Life Services Network - 2008 Annual Convention & Exhibition April 2-4, 2008 - Navy Pier, Chicago

Total Page:16

File Type:pdf, Size:1020Kb

Life Services Network - 2008 Annual Convention & Exhibition April 2-4, 2008 - Navy Pier, Chicago Life Services Network - 2008 Annual Convention & Exhibition April 2-4, 2008 - Navy Pier, Chicago REGISTRATION INFORMATION: Please bring your confirmation with you to the conference. Registration will occur at Navy Pier inside Festival Hall A, Level 2 . QUESTIONS: Questions regarding your registration should be directed to 508.660.5024. Questions regarding the LSN Annual Convention should be directed to LSN Meeting Services at 630.325.6170 or [email protected]! SHUTTLE SERVICE Shuttle buses will run between the Embassy Suites Lakefront Hotel and Chicago City Centre Hotel and Navy Pier each day of the convention. Signs will be posted at each location identifying the pick-up/drop off areas. Pick up and drop off locations are as follows: Embassy Suites Lakefront Hotel – Street Level on Columbus Drive Chicago City Centre - SE corner of Ohio and Fairbanks Navy Pier - Entrance 2, Lower Level (taxi/bus turn around and drop off area) Shuttle service to Metra stations: On Wednesday, April 2, one shuttle will run continuously shuttle from Navy Pier to Union Station and Ogilvie Transportation Center starting at 6:00pm. A shuttle will also run to those stations on Thursday, April 3 beginning at 5:30pm and on Friday, April 4 one shuttle will run from Navy Pier to those stations at 12:00pm and will make an additional run if needed. Shuttle service for LSN’s Opening Night Reception: Shuttle service will be available for those attending the Opening Night Reception at Navy Pier and returning to the hotels. The last bus will depart Navy Pier for the hotels at 8:00pm. Schedule Wednesday, April 2 and Thursday, April 3 6:45am–10:30am every 20 minutes from the hotels to Navy Pier 10:30am–3:30pm every 30 minutes from Navy Pier to the hotels 3:30pm-6:30pm every 20 minutes from Navy Pier to the hotels Friday, April 4 7:00am-10:00am every 15 minutes from the hotels to Navy Pier 10:15am–1:00pm every 15 minutes from Navy Pier to the hotels ALTERNATIVE PARKING Please call ahead to verify price and availability. Overnight prices vary for oversized vehicles, mini buses or vans. Park 1 (St. Clair & Grand) – 312-661-1839 Will take larger vehicles after 5pm.) Erie Ontario Self Park Garage - 312-642-6062 Clearance 7ft Northwestern Hospital (Huron & St. Clair) - 312-787-0551 Clearance 8ft for 1st 2 floors and then drops to 7ft New St. & Illinois – 312-527-4882 - OPEN LOT There is no staging at Navy Pier. The marshalling yard is located at the 31st Parking Lot (one block west of Lake Shore Drive) and is a fenced, patrolled lot open 24 hrs. Call (312) 808-3138 for more information. Parking lot attendant can provide taxi information for drivers returning to the downtown area. As an alternative, buses can stage on Elston Avenue between Potomac Avenue and LeMoyne Street. NAVY PIER If you are taking a taxi make sure you tell them to drop you off at the convention center of Navy Pier (near entrance 2). It is a long walk to the other side of the pier. DIRECTIONS TO NAVY PIER 600 East Grand St., Chicago, IL 60611 – 312-595-5300 www. navypier.com Please visit the Navy Pier website for public transportation information and a link for current traffic advisories. • From the north, take Lake Shore Drive (US 41) to the Grand Avenue exit. • From the northwest, take the Kennedy Expressway (I-90/94) to the Ohio Street Exit, south on Orleans to Illinois Street and proceed east. • From the west, take the Eisenhower Expressway (I-290) to Columbus Drive, north to Illinois Street and proceed east. • From the southwest, take the Stevenson