TOSEE SILOHA DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

Design & Construction of Concrete and Steel Silos

Construction of Elevated Chimneys

Construction of Cement Factories

Execution of Power Plant Projects & Cooling Towers for P/P

Execution of & Gas Projects

www.Tosee-Siloha.com ﺮ ﻮ ﻪ ﯿﻮ

S/N TITLE

1 INTRODUCTION

2 ORGANIZATION CHART

3 CERTIFICATES

4 MEMBERS OF BOARD

5 MANPOWER STATUS

6 EQUIPMENTS & MACHINERY

7 COMPLETED PROJECTS :

8 SILO PROJECTS

9 POWER PLANT PROJECTS

10 CHIMNEY PROJECTS

11 CEMENT FACTORY PROJECTS

12 OTHER PROJECTS

13 IN HAND PROJECTS

14 AWARDS & APPRECIATIONS

www.tosee-siloha.com ﺮ ﻮ ﻪ ﯿﻮ

INTRODUCTION

www.tosee-siloha.com ﺮ ﻮ ﻪ ﯿﻮ

Introduction :

Tosee Siloha Co. ( T.S.C ) is one of the International leading companies for construction of heavy industrial projects, such as concrete and steel silos (with the range of 30.000 up to 200.000 tones capacity), chimney & cooling tower for power plants, cement factories, flour mills, and plants, etc.

T.S.C Obtained Several ISO & OHSAS Certificates as a professional company for execution of heavy industrial projects briefly mentioned above. The company is fully capable to offer and do all types of industrial projects on EPC (Turn – key) basis (including design, supply, construction, erection & commissioning).

www.tosee-siloha.com ﺮ ﻮ ﻪ ﯿﻮ

ORGANIZATION CHART

www.tosee-siloha.com ﺮ ﻮ ﻪ ﯿﻮ

www.tosee-siloha.com ﺮ ﻮ ﻪ ﯿﻮ

CERTIFICATES

www.tosee-siloha.com ﺮ ﻮ ﻪ ﯿﻮ

www.tosee-siloha.com ﺮ ﻮ ﻪ ﯿﻮ

www.tosee-siloha.com ﺮ ﻮ ﻪ ﯿﻮ

www.tosee-siloha.com ﺮ ﻮ ﻪ ﯿﻮ

www.tosee-siloha.com ﺮ ﻮ ﻪ ﯿﻮ

www.tosee-siloha.com ﺮ ﻮ ﻪ ﯿﻮ

www.tosee-siloha.com ﺮ ﻮ ﻪ ﯿﻮ

PRESIDENTIAL DEPUTY (P.B.O.)

“Certification of Contractor’s Qualification”

www.tosee-siloha.com ﺮ ﻮ ﻪ ﯿ ﻮ

PRESIDENTIAL DEPUTY (P.B.O.) “Certification of Contractor’s Gradation”

www.tosee-siloha.com ﺮ ﻮ ﻪ ﯿﻮ

ASSOCIATION OF HOUSING COMPLEX CONSTRUCTORS

“Certification of Constructor’s Qualification & Gradation”

www.tosee-siloha.com ﺮ ﻮ ﻪ ﯿﻮ

Members of Board

www.tosee-siloha.com Bord of Directors ﺮ ﻮ ﻪ ﯿﻮ

Design and Execution of Heavy Industry Projects on EPC Basis

Resume of Board Members :

Name & Family Name : Saeid Safaei

Education : B.S. in Electronic Engineering kkkkkkﻧﻧﻧن

Position : Chairman of Board

Work Resume

S/N Organization Name Working Place Position Duration

Since 2013 1 Tosee Siloha Co Chairman Of Board till now

2 Khadamat Zirbanaei Co Tehran Chairman Of Board 1992~ 1995

Chairman Of Board & 3 Tosee Siloha Co Tehran 1987~ 2012 Managing Director

www.tosee-siloha.com Bord of Directors ﺮ ﻮ ﻪ ﯿﻮ Design and Execution of Heavy Industry Projects on EPC Basis

Resume of Board Members :

