Marketing Brochure

Total Page:16

File Type:pdf, Size:1020Kb

Marketing Brochure 2253 Lister Avenue 2250 Lister Avenue 2300 Elston Avenue 2301 Lister Avenue Michael Conway +1 773 458 1391 Park@Elston [email protected] Chicago, IL 60614 Gavin Stainthorpe +1 773 632 1101 [email protected] For Lease | Park@Elston | Chicago, IL 60614 Summary JLL is pleased to present 2300 Elston Avenue, 2301 Lister Avenue, 2253 Lister Avenue, and 2250 Lister Fullerton Avenue Avenue; four land parcels in the heart of the booming Elston corridor. Perfect for parking, outdoor storage, and construction material storage. This property features proximity to Interstate 90/94 (Kennedy Expressway), multiple CTA train and bus routes, Clyborne Avenue METRA station, and is only 5 minutes from downtown Chicago. These sites are located immediately north of the Lincoln Damen Avenue Yards development and offer numerous opportunities. 2300 N Elston Avenue (Lot A) Lot Size: 1.76 acres (76,500 s.f.) Divisible: 76,500 s.f. Lot A : 2300 Elston Avenue Zoning: M3-3 Elston Avenue Ward & Alderman: 32nd, Scott Waguespack Lot B : 2301 Lister Avenue Lease Rate: $17,531 per month gross ($2.75 p.s.f.) 2301 N Lister Avenue (Lot B) Lot D : 2253 Lister Avenue Lot Size: 0.48 acres (21,000 s.f.) Divisible: 21,000 s.f. Zoning: M3-3 Lot C : 2250 Lister Avenue Ward & Alderman: 32nd, Scott Waguespack Lister Avenue Lease Rate: $6,125 per month gross ($3.50 p.s.f.) 2250 N Lister Avenue (Lot C) Lot Size: 0.77 acres (33,417 s.f.) Divisible: 33,417 s.f. Zoning: M3-3 Ward & Alderman: 32nd, Scott Waguespack Lease Rate: $9,750 per month gross ($3.50 p.s.f.) 2253 N Lister Avenue (Lot D) Webster Avenue Lot Size: 0.22 acres (9.750 s.f.) Divisible: 9,750 s.f. Zoning: M3-3 Ward & Alderman: 32nd, Scott Waguespack Lease Rate: $2,230 per month gross ($2.75 p.s.f.) Michael Conway Gavin Stainthorpe +1 773 458 1391 +1 773 632 1101 [email protected] [email protected] LOT 33 WOLCOTTBUILDING ST X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 1650 X X LLC X FULLERTON X X X LOT 2 LOT 3 X LOT 1 LOT 4 LOT 5 LOT 6 X LOT 21 X LOT 20 LOT 19 X PARCEL 7 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X LOT 2 LOT 3 LOT 4 LOT 5 LOT 6 PARCEL 4 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 2250 Lister Avenue | Lot C X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 14-312-070-63-0000, 14-312-070-64-0000, 14-312-070-66-0000 X X Property PINs: X X X X X 14-312-070-20-0000 X X X X X X X X X X X X X X X X X X X X X X M3-3 X X X X X X X X X X X LOT 31 LOT 30 LOT 29 X X LOT 32 LOT 28 LOT 33 X X LOT 34 X LOT 18 X N/A LOT 19 X LOT 20 X X X PARCEL 6 0.77 Acre (33,417 SF) 14-31-205-027-0000 X X WOLCOTT ST X X BUILDING X X X X X X PARCEL 3 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X $9,750 per month gross ($3.50 p.s.f.) X X X Total Available Acerage: X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X Zoning: X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X Lease Rate: Gavin Stainthorpe X X X X EROL X X GLADAN X +1 773 632 1101 ALAN X X FREIMAN X LOT 7 X LOT 8 LOT 4 LOT 5 LOT 6 LOT 10 LOT 11 LOT 9 LOT 12 LOT 13 LOT 17 LOT 1 LOT 3 X LOT 14 LOT 15 LOT 16 LOT 2 LOT 4 X LOT 5 LOT 6 LOT 7 LOT 8 LOT 9 X LOT 10 LOT 11 [email protected] X PARCEL 2 PARCEL 5 X PARCEL 4 X X PARCEL 8 PARCEL 1 X PARCEL 1 X 2253 Lister Avenue | Lot D X X X X X LOT 3 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 14-312-050-04-0000, 14-312-050-19-0000 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X Property PINs: X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X