The M25 Motorway (Junctions 6

Total Page:16

File Type:pdf, Size:1020Kb

The M25 Motorway (Junctions 6 90 THE LONDON GAZETTE FRIDAY 1 APRIL 2011 SUPPLEMENT No. 1 The M25 Motorway (Junctions6-5,Clacket Lane) The M40 Motorway (Junction 10, Oxfordshire) (Temporary Restriction of Traffic) Order 2011 No. Northbound Entry Slip Road (Temporary Restriction 2011/359. - Enabling power: Road Traffic Regulation Act and Prohibition of Traffic) Order 2011 No. 2011/267.- 1984, s. 14 (1) (a). - Issued: 16.02.2011. Made: Enabling power: Road Traffic Regulation Act 1984, s. 14 07.02.2011. Coming into force: 26.02.2011. Effect: None. (2) (b). - Issued: 11.02.2011. Made: 26.01.2011. Coming Territorial extent & classification: E. Local. - Available at into force: 02.02.2011. Effect: None. Territorial extent & http://www.legislation.gov.uk/uksi/2011/359/contents/mad classification: E. Local. - Available at e Non-print http://www.legislation.gov.uk/uksi/2011/267/contents/mad The M25 Motorway (Junctions8-9)(Temporary e Non-print Restriction and Prohibition of Traffic) Order 2011 No. The M42 Motorway (Junction 2) (Southbound Entry 2011/204. - Enabling power: Road Traffic Regulation Act Slip Road) (Temporary Prohibition of Traffic) Order 1984, s. 14 (1) (a). - Issued: 04.02.2011. Made: 2011 No. 2011/355. - Enabling power: Road Traffic 24.01.2011. Coming into force: 29.01.2011. Effect: None. Regulation Act 1984, s. 14 (1) (a). - Issued: 15.02.2011. Territorial extent & classification: E. Local. - Available at Made: 02.02.2011. Coming into force: 09.02.2011. Effect: http://www.legislation.gov.uk/uksi/2011/204/contents/mad None. Territorial extent & classification: E. Local. - e Non-print Available at The M25 Motorway (Junctions 9 - 10) (Temporary http://www.legislation.gov.uk/uksi/2011/355/contents/mad Restriction and Prohibition of Traffic) Order 2011 No. e Non-print 2011/500. - Enabling power: Road Traffic Regulation Act The M42 Motorway (Junction 3a) (Link Road) 1984, ss. 14 (1) (a) (7), 15 (2), 122A. - Issued: 28.02.2011. (Temporary Prohibition of Traffic) Order 2011 No. Made: 21.02.2011. Coming into force: 07.03.2011. Effect: 2011/172. - Enabling power: Road Traffic Regulation Act None. Territorial extent & classification: E. Local. - 1984, s. 14 (1) (a). - Issued: 01.02.2011. Made: Available at 17.01.2011. Coming into force: 24.01.2011. Effect: None. http://www.legislation.gov.uk/uksi/2011/500/contents/mad Territorial extent & classification: E. Local. - Available at e Non-print http://www.legislation.gov.uk/uksi/2011/172/contents/mad The M25 Motorway (Junctions 27 - 29) (Temporary e Non-print Restriction and Prohibition of Traffic) Order 2010 The M42 Motorway (Junction 3a to Junction 4) Variation Order 2011 No. 2011/203. - Enabling power: (Temporary Prohibition of Traffic) Order 2011 No. Road Traffic Regulation Act 1984, s. 14 (1) (a) (7), sch. 9, 2011/393. - Enabling power: Road Traffic Regulation Act para. 27 (1). - Issued: 04.02.2011. Made: 24.01.2011. 1984, s. 14 (1) (a). - Issued: 17.02.2011. Made: Coming into force: 07.02.2011. Effect: S.I. 2010/1559 11.02.2011. Coming into force: 18.02.2011. Effect: None. varied. Territorial extent & classification: E. Local. - Territorial extent & classification: E. Local. - Available at Available at http://www.legislation.gov.uk/uksi/2011/393/contents/mad http://www.legislation.gov.uk/uksi/2011/203/contents/mad e Non-print e Non-print The M42 Motorway (Junction 3) (Southbound Entry The M27 Motorway (Junction 4, Eastbound) Slip Road) (Temporary Prohibition of Traffic) Order (Temporary Prohibition of Traffic) Order 2011 No. 2011 No. 2011/351. - Enabling power: Road Traffic 2011/470. - Enabling power: Road Traffic Regulation Act Regulation Act 1984, s. 14 (1) (a). - Issued: 15.02.2011. 1984, s. 14 (1) (a). - Issued: 25.02.2011. Made: Made: 31.01.2011. Coming into force: 07.02.2011. Effect: 14.02.2011. Coming into force: 05.03.2011. Effect: None. None. Territorial extent & classification: E. Local. - Territorial extent & classification: E. Local. - Available at Available at http://www.legislation.gov.uk/uksi/2011/470/contents/mad http://www.legislation.gov.uk/uksi/2011/351/contents/mad e Non-print e Non-print The M27 Motorway (Junctions 1 - 12, Carriageways) The M49 Motorway and M4 Motorway (Junction 22) (Temporary Restriction of Traffic) Order 2011 No. (Temporary Prohibition and Restriction of Traffic) 2011/287. - Enabling power: Road Traffic Regulation Act Order 2011 No. 2011/346. - Enabling power: Road Traffic 1984, s. 14 (1) (a) (7), sch. 9, para. 27 (1). - Issued: Regulation Act 1984, s. 14 (1) (a) (7). - Issued: 15.02.2011. 