High Potential

Total Page:16

File Type:pdf, Size:1020Kb

High Potential MAGAZINE FOR HYDROPOWER TECHNOLOGY HyPower #28 | Autumn 2016 HYDROPOWER IN AFRICA HIGH POTENTIAL SUCCESSFUL PARTNERSHIPS REPLACE OR REFURBISH? FULL LINE SUPPLIER WHY SMALL HYDRO IS BIG NEWS EDITORIAL IMPRINT Publisher: Voith GmbH St. Pöltener Str. 43 89522 Heidenheim Germany Responsible for the publisher: Kristine Adams Editor-in-chief: Gudrun Köpf Editorial Board: Elke Kleinknecht, Susanne Speiser, Dr. Vesna Stirnadel In cooperation with: C3 Creative Code and Content GmbH, Heiligegeistkirchplatz 1, 10178 Berlin, Germany www.c3.co Paper: HyPower is printed on Respecta Silk. This paper was produced on a Voith paper machine. Copyright: UNLOCKING POWERFUL No part of this publication may be copied, reproduced or otherwise disseminated, POTENTIAL nor may any of the content in it be used in part or in whole in other works in any form whatsoever, without express written Diversity. Complexity. Potential. Three words dance. We work closely with leading financial permission of the editor. that sum up Africa pretty well in many different institutions and insurers to help our African contexts – geographical, political, economic customers spread the cost of building or reha- and social. They also apply to Africa’s energy- bilitating hydropower facilities over realistic time generation infrastructure. While some African frames. Our experts in Heidenheim and across countries have plentiful oil and gas reserves, the world are ready and willing, not only to some have none. Some can rely on hydropow- manufacture the equipment required, but to er for nearly all their power requirements, some spend weeks and months on site, working need to import almost all their electricity from closely with customers to transfer knowledge, outside their borders. And even if the resources build skills and ensure that once a plant is com- exist, building an infrastructure that delivers pleted, it can be run effectively by local people. power to homes and businesses reliably is an- We are also investing in improving our local ser- other challenge altogether – especially in coun- vicing capabilities to permanently improve ser- tries that have been ravaged by recent or cur- vice for our customers. rent conflicts. This new edition of HyPower showcases Join us on: YOUR FEEDBACK: If you have any As a result, there is one reality that applies how customers and communities in Africa and comments or questions on this issue of to some areas of every African country: elec- elsewhere are benefiting from maximizing their HyPower, please contact us: [email protected] tricity supply is nowhere near sufficient to meet hydropower potential, and leveraging the new- https://twitter.com/voith_hydro demand. In fact, even in 2016, around three- est technologies to do so. Enjoy! quarters of the African population do not have Photographs: access to reliable, constant power. From a hy- Yours sincerely, https://www.linkedin.com/ Cover: Graeme Williams, Gauteng; Ryan Thomas /AerialShots, Johannesburg: 8, 9, 19; Christian company/voith-hydro Wesser, Heidenheim: p. 16, 17, 18, 29, 35; Graeme Williams, Gauteng,: 10, 11, 12, 13, 14, 15, 20, dropower perspective, Voith is at the forefront 21, 22, 23; Dawin Meckel, Berlin: p. 26, 27, 28; Brian Gartside: p. 44, 45 Kent Kallberg Studios, of efforts to change this. Vancouver: p. 39, 40; U3: Robert Caputo /Aurora / laif To harness Africa’s hydropower potential, https://www.youtube.com/ All other photos are from Voith. financing flexibility, expertise and commitment Uwe Wehnhardt c/Voith_Hydro are all essential. Voith has all three in abun- President and CEO of Voith Hydro HyPower 2016 | 3 CONTENTS CONTENTS 8 26 39 AGENDA SETTING FULL LINE SUPPLIER GLOBAL EXPERTISE 39 THE BIG QUESTION: GUEST PERSPECTIVE REPLACE OR REFURBISH? 