As of October 1. 2016

Kyuman Cho, Ph.D.

Associate Professor in Charge, SERICS (Solutions for Economic Reorganization In Construction Systems) Lab.

Department of Architectural Engineering, School of Architecture Chosun University 309 Pilmun-daero, Dong-gu, , Korea, 61452 E-mail: [email protected] Office: 82-62-230-7141

1. Education The University of Seoul, Seoul, Korea A. Doctoral of Philosophy, Construction Engineering and Management, Feb. 2009 B. Master of Science, Construction Engineering and Management, Feb. 2005 C. Bachelor of Science, Architectural Engineering, Feb. 2003

2. Professional Experience A. 2016.10~ Present: Associate Professor, Chosun Univ., Korea B. 2014. 8 ~ 2016. 7: Head, School of Architecture, Chosun Univ., Korea C. 2012. 3 ~ 2016. 9: Assistant Professor, Chosun Univ., Korea D. 2010. 8 ~ 2012. 2: Postdoctoral Research Fellow, Purdue Univ., USA E. 2010. 1 ~ 2010. 7: Engineer, Daelim Industrial Company, Korea F. 2009. 3 ~ 2010. 1: Research Assistant Professor, Univ. of Seoul, Korea

3. Professional Affiliations A. 2015. 8 ~ Present: Review Editor, Sustainable Design and Construction, Frontiers B. 2015. 4 ~ 2017. 4: Member of Committee, Construction Design Review Board, Jeonnam Development Corp., Jeonnam, C. 2014.10~ 2017. 9: Member of Committee, Technical Proposal Evaluation Board, Public Procurement Service, Daejeon, South Korea D. 2013. 12 ~ 2015.11: Member of Committee, JellaNamdo Regional Construction Management Administration, Jeonnam, South Korea E. 2013. 5 ~ Present: Vice President, Honam Branch of KICEM F. 2013. 3 ~ Present: Editorial Board Member, Journal of Building Construction and Planning research G. 2012. 9 ~ Present: Member of Committee, Construction Contract Review Board, Gwangju Metropolitan Office of Education, Gwangju, South Korea H. 2012. 8 ~ Present: Editorial Board Member, J. of Korean Inst. of Educational

Page 1 / 9

Kyuman Cho, Ph.D.

Environment I. 2012 ~ Present: Member, Korean Institute of Educational Environment J. 2010 ~ Present: Member, Korea Institute of Building Construction K. 2007 ~ Present: Member, Korea Institute of Construction Engineering Management L. 2003 ~ Present: Member, Architectural Institute of Korea

4. Research Interests A. Economic Analysis on Construction Systems B. Building Renovation (Remodeling) Techniques C. Schedule Management D. Sustainable Construction E. Construction Simulation F. Construction Delivery Systems

5. Scholarly and Professional Honors A. Third prize at the 2016 KIC Fall Conference, Octo. 2016 B. Nominator of the IBC Top 100 EDUCATORS 2016, Sept. 2016 C. First prize at the 2016 KIC Spring Conference, May. 2016 D. Third prize at the 2016 KIC Spring Conference, May. 2016 E. Outstanding Reviewer for Applied Energy Elsevier, Jan., 2016 F. Nominator of Marquis Who`s Who in the World 2016 (33rd Edition), Nov. 2015 G. Excellent paper award of the 2014 KICEM Conference, Nov. 2014 H. First prize at the 2014 KICEM Undergraduate Student Competition, Nov. 2014 I. Third prize at the 2012 KICEM Undergraduate Student Competition, Nov. 2014 J. Excellent paper award of the 2013 KICEM Conference, Nov. 2013 K. Third prize at the 2013 KICEM Undergraduate Student Competition, Nov. 2013 L. Second Prize at the 9th AIK Undergraduate Student competition, April 2013 M. 2012 Outstanding Reviewer for ASCE J. of Mgmt. in Eng., Nov. 2012 N. First prize at the 2012 KICEM Undergraduate Student Competition, Nov. 2012 O. Third prize at the 2012 KICEM Undergraduate Student Competition, Nov. 2012 P. 2007 Best graduate student of the Brain Korea 21 Program Q. Excellent paper of the 2006 KICEM Conference

6. Certifications A. Architectural Engineer, Human Resource Development Service of Korea B. Associated Value Professional, Korea Const. Value Eng. Research Ins.

