page 15 Table Talk is published monthly by the Australian Association of Timetable Collectors Inc. [Registration No: A0043673H] as a journal of record covering recent news items. The AATTC also publishes The Times covering historic and general items. Items for publication can be submitted to the Editor, Steven Haby. Editor: Steven Haby, PO Box 1072 Newport, VIC, 3015 – (03) 9399 4049, [email protected] Editorial Team: Geoff Mann (Associate Editor), Graeme Cleak, Lourie Smit. Production: Geoff and Judy Lambert, Chris London Secretary: Steven Haby, PO Box 1072 Newport, VIC, 3015 – (03) 9399 4049, [email protected] AATTC on the web: www.aattc.org.au Original material appearing in Table Talk may be reproduced in other publications, acknowledgement is required and acknowledgment is made of material sourced from Railway Digest and Transit Australia Membership of the AATTC includes monthly copies of The Times, Table Talk, the distribution list of TTs and the twice-yearly auction catalogue. The membership fee is $50.00 pa. Membership enquiries should be directed to the Membership Officer: Dennis McLean, PO Box 24 NUNDAH, Qld 4012, - (07) 3266 8515.
    [Show full text]
  • Transport and Main Roads Annual Report 2011-12
    Annual Report Department of Transport and Main Roads Volume 1 of 2 Letter of compliance Communication objective 14 September 2012 This annual report for the Department of Transport and Main Roads details our progress in meeting the objectives of the The Honourable Scott Emerson MP Transport and Main Roads Corporate Plan 2011–2015 and Minister for Transport and Main Roads achieving our vision of Connecting Queensland. Level 15 We use this report to inform our diverse range of stakeholders about Capital Hill Building our activities. In doing this, we ensure our legislative reporting 85 George Street obligations under the Financial Accountability Act 2009 and the BRISBANE Qld 4000 Financial and Performance Management Standard 2009 are met. Dear Minister A checklist outlining the governance, performance, reporting compliance and procedural requirements of the Financial I am pleased to present the Annual Report 2011–12 and financial Accountability Act 2009 and the Financial and Performance statements for the Department of Transport and Main Roads. Management Standard 2009 is available on our website. I certify that this annual report complies with: This annual report is available on our website at • the prescribed requirements of the Financial Accountability www.tmr.qld.gov.au/annualreport and in hard copy on request. Act 2009 and the Financial and Performance Management Standard 2009 Further information is contained in the Transport and Main Roads • the detailed requirements set out in the Annual Report Annual Report 2011–12 Additional Published Information, available Requirements for Queensland Government Agencies 2011–12. on our website together with opportunities for your feedback. A checklist outlining the annual reporting requirements can The Queensland Government is committed to providing be accessed at www.tmr.qld.gov.au.
    [Show full text]
  • FEBRUARY DON't FORGET 1.5M SOCIAL DISTANCING Saturday
    FEBRUARY IF YOU ARE FEELING UNWELL OR SHOWING ANY SYMPTOMS OF A COLD OR FLU PLEASE STAY AT HOME DON’T FORGET 1.5M SOCIAL DISTANCING Saturday morning & Monday afternoon walks are approx. 6 km, 1½hours in length and are always a circuit. MONDAY 1st 3.30 pm - HEMMANT - LAGOON AND WETLAND WALK – walk around the Hemmant Lagoon followed by a stroll through the Tingalpa Wetlands Meet Carpark, Hemmant Reserve, Fleming Rd Hemmant UBD Map 162 L 9 - some uphill walking TUESDAY 2nd 10 am - HOLLAND PARK TO STONES CORNER – Walk through the parks and streets of Holland Park & Greenslopes and continue along the bike path to Stones Corner Distance 7 km mostly flat terrain Meet Bus stop 34 Logan Road at Mt Thompson Mt Gravatt UBD Map 181 A 18 Transport Bus Cityxpress 170 departs 9.11 am Queen Street Bus Station 1g Finish Stones Corner WEDNESDAY 3rd 10 am - NEW FARM HERITAGE WALK - Allow extra time to cover the numerous heritage sites throughout the quiet streets of New Farm that date back to the 1800s. After lunch in New Farm Park the walk will continue to complete the heritage trail. Distance 8 km mostly flat terrain, one slight incline Meet Brunswick Street Railway Station near ticket office Transport North bound train from Central Station Finish Return to starting point THURSDAY 4th 10 am - KEDRON BROOK CIRCUIT - Follow Kedron Brook to Gympie Road and return on the bikepath past the duck pond through Shaw Park to Toombul. Distance 6 km mostly flat terrain Meet Toombul Railway Station UBD Map 140 L 4 Transport Train Shorncliffe Line, departs 9.28 am Central Station Finish Return to Toombul Shopping Town 5.30 pm - SOUTH BANK EVENING WALK – is a circuit walk lasting approximately 1½ hours, starting at South Bank Parklands.
    [Show full text]
  • BRISBANE METRO Draft Design Report Key Findings
    BRISBANE METRO Draft Design Report Key Findings APRIL 2018 Have your say A range of opportunities will be available to learn Feedback can be provided by making a submission: more about Brisbane Metro and provide feedback on ❙ in writing to: Brisbane Metro, Brisbane City Council, the draft Design Report. This includes: GPO Box 1434, Brisbane QLD 4001 ❙ reviewing the draft Design Report on Council’s ❙ by email to the Brisbane Metro project website: brisbane.qld.gov.au team at [email protected] ❙ attending community information sessions held at ❙ through Council’s website, brisbane.qld.gov.au. locations along the Brisbane Metro corridor Feedback on the draft Design Report should ❙ contacting the Brisbane Metro project team on 1800 692 333 during business hours. be received by 25 May 2018. 2 BRISBANE METRO Draft Design Report | Key Findings A MESSAGE FROM THE LORD MAYOR As Lord Mayor, I am committed to delivering world-class public transport for residents and visitors. A key part of this is Brisbane Metro, Brisbane City Council’s high-frequency, high-capacity public A MESSAGE FROM transport system. THE DEPUTY MAYOR With two metro routes operating every three minutes Brisbane Metro presents a during peak periods, Brisbane Metro will deliver turn-up-and-go services across a 21 kilometre once-in-a-generation opportunity network, linking the suburbs with the inner city. to improve the way people travel Following the release of the Brisbane Metro Business to and within Brisbane. Case in 2017, I announced Council’s commitment to fund two-thirds of the capital cost of Brisbane Metro.
    [Show full text]