8 ENERGIZING AFRICA 26 SMALL PROJECTS, 32 STOPPING THE FLOW Why it can pay dividends to 44 CREATING THE How significant hydropower projects BIG RESULTS How an electronic control overhaul old hydropower SAFE WATER BOOK™ in South Africa and Angola are In Asia, a larger number of smaller mechanism for ring gates has equipment, rather than retire it. An exciting water filtering transforming economies and lives. hydropower projects set new standards in precision. innovation could solve the problem could be the key to improving INNOVATION of dirty drinking water for millions. 16 MANAGEMENT INTERVIEW rural power availability. 34 SERVICING AFRICA Voith Hydro's CMO and African When it comes to maintenance, 42 SAFE AND SOUND sales leader discuss the potential 28 MEETING THE LARGE HYDRO it's always better to have local Why a new listening technology is 47 VOITH HYDRO PROJECTS of hydropower in Africa. CHALLENGE resources on hand. Voith Hydro is the best way of monitoring plant A visual summary of hydropower Discover more about Voith through its Hydropower projects so large that investing in developing local operation remotely. projects by Voith in Africa explored other insightful publications. 19 MODERNIZING they can take almost a decade African expertise. in this issue. MOUNT COFFEE to complete require a special set How Liberia's hydropower of skills for success. SUCCESSFUL PARTNERSHIPS infrastructure is being MOUNT COFFEE rebuilt to support rapid economic FROM THE ARCHIVES 35 24/7 MOBILE SERVICE development. In Europe, the Voith HyService Bus REGULARS 30 TRUE SURVIVOR is ready to leap into action 24 GLOBAL TRAINING, The rollercoaster history of the whenever customers need it. CAMBAMBE TULILA 03 EDITORIAL LOCAL BENEFITS Cahora Bassa hydropower plant 06 WHAT’S NEW All over the world, Voith Hydro is in Mozambique. 36 THE POWER TO CHANGE LIVES CAHORA BASSA 07 ON TOPIC delivering training concepts How a convent in Tanzania and the 43 WORLD OF VOITH that meet the needs of individual community it serves are benefitting BOKSBURG 46 5 QUESTIONS FOR … customers. from Small Hydro. INGULA 4 | HyPower 2016 HyPower 2016 | 5 WHAT’S NEW ON TOPIC VOITH AT HYDROVISION 2016 DRIVING DEVELOPMENT USA The StreamDiver was the focus of a presentation delivered at the recent 2016 HydroVision International event in Minneapolis, In many parts of Africa, the lack of a reliable electricity infrastructure Minnesota. Presenter Philip Daus, a Small Hydro engineering project hinders economic development. Hydropower can play a big part in manager at Voith Hydro, said, “Hydropower is among the best solu- tions to energy market challenges, and we are using our technology changing this picture. and expertise to achieve the best outcomes in economy and perfor- mance, both technically and environmentally.” Other important Voith innovation papers presented at the event covered: a rotor rim slot reshaping process for increasing generator longevity; a new analysis and replacement process for damaged Klaus Schädler, Voith, at groundbreaking ceremony. turbine thrust collars, which improves monitoring, maintenance and 1 Power is patchy 2 Hydropower potential is enormous repair; a new forecasting method to increase accuracy and improve short-time pumped-storage balancing; and an overview of improved BREAKING NEW GROUND online assessment processes for hydro-components. GERMANY One of the most exciting innovations 645 million being introduced at Voith Hydro in 2016 is the Africans have no access to electricity. 