LIST OF EXECUTED WORKS: ROADS & MOTORWAYS

INTEGRAL IN ENJERING PLC

Contracted Value of commence- Name and Contractor (C) Ordinal Internal Value of Project name and location Contract in ment and address of the Type and description of the works Subcontractor No. No. Contract in KM EUR completion Employer (S) date

Koridori Srbije, d.o.o. ( Construction of highway section in total length l= 6,75 km, with all structures, Construction of 7 Corridors) bridges on highway section, one bridge on local road, one railway bridge, 3 RC grille structures Corridor X Highway Project, Construction of Beograd, with prestressed anchors for permanent protection of slopes, 28 culverts, relocation of 1 km of JV Integral-Inter- Highway E 75, Section: Cari inaDolina – September Kralja Petra 21 railway, relocation of 1,3 km of local roads, works on regulation of Ju na Morava river, Sokolica kop- 135 273 Vladi in Han, LOT 5: Road and bridges at 224.407.629,56 114.737.799,07 2013 11000 Beograd river and Kozni ka river. Prijedorputevi sub-section Cari inaDolina – Tunnel Manajle, June 2018 phone 11 33 44 project involve relocation of HV, MV and LV lines, construction of TC chanellization, PS, (60-20-20) ICB br. CORRX.E75.EIB.PACK2-LOT5.ICB 174 drainage works, supply and installation of traffic signalization and equipment, noise protection fax: +381 11 32 walls and landscaping. 48 682

Construction of the Main Road M-17.3 JP Ceste Neum –Stolac LOT 1 Federacije BiH Pavement of road section Stari Neum – d.o.o. Sarajevo Project included construction of main road in total lenght of 7,00 km. Works includes Babin Do L=5,3km 01.02.2018. - Terazije 54 134 272 6.027.207,03 3.081.662,02 construction of tunnel O trovac, in total lenght of 190 m1 and construction of underpass C Construction of road section Babin Do – 24/04/2019 tel: +387 33 250 Oskrusnica. O trovac L=1,7km and 370 Construction of the tunnel O trovac L=190m1.

Works on design and construction of full profile motorways section (l=35,300.00 m) with all belonging elements, two motorway intersections with toll plazas, traffic control and maintenance centre, rest and service area, structures at the motorway, of which the most important are viaducts with length l=449 m, and l=400 m, bridge with length l=340.00 m, and artificial tunnel. Project includes construction of total of 21,529.24 m local roads, geomechanical works, Public Company relocation of power installation, power supply installations of the toll plazas, rest and service Design and construction of Luka - "Republic of area and artificial tunnel, works on illumination of interchanges, works on setting up traffic Doboj Motorway, Section Banja Luka - 01 Sept 2014 - JV Integral- 133 268 445.558.204,83 227.810.292,73 Srpska signalization and equipment, and noise protection. Prnjavor (km 0+000 to km 35+300) Contract 30 Sept 2018 Granit (60-40) Motorways" Project includes design and implementation of intelligent traffic systems, video surveillance no. RS/EIB-2012/W +387 51 233 670 and traffic management; works on dewatering of pavement, regulation of watercourses, installations of optical cables and emergency call system, and toll collection system. Pavement structure: driving and overtaking lane: SMA 4cm, binding bituminous course 6 cm, bituminous road base BNS 7 cm, cement stabilisation 20 cm, road base 25 cm stopping lane: asphalt concrete 7 cm, bituminous bearing course BNS 7 cm, road base 52 cm

1272 calendar Design and construction of motorway section in total length l=36.609.72 m, with all days after structures, two motorway intersections with toll plazas, traffic control and maintenance centre, Commencement rest and service area, structures at the motorway, of which the most important are the Bosna Date bridge L=425.40 m, Ukrina bridge L=103.06 m, Slatinci artificial tunnel l=80.50m. Project includes construction of total of 21.422,48 m local roads, geomechanical works, 09 November relocation of power installation, power supply installations of the toll plazas, rest and service Public Company Design and construction of Banja Luka - 2012 -10 area and artificial tunnel, works on illumination of interchanges, works on setting up traffic "Republic of Doboj Motorway, Section Prnjavor - Doboj September 2016 signalization and equipment. JV Integral- 132 265 452.807.085,58 231.516.586,61 Srpska (km 35+300 to km 71+909.72) Contract no. (Taking-over) Project shall include design and implementation of intelligent traffic systems, video Granit (60-40) Motorways" RS/EBRD-2012/W of 24 August 2012 DNP in duration surveillance and traffic management; works on dewatering of pavement, installations of optical +387 51 233 670 of 730 days cables and emergency call system, and noise protection. starts as from 11 Pavement structure: September driving and overtaking lane: SMA 4cm, binding bituminous course 6 cm, bituminous road 2016, ends on base BNS 7 cm, cement stabilisation 20 cm, road base 25 cm; 10 September stopping lane: asphalt-concrete 7 cm, bituminous bearing course BNS 7 cm, road base 52 2018 cm

Project included construction of main road in total length of 8.9 km. Two tunnels constructed were: tunnel emerno and tunnel Surdup, in total length of l=2.305.00m. Tunnel emerno is 2,109.00 m long, and tunnel Surdup is 196.00m long. Both tunnels were constructed by applying the New Austrian construction method (NATM), including all electrical and mechanical installation. Clearance of each tunnel is 55sq.m, and excavation pro le of both tunnels is 97.54sq.m each. Tunnel works included underground and open cut excavations. Rocky mass was secured by installation of SN anchors and Public Company reinforcing mesh at tunnel portals, and installation of SN and IBO anchors, steel Permanent solution for the landslide September "Republic of reinforcing mesh and centerings in the other parts of the tunnel. Following installation of JV Integral, CPM 131 260 emerno at the trunk road M-20 Gacko- 71.846.761,91 36.734.666,05 2008 - 06 Srpska Roads" anchors, mesh and centerings, the tunnel surface was protected by sprayed concrete MB BH, REWEUS Fo a August 2013 +387 51 334 500 30, waterproo ng coat, and construction of the secondary tunnel lining. The project further included the structures: viaduct ''Trnova Luka'', length: L=408.00 (steel composite structure with columns of over 50m high), one viaduct length l=88.00m, the "Hr tica" Bridge l=37.36m and the bridge over the dralov potok l=12m. In order to secure stability of the road structure, total of 1,605.00m of reinforced-concrete walls were constructed. In addition, slope stabilisation in this geologically very complex terrain was obtained by installation of steel anchors and applying up-to-date geotehnical methods.

Federation of Construction of an intersection at the trunk road M4 Tuzla - i ki Brod. The work B&H 2 2 encompasses construction of 5 bridges (l1=9,80m/P1= 88 m ; l2=13,80m/P2=136,6 m ; Road 2 2 2 Construction of intesection i ki Brod (Lot March 2010 - l3=18,40m/P3=184m ; l4=42,50m/P4=415 m ; l5=26,50m/P5=258 m ), reconstruction of 4 JV Integral, CPM 130 254 6.466.914,00 3.306.480,62 Directorate of 2) 31-Dec-2011 bridges (P=185,4+187,41+184,00+388m2), alignment works (reconstruction of existing and BH, REWEUS FB&H construction of a new pavement) works on intersection branches, drainage, lighting, tra c Tel. +387 33 563 signalization and equipment. 468

Rehabilitation of the pavement structure in total length of l=8.13 km. Works include scraping and destroying of asphalt surfacing in total surface of approx. 53.000 m2, Public Company replacing of road base, pot holes patching, cracks sealing, construction of new bearing Rehabilitation of Kopa i - Ustipra a (M20) April - "Republic of course BNS 22 in the sutface of approx. 4.450 m2, and wearing course AB 11ks in the 129 253 2.799.091,30 1.431.152,66 C BA-RISP-40381BA/RS-ICB-W-10-03 December 2011 Srpska Roads" surface of approx. 53.000m2. Besides the a/m, the works include: reconstruction and +387 51 334 500 upgrade of existing retaining wall, cleaning of drainage system, construction of new drainage system, cleaning and reconstruction of gutters, cleaning and lling of shoulders and as well as works related to tra c signalization and equipment.

Rehabilitation of the pavement structure in total length of l=29.40 km. Works include Public Company scraping and destroying of asphalt surfacing in total surface of approx. 145.000 m2, Rehabilitation of road direction R15 ipovo - April - "Republic of replacing of road base, pot holes patching, cracks sealing, construction of a wearing 128 252 Kupres in the length of 29,40 km 2.525.513,69 1.291.274,65 C December 2011 Srpska Roads" course AB 11ks in the surface of approx. 157.000m2. Besides the a/m, the works include: EBRD/RS-10-03W +387 51 334 500 cleaning of drainage system, cleaning and reconstruction of gutters, cleaning and lling of shoulders and as well as works related to tra c signalization and equipment.