15.02.2011. Made: 31.01.2011. Coming into force: Made: 07.02.2011. Coming into force: 09.02.2011. Effect: 21.02.2011. Effect: S.I. 2010/565 revoked. Territorial None. Territorial extent & classification: E. Local. - extent & classification: E. Local. - Available at Available at http://www.legislation.gov.uk/uksi/2011/287/contents/mad http://www.legislation.gov.uk/uksi/2011/346/contents/mad e Non-print e Non-print The M32 Motorway (Junctions 1-3) (Temporary Prohibition of Traffic) Order 2011 No. 2011/321.- Enabling power: Road Traffic Regulation Act 1984, s. 14 (1) (a). - Issued: 14.02.2011. Made: 02.02.2011. Coming into force: 05.02.2011. Effect: None. Territorial extent & classification: E. Local. - Available at http://www.legislation.gov.uk/uksi/2011/321/contents/mad e Non-print Road traffic: Traffic regulation.
Recommended publications
  • Avonmouth Severnside Development Strategy Report April 2012
    Avonmouth Severnside Outline Development Strategy April 2012 - Final Report AMION Consulting Limited Customs House, 7 Union Street, Liverpool L3 9QX Avonmouth Severnside - Outline Development Strategy April 2012 - Final Report Avonmouth Severnside Outline Development Strategy April 2012 - Final Report Reviewed and approved by: Signature(s): Name(s): Graham Russell Job Title(s): Partner Director Date: April 2012 AMION Consulting is the trading name of AMION Consulting Limited Registered Office: Langtons, The Plaza, 100 Old Hall Street, Liverpool L3 9QJ Company No: 3909897 Tel: 0151 227 5563 This document including appendices contains 98 pages Ref: K:\CLIENTS\White Young Green\Avonmouth Severnside\Deliverables\Avonmouth Severnside Development Strategy Report - Final 14 Feb.12.docx Avonmouth Severnside - Outline Development Strategy April 2012 - Final Report Contents Executive summary ............................................................................................................................ i Introduction ............................................................................................................................................................... i Avonmouth Severnside ............................................................................................................................................. ii Realising the Opportunity – an Integrated Strategy ................................................................................................ iv Costs, Benefits and Value for Money .......................................................................................................................
    [Show full text]
  • Particulars Do Not Form Part of Any Offer Or Contract and Must Not Be Relied Upon As Statements Or Representations of Fact
    NORFOLK HOUSE / BRISTOL / BS2 8RQ www.nohobristol.com BRISTOL Bristol boasts a world-class “ knowledge and financial based economy and is recognised as one of the UK’s creative, tech and media hotspots.” THE NOHO NINE Classic Facade¸ with Creative Finishes for a Chic Feel BRISTOL. The city of Bristol continues to grow at an exponential rate with regeneration projects planned across the entire city. The development of Bristol Temple Quarter is a sustainable and flourishing urban new quarter and a brand new Redcliff Quarter set to have some of the best bars, restaurants and shopping in the city. The existing Cabot Circus, is deemed “the best shopping centre in Europe” and all of this is just a short walk from NOHO. The larger urban area population is estimated to be 1.6 million and is amongst the most attractive, successful and culturally prestigious cities in the UK, enjoying a rising profile within Europe and beyond. It is one of the UK’s fastest growing cities economically. Bristol has a relatively young population profile with the median age of people living in Bristol standing at 32.5 years. The City is an ideal place for regeneration with a distinct identity as Bristol’s independent retail centre with a growing population of professionals and young families. THE MATTHEW, BRISTOL HARBOUR Bristol has a long association with the 'green' movement and is proud of its status as a Green Capital. Not only is it the UK's first Cycling City, Bristol is also a Fair trade City which sees it trading fairly with nearly five million workers in 58 developing countries.
