Junction One Prime Logistics / Industrial Facility 137,315 Sq Ft to Let

Total Page:16

File Type:pdf, Size:1020Kb

Junction One Prime Logistics / Industrial Facility 137,315 Sq Ft to Let WELCOME TO JUNCTION ONE PRIME LOGISTICS / INDUSTRIAL FACILITY 137,315 SQ FT TO LET JUNCTION ONE, CENTRAL PARK, J1 M49, BRISTOL, BS35 4GH COMPLETION Q3 2019 WELCOME TO JUNCTION ONE JUNCTION ONE OFFERS AN UNRIVALLED DISTRIBUTION WAREHOUSE SPECIFICATION. THE SCHEME OCCUPIES A PRIME POSITION ADJACENT TO THE NEW JUNCTION (J1) OF THE M49 MOTORWAY AND THE NEW AMENITY FACILITIES ON THE PARK. CENTRAL PARK IS THE PREMIER DISTRIBUTION PARK IN THE SOUTH WEST. Central Park has become the dominant JUNCTION ONE distribution and logistics hub for the South KEY STATS West, offering excellent access to the national motorway network via the M49, M5 and M4 motorways. 15m 400m The property will comprise 137,315 sq ft clear height to new M49 junction of highly specified distribution warehouse accommodation, located on the gateway site 14 3mi at Central Park. It will also be adjacent to the dock loading doors to M4 J22 park's proposed new amenities comprising a petrol filling station, convenience retail, coffee shop, restaurants and a hotel. 2 3mi level loading doors to M5 J18 The new junction of the M49 will be only 400m away, and is scheduled to complete in December 2019. 50m 25 The property will be available for occupation yard depth HGV parking spaces from Q3 2019 onwards. COMPLETION Q3 2019 INDICATIVE OF COMPLETED SCHEME 137,315 SQ FT (12,757 SQ M) NORTH ACCOMMODATION sq ft sq m Warehouse 123,370 11,461 Undercroft 5,965 554 141m Ground Floor Core* 1,230 114 Office First* 6,750 627 TOTAL 137,315 12,757 JUNCTION ONE *Office/Core @5.8% of GIA 85m 6 9 5 7 8 M49 SPECIFICATION 10 2 2 Storey Offices 104 Car Spaces WAREHOUSE 3 4 ■ 1 Level 14 Dock Level 15m eaves height Access Door Levellers Access Door ■ 14 dock level loading doors ■ 2 level access doors 11 ■ 50m yard M49 J1 (UNDER CONSTRUCTION) ■ 50 kN/m2 floor loading ■ BREEAM rating of ‘Very Good’ NEW HOTEL AND EURO GARAGES AMENITY 50m ■ 104 car parking spaces ■ 25 HGV parking bays ■ Site area of 6.62 acres, 2.68 hectares 25 HGV Spaces UNRIVALLED ACCESS TO THE M49 AND NATIONAL 1 2 3 4 M49 MOTORWAY NETWORK; SURROUNDED BY OFFICES ■ VRF comfort cooling PROPOSED NEW UNRIVALLED NEIGHBOURS. AMENITY FACILITIES ■ Raised floors – 150mm void ■ Suspended ceilings with recessed LED 5 6 7 8 9 10 11 lighting with PIR sensors ■ 8 person passenger lift ■ Open plan arranged over first floor and part ground floor PROPOSED SITE PLAN NEWCASTLE INVESTMENT IN 296.0 MILES / 5HR 6MINS CENTRAL PARK LEEDS BRADFORD AIRPORT LEEDS 208.0 MILES / 3HRS 44MINS PORT OF LIVERPOOL MANCHESTER 3HRS 08MINS PORT OF THERE IS SIGNIFICANT OCCUPIER THERE IS A 169.0 MILES / 3HRS 25MINS HULL BRAND 3HRS 43MINS NEW AMENITY INVESTMENT IN 3 H PORT OF OU IMMINGHAM CONFIDENCE IN THIS AREA WITH HIGHER % OF RS CENTRAL PARK 3HRS 43MINS NEW