Rehabilitation of the pavement structure in total length of l=11.77 km. Works include scraping and destroying of asphalt surfacing in total surface of approx.87.000 m2, Public Company replacing of road base, pot holes patching, cracks sealing, construction of a new bearing Rehabilitation of road direction R14 Han April - "Republic of layer BNS 22 in the surface of approx. 31.000 m2 and construction of wearing course AB 127 251 Kola - Srpske Toplice 2.122.422,94 1.085.177,62 c December 2011 Srpska Roads 11ks in total surface of 82.000m2. Besides the a/m, the works include: cleaning of EBRD/RS-10-02W +387 51 334 500 drainage system, construction of a new drainage, cleaning and reconstruction of gutters and cleaning and lling of shoulders and as well as works related to tra c signalization and equipment.

Rehabilitation of the pavement structure in total length of l=36.39 km. The works include scraping and destroying of asphalt surfacing in total surface of approx. 90.000 m2, Rehabilitation of road directions M5/M19.3 Public Company replacing of road base, pot holes patching, cracks sealing, construction of a new bearing Rogatica - Sastavci - Ustipra a and M5/ April - "Republic of 126 250 2.968.241,75 1.517.637,91 layer BNS 22 in the surface of approx.2.000 m2 and construction of wearing course AB M19.3 Vi egrad - Vardi te December 2011 Srpska Roads" 11ks in total surface of 175.000m2. Besides the a/m, the works include: cleaning of EBRD/RS-10-01W +387 51 334 500 drainage system and gutters, cleaning and lling of shoulders as well as works related to tra c signalization and equipment.

Public Company "Republic of Srpska Roads" Director: Nedeljko Execution of works at construction of motorway section (l=6.736 m) with all additional Kne evi , Construction of the highway Gradi ka - elements, earthmoving works, concrete and insulation works on two bridges of spans 27-April-2011 - B.Sc.Oec. 125 249 Banja Luka (Mahovljani): 46.927.945,37 23.993.877,47 28,80 m and 19,60m and three overbridges. C 24-Nov-2011 +387 51 334 500 Lot 3: km 30+000 to km 36+736 Bridges are prefabricated monolith structure, prestressed concrete prefabricated girders /Public MB45, M150, V8, structure funded on bored HW piles Ø1000, length 14,0m. Company "Republic of Srpska Motorways" +387 51 233 670

Execution of works at construction of entire motorway (l=9,500 m) with all additional elements, four overbridges, three double bridges (spans 30m each) on the motorway and two bridges on local roads, and one underbridge Jazovac bridge - two bridges length 2x37.60 m, prefabricated monolith structure, prestressed concrete prefabricated girders MB45, M150, V8, structure funded on bored HW piles Ø800, length 14,0m Jurkovica II bridge - two bridges length 2x37.51 m, prefabricated monolith structure, prestressed concrete prefabricated girders MB45, M150, V8, structure funded on bored Public Company HW piles Ø800, length 14,0m "Republic of Borna bridge - two bridges length 2x37.64 m, prefabricated monolith structure, Srpska Roads" prestressed concrete prefabricated girders MB45, M150, V8, structure funded on bored Director: HW piles Ø800, length 12,0m Nedeljko Bridge at VL 27A - bridge length 53,84 m, bridge structure (2x20=40m), prefabricated Kne evi , Construction of the highway Gradi ka - monolith structure, prestressed concrete prefabricated girders MB45, M150, V8, structure JV Konstruktor 11-Dec-2007 - B.Sc.Oec. Banja Luka (Mahovljani): funded on bored HW piles Ø800, length 12,0m In enjering - 124 248 82.586.511,74 42.225.812,95 24-Nov-2011 +387 51 334 500 Lot 2: km 20+500 to km 30+000 including Bridge on RAMP A- bridge length 53,84 m, bridge structure (2x20=40m), prefabricated Integral /Public local roads monolith structure, prestressed concrete prefabricated girders MB45, M150, V8, structure In enjering Company funded on bored HW piles Ø800, length 13,0m "Republic of Overbridges in length 54.04m each, overbridge structure (2x20=40m), prefabricated Srpska monolith structure, prestressed concrete prefabricated girders MB45, M150, V8, structure Motorways" funded on bored HW piles Ø1000 Du an Topi Underbridge at km 29+515.000 - monolith RC structure, underbridge clear span 9.50 x +387 51 233 670 5.30m Pavement structure: driving lane: SMA 5cm, binding bituminous course 7 cm, bituminous road base BNS 10 cm, cement stabilisation 20 cm, road base 30 cm overtaking lane: SMA 5cm, binding bituminous course 7 cm, bituminous road base 10 cm, road base 35 cm stopping lane: bituminous bearing course BNS 5 cm, binding bituminous course 7 cm, road base 35 cm

Execution of works at construction of entire motorway (l=10.755 m) with all additional elements, six overbridges and one double carriageway bridge (span 40m) Jurkovica Bridge - two bridges in the length 2x53.29m, bridge structure (2x20=40m) prefabricated monolith structure, prestressed prefabricated concrete girders MB45, M150, V8, structure funded on bored HW piles Ø1000, length 14.0m. Overbridge at km 13+688.902 - length 113.84m, Overbridge structure (4x25=100m), prefabricated monolith structure, prestressed concrete prefabricated girders MB45, M150, V8, structure funded on bored HW piles Ø1000 for middle piers Ø800. Abutments funded on 5 piles each, length 18m, that is 22m. Foundation of the middle pier is funded on 6 piles. Overbridge at km 11+662.045 - length 54.04m, Overbridge structure (2x20=40m), Public Company prefabricated monolith structure, prestressed concrete prefabricated girders MB45, M150, "Republic of V8, structure funded on bored HW piles Ø1000 Srpska Roads" Overbridge at km 12+348.955 - length 54.04m, Overbridge structure (2x20=40m), +387 51 334 500 prefabricated monolith structure, prestressed concrete prefabricated girders MB45, M150, JV Konstruktor Construction of the highway Gradi ka - 11-Dec-2007 - /Public V8, structure funded on bored HW piles Ø1000 In enjering - 123 247 Banja Luka (Mahovljani): 97.663.418,74 49.934.513,09 24-Nov-2011 Company Overbridge at km 14+910.00 - length 54.04m, Overbridge structure (2x20=40m), Integral Lot 1: km 10+254,59 to km 20+500 "Republic of prefabricated monolith structure, prestressed concrete prefabricated girders MB45, M150, In enjering Srpska V8, structure fundd on bored HW piles Ø1000 Motorways Overbridge at km 17+550.00 - length 54.04m, Overbridge structure (2x20=40m), +387 51 233 670 prefabricated monolith structure, prestressed concrete prefabricated girders MB45, M150, V8, structure funded on bored HW piles Ø1000 Overbridge at km 20+252.50 - length 54.04m, Overbridge structure (2x20=40m), prefabricated monolith structure, prestressed concrete prefabricated girders MB45, M150, V8, structure funded on bored HW piles Ø1000 Pavement structure: driving lane: SMA 5cm, binding bito course 7 cm, Bituminous road base BNS 10 cm, cement stabilisation 20 cm, road base 30 cm overtaking lane: SMA 5cm, binding bito course 7 cm, Bituminous road base BNS 10 cm, road base 35 cm stopping lane: Bituminous road base BNS 5 cm, binding bituminous course 7 cm, road base 35 cm

Municipality Works on construction and asphalting of local road network in Municipality Kupres: Works on asphalting of local road network December 2010 Kupres 122 245 72.421,24 37.028,39 construction and asphalting of the road to Mili i i and construction and asphalting of the c in Municipality Kupres - July 2011 + 387 50 480 road to Mati i 077

Municipality Works on asphalting and furnishing of December 2010 Kupres Works on subgrade, construction of stabilized roadabse, construction of wearing course 121 244 48.385,35 24.739,04 C football ground in Municipality Kupres - July 2011 + 387 50 480 AB 11, illumination of the playground and furnishing of the football ground. 077

Agency for Construction and Earth works (earth tra c lanes planning, rolling and compacting of a new road alignment), Execution of works and interventions at Development of concrete works (construction of asphalt-concrete wearing course, equilizing bed, upper streets and local road directions within May - Berane 120 243 391.166,00 200.000,00 bearing layer, mechanical milling of asphalt wearing course, mechanical cutting of asphalt) C regular maintenance in December 2010 Ul. IV transport of debris, mechanical and manual removal of existing asphalt layer, delivery of 2010 at the territory of Berane Municipality Crnogorske br. asphalt mixture AB-11 andBNS-22). 4; Berane Tel: + 382 51 230 574

