Retail for Sale Canvas Condos at the Corner of Danforth Ave & Morton Rd

Total Page:16

File Type:pdf, Size:1020Kb

Retail for Sale Canvas Condos at the Corner of Danforth Ave & Morton Rd v 2301-2315 FOR SALE Danforth Avenue Retail For Sale Canvas Condos At the Corner of Danforth Ave & Morton Rd CBRE Limited, Real Estate Brokerage | 145 King Street West | Suite 1100 | Toronto, ON M5H 1J8 | 416 362 2244 | www.cbre.ca BRAND NEW DEVELOPMENT TRANSIT CONNECTED PROPERTY HIGHLIGHTS Currently under construction, Canvas Condos is an 8 Conveniently located, Canvas Condos is near accessible storey mixed-use building with 170 residential units public transportation with both the Woodbine and Main designed by Graziani + Corazza Architects. Street subway stations situated nearby. CBRE Limited is pleased to offer for sale on behalf of the Vendor, Danmor Developments Limited, ground floor retail space in Danforth Village. The Property is located at the base of the currently under-construction Canvas Condominium. The Property provides users and investors with an opportunity to acquire brand new, transit connected right-sized space. The property features 4,225 sq. ft. of commercial space below 170 residential units. 2301-2315 Danforth Avenue retail comprises of four units totalling 4,255 sq. ft. of prime retail space under a brand new 8 storey condominium building constructed by Marlin Springs. Located on the southwest corner of Danforth Avenue and Morton Road, this new development sits at the edge of the Danforth Village and adjacent to the Upper Beaches neighbourhood. AMAZING EXPOSURE USER OR INVESTOR OPPORTUNITY Fronting on Danforth Avenue this property has amazing The property lends itself as a unique opportunity for both exposure and very prominent and wide (over 180 ft.) investor or users to acquire right sized space. Purpose frontage on the corner built, condo retail space is ideal for a wide array of users who desire street front exposure as well as efficient floor *Price $425,000 - $2,899,999 space. 598 - 4,255 sq. ft. Available Canvas Condo Retail Canvas Condo Retail This drawing, as an instrument of service, is provided by and is the property of Graziani + Corazza Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Graziani + Corazza Architects Inc. of any variations from the supplied information. Graziani + Corazza Architects Inc. is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., engineering information shown on this drawing. Refer to the appropriate engineering drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of the authorities 15'-7" having jurisdiction. Unless otherwise noted, no investigation has been undertaken or reported on by this office in regards to the environmental condition of this site. SHOWCASE WINDOW This drawing is not to be scaled. All architectural symbols indicated on this drawing are graphic representations only. Conditions for electronic information transfer 6'-6" Electronic information is supplied to the other associated firms to assist them in the execution of their work/review. The recipient firms must determine the completeness/appropriateness/relevance of the information in respect to their particular responsibility. Graziani + Corazza Architects Inc. shall not be responsible for: 1. Errors, omissions, incompleteness due to loss of information in whole or part when information is transferred. 2. Transmission of any virus or damage to the receiving electronic system when 01 02 03 information is transferred. COMMERCIAL UNIT COMMERCIAL UNIT COMMERCIAL UNIT 20'-3" 55.56 m2 (598 ft2) 41'-8" 89.75 m2 (966 ft2) 41'-6" 94.48 m2 (1016 ft2) 01. Jan.l9.2019 Issued to Client G.C. 21'-4" 22'-4" 20'-6" 23'-2" 22'-10" 20'-0" 20'-10" 23'-2" COMMERCIAL UNITS (01, 02 & 03) 1:50 63'-8" 04 COMMERCIAL UNIT 155.61 m2 (1675 ft2) 66'-4" issued for revisions 22'-5" 20'-2" 14'-6" COMMERCIAL UNIT 04 1:50 PROPERTY DETAILS 1320 Shawson Drive, Suite 100 Mississauga Ontario L4W 1C3 DANFORTH AVENUE Phone. 