LIVERPOOL PORT OF THE POPULATION DONCASTER GRIMSBY 3HRS 48MINS 180.0 MILES / 3HRS 33MINS SHEFFIELD SHEFFIELD AIRPORT JUNCTION 1 WITHIN A 30 MANCHESTER 180.0 MILES / 3HRS 20MINS EURO GARAGES* AIRPORT MINUTE DRIVE M6 M1 ACRES PETROL FILLING 2 H TIME THAT ARE OU 243 RS STATION WITH SOLD SINCE 2015 FACILITATING ACTIVELY SEEKING CONVENIENCE M49 BIRMINGHAM 3.34M SQ FT OF NEW PURPOSE EMPLOYMENT, 89.3 MILES / 1HR 54MINS STORE CURRENTLY UNDER COMPARED TO BUILT INDUSTRIAL DEVELOPMENT, BIRMINGHAM AIRPORT ALL EITHER OCCUPIED OR UNDER THE REST OF THE 1 HO CONSTRUCTION UR *subject to planning CONSTRUCTION SOUTH WEST M1 CAMBRIDGE AND DUE TO COMPLETE 176.0 MILES / 3HRS 28MINS M5 M40 CARDIFF A1(M) Q4 2019 37.4 MILES / 1HR 4MINS JUNCTION ONE M11 PORTS OF FELIXSTOWE & HARWICH M25 3HRS 36MINS M4 TOLLS ON THE SEVERN CROSSINGS LINKING LONDON M4 BRISTOL 125.0 MILES / 2HRS 45MINS PORT OF WITH INITIAL PREPARATORY WORKS ENGLAND WITH WALES ARE TO BE ABOLISHED AIRPORT PORT OF SWANSEA GATWICK TILBURY 1HR 18MINS COMPLETE, CONSTRUCTION HAS FOR ALL VEHICLES AT THE END OF 2018. CIRCA BRISTOL AIRPORT 2HRS 58MINS CARDIFF HEATHROW M25 AIRPORT 10.8 MILES / 35MINS AIRPORT M20 BEGUN ON THE NEW M49 JUNCTION M3 M5 SOUTHAMPTON 108.0 MILES / 2HRS 9MINS The new M49 junction will provide a connection into the EXETER AVONMOUTH & 84.0 MILES / 1HR 31MINS PORTBURY DOCKS Avonmouth and Severnside Enterprise Area from the 16 MINS PORT OF 25 MILLION FOLKESTONE PORT OF 3HRS 21MINS motorway network. DRIVERS A YEAR CURRENTLY USE THESE CROSSINGS SOUTHAMPTON 826,500 1HR 56MINS EXETER 81 3 AIRPORT Comprising two bridges, the junction will promote This provides excellent opportunities for businesses based both in BED HOTEL DRIVE-THRU POPULATION WITHIN A 30 MINUTE economic growth in Bristol and reduce the numbers of Bristol and South Wales, especially with regards to employee access PROPOSED SERVICES DRIVE OF CENTRAL PARK HGVs and other vehicles on the local road network. and logistic costs. PORT OF PLYMOUTH 2HRS 15MINS DERBY NOTTINGHAM M4 M1 A1 M4 J22 M6 M4/M5 INTERCHANGE SOUTH WALES A4O3 BIRMINGHAM CAMBRIDGE COVENTRY JUNCTION ONE NORTHAMPTON A1[M] GLOUCESTER M11 M1 MOUTH OF A4O3 M49 THE SEVERN JUNCTION ONE M5 M40 M4 M4 SWINDON GOVIER WAY SWANSEA LONDON CARDIFF WESTERN APPROACH BRISTOL M3 DISTRIBUTION PARK M25 TAUNTON CENTRAL PARK M49 J1 SEVERN ROAD AVONMOUTH DOCKS UNDER CONSTRUCTION M5 SOUTHAMPTON CENTRAL AVE A4O3 M49 EXETER J18 M5 WWW.JUNCTIONONECENTRALPARK.COM ROB CLEEVES RUSSELL CROFTS [email protected] [email protected] M5 0117 910 2227 0117 917 4535 07970 494 371 07790 707 723 RICHARD SULLIVAN [email protected] 020 7409 8125 07799 413 721 OCCUPIER SUPPORT A DEVELOPMENT BY Misrepresentation Act: Particulars contained in this brochure have been produced in good faith, are set out as a general guide and do not constitute the whole or part of any contract. All liability in negligence or otherwise, arising from use of these particulars are hereby excluded..