Tra c Directorate 19 IV Reconstruction-investment maintenance of proleterske May - Construction of wearing course AB 11s, levelling of existing asphalt layer, construction of 119 242 trunk and pincipal roads in 233.351,37 119.310,66 Street, C June 2010 equilizing bed Lot 16: R-8 Ro aje - Kula Podgorica, Crna Gora Tel: +382 20 655 052

Tra c Directorate 19 IV Reconstruction-investment maintenance of proleterske May - Construction of wearing course AB 11s, levelling of existing asphalt layer, construction of 118 241 trunk and pincipal roads in Montenegro 60.811,57 31.092,46 Street, C June 2010 equilizing bed Lot 15: R-9 Murino-Plav-Gusinje Podgorica, Crna Gora Tel: +382 20 655 052

Tra c Directorate 19 IV Reconstruction-investment maintenance of proleterske trunk and pincipal roads in Montenegro May - Construction of wearing course AB 11s, levelling of existing asphalt layer, construction of 117 240 185.467,66 94.828,11 Street, C Lot 14: M-9 Kola in-Mate evo-Andrijevica- June 2010 equilizing bed Podgorica, Crna Bjeluha Gora Tel: +382 20 655 052

Tra c Directorate 19 IV Reconstruction-investment maintenance of proleterske May - Construction of wearing course AB 11s, levelling of existing asphalt layer, construction of 116 239 trunk and pincipal roads in Montenegro 325.418,86 166.384,02 Street, C June 2010 equilizing bed Lot 13: M-21 Barski Most-Ribarevina Podgorica, Crna Gora Tel: +382 20 655 052

Tra c Directorate 19 IV Reconstruction-investment maintenance of proleterske May - Construction of wearing course AB 11s, levelling of existing asphalt layer, construction of 115 238 trunk and pincipal roads in Montenegro, Lot 610.049,88 311.913,55 Street, C June 2010 equilizing bed 12: M-2 Ribarevine- piljani Podgorica, Crna Gora Tel: +382 20 655 052

Public Works Directorate 18 Novaka Improvement of local roads in the length of May - Milo eva Street, Levelling of existing road, scraping of asphalt pavement, construction of mechanically 114 237 256.545,22 131.169,49 C 3km in the Berane Municipality June 2010 Podgorica, Crna stabilized road bed, construction of shoulders Gora Tel: +382 20 230 207

Public Works Directorate 18 Novaka Milo eva Street, Improvement of local roads in the length of May - Levelling of existing road, scraping of asphalt pavement, construction of mechanically 113 236 244.146,42 124.830,08 Podgorica, Crna C 3km in the Andrijevica Municipality June 2010 stabilized road bed, construction of shoulders Gora Tel: +382 20 230 207

Agency for Investments Earth works (planning earth lanes, rolling and compaction, excavation and spreading on and Execution of works and interventions at the new road section), concrete works (material purchase, construction of wearing coarse Construction local roads, as well as maintenance of roads April - made of asphalt concrete, construction of levelling coarse, construction of upper bering 112 230 2.967.084,06 1.517.045,99 Berana C and streets at the territory of Berane December 2009 layer, mechanict removal of wearing asphalt coarse, mechanic asphalt cutting) IV Crnogorske Municipality in 2009 (regular maintenance) transport of debris, mechanical and manual removal of existing asphalt, delivery of 4; Berane asphalt mixture AB-11 and BNS-22. Tel: + 382 51 230 574

Plav Execution of street asphalt works works in Municipality Plav and Gusinje and reconstruction of May - Directorate for Execution of street asphalt works works in Plav and Gusinje and reconstruction of 111 227 damaged asphalt pavement at streets and 171.360,89 87.615,43 September Space Designing C damaged asphalt pavement at streets and local roads (patching of damaged pavement) local roads (patching of damaged 2009 and pavement) investments ar ijska bb

Andrijevica Municipality Improvement (asphalt works) of local road B. Deleti a bb July - August Mechanical excavation, construction of culverts, construction of bearing road base, 110 225 Tre njevik- tavna, in the length of 449.192,85 229.668,66 84 320 C 2009 construction of BNS. Total lenght of the section is 4.4 km 4.433,98m Andrijevica Tel. 087/243-161

Government of Montenegro Tra c Reconstruction works - capital maintenance Directorate The works include asphalt scraping to the level of blanket course, rehabliatation of asphalt of trunk and principal roads in Montenegro May 2009 - June 4. Proleterske 109 224 97.253,64 49.725,00 paving, repair and cleaning of dewatering system, procurement and installation of tra c C – Lot 18.R-20 Berane-Trpezi-Kala e, in total 2009 19 signalization. Works on this project are performed without complete road closure. length of 950 m Podgorica Tel: + 382 20 655 052

Government of Montenegro Tra c Reconstruction works - capital maintenance Directorate Removal of asphalt till the road base level, works on rehabliatation of asphalt paving, of trunk and principal roads in Montenegro May 2009 - June 4. Proleterske 108 223 181.578,28 92.839,50 repair and cleaning of dewatering system, procurement and installation of tra c C – Lot 17.R-9 Murino-Plav-Gusinje, in total 2009 19 signalization. Works on this project are performed without complete road closure. length of 1400 m Podgorica Tel: + 382 20 655 052

Earth works (planning of earth carriageway, rolling and compacting, excavation and Agency for spreading in new road route), concrete works, (purchase of material, construction of Execution of works and interventions at April - Construction asphalt-concrete wearing course, construction of equalizing bed, construction of upper 107 218 streets and road directions within regular 3.932.830,31 2.010.824,21 December and C bearing base, mechanical removing of wearing asphalt course, mechanical cutting of maintenance in 2008 2008 Development of asphalt), transport of debris, mechanical and manual removing of existing asphalt, delivery Berane of asphalt mixture AB-11 and BNS-22.

Municipality Gacko Construction of roadbase, placement of curbstones and pavement on street, with Street pavement in the settlement Burak- July - September 106 217 813.274,54 415.820,67 Tel: construction of drainage system and concrete manholes. Total lenght of the section is 1.2 C Vo njak in Gacko 2008 059/464-430 km

Government of Montenegro; Construction of the Obalska Street in Berane, length 3117,36m: construction of 3 sections Tra c and main road in the widening zone, construction of sidewalks and pedestrian passes, Construction of Obalska Street in Berane Directorate, April - construction of vertical and horizontal signallization, and precipitation sewerage. and construction of Bridge over the Bistrica Novaka 105 216 6.586.161,24 3.367.450,77 December Construction of prestressed RC bridge over the Bistrica river and preparation of design C River Milo eva St, 18, 2008 documentation; including the construction of access road to the new bridge, mechanical Contract no. 07/08 from 03 April 2008 Podgorica excavation and contact concreting of drilled piles Ø 880 mm that the bridge is based upon. Tel: +381 81 230 Piers have been casted at situ in metal formwork 133

The Project includes reconstruction of the trunk road M-4 in the length of 32,2 km. The Rehabilitation of the road M4 Banja Luka Public Company works include asphalt scraping to the level of blanket course, excavation and replacement (Rebrovac)- elinac and October 2008 - "Republic of 104 215 6.641.323,02 3.395.654,54 of the poor-quality blanket course, works on rehabilitation of the asphalt overlay, repair C M4 elinac-Kotor Varo , tender no. EIB/ December 2008 Srpska Roads" and cleaning of the drainage system, supply and installation of tra c signalization. Works RS-08-01W +387 51 309 129 on this project are executed without total stoppage of tra c

Fondation September Reconstruction of roads in Tre njevo, CARITAS Reconstruction of roads in Tre njevo local community, in the lenght of 2 km. The works JV Konstruktor - 103 214 114.508,56 58.547,30 2008 - October Andrijevica Municipality Luxembourg, include (pavement) asphalt scraping and construction of new BNS layer. Integral 2008 Berane O ce

Road Reconstruction of 6km long road including construction of 1 km long additional lane for Directorate Reconstruction of the road M2 Sept 2007/ slow tra c; reconstruction of the tunnel, underground excavation, protection of rocks by 102 213 21.453.471,88 10.968.986,72 Republic of Mioska-Kola in Oct 2008 SN anchors, protection by grouting with CC 30, new linings, new impregnation, new portal C Montenegro of total length of approximately 1.000,00 m; stabilization of 5 slopes - 30 and 50 m high +38281244662