905.795.2601 Fax.905.795.2844 www.gc-architects.com Proposed Mixed Use Development SIZE PRICE CANVAS COMM. 01 COMMERCIAL 02 COMMERCIAL 03 COMMERCIAL 04 2301-2315 Danforth Ave. Retail Unit One 598 sq. ft. $425,000 TORONTO ONTARIO Project Architect: E. Corazza Retail Unit Two 966 sq. ft. $675,000 RESIDENTAIL LOBBY Assistant Designer: C. Kotva Retail Unit Three 1,016 sq. ft. $700,000 Drawn By: S.J. / J.C. Checked By: D.Biase/G.Colangelo RAMP RESIDENTAIL LOADING AMENITY AREA RESIDENTAIL Plot Date: Jan. 9, 2019 This drawing, as an instrument of service, is provided by and is the Retail Unit Four 1,675 sq. ft. $1,200,000 property of Graziani + Corazza Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site Job and must # notify 1282.15 Graziani + Corazza Architects Inc. of any variations from the supplied information. Graziani + Corazza Architects Inc. is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., engineering information shown on this drawing. Refer to the appropriate engineering drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of the authorities 15'-7" having jurisdiction. Unless otherwise noted, no investigation has been undertaken or reported on by this office in regards to the environmental condition of this site. SHOWCASE WINDOW This drawing is notMORTON ROAD to be scaled. All architectural symbols indicated on this drawing are Full Retail Space 4,255 sq. ft. $2,899,999 graphic representations only. Conditions for electronic information transfer 6'-6" Electronic information is supplied to the other associated firms to assist them in the execution of their work/review. The recipient firms must determine the completeness/appropriateness/relevance of the information in respect to their particular responsibility. Graziani + Corazza Architects Inc. shall not be responsible for: 1. Errors, omissions, incompleteness due to loss of information in whole or part when information is transferred. 2. Transmission of any virus or damage to the receiving electronic system when 01 02 03 information is transferred. COMMERCIAL UNIT COMMERCIAL UNIT COMMERCIAL UNIT 1:50 DANFORTH AVENUE 20'-3" 55.56 m2 (598 ft2) 41'-8" 89.75 m2 (966 ft2) 41'-6" 94.48 m2 (1016 ft2) 01. Jan.l9.2019 Issued to Client G.C. KEY PLAN 1:250 TITLEBLOCK SIZE: 610 x 950 21'-4" 22'-4" DANFORTH20'-6" AVENUE23'-2" 22'-10" 20'-0" 20'-10" 23'-2" COMMERCIAL UNITS (01, 02 & 03) 1:50 35 FT. 42 FT. 42 FT. 63 FT. This drawing, as an instrument of service, is provided by and is the property of Graziani + Corazza Architects Inc. The contractor must verify and accept responsibility for all dimensions and conditions on site and must notify Graziani + Corazza Architects Inc. of any variations from the supplied information. Graziani + Corazza Architects Inc. is not responsible for the accuracy of survey, structural, mechanical, electrical, etc., engineering information shown on this drawing. Refer to the appropriate engineering drawings before proceeding with the work. Construction must conform to all applicable codes and requirements of the authorities 15'-7" having jurisdiction. Unless otherwise noted, no investigation has been undertaken or reported on by this office in regards to the environmental condition of this site. SHOWCASE WINDOW This drawing is not to be scaled. All architectural symbols indicated on this drawing are graphic representations only. 63'-8" Conditions for electronic information transfer 6'-6" Electronic information is supplied to the other associated firms to assist them in the execution of their work/review. The recipient firms must determine the completeness/appropriateness/relevance of the information in respect to their particular responsibility. Graziani + Corazza Architects Inc. shall not be responsible for: 1. Errors, omissions, incompleteness due to loss of information in whole or part when information is transferred. 2. Transmission of any virus or damage to the receiving electronic system when 01 02 03 information is transferred. 