Recommended publications
  • Avonmouth Severnside Development Strategy Report April 2012
    Avonmouth Severnside Outline Development Strategy April 2012 - Final Report AMION Consulting Limited Customs House, 7 Union Street, Liverpool L3 9QX Avonmouth Severnside - Outline Development Strategy April 2012 - Final Report Avonmouth Severnside Outline Development Strategy April 2012 - Final Report Reviewed and approved by: Signature(s): Name(s): Graham Russell Job Title(s): Partner Director Date: April 2012 AMION Consulting is the trading name of AMION Consulting Limited Registered Office: Langtons, The Plaza, 100 Old Hall Street, Liverpool L3 9QJ Company No: 3909897 Tel: 0151 227 5563 This document including appendices contains 98 pages Ref: K:\CLIENTS\White Young Green\Avonmouth Severnside\Deliverables\Avonmouth Severnside Development Strategy Report - Final 14 Feb.12.docx Avonmouth Severnside - Outline Development Strategy April 2012 - Final Report Contents Executive summary ............................................................................................................................ i Introduction ............................................................................................................................................................... i Avonmouth Severnside ............................................................................................................................................. ii Realising the Opportunity – an Integrated Strategy ................................................................................................ iv Costs, Benefits and Value for Money .......................................................................................................................
    [Show full text]
  • Local Plan Was Adopted on December 16Th 1997
    B RISTOL L OCAL P LAN The city council wishes to thank all the people of Bristol who were involved in planning the future of our city by making comments on the formulation of this Plan. After five years of debate involving consultation, a public local inquiry and modifications, the Bristol Local Plan was adopted on December 16th 1997. The Plan consists of this written statement and a separate Proposals Map. For further information, please contact Strategic and Citywide Policy Team Directorate of Planning, Transport and Development Services Brunel House St George’s Road Bristol BS1 5UY Telephone: 903 6723 / 903 6724 / 903 6725 / 903 6727 Produced by: Planning content The Directorate of Planning, Transport and Development Services Technical Production Technical Services and Word Processing Bureau of the Planning Directorate Graphic & 3-D Design Unit of the Policy Co-ordinator and Chief Executive’s Office Printed by Bristol City Council Contract Services – Printing and Stationery Department, Willway Street, Bedminster GRA1865 20452 P&S Printed on recycled paper ADOPTED BRISTOL LOCAL PLAN DECEMBER 1997 P REFACE The Bristol Local Plan was formally adopted in December 1997 after a long and lively debate involving many thousands of local people and numerous organisations with a stake in the city’s future. Bristol now has up to date statutory planning policies covering the whole city. This Plan will guide development up to 2001 and form the basis for a review taking Bristol into the 21st Century. The Plan sets out to protect open space, industrial land, housing, shopping and local services and to promote the quality of life for all the citizens of Bristol.