LOT 31 LOT 30 LOT 29 X X X LOT 32 LOT 28 LOT 33 X X X LOT 34 X X LOT 18 X M3-3 LOT 24 LOT 22 LOT 21 N/A LOT 23 X X LOT 19 LOT 20 X X X X 14-31-205-027-0000 X X X X X WOLCOTT ST X BUILDING X X X X X X X X APRIL M X X X PLATIS X X X X X X X X X X X X X X X X X X X Michael Conway X X X X 0.22 Acre (9,750 SF) X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X +1 773 458 1391 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X LOT 13 LOT 14 LOT 15 LOT 16 [email protected] PARCEL 1 X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X LOT 21 LOT 20 LOT 19 $2,230 per month gross ($2.75 p.s.f.) X X X X X X X X X X X X X X X X X X X X X X X X X X 2300 Elston Avenue | Lot A X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X 14-312-040-21-0000, 14-312-040-22-0000, 14-312-040-23-0000X X X X Property PINs: X X X X 14-312-040-24-0000, 14-312-040-25-0000, 14-312-040-26-0000 X X X X X X 14-312-040-33-0000, 14-312-050-22-0000, 14-312-040-20-0000 X X X X X X X X Total Available Acerage: X X X X X X X X X X M3-3 X X X Zoning: X X X X LOT 33 LOT 32 X X LOT 34 X LOT 24 LOT 23 LOT 22 LOT 21 LOT 18 X X LOT 19 LOT 20 X Lease Rate: X X X X X WOLCOTT ST X BUILDING X X 1.76 Acres (76,500 SF) X X X APRIL M X X PARCEL 3 PLATIS X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X $17,531 per month gross ($2.75 p.s.f.) Total Available Acerage: Zoning: Lease Rate: 2301 Lister Avenue | Lot B 14-312-040-12-0000, 14-312-040-13-0000, 14-312-040-14-0000 Property PINs: 14-312-040-15-0000, 14-312-040-16-0000, 14-312-040-17-0000 M3-3 0.48 Acre (21,000 SF) $6,125 per month gross ($3.50 p.s.f) Total Available Acerage: Zoning: Lease Rate: N Diversey Avenue 22 21 Lincoln Park 15 16 20 Amenities Elston Avenue 2 17 Food & Drink Retail 19 1 Popeyes 1 Jewel Osco 10 18 Logan Blvd.
Recommended publications
  • Streeterville Neighborhood Plan 2014 Update II August 18, 2014
    Streeterville Neighborhood Plan 2014 update II August 18, 2014 Dear Friends, The Streeterville Neighborhood Plan (“SNP”) was originally written in 2005 as a community plan written by a Chicago community group, SOAR, the Streeterville Organization of Active Resi- dents. SOAR was incorporated on May 28, 1975. Throughout our history, the organization has been a strong voice for conserving the historic character of the area and for development that enables divergent interests to live in harmony. SOAR’s mission is “To work on behalf of the residents of Streeterville by preserving, promoting and enhancing the quality of life and community.” SOAR’s vision is to see Streeterville as a unique, vibrant, beautiful neighborhood. In the past decade, since the initial SNP, there has been significant development throughout the neighborhood. Streeterville’s population has grown by 50% along with new hotels, restaurants, entertainment and institutional buildings creating a mix of uses no other neighborhood enjoys. The balance of all these uses is key to keeping the quality of life the highest possible. Each com- ponent is important and none should dominate the others. The impetus to revising the SNP is the City of Chicago’s many new initiatives, ideas and plans that SOAR wanted to incorporate into our planning document. From “The Pedestrian Plan for the City”, to “Chicago Forward”, to “Make Way for People” to “The Redevelopment of Lake Shore Drive” along with others, the City has changed its thinking of the downtown urban envi- ronment. If we support and include many of these plans into our SNP we feel that there is great- er potential for accomplishing them together.