7. Journal Reviewers A. Jun.2016 ~ Present: Canadian Journal of Civil Engineering B. Mar.2015 ~ Present: MDPI, Energies C. Jan.2015 ~ Present: Elsevier, J. of Cleaner Production

Page 2 / 9

Kyuman Cho, Ph.D.

D. Nov.2014 ~ Present: Elsevier, Energy Policy E. Nov.2014 ~ Present: Elsevier, Applied Energy F. Sep.2014 ~ Present: Elsevier, Automation in Construction G. Sep.2014 ~ Present: Hindawi, The Scientific World Journal H. Feb.2014 ~ Present: Taylor & Francis, J. of Civil Eng. and Mgmt. I. Nov. 2013 ~ Present: KSCE J. of Civil Eng. J. Mar. 2013 ~ Present: J. of the Korea Inst. of Building Const. K. Jun. 2012 ~ Present: J. of Korean Inst. of Const. Eng. & Mgmt. L. Aug. 2012 ~ Present: J. of Korean Inst. of Educational Environment M. Apr. 2011 ~ Present: KICEM J. of Const. Eng. and Project Mgmt. N. Mar. 2011 ~ Present: ASCE J. of Const. Eng. & Mgmt. O. Nov. 2010 ~ Present: ASCE J. of Mgmt. in Eng.

8. Classes A. Undergraduate 1. Construction Engineering and Management 2. Economic Analysis in Construction Projects 3. Project Schedule Management 4. Construction Capstone Design B. Graduate 1. Engineering Economic Analysis 2. Infrastructure Asset Management 3. Advanced Construction Scheduling and Control 4. Advanced Construction Productivity Analysis

9. Publications

A. Thesis  Integrated Schedule and Cost Management Model for Repetitive Construction Process of High-rise Buildings, (2009), Univ. of Seoul, Ph.D.  Development of a Partnering Process Model for Public Design Build Fast-Track Projects, (2005), Univ. of Seoul, M.S.

B. Full articles I _ SCI, SCI(E), A&HCI Note: Corresponding Author** (1) Kim, J., Cho, K., Kim, T., and Yoon, Y. (20xx). “Model for predicting a monetary value of office property due to the renovation work,” International J. of Property Mgmt., Elsevier. (under review) (2) Cho, K., Shin, Y., Kim, T., and Yoon, Y. (20xx). “Effect of Half-precast concrete slab system on construction productivity,” Canadian J. of Civil Eng. (under review)

Page 3 / 9

Kyuman Cho, Ph.D.