04 UNITCOMMERCIAL UNIT 1 UNITCOMMERCIAL 2 UNIT COMMERCIALUNIT UNIT 3 UNITCOMMERCIAL UNIT 4 20'-3" 55.56 m2 (598 ft2) 41'-8" 89.75 m2 (966 ft2) 41'-6" 94.48 m2 (1016 ft2) 01. Jan.l9.2019 Issued to Client G.C. 155.61 m2 (1675 ft2) 66'-4" 21'-4" 22'-4" issued for revisions 20'-6" 23'-2" 22'-10" 20'-0" 20'-10" 23'-2" 22'-5" 20'-2" 14'-6" ROAD MORTON COMMERCIAL UNITS (01, 02 & 03) 1:50 COMMERCIAL UNIT 04 1:50 1320 Shawson Drive, Suite 100 Mississauga Ontario L4W 1C3 DANFORTH AVENUE Phone. 905.795.2601 Fax.905.795.2844 www.gc-architects.com Proposed Mixed Use Development Over 180 ft. of frontage CANVAS COMM. 01 COMMERCIAL 02 COMMERCIAL 03 COMMERCIAL 04 63'-8" 2301-2315 Danforth Ave. TORONTO ONTARIO Project Architect: E. Corazza RESIDENTAIL LOBBY Assistant Designer: C. Kotva Drawn By: S.J. / J.C. Canvas Condo Retail 04 Checked By: D.Biase/G.Colangelo Canvas Condo Retail RAMP RESIDENTAIL LOADING AMENITY AREA RESIDENTAIL Plot Date: Jan. 9, 2019 COMMERCIAL UNIT Job # 1282.15 155.61 m2 (1675 ft2) MORTON ROAD 66'-4" 1:50 KEY PLAN issued for revisions 1:250 22'-5" 20'-2" 14'-6" TITLEBLOCK SIZE: 610 x 950 COMMERCIAL UNIT 04 1:50 1320 Shawson Drive, Suite 100 Mississauga Ontario L4W 1C3 DANFORTH AVENUE Phone. 905.795.2601 Fax.905.795.2844 www.gc-architects.com Proposed Mixed Use Development CANVAS COMM. 01 COMMERCIAL 02 COMMERCIAL 03 COMMERCIAL 04 2301-2315 Danforth Ave. TORONTO ONTARIO Project Architect: E. Corazza RESIDENTAIL LOBBY Assistant Designer: C. Kotva Drawn By: S.J. / J.C. Checked By: D.Biase/G.Colangelo RAMP RESIDENTAIL LOADING AMENITY AREA RESIDENTAIL Plot Date: Jan. 9, 2019 Job # 1282.15 MORTON ROAD 1:50 KEY PLAN 1:250 TITLEBLOCK SIZE: 610 x 950 THE DANFORTH Danforth Village is a popular residential Danforth Village is a popular residential city known the end of east in the neighborhood for its multicultural residents, strong sense of community and unique charm.
Recommended publications
  • Noise and Vibration Projects
    Frontop Engineering Limited 101 Amber Street, Unit 1, Markham Ontario, Canada, L3R 3B2 Telephone: (905) 947-0900; Fax: (905) 305-9370 Website: www.frontop.ca; Email: [email protected] List of Our Ongoing Noise and Vibration Monitoring Projects Project 1: Name of Project: Geotechnical Instrumentation and Monitoring Plan- Segment 1- Keelesdale Station Location: Toronto, Ontario, Canada Client: Metrolinx-Eglinton Crosstown Light Rapid Transit (ECLRT) Project Main project features: Geotechnical Instrumentation and Monitoring, Noise and Vibration Monitoring Activities performed: install and monitoring following instrument Prepared and installed six (6) real-time vibration stations and five (5) real-time noise monitoring station. And weekly attendant two (2) noise and two (2) vibration stations monitoring. Project 2: Name of Project: Geotechnical Instrumentation and Monitoring Plan- Segment 1- Mt Dennis Station Location: Toronto, Ontario, Canada Client: Metrolinx-Eglinton Crosstown Light Rapid Transit (ECLRT) Project Main project features: Geotechnical Instrumentation and Monitoring, Noise and Vibration Monitoring Activities performed: install and monitoring following instrument Prepared and installed four (4) real-time vibration stations and four (4) real-time noise monitoring station. And weekly attendant two (2) noise and two (2) vibration stations monitoring Project 3: Name of Project: TTC Wilson Yard Track and Structure Building Renovation (Contract AW1-3) Location: Toronto, Ontario, Canada Client: TTC Main project features: Track and Structure Building Renovation Activities performed: Prepared and installed the one (1) real-time noise monitoring station and one (1) real- time vibration monitoring station. Project 4: Name of Project: TTC Hillcrest Complex Surface Way Facility Replacement, and Harvey Shop Loading Deck (Contract M7-2 & M1-91) Client: TTC Main project features: Surface Way Facility Replacement Activities performed: Prepared and installed the two (2) real-time noise monitoring station and two (2) real- time vibration monitoring station.