    [Show full text]
  • Avonmouth/Severnside SFRA Technical Report
    Bristol City Council South Gloucestershire Council Lower Severn Drainage Board Strategic Flood Risk Assessment Avonmouth / Severnside TECHNICAL REPORT FINAL February 2011 successful people successful projects successful performance Bristol City Council Strategic Flood Risk Assessment South Gloucestershire Council Technical Report FINAL Lower Severn Drainage Board March 2011 Quays Office Park Conference Avenue Portishead Bristol BS20 7LZ Tel: 01275 840 840 Fax: 01275 840 830 Project manager: Claire Storer www.capitasymonds.co.uk Capita Symonds Management System Job Number: CS043163 PD: RG PM: CS Report status: FINAL v4 Date of issue: March 2011 Main author(s): CS, LA, JT, AM Checked: CS Approved: CS i Bristol City Council Strategic Flood Risk Assessment South Gloucestershire Council Technical Report FINAL Lower Severn Drainage Board March 2011 Contents ABOUT THIS DOCUMENT......................................................................................... XI GLOSSARY AND NOTATION................................................................................... XII SECTION 1. INTRODUCTION ...............................................................................1-1 1.1. Background...................................................................................................1-1 1.2. Scope of Work ..............................................................................................1-2 1.3. Overall Methodology.....................................................................................1-2 Section 1 Appendices......................................................................................................1-11
    [Show full text]
  • The M42 Motorway (Junction 3) (Southbound Exit Slip
    860 THE LONDON GAZETTE FRIDAY 26 NOVEMBER 2010 SUPPLEMENT No. 1 The M42 Motorway (Junction 3) (Southbound Exit Slip The M49 Motorway (M5 Junction 18A to M4 Junction Road) (Temporary Prohibition of Traffic) Order 2010 22) (Temporary Prohibition of Traffic) Order 2010 No. No. 2010/2123. - Enabling power: Road Traffic Regulation 2010/2526. - Enabling power: Road Traffic Regulation Act Act 1984, s. 14 (1) (a). - Made: 16.08.2010. Coming into 1984, s. 14 (1) (a). - Issued: 20.10.2010. Made: force: 23.08.2010. Effect: None. Territorial extent & 05.10.2010. Coming into force: 08.10.2010. Effect: None. classification: E. Local Non-print Territorial extent & classification: E. Local Non-print The M42 Motorway (Junction 3) (Temporary The M50 Motorway (Junctions 2 to 4) (Temporary Restriction and Prohibition of Traffic) Order 2010 No. Prohibition of Traffic) (No. 2) Order 2010 No. 2010/2419. - Enabling power: Road Traffic Regulation Act 2010/2095. - Enabling power: Road Traffic Regulation Act 1984, s. 14 (1) (a). - Issued: 06.10.2010. Made: 1984, s. 14 (1) (a). - Made: 06.08.2010. Coming into force: 23.09.2010. Coming into force: 30.09.2010. Effect: None. 16.08.2010. Effect: None. Territorial extent & Territorial extent & classification: E. Local Non-print classification: E. Local Non-print The M42 Motorway (Junction 7a) (Link Road) The M50 Motorway (Junctions 2 to 4) (Temporary (Temporary Prohibition of Traffic) Order 2010 No. Prohibition of Traffic) Order 2010 No. 2010/1843.- 2010/2176. - Enabling power: Road Traffic Regulation Act Enabling power: Road Traffic Regulation Act 1984, s. 14 1984, s. 14 (1) (a).
    [Show full text]
  • Public Forum West of England Joint Committee Statements 27 July 2018
    Public Forum West of England Joint Committee Statements 27 July 2018 Public Forum Statements Received Statement Name, organisation 1. David Redgewell, SWTN/Bus Users UK West of England Transport Links 2. David Redgewell, SWTN/Bus Users UK MetroBus 3. Christina Biggs, FOSBR FOSBR Rail Plan 2018 Proposals 4. Martyn Hall (Christina Biggs to speak on behalf of) Thornbury Railway Public Forum West of England Joint Committee Statements 27 July 2018 Statement 1 David Redgewell SWTN/Bus Users UK West of England Transport Links 1. The Chocolate Path Bristol We support plans to reinstate the path and make it fit for purpose for walking and cycling. 2. MetroWest We welcome the DfT and Metro Mayor study into the suburban rail network for Greater Bristol and the investment in Severn Beach – Westbury and the proposed Portishead – Westbury lines. We also welcome studies into Bristol – Gloucester and Bristol – Henbury Loop, noting that the Henbury loop will need a higher level of service if indeed the Arena is sited at Filton North Station. We feel it is very important to make progress for the City Region and we must ensure that all stations are fully accessible eg Lawrence Hill and Stapleton Road. 3. Congestion Task Group We welcome the work undertaken especially on bus priority and bus infrastructure and the potential Quick Wins on the A38 corridor. The Group worked on getting progress on Temple Meads station works which are now receiving funding. We believe that through Partnership working with First Bus division, First Rail division and Network Rail we are getting funding released and are making real progress.