(3) Kim, J., Chang, H., Jung, Y., Cho, K., and Augenbroe, G., (20xx). “Energy conservational effects of multi-stage outdoor air enabled cooling system in a data center,” Energy and Buildings, Elsevier. (under review) (4) Cho, K., Chang, H., Jung, Y., and Yoon, Y. (20xx). “Economic analysis of Data Center cooling strategies,” Sustainable Cities and Society, Elsevier, (under review) (5) Yoon, Y., Hastak, M., and Cho, K.,** (20xx). “Preference Clustering-based Mediating Group Decision-Making (PCM-GDM) Method for Infrastructure Asset Management,” Expert Systems With Applications, Elsevier, (Under review) (6) Yoon, Y., Hastak, M., and Cho, K.,** (20xx). “Advanced Method for MR$R Cost- Leveling Models,” J. of Infrastructure Systems, ASCE (Paper scheduled for publication) (7) Cho, K. and Yoon, Y. (2016). “Decision support model for determining cost-effective renovation time,” J. of Mgmt. in Eng., ASCE, 32(3), 04015051-1 - 9 (8) Shin, Y. and Cho, K.,** (2015). “BIM Application to select appropriate design alternative with consideration of LCA and LCCA,” Mathematical Problems in Engineering, HINDAWI, 2015, 1-14, Article ID 281640 (9) Wright, E., Cho, K.,** and Hastak, M. (2015). “Assessment of the US nuclear construction industry in terms of human capital and construction technologies,” J. of Mgmt. in Eng., ASCE, 31(4), 0414068-1 - 9 (10) Wright, E., Cho, K.,** and Hastak, M. (2014). “Assessment of critical construction engineering and management aspects of nuclear power projects,” J. of Mgmt. in Eng., ASCE, 30(4), 04014016_1 - 04014016_11 (11) Cho, K., Hong, Y., and Seo, J. (2014). “Assessment of the Economic Performance of Vacuum Insulation Panels for Housing Projects,” Energy and Buildings, Elsevier, 70, 45-51 (IF: 2.679) (12) Cho, K (2014). “Evaluation on Technologies Ensuring Green Performance on Multi- family housing projects,” J. of Asian Architecture and Building Engineering, 17(1), 133-139. (13) Cho, K., Hong, T., and Hyun, C. (2013). “Space Zoning concept-based Scheduling Model for Repetitive Construction Process,” Journal of Civil Engineering and Management, Taylor & Francis, 19(3), 409-421 (IF: 2.171) (14) Cho, K. and Hastak, M. (2013). “Time and cost optimized decision support model for fast track projects,” J. of Const. Eng. & Mgmt., ASCE. 139(1), 90-101. (IF: 0.676) (15) Han, Y., Cho, K., Hong, T., and Hyun, C. (2012). “Percentage of workable days in scheduling superstructure work for building construction projects in Korea,” KSCE J. of Civil Engineering, 16(4), 517-525 (IF: 0.450) (16) Jin, R., Cho, K.**, Hyun, C., and Son, M. (2012). “MRA-based Revised CBR Model for Cost Prediction in the Early Stage of Construction Projects,” Exp. Sys. App., Elsevier, 39(5), 5214-5222 (IF: 2.908) (17) Hong, T., Cho, K., Hyun, C., and Han, S. (2011). “Simulation based schedule control model for core wall construction of high-rise building,” J. of Const. Eng. & Mgmt., ASCE, 137(6), 393-402. (IF: 0.676) (18) Moon, H., Cho, K., Hyun, C., and Hong, T. (2011). “Selection model of delivery methods for multi-family housing construction projects,” J. of Mgmt. in Eng., ASCE, 27(2), 106-115. (IF: 0.750)

Page 4 / 9

Kyuman Cho, Ph.D.

(19) Cho, K., Hong, T., and Hyun, C. (2011). “Scheduling model for repetitive construction process of high-rise buildings,” Can. J. of Civ. Eng., 38(1), 36-48. (IF: 0.401) (20) Cho, K., Hong, T., and Hyun, C. (2010). “Integrated schedule and cost model for repetitive construction process,” J. of Mgmt. in Eng., ASCE, 26(2), 78-88. (IF: 0.750) (21) Cho, K., Hyun, C., Koo, K., and Hong, T. (2010). “Partnering process model for public sector fast-track design build projects,” J. of Mgmt. in Eng., ASCE, 26(1), 19-29. (IF: 0.750) (22) Cho, K., Hong, T., and Hyun, C. (2009). “Effect of project characteristics on project performance in construction projects based on Structural Equation Model,” Expert System with Applications, Elsevier, 36(7), 10461-10470. (IF: 2.908) (23) Hyun, C., Cho, K., Koo, K., Hong, T., and Moon, H. (2008). “Effect of delivery methods on design performance in multi-family housing projects,” J. of Const. Eng. & Mgmt., ASCE, 134(7), 468-482. (IF: 0.676)

C. Full articles II _ Korea Citation Index Note: Corresponding Author** (1) Kim, J., Cho, K.,**, and Kim, T. (2016). “Real estate appraisal method for the remodeled office building – focused of income capitalization method,” J. of Archit. Ins. of Korea, 32(7), 57-63 (2) Cho, K.,, Lee, J., and Kim, T. (2016). “Model for determining an economical volume of vertical extension remodeling work – focused on commercial buildings,” J. of Advanced Engineering and Technology, 9(2), 111 - 119 (3) Kim, J., Cho, K.,**, and Kim, T. (2016). “Factors determining the price of remodeled multi-family housing,” J. of Korea Ins. of Const. Eng. and Mgmt., 17(3), 13-22 (4) Chae, C., Cho, K.,**, and Kim, J. (2015). “Economic Feasibility study on Double-skin façade remodeling work,” J. of Advanced Engineering and Technology, 8(3), 185 - 193 (5) Shin, Y., Cho, K.,**, and Kim, J. (2015). “Decision support process model for energy efficient remodeling projects focused on building envelope and renewable-energy systems,” J. of Korea Ins. of Const. Eng. and Mgmt., 16(3), 91-100 (6) Shin, Y., Cho, K.,**, and Cho, C. (2014). “Work Process Analysis of the High- performed Precast Concrete Columns using Simulation Technology,” J. of Korea Ins. of Const. Eng. and Mgmt., 15(4), 49-57 (7) Kim, D. and Cho, K.,** (2013). “A study on the economic feasibility and the LCCO2 of main floor covering materials in Day care centers,” J. of Korean Inst. of Educational Environment, 12(1), 25-34 (8) Shin, C., Kim, Y., Cho, K., Hyun, C., and Hong, T. (2011). “Development of checklist to prevent claim through dispute case analysis of public construction projects,” J. of Korea Ins. of Const. Eng. and Mgmt., 12(1), 13-22. (9) Lee, J., Hyun, C., Jeong, S., and Cho, K. (2010). “Improvement of design evaluation method for design build delivery system,” J. of Archit. Ins. of Korea, 26(10), 115-122. (10) Kang, D., Shim, J., Kim, Y., Cho, K.,** and Hyun, C. (2010). “A Study on the Productivity Analysis of Superstructure Construction for Multi-Housing Projects Using