    [Show full text]
  • Upper Canada Railway Society the Cover
    Upper Canada Railway Society The Cover Rapid transit comes to tbe suburbs I A westbound TTC Bloor-Danforth train is sbown bere on tbe newly-opened eastern extension of tbe subway, between Warden and Victoria Park Stations. It is skirting Bell's Busb Park and tbe Massey Creek Ravine — scenery wbicb no doubt newsletter comes as a pleasant surprise to many commuters formerly used to traffic jams on their way to work. See page 55. Number 268 May, 1968 — Ted Wickson Published monthly by the Upper Canada Railway Society, Inc., Box 122, Terminal A, Toronto, Ont. Coming Events James A. Brown, Editor ^xo:OT•^x•:•x•>x•:•>^>^^^^:•:•^^^^:^^ Regular meetings of the Society are held on the third Friday of each month (except July and August) at 589 Mt. Pleasant Road, Authorized as Second Class Matter by the Post Office Department, Toronto, Ontario. 8.00 p.m. Ottawa, Ont. and for payment of postage In cash. Members are asked to give the Society at least five weeks notice June 1: Steam excursion to Stratford, leaves Toronto of address changes. (Sat) at 0815 EDT. FARES: Adult S9.75; Child S5.00; Infant $1.00. June 9: A visit to tbe OERHA property at Rockwood is (Sun) being arranged. Write tbe Entertainment Com• Please address NEWSLETTER contributions to the Editor at mittee for details. 3 Bromley Crescent, Bramalea, Ontario. No responsibility is June 13: NOTE CHANGE OF DATE! assumed for loss or nonreturn of material. (Tburs) Outdoor meeting: A visit to CN's new Express Terminal at Toronto Yard, Keele Street at Hwy All other Society business, including membership Inquiries, should 7.
    [Show full text]
  • Relief Line and Yonge Subway Extension
    Relief Line and Yonge Subway Extension Leslie Woo Chief Planning Officer JUNE-26-17 RELIEF LINE AND YONGE SUBWAY EXTENSION OVERVIEWS • Both the Relief Line and the Yonge Subway Extension are priority projects included in The Big Move and will be included in the next Regional Transportation Plan • Each project makes a significant contribution to the regional transit network by: • Enhancing our ability to connect people to where they need to be • Adding capacity so that transit trips are more comfortable • Enabling more residents to choose transit for their trips • Spurring on local transit oriented development 2 A REGIONAL SYSTEM • The Relief Line and the Yonge Subway Extension are part of the regional transportation network needed to meet the GTHA’s growth to 2031 and beyond • The 7.4 km northern extension of the Yonge Subway (Line 1) from Finch Avenue into Richmond Hill will connect two provincial urban growth centres, North York Centre and Richmond Hill Centre, and significantly reduce the 2,500 daily bus trips along the busy Yonge corridor • The Relief Line is a critical infrastructure investment required to create capacity for new riders on the Yonge subway and provide a new connection into Toronto’s downtown • The Yonge Subway Extension would generate more access • The Relief Line would create more capacity • Both projects need to advance in an integrated way 3 PARTNERSHIPS Much progress is being made in bringing the parties together to work as a team to advance both projects Yonge Subway Extension • Metrolinx, City of Toronto, Toronto
    [Show full text]
  • General Manager Subway Construction Date