    [Show full text]
  • Meeting Display Boards for Public Meetings on the Ashland Avenue Ashland Avenue Bus Rapid Transit Project, Held December 10 and 11, 2013
    Meeting Display Boards for Public Meetings on the Ashland Avenue Ashland Avenue Bus Rapid Transit Project, held December 10 and 11, 2013. Logos: CTA in partnership with Chicago Department of Transportation and Chicago Department of Housing and Economic Development Welcome: Welcome to the public open house for the Ashland Avenue Bus Rapid Transit Environmental Assessment and project. • In April 2013, CTA and CDOT announced a vision for a center running Bus Rapid Transit (BRT) system on Ashland Avenue between Irving Park Road and 95th Street to provide a fast and reliable north/ south transit connection for 16 miles through Chicago. The vision reflects the planning process and community engagement undertaken in 2012. • Over the summer, CTA and CDOT heard from various key stakeholders about this plan. We are now holding two public open house meetings as an extension of this outreach to gather additional input from the public. CTA and CDOT are still developing the Ashland BRT design, and we are considering options and modifications, including the implementation of additional left turns, based on continued feedback from the public. • The public open house meetings will summarize studies of the project impacts, including traffic analyses, that have been performed as part of the formal Environmental Assessment for the project, in accordance with federal government requirements. The Environmental Assessment is now complete and available on CTA’s website and in hard copy at several community locations. CTA and CDOT would like your comments on the Environmental Assessment, which can be made at the public open houses or by e-mail at [email protected].
    [Show full text]
  • Milwaukee Avenue Spoke Route Project
    Milwaukee Avenue Spoke Route Project Project Overview Limits: Milwaukee Avenue - Kinzie Street to Elston Avenue • Length: 0.85 Miles CDOT will begin work in 2013 on the Milwaukee Avenue Spoke Route Project. This project will feature barrier/buffer protected bike lanes, increased bike parking and improved pedestrian crossings. The new Milwaukee Avenue design will complement Chicago’s future Bike Share System and highlight the corridor as a complete street by improving transportation options for all roadway users. Project Data • 638 reported crashes (2006 - 2011) - 15 serious injury crashes - 1 fatal crash • 12,000 vehicles per day 470 N. Milwaukee Ave - Existing Conditions - 30% exceeding the speed limit • Bicyclists represent over 40% of traffic during peak hours 25.5’ 25.5’ Highlights TRAVEL / PARKING LANE TRAVEL / PARKING LANE • Barrier/Buffer protected bike lanes RIGHT-OF-WAY51’ • High-visibility pedestrian crosswalks • On-street bike parking • Roadway resurfaced Avenue Elston Bicyclist Improvements Chicago Avenue • Barrier/Buffer protected bike lane in both directions on Chicago’s busiest street for bicycling • Improved bike facilities to complement Chicago Bike Share • Increased bike parking throughout the corridor 1.5’ 1.5’ BUFFER BUFFER 7’ 4’ BUFFER2’ 11’ 11’ BUFFER2’ 7’ PARKING BIKE TRAVEL LANE TRAVEL LANE 4’BIKE PARKING LANE LANE Pedestrian Improvements Halsted Street Grand Avenue • High-visibility continental crosswalks at RIGHT-OF-WAY51’ all intersections • Shortened pedestrian crossing distances Kinzie Street Motorist Improvements
    [Show full text]
  • Licensed Contractor Report
