As of October 1. 2016 Kyuman Cho, Ph.D. Associate Professor in Charge, SERICS (Solutions for Economic Reorganization In Construction Systems) Lab. Department of Architectural Engineering, School of Architecture Chosun University 309 Pilmun-daero, Dong-gu, Gwangju, Korea, 61452 E-mail: [email protected] Office: 82-62-230-7141 1. Education The University of Seoul, Seoul, Korea A. Doctoral of Philosophy, Construction Engineering and Management, Feb. 2009 B. Master of Science, Construction Engineering and Management, Feb. 2005 C. Bachelor of Science, Architectural Engineering, Feb. 2003 2. Professional Experience A. 2016.10~ Present: Associate Professor, Chosun Univ., Korea B. 2014. 8 ~ 2016. 7: Head, School of Architecture, Chosun Univ., Korea C. 2012. 3 ~ 2016. 9: Assistant Professor, Chosun Univ., Korea D. 2010. 8 ~ 2012. 2: Postdoctoral Research Fellow, Purdue Univ., USA E. 2010. 1 ~ 2010. 7: Engineer, Daelim Industrial Company, Korea F. 2009. 3 ~ 2010. 1: Research Assistant Professor, Univ. of Seoul, Korea 3. Professional Affiliations A. 2015. 8 ~ Present: Review Editor, Sustainable Design and Construction, Frontiers B. 2015. 4 ~ 2017. 4: Member of Committee, Construction Design Review Board, Jeonnam Development Corp., Jeonnam, South Korea C. 2014.10~ 2017. 9: Member of Committee, Technical Proposal Evaluation Board, Public Procurement Service, Daejeon, South Korea D. 2013. 12 ~ 2015.11: Member of Committee, JellaNamdo Regional Construction Management Administration, Jeonnam, South Korea E. 2013. 5 ~ Present: Vice President, Honam Branch of KICEM F. 2013. 3 ~ Present: Editorial Board Member, Journal of Building Construction and Planning research G. 2012. 9 ~ Present: Member of Committee, Construction Contract Review Board, Gwangju Metropolitan Office of Education, Gwangju, South Korea H. 2012. 8 ~ Present: Editorial Board Member, J. of Korean Inst. of Educational Page 1 / 9 Kyuman Cho, Ph.D. Environment I. 2012 ~ Present: Member, Korean Institute of Educational Environment J. 2010 ~ Present: Member, Korea Institute of Building Construction K. 2007 ~ Present: Member, Korea Institute of Construction Engineering Management L. 2003 ~ Present: Member, Architectural Institute of Korea 4. Research Interests A. Economic Analysis on Construction Systems B. Building Renovation (Remodeling) Techniques C. Schedule Management D. Sustainable Construction E. Construction Simulation F. Construction Delivery Systems 5. Scholarly and Professional Honors A. Third prize at the 2016 KIC Fall Conference, Octo. 2016 B. Nominator of the IBC Top 100 EDUCATORS 2016, Sept. 2016 C. First prize at the 2016 KIC Spring Conference, May. 2016 D. Third prize at the 2016 KIC Spring Conference, May. 2016 E. Outstanding Reviewer for Applied Energy Elsevier, Jan., 2016 F. Nominator of Marquis Who`s Who in the World 2016 (33rd Edition), Nov. 2015 G. Excellent paper award of the 2014 KICEM Conference, Nov. 2014 H. First prize at the 2014 KICEM Undergraduate Student Competition, Nov. 2014 I. Third prize at the 2012 KICEM Undergraduate Student Competition, Nov. 2014 J. Excellent paper award of the 2013 KICEM Conference, Nov. 2013 K. Third prize at the 2013 KICEM Undergraduate Student Competition, Nov. 2013 L. Second Prize at the 9th AIK Undergraduate Student competition, April 2013 M. 2012 Outstanding Reviewer for ASCE J. of Mgmt. in Eng., Nov. 2012 N. First prize at the 2012 KICEM Undergraduate Student Competition, Nov. 