    [Show full text]
  • The M25 Motorway (Junctions 6
    90 THE LONDON GAZETTE FRIDAY 1 APRIL 2011 SUPPLEMENT No. 1 The M25 Motorway (Junctions6-5,Clacket Lane) The M40 Motorway (Junction 10, Oxfordshire) (Temporary Restriction of Traffic) Order 2011 No. Northbound Entry Slip Road (Temporary Restriction 2011/359. - Enabling power: Road Traffic Regulation Act and Prohibition of Traffic) Order 2011 No. 2011/267.- 1984, s. 14 (1) (a). - Issued: 16.02.2011. Made: Enabling power: Road Traffic Regulation Act 1984, s. 14 07.02.2011. Coming into force: 26.02.2011. Effect: None. (2) (b). - Issued: 11.02.2011. Made: 26.01.2011. Coming Territorial extent & classification: E. Local. - Available at into force: 02.02.2011. Effect: None. Territorial extent & http://www.legislation.gov.uk/uksi/2011/359/contents/mad classification: E. Local. - Available at e Non-print http://www.legislation.gov.uk/uksi/2011/267/contents/mad The M25 Motorway (Junctions8-9)(Temporary e Non-print Restriction and Prohibition of Traffic) Order 2011 No. The M42 Motorway (Junction 2) (Southbound Entry 2011/204. - Enabling power: Road Traffic Regulation Act Slip Road) (Temporary Prohibition of Traffic) Order 1984, s. 14 (1) (a). - Issued: 04.02.2011. Made: 2011 No. 2011/355. - Enabling power: Road Traffic 24.01.2011. Coming into force: 29.01.2011. Effect: None. Regulation Act 1984, s. 14 (1) (a). - Issued: 15.02.2011. Territorial extent & classification: E. Local. - Available at Made: 02.02.2011. Coming into force: 09.02.2011. Effect: http://www.legislation.gov.uk/uksi/2011/204/contents/mad None. Territorial extent & classification: E. Local. - e Non-print Available at The M25 Motorway (Junctions 9 - 10) (Temporary http://www.legislation.gov.uk/uksi/2011/355/contents/mad Restriction and Prohibition of Traffic) Order 2011 No.
    [Show full text]
  • Junction One Prime Logistics / Industrial Facility 139,061 Sq Ft to Let
    WELCOME TO JUNCTION ONE PRIME LOGISTICS / INDUSTRIAL FACILITY 139,061 SQ FT TO LET JUNCTION ONE, CENTRAL PARK, J1 M49, BRISTOL, BS35 4GH AVAILABLE FOR OCCUPATION WELCOME TO JUNCTION ONE SEVERNSIDE HOTEL, PETROL FILLING JUNCTION ONE OFFERS AN UNRIVALLED DISTRIBUTION WAREHOUSE SPECIFICATION. STATION, CONVENIENCE RETAIL, COFFEE SHOP & RESTAURANTS. JUNCTION ONE THE SCHEME OCCUPIES A PRIME POSITION ADJACENT TO THE NEW JUNCTION (J1) OF THE M49 MOTORWAY AND THE NEW AMENITY FACILITIES ON THE PARK. CENTRAL PARK IS THE PREMIER DISTRIBUTION PARK IN THE SOUTH WEST. Central Park has become the dominant distribution and logistics hub for the KEY STATS South West, offering excellent access to the national motorway network via the M49, M5 and M4 motorways. 15m 250m The property comprises 139,061 sq ft of clear height to new M49 junction highly specified distribution warehouse accommodation, located on the gateway site at Central Park. It will also be adjacent to the park's proposed new 14 3mi amenities comprising a petrol filling dock loading doors to M4 J22 station, convenience retail, coffee shop, restaurants and a hotel. 2 3mi level loading doors to M5 J18 50m 25 yard depth HGV parking spaces 139,061 SQ FT (12,915 SQ M) NORTH ACCOMMODATION sq ft sq m Warehouse 124,896 11,603 Undercroft 7,229 672 141m JUNCTION ONE Office First* 6,936 644 TOTAL 139,061 12,919 *Office/Core @5.8% of GIA 85m M49 J1 SPECIFICATION M49 2 Storey Offices M49 104 Car Spaces WAREHOUSE Level 14 Dock Level ■ 15m eaves height Access Door Levellers Access Door ■ 14 dock level loading doors ■ 2 level access doors ■ 50m yard ■ 50 kN/m2 floor loading ■ 50m BREEAM rating of ‘Very Good’ ■ 104 car parking spaces ■ 25 HGV parking bays 25 HGV Spaces UNRIVALLED ACCESS TO THE M49 AND NATIONAL M49 ■ Site area of 6.62 acres, 2.68 hectares MOTORWAY NETWORK; SURROUNDED BY OFFICES NEW AMENITY ■ UNRIVALLED NEIGHBOURS.