Construction of section of Gradi ka – Banja Luka motorway in the toatl length of 5700 m with four tra c lanes, 3.75 m wide, two stopping lanes, 2.50 m wide, two marginal strips along verge 0.50 m wide, two marginal strips along central reserve, 0.20 m wide, two shoulders, 1.50 m wide, central reserve of app. width of 4.00 m between lanes. Beside the construction of the whole highway pro le, the project included: Bridge veza 5: the structure constructivelly, rigid RC carcass with three spans and surfacing, two bridges of the total length of L=9+12+9m= 30 m; Bridge veza 4: constructivelly, rigid RC carcass with three spans and surfacing, two bridges of the total length of L=9+12+9m= 30 m; Bridge veza 3: overpass L=2x25=50 m, continuous plate with T-section; Viaduct veza 2: two viaducts of the total length of L=7x35=245 m m, precast prestressed main girders; September Public Company Bridge veza 1: two bridges of the total length of L=10 m, constructive solution is precast Execution of works on highway E661, 2004 - "Republic of plate made of two types of prestressed elements and elements of which work in-situ. 101 209 section Gradi ka - Banja Luka, section 109.995.198,57 56.239.652,00 September Srpska Roads" Construction of 4 tunnels of the total length of 1673 m (391+389+477+416) with complete C Banja Luka Airport - Glamo ani 2009 +387 51 334 500 lightning and ventilation installation. The tunnels are constructed with the new Austrian method of constructing (NATM). The area of the tunnel pro le is 55 m2. The works on construction of tunnels meant the underground and wide excavation (open cut). Protection of slopes is done by placing of SN anchors and reinforcement on the outlets and inlets from the tunnel and placing of SN and IBO anchors, reinforcement and centres in the other part of the tunnel. After the placing of anchors, mesh and centres, the protection of sprayed concrete MB 30, the waterproo ng layer and construction of secondary concrete tunnel lining. Construction of service communications of the total length of 2700 m. Construction of motorway drainage system with PP pipes, DN 250-500, the total length of 7330 m, installation of system for atmpsheric water treatment - 15 pieces of separators.

Construction of rotary intersection at the west transit road in Banja Luka. Besides works on construction of the communication, the project also includes works on cable sewage, Public Company street-lights and rainfall sewage. The works on construction of pavement structure Construction of the rotary intersection near July - September "Republic of 100 207 892.030,08 456.087,33 included the removal of the existing layers of pavement structure, excavation of material, C "Energomont" building 2008 Srpska Roads" construction of embankment till the designed level, construction of upper bearing layer of +387 51 334 500 crushed stones, construction of BNS bearing layer and wearing asphalt concrete layer. The project has been completed without complete road closure.

The project included: construction of complete section of urban road in total length of 1,4 km. The works included: works on excavations and embankments construction, protection Public Company Construction of south bypass around November 2007 of embankment slopes, construction of roadbase and bitumenous layer BNS and asphalt "Republic of 99 206 Trebinje 819.923,36 419.220,16 - September concrete layer; installation of tra c signalization. Beside these works, the project included: C Srpska Roads" Trebinje 2008 excavation of bridge foundations, concrete works on abutment and middle bridge piers, +387 51 334 500 coupling beams of bridge structure, span and road structure and placing of bridge lighting. The span structure of bridge is constructed in the matal formwork in-situ.

The Project includes reconstruction of the main road M-14, section Otoka - Novi Grad in Public Company total length app. 17,7 km. The works include asphalt scraping to the level of blanket Rehabilitation of the road M-14, section "Republic of course, excavation and replacement of the poor-quality blanket course, works on 98 205 2.002.724,79 1.023.976,93 April - June 2008 C Otoka - Novi Grad Srpska Roads" rehabilitation of the asphalt overlay, repair and cleaning of the drainage system, supply +387 51 334 500 and installation of tra c signalization. Works on this project are executed without total stoppage of tra c.

Municipality of Asphalting of local macadam road in the October 2007- Lopare, Local Execution of earthworks, civil engineering works, installation of enbankment, roadbase, 97 204 settlement Vukosavci - atinova a, 130.000,00 66.468,00 November community C asphalting Municipality of Lopare 2007. Vukosavci, 065 658 135

Municipality of Asphalting of local macadam road in the Lopare, Local October 2007- Execution of earthworks, civil engineering works, installation of enbankment, roadbase, 96 203 settlement Kozjak, 96.996,00 49.593,26 community C November 2007 asphalting Municipality of Lopare Vukosavci, 065 658 135

Municipality of Lopare, Local October 2007- Execution of earthworks, civil engineering works, installation of enbankment, roadbase, 95 202 Asphalting of streets in Lopare 48.558,40 24.827,40 community C November 2007 asphalting Lopare 065 658 135

BiH Federation, Ministry of Rehabilitation and reconstruction of roads Tra c, in upanija Posavska October 2007- Communication Construction of sidewalks, access roads, roadbase, asphalting of roads, installation of 94 201 1.579.268,89 807.467,36 C Municipalities Od ak, Domaljevac and November 2007 s, Trade and shoulders, drainage, installation of tra c signalization Ora je Entrepreneurshi p of upanija Posavska

Banja Luka City Reconstruction of city communication via Reconstruction of city communication with total length of approx. 550 m with Bulevar Cara Du ana with complete Construction reconstruction of vertical and horizontal tra c signalization . October 2007 93 200 infrastructure in the section between 1.023.471,18 523.292,50 Establishment Infrastructural reconstruction: reconstruction of water system network in total length of C December 2007 streets Kraji kih brigada and Kralja Petra I Banja Luka 470 m (PEHD DN 225); reconstruction of street lights; construction of energy and PTT Kara or evi a in Banja Luka tel: 051 225 900 pipelines (PVC DN 110). 051 225 904

"Fondation CARITAS Rehabilitation of the existing streets in the Luxembourg", Construction and other works, mechanical asphalt cutting, manual removal of existing September- 92 199 Local Community Pe ca, Municipality 111.437,36 56.977,02 o ce in Berane asphalt, edge preparation and transport of debris to the disposal site, provision of C November 2007 Berane O ce of materials and asphalt creation, kerbs and channels creation CARITAS in Berane

Government of Montenegro Directorate of Construction of embankment out of material from local borrow pit, Construction of pipe culverts and August 2007- Public Works thickness 20 cm. 91 198 embankments at local road for Lake Hrid in 58.947,15 30.139,20 September Podgorica C Construction of prefabricated or semi-prefabricated culverts with ends, total construction, the length of 2.5 km, Plav Municipality 2007 Novaka DN 600 mm Milo eva 18 + 382 20 230 207

Municipality Plav; Rehabilitation of asphalt road surface damages (pot holes) on streets; mechanical asphalt Directorate for Rehabilitation of asphalt road surface cutting, manual removal of existing asphalt, edge preparation and transport of debris to July- space designing 90 197 damages (pot holes) on streets in Plav and 56.141,38 28.704,63 the disposal site, provision of materials and asphalt Asphalt-concrete-11 creation for C August 2007 and Gusinje levelling holes 5 cm average depth, with emulsion spraying and compaction by rolling. investments, Total lenght of the rehabilitated road is 12 km. ar ijska b.b., Plav

Agency for Earthworks (planning earth lanes, rolling and compaction, excavation and spreading on Works on rehabilitation and asphalt laying Construction the existing road section), concrete works, works on pavement structure (mechanical May 2007 - 89 196 on the existing town streets and local roads 988.831,62 505.581,58 and removal of wearing coarse, mechanic asphalt cutting, construction of upper bering layer C December 2007 in the territory of Municipality Berane Development of out of crushed stones, construction of BNS levelling coarse and wearing coarse out of Berane asphalt concrete 11. Total lenght of the road section is 15 km.

The project encompassed preliminary and earth works, as well as works on pavement construction (roadbase, BNS and asphalt-concrete layer), installation of horizontal and JV GP Put vertical signalisation on the following sections of tra c network) Sarajevo, Modernization (aphalt work) of road June 2007 - 1. Andrijevica -Seoce, 4.50km long; Municipality Asfaltgradnja 88 195 infrastructure on the territory of 999.676,19 511.126,32 September 2. Trep a 2.00km long; Andrijevica Visoko, Integral Municipality Andrijevica 2007 3. Tre njevo 1.00 km long; in enjering, 4. Kralje - Oblo Brdo 1.00 km long; BBM Am bolit 5.Konjuhe - Jo anica 3.20 km long, according to adopted o er No. 1858 dated June 4, 2007.