Expressway (I-55) to Lake Shore Drive (US 41), north to Illinois Street and proceed east. • From the south, take the Dan Ryan Expressway (I-90/94) east to the Stevenson Expressway (I-55) to Lake Shore Drive (US 41), north to Illinois Street and proceed east. • From the southeast, take Lake Shore Drive (US 41) north to the Illinois Street exit. PARKING FOR NAVY PIER If parking is available, the West Parking garage is closet to the LSN registration area. The The West garage is 6ft. 3 in., and East garage is 7ft. 9in. Standard Parking operates on-site parking garages at Navy Pier. Self-park rates (including $3.50 city & county tax): Monday through Thursday - a flat rate of $19.00 per day* Friday through Sunday - a flat rate of $23.00 per day* Prices are subject to change NEW AUTOMATED PARKING PAY STATIONS! For your convenience, Navy Pier has installed parking pay stations at various locations throughout the Pier. EMBASSY SUITES DIRECTIONS TO EMBASSY SUITES/LAKEFRONT 511 North Columbus Drive, Chicago, IL 60611 – 312-836-5900 – www.embassysuites.com The hotel is located at the cross streets of Columbus Drive and Illinois Street • From I-90, exit Ohio Street, turn right on Orleans and go two blocks. Turn left on Illinois and proceed ten blocks until you cross Columbus Drive. The hotel is at the intersection of Illinois and Columbus. • From I-290, Exit I-90-94 North and go two miles. Take the Ohio Street exit and go one mile. Make a right onto Fairbanks Court. The hotel is two blocks on the left. • Cross Streets are Columbus Drive and Illinois Street. • Lakeshore Drive exit Illinois west 3blks to hotel. Hotel on right hand side. • I-55 exit Lakeshore Drive north. Lakeshore Drive exit Illinois west 3 blocks to hotel. • I-57 North to 90/94 North and go two miles. Take the Ohio St. East exit and go one mile. Make a right on Fairbanks Court the hotel is two blocks on the left. PARKING FOR EMBASSY SUITES/LAKEFRONT Entrance to Parking Garage off of Illinois - Prices are subject to change Daily Parking Charge: $39.00 per 24 hours – self park (No in & out privileges) Valet Parking Charge: $48.00 per 24 hours– Valet Parking can be charged to the sleeping room Chicago City Centre Hotel & Sports Club From I-94 Expressway (Milwaukee, Wisconsin) From I-90 Kennedy Expressway (Madison, Wisconsin and O'Hare) Take I-94/I-90 East towards downtown Chicago. Exit Ohio St. East. Drive 11 blocks East on local Ohio St. to Fairbanks Court. Hotel is on the left side. From I-88 East/West Tollway (Quad City Area) Take I-88 east to I-290 Eisenhower Expressway. Take I-290 East to Downtown Chicago, Congress Parkway Exit. Drive East 10 blocks to Michigan Ave. Turn left. Drive North 1-2 miles until you reach Ohio St. Turn Right. Drive 2 blocks to Fairbanks Court. Hotel is on the left side. From I-80 (Quad City Area) Take I-80 to I-55 Stevenson Expressway. Then drive I-55 East to I-90/94 West towards Downtown Chicago. Exit Ohio St. East. Drive 11 blocks East on local Ohio St. to Fairbanks. Court. Hotel is on the left side. From I-55 Stevenson Expressway (Bloomington-Normal, Illinois, And Midway) Take I-55 east to I-90/94 West towards Downtown Chicago. Exit Ohio St. East. Drive 11 blocks East on local Ohio St. to Fairbanks Court. Hotel is on the left side. From I-57 North (Champaign-Normal, Illinois) Take I-57 North to I90/94 West towards Downtown Chicago. Exit Ohio St. East. Drive 11 blocks East on local Ohio St. to Fairbanks Court. Hotel is on the left side. PARKING - Chicago City Centre Hotel & Sports Club Indoor self-parking at the Hotel is based upon availability. Parking is currently $38.00 per day, for a 24-hour period, which includes in and out privileges for registered hotel guests. Please have the Front Desk post the parking charges to your room. .