    [Show full text]
  • London to Wales Route Strategy March 2017 Contents 1
    London to Wales Route Strategy March 2017 Contents 1. Introduction 1 Purpose of Route Strategies 2 Strategic themes 2 Stakeholder engagement 3 Transport Focus 3 2. The route 5 Route Strategy overview map 7 3. Current constraints and challenges 9 A safe and serviceable network 9 More free-flowing network 9 Supporting economic growth 10 An improved environment 10 A more accessible and integrated network 10 Diversionary routes 14 Maintaining the strategic road network 15 4. Current investment plans and growth potential 17 Economic context 17 Innovation 17 Investment plans 17 5. Future challenges and opportunities 21 6. Next steps 27 i R Lon ou don to Scotla te nd East London Or bital and M23 to Gatwick str Lon ategies don to Scotland West London to Wales The division of rou tes for the F progra elixstowe to Midlands mme of route strategies on t he Solent to Midlands Strategic Road Network M25 to Solent (A3 and M3) Kent Corridor to M25 (M2 and M20) South Coast Central Birmingham to Exeter A1 South West Peninsula London to Leeds (East) East of England South Pennines A19 A69 North Pen Newccaastlstlee upon Tyne nines Carlisle A1 Sunderland Midlands to Wales and Gloucest M6 ershire North and East Midlands A66 A1(M) A595 South Midlands Middlesbrougugh A66 A174 A590 A19 A1 A64 A585 M6 York Irish S Lee ea M55 ds M65 M1 Preston M606 M621 A56 M62 A63 Kingston upon Hull M62 M61 M58 A1 M1 Liver Manchest A628 A180 North Sea pool er M18 M180 Grimsby M57 A616 A1(M) M53 M62 M60 Sheffield A556 M56 M6 A46 A55 A1 Lincoln A500 Stoke-on-Trent A38 M1 Nottingham
    [Show full text]
  • Thyssen Mining Report 2002
    www.thyssen-schachtbau.com THYSSEN SCHACHTBAU GROUP Report 2002 THYSSEN SCHACHTBAU GROUP SCHACHTBAU THYSSEN www.thyssen-schachtbau.com 2002 Content MINING GERMANY CONSTRUCTION GERMANY 1 Situation update DIG 48 High-lustre mesh proves to be a brilliant TS Mining solution in every way 5 AV 8 – A symbol for the future TS Bau GmbH TS Shaft Sinking and Drilling 51 Riesa gets new youth training centre 9 Tunnelling through frozen sand 52 One thousand years of shipping on the river Saale 10 Controlled fall is the shortest route to the shaft 55 New road scheme looks to the future 13 Ventilation borehole doubles as coal clearance shaft DIG 56 Interior design by DIG provides the TS Mining finishing touch 14 Combination support system proves its worth TS Bau GmbH as an all rounder 58 Gohlis Bypass gets the traffic moving again TS Shaft Sinking and Drilling 60 Regeneration of high-profile refuse site 20 Mechanised sinking of the Primsmulde upcast 62 Duisburg’s new coal import terminal shaft sets new raise boring and shaft boring records (1,260 m) CONSTRUCTION INTERNATIONAL Central Services · Work Safety Östu-Stettin 24 Trend reversal but TS still tops safety league 64 „Knoten Rohr“ relieves rail congestion 66 Vienna underground extension line poses MINING INTERNATIONAL engineering challenge TMCC Östu-Stettin – Tunnelbau 26 McArthur River –Year 9, Ongoing Infrastructure 69 Kaprun Hydroelectric plant: New poser descent Development stage is a triumph of environmental engineering TS Shaft Sinking and Drilling Stettin Hungaria 30 Constructing underground sealings and dams 72 Casinos Ausztria in the MAGYAR MÜVELÖDÈS HÀZA in the Potash and Rock-Salt Industry TGB Construction Division 74 Avon Ring Road TGB 78 Thyssen Construction Ltd.