Construction of new motorway lane, reconstruction and expansion of the existing Federation of motorway lane to solid pro le. Section is 7.6 km long. Pro le of one lane of the motorway Bosnia and is two tra c lanes (driving and overtaking lanes 3.75 m wide), stopping lane 2.5 m wide, Construction of motorway Zenica - Herzegovina, marginal strip 0.50 m wide. Verge is 4.00 m wide. Within the project, there are three Sarajevo, section Kakanj - Visoko, February - FBiH Road concrete retaining “L” walls, 350 m long, and three concrete gravity retaining walls 280 m 87 194 subsection II: - Visoko, in length 30.983.704,13 15.841.716,37 C November 2007 Directorate, long. Construction of atmospheric sewage with PEHD corrugated pipes SN 8, DN 315-630, 7.6 km, Tel: +387 33 563 7000 m long in total, construction of drainage system of the road with PEHD perforated LOT A1 section works 468 corrugated pipes SN8, DN 315-500, 6150 m long in total. Pavement structure consist of BNS22A layer (6-7cm thick) wearing coarse; SMA 16 (5cm) and asphalt-concrete 16s layer (5cm)

Government of Montenegro; The project included: execution of preliminary and earth works, works on construction of Traffic new and rehabilitation of existing culverts, construction of new retaining walls, works on Reconstruction of regional road R-10, May - Directorate, 86 189 3.047.357,60 1.558.089,20 construction of road base (roadbase made of crushed stone aggregate, bitumenous layer BNS C Slijepa Most - Toma evo December 2007 Novaka Milo eva and asphalt concrete layer), placing of vertical and horizontal signalization and installation of St, 18, Podgorica guard-rails.The total length of reconstructed road is 5 km. Tel: +381 81 230 133

Municipality of Ro aje The project included: execution of earth works, civil engineering and craftsman works, Construction of streets in Ro aje - "Jaha Address: M. Tita works on construction of road base (roadbase made of crushed stone aggregate, Kurtagi a" Street, "Novopazarska" Street April - 85 188 1.886.571,09 964.588,48 bb bitumenous layer BNS and asphalt concrete layer), placing of vertical and horizontal C and reconstruction of "Hivzije atovi a" October 2007 Phone: +381 69 signalization, public lighting (electriacal installations). The total length of constructed and Street in Ro aje 620 186 reconstructed street is 3 km.

The proiject of Rehabilitation of Dobrinja - Bogati i Road included: route cleaning, Public Company removing of topsoil, road bed-bulk excavation, excavation, construction of embankment, September Rehabilitation of Dobrinja - Bogati i Road "Republic of road darinage. Works on superstructure included: lling of alligator cracks by liquid 84 186 1.711.453,32 875.052,19 2006 - C (M 18) Srpska Roads" bitumen mass and mixture of bitumen and ller, milling of asphalt and placement of November 2006 +387 51 334 500 bitumenous layer and layer of asphalt concrete, placing of horizontal and vertical signalization, installation of guard-rail on the section of app. 20 km.

Construction of the access road to the new bridge in Modri a. The project included the works on construction of complete section of the main road in the toatl length of 1,8 km with the construction of junction on the existing crossroads and Construction of the access road to new Public Company the construction of new junction. The works included the earth works: excavation, bridges and belonging structures, and January 2005 - "Republic of construction of embankment and drainage; works on construction of superstructure: 83 183 crossroads (connection) to the existing 1.556.310,42 795.728,88 C December 2006 Srpska Roads" construction of roadbase made of crushed stone aggregate, construction of bearing layer roads in Modri a and Vukosavlje over the +387 51 334 500 BNS d=8cm and asphalt-concrete d=5cm; construction of vertical and horizontal Bosna River, on the new route M17-1 signalization and illumination of the access to the underpass and placing of guard-rail. On the crossing on the new road acrosss the stream Jake nica is constructed the RC bridge, span l=11m, which is executed monolithly in-situ.

Construction of the access road to the new bridge in Doboj. The project included the works on construction of complete section of the main road in the total length of 2,4 km with the construction of junction on the existing crossroads and Construction of the access road to new Public Company the construction of new junction. The works included the earth works: excavation, bridges and belonging structures, and October 2004 - "Republic of construction of embankment and drainage; works on construction of superstructure: 82 182 crossroads (connection) to the existing 1.925.296,66 984.388,55 S December 2006 Srpska Roads" construction of roadbase made of crushed stone aggregate, construction of bearing layer roads in Doboj over the Bosna River, on the +387 51 334 500 BNS d=8cm and asphalt-concrete d=5cm; construction of vertical and horizontal new route M4-3 signalization and illumination of the access to the underpass and placing of guard-rail. The project also included the construction of undrepass below the railway, span l=14m, made of pre-stressed RC girders, funded on piles.

December 2003 City of Banja Route cleaning, removing of topsoil, road bed-bulk excavation, construction of Improvement of local roads in the area of 81 176 2.783.450,50 1.423.155,64 - Luka embankment, embankment facing and shoulders, road structures and superstructure out C Banja Luka July 2006 051/216 688 of asphalt mass, horizontal and vertical signalization, installation of guard-rail.

Asfaltgradnja Rehabilitation of Novi Grad - Prijedor Road September d.d. Visoko Earth works, construction of the carriageway, patching, overlaying, construction of gullies, 80 171 Contract: RS-WB/04-6W, Subcontractor's 1.545.139,41 790.017,24 2004 - Tel: C tra c marking and road equipment Contract: 1251/04 dtd 14/09/2004 November 2005 +387.32.740.12 6

Reconstruction, modernization and Public Company construction of the primary route M-8 Fo a/ September "Republic of Reconstruction and widening in the length of 2,15km, including excavation, construction of 79 170 Srbinje - Pljevlja, section Fo a/Srbinje - 1.812.473,11 926.702,78 2004 - C Srpska Roads" embankments, road drainage, retainment walls, carriageway and road signallization Duhovna Akademija from km 22+576,64 - November 2005 +387 51 334 500 24+726,64 in the length l=2,15km

Road reconstruction works, construction of second tra c lane with pedestrian pathway Public Company Reconstruction of Banja Luka West Transit and service facilities. The Works include: regulation of Postranac creek, construction of August 2005 - "Republic of 78 169 Road (EIB/RS-15) 2.680.315,72 1.370.423,67 water and sewerage pipeline, as well as main sewer, electro-energetic and S November 2005 Srpska Roads" RS, B&H telecommunication sewage, vertical, horizontal and tra c signalization, public lighting and +387 51 334 500 landscaping.

Public Company Construction of road bed and superstructure of AB 16, upgrading of the wearing course, Rehabilitation of Trnovo - Dobro Polje Road, April - August "Republic of 77 166 2.820.837,35 1.442.271,24 lling cracks, eliminating ruts and patching potholes; placement of new kerbs; tra c C Contract EIB/RS-09 2005 Srpska Roads" signalization and equipment +387 51 334 500

Asfaltgradnja Rehabilitation of Doboj - Petrovo Road d.d. Visoko September Earth works, construction of the carriageway, patching, overlaying, construction of gutters, 76 163 Contract: RS-WB/04-7W, Subcontractor's 1.748.269,35 893.875,92 Tel: C 2004 - July 2005 tra c marking and road equipment Contract: 1250/04 dtd 14/09/2004 +387.32.740.12 6

Government of Montenegro Main road M2, Podgorica - Kola in Ministry of Section Bogutovski potok: reconstruction of September Earth works, structures, road superstructure, tra c signalization and road equipment, 75 161 2.210.767,86 1.130.347,66 Maritime A airs C road and tunnel No:13 with galleries 2003 - May 2005 reinforcing works, reconstruction of the tunnel No:13, galleries and Transport Section Subadanj: reconstruction of road Tel: +381 81 230 133

August - Asfaltgradnja dd Installation of the rock fall prevention Reconstruction of slopes on the road by containment net, anchors and sprayed concrete. 74 153 707.546,50 361.762,78 September Visoko C structure on the road M-16, Jajce -B.Luka; Slope decreasing with slope digging and wedging. Construction of protective gabions. 2004 032.740.126

Ministry of Transport and Communication August - s of RS, Section Construction of East Trunk Road, 73 152 413.810,22 211.577,81 September Road Construction of city communication of four lane (2+2) cariage drive, total length 177.60m. C Section on km 0+000 to 0+177.60, Annex 2004 directorate of RS Banja Luka Tel. 051 309 128

Public Company Improvement of Road Conditions on Main Excavation and construction of embankments out of natural gravel, construction of June - August "Republic of 72 150 Road M-14.1 S. Brod-Derventa (MSR New 927.383,07 474.163,43 mechanically stabilized bearing structure, construction of upper bearing structure (BNS), C 2004 Srpska Roads" Jersey) Sijekovac - SFOR/46A-2002 as well as asphalt wearing course. Soiling and vegetative protection of the slopes. +387 51 334 500

Ministry of Transport and Communication Reconstruction works on ditches, gutters, berms, cleaning of culverts and drainages, October 2003- s of RS Rehabilitation of the road section Lapi nica reconstruction of potholes, ruts, longitudinal and transversal cracks, gabions, pavement 71 149 7.199.933,31 3.681.267,45 September PID Transport C - Podromanija - Vardi te reconstruction, reconstruction of shoulders, placing of new guard rail, guard posts, 2004 Public Company containment nets, and tra c signalization "Republic of Srpska Roads" +387 51 334 500 TACO Installation of rock fall prevention Sarajevo Reconstruction of slopes on the road by containment net, anchors and sprayed concrete. 70 145 structures on the road Gornji Vakuf-Prozor- 206.648,23 105.657,56 April-June 2004 C SFOR Slope decreasing with slope digging and wedging. Construction of protective gabions. Jablanica (Gra anica) +387 33 495 723