Recommended publications
  • Marketing Brochure
    2253 Lister Avenue 2250 Lister Avenue 2300 Elston Avenue 2301 Lister Avenue Michael Conway +1 773 458 1391 Park@Elston [email protected] Chicago, IL 60614 Gavin Stainthorpe +1 773 632 1101 [email protected] For Lease | Park@Elston | Chicago, IL 60614 Summary JLL is pleased to present 2300 Elston Avenue, 2301 Lister Avenue, 2253 Lister Avenue, and 2250 Lister Fullerton Avenue Avenue; four land parcels in the heart of the booming Elston corridor. Perfect for parking, outdoor storage, and construction material storage. This property features proximity to Interstate 90/94 (Kennedy Expressway), multiple CTA train and bus routes, Clyborne Avenue METRA station, and is only 5 minutes from downtown Chicago. These sites are located immediately north of the Lincoln Damen Avenue Yards development and offer numerous opportunities. 2300 N Elston Avenue (Lot A) Lot Size: 1.76 acres (76,500 s.f.) Divisible: 76,500 s.f. Lot A : 2300 Elston Avenue Zoning: M3-3 Elston Avenue Ward & Alderman: 32nd, Scott Waguespack Lot B : 2301 Lister Avenue Lease Rate: $17,531 per month gross ($2.75 p.s.f.) 2301 N Lister Avenue (Lot B) Lot D : 2253 Lister Avenue Lot Size: 0.48 acres (21,000 s.f.) Divisible: 21,000 s.f. Zoning: M3-3 Lot C : 2250 Lister Avenue Ward & Alderman: 32nd, Scott Waguespack Lister Avenue Lease Rate: $6,125 per month gross ($3.50 p.s.f.) 2250 N Lister Avenue (Lot C) Lot Size: 0.77 acres (33,417 s.f.) Divisible: 33,417 s.f. Zoning: M3-3 Ward & Alderman: 32nd, Scott Waguespack Lease Rate: $9,750 per month gross ($3.50 p.s.f.) 2253 N Lister Avenue (Lot D) Webster Avenue Lot Size: 0.22 acres (9.750 s.f.) Divisible: 9,750 s.f.
    [Show full text]
  • Streeterville Neighborhood Plan 2014 Update II August 18, 2014
    Streeterville Neighborhood Plan 2014 update II August 18, 2014 Dear Friends, The Streeterville Neighborhood Plan (“SNP”) was originally written in 2005 as a community plan written by a Chicago community group, SOAR, the Streeterville Organization of Active Resi- dents. SOAR was incorporated on May 28, 1975. Throughout our history, the organization has been a strong voice for conserving the historic character of the area and for development that enables divergent interests to live in harmony. SOAR’s mission is “To work on behalf of the residents of Streeterville by preserving, promoting and enhancing the quality of life and community.” SOAR’s vision is to see Streeterville as a unique, vibrant, beautiful neighborhood. In the past decade, since the initial SNP, there has been significant development throughout the neighborhood. Streeterville’s population has grown by 50% along with new hotels, restaurants, entertainment and institutional buildings creating a mix of uses no other neighborhood enjoys. The balance of all these uses is key to keeping the quality of life the highest possible. Each com- ponent is important and none should dominate the others. The impetus to revising the SNP is the City of Chicago’s many new initiatives, ideas and plans that SOAR wanted to incorporate into our planning document. From “The Pedestrian Plan for the City”, to “Chicago Forward”, to “Make Way for People” to “The Redevelopment of Lake Shore Drive” along with others, the City has changed its thinking of the downtown urban envi- ronment. If we support and include many of these plans into our SNP we feel that there is great- er potential for accomplishing them together.
    [Show full text]
  • Meeting Display Boards for Public Meetings on the Ashland Avenue Ashland Avenue Bus Rapid Transit Project, Held December 10 and 11, 2013
    Meeting Display Boards for Public Meetings on the Ashland Avenue Ashland Avenue Bus Rapid Transit Project, held December 10 and 11, 2013. Logos: CTA in partnership with Chicago Department of Transportation and Chicago Department of Housing and Economic Development Welcome: Welcome to the public open house for the Ashland Avenue Bus Rapid Transit Environmental Assessment and project. • In April 2013, CTA and CDOT announced a vision for a center running Bus Rapid Transit (BRT) system on Ashland Avenue between Irving Park Road and 95th Street to provide a fast and reliable north/ south transit connection for 16 miles through Chicago. The vision reflects the planning process and community engagement undertaken in 2012. • Over the summer, CTA and CDOT heard from various key stakeholders about this plan. We are now holding two public open house meetings as an extension of this outreach to gather additional input from the public. CTA and CDOT are still developing the Ashland BRT design, and we are considering options and modifications, including the implementation of additional left turns, based on continued feedback from the public. • The public open house meetings will summarize studies of the project impacts, including traffic analyses, that have been performed as part of the formal Environmental Assessment for the project, in accordance with federal government requirements. The Environmental Assessment is now complete and available on CTA’s website and in hard copy at several community locations. CTA and CDOT would like your comments on the Environmental Assessment, which can be made at the public open houses or by e-mail at [email protected].