Page 5 / 9

Kyuman Cho, Ph.D.

Construction Simulation,” J. of Archit. Ins. of Korea, 26(4), 123-131. (11) Song, C., Lee, H., Park, S., Cho, K.,** and Hyun, C. (2010). “Productivity Analysis of Structural Work for Apartment Building Using AL-Form,” J. of Archit. Ins. of Korea, 26(4), 113-122. (12) Kim, Y., Cho, J., Kim, M., Cho, K.,** and Hyun, C. (2010). “Productivity Analysis of Tower Crane Installation Progress Based on Simulation Technique,” J. of Korea Ins. of B. Const., 10(2), 33-40. (13) Jeong, S., Cho, K.,** and Hyun, C. (2010). “A Study on the Productivity Analysis of the Deck Plate Installation Work in Steel Structure Construction,” J. of Korea Ins. of B. Const., 10(1), 74-79. (14) Park, I., Cho, K., Hyun, C., and Hong, T. (2009). “Development of customer satisfaction VE process during design phase using Axiomatic Design Theory,” J. of Korea Ins. of Const. Eng. and Mgmt., 10(3), 111-121. (15) Park, J., Jun, H., Cho, K., Hong, T., Koo, K., and Hyun, C. (2008). “Improvement factors for reinforced concrete firm against removing the restriction of construction market activation,” J. of Korea Ins. of Const. Eng. and Mgmt., 9(1), 118-125. (16) Hyun, C., Hong, T., Koo, K., Yeon, H., Moon, H., and Cho, K. (2007). “Development of Space Cost Breakdown Structure for Multi-Family Housing projects,” J. of Korea Ins. of Const. Eng. and Mgmt., 8(6), 178-186. (17) Woo, Y., Song, J., Cho, K., Lee, H., Koo, K., Hong, T., and Hyun, C. (2007). “Key Influencing factors for efficient cost management of design stage,” J. of Korea Ins. of Const. Eng. and Mgmt, 8(4), 176-184. (18) Cho, K., Kim, H., Hyun C., and Koo, K. (2007) “Evaluation on performance level of design build and design bid build –focused on bridge construction project,” J. of Korea Ins. of Const. Eng. and Mgmt., 8(2), 75-83. (19) Kim, S., Cho, K., Kim, C., Hong, T., Hyun, C., and Koo, K. (2007). “A study on the life cycle cost analysis for waterproofing work of residential building basement,” J. of Archit. Ins. of Korea, 23(1), 95-103. (20) Hyun, C. and Cho, K. (2007). “Key success factors for the Fast-Track in public Design-Build projects,” J. of Archit. Ins. of Korea, 23(1), 129-136.