    TORONTO TRANSIT COMMISSION REPORT NO. S7 Meeting Date June 4, 1968 From: General Manager Subway Construction Date: June 3, 1968 QUEEN STREET SUBWAY FOR STREETCAR OPERATION The Commission, at its meeting of February 8, 1966, approved advising the City of Toronto that it was prepared to co-operate in the study of a "transit facility in the downtown section of Queen Street" and approved advising the Metropolitan Council that the Commission proposes to undertake this study at a cost of $30,000.00, it being understood that the cost involved would form part of the capital cost of the project when approved. The General Secretary transmitted the above approval of the Commission to the City Clerk in a letter dated February 22, 1966, a copy of which is attached. In a letter dated November 2, 1966, a copy of which is attached, the Commission was advised by the Metropolitan Clerk that Metropolitan Council had adopted Clause No. 2 of Report No. 16 of the Transportation Committee, headed "Proposed Queen Street Subway", as amended. The recommendation of Clause No. 2 reads as follows, "It is recommended that the Metropolitan Council formally request the Toronto Transit Commission to complete their study of the physical aspects of the Queen Street tunnel as outlined in the Commission's letter of February 22, 1966, on the understanding that the required expenditure of $30,000.00 will form part of the capital cost of the project." The amendment to Clause No. 2 reads as follows, "The matter of the Queen Street tunnel being considered in relation to the question of the Queen-Greenwood Subway." In accordance with all the foregoing, plans were developed for a "transit facility in the downtown section on Queen Street", and in addition to this a preliminary examination was made of the downtown section in relation to it becoming part of the Queen-Greenwood Subway.
    [Show full text]
  • Making Donlands Station Accessible and Second Exit/Entrance
    2045.8 For Action Making Donlands Station Accessible and Second Exit/Entrance Date: July 14, 2020 To: TTC Board From: Chief Capital Officer Summary The purpose of this report is to obtain authorization for the award of Contract D6-3, Donlands Station Second Exit/Entrance and Easier Access to Maystar General Contractors Inc. in the amount of $45,663,300.00, inclusive of all taxes, on the basis of lowest priced acceptable bid. The work for Contract D6-3 Donlands Station - Second Exit/Entrance and Easier Access includes construction of stairs from each of the eastbound and westbound platforms and an underground corridor leading to a second exit and entrance building, construction and installation of elevators, and all other associated works. The construction phase of the Contract is scheduled to commence in Q3 2020 and is expected to be completed by Q4 2023. Elevators are scheduled to be put in service by Q4 2022. Recommendations It is recommended that the Board authorize: 1. Award of Contract D6-3, Donlands Station - Second Exit/Entrance and Easier Access to Maystar General Contractors Inc. in the amount of $45,663,300.00, inclusive of all taxes, on the basis of lowest priced acceptable bid. Financial Summary Sufficient funds for this expenditure are included in the TTC's 2020-2029 approved Capital Budget and Plan under Program 3.9 Building and Structures – Fire Ventilation Upgrade project, State of Good Repair/Safety category and Easier Access III project, Legislative category. The Fire Ventilation Upgrade total project cost is approximately $504 million, of which approximately $303 million has been committed to date.