    [Show full text]
  • 17. Severnside
    17. Severnside 17.1 The Avonmouth-Severnside area is a regionally significant employment location with considerable further economic potential. The Severnside part of this area lies in the coastal zone between the Avonmouth industrial area (in the administrative area of Bristol City Council) and the village of Severn Beach,. It is comprising an employment area of approximately 650 hectares which benefits from planning permissions granted to ICI in 1957 and 1958. It is currently a mix of industrial and former industrial areas and greenfield sites not yet developed. The M49 motorway bisects the area. Bristol Port lies at the southern end of the Avonmouth-Severnside area. The capacity of this Port is to be enlarged with a deep sea container terminal. 17.2 Although the area has extant planning permissions there are a number of constraints which affect its development potential, including: • national and international nature conservation designations relating to the Severn Estuary. • the risk of flooding from the River Severn due to breaching or overtopping of the existing flood defences, coupled with a rising tide level, as well as groundwater flooding; • the limited capacity of the existing highway network and infrastructure in the area; and • high archaeological interest in the Severn Levels. 17.3 The principal landowners intend to implement the extant permissions and develop warehousing and distribution centres. There is also interest in waste recovery and energy generation. There may also be some potential for waste recovery facilities (see West of England Joint Waste Core Strategy Submission document, available separately) and for power generation. SITA intends to develop a waste to energy facility, and Scottish Power has indicated its intention to promote a Combined Cycle Gas Turbine (CCGT) Power Station on the former Grow How site at Saltmarsh.
    [Show full text]
  • Central Park 2Pp Bro Aw4b
    Central Park THE SOUTH WEST’S PREMIER LOGISTICS PARK... 350 acre Greenfi eld site with Planning Consents for units of up to 800,000 sq ft WESTERN APPROACH | BRISTOL Serviced plots and infrastructure now in place including roads and utilities Multimodal site with a dedicated rail terminal completed Avonmouth Docks Severn Crossing DSGi M5 and Bristol Rail Terminal A40303 Davies Turner Expansion Land Farmfood Expansion Land M49 Proposed Motorway Junction JOIN THE SUCCESS STORY AT CENTRAL PARK - 2,650,000 SQ FT ALREADY DELIVERED OR UNDER CONSTRUCTION Central Park is a 350 acre warehouse and Chep UK Limited 48,525 sq ft Lidl 550,000 sq ft Unit 10 108,500 sq ft Unit 2 185,000 sq ft The Range 1,200,000 sq ft Unit 11 140,000 sq ft distribution park development, strategically Unit 3 24,000 sq ft Unit 8a 400,000 sq ft Unit 12 13,500 sq ft located within the region and designed to be Unit 4 760,000 sq ft Davies Turner 130,000 sq ft Unit 13 23,050 sq ft the South West’s largest logistics park. Farmfoods 179,105 sq ft Mountpark 410,000 sq ft Unit 14 14,000 sq ft Bristol and the South West Bristol is the economic hub of the south west region with excellent labour Central Park WESTERN APPROACH | BRISTOL availability, education resources, and connectivity. Outside of London, the West of England has the largest proportion of highly qualifi ed workers in the SatNav Ref: BS35 4GG UK and can draw on a wide labour pool including from South Wales.