    [Show full text]
  • 2016 Air Quality Annual Status Report (ASR)
    South Gloucestershire Council 2016 Air Quality Annual Status Report (ASR) In fulfilment of Part IV of the Environment Act 1995 Local Air Quality Management October 2016 LAQM Annual Status Report 2016 South Gloucestershire Council Local Authority Sally Radwell Officer Department Environment & Community Services Environmental Protection, PO Box 299, Address Civic Centre, High Street, Kingswood, Bristol BS15 0DR Telephone 01454 868001 E-mail [email protected] Report Reference SGC_ASR_2016 number Date October 2016 LAQM Annual Status Report 2016 South Gloucestershire Council Executive Summary: Air Quality in Our Area Air pollution is associated with a number of adverse health impacts. It is recognised as a contributing factor in the onset of heart disease and cancer. Additionally, air pollution particularly affects the most vulnerable in society: children and older people, and those with heart and lung conditions. There is also often a strong correlation with equalities issues, because areas with poor air quality are also often the less affluent areas1, 2. The annual health cost to society of the impacts of particulate matter alone in the UK is estimated to be around £16 billion3. The Council has a duty to review and assess air quality within its district under the Part IV of the Environment Act 1995 and this Annual Status Report has been prepared to fulfil this requirement. Air pollutants can arise from a variety of sources, including transport and industry. Pollutant levels are assessed against health-based national air quality objectives. Where the objectives are not met, Air Quality Management Areas (AQMAs) must be declared and an Action Plan put in place to improve the air quality in these areas.
    [Show full text]
  • Cubem4 Vantage Final.Pdf
    OFFICES FOR SALE / TO LET Old Gloucester Road, Parkway, Bristol BS16 1FX ■ Highly specifi ed self-contained o ces with air conditioning ■ Located between the M4/M5 interchange & M32 motorways ■ Suites of 1,650–7,109 sq ft, with 20 car parking spaces ■ Built in 2006, fully refurbished in Spring 2017 M4/M5 INTERCHANGE CUBE M4, OLD GLOUCESTER ROAD, PARKWAY, BRISTOL BS16 1FX NEW STOKE GIFFORD BYPASS M4 M32/M4 INTERCHANGE M32 WHY CUBEM4, Parkway Parking Bristol Parkway for 20 cars Train Station 20 minutes walk M4/M5 interchange 5 minutes drive Pub lunch Winter Stream Farm pub/restaurant 2 minutes walk Shopping Tesco Extra 7 minutes drive MetroBus coming 2017 Bus stop 4 minutes walk. Buses every Superfast 10 minutes – Fibre Internet shorter journey times Connection in with dedicated lanes place on park CUBE M4, OLD GLOUCESTER ROAD, PARKWAY, BRISTOL BS16 1FX LOCATION AND AMENITIES M5 MetroBus route: CUBEM4 is situated on the MetroBus - coming 2017 Old Gloucester Road within 15 North Bristol approximately 1.4 miles from Parkway railway 20 station, 2 miles from junction 1 16 D A of M32 motorway and 4 miles Tesco Extra supermarket AZTEC O R WEST R from junction 16 of the M5. E A38 T B S R E A C M5 D U L O E L Y Woodlands Golf & Country Club G S T D O M4 L K O M5 BRADLEY E 2 CRIBBS M48 1 A38 W STOKE A CAUSEWAY D Y B4427 2 A O M48 THORNBURY R 21 1 M4 22 M4 R 15 E A403 A38 20 T 16 S 21 M4 E M4 22 M5 M5 C B4057 M49 19 M4 18 U 15 A4174 17 1 O 16 20 A403 L M4 18 2 G M49 17 AZTEC A4018 WEST A432 M5 M32 A46 19 A38 A4174 M5 18A A4018 1 18 FILTON 3 M32 19
    [Show full text]
  • Local Plan Was Adopted on December 16Th 1997
    B RISTOL L OCAL P LAN The city council wishes to thank all the people of Bristol who were involved in planning the future of our city by making comments on the formulation of this Plan. After five years of debate involving consultation, a public local inquiry and modifications, the Bristol Local Plan was adopted on December 16th 1997. The Plan consists of this written statement and a separate Proposals Map. For further information, please contact Strategic and Citywide Policy Team Directorate of Planning, Transport and Development Services Brunel House St George’s Road Bristol BS1 5UY Telephone: 903 6723 / 903 6724 / 903 6725 / 903 6727 Produced by: Planning content The Directorate of Planning, Transport and Development Services Technical Production Technical Services and Word Processing Bureau of the Planning Directorate Graphic & 3-D Design Unit of the Policy Co-ordinator and Chief Executive’s Office Printed by Bristol City Council Contract Services – Printing and Stationery Department, Willway Street, Bedminster GRA1865 20452 P&S Printed on recycled paper ADOPTED BRISTOL LOCAL PLAN DECEMBER 1997 P REFACE The Bristol Local Plan was formally adopted in December 1997 after a long and lively debate involving many thousands of local people and numerous organisations with a stake in the city’s future. Bristol now has up to date statutory planning policies covering the whole city. This Plan will guide development up to 2001 and form the basis for a review taking Bristol into the 21st Century. The Plan sets out to protect open space, industrial land, housing, shopping and local services and to promote the quality of life for all the citizens of Bristol.