    3/23/2020 Chicago Department of Transportation Licensed_Contractors_Report Company Name Company Address City State Zip Day Phone Fax AA ANTHONYS INC 9621 TRIPP SKOKIE IL 60076 (773)230-1062 A ARROW SEWERAGE 4243 N. MONITOR CHICAGO IL 60634 (773)761-0759 ABBEY PAVING CO, INC. 1949 County Line Rd AURORA IL 60504 (630)585-7220 ABBOTT INDUSTRIES 225 WILLIAM STREET BENSENVILLE IL 60106 (630)595-2320 ACE CONSTRUCTION CORP 7334 N. MONTICELLO AVENUE SKOKIE IL 60076 (847)679-4155 ACHILLES CONSTRUCTION, INC. 4857 WEST 171ST STREET COUNTRY CLUB HILLS IL 60478 (708)799-0525 ACURA INC 556 COUNTY LINE ROAD BENSENVILLE IL 60106 (630)766-9979 ADAMSON PLUMBING CONTRACTORS, INC. 860 SOUTH FIENE DRIVE ADDISON IL 60101 (312)492-7600 ADEN PLUMBING INC 3804 W PRETSWICK ST MCHENRY IL 60050 ADJUSTABLE FORMS INC 1 E PROGRESS RD LOMBARD IL 60148 (630)953-8700 ADVANCED WATER SOLUTIONS LLC 7637 W. PETERSON CHICAGO IL 60631 (773)636-0066 A & H PLUMBING & HEATING 330 BOND STREET ELK GROVE VILLAGE IL 60007 (847)981-8800 ALARCON PLUMBING INC 8518 S KEDVALE AVE CHICAGO IL 60652 (773)349-1264 ALDRIDGE ELECTRIC INC 844 E. ROCKLAND ROAD LIBERTYVILLE IL 60048 (847)680-5200 ALL CONCRETE CHICAGO INC 414 E 1ST STREET HINSDALE IL 60521 (773)729-7004 ALLSTATE CONCRETE CUTTING 514 ROLLINS RD INGLESIDE IL 60041 ALL STATE SEWER & WATER 6941 W MONTROSE HARWOOD HEIGHTS IL 60706 (312)446-7300 ALMIGHTY ROOTER 16858 S LATHROP #1 HARVEY IL 60426-6031 (773)284-6616 ALRIGHT CONCRETE COMPANY INC. 1500 RAMBLEWOOD DR. STREAMWOOD IL 60107 (630)250-7088 AMERICAN BACKHOE SERVICE & EXCAVATING CO 2560 FEDERAL SIGNAL DR UNIVERSITY PARK IL 60484 (815)469-2100 AMERICAN LANDSCAPING, INC 2233 PALMER DR.
    [Show full text]
  • Epared This Community Involvement Plan (CIP) for the Four Peoples Gas Cleanup Sites Located on the Near North Side, One of 77 Well-Defined Community Areas of Chicago
    U.S. Environmental Protection Agency Region 5 Community Involvement Plan Peoples Gas Plant Sites: Division Street Station Hawthorne Avenue Station North Station Willow Street Station City of Chicago, Cook County, Illinois August 2009 Introduction U.S. Environmental Protection Agency prepared this community involvement plan (CIP) for the four Peoples Gas cleanup sites located on the Near North Side, one of 77 well-defined community areas of Chicago. The sites are found near Goose Island, which is located in the North Branch of the Chicago River. This CIP provides background information on the sites, describes activities EPA will perform to keep the public and local officials informed about progress at the sites, and encourages community involvement during cleanup of the sites. This CIP also lists the concerns of nearby residents and local officials regarding the sites and ways for EPA to address those concerns. The information in this CIP is based primarily on discussions with residents and local officials that occurred April 1-2, 2009. Site background EPA has entered into an agreement with Peoples Gas Company to oversee the company’s investigation of 11 former manufactured gas plant (MGP) sites in Chicago. Peoples Gas will investigate the extent and nature of contamination at each site, and then evaluate potential cleanup options. In consultation with Illinois EPA, the City of Chicago and area residents, EPA will make the final cleanup determinations. All of the properties covered by the agreement are relatively close to the Chicago River, which was a transportation route when the MGPs operated. These facilities produced gas from coal from the mid-19th through the mid-20th centuries.