    [Show full text]
  • A Case Study on Dan Ryan Reconstruction Project
    WORK ZONE SAFETY AND MOBILITY ISSUES: A CASE STUDY ON DAN RYAN RECONSTRUCTION PROJECT Submission date: August 1, 2007 No. of figures: 4 No. of Tables: 2 Word Count: 5,729 Corresponding Author: Jonathan Shi Professor Department of Civil and Architectural Engineering Illinois Institute of Technology 3201 South Dearborn Street, Chicago Illinois 60616. Phone: (312) 567-3630 Fax: (312) 567-3519 Email: [email protected] Contributing Author: Sean Washatka Project Engineer McShane Construction 9550 W Higgins Rd, Rosemont IL 60018 Phone: (847) 292-4300 Fax: (847) 292-4310 Email: [email protected] This manuscript is submitted for review for the 2008 TRB 87th Annual Conference. TRB 2008 Annual Meeting CD-ROM Original paper submittal - not revised by author. Shi & Washatka 2 ABSTRACT Due to the significance of the Dan Ryan reconstruction project with a total cost close to $1 billion and its proximity to downtown Chicago and the densely populated suburbs; IDOT has taken some extra measures to ensue safety and mobility during the construction of the project. The main objectives of this study are to review and document information pertaining to the reconstruction project; review work zone safety practices, safety programs, and implementation of transportation management plans; analyze the roles and responsibilities of various parties involved in the project; and assess the work zone impact on safety and mobility of the transportation network. Based on our interviews and collected information, the project has been very successful without any worker fatality; fewer crashes are recorded in the work zones; and its impact on the mobility of the transportation network in the Chicago area is minimal.
    [Show full text]
  • Milwaukee Avenue Spoke Route Project
    Milwaukee Avenue Spoke Route Project Project Overview Limits: Milwaukee Avenue - Kinzie Street to Elston Avenue • Length: 0.85 Miles CDOT will begin work in 2013 on the Milwaukee Avenue Spoke Route Project. This project will feature barrier/buffer protected bike lanes, increased bike parking and improved pedestrian crossings. The new Milwaukee Avenue design will complement Chicago’s future Bike Share System and highlight the corridor as a complete street by improving transportation options for all roadway users. Project Data • 638 reported crashes (2006 - 2011) - 15 serious injury crashes - 1 fatal crash • 12,000 vehicles per day 470 N. Milwaukee Ave - Existing Conditions - 30% exceeding the speed limit • Bicyclists represent over 40% of traffic during peak hours 25.5’ 25.5’ Highlights TRAVEL / PARKING LANE TRAVEL / PARKING LANE • Barrier/Buffer protected bike lanes RIGHT-OF-WAY51’ • High-visibility pedestrian crosswalks • On-street bike parking • Roadway resurfaced Avenue Elston Bicyclist Improvements Chicago Avenue • Barrier/Buffer protected bike lane in both directions on Chicago’s busiest street for bicycling • Improved bike facilities to complement Chicago Bike Share • Increased bike parking throughout the corridor 1.5’ 1.5’ BUFFER BUFFER 7’ 4’ BUFFER2’ 11’ 11’ BUFFER2’ 7’ PARKING BIKE TRAVEL LANE TRAVEL LANE 4’BIKE PARKING LANE LANE Pedestrian Improvements Halsted Street Grand Avenue • High-visibility continental crosswalks at RIGHT-OF-WAY51’ all intersections • Shortened pedestrian crossing distances Kinzie Street Motorist Improvements
    [Show full text]
  • Licensed Contractor Report
