NSC Annual Review Jan16
Total Page:16
File Type:pdf, Size:1020Kb
www.newsteelconstruction.com Annual Review In this issue Cover Image Cheltenham Racecourse Grandstand Main client: The Jockey Club Architect: Roberts Limbrick Architects Main contractor: Kier Construction Structural engineer: Furness Partnership Steelwork contractor: Hambleton Steel Steel tonnage: 1,660t Annual Review Martin Photography Cleveland Introduction from BCSA Director General Sarah McCann-Bartlett. 3 News A four page review of steel construction news highlights from 2015. 4 8 SSDA Awards The annual steel construction industry awards are a pinnacle for the sector. Industrial The RNLI has built a steel-framed manufacturing facility for its next generation 12 of lifeboats. Leisure Cheltenham Racecourse’s new grandstand will be complete in time for this year’s 14 prestigious Gold Cup. Commercial The second phase of an office-led regeneration scheme in west London is nearing 16 completion. The Right Choice Steel provides a host of benefits for designers, contractors, developers and 18 building users. Education Ulster University is in the midst of constructing a new campus in Belfast city centre. 20 Retail The Friars Walk development has brought new life into Newport city centre. 22 Bridges More than 40 new bridges, many of them steel, have been built for the Borders Railway. 24 Commercial A number of logistical challenges have been overcome during the construction of 26 the Monument Building in the City. Distribution Occupying a footprint of 58,000m2 and measuring 380m in length, a huge distribution 28 centre is under construction for Next at IDI Gazeley’s G.Park in Doncaster. Website A host of updates and improvements have been added in the last 12 months to steel 30 construction’s go-to website. Cost A new guidance document and regularly updated cost analyses make the cost planning 32 process straightforward. These and other steelwork articles CE Marking A revised Eurocode 3, and associated National Annex, clarifies the engineer’s can be downloaded from the New Steel Construction Website at 34 responsibility for “CE Marking”. www.newsteelconstruction.com NSC 2 Annual Review Introduction UK steel a world leader on level playing fields Introduction by Sarah McCann-Bartlett, Director General of the British Constructional Steelwork Association. UK steel construction had a successful 2015 was a year of achievement for year in 2015. Most of the steel related steel construction on many fronts as publicity during the year concerned the we see every month in New Steel problems that the world’s steel Construction. manufacturers are struggling to solve, This review of NSC in 2015 shows the and it is encouraging that we are at last range of outstanding projects that are seeing recognition from the UK routinely delivered using steel, which government that manufacturers across a year after year proves to be the most range of key industries like steel need cost-effective and sustainable framing support in the face of high energy prices, solution. carbon taxes and unfair overseas Some 98% of the structural steelwork competition. used in the UK is fabricated here, mostly Steelwork contractors give their full by members of the BCSA. Main support to steel manufacturers in their contractors and clients clearly have a efforts to combat dumping of steel in the strongly justified confidence in this UK by overseas producers and to ensure supply chain’s ability to deliver the level playing fields in energy costs and highest quality, cost-effective product to carbon taxes. programme. The UK has an efficient steel Many benefits flow from using a UK- distribution sector that services the based steelwork contractor, including structural steelwork sector well with a shorter lead times, contractual security, balance of UK and imported steels. UK world class quality design work, steel distributors hold high levels of improved logistics on site and a health stock and a wide range of products for all and safety record that is the envy of the construction and infrastructure end uses. construction industry. Tata Steel has reassured customers that A technically sophisticated and supply of steel sections is unaffected by efficient industry like this has nothing to the mothballing and plant closures fear from overseas competition – always announced in October. assuming level playing fields of course. EDITOR NEW STEEL CONSTRUCTION IS PRODUCED BY BARRETT BYRD EDITORIAL ADVISORY BOARD Nick Barrett Tel: 01323 422483 ASSOCIATES ON BEHALF OF THE BRITISH CONSTRUCTIONAL Ms S McCann-Bartlett (Chair); [email protected] STEELWORK ASSOCIATION AND TATA STEEL, IN ASSOCIATION Mr N Barrett; Mr D G Brown, SCI; DEPUTY EDITOR WITH THE STEEL CONSTRUCTION INSTITUTE. Mr C Dolling, BCSA; Mr R Gordon; Martin Cooper Tel: 01892 538191 Mr A Palmer, Buro Happold Engineering; [email protected] The British Constructional Steelwork Association Ltd Ms B Romans, Bourne Construction Engineering; CONTRIBUTING EDITOR 4 Whitehall Court, Westminster, London SW1A 2ES Mr G H