300 - 400 GW construction of a small hydropower plant (called Potential hydropower capacity in 'Alte Bleiche') at the Heidenheim site, to act as a Europe and Africa is similar... demonstration facility for customers, employees and the public. The 35 kW plant will also feed electricity directly into the local grid – enough to Power consumption per head power 100 homes. Construction work started ...but Europe has an installed in Africa in Europe with a groundbreaking ceremony in April, and capacity of 218 GW. Africa has only 30 GW. 1 the plant should be operational by year end. 181 kWh/y 6,500 kWh/y Voith apprentices are involved in the design and manufacturing, and are working to an eco- friendly design – created in cooperation with the Technical University of Munich – that eliminates the need for a new powerhouse. The plant will feature Voith’s new StreamDiver generator unit, recently showcased at a series of roadshows across Latin America. StreamDiver is designed 2 3 for low-head river plants and deployed underwa- ter, eliminating noise emissions, minimizing local 1 Voith exhibition booth. Africa produces 4% 2 Customer event banquet. environmental impact and making small hydro- of the world’s total 3 Bob Gallo, Bill Malus and Martin Andrä at HydroVision 2016. power plants more cost-effective. energy, but is home 218 GW 30 GW to 13% of the global in Europe in Africa 4% population. MORE POWER FOR UGANDA 2015 UGANDA Voith Hydro has been awarded a contract for the Berkeley Energy and customer ARPE Ltd. Commenting on complete design, manufacturing, supply, installation and com- the project, Head of Voith Hydro’s Small Hydro Business Between 2010 and missioning of the electromechanical equipment for the new Klaus Schädler said, “We are happy to be part of the project 2,174 MW Frequent power outages are the norm in across Africa 2015, 2,174 MW of hydropower plant on the Achwa River in northern Uganda. that supports reliable power production and sustainable eco- hydropower capacity The plant features four vertical Francis turbines and vertical nomic development in the region. We look forward to putting 30 African countries. 2010 was added across synchronous generators with an installed capacity of 42 MW. our ideas into practice, and to foster our collaboration for Africa. The project
Recommended publications
  • Hydrobiological Assessment of the Zambezi River System: a Review
    WORKING PAPER HYDROBIOLOGICAL ASSESSMENT OF THE ZAMBEZI RWER SYSTEM: A REVIEW September 1988 W P-88-089 lnlernai~onallnsl~iule for Appl~rdSysiems Analysis HYDROBIOLOGICAL ASSESSMENT OF THE ZAMBEZI RIVER SYSTEM: A REVIEW September 1988 W P-88-089 Working Papers are interim reports on work of the International Institute for Applied Systems Analysis and have received only limited review. Views or opinions expressed herein do not necessarily represent those of the Institute or of its National Member Organizations. INTERNATIONAL INSTITUTE FOR APPLIED SYSTEMS ANALYSIS A-2361 Laxenburg, Austria One of the Lmporhnt Projects within the Environment Program is that entitled: De- *on apport *stems jbr Mancrgfnq Lurge Intemartiorrcrl Rivers. Funded by the Ford Foundation, UNEP, and CNRS France, the Project includes two case stu- dies focused on the Danube and the Zambezi river basins. The author of this report, Dr. G. Pinay, joined IIASA in February 1987 after completing his PhD at the Centre dSEmlogie des Ressources Renouvelables in Toulouse. Dr. Pinny was assigned the task of reviewing the published literature on water management issues in the Zambezi river basin, and related ecological ques- tions. At the outset, I thought that a literature review on the Zambezi river basin would be a rather slim report. I am therefore greatly impressed with this Working Paper, which includes a large number of references but more importantly, syn- thesizes the various studies and provides the scientific basis for investigating a very complex set of management issues. Dr. Pinay's review will be a basic refer- ence for further water management studies in the Zambezi river basin.