    [Show full text]
  • M4 Smart Motorway Faqs
    Transport for NSW M4 Smart Motorway FAQs Here are some of our top questions about the M4 Smart Motorway project. Which motorway is the M4? The M4 Motorway is a 35km long motorway that opened in Sydney in the 1960’s. It stretches from Concord in the inner west to Lapstone in the Blue Mountains. The M4 Motorway connects to the M5 WestConnex at Haberfeld and also intersects the Westlink M7 at Eastern Creek. What is the M4 Smart The M4 Motorway will become frst smart motorway in Motorway Project? NSW with new road structures and technology being installed from Parramatta to Penrith. What is a Smart Motorway? A Smart Motorway, also known as a Managed Motorway in Victoria, use real-time information, communication and trafc control systems in and alongside the road to improve trafc fow. Variable road signs and messages communicate to drivers how to best travel along the motorway for a safer, more consistent journey with less congestion. roads-maritime.transport.nsw.gov.au Page 1 of 3 M4 Smart Motorway FAQs Where else is this technology Smart motorway technologies are being used on Melbourne’s being used in Australia? M1 motorway and introduced in southern Queensland on several roads including the Ipswich Motorway. Some individual elements of the technology are already in place on Sydney roads including the M1, M2, M5 and M7 Motorways. Has this system delivered Yes, studies have reported a signifcant reduction in improvements in other motorway incidents and improved trafc fow. On locations? Melbourne’s M1 Motorway reports have shown: • Travel times have been reduced by up to 42 percent • Crash rates have decreased by 30 percent • Vehicle emissions have been reduced by 11 percent How does the Smart There are a number of diferent parts that work together to Motorway work? ensure trafc fow and safety along the motorway.
    [Show full text]
  • The M49 Motorway and M4 Motorway (Junction 22) (Temporary Prohibition of Traffic) Order 2014
    STATUTORY INSTRUMENTS 2014 No. 2283 ROAD TRAFFIC The M49 Motorway and M4 Motorway (Junction 22) (Temporary Prohibition of Traffic) Order 2014 Made - - - - 27th August 2014 Coming into force - - 30th August 2014 WHEREAS the Secretary of State for Transport, being the traffic authority for the M49 Motorway (“the M49”), the M4 Motorway (“the M4”) and connecting roads, is satisfied that traffic on lengths of those roads and some of those connecting roads in the City of Bristol and South Gloucestershire should be prohibited because works are proposed to be executed thereon: NOW, THEREFORE, the Secretary of State, in exercise of the powers conferred by section 14(1)(a) of the Road Traffic Regulation Act 1984( a), hereby makes the following Order:- 1. This Order may be cited as the M49 Motorway and M4 Motorway (Junction 22) (Temporary Prohibition of Traffic) Order 2014 and shall come into force on 30th August 2014. 2. In this Order – “the M49” means both carriageways of the M49 between M5 Junction 18A and the southern edge of the M4 Junction 22 interchange roundabout; “the slip roads” mean the eastbound and westbound exit and entry slip roads at M4 Junction 22; “the works” mean resurfacing, white lining, drainage repairs and surveying works; “a works period” means a period of 10 hours starting at 20.00 hours on Monday 1st September 2014 or on any subsequent day and ending when the said works have been completed; and a reference to an article followed by a number is a reference to the article in this Order which bears that number.