    [Show full text]
  • Rapid Transit in Toronto Levyrapidtransit.Ca TABLE of CONTENTS
    The Neptis Foundation has collaborated with Edward J. Levy to publish this history of rapid transit proposals for the City of Toronto. Given Neptis’s focus on regional issues, we have supported Levy’s work because it demon- strates clearly that regional rapid transit cannot function eff ectively without a well-designed network at the core of the region. Toronto does not yet have such a network, as you will discover through the maps and historical photographs in this interactive web-book. We hope the material will contribute to ongoing debates on the need to create such a network. This web-book would not been produced without the vital eff orts of Philippa Campsie and Brent Gilliard, who have worked with Mr. Levy over two years to organize, edit, and present the volumes of text and illustrations. 1 Rapid Transit in Toronto levyrapidtransit.ca TABLE OF CONTENTS 6 INTRODUCTION 7 About this Book 9 Edward J. Levy 11 A Note from the Neptis Foundation 13 Author’s Note 16 Author’s Guiding Principle: The Need for a Network 18 Executive Summary 24 PART ONE: EARLY PLANNING FOR RAPID TRANSIT 1909 – 1945 CHAPTER 1: THE BEGINNING OF RAPID TRANSIT PLANNING IN TORONTO 25 1.0 Summary 26 1.1 The Story Begins 29 1.2 The First Subway Proposal 32 1.3 The Jacobs & Davies Report: Prescient but Premature 34 1.4 Putting the Proposal in Context CHAPTER 2: “The Rapid Transit System of the Future” and a Look Ahead, 1911 – 1913 36 2.0 Summary 37 2.1 The Evolving Vision, 1911 40 2.2 The Arnold Report: The Subway Alternative, 1912 44 2.3 Crossing the Valley CHAPTER 3: R.C.
    [Show full text]
  • FINCH WEST SERVICE: DAILY SCHEDULE NO: PAGE: 1 TORONTO TRANSIT COMMISSION DIVISION: ARRW REPLACES NO: EFFECTIVE: Mar 29, 2021
    ROUTE: 36 - FINCH WEST SERVICE: DAILY SCHEDULE NO: PAGE: 1 TORONTO TRANSIT COMMISSION DIVISION: ARRW REPLACES NO: EFFECTIVE: Mar 29, 2021 SERVICE PLANNING-RUN GUIDE SAFE OPERATION TAKES PRECEDENCE OVER TIMES SHOWN ON THIS SCHEDULE ------------------------------------------------------------------------------------------------------------------------------- DOWN FROM: -- HUMBERWOOD LOOP CL HUMBER COLLEGE BLV.& FINCH AVE.W AL ALBION RD. & FINCH AVE. W. AD ARDWICK BLVD. & FINCH AVE. W. MI MILVAN DR & PENN DR FA FINCH AVE. W. & ARROW RD. YO YORK GATE BLVD. - NORTH OF FINCH FJ FINCH AVE. W. & JANE ST. FW FINCH WEST STATION KE KEELE ST. & FINCH AVE. W. ------------------------------------------------------------------------------------------------------------------------------- UP FROM: -- FINCH STATION KE KEELE ST. & FINCH AVE. W. FW FINCH WEST STATION FJ FINCH AVE. W. & JANE ST. OD OAKDALE RD. & FINCH AVE. W. FA FINCH AVE. W. & ARROW RD. BA ST.BASIL THE GREAT COLL SCHOOL ------------------------------------------------------------------------------------------------------------------------------- RUN | |AR |FA& | 3| 1| 3| 4| | | | | | | | | | | | | |TOTAL |DOWN | 428a| 433a| 638a| 826a|1029a|1254p| 315p| | | | | | | | | | | | | 1 | UP | | 525a| 736a| 925a|1140a| 205p| 401p| 406p| | | | | | | | | | | |11:38 | | | 8|FW 1|FW 2|FW 5|FW 5|FA |AR | | | | | | | | | | | | ------------------------------------------------------------------------------------------------------------------------------- RUN | | | |WB? | 5| 1| 7| 4| 4| 5| 7| | | | | | |
    [Show full text]
  • Country BIA Business - Name Address Website/Social Media Argentina York Eglington Rincon De La Boca 1710 Eglinton Ave