    [Show full text]
  • Final Report for WWF
    Intermediate Technology Consultants Ltd Final Report for WWF The Mphanda Nkuwa Dam project: Is it the best option for Mozambique’s energy needs? June 2004 WWF Mphanda Nkuwa Dam Final Report ITC Table of Contents 1 General Background.............................................................................................................................6 1.1 Mozambique .................................................................................................................................6 1.2 Energy and Poverty Statistics .....................................................................................................8 1.3 Poverty context in Mozambique .................................................................................................8 1.4 Energy and cross-sectoral linkages to poverty ........................................................................11 1.5 Mozambique Electricity Sector.................................................................................................12 2 Regional Electricity Market................................................................................................................16 2.1 Southern Africa Power Pool......................................................................................................16 3 Energy Needs.......................................................................................................................................19 3.1 Load Forecasts............................................................................................................................19
    [Show full text]
  • Cahora Bassa North Bank Hydropower Project
    Hydropower Sustainability Assessment Protocol: Cahora Bassa North Bank Hydropower Project Cahora Bassa North Bank Hydropower Project Public Disclosure Authorized Hidroeléctrica de Cahora Bassa Public Disclosure Authorized Zambezi River Basin Introduction The hydropower resources of the Zambezi River Basin are central to sustaining economic development and prosperity across southern Africa. The combined GDP among the riparian states is estimated at over US$100 billion. With recognition of the importance of shared prosperity and increasing commitments toward regional integration, there is significant potential for collective development of the region’s rich natural endowments. Despite this increasing prosperity, Contents however, poverty is persistent across the basin and coefficients of inequality for some of the riparian states are among the highest in Introduction .......................................................................................... 1 the world. Public Disclosure Authorized The Hydropower Sustainability Assessment Protocol ......................... 4 Reflecting the dual nature of the regional economy, new investments The Project ............................................................................................ 3 in large infrastructure co-exist alongside a parallel, subsistence economy that is reliant upon environmental services provided by the The Process ........................................................................................... 8 river. Appropriate measures are therefore needed to balance
    [Show full text]
  • Press Release HCB ANNOUNCES the IPO of up to 7.5% of ITS SHARES on the MOZAMBICAN STOCK EXCHANGE
    Press Release HCB ANNOUNCES THE IPO OF UP TO 7.5% OF ITS SHARES ON THE MOZAMBICAN STOCK EXCHANGE • HCB is the concessionaire of the largest hydroelectric power plant in southern Africa, located in Songo, Northern Mozambique • Listing planned for July 2019 with shares offered to Mozambican nationals, companies and institutional investors at 3 Meticais per share • Vision of reach and inclusion to be achieved through innovative nationwide multibank distribution channels, mobile app and USSD platform Maputo, 21 May 2019 Hidroeléctrica de Cahora Bassa (HCB), the Mozambican concessionaire of the Cahora Bassa hydroelectric plant, the largest in southern Africa, yesterday launched its Initial Public Offer (IPO) for up to 7.5% of its shares to individual Mozambicans, national companies and institutional investors. The IPO will see a first tranche of 2.5% of its shares becoming available on the Mozambican stock exchange - Bolsa de Valores de Moçambique (“BVM”). HCB shares will be sold at 3 Meticais each with the subscription period taking place between 17 June and 12 July 2019. Nationwide roadshows and innovative channels have been created to ensure maximum reach and inclusion. Individuals will be able to place purchase orders through various Mozambican banks’ branch networks but also through a USSD mobile application, a mobile app and via internet banking. The Consortium BCI-BiG (BCI and BIG are two Mozambican banks), are the global coordinators for this IPO with other financial institutions supporting the placement of the shares through their branch networks. Maputo Office Head Office: Edifício JAT I – Av. 25 de Setembro, 420 – 6th Floor PO Box – 263 – Songo PO Box: 4120 PBX: +258 252 82221/4 | Fax: +258 252 82220 PBX: +258 21 350700| Fax: +258 21 314147 Pág.
    [Show full text]
  • Mozambique Case Study Example1
    Mozambique Case study example1 - Principle 1: The Zambezi River Basin - "dialogue for building a common vision" The Zambezi River Basin encompasses some 1.300 km2 throughout the Southern African Development Community (SADC) region, including a dense network of tributaries and associated wetland systems in eight countries (Angola, Namibia, Botswana, Zimbabwe, Zambia, Malawi, Tanzania, Mozambique). The livelihoods of approximately 26 million people are directly dependent on this basin, deriving benefits from its water, hydro-electric power, irrigation developments, fisheries and great wealth of related natural resources, including grazing areas, wildlife, and tourism. Over the past forty years, however, the communities and ecosystems of the lower Zambezi have been constraint by the management of large upstream dams. The toll is particularly high on Mozambique, as it the last country on the journey of the Zambezi; Mozambicans have to live with the consequences of upriver management. By eliminating natural flooding and greatly increasing dry season flows in the lower Zambezi, Kariba Dam (completed in 1959) and especially Cahora Bassa Dam (completed in 1974) cause great hardship for hundreds of thousands of Mozambican villagers whose livelihoods depend on the ebb and flow of the Zambezi River. Although these hydropower dams generate important revenues and support development however, at the expense of other resource users. Subsistence fishing, farming, and livestock grazing activities have collapsed with the loss of the annual flood. The productivity of the prawn fishery has declined by $10 - 20 million per year -- this in a country that ranks as one of the world’s poorest nations (per capita income in 2000 was USD230).