Name & Family Name : Saeid Gholami

Education : B.S. in Civil Engineering kkkkkkﻧﻧﻧن

Position : Managing Director & Member of Board

Work Resume

S/N Organization Name Working Place Position Duration

Member Of Board & Since 2013 1 Tosee Siloha Co Tehran Managing Director till now

Technical & Executive Engineer ,site Manager Project, 2 Tosee Siloha Co Tehran , Manager , Technical Director 1992~ 2012 Deputy of M.D. in Technical affairs

www.tosee-siloha.com Bord of Directors ﺮ ﻮ ﻪ ﯿﻮ Design and Execution of Heavy Industry Projects on EPC Basis

Resume of Board Members :

Name & Family Name : Mahmood Davoodi

Education : M.S. in Civil Engineering kkkkkkﻧﻧﻧن

Deputy of Chairman of Board & Position : Deputy of M.D. in Technical affairs and abroad projects

Work Resume

S/N Organization Name Working Place Position Duration

Member of the Board & Deputy & of M.D. in Technical Affairs Since 1989 1 Tosee Siloha Co Tehran Exportation of Technical and till now Enginering Services

& Member of Technical Board. 2 Bou Ali Sina University Hamedan 1985~ 1989 Supervisor of Technical Dept

Shiraz & Imam Water 3 Ahwaz-Shiraz Consultant Engineer 1981 Securement Projects

www.tosee-siloha.com ﺮ ﻮ ﻪ ﯿﻮ

MANPOWER STATUS

www.tosee-siloha.com ﺮ ﻮ ﻪ ﯿﻮ

MANPOWER STATUS:

Engineers , Technicians & Craftsmen

Years of Experiences Total Grand Titles 0ver 15 10 5 Tentative Permanent total Engineer 60 7 1 2 66 68 Technician 45 4 1 5 45 50 Craftsman 120 80 17 150 67 217 Total 157 178 335

Administration , Finance & Commercial

Years of Experiences Total Grand Titles 0ver 15 10 5 Tentative Permanent total Experts 22 0 0 0 22 22 Officers 5 1 1 0 7 7 Staff 43 19 10 20 52 72 Total 20 81 101

www.tosee-siloha.com ﺮ ﻮ ﻪ ﯿﻮ

EQUIPMENT & MACHINERY

www.tosee-siloha.com MACHINARY ﺮ ﻮ ﻪ ﯿﻮ

QT'Y (unit) S/N PRESCRIPTION Syria 1 Tower Crane 14 9 2 Batch Plant 12 9 3 Mixer Truck 8 4 Wheel Loader 5 4 5 Mobile Crane 10 4 6 Stationed Concrete Pump 1 7 Dump Truck 5 8 Truck for Trailer 2 9 Concrete Pump Truck 4 10 Mini Loader ( Bobcat) 2 11 Excavator 3 12 Bull Dozer 1 13 Diesel Generator 11 3 14 Vibro Roller 3 15 Crashing Plant 1 16 Air Compressor 6 10 17 Farming Tractor 3 18 Mini Bus 2 19 Sedan & Vehicle 13 20 Fire Fighting Truck 1 21 Ambulance 1 22 Building Hoist 4 2 Total 112 41 Grand Total of Machinary 153

www.tosee-siloha.com EQUIPMENT ﺮ ﻮ ﻪ ﯿﻮ

QT'Y S/N Prescriptions Iran Syria 1 Various types of Saw 9 unit

2 Electric Welding Machine 30 unit

3 Surveying Equipment 25 unit

4 Manual Vibro- Roller 6 unit

5 Plate Compactor 12 unit

6 Statoined Concrete Mixer 4 unit

7 Floating & Chassis Mounted Waterpump 2"~ 4" 23 unit

8 Poly Ethylene Welding 1/2"~ 6" 7 unit

9 Electric Steel Bar Scissors 37 unit

10 Electric Bar Bending M/C 31 unit

11 Cement Silo 22 unit

12 Chain & Rachet Block 75 set

13 Electric,Gasoline & Diesel Operate Vibrator 48 set

14 Formwork 250 m2

15 Slipform's Accessories 1,500 ton 300 ton

16 Climbing Formwork 1 Whole set

17 Slipform 500 m2

18 Yuk for Slipform 250 set 250 set

19 Slipform's Hydro-Jack :3ton 170 ea 170 ea

20 Slipform's Hydro-Jack :6ton 300 ea 300 ea

www.tosee-siloha.com ﺮ ﻮ ﻪ ﯿﻮ

completed projects

www.tosee-siloha.com ﺮ ﻮ ﻪ ﯿﻮ ﭘﺮوژه ﻫﺎي اﺟــﺮا ﺷﺪه ﻧﯿـﺮوﮔﺎه، ﮐﺎرﺧـﺎﻧﻪ ﺳﯿﻤــﺎن، ﺳﯿــﻠﻮ، ﺑـﺮج ﺧﻨــﮏ