Taylor, Caunton Engineering; Ty Byrd Tel: 01892 553143 Telephone 020 7839 8566 Mr M Thompson, Mott MacDonald; [email protected] Website www.steelconstruction.org Mr O Tyler, Wilkinson Eyre Architects PRODUCTION EDITOR Email [email protected] Andrew Pilcher Tel: 01892 553147 The role of the Editorial Advisory Board is to advise [email protected] Tata Steel on the overall style and content of the magazine. PRODUCTION ASSISTANT PO Box 1, Brigg Road, Scunthorpe, Alastair Lloyd Tel: 01892 553145 North Lincolnshire DN16 1BP New Steel Construction welcomes contributions on [email protected] Telephone 01724 404040 any suitable topics relating to steel construction. NEWS REPORTER Website www.tatasteelconstruction.com Publication is at the discretion of the Editor. Views Mike Walter Email [email protected] expressed in this publication are not necessarily COMMERCIAL MANAGER those of the BCSA, SCI, Tata Steel or the Contract Fawad Minhas Tel: 01892 553149 The Steel Construction Institute Publisher. Although care has been taken to ensure [email protected] Silwood Park, Ascot, Berkshire SL5 7QN that all information contained herein is accurate Telephone 01344 636525 Fax 01344 636570 with relation to either matters of fact or accepted Website www.steel-sci.com practice at the time of publication, the BCSA, SCI, Email [email protected] Tata Steel and the Editor assume no responsibility for any errors or misinterpretations of such CONTRACT PUBLISHER & ADVERTISING SALES information or any loss or damage arising from or Barrett, Byrd Associates related to its use. No part of this publication may be 7 Linden Close, reproduced in any form without the permission of Tunbridge Wells, Kent TN4 8HH the publishers. Telephone 01892 524455 Website www.barrett-byrd.com All rights reserved ©2016. ISSN 0968-0098 NSC Annual Review 3 News Steel to kick-start Manchester and Salford regeneration scheme On the site of the former Manchester under way is a three-storey steel-framed car Exchange railway station, famous for park constructed within the footprint of the having the world’s longest platform, a multi- old Exchange station and adjacent 12-storey million pound regeneration scheme is steel-framed Grade A office development. about to reinvigorate the boundary between Steelwork erection began in April and the north-west’s twin cities of Manchester Elland Steel Structures will fabricate, and Salford. supply and erect approximately 3,000t Known as Greengate Embankment, of steel for the project. the scheme centres on the old station and Greengate Embankment is a joint Manchester Cathedral and will ultimately development between Ask Developments deliver a host of retail, commercial and and Network Rail that will regenerate a residential buildings, alongside new public long-neglected and underused site into a realms and a new footbridge spanning the vibrant new residential, retail and River Irwell. business destination right in the centre One of the first parts of the project to get of two cities. Developer Ballymore Properties has through into new foundations, enabling Third steel tower planned applied for detailed planning consent for existing structures to be reused. an £80M steel-framed office building in “The development will provide high for Birmingham’s Snowhill central Birmingham to complete its trio of quality office space and will put the last steel Snowhill development towers. piece of the Snowhill jigsaw in place, Designed by Sidell Gibson Architects, both architecturally and in terms of the the 17-storey Three Snowhill replaces business and employment community proposals for a 43-storey residential that is taking shape in this part of the tower and adjacent 23-storey hotel, city,” said Ron Sidell of Sidell Gibson. whose construction started but was “Reusing part of the scheme that halted in 2010. was aborted owing to the effects of The building would provide 33,500m² the global financial crisis will ensure a of B1 office space and 1,400m² of leisure more sustainable approach, one which and conference facilities. will also reduce the disruptive effects of Construction will reuse part of the the construction phase of the proposed aborted residential and hotel scheme, project,” he added. including three levels of basement car Subject to consent, the development parking and the ground floor will start on site soon and is expected to conference area. be completed in the third quarter of 2017. Structural cores for the earlier project Opened in 2013, steel for Two Snowhill had been built to fourth floor level but was erected by Caunton Engineering and have now been demolished. The steel the steel-framed One Snowhill was in frame of the new building will punch completed in 2010. Plans for 40-storey high City of London steel tower unveiled Mitsubishi Estate Company (MEC) Leases in the existing buildings expire London has unveiled plans for a new at the end of this year, paving the way for 40-storey skyscraper to be built in the a potential start on site in 2016, subject to heart of the City’s insurance district.