    [Show full text]
  • Joint Local Transport Plan 3 – Progress Report 2016
    West of England Joint Local Transport Plan 3 Progress Report 2015/16 1. Introduction In the Joint Local Transport Plan 3 (JLTP3) we said that we would produce an annual report on progress made in delivering transport improvements. This report outlines what was delivered in 2015/16 and how we performed against our targets and indicators. 2. Major Schemes In late 2011 the Department for Transport (DfT) agreed to make available £135m towards the cost of five major schemes in the West of England and during 2015/16 we continued to focus our efforts on progressing delivery of these substantial infrastructure projects: Bath Transportation Package The great news is this scheme was substantially complete by the end of March 2016 with the final 17 bus shelters and 12 stops, junction upgrades including Charles Street/Monmouth Street and the Lower Borough Walls and Stall Street pedestrian improvements installed. MetroBus Ashton Vale to Temple Meads Key achievements in 2015/16 include: Permanent guideway works next to the Create Centre and on-highway works on Smeaton Road/Cumberland Road and the busway on Ashton Fields started. Completion of the Redcliffe Hill inbound works and commencement of outbound works. Flood defence wall construction on Cumberland Road. Ashton Avenue Swing Bridge shot-blasting. Qualifying tenders returned for Bathurst Basin Bridge work, and Network Rail over-bridge agreement completed. MetroBus refurbishment works on Ashton Avenue Swing Bridge North Fringe to Hengrove Package Diggers went on site in early August 2015 and works are now well progressed with over a year left to run in the construction programme.
    [Show full text]
  • Joint Spatial Plan Joint Transport Study Final Report October 2017
    WEST OF ENGLAND “BUILDING OUR FUTURE” West of England Joint Spatial Plan Joint Transport Study final report October 2017 NOVEMBER 2017 9 www.jointplanningwofe.org.uk West of England Joint Transport Study Final Report Notice This document and its contents have been prepared and are intended solely for the West of England authorities’ information and use in relation to the West of England Joint Transport Study. Atkins Limited assumes no responsibility to any other party in respect of or arising out of or in connection with this document and/or its contents. This document has 120 pages including the cover. Document history Job number: 5137782 Document ref: Final Report Revision Purpose description Originated Checked Reviewed Authorised Date Rev 1.0 First Draft JFC TP, SG RT, TM JFC 05/05/17 Rev 2.0 Second Draft JFC, TP 26/05/17 Rev 3.0 Third Draft JFC BD, SG RT JFC 07/06/17 Rev 4.0 Fourth Draft JFC SG RT JFC 21/06/17 Rev 5.0 5th Draft (Interim Version) JFC 27/06/17 Rev 6.0 Sixth Draft JFC SG RT JFC 28/06/17 Rev 7.0 Final Draft JFC RT RT JFC 07/07/17 Rev 8.0 Revised Final Draft JFC JFC 01/09/17 Rev 9.0 Final JFC SG RT JFC 19/10/17 Client signoff Client West of England authorities Project West of England Joint Transport Study Document title Final Report Job no. 5137782 Copy no. Document 5137782/Final Report reference Atkins West of England Joint Transport Study Final Report | October 2017 West of England Joint Transport Study Final Report Table of contents Chapter Pages 1.
    [Show full text]
  • The M4 Motorway (West of Magor to East of Castleton) and the A48(M) Motorway (West of Castleton to St Mellons) (Variation of Various Schemes) Scheme 201
    WELSH STATUTORY INSTRUMENT S 201- No. (W. ) HIGHWAYS, WALES The M4 Motorway (West of Magor to East of Castleton) and The A48(M) Motorway (West of Castleton to St Mellons) (Variation of Various Schemes) Scheme 201- EXPLANATORY NOTE (This note is not part of the Scheme) This Scheme removes the special road classification from various parts of the M4 motorway in the City of Newport and the County of Monmouthshire and from various parts of the A48(M) motorway in the City of Newport and the City and County of Cardiff. The parts removed will continue to be trunk road. The Scheme comes into force on such day or days as may be appointed by the Welsh Ministers and specified in a notice in the London Gazette. WEL SH STATUTORY INSTRUMENT S 201- No. (W. ) HIGHWAYS, WALES The M4 Motorway (West of Magor to East of Castleton) and The A48(M) Motorway (West of Castleton to St Mellons) (Variation of Various Schemes) Scheme 201- Made 201- Coming into force 201- The Welsh Ministers, in exercise of powers conferred by sections 16, 17, 19 and 326 of the Highways Act 1980(1), and of all other enabling powers(2), make this Scheme. Title, Interpretation and Commencement 1. This Scheme may be cited as The M4 Motorway (West of Magor to East of Castleton) and The A48(M) Motorway (West of Castleton to St Mellons) (Variation of Various Schemes) Scheme 201- and shall come into force on such day or days as may be appointed by the Welsh Ministers and specified in a notice in the London Gazette.
    [Show full text]