    3/23/2020 Chicago Department of Transportation Licensed_Contractors_Report Company Name Company Address City State Zip Day Phone Fax AA ANTHONYS INC 9621 TRIPP SKOKIE IL 60076 (773)230-1062 A ARROW SEWERAGE 4243 N. MONITOR CHICAGO IL 60634 (773)761-0759 ABBEY PAVING CO, INC. 1949 County Line Rd AURORA IL 60504 (630)585-7220 ABBOTT INDUSTRIES 225 WILLIAM STREET BENSENVILLE IL 60106 (630)595-2320 ACE CONSTRUCTION CORP 7334 N. MONTICELLO AVENUE SKOKIE IL 60076 (847)679-4155 ACHILLES CONSTRUCTION, INC. 4857 WEST 171ST STREET COUNTRY CLUB HILLS IL 60478 (708)799-0525 ACURA INC 556 COUNTY LINE ROAD BENSENVILLE IL 60106 (630)766-9979 ADAMSON PLUMBING CONTRACTORS, INC. 860 SOUTH FIENE DRIVE ADDISON IL 60101 (312)492-7600 ADEN PLUMBING INC 3804 W PRETSWICK ST MCHENRY IL 60050 ADJUSTABLE FORMS INC 1 E PROGRESS RD LOMBARD IL 60148 (630)953-8700 ADVANCED WATER SOLUTIONS LLC 7637 W. PETERSON CHICAGO IL 60631 (773)636-0066 A & H PLUMBING & HEATING 330 BOND STREET ELK GROVE VILLAGE IL 60007 (847)981-8800 ALARCON PLUMBING INC 8518 S KEDVALE AVE CHICAGO IL 60652 (773)349-1264 ALDRIDGE ELECTRIC INC 844 E. ROCKLAND ROAD LIBERTYVILLE IL 60048 (847)680-5200 ALL CONCRETE CHICAGO INC 414 E 1ST STREET HINSDALE IL 60521 (773)729-7004 ALLSTATE CONCRETE CUTTING 514 ROLLINS RD INGLESIDE IL 60041 ALL STATE SEWER & WATER 6941 W MONTROSE HARWOOD HEIGHTS IL 60706 (312)446-7300 ALMIGHTY ROOTER 16858 S LATHROP #1 HARVEY IL 60426-6031 (773)284-6616 ALRIGHT CONCRETE COMPANY INC. 1500 RAMBLEWOOD DR. STREAMWOOD IL 60107 (630)250-7088 AMERICAN BACKHOE SERVICE & EXCAVATING CO 2560 FEDERAL SIGNAL DR UNIVERSITY PARK IL 60484 (815)469-2100 AMERICAN LANDSCAPING, INC 2233 PALMER DR.
    [Show full text]
  • Risk Framework for Public Private Partnerships in Highway Construction
    RISK FRAMEWORK FOR PUBLIC PRIVATE PARTNERSHIPS IN HIGHWAY CONSTRUCTION by Mamata Shrestha An independent research paper submitted in partial fulfillment of the requirements for the degree of Masters of Science Construction Engineering and Management (Department of Civil and Environmental Engineering) at the University of Wisconsin-Madison 2011 RISK FRAMEWORK FOR PUBLIC PRIVATE PARTNERSHIPS IN HIGHWAY CONSTRUCTION Mamata Shrestha1 ABSTRACT Recent Public Private Partnerships (P3) in the United States represents a significant advancement in the level of participation of the private sector in the provision of road and highway assets. A number of states and local governments consider P3 as a mechanism to streamline project delivery, transfer risk, reduce costs and raise additional transportation revenues. P3 broaden the private sector‟s participation beyond the design and construction phases to include the assumption of responsibility and risks for the financing, operations, and maintenance of project. In this paper, the author introduces a framework that identifies and organizes the broad range of risks associated with P3 arrangements for highway project delivery. The “PEST” framework organizes risks into four categories: Political, Economic, Socio-Cultural and Technical which could help P3 projects in devising risk management strategies. P3 projects could benefit by these categorization in identifying, allocating, managing and thus minimizing overall project risks. The framework was developed by considering the risks associated with major P3 highway projects in the United States. Project documentation, case studies, and literature related to P3 highway projects (completed/on-going) were used to validate the framework. The categorization of the risk factors can help practitioners identify the parties involved (public or private) that assume the most risk based on different phases of highway construction and the type of risk involved within it.