    [Show full text]
  • Life Services Network - 2008 Annual Convention & Exhibition April 2-4, 2008 - Navy Pier, Chicago
    Life Services Network - 2008 Annual Convention & Exhibition April 2-4, 2008 - Navy Pier, Chicago REGISTRATION INFORMATION: Please bring your confirmation with you to the conference. Registration will occur at Navy Pier inside Festival Hall A, Level 2 . QUESTIONS: Questions regarding your registration should be directed to 508.660.5024. Questions regarding the LSN Annual Convention should be directed to LSN Meeting Services at 630.325.6170 or [email protected]! SHUTTLE SERVICE Shuttle buses will run between the Embassy Suites Lakefront Hotel and Chicago City Centre Hotel and Navy Pier each day of the convention. Signs will be posted at each location identifying the pick-up/drop off areas. Pick up and drop off locations are as follows: Embassy Suites Lakefront Hotel – Street Level on Columbus Drive Chicago City Centre - SE corner of Ohio and Fairbanks Navy Pier - Entrance 2, Lower Level (taxi/bus turn around and drop off area) Shuttle service to Metra stations: On Wednesday, April 2, one shuttle will run continuously shuttle from Navy Pier to Union Station and Ogilvie Transportation Center starting at 6:00pm. A shuttle will also run to those stations on Thursday, April 3 beginning at 5:30pm and on Friday, April 4 one shuttle will run from Navy Pier to those stations at 12:00pm and will make an additional run if needed. Shuttle service for LSN’s Opening Night Reception: Shuttle service will be available for those attending the Opening Night Reception at Navy Pier and returning to the hotels. The last bus will depart Navy Pier for the hotels at 8:00pm.
    [Show full text]
  • Chicago Area Disaster Response Resource File
    CHICAGO AREA DISASTER RESPONSE RESOURCE FILE Compiled at the Newberry Library 2009 (Updated 2016) CONTENTS INTRODUCTION. 3 MUSEUM/ LIBRARY CONTACTS. 4 HUMAN RESOURCES. 5 SERVICES . 13 EQUIPMENT . 22 SUPPLIES . 32 INDEX . 43 ONLINE CONSERVATION & COLLECTIONS CARE RESOURCE . .44 SELECTED BIBLIOGRAPHY. 46 2 INTRODUCTION The history of the Chicago Area Disaster Response Resource File is outlined in the original introduction written over 20 years ago and reprinted in full below. The usefulness of this resource seems more relevant than eve, however, as we enter a millennium when global warming and its effects – extreme weather - have become common. The original document, intended to assist in the planning and implementation of disaster response and recovery, remains a practical tool in the preparation of Chicago area disaster response manuals for institutions large and small. It has been updated to include new members of DRAT and also includes websites and email addresses of individuals and companies as appropriate. The document includes listings for Human Resources, Suppliers, Services, and Equipment, and is available through the Newberry Library as a pdf with active links to listings. For more information or to obtain a copy, please contact me at [email protected] Barbara Korbel Collections Conservator(Retired) The Newberry Library February 2009 The idea for this resource file evolved from two independent projects begun by two different groups of professionals. Both projects, however, were inspired by the same event. In the late afternoon of July 11, 196, an exposed water main behind the Chicago Historical Society broke and began shooting water into the air. Before it could be shut off the water had filled a large foundation pit which had been excavated as part of the CHS building project.