D. Conference Proceedings Note: Corresponding Author** (1) Lee, J., Cho, K., and Kim, T., (2016). “Priority analysis for developing construction automation technology using the IPA,” Conference proceeding of the Korean Inst. Of Building Construction 2016, Haebichi Resort, Jeju. May 22 ** Excellent paper award (2) Kim, J., Cho, K.,**, and Kim, T. (2016). “A study on the patterns of price variation for the remodeled multi-family housing,” Conference proceeding of the Korean Inst. Of Building Construction 2016, Haebichi Resort, Jeju. May 22 ** Excellent paper award (3) Shin, Y., Cho, K.** and Cho, C. (2015). “Work productivity analysis of high- performance PC slab installation,” Conference proceeding of ICCEPM 2015, Paradise Hotel Busan, Oct. 11 – 14 (4) Kim, J. and Cho, K.** (2015). “Variations in multi-family house prices following

Page 6 / 9

Kyuman Cho, Ph.D.

remodeling work,” Conference proceeding of ICCEPM 2015, Paradise Hotel Busan, Oct. 11 – 14 (5) Shin, Y. and Cho, K.** (2014). “Decision support model development for skin system remodeling,” Conference proceeding of KICEM 2014, Seoul National University of Technology, Korea, November 7-8. ** Excellent paper award (6) Kim, J., Kim, H., and Cho, K.** (2014). “A Study on the optimal time for remodeling construction,” Conference proceeding of KICEM 2014, Seoul National University of Technology, Korea, November 7-8. ** Excellent paper award (7) Min, S., Kim, D., and Cho, K.** (2014). “A Study on effective green remodeling work planning in terms of environmental and economic performances,” Conference proceeding of KICEM 2014, Seoul National University of Technology, Korea, November 7-8. ** Excellent paper award (8) Shin, Y. and Cho, K.** (2014). “Selection of optimal building skin-system in remodeling projects,” Conference proceeding of the Korean Inst. Of Building Construction 2014, K-Hotel, Kyoungju, May 1 (9) Kim, D. and Cho, K.** (2014). “Selection process of the optimal structural- reinforcement method in remodeling construction works,” Conference proceeding of the Korean Inst. Of Building Construction 2014, K-Hotel, Kyoungju, May 1. (10) Kim, D. and Cho, K.** (2013). “Enhancement techniques of superstructure on the multi-family housing remodeling projects,” Conference proceeding of KICEM 2013, Dankook Uni., Korea, November 8-9. ** Excellent paper award (11) Min, K. and Cho, K.** (2013). “Economic analysis of the materials comparing modern Hanok using LCC,” Conference proceeding of KICEM 2013, Dankook Uni., Korea, November 8-9. ** Excellent paper award (12) Shin, Y. Cho, K.** and Cho, C. (2013). “Productivity analysis of precast column structure work,” Conference proceeding of KICEM 2013, Dankook Uni., Korea, November 8-9. (13) Shin, Y. and Cho, K.** (2013). “Application of BIM on conducting LCA and LCCA,” the 9th AIK Undergraduate Student competition, Posco R&D Center, Korea, April. ** Excellent paper award (14) Shin, Y. and Cho, K.** (2012). “BIM-based advanced technique on conducting LCA and LCC analysis,” Conference proceeding of KICEM 2012, Daegu Korea, November 9-10. ** Excellent paper award (15) Kim, D. and Cho, K.** (2012). “Economic analysis of child care center`s floor finishing materials through LCC analysis,” Conference proceeding of KICEM 2012, Daegu Korea, November 9-10. ** Excellent paper award (16) Hong, Y., Cho, K.,** and Kim, E. (2012). “LCC analysis of thermal insulation materials for housing projects,” ISAIA 2012, Gwangju Korea, October 22-24. (17) Choi, H., Cho, K., ** and Kim, E. (2012). “A Model for predicting and Electrical Performance of BIPV system,” ISAIA 2012, Gwangju Korea, October 22-24. (18) Wright, E., Cho, K., and Hastak, M. (2012). “Advanced Construction Technologies for the Nuclear Construction Industry,” Construction Research Congress 2012, ASCE, 2359-2368, Purdue University, IN, USA, May 21-23 (19) Cho, K., and Hyun, C. (2009). “A scheduling method based on construction simulation techniques for repetitive construction process,” Conference proceeding of

Page 7 / 9

Kyuman Cho, Ph.D.