    [Show full text]
  • Epared This Community Involvement Plan (CIP) for the Four Peoples Gas Cleanup Sites Located on the Near North Side, One of 77 Well-Defined Community Areas of Chicago
    U.S. Environmental Protection Agency Region 5 Community Involvement Plan Peoples Gas Plant Sites: Division Street Station Hawthorne Avenue Station North Station Willow Street Station City of Chicago, Cook County, Illinois August 2009 Introduction U.S. Environmental Protection Agency prepared this community involvement plan (CIP) for the four Peoples Gas cleanup sites located on the Near North Side, one of 77 well-defined community areas of Chicago. The sites are found near Goose Island, which is located in the North Branch of the Chicago River. This CIP provides background information on the sites, describes activities EPA will perform to keep the public and local officials informed about progress at the sites, and encourages community involvement during cleanup of the sites. This CIP also lists the concerns of nearby residents and local officials regarding the sites and ways for EPA to address those concerns. The information in this CIP is based primarily on discussions with residents and local officials that occurred April 1-2, 2009. Site background EPA has entered into an agreement with Peoples Gas Company to oversee the company’s investigation of 11 former manufactured gas plant (MGP) sites in Chicago. Peoples Gas will investigate the extent and nature of contamination at each site, and then evaluate potential cleanup options. In consultation with Illinois EPA, the City of Chicago and area residents, EPA will make the final cleanup determinations. All of the properties covered by the agreement are relatively close to the Chicago River, which was a transportation route when the MGPs operated. These facilities produced gas from coal from the mid-19th through the mid-20th centuries.
    [Show full text]
  • Corporate Checkers Ground Lease  Next to CTA ‘L’ Station ∙ Signalized Hard Corner ∙ Strong Traffic Counts 6301 S
    CONFIDENTIAL OFFERING MEMORANDUM Corporate Checkers Ground Lease Next to CTA ‘L’ Station ∙ Signalized Hard Corner ∙ Strong Traffic Counts 6301 S. Ashland Avenue // Chicago, IL 60636 Actual Site EXCLUSIVELY OFFERED BY: BRAD TEITELBAUM BAUM REALTY GROUP, LLC Vice President / Broker 1030 W. Chicago Avenue, Suite 200 [email protected] Chicago, IL 60642 312.275.3116 www.baumrealty.com 6301 S. ASHLAND AVENUE // CHICAGO, IL // OFFERING SUmmARY Offering Summary Baum Realty Group has been exclusively retained by ownership to sell a ground leased Checkers asset located in Chicago, IL. The property is situated at the signalized hard corner of Ashland Avenue and 63rd Street featuring vehicular exposure of 47,780 cars per day. Checkers built a new drive-thru restaurant and has 9.75 years remaining with rent increases and extension options. The site is adjacent to the CTA ‘L’ Green Line Ashland station, which has annual ridership of 377,000 passengers, adding to the dense daytime population in the immediate area. PRICE: $1,307,700 CURRENT CAP RATE: 6.50% CAP RATE AS OF DECEMBER 2020 7.15% TERM REMAINING: 9.75 Years Current Annual Ground Rent: $85,000 December 2020 Ground Rent: $93,500 Escalations: 10% every 5 years Lease Type: Absolute NNN Ground Lease – No Landlord Maintenance Responsibilities Corporate Tenant: Checkers Drive-In Restaurants, Inc. Year Built: 2017 2 // CONFIDENTIAL OFFERING MEMORANDUM 6301 S. ASHLAND AVENUE // CHICAGO, IL // INVESTMENT HIGHLIGHTS Investment Highlights THREE CTA ‘L’ STATIONS WITHIN 1.5 MILES The site is next to the CTA ‘L’ Green Line Ashland station and 1 mile away from the Green Line Halsted station; the two Green Line stations have a combined annual ridership of 588,000 passengers.
    [Show full text]
  • Highways and Urban Decentralization Prepared for Illinois State Toll
    Highways and Urban Decentralization Final Rep ort Prepared for Illinois State Toll Highway Authority by Urban Transp ortation Center University of Illinois at Chicago Suite 340, M/C 357 412 South Peoria Street Chicago, IL 60607 http://www.uic.edu/cuppa/utc Phone: 312996-4820 Fax: 312413-0006 i Contents 1 Intro duction 1 2 Causes of Decentralization 2 2.0.1 Empirical Evidence . 2 2.0.2 Theoretical Background . 3 2.1 Relationship of Highways to Decentralization . 6 2.1.1 Decentralization and Highways in Chicago . 6 2.1.2 Nineteenth and Early Twentieth Century Decentralization . 9 2.1.3 Literature on Decentralization . 13 2.1.4 Decentralization and Travel Behavior in Chicago . 14 2.2 Relationship b etween County Growth and Increases in Highway Capacity . 22 2.3 Can Decentralization Occur Without Highways? . 23 3 E ects of Decentralization 24 3.1 Decentralization and the Cost of Housing . 25 3.2 Highways and Economic Development . 27 3.3 Highways and Firm Lo cation . 28 3.3.1 E ect of Highway Capacity on Business Costs and Firm Lo cation . 29 3.3.2 Survey of Companies in DuPage County, Illinois . 30 ii List of Figures 1 Percentchange in p opulation from 1940 to 1950. 10 2 Percentchange in p opulation from 1970 to 1980. 11 3 Ma jor contributors to the p ercentage increase in VMT in the Chicago area from 1973 to 1993. 17 4 Hyp othetical trip chains . 20 5 Hyp othetical trip chain patterns for di erent households . 20 6 Lane miles p er p opulation in McHenry County: 1983-1995.