TACO Installation of rock fall prevention Sarajevo Reconstruction of slopes on the road by containment net, anchors and sprayed concrete. 69 144 structures on the road Gornji Vakuf- 127.632,87 65.257,65 April-June 2004 C SFOR Slope decreasing with slope digging and wedging. Construction of protective gabions. Makljen-Prozor +387 33 495 723

Ministry of Transport and Communication Reconstruction works on ditches, gutters, berms, cleaning of culverts and drainages, s of RS Rehabilitation of the road section e lije - October 2003- reconstruction of potholes, ruts, longitudinal and transversal cracks, pavement 68 143 3.100.000,33 1.585.005,00 PID Transport C Doboj Contract No. EIB/RS/07 May 2004 reconstruction, reconstruction of shoulders, placing of new guard rail, guard posts, and Public Company tra c signalization "Republic of Srpska Roads" +387 51 334 500

Installation of Road Safety Structures SFOR / TACO March -April JV "Tuzlaputevi - 67 142 (Guardrails) SA-03-C-1069, NJ 03 09 B, Doboj 119.967,10 61.338,20 + 387 35 254 Replacement of old and installing of new guardrails, as well as metal supports 2004 Integral" - i ki Brod 170

Ministry of Transport and Communication Reconstruction, construction and s of RS, modernization of the road R-476 A Road May 2002 - Cleaning of the route, removal of topsoil, road bed – wide excavation, excavation for stairs njegotina – Klupe, road section from km Directorate of 66 140 725.724,90 371.057,25 September and ditches, construction of embankment, embankment facing and shoulder, structures S 2+979,98 to km 4+578,61, in length l RS 2003 and superstructure are made of asphalt, tra c signalization and placing of guard rail =1.598,63 m, Contract No. 03-345-1742/02 Banja Luka RS, Bosnia and Herzegovina Public Company "Republic of Srpska Roads" +387 51 334 500

FBH Road Rehabilitation of M-18 i ki Brod - September Directorate Cleaning and routine maintenance of drainage; patching of asphalt constructions; 65 139 Krivajevi i, Contract No. BA/RMSP/FBHRD/ 2.794.256,96 1.428.680,90 2003 - 2 Put ivota, overlaying of asphalt-concrete course; reconstruction of existing road; horizontal road C ICB/13/W/03/IN December 2003 krilo A/III markings; supported signs. 71000 Sarajevo

PARSONS Road reconstruction, in length 5400 m. Removal of old asphalt layer, culvert construction Road reconstruction Kozarac - Trnopolje, April 2003- 64 132 886.228,80 453.121,59 DELAWARE INC. and construction of access roads. Channel cleaning, construction of base layer, asphalt C Contract No. 739387-30281 August 2003 035/253 161 placing. Placing of vertical and horizontal road signalization.

Construction of reinforced concrete wall km Republic of Watercourse regulation, mechanical excavations, making of drainage layer behind 119+200 to 119+230 in order to secure April 2003 - Srpska Railways 63 128 68.900,00 35.228,01 retaining wall, concreting of reinforced concrete retaining wall, preparation of design C earth roadway Dobrinj-Banja Luka-Doboj- June 2003 Doboj documentation Zvornik from undercutting 053 / 223 - 012

Construction of Marija Dimi Street Reconstruction of communication, execution of earth works, RC works, works on October 2002 - City of Banja 62 127 (Petri eva ki put) in Banja Luka, Contract 852.955,75 436.109,35 construction of new atmospheric sewage system with appropriate infrastructure, C 2003 Luka No.05-370-2822/02 execution of works on establishing of communication and placing tra c equipment Tel. 051 216 688

Europen Agency for Access communications to Primary school " February 2003 - Construction of communications with accompanying infrastructure.Primarily electrical 61 125 243.650,53 124.576,54 Reconstruction, C Zlatica " Podgorica Maj 2003 cables are to be laid illumination, horizontal and vertical signalization Podgorica Tel. 081 231 741

City of Banja Construction of communication with Staking of route, cleaning of terrain, construction of whole communication, construction of January - May Luka 60 123 related infrastructure - Stevana Markovi a 101.793,60 52.046,24 water supply, precipitation and foul drainage, installation of street lighting and distribution C 2003 Dragoljub Street, Banja Luka of power supply network for street lighting Davidovi Tel. 051 216 688

Reconstruction and construction of the part Route cleaning, removal of the humus layer, road bed-wide excavation, excavations for of Njego eva Street, as well as construction August 2002 - City of Banja stairs and excavation of ditches, construction of embankment, embankment facing and 59 122 960.449,91 491.070,24 C of atmospheric and foul water sewage in December 2002 Luka shoulder, structure and superstructure will be made of asphalt, tra c signalisation and Banja Luka, Contract No. 05-370-2447/02 Tel. 051 216 688 placing of guard rails, construction of atmospheric and foul water sewage

Earth excavation and terrain drainage by concrete walls, making of shoulder drainage SFOR Rehabilitation of landslide Stupari (near Octobar 2002 - channels, making a roadbase, asphalt road surface and structures, concreting of 58 120 124.321,36 63.564,50 Sarajevo O ce C Tuzla) by retaining wall construction January 2003 foundations and walls, construction of stone lining, replacement of surfacing and guard Tel. 033 495 000 rail

Forestry Project Construction of the forest truck road Cleaning of the route, removal of topsoil, road bed-wide excavation for stairs and ditches, May 2002 - Implementation 57 117 ipa no-Zlatac (Forest reserve 401.289,06 205.175,84 construction of embankment, embankment facing and shoulder, structures and C November 2002 Unit (PIU) "Botin",Nevesinje),RS, Bosnia & Herzegovina superstructure are made of broken stone, tra c signalisation Tel. 055 220 940

Forestry Project Construction of the forest truck road Cleaning of the route, removal of topsoil, road bed-wide excavation for stairs and ditches, May 2002 - Implementation 56 116 Livade-Ba (Forest reserve 350.120,44 179.013,74 construction of embankment, embankment facing and shoulder, structures and S November 2002 Unit (PIU) "Magli ",Srbinje),RS, Bosnia & Herzegovina superstructure are made of broken stone, tra c signalisation Tel. 055 220 940

European Agency for JV Integral, Put Upgrading of Road Safety Equipment in April 2002 - Repair of asphalt layer on four sections of the road, placing of the horizontal and vertical 55 115 3.207.123,33 1.639.776,12 Reconstruction E.Sarajevo and Southern Montenegro May 2003 signalization, construction of new guardrail on seven sections of the road Tel. + 381 81 Primorje 406 600

PARSONS Making of the Main/construction Design, cleaning of the route, machine removal of May 2002 - DELAWARE INC. 54 113 Bratunac - Hrn i i Road Reconstruction 187.923,10 96.083,56 topsoil, construction of sub-base of the road with necessary compacting, construction of C October 2002 Sarajevo O ce the road base and road ttings Tel. 033 220 948

Government of Montenegro, Project of Reconstruction Pavement Ministry of rehabilitation of the road KULA - RO AJE August 2001 - Removal of the existing bituminous layers, construction of new roadway, drainage works 53 111 2.943.804,91 1.505.143,55 Maritame Trade C RK 1 and RK2 October 2002 and placing of tra c sign work and Transport Montenegro Tel. + 381 81 230 133

Reconstruction and rehabilitation of the City of Banja Reconstruction of the communication, execution of earth works, RC works, works on part of Milana Radmana Street and August 52 110 260.848,45 133.369,69 Luka construction of new atmospheric water intellation, with appropriate infrastructure, C extension of the Drage Vasi a Street in 2002-May 2003 Tel. 051 216 688 execution of works on communication construction and placing of tra c equipment Banja Luka

Ministry of Transport and Communication s of RS, Reconstruction, rehabilitation and September Road modernization of the road R-429 Trebinje - 2001 - Directorate of Reconstruction, rehabilitation and modernization of the regional road section, lenght 51 106 2.956.510,83 1.511.639,98 C Herceg Novi, section Tuli - Grab September RS 7.120,31 m RS, Bosnia & Herzegovina 2002 Banja Luka Public Company "Republic of Srpska Roads". +387 51 334 500

Ministry of Transport and Communication s of RS, Road Temporary roads for the Western main December 2001 Preparatory works, machine excavation of the soil, panning of road bed, construction of Directorate of 50 103 road in Banja Luka (P-12 to P-18 i P-20 to 213.254,20 109.035,14 - road base, new layers of the roadway, drainage works and construction of vertical and C RS P-34) July 2002 horizontal signalisation Banja Luka Public Company "Republic of Srpska Roads" +387 51 334 500