    [Show full text]
  • Chicago - Urban New Construction & Proposed Multifamily Projects 4Q20
    Chicago - Urban New Construction & Proposed Multifamily Projects 4Q20 ID PROPERTY UNITS 3 Tamarisk NorthShore 240 9 Cicero Senior Lofts 62 Total Lease Up 302 27 8000 North 153 43 Veteran’s Circle 75 159 3 160 Total Under Construction 228 81 80 1850 Glenview Road 68 81 Northbrook Court Redevelopment 300 80 82 Heritage Village Pointe Redevelopment 924 82 83 8700 Waukegan Road 184 83 87 84 Jefferson Place 114 27 85 Niles Horizon Senior Living 72 161 85 162 86 86 Purple Hotel Redevelopment 300 87 Sawmill Station 250 205 43 84 88 7141 West Wabansia Avenue 152 165 168 89 711 Madison Street 174 163 103 Parkview Lofts 125 164 88 104 LeClaire Revitalization 183 171 105 Montclare Veterans Village of Roseland 78 170 169 Total Planned 2,924 185 89 193 186 158 Park Station Lofts 135 103 159 1085 Lake Cook 212 104 194 160 300 Northbrook 50 9 161 100 Euclid Avenue 91 158 162 Touhy & Franks 81 195 196 163 Belmont Avenue 146 164 North Avenue Sears Redevelopment 161 165 Six Corners Sears Redevelopment 313 168 Sabatino Building Redevelopment 100 105 169 835 Lake Street 84 170 855 Lake Street Redevelopment 65 195 Marquette Road 151 171 Lake Street and Park Avenue 100 196 West Marquette Road & 197 185 800 Des Plaines 50 Wentworth Avenue 100 186 North Riverside Park Mall 100 197 Whistler Crossing Phase II & III 250 193 Storkline Factory Redevelopment 148 205 8535 West Higgins 297 194 Parkview Lofts Phase II 50 Total Prospective 2,684 5 mi Source: Yardi Matrix LEGEND Lease-Up Under Construction Planned Prospective Chicago - Urban New Construction & Proposed
    [Show full text]
  • Complete Streets Chicago: Design Guidelines
    Complete Streets Chicago Department of Transportation Design Guidelines 2013 Edition TABLETABLE OFOF CONTENTSCONTENTS 20132013 Edition LISTLIST OF OF FIGURES.........................................................................2 FIGURES.........................................................................2 CHAPTERCHAPTER THREE:THREE: DESIGNDESIGN GUIDANCE.......................................79GUIDANCE.......................................79 COMMISSIONER’SCommissioner’s STATEMENT.................................................4 stATEMENT.................................................4 3.13.1 MMODAL HIERARCHYo............................................................79d a l Hierarchy............................................................79 EXECUTIVEEXECUTIVE SUMMARY................................................................5 SUMMARY................................................................5 3.2 DESIGN TREES..................................................................82 3.2 Design Tre CHAPTERCHAPTER ONE: ONE: INTRODUCTION................................................13 INTRODUCTION................................................13 3.3 CROSS-SECTION ELEMENTS....................................................89 es..................................................................82 1.11.1 PurposePURPOSE ANDand N Need..........................................................EED..........................................................13 3.4 INTERSECTIONS.................................................................96
    [Show full text]
  • City of Chicago Freight System Planning Information
    Howard Street Ridge Boulevard City of Chicago Rogers Avenue Touhy Avenue Freight System Planning Information CentralAvenue KedzieAvenue Northwest Highway WesternAvenue HarlemAvenue CaliforniaAvenue Pratt Boulevard Caldwell Avenue Ashland Boulevard MannheimRoad CiceroAvenue Pulaski Road Version 1.0 Prepared by the Chicago Metropolitan Agency for Planning For Planning Purposes Only Devon Avenue February, 2012 ¨¦§94 Not for Navigation Talcott Avenue Peterson Avenue Elston Avenue Sheridan Road NagleAvenue Milwaukee Avenue 0 1 2 3 4 Miles KimballAvenue Bryn Mawr Avenue CentralPark Avenue ¨¦§90 Foster Avenue ¨¦§190 Higgins Road BroadwayStreet EastRiver Road Lincoln Avenue LawrenceJ" Avenue CanfieldAvenue Montrose Avenue ¨¦§90/94 ± Clark Street Irving Park Road Addison Street J" Belmont Avenue HarlemAvenue Diversey Avenue Fullerton Avenue CumberlandAvenue Grand Avenue Armitage Avenue North Avenue J" Division Street Augusta Boulevard OakPark Avenue Austin Boulevard Chicago Avenue NarragansettAvenue Note regarding designated Class II Truck Routes: Grand Avenue Class II Truck Route signs were observed at the following locations that are not included in IDOT's inventory of local- Lake Street or state-jurisdiction Class II Truck Routes: - On Roosevelt at Kostner, east leg - On Roosevelt at Hamlin/Independence, west leg Washington Boulevard - On Roosevelt at Western, west leg Madison Street - On Roosevelt at Morgan, east and west legs - On Damen at Cermak, south leg Jackson Boulevard - On Cermak at Halsted, east leg ¨¦§290 - On Blue Island at Damen,