    [Show full text]
  • Floods ' South Af Rican Talks Fol Low on March 16, 1984, Mozambique and Dock and Rail Use, and Tourism
    Number 3 April-June 1984 In This Issue ' The Mozambican - Floods ' South Af rican Talks Fol low On March 16, 1984, Mozambique and dock and rail use, and tourism . Drought South Africa signed a non-agression In this issue we try to answer some agreement which, if respected by both of the questions about how and why The worst drought in Mozambique's sides, would prevent either country talks between Mozambique and South recent history—lasting almost four from being used as a base for launch- African came about and to present years—has now been followed by one ing military actions against the other . documents and articles which explain of the worst floods of all time . Floods The Nkomati Agreement, as it is also what Mozambique's position has been which overran southern Mozambique known, was signed in a ceremony near in relation to these talks . To accom- at the end of January caused 109 the Nkomati River which borders both modate the material to do this, we deaths, dozens of disappearances and countries. The signing of the security have suspended from this issue some the loss of homes for over 49,000 peo- agreement was preceded by weeks of newsletter departments, which will pie. In addition, 350,000 people lost intense discussions between the two reappear in the next issue . their family farming plots. countries and immediately became Other articles of special interest in- The first floods came after 22 hours the subject of discussions and elude a report of SADCC talks by of continuous rainfall accompanied by speculations worldwide .
    [Show full text]
  • Electrifying Colonial Africa: Portuguese Developments
    Major technological networks and sovereignty Electrifying colonial Africa: Portuguese developments Ana Paula SILVA ABSTRACT The electrification of Portuguese African colonies was a long-term process beginning in the late nineteenth century. Interestingly, it was boosted by a late effort of Portuguese colonialism after World War II, in the international context of the ‘second colonial occupation’, following the example of other European colonial powers. But it faced both international censure and the pressure of liberation movements such as the Marxist “Frelimo” breaking through in Angola, Guinea, and Mozambique in the early 1960s. Le barrage de Cabora-Bassa, au Mozambique. Source : Climate and development knowledge network. Portugal built electricity generation facilities in Africa from the late 1890s until 1976, two years after its retreat from the continent. Indeed, the military insurgency (1974) that removed the dictatorship and paved the way for democracy and decolonization did not prevent the completion of works under construction. The electrification of Portuguese colonies (Cape Verde, Guinea-Bissau, Sao Tome and Principe, Angola, and Mozambique) began with isolated, small-scale generators supplying farms/plantations, industries, and municipalities with lighting, promoted by colonial administrators and private entities. After World War II (WW II), the process changed completely. In the aftermath of WW II, Europe recovered on the basis of overseas territories development, for which the Marshall Plan allocated funds. Also driven by the urgency to promote the progress of indigenous peoples and the need to plan public investment, this economic development was carried out through the adoption of systematic plans: France drew up plans for its overseas territories in 1946, Belgium for Congo in 1948, Italy for Somalia in 1954, and Britain for several territories at different dates.