Ministry of Transport and Communication s of RS, Road Temporary roads for the Western main December 2001 Directorate of 49 102 road in Banja Luka (P-12 to P-18 i P-20 to 197.002,01 100.725,53 - Works on the construction of the temporary roads, rain-water drainage and retaining wall C RS P-34) July 2002 Banja Luka Public Company "Republic of Srpska Roads" +387 51 334 500

Supply and installation of guardrails on the SFOR May - June Supply and installation of tra c safety equipment that consists of guardrail sements- 48 92 main road M 17,section Doboj - Bos.Brod 43.336,24 22.157,47 Sarajevo O ce C 2002 panels normal, long, short, steel poles made of I pro les and catadiopters Bosnia & Herzegovina Tel. 033 495 000

Landscaping of bussines premises at " Maxmara " Works on landscaping consist of excavation and construction of road bed for the new crossroads of Njego eva Street - Kupre ka March - June 47 91 33.047,39 16.896,86 Banja Luka roadway surfaces, construction of roadbase, placing of asphalt, construction of C Street in Banja Luka 2002 Tel. 051 358 940 precipitation and atmospheric drainage Bosnia & Herzegovina

Construction of the retaining wall on the SFOR Chase cutting of the damages on the existing retaining wall, cleaning of the weakened March - May 46 90 road M-15, Bara i 51.969,75 26.571,71 Sarajevo O ce parts of the wall, construction of the concrete counterforts, placing of the safety fence of C 2002 Bosnia & Herzegovina Tel. 033 495 000 the new RC slab

City of Banja Luka via October - Reconstruction of the section of Kralja Construction Stripping of the existing pavement and the construction of the new one, in the lenght of 45 83 66.118,10 33.805,65 December C Alfonsa XIII Street Establishment 120 m 2001 Banja Luka. Tel. 051 216 662

Ministry of Transport and Communication s of RS, Road Rehabilitation and Reparation Banja Road January 2001 - Luka - Tesli Directorate of 44 76 1.443.980,97 738.295,75 September Ground levelling, horizontal and vertical signalisation, channel making C Section Maslovare - Hrastova Kosa RS 2001 Bosnia & Herzegovina Banja Luka Public Company "Republic of Srpska Roads" +387 51 334 500

PID Transport of RS Banja Luka Road Construction Banja Luka - Tesli October 2000 - Public Company Construction of new road, soil repair, system of drainage of surface and riparian water and 43 75 Section Hrastova Kosa - village Bebe, 9.849.670,80 5.036.056,71 September C "Republic of slope landscaping. Bosnia & Herzegovina 2001 Srpska Roads" +387 51 334 500

Ministry of Transport and Communication November 2000 Construction, econstruction and s of RS, - Construction of another road surface lane with associate junctions, bicycle and pedestrian 42 74 modernization of the Eastern Motorway, 2.071.361,77 1.059.070,46 Road C September paths, lighting and horizontal and vertical signalisation Banja Luka directorate of 2001 RS Banja Luka Tel. 051 309 128

March SFOR 41 67 Derventa - Kla nice Road 35.214,00 18.004,63 Installation of the containment nets, road barriers and road marking C 2001 Tel. 033 495 000 Bosnia & Herzegovina

ODP Reconstruction of local road "PRIJEDORPUTE December 40 66 Omarska - Mari ka 310.620,00 158.817,48 VI" Construction of base layer, cleaning of structures, development of opened channels C 2000 Bosnia & Herzegovina Prijedor Tel. 052 233 117

ODP Reconstruction of local road Bistrica - June - "PRIJEDORPUTE 39 65 Lamovita Vrijesak 333.420,00 170.474,94 September VI" Construction of base layer, cleaning of structures, development of opened channels C Bosnia & Herzegovina 2000 Prijedor Tel. 052 233 117

ODP Reconstruction of local road M-4 September - "PRIJEDORPUTE 38 64 Srednja Lamovita 383.980,00 196.325,86 December VI" Construction of base layer, cleaning of structures, development of opened channels C Bosnia & Herzegovina 2000 Prijedor Tel. 052 233 117

ODP Reconstruction of local road October - "PRIJEDORPUTE 37 63 Dubovik - Novi Grad 225.063,00 115.072,88 November VI" Construction of base layer, cleaning of structures, development of opened channels C Bosnia & Herzegovina 2000 Prijedor Tel. 052 233 117

ODP Road reconstruction September - "PRIJEDORPUTE Cutting of pot holes,hole patching,scraping of delevelled surfaces, construction of new 36 62 K.Dubica - Prijedor 636.300,00 325.335,02 December VI" asphalt surface,horizontal and vertical signalisation, cleaning of structures, installation of C Bosnia & Herzegovina 2000 Prijedor steel nets to the asphalt structure Tel. 052 233 117

Road Directorate of RS Rehabilitation of road surface on road September - Cutting of pot holes,hole patching,scraping of delevelled surfaces, construction of new Banja Luka 35 61 B.Luka - Kla nice 408.211,00 208.714,97 November asphalt surface,horizontal and vertical signalisation, cleaning of structures, installation of C Public Company Bosnia & Herzegovina 2000 steel nets to the asphalt structure "Republic of Srpska Roads" +387 51 334 500

Road Directorate of RS November - Construction of road Kotor Varo - Tesli Banja Luka New route cutting, construction of bed, carrying layer and asphalt structure with road 34 60 143.196,67 73.215,29 December C Bosnia & Herzegovina Public Company structures (culverts, opened channels, etc) 2000 "Republic of Srpska Roads" +387 51 334 500

Road Directorate of RS Rehabilitation of road surface on road M 16 October - Banja Luka Scraping of delevelled surfaces, cutting and patching of pot holes, construction of asphalt 33 59 Banja Luka - Jajce 150.016,68 76.702,31 December C Public Company structure Bosnia & Herzegovina 2000 "Republic of Srpska Roads". +387 51 334 500

Road Directorate of RS Rehabilitation of road surface on road M 19 November - Banja Luka Scraping of delevelled surfaces, cutting and patching of pot holes, construction of asphalt 32 58 epak - Vlasenica 101.043,72 51.662,83 December C Public Company structure Bosnia & Herzegovina 2000 "Republic of Srpska Roads" +387 51 334 500

Road Directorate of RS Lighting and tra c lighting works on the September - Banja Luka Installation of galvanized chandeillier, height of 10 m, installation of lighting signalisation 31 56 road M16 1.733.647,40 886.399,84 December C Public Company at portals and consoles Bosnia & Herzegovina 2000 "Republic of Srpska Roads" +387 51 334 500

PID Transport of RS Banja Luka Reconstruction of the road Tjenti te - September - Public Company Cutting of pot holes,hole patching,scraping of delevelled surfaces, construction of new 30 53 Gacko 3.620.152,00 1.850.954,33 November C "Republic of asphalt surface,horizontal and vertical signalisation, cleaning of structures Bosnia & Herzegovina 2000 Srpska Roads" +387 51 334 500

Road Directorate of RS Cutting of pot holes,hole patching,scraping of delevelled surfaces, construction of new Rehabilitation of road surface on road October - Banja Luka asphalt surface,horizontal and vertical signalisation, cleaning of structures, installation of 29 52 Banja Luka - Kla nice and Sratinska 933.670,52 477.378,16 November C Public Company steel nets to the asphalt structure. Construction of base layer, cleaning of structures, Bosnia & Herzegovina 2000 "Republic of development of opened channels Srpska Roads" +387 51 334 500

Ministry of Transport and Communication Rehabilitation of the pavement on the road September - s of RS, Cutting of pot holes,hole patching,scraping of delevelled surfaces, construction of new M 16 Banja Luka - Kla nice, section 28 51 408.211,00 208.714,97 October Road asphalt surface,horizontal and vertical signalisation, cleaning of structures, installation of C 380+450-40+080 2000 Directorate of steel nets to the asphalt structure Bosnia & Herzegovina RS Banja Luka Tel. 051 309 128

Republi ka Rehabilitation of the road M16, Banja Luka - October - Direkcija za Repair of landslide, construction of pavement structure and culverts, installation of 27 50 Jajce, km 26-27 649.935,90 332.306,95 November puteve C drainage and their dewatering, horizontal and vertical signalisation Bosnia & Herzegovina 2000 Banja Luka Tel. 051 309 128

Road Rehabilitation of the landslide at the road September - directorate of Repair of landslide by counterforts, with cushion beams and retaining wall from the both 26 49 M19, epak - Vlasenica km 43 - 44 466.641,92 238.590,23 November RS C sides of the landslide,construction of pavement structure and culverts Bosnia & Herzegovina 2000 Banja Luka Tel. 051 309 128

Rehabilitation of the Motor Way, PID Transport of Cutting of pot holes,hole patching,scraping of delevelled surfaces, construction of new 25 47 Banja Luka - Kla nice 1.017.465,03 520.221,61 2000 RS Banja Luka asphalt surface,horizontal and vertical signalisation, cleaning of structures, installation of C Bosnia & Herzegovina Tel. 051 308 172 steel nets to the asphalt structure