    [Show full text]
  • Planned Protests in Chicago Area Expressways
    Planned protests on Chicago Area Expressways Matt Daeda Jim McKay IDOT District 1 IDOT District 1 Expressway Traffic Emergency Traffic Operations Engineer Patrol Manager 3 events in 2018 • 7/7/18 - I-90/94 Dan Ryan Protest • 8/2/18 – Lake Shore Drive Protest (no IDOT involvement) • 9/3/18 – I-90/94 Kennedy/O’Hare Airport Protest July 7th, 2018 Dan Ryan Protest • Community Activist Father Pfleger from Saint Sabina Catholic Church announced a planned protest on the Dan Ryan Expressway to bring attention violence, crime, joblessness, and poverty plaguing certain neighborhoods in Chicago. • Protest planned to enter the northbound expressway at the 79th St. entrance ramp and march to the 67th St. exit ramp. July 7th, 2018 Dan Ryan Protest • Illinois State Police reached out to IDOT on June 29th requesting IDOT resources to assist with closing ramps and the mainline expressway should the protestors gain assess to the expressway. • Plan at this time was to keep all people off the expressway. • Plan included resources from Illinois Department of Transportation, Illinois State Police District Chicago and District 15, Chicago Police Department, and others. July 7th, 2018 Dan Ryan Protest • Internal IDOT meeting on 7/3/18 to discuss IDOT’s response to this event • IDOT prepared to close both directions of the expressway, northbound lanes at the I-57 and I-94 merge, and southbound lanes at 63rd St. • 8 Maintenance trucks to close the southbound lanes • 7 Maintenance trucks to close the northbound lanes • Other vehicles as needed to close various entrance ramps Protest Location Northbound Closure Southbound Closure July 7th, 2018 Dan Ryan Protest • Plan changed • Anticipated 2,000 protestors with 600 law enforcement officers to keep protestors off the highway.
    [Show full text]
  • Directions to Mccormick Place – North Building and Marshalling Yard
    ______________________________________________________________ Directions to McCormick Place – North Building and Marshalling Yard The McCormick Place Complex is located south of downtown Chicago at 23rd Street and South Lake Shore Drive. The phone number to the Standard Parking office located in the Marshalling Yard is 312-791-6200. Parking lots are located at the following locations (see McCormick Place Area Map): Lot A - McCormick Place/Martin Luther King Lot (Cottage Grove Ave. access) $16.00/day** – Phone: 312.567.8360 Lot C - McCormick Pace East - Underground Garage (Ft. Dearborn Dr. access) $16.00/day** – Phone: 312.567.8152 Exhibitor Reserved Parking – For $20.00/day**, exhibitors are allowed in-and-out privileges. You must request this by Thursday, December 20 th , 2007. To obtain this parking pass, a form can be found under the OTHER SERVICE PROVIDER FORMS TAB in this kit. For further questions, please call 312-595-5201. ** Parking prices subject to change. TRAVELING TO MCCORMICK PLACE (LOT A) BY CAR: (For parking at the South, North and West Buildings) FROM O'HARE INTERNATIONAL AIRPORT, NORTHWEST OR THE NORTH: Follow I-190 East to I-90 East. This turns into I-90/94 East (Dan Ryan Expressway). Keeping to the right, follow to I-55 North (Stevenson Expressway). Exit at Martin L. King Drive (Exit #293D) and follow signs to Lot A entrance ramp located immediately to your left. FROM THE WEST: Take I-290 East (Eisenhower Expressway) to I-94 East (Dan Ryan Expressway). Keeping to the right, follow to I-55 North (Stevenson Expressway). Exit at Martin L. King Drive (Exit #293D) and follow signs to Lot A entrance ramp located immediately to your left.
    [Show full text]