    [Show full text]
  • Morton Salt Company Warehouse Complex 1357 North Elston Avenue
    PRELIMINARY SUMMARY OF INFORMATION SUBMITTED TO THE COMMISSION ON CHICAGO LANDMARKS IN FEBRUARY 2021 MORTON SALT COMPANY WAREHOUSE COMPLEX 1357 NORTH ELSTON AVENUE CITY OF CHICAGO Lori E. Lightfoot, Mayor Department of Planning and Development Maurice D. Cox, Commissioner The Commission on Chicago Landmarks, whose nine members are appointed by the Mayor and City Council, was established in 1968 by city ordinance. The Commission is responsible for recommending to the City Council that individual building, sites, objects, or entire districts be designated as Chicago Landmarks, which protects them by law. The Commission is staffed by the Chicago Department of Planning and Development, Historic Preservation Division, City Hall, 121 North LaSalle Street, Room 1000, Chicago, IL 60602; (312-744-3200) phone; web site: www.cityofchicago.org/landmarks This Preliminary Summary of Information is subject to possible revision and amendment during the designation process. Only language contained within the final landmark designation ordinance as approved by City Council should be regarded as final. CONTENTS Location Map 2 Location, Description, and Construction of the Morton Salt Company Warehouse Complex 3 Location 3 Description 3 Construction 6 The Morton Salt Complex and the Production Shed Building Type 8 History of Salt Production in the United States 12 History of the Morton Salt Company 14 Joy Morton (1855-1934) 14 Joy Morton & Company: 1886-1910 14 The Morton Salt Company: 1910 to 1965 16 Later History: 1965 to 2015 21 Morton Salt and De-icing for Wintertime Road Safety 21 Architects Graham, Anderson, Probst & White 24 Criteria for Designation 28 Significant Historical and Architectural Features 32 Bibliography 34 MORTON SALT COMPANY WAREHOUSE COMPLEX 1357 NORTH ELSTON AVENUE DATE OF CONSTRUCTION: 1929-1930 ARCHITECT: GRAHAM, ANDERSON, PROBST & WHITE The Morton Salt Company Warehouse Complex on Elston Avenue is one of the most iconic industrial sites along the North Branch of the Chicago River.
    [Show full text]
  • Plan Commission OK's 6-Story Sears Site Project
    Several shootings reported recently on Northwest Side by BRIAN NADIG Sept. 17, in the 5100 block of West once on the left side of the body, A 24-year-old man is in critical Cullom Avenue in Portage Park, once in the leg and twice in the condition after being shot while according to News Affairs. chest, according to police. driving at about 2:55 a.m. Sunday, The Cullom incident does not Some residents reported that Sept. 19, near Central and Wilson appear to be random, as the man there recently have been home win- avenues in Jefferson Park, accord- may have been targeted, police said. dows and car windows shot out on ing to the Chicago Police Depart- The man was transported in critical Cullom near Austin Avenue. ment Office of News Affairs. condition to Advocate Lutheran Police have said that some of the The man reportedly was driving General Hospital, police said. He shootings in the 16th (Jefferson south on Central near Wilson when was shot six times, including two Park) and 17th (Albany Park) dis- several bullets struck him in the times on the right side of the body, (Continued on Page 8) neck and back area, according to police. The man drove himself to Community First Hospital and was later transferred to Illinois Masonic Taft LSC to continue to Hospital, police said. Police reportedly found shell cas- ings in the area of the shooting. recite Pledge of Allegiance ALSO IN THE AREA, about a week ago a suspected gang member by BRIAN NADIG pledge at meetings was deadlocked was arrested on a gun charge in the The Taft High School Local at 6-6, and members agreed to 4300 block of North Milwaukee School Council at its Sept.
    [Show full text]