2012 O. Third prize at the 2012 KICEM Undergraduate Student Competition, Nov. 2012 P. 2007 Best graduate student of the Brain Korea 21 Program Q. Excellent paper of the 2006 KICEM Conference 6. Certifications A. Architectural Engineer, Human Resource Development Service of Korea B. Associated Value Professional, Korea Const. Value Eng. Research Ins. 7. Journal Reviewers A. Jun.2016 ~ Present: Canadian Journal of Civil Engineering B. Mar.2015 ~ Present: MDPI, Energies C. Jan.2015 ~ Present: Elsevier, J. of Cleaner Production Page 2 / 9 Kyuman Cho, Ph.D. D. Nov.2014 ~ Present: Elsevier, Energy Policy E. Nov.2014 ~ Present: Elsevier, Applied Energy F. Sep.2014 ~ Present: Elsevier, Automation in Construction G. Sep.2014 ~ Present: Hindawi, The Scientific World Journal H. Feb.2014 ~ Present: Taylor & Francis, J. of Civil Eng. and Mgmt. I. Nov. 2013 ~ Present: KSCE J. of Civil Eng. J. Mar. 2013 ~ Present: J. of the Korea Inst. of Building Const. K. Jun. 2012 ~ Present: J. of Korean Inst. of Const. Eng. & Mgmt. L. Aug. 2012 ~ Present: J. of Korean Inst. of Educational Environment M. Apr. 2011 ~ Present: KICEM J. of Const. Eng. and Project Mgmt. N. Mar. 2011 ~ Present: ASCE J. of Const. Eng. & Mgmt. O. Nov. 2010 ~ Present: ASCE J. of Mgmt. in Eng. 8. Classes A. Undergraduate 1. Construction Engineering and Management 2. Economic Analysis in Construction Projects 3. Project Schedule Management 4. Construction Capstone Design B. Graduate 1. Engineering Economic Analysis 2. Infrastructure Asset Management 3. Advanced Construction Scheduling and Control 4. Advanced Construction Productivity Analysis 9. Publications A. Thesis Integrated Schedule and Cost Management Model for Repetitive Construction Process of High-rise Buildings, (2009), Univ. of Seoul, Ph.D. Development of a Partnering Process Model for Public Design Build Fast-Track Projects, (2005), Univ. of Seoul, M.S. B. Full articles I _ SCI, SCI(E), A&HCI Note: Corresponding Author** (1) Kim, J., Cho, K., Kim, T., and Yoon, Y. (20xx). “Model for predicting a monetary value of office property due to the renovation work,” International J. of Property Mgmt., Elsevier. (under review) (2) Cho, K., Shin, Y., Kim, T., and Yoon, Y. (20xx). “Effect of Half-precast concrete slab system on construction productivity,” Canadian J. of Civil Eng. (under review) Page 3 / 9 Kyuman Cho, Ph.D. (3) Kim, J., Chang, H., Jung, Y., Cho, K., and Augenbroe, G., (20xx). “Energy conservational effects of multi-stage outdoor air enabled cooling system in a data center,” Energy and Buildings, Elsevier. (under review) (4) Cho, K., Chang, H., Jung, Y., and Yoon, Y. (20xx). “Economic analysis of Data Center cooling strategies,” Sustainable Cities and Society, Elsevier, (under review) (5) Yoon, Y., Hastak, M., and Cho, K.,** (20xx). “Preference Clustering-based Mediating Group Decision-Making (PCM-GDM) Method for Infrastructure Asset Management,” Expert Systems With Applications, Elsevier, (Under review) (6) Yoon, Y., Hastak, M., and Cho, K.,** (20xx). “Advanced Method for MR$R Cost- Leveling Models,” J. of Infrastructure Systems, ASCE (Paper scheduled for publication) (7) Cho, K. and Yoon, Y. (2016). “Decision support model for determining cost-effective renovation time,” J. of Mgmt. in Eng., ASCE, 32(3), 04015051-1 - 9 (8) Shin, Y. and Cho, K.,** (2015). “BIM Application to select appropriate design alternative with consideration of LCA and LCCA,” Mathematical