    [Show full text]
  • 773070V30esmap0ora0bassa0
    Public Disclosure Authorized Public Disclosure Authorized The Potential of Regional Power Sector Integration Cahora Bassa | Generation Case Study Public Disclosure Authorized Submitted to ESMAP by: Economic Consulting Associates August 2009 Public Disclosure Authorized Economic Consulting Associates Limited 41 Lonsdale Road, London NW6 6RA, UK tel: +44 20 7604 4545, fax: +44 20 7604 4547 email: [email protected] Contents Contents Abbreviations and acronyms iii Preface v 1 Executive summary 1 1.1 Motivations/objectives for trade 1 1.2 The trade solution put in place 1 1.3 Current status and future plans 1 2 Context for trade 3 2.1 Economic and political context 3 2.2 Supply options 4 2.3 Demand 5 2.4 Energy tariffs 5 3 History of scheme 7 3.1 Overview including timeline/chronology 7 3.2 Project concept, objectives, and development 9 3.3 Feasibility studies done 11 3.4 Assets built and planned 12 3.5 Interconnections and electricity trade 13 3.6 Environmental and social issues 14 4 Institutional arrangements 18 4.1 Governance structure 18 4.2 Role of national governments and regional institutions 18 4.3 Regulatory agencies 19 4.4 Role of outside agencies 19 5 Contractual, financial and pricing arrangements 21 5.1 Contracts 21 Cahora Bassa Case Study REGIONAL POWER SECTOR INTEGRATION: LESSONS FROM GLOBAL CASE STUDIES AND A LITERATURE REVIEW i ESMAP Briefing Note 004/10 | June 2010 Contents 5.2 Ownership and finance 22 5.3 Pricing arrangements 24 6 Future Plans 27 Bibliography 28 Tables and figures Tables Table 1 Cahora Bassa Chronology
    [Show full text]
  • Allen F. Isaacman and Barbara S. Isaacman, Dams, Displacement, and the Delusion of Development: Cahora Bassa and Its Legacies In
    Allen F. Isaacman and Barbara S. Isaacman, Dams, Displacement, and the Delusion of Development: Cahora Bassa and its Legacies in Mozambique, 1965-2007 (Athens (OH): Ohio University Press, Coll. ‘New African Histories’, 2013), 324 pp. Pbk $32.95, ISBN: 9780821420331. Dams represent a major investment, both economically and ideologically. They de- mand large financial resources to be built, and sustained campaigns to convince af- fected people that dams will serve their interest and they should therefore voluntarily leave areas to be flooded. Since the 1980s, postmodern and postcolonial authors have submitted ‘development’ and ‘high modernism’ to a thorough critique. Yet belief in development continues to dominate political elites, and more and ever bigger dams are consequently built all over the world. In Africa, the NGO International Rivers counted no fewer than 67 large dams being ‘proposed, under construction, rehabili- tation, or expansion’ in 2010. In Dams, Displacement, and the Delusion of Development (DDDD), Allen and Barbara Isaacman investigate the history and legacies of one of Africa’s largest dams, Cahora Bassa, which was built in Mozambique by the Portuguese in the late 1960s and early 1970s. The dam was constructed under conditions of war and it was inaugurat- ed after independence by a government led by the Liberation Front of Mozambique (Frelimo). The dam has since operated continuously, though much of its electricity has not been exported or used for many years because armed rebels had destroyed many high voltage power line pillars. Since the end of the armed conflict in 1992, power lines have been rebuilt and Cahora Bassa has provided electricity again, pri- marily to South Africa, though increasingly to the national Mozambican grid as well.