    [Show full text]
  • List of Planning Applications and Other Proposals Submitted Under the Planning Acts to Be Determined by the Director of Environment and Community Services
    List of planning applications and other proposals submitted under the planning acts to be determined by the director of environment and community services CIRCULATED SCHEDULE NO. 19/19 Date to Members: 10/05/2019 Member’s Deadline: 16/05/2019 (5.00pm) The reports listed over the page form the ‘Circulated Schedule’ a procedure agreed by Council in July 2018. Under the arrangement certain reports are circulated on a weekly basis. The reports assess the application, considers representations which have been received, and make a recommendation regarding the proposal. Having considered the reports, those applications that Councillors feel should be referred to the relevant Planning Committee must be notified to the Strategic Planning section by email within five working days of the publication of the schedule (by 5pm) in line with the procedure set out below. If there has been no valid Member request for referral within the time period, the decision notices will be issued in line with the recommendation in this schedule. Before referring an item to the Committee, it is recommended that Members speak to an officer about the issue, to explore whether any problems can perhaps be resolved without the need for referral to a Committee. PLEASE NOTE: The circulated schedule process is only open to elected Members of South Gloucestershire Council. NOTES FOR COUNCILLORS – formal arrangements for referral to committee If any Member requires any of the proposals listed in the Schedule to be considered by the appropriate planning committee then a referral should: a) Be made in writing using the attached form by emailing [email protected] identifying the application reference and site location b) Within 5 working days of the date of this schedule e.g.
    [Show full text]
  • Avon Power Station EIA Scoping Report
    Avon Power Station EIA Scoping Report Scottish Power Generation Limited Avon Power Station January 2015 EIA Scoping Report Table of Contents 1 Introduction 1 Background 1 Consenting Regime 3 Objectives of Scoping 3 The Need for the Proposed Development 4 2 Description of the Existing Environment 6 Description of the Site 6 Site surroundings 8 Historic and Existing Site Use 9 Sensitive Environmental Receptors 10 Previous Environmental Studies 11 3 Project Description 12 The Proposed Development 12 Overview of Operation of Combined Cycle Gas Turbines 13 Fast Response Generators 15 Electricity Connection 15 Gas Connection 16 Water Supply Options 16 Water Discharge 17 Access to the Site 17 Potential Rail Spur 17 Carbon Capture Readiness (CCR) 17 Preparation of the Site 18 Construction Programme and Management 19 4 Project Alternatives 20 Alternative Sites 20 Alternative Developments 20 Alternative Technologies 21 5 Planning Policy 22 Primary Policy Framework 22 Secondary Policy Framework 23 6 Potentially Significant Environmental Issues 25 Air Quality 25 Noise and Vibration 28 Ecology 31 Flood Risk, Hydrology and Water Resources 35 Geology, Hydrogeology and Land Contamination 36 Archaeology and Cultural Heritage 38 Traffic and Transport 41 Land Use, Recreation and Socio-Economics 43 Landscape and Visual Impact Assessment 44 Health Impact Assessment 47 Sustainability and Climate Change 47 CHP Assessment 48 Avon Power Station January 2015 EIA Scoping Report CCR Assessment 48 7 Non-Significant EIA Issues 49 Waste 49 Electronic Interference 49
    [Show full text]
  • Bristol & Bath Bristol & Bath
    COVER Filton Enterprise Area Bristol & Bath Avonmouth Severnside Enterprise Area Development and investment hotspots Emersons Green Enterprise Area Bristol Temple Quarter Enterprise Zone Bath City Riverside Enterprise Area J21 Enterprise Area Contents 02 Key reasons to invest 04 Bristol Temple Quarter Enterprise Zone 06 Bath City Riverside Enterprise Area 08 Junction 21 Enterprise Area 10 Map of investment and development hotspots 16 Filton Enterprise Area 18 Emersons Green Enterprise Area 20 Avonmouth-Severnside Enterprise Area 24 Bristol & Bath market review © BBSP Bristol and Bath Science Park at Emersons Green Enterprise Area Investing in Bristol & Bath Welcome to a £26bn economy The Bristol and Bath region is an economic powerhouse for the UK. Its £26bn economy contributing billions to the Treasury every year. This ambitious hotspot is home to six business districts, fast global and UK transport links, well-priced housing and world-class centres of excellence. Many global and niche players are already thriving here, securing record growth in the region’s five key industries: creative and digital, high tech, low carbon, aerospace and advanced engineering and professional services. This success is underpinned by a cutting-edge R&D base, leading academic institutions and high-calibre graduates. We invite you to invest in this exciting city region and be part of an extraordinary success story. As UK powers devolve from London, this region aims to secure an additional £1bn investment in infrastructure, adding £2bn to the local economy.
    [Show full text]