Problems in Engineering, HINDAWI, 2015, 1-14, Article ID 281640 (9) Wright, E., Cho, K.,** and Hastak, M. (2015). “Assessment of the US nuclear construction industry in terms of human capital and construction technologies,” J. of Mgmt. in Eng., ASCE, 31(4), 0414068-1 - 9 (10) Wright, E., Cho, K.,** and Hastak, M. (2014). “Assessment of critical construction engineering and management aspects of nuclear power projects,” J. of Mgmt. in Eng., ASCE, 30(4), 04014016_1 - 04014016_11 (11) Cho, K., Hong, Y., and Seo, J. (2014). “Assessment of the Economic Performance of Vacuum Insulation Panels for Housing Projects,” Energy and Buildings, Elsevier, 70, 45-51 (IF: 2.679) (12) Cho, K (2014). “Evaluation on Technologies Ensuring Green Performance on Multi- family housing projects,” J. of Asian Architecture and Building Engineering, 17(1), 133-139. (13) Cho, K., Hong, T., and Hyun, C. (2013). “Space Zoning concept-based Scheduling Model for Repetitive Construction Process,” Journal of Civil Engineering and Management, Taylor & Francis, 19(3), 409-421 (IF: 2.171) (14) Cho, K. and Hastak, M. (2013). “Time and cost optimized decision support model for fast track projects,” J. of Const. Eng. & Mgmt., ASCE. 139(1), 90-101. (IF: 0.676) (15) Han, Y., Cho, K., Hong, T., and Hyun, C. (2012). “Percentage of workable days in scheduling superstructure work for building construction projects in Korea,” KSCE J. of Civil Engineering, 16(4), 517-525 (IF: 0.450) (16) Jin, R., Cho, K.**, Hyun, C., and Son, M. (2012). “MRA-based Revised CBR Model for Cost Prediction in the Early Stage of Construction Projects,” Exp. Sys. App., Elsevier, 39(5), 5214-5222 (IF: 2.908) (17) Hong, T., Cho, K., Hyun, C., and Han, S. (2011). “Simulation based schedule control model for core wall construction of high-rise building,” J. of Const. Eng. & Mgmt., ASCE, 137(6), 393-402. (IF: 0.676) (18) Moon, H., Cho, K., Hyun, C., and Hong, T. (2011). “Selection model of delivery methods for multi-family housing construction projects,” J. of Mgmt. in Eng., ASCE, 27(2), 106-115. (IF: 0.750) Page 4 / 9 Kyuman Cho, Ph.D. (19) Cho, K., Hong, T., and Hyun, C. (2011). “Scheduling model for repetitive construction process of high-rise buildings,” Can. J. of Civ. Eng., 38(1), 36-48. (IF: 0.401) (20) Cho, K., Hong, T., and Hyun, C. (2010). “Integrated schedule and cost model for repetitive construction process,” J. of Mgmt. in Eng., ASCE, 26(2), 78-88. (IF: 0.750) (21) Cho, K., Hyun, C., Koo, K., and Hong, T. (2010). “Partnering process model for public sector fast-track design build projects,” J. of Mgmt. in Eng., ASCE, 26(1), 19-29. (IF: 0.750) (22) Cho, K., Hong, T., and Hyun, C. (2009). “Effect of project characteristics on project performance in construction projects based on Structural Equation Model,” Expert System with Applications, Elsevier, 36(7), 10461-10470. (IF: 2.908) (23) Hyun, C., Cho, K., Koo, K., Hong, T., and Moon, H. (2008). “Effect of delivery methods on design performance in multi-family housing projects,” J. of Const. Eng. & Mgmt., ASCE, 134(7), 468-482. (IF: 0.676) C. Full articles II _ Korea Citation Index Note: Corresponding Author** (1) Kim, J., Cho, K.,**, and Kim, T. (2016). “Real estate appraisal method for the remodeled office building – focused of income capitalization method,” J.
Details
-
File Typepdf
-
Upload Time-
-
Content LanguagesEnglish
-
Upload UserAnonymous/Not logged-in
-
File Pages9 Page
-
File Size-