    [Show full text]
  • Patterns of Hydrological Change in the Zambezi Delta, Mozambique
    PATTERNS OF HYDROLOGICAL CHANGE IN THE ZAMBEZI DELTA, MOZAMBIQUE WORKING PAPER #2 PROGRAM FOR THE SUSTAINABLE MANAGEMENT OF CAHORA BASSA DAM AND THE LOWER ZAMBEZI VALLEY Richard Beilfuss International Crane Foundation, USA David dos Santos Direcção Naçional de Aguas, Mozambique 2001 2 WORKING PAPERS OF THE PROGRAM FOR THE SUSTAINABLE MANAGEMENT OF CAHORA BASSA DAM AND THE LOWER ZAMBEZI VALLEY 1. Wattled Cranes, waterbirds, and wetland conservation in the Zambezi Delta, Mozambique (Bento and Beilfuss 2000) 2. Patterns of hydrological change in the Zambezi Delta, Mozambique (Beilfuss and dos Santos 2001) 3. Patterns of vegetation change in the Zambezi Delta, Mozambique (Beilfuss, Moore, Dutton, and Bento 2001) 4. Prescribed flooding and restoration potential in the Zambezi Delta, Mozambique (Beilfuss 2001) 5. The status and prospects of Wattled Cranes in the Marromeu Complex of the Zambezi Delta (Bento, Beilfuss, and Hockey 2002) 6. The impact of hydrological changes on subsistence production systems and socio-cultural values in the lower Zambezi Valley (Beilfuss, Chilundo, Isaacman, and Mulwafu 2002) 3 TABLE OF CONTENTS Introduction.............................................................................................................................. 4 Patterns of runoff in the Zambezi system ................................................................................ 6 Flooding patterns in the Zambezi Delta................................................................................. 31 Water balance of the Zambezi Delta.....................................................................................
    [Show full text]
  • Landmines and Spatial Development Appendix I History of Conflict
    Landmines and Spatial Development Appendix I History of Conflict ∗ Giorgio Chiovelliy Stelios Michalopoulosz Universidad de Montevideo Brown University, CEPR and NBER Elias Papaioannoux London Business School, CEPR December 4, 2019 Abstract This appendix provides an overview of two key periods in the recent history of Mozambique that are intimately linked to landmine contamination. The appendix is not intended to be a comprehensive reconstruction of the War of Independence or the subsequent Civil War. Its aim is to highlight, in a concise way, the events that led Mozambique to be a classified as \heavily mined" at the end of hostilities in 1992. We start by going over the war of independence (1964−1974) and then discuss the ensuing civil war (1977 − 1992). Going over the historical narrative is useful, as it highlights the underlying causes of the widespread usage of landmines. It also puts in context the gigantic effort to clear the country from the thousands of minefields after the peace agreement. We conclude by describing socioeconomic conditions at the end of civil war in 1992. ∗Additional material can be found at www.land-mines.com yGiorgio Chiovelli. Universidad de Montevideo, Department of Economics, Prudencio de Pena 2440, Montevideo, 11600, Uruguay; [email protected]. Web: https://sites.google.com/site/gchiovelli/ zStelios Michalopoulos. Brown University, Department of Economics, 64 Waterman Street, Robinson Hall, Providence RI, 02912, United States; [email protected]. Web: https://sites.google.com/site/steliosecon/ xElias Papaioannou.
    [Show full text]
  • Managing Lakes and Their Basins for Sustainable
    Managing Lakes and their Basins for Sustainable Use A Report for Lake Basin Managers and Stakeholders Copyright © 2005 by the International Lake Environment Committee Foundation ISBN 4-9901546-2-2 3rd Printing. Printed and bound by Otsu Shigyo in Otsu, Japan. This publication may be reproduced in whole or in part and in any form for educational or non-profi t purposes without special permission from the copyright holder, provided acknowledgement of the source is made. No use of this publication may be made for resale or for any other commercial purpose whatsoever without the prior permission in writing from the International Lake Environment Committee Foundation. DISCLAIMER The fi ndings, interpretations and conclusions expressed in this report are the views of the authors and do not necessarily represent the views of The World Bank and its Board of Directors, or the countries they represent, nor do they necessarily represent the view of the organizations, agencies or governments to which any of the authors are associated. Also, the colors, boundaries, denominations, and classifi cations in this report do not imply, on the part of The World Bank and its Board of Directors, or the countries they represent, and the organizations, agencies or governments to which any of the authors are associated, any judgment on the legal or other status of any territory, or any endorsement or acceptance of any boundary. CITATION Please cite this report as: ILEC. 2005. Managing Lakes and their Basins for Sustainable Use: A Report for Lake Basin Managers and Stakeholders. International Lake Environment Committee Foundation: Kusatsu, Japan.
    [Show full text]