Roads & Motorways Integral in Enjering

Roads & Motorways Integral in Enjering

LIST OF EXECUTED WORKS: ROADS & MOTORWAYS INTEGRAL IN ENJERING PLC Contracted Value of commence- Name and Contractor (C) Ordinal Internal Value of Project name and location Contract in ment and address of the Type and description of the works Subcontractor No. No. Contract in KM EUR completion Employer (S) date Koridori Srbije, d.o.o. (Serbia Construction of highway section in total length l= 6,75 km, with all structures, Construction of 7 Corridors) bridges on highway section, one bridge on local road, one railway bridge, 3 RC grille structures Corridor X Highway Project, Construction of Beograd, with prestressed anchors for permanent protection of slopes, 28 culverts, relocation of 1 km of JV Integral-Inter- Highway E 75, Section: Cari inaDolina – September Kralja Petra 21 railway, relocation of 1,3 km of local roads, works on regulation of Ju na Morava river, Sokolica kop- 135 273 Vladi in Han, LOT 5: Road and bridges at 224.407.629,56 114.737.799,07 2013 11000 Beograd river and Kozni ka river. Prijedorputevi sub-section Cari inaDolina – Tunnel Manajle, June 2018 phone 11 33 44 project involve relocation of HV, MV and LV lines, construction of TC chanellization, PS, (60-20-20) ICB br. CORRX.E75.EIB.PACK2-LOT5.ICB 174 drainage works, supply and installation of traffic signalization and equipment, noise protection fax: +381 11 32 walls and landscaping. 48 682 Construction of the Main Road M-17.3 JP Ceste Neum –Stolac LOT 1 Federacije BiH Pavement of road section Stari Neum – d.o.o. Sarajevo Project included construction of main road in total lenght of 7,00 km. Works includes Babin Do L=5,3km 01.02.2018. - Terazije 54 134 272 6.027.207,03 3.081.662,02 construction of tunnel O trovac, in total lenght of 190 m1 and construction of underpass C Construction of road section Babin Do – 24/04/2019 tel: +387 33 250 Oskrusnica. O trovac L=1,7km and 370 Construction of the tunnel O trovac L=190m1. Works on design and construction of full profile motorways section (l=35,300.00 m) with all belonging elements, two motorway intersections with toll plazas, traffic control and maintenance centre, rest and service area, structures at the motorway, of which the most important are viaducts with length l=449 m, and l=400 m, bridge with length l=340.00 m, and artificial tunnel. Project includes construction of total of 21,529.24 m local roads, geomechanical works, Public Company relocation of power installation, power supply installations of the toll plazas, rest and service Design and construction of Banja Luka - "Republic of area and artificial tunnel, works on illumination of interchanges, works on setting up traffic Doboj Motorway, Section Banja Luka - 01 Sept 2014 - JV Integral- 133 268 445.558.204,83 227.810.292,73 Srpska signalization and equipment, and noise protection. Prnjavor (km 0+000 to km 35+300) Contract 30 Sept 2018 Granit (60-40) Motorways" Project includes design and implementation of intelligent traffic systems, video surveillance no. RS/EIB-2012/W +387 51 233 670 and traffic management; works on dewatering of pavement, regulation of watercourses, installations of optical cables and emergency call system, and toll collection system. Pavement structure: driving and overtaking lane: SMA 4cm, binding bituminous course 6 cm, bituminous road base BNS 7 cm, cement stabilisation 20 cm, road base 25 cm stopping lane: asphalt concrete 7 cm, bituminous bearing course BNS 7 cm, road base 52 cm 1272 calendar Design and construction of motorway section in total length l=36.609.72 m, with all days after structures, two motorway intersections with toll plazas, traffic control and maintenance centre, Commencement rest and service area, structures at the motorway, of which the most important are the Bosna Date bridge L=425.40 m, Ukrina bridge L=103.06 m, Slatinci artificial tunnel l=80.50m. Project includes construction of total of 21.422,48 m local roads, geomechanical works, 09 November relocation of power installation, power supply installations of the toll plazas, rest and service Public Company Design and construction of Banja Luka - 2012 -10 area and artificial tunnel, works on illumination of interchanges, works on setting up traffic "Republic of Doboj Motorway, Section Prnjavor - Doboj September 2016 signalization and equipment. JV Integral- 132 265 452.807.085,58 231.516.586,61 Srpska (km 35+300 to km 71+909.72) Contract no. (Taking-over) Project shall include design and implementation of intelligent traffic systems, video Granit (60-40) Motorways" RS/EBRD-2012/W of 24 August 2012 DNP in duration surveillance and traffic management; works on dewatering of pavement, installations of optical +387 51 233 670 of 730 days cables and emergency call system, and noise protection. starts as from 11 Pavement structure: September driving and overtaking lane: SMA 4cm, binding bituminous course 6 cm, bituminous road 2016, ends on base BNS 7 cm, cement stabilisation 20 cm, road base 25 cm; 10 September stopping lane: asphalt-concrete 7 cm, bituminous bearing course BNS 7 cm, road base 52 2018 cm Project included construction of main road in total length of 8.9 km. Two tunnels constructed were: tunnel emerno and tunnel Surdup, in total length of l=2.305.00m. Tunnel emerno is 2,109.00 m long, and tunnel Surdup is 196.00m long. Both tunnels were constructed by applying the New Austrian construction method (NATM), including all electrical and mechanical installation. Clearance of each tunnel is 55sq.m, and excavation pro le of both tunnels is 97.54sq.m each. Tunnel works included underground and open cut excavations. Rocky mass was secured by installation of SN anchors and Public Company reinforcing mesh at tunnel portals, and installation of SN and IBO anchors, steel Permanent solution for the landslide September "Republic of reinforcing mesh and centerings in the other parts of the tunnel. Following installation of JV Integral, CPM 131 260 emerno at the trunk road M-20 Gacko- 71.846.761,91 36.734.666,05 2008 - 06 Srpska Roads" anchors, mesh and centerings, the tunnel surface was protected by sprayed concrete MB BH, REWEUS Fo a August 2013 +387 51 334 500 30, waterproo ng coat, and construction of the secondary tunnel lining. The project further included the structures: viaduct ''Trnova Luka'', length: L=408.00 (steel composite structure with columns of over 50m high), one viaduct length l=88.00m, the "Hr tica" Bridge l=37.36m and the bridge over the dralov potok l=12m. In order to secure stability of the road structure, total of 1,605.00m of reinforced-concrete walls were constructed. In addition, slope stabilisation in this geologically very complex terrain was obtained by installation of steel anchors and applying up-to-date geotehnical methods. Federation of Construction of an intersection at the trunk road M4 Tuzla - i ki Brod. The work B&H 2 2 encompasses construction of 5 bridges (l1=9,80m/P1= 88 m ; l2=13,80m/P2=136,6 m ; Road 2 2 2 Construction of intesection i ki Brod (Lot March 2010 - l3=18,40m/P3=184m ; l4=42,50m/P4=415 m ; l5=26,50m/P5=258 m ), reconstruction of 4 JV Integral, CPM 130 254 6.466.914,00 3.306.480,62 Directorate of 2) 31-Dec-2011 bridges (P=185,4+187,41+184,00+388m2), alignment works (reconstruction of existing and BH, REWEUS FB&H construction of a new pavement) works on intersection branches, drainage, lighting, tra c Tel. +387 33 563 signalization and equipment. 468 Rehabilitation of the pavement structure in total length of l=8.13 km. Works include scraping and destroying of asphalt surfacing in total surface of approx. 53.000 m2, Public Company replacing of road base, pot holes patching, cracks sealing, construction of new bearing Rehabilitation of Kopa i - Ustipra a (M20) April - "Republic of course BNS 22 in the sutface of approx. 4.450 m2, and wearing course AB 11ks in the 129 253 2.799.091,30 1.431.152,66 C BA-RISP-40381BA/RS-ICB-W-10-03 December 2011 Srpska Roads" surface of approx. 53.000m2. Besides the a/m, the works include: reconstruction and +387 51 334 500 upgrade of existing retaining wall, cleaning of drainage system, construction of new drainage system, cleaning and reconstruction of gutters, cleaning and lling of shoulders and as well as works related to tra c signalization and equipment. Rehabilitation of the pavement structure in total length of l=29.40 km. Works include Public Company scraping and destroying of asphalt surfacing in total surface of approx. 145.000 m2, Rehabilitation of road direction R15 ipovo - April - "Republic of replacing of road base, pot holes patching, cracks sealing, construction of a wearing 128 252 Kupres in the length of 29,40 km 2.525.513,69 1.291.274,65 C December 2011 Srpska Roads" course AB 11ks in the surface of approx. 157.000m2. Besides the a/m, the works include: EBRD/RS-10-03W +387 51 334 500 cleaning of drainage system, cleaning and reconstruction of gutters, cleaning and lling of shoulders and as well as works related to tra c signalization and equipment. Rehabilitation of the pavement structure in total length of l=11.77 km. Works include scraping and destroying of asphalt surfacing in total surface of approx.87.000 m2, Public Company replacing of road base, pot holes patching, cracks sealing, construction of a new bearing Rehabilitation of road direction R14 Han April - "Republic of layer BNS 22 in the surface of approx.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us