Korea Ins. of Const. Eng. and Mgmt. 2009. Invited conference presentation** (20) Koo, J., Cho, K., Moon, H., and Hyun, C. (2009). “Application method of zero look VE at the early phase of mega-project,” Conference proceeding of Korea Ins. of Const. Eng. and Mgmt., 2009. (21) Cho, K., Moon, H., Koo, C., Hyun, C., and Koo, K. (2006). “Evaluation on Performance level of Design Build and Design Bid Build,” Conference proceeding of CCIM 2006, Dubai (22) Moon, H., Cho, K., Hyun, C., Koo, K., and Hong, T. (2006). “The selection criteria of delivery method based on project characteristics, Conference proceeding of Korea Ins. of Const. Eng. and Mgmt. 2006. ** Excellent paper award (23) Cho, K., Hyun, C., and Koo, K. (2005). “Key Success Vehicles for Fast-Track in Design Build Projects,” Conference proceeding of ICCEM 2005, Seoul (24) Byun, E., Lim, C., Oh, M., Heo, N., Cho, K., Hyun, C., and Koo, K. (2005). “Application of fast track method on remodeling project,” Conference proceeding of Archit. Ins. of Korea 2005. (25) Cho, K., Hyun, C., and Koo, K. (2004). “A model for selecting effective fast track projects in design build delivery method,” Conference proceeding of Archit. Ins. of Korea 2004.

E. Books (1) Kim, S., Hyun, C., and Cho, K., A study on Development of Delivery Method Selection Criteria for Public Construction Project, 2005, Korea Research Institute for Human Settlements

10. Research projects Note: ** Currently Ongoing Projects (1) ** PI: Decision support model for the optimal remodeling planning along with objective of remodeling projects, 2014. 05 ~ 2017.04, NRF of Korea (2) ** Co-PI: Honam Stronghold Center of construction and transportation technologies, 2014.05 ~ 2019.02, MOCT (3) Co-PI: Development and Application for the Smart Green Construction Technology, 2013.09 ~ 2016.08, NRF of Korea (4) Co-PI: Efficient cooling system development for Data center, 2013.02 ~ 2014.07, MOCT(Ministry of Construction and Transportation, Korea) (5) RA : Development of i-PgMIS (Intelligent Program Mgmt. Sys.), 2007~2010, MOCT (6) RA: VE/LCC analysis for The Naval Academy, 2008, Kolong Const. Co. (7) RA: A study on analysis of optimal costs for M.H. Pro., 2007, MOCT (8) RA: A development of the optimized design collaboration and equivalent techniques, 2005~2007, MOCT (9) RA: Estimation of appropriate construction time for UOS Science and Technology Building, 2006, Shinmirae Const. Co. (10) RA: Review of the RFP of YRP Projects, 2006, Ministry of Defense, Korea (11) RA: A study on the performance evaluation of DB projects, 2006, MOCT

Page 8 / 9

Kyuman Cho, Ph.D.

(12) RA: VE/LCC analysis for M Elementary School, 2006, Namhoung Const. Co. (13) RA: Development of Conservation system for National Documentary Archive, 2005, National Archives of Korea (14) RA: Development of the DB RFP for The third training center for employees, 2005, Seoul Metropolitan Government (15) RA: VE/LCC analysis for Taegu City Museum, 2005, ChungSeok Eng. Co. (16) RA: Development of the DB RFP for Kangbook English Village, 2005, Seoul Metropolitan Government (17) RA: Development of Text book of project delivery method, 2003, Korea Ins. of Eng.

11. Individual Student Guide Note: * Supervisor; ** Committee Member (1) * Kim, Dong-phil, MS Thesis, Chosun Univ., Graduated-Spring semester 2016 (2) * Shin, Young-soo, MS Thesis, Chosun Univ., Graduated-Spring semester 2015 (3) **Kim, Yoonsik, Doctoral Thesis, Univ. of Seoul, Graduated-Fall semester 2013 (4) * Park, Sunghyun, MS Thesis, Chosun Univ., Graduated-Spring semester 2013 (5) ** Son, Myoungjin, Doctoral Thesis, Univ. of Seoul, Graduated-Fall semester 2012 (6) ** Kim, Jayeon, Doctoral Thesis, Chosun Univ., Graduated-Fall semester 2012 (7) ** Ha, Seoungryong, MS Thesis, Univ. of Seoul, Graduated-Fall semester 2009 (8) ** Kang, Dongwan, MS Thesis, Univ. of Seoul, Graduated-Fall semester 2009 (9) ** Kim, Yoonsik, MS Thesis, Univ. of Seoul, Graduated-Fall semester 2009 (10) ** Koo, Jungsan, MS Thesis, Univ. of Seoul, Graduated-Fall semester 2009 (11) ** Lee, Hwanchul, MS Thesis, Univ. of Seoul, Graduated-Fall semester 2009

Page 9 / 9