ﮐﻦ در اﻗﺼﯽ ﻧﻘـﺎط اﯾــﺮان

www.tosee-siloha.com 7 ﺮ ﻮ ﻪ ﯿﻮ

ﺳﺎﺧﺖ 10 ﺳﯿﻠﻮ و 2 ﺑﺮج ﺧﻨﮏ ﮐﻦ در ﮐﺸﻮر ﺳﻮرﯾﻪ

www.tosee-siloha.com ﺮ ﻮ ﻪ ﯿﻮ

ﺳﺎﺧﺖ 6 ﺳﯿﻠﻮ ﻓﻠﺰي در ﮐﺸﻮر ﺗﺮﮐﻤﻨﺴﺘﺎن

www.tosee-siloha.com ﺮ ﻮ ﻪ ﯿﻮ

PROVISION S/N TITLE OF PROJECT LOCATION AL A.C. CLIENT DATE SILO PROJECTS 1 Daraa Silo Syria 2011 Syrian G.C.C.S. 2 Shenshar Silo Syria 2011 Syrian G.C.C.S. 3 Sarakeb Silo Syria 2010 Syrian G.C.C.S. 4 Sharakrak Silo Syria 2010 Syrian G.C.C.S. 5 Serrin Silo Syria 2010 Syrian G.C.C.S. Extension Projects of Serrin , Sharakrak Syrian General Co. 6 Syria 2010 &Alia Silos for Cereal Silos Extension Projects of Kabaka & Syrian General Co. 7 Syria 2010 Sabah Alkheir Silos for Cereal Silos 8 Honaida Silo Syria 2010 Syrian G.C.C.S. 9 Tal Hamis Silo Syria 2009 Syrian G.C.C.S. 10 Aia Silo Syria 2009 Syrian G.C.C.S. 11 Sabah Alkheir Silo Syria 2008 Syrian G.C.C.S. 12 Kabaka Silo Syria 2008 Syrian G.C.C.S. 13 Kok sazi zob ahan Silos Isfehan City 2006 Zob ahan Co. 14 Bijar Silo Bijar City 2004 Ministry of agriculture Turkmenistan Steel Silos Turkmenistan 15 Across Turkmenistan 2001 ( 6 Projects) Agriculture & Food Industries Ministry 16 Bojnourd Silo Bojnourd City 2001 Cereal Organization 17 Khorramabad Silo Khorramabad City 2001 Ministry of agriculture 18 Gonbad Mechanized Storage Gonbad City 2001 Ministry of agriculture Manufacturing & Erection of Machinery Abadeh , Kashan , Cereal 19 for Abadeh , Kashan , Neishabour & Neishabour & 2001 Organization Bojnourd Silos Bojnourd Cities 20 Abadeh Silo Abadeh City 1998 Cereal Organization 21 Zahedan Silo Zahedan City 1998 Ministry of agriculture 22 Kashan Silo Kashan City 1998 Cereal Organization 23 Kermanshah Silo Kermanshah City 1998 Ministry of agriculture 24 Neishabour Silo Neishabour City 1998 Cereal Organization Mechanized buildings of Zahedan , Zahedan , Kermanshah & Administrative of 25 1998 Kermanshah & Ahvaz Silos Ahvaz Cities Silo Projects 26 Imam Khokeini Silo B.I.K. City 1995 P&Shipping Org. 27 Hamedan Silo Hamedan City 1994 Ministry of agriculture 28 Gonbad Silo Gonbad City 1993 Ministry of agriculture 29 Kerman Silo & Flour Mill Kerman City 1992 Ministry of agriculture 30 Shiraz Silo Shiraz City 1992 Ministry of agriculture Power Plants Projects Damavand Combine Cycle Power Plant - 31 Pakdasht City 2012 Mapna Group 2nd. Phase-Cooling Towers 32 Jandar P.P.-Cooling Tower Syria 2010 Mpna Group 33 Teshreen P.P. Piling & Cooliong Tower Syria 2010 Mpna Group Damavand Combine Cycle Power Plant - 34 Pakdasht City 2010 Mapna Group 1st. Phase-Cooling Towers Torhan Industries & 35 Yazd P.P. - Cooling Towers Yazd City 2006 Behin Saman S. 36 Sahriati P.P. - Cooling Tower Mashhad City 2003 Mapna Group www.tosee-siloha.com ﺮ ﻮ ﻪ ﯿﻮ