PID Transport of RS Banja Luka Rehabilitation of the Motor Way Cutting of pot holes,hole patching,scraping of delevelled surfaces, construction of new May - October Public Company 24 45 Brod na Drini - Tjenti te 506.563,00 259.001,55 asphalt surface,horizontal and vertical signalisation, cleaning of structures and shoulders C 2000 "Republic of Bosnia & Herzegovina and development of road area Srpska Roads" +387 51 334 500

Improvement of tra c safety, SA-00- SFOR 23 44 C-202,TCR PELICAN 60.627,50 30.998,35 2000 Installation of safety fences, road barriers and road marking C Tel. 033 495 000 Bosnia & Herzegovina

Improvement of tra c safety, SA-00- March - August SFOR 22 43 C-202,TCR PELICAN 67.582,70 34.554,49 Installation of safety fences, road barriers and road marking C 2000 Tel. 033 495 000 Bosnia & Herzegovina

Improvement of tra c safety, SA-00- March - August SFOR 21 42 C-0204,TCR GULL 123.572,00 63.181,36 Installation of safety fences, road barriers and road marking C 2000 Tel. 033 495 000 Bosnia & Herzegovina

Improvement of tra c safety, SA-00- SFOR 20 41 C-1617,TCR BLUEBIRD 17.372,00 8.882,16 July 2000 Installation of safety fences, road barriers and road marking C Tel. 033 495 000 Bosnia & Herzegovina

Installing of safety fences and containing March - August SFOR 19 40 nets, SA-00-C-203,TCR HORNBLOWER 53.112,00 27.155,73 Installation of safety fences, road barriers and road marking C 2000 Tel. 033 495 00 Bosnia & Herzegovina

Installing of safety fences and improvement of tra c safety, SA-00-C-1648,TCR July - August SFOR 18 39 70.370,00 35.979,61 Installation of safety fences, road barriers and road marking C HORNBLOWER 2000 Tel. 011 650 522 Bosnia & Herzegovina

PID Transport of RS Banja Luka Rehabilitation of the Motor Way,Banja Luka- Cutting of pot holes,hole patching,scraping of delevelled surfaces, construction of new Public Company 17 36 Kla nice 2.193.924,18 1.121.735,62 June 2000 asphalt surface,horizontal and vertical signalisation, cleaning of structures, installation of C "Republic of Bosnia & Herzegovina steel nets to the asphalt structure Srpska Roads" +387 51 334 500

Reparation of the access road and left river ELEKTROPRIVRE June - Cutting of pot holes,hole patching,scraping of delevelled surfaces, construction of new dyke, downstream Hydro Power Plant - DA RS 16 33 1.247.663,02 637.919,97 December asphalt surface,horizontal and vertical signalisation, cleaning of structures, bank C BO AC H.E. BO AC 2000 protection Bosnia & Herzegovina Tel. 051 215 915

Road Rehabilitation of the local road at km 26 April - May Directorate of 15 32 Gole i, local community Borkovi i 17.614,33 9.006,06 Construction of base layer, cleaning of structures, development of opened channels C 2000 Banja Luka City Bosnia & Herzegovina Tel. 051 309 128

Installing of the containment nets on the SFOR - RACO, road directions Banja Luka - Jajce - Mrkonji March - May 14 29 250.000,00 127.822,97 Sarajevo Installation of the containment nets, road barriers and road marking C Grad - Glamo 2000 Tel. 033 495 000 Bosnia & Herzegovina

Republi ka Direkcija za Rehabilitation of the langslide at the road December 1999 puteve 13 28 M15 Banja Luka - Jajce (GULL) 506.629,00 259.035,29 - Construction of concrete foundations of retaining wall, replacement of pavement structure C RS / SFOR - Bosnia & Herzegovina April 2000 RACO Sarajevo Tel. 051 309 128

Banja Luka City, Fund for Boulevard Cara Du ana, Construction new September - construction roadways/extension including construction Concrete works at bridges, construction of new pavement structure, construction of new December land planning of new square,arches over the river and asphalt surface, horizontal and vertical signalization, cleaning of structures, reconstruction 12 24 3.734.662,75 1.909.502,74 1999/ and Road C four smaller bridges and dislocation of of water supply network - pipeline PHDE 100 DN 400, PN 10, L=460 m, construction of September - Directorate of water supply network sewage system Ø 350 - Ø 1000, concrete and PVC pipes - total length 620 m. December 2006 RS Banja Luka Bosnia & Herzegovina Tel. 051 308 172

Parsons June - Road Reconstruction / Bijeljina - Banj Brdo Delaware / Cutting of pot holes,hole patching,scraping of delevelled surfaces, construction of new 11 21 4.395.194,00 2.247.227,01 December C Bosnia & Herzegovina Tuzla asphalt surface,horizontal and vertical signalisation, cleaning of structures 1999 Tel. 035 282 200

PID Transport of RS Banja Luka Road Reconstruction / Novi Grad - K.Dubica April - October Public Company Cutting of pot holes,hole patching,scraping of delevelled surfaces, construction of new 10 20 1.190.271,25 608.576,03 C Bosnia & Herzegovina 1999 "Republic of asphalt surface,horizontal and vertical signalisation, cleaning of structures Srpska Roads" +387 51 334 500

PID Transport of RS Banja Luka Road Reconstruction / Brod on/D - Tjentiste March - July Public Company Cutting of pot holes,hole patching,scraping of delevelled surfaces, construction of new 9 19 2.482.247,98 1.269.153,24 C Bosnia & Herzegovina 1999 "Republic of asphalt surface,horizontal and vertical signalisation, cleaning of structures Srpska Roads". +387 51 334 500

Parsons Reconstruction of the bridge/road Modri a - April - June Delaware / Scraping of delevelled surfaces, construction of new asphalt surface, horizontal and 8 14 Grada ac 196.000,00 100.213,21 C 1999 Tuzla vertical signalisation Bosnia & Herzegovina Tel. 035 282 200

PID Transport of RS Banja Luka Concrete works on bridges,cutting of pot holes,hole patching,scraping of delevelled Road Reconstruction / Johova - K.Dubica Oktober 1998 - Public Company 7 13 400.000,00 204.516,75 surfaces,construction of new asphalt surface,horizontal and vertical signalisation,cleaning C Bosnia & Herzegovina March 1999 "Republic of of structure Srpska Roads" +387 51 334 500

Parsons Bridges and road reparations/ road September Concrete works on bridges,cutting of pot holes,hole patching,scraping of delevelled Delaware / 6 12 Derventa - Brod 815.823,00 417.123,68 1998 - surfaces,construction of new asphalt surface,horizontal and vertical signalisation,cleaning C Tuzla Bosnia & Herzegovina April 1999 of structure Tel. 035 282 200

PID Transport of RS Banja Luka Road reparation / Doboj-Crkvine- amac July - October Public Company Ctting of pot holes,hole patching,scraping of delevelled surfaces,construction of new 5 11 750.000,00 383.468,91 C Bosnia & Herzegovina 1998 "Republic of asphalt surface,horizontal and vertical signalisation Srpska Roads" +387 51 334 500

PID Transport of RS Banja Luka Construction of the road,bridge and River July 1998 - Public Company Embankment construction, pavement structure construction, paving of access places, 4 10 Dike/Road Kostajnica-K.Dubica 337.626,00 172.625,43 C May 1999 "Republic of construction of asphalt structure, concrete works at bridges and road structures Bosnia & Herzegovina Srpska Roads" +387 51 334 500

Parsons Construction of the road,bridge and River Concrete works on bridges,cutting of pot holes,hole patching,scraping of delevelled July 1998 - Delaware / 3 9 Dike/Road Kostajnica-K.Dubica 318.594,00 162.894,53 surfaces,construction of new asphalt surface,horizontal and vertical signalisation,cleaning C May 1999 Banja Luka Bosnia & Herzegovina of structure,river bank protection Tel. 035 282 200

Rehabilitation of the Motor Way,Banja Luka- JEDINSTVO - Cutting of pot holes,hole patching,scraping of delevelled surfaces, construction of new May - October 2 6 Kla nice 2.709.050,00 1.385.115,27 Gradi ka asphalt surface,horizontal and vertical signalisation, cleaning of structures, installation of 1998 Bosnia & Herzegovina Tel. 051 813 297 steel nets to the asphalt structure

World Vision - Construction of the roads and River Ferry April - October Banja Luka Embankment construction, pavement structure construction, paving of access places, 1 4 Dock on the Sava river Municipality Srbac 560.000,00 286.323,45 1998 Tel. 051 464 490 construction of asphalt structure, concrete works at bridges and road structures Bosnia & Herzegovina