The Future of Berlin TXL. 10 Ha Experimentation Area
Total Page:16
File Type:pdf, Size:1020Kb
BERLIN TXL – THE FUTURE BEGINS ASAP. CONTACT U SCHARNWEBERSTRASSE Tegel Projekt GmbH DESIGNATED ROUTE FOR SUBW TXL NORTH 29 ha Kurt- Lietzenburger Strasse 107 SCHUMACHER- 10707 Berlin, Germany PLatZ U A Y U Tel. +49 30 577 04 700 BERLIN Txl – [email protected] LANDSCAPE AREA SCHUMACHER QUARTER 48 ha* www.berlintxl.de THE PLAN ROUTE FOR INNOVATIVE MEANS OF TRANSPORTATION 495 ha total area INDUSTRIAL park 82 ha 221 ha building area U The Future of Berlin TXL. 10 ha experimentation area 2 CITÉ PASTEUR 18 ha 150,000 m floor space of existing buildings CAMPUS 39 ha 111 Plots 3,000 – 200,000 m2 Potential for up to 2 million m2 floor space COMMERCIAL AREA 70 ha 800 –1,000 companies, institutes, research insti- EXPRESS CYCLE patH tutes 5,000 students 17,500 – 20,000 new jobs * Of which 29 ha are on the former airport grounds. 09 | 2017 Hamburg Rostock Gdansk´ Szczecin 10 BERLIN TXL – 111 BERLIN Txl – TODAY URBAN BERLIN TXL DISTANCES AN AIRPORT, HIGHWAY 1 MIN. TECHNOLOGIES 10 MAIN RAILWAY station 15 MIN. BERLIN 10 CITY CENTER / TOMORROW ENERGY Water MOBILITY RECYCLING RESOURCES ICT 100 GOVERNMENT quarter 15 MIN. A LOCATION. BER airport 30 MIN. 113 Hanover Magdeburg 115 BER 10 Prague Warsaw Dresden Frankfurt (Oder) Munich Nuremberg Leipzig 111 BERLIN Txl – K Our planet is becoming a THE LOCATION B world of cities: 1.5 million A/A2 people move to cities each D W week. And in the next 40 N1/N1A Once Berlin’s Tegel airport closes down, High international profile U years, we will see more cities N2/N2A the site will then be converted to create H V built than in the last 4,000 A tight network of universities, E3 a research and industrial park for Urban years. A total of 70% of the new enterprises, manufacturing E2 Technologies: companies, and institutes world’s population will then Berlin TXL – The Urban Tech Republic. live on 3% of the earth’s EXISTING BUILDINGS It will offer a place for founders, students, Areas available for large-scale surface. Organizing this is investors, industrialists, and researchers industrial operations D Base Camp a real challenge. We need A/A2 Hexagon to meet to develop the cities of tomorrow. 2 new solutions for mobility, for 150,000 m potential floor space B Main building energy, and for resources. in striking and unique buildings N1/N1A Large hangar At Berlin TXL, Urban Technologies will N2/N2A Small hangar And we need new materials be designed, produced, and exported. Direct highway connection V Administration and intelligent systems to E2 Workshops No other city in the world is better suited H Cargo hangar make these solutions possible. Close to city center for this than this creative metropolis. And E3 Cargo hangar We need Urban Technologies. W Rental car center in this city, there is no better location International showcase for Urban Technologies for the cities U Gas station than this one: Berlin TXL. Technologies Image: A. Schiebel K Tower of tomorrow..