    Country BIA Business - Name Address Website/Social Media Argentina York Eglington Rincon de la Boca 1710 Eglinton Ave. W http://www.yorkbia.ca/item/rincon-de-la-boca-bar-restaurant/ York Eglington Toronto Latino 1786 Eglinton Ave. W http://www.torontolatino.com/toronto/ Harbord Tik Talk Bistro Cafe’ 96 Harbord Street www.tiktalkcafeTO.com Bahamas Harbord The Harbord Room 97 Harbord Street, www.theharbordroom.com Barbados Harbord RASA By The Food Dudes 196 Robert/Harbord Street www.rasarestaurant.com Bermuda St.Lawrencemarket Goldstein Eyewear Boutique 225 King Street East www.goldsteinboutique.com harbord Harbord House 150 Harbord Street www.harbordhouse.ca Bolivia York Eglington Toronto Latino 1786 Eglinton Ave. West http://www.torontolatino.com/toronto/ Harbord Dessert Trends & Bistro 154 Harbord Street www.DTBristro.com Brazil York Eglington Book Café 1790 Eglinton Avenue West http://www.yorkbia.ca/item/bookafe/ Riverside MacFAB Sews http://www.macfabfabrics.com/macfab-sews/ York Eglington Toronto Latino 1786 Eglinton Ave. West Toronto, ON http://www.torontolatino.com/toronto/ St.Lawrencemarket St. Lawrence Pet Valu 184 Front Street East www.petvalu.com The Beach Village Gongton Design 2116-C Queen Street East www.gongtondesign.com Copacabana Brazilian Steakhouse 230 Adelaide St. West www.thecopa.ca Copa by Sea 230 Adelaide St. West | Lower Venue www.copabysea.com Harbord THR & Co. 97 Harbord Street – M5S-1G6 www.thrrestaurant.com British Virgin Islands Waterfront Gone Sailing Adventures 415 Queens Quay West www.gosailto.com Canada
    [Show full text]
  • Inclusion on the City of Toronto's Heritage Register -1627 Danforth Avenue
    ~TORONTO REPORT FOR ACTION Inclusion on the City of Toronto's Heritage Register - 1627 Danforth Avenue Date: April 4, 2019 To: Toronto Preservation Board Toronto and East York Community Council From: Senior Manager, Heritage Preservation Services, Urban Design, City Planning Wards: Ward 19 – Beaches-East York SUMMARY This report recommends that City Council include the property at 1627 Danforth Avenue on the City of Toronto's Heritage Register. The site contains a complex known historically as the Danforth Carhouse, which is currently owned by the Toronto Transit Commission (TTC). It was developed beginning in 1914 by the Toronto Civic Railways (TCR), expanded by the Toronto Transportation Commission (forerunner to today's TTC) and the TTC and currently used as offices and staff facilities for TTC personnel. In 2015, City Council requested that the property at 1627 Danforth Avenue be researched and evaluated for inclusion on the City of Toronto's Heritage Register. It has been identified for its potential cultural heritage value in the Danforth Avenue Planning Study (2018). It is the selected site for a police station consolidating 54 and 55 Divisions. The property at 1627 Danforth Avenue is part of a Master Plan study being undertaken by CreateTO to guide the redevelopment of the site as a multi-use civic hub for the Toronto Transit Commission, the Toronto Police Service and the Toronto Public Library as the key anchor tenants, which will incorporate and adaptively reuse the Danforth Carhouse. RECOMMENDATIONS The Senior Manager, Heritage Preservation Services, Urban Design City Planning recommends that: 1. City Council include the property at 1627 Danforth Avenue on the City of Toronto's Heritage Register in accordance with the Statement of Significance (Reasons for Inclusion), attached as Attachment 3 to the report (April 4, 2019) from the Senior Manager, Heritage Preservation Services, Urban Design, City Planning.
    [Show full text]
  • Service Improvements for 2002
    SERVICE IMPROVEMENTS FOR 2002 Subway Streetcars Buses RT October 2001 Service Improvements for 2002 - 2 - Table of contents Table of contents Summary................................................................................................................................................................4 Recommendations ..............................................................................................................................................5 1. Planning transit service ...............................................................................................................................6 2. Recommended new and revised services for the Sheppard Subway .......................................10 Sheppard Subway.................................................................................................................................................................................10 11 BAYVIEW – Service to Bayview Station...........................................................................................................................................10 25 DON MILLS – Service to Don Mills Station ....................................................................................................................................11 Don Mills/Scarborough Centre – New limited-stop rocket route ....................................................................................................11 Finch East – Service to Don Mills Station...........................................................................................................................................11
    [Show full text]
  • View Transactions
    2020 LAND SPECIALISTS TRANSACTIONS LAND SPECIALISTS TABLE OF CONTENTS MEET THE Specialists 6 ABOUT CBRE 8 TRANSACTIONS Map 10 RESIDENTIAL TRANSACTIONS 211 POWERLINE ROAD, Brantford 13 JENNINGS CREEK PHASE I & II, Lindsay 14 6480, 6482 & 6484 KINGSTON ROAD, Toronto 14 3431 OLD SCHOOL ROAD, Caledon 15 197, 199, 201 GALLOWAY ROAD 16 & 4097 LAWRENCE AVENUE EAST, Toronto I.C.I. TRANSACTIONS 3650 DANFORTH AVENUE, Toronto 18 2 ROYAL AVENUE, Nobleton 19 9361 & 9371 HIGHWAY 11, Severn 19 455 MAGNA DRIVE, Aurora 20 60 MAIN STREET NORTH, Brampton 21 36-40 MAIN STREET NORTH, Brampton 22 2829 MCKINSTRY ROAD, Bradford 23 2156 QUEENSVILLE SIDEROAD, East Gwillimbury 23 LAND Industrial Commercial Institutional “I.C.I.” SPECIALISTS JASON CHILD OUR TEAM SENIOR VICE PRESIDENT Jason Child is a Senior Vice President at CBRE Limited. Since joining CBRE, Jason has become a leading expert in the disposition of residential land throughout the Greater Toronto Area and Greater Golden Horseshoe Area. Throughout his career, Jason has been involved in more than 350 land deals. Over his 20-year career, he has SPECIALIZES IN been consistently recognized as a top performer in the acquisition and disposition of residential land throughout the Greater Golden Horseshoe Area. Jason earned his Bachelor of Commerce, majoring in Housing and Real Estate Management from the University of Guelph. A MESSAGE FROM LAND THE PARTNERS IAN HUNT SENIOR VICE PRESIDENT Ian Hunt is a Senior Vice President at CBRE Limited. He is recognized as a leading advisory expert in land dispositions 2020 was an interesting year, throughout the ‘416’ and ‘905’ regions and is ranked within the Top 10 Sales Professionals in CBRE’s Toronto North Our team specializes in Land Advisory & Transaction impacting each of us and all of those Office.
    [Show full text]
  • Watermain Replacement on Broadview Avenue from Danforth Avenue to Gerrard Street East
    Construction Notice April 26, 2021 Watermain Replacement on Broadview Avenue from Danforth Avenue to Gerrard Street East Contract: 21ECS-TI-13SP Expected Start Date: May 10, 2021 Expected End Date: December, 2021 *Timelines are subject to change and future notice will be provided. The City of Toronto will be replacing the watermain and the City-owned portion of substandard water services, on Broadview Avenue between Danforth Avenue and Gerrard Street East. Additional watermain replacement work will also be undertaken on Montcrest Boulevard. The water service is the underground pipe that brings water to your water meter and is owned by you and by the City. The part you own is from your house to the end of your property, the part the City owns is from the end of your property to the watermain. This project is part of the Council-approved 2021 Capital Works Program to renew our aging infrastructure, improve water distribution, reduce the risk of waterman breaks and improve Toronto's infrastructure. IMPORTANT INFORMATION ABOUT COVID-19 AND CONSTRUCTION WORK IN TORONTO During construction, the contractor is responsible for the Health & Safety on site under the Ontario Occupational Health and Safety Act and is expected to implement COVID-19 mitigation practices. For more information on the City's response to COVID-19 please visit toronto.ca/covid-19. Community Impacts: We understand this project will have an impact on the residents and businesses in the area, especially during the COVID-19 pandemic. We sympathize and appreciate your patience with the dust, noise, fencing, parking and other impacts of this essential infrastructure construction.
    [Show full text]