PROVISION S/N TITLE OF PROJECT LOCATION AL A.C. CLIENT DATE 37 Neishabour P.P. -Cooling Tower Neishabour City 2003 Mapna Group 38 Shahid Rajaei P.P.-Cooling Tower Qazvin City 2002 Mapna Group 39 Khoy P.P.- Cooling Tower Khoy City 2002 Mapna Group 40 Montazer Ghaem P.P.-Cooling Tower Fardis City 2000 Mapna Group 41 Zanjan Gas Turbine Power Plant Zanjan City 2011 Mapna Group 42 Kahnouj Power Plant Kahnouj City 2009 Mapna Group 43 Besat Power Plant-SPGD Asaluyeh 2012 Mapna Co. Damavand Gas Turbine Power Plant-2nd. 44 Pakdasht City 2006 Mapna Co. Phase Damavand Gas Turbine Power Plant-1st. 45 Pakdasht City 2005 Mapna Co. Phase 46 Kazeroon Gas Turbine Power Plant Kazeroon City 2004 Mapna Group 47 Fajr Petrochemical Power Plant Mahshahr City 2001 Fajr.Petrochem. Co. 48 Yazd B.O.P Power Plant Yazd City 2014 Mapna Group 49 Mahshahr Gas Turbine Power Plant Mahshahr City 2015 Mapna Group Cement Factory Projects 50 Tehran Cement Factory Tehran City 2014 Tehran Cement Co. Mond-e-Dashti 51 Khormoj City 2012 Mond-e- Dashti Cement Factory-Phase 1 Cement Co. Gilan Sabz cement 52 Gilan Sabz 3,400 Ton Cement Factory Deylaman 2012 Industries Co. 53 Abyek Cement Factory Abyek City 2009 Abyek Cement Co. 54 Abyek Cement Factory-2nd. Line Abyek City 2009 Abyek Cement Co. Momtazan Kerman 55 Kerman Momtazan Cement Factory Kerman City 2007 Cement Co. Increment Products Loading Capacity of 56 Abyek City 2006 Abyek Cement Co. Abyek Cement Factory 57 Fars No Cement Factory Shiraz City 2006 Fars No Cement Co. 58 Larestan Cement Factory Larestan City 2006 Larestan Cement Co. 59 Clinker Production -Abyek Cement Factory Abyek City 2006 Abyek Cement Co. 60 Isfehan Cement Factory Extension Isfehan City 2000 Isfehan Cement Co. 61 Cement Factory Bushehr City 1998 Bushehr Cement Co. 62 Ardebil Cement Factory Ardebil City 1995 Ardebil Cement Co. 63 Nyriz Cement Co. Nyriz City 1995 Neyriz Cement Co. Behbehan Cement 64 Behbehan Cement Co. Behbehan City 1992 Company Chimney Projects 65 Chimney of Qazvin Glazing Factory Abhar City 2008 Qazvin Glazing Co. Chimney & Steel Structure of Evaluation 66 Isfehan City 2007 Zob ahan Co. Project 67 Chimney of Shazand Thermal P.Plant Shazand City 2001 Mapna Co. 68 Chimney of Bistoon P.Plant Kermanshah City 1992 Tavanir Co. 69 Chimney of Gharb P.Plant Hamedan City 1992 Tavanir Co. 70 Saveh-Jam Chimney Saveh City 1990 Saveh-Jam Glazing Other Projects Civil Works of Phase 9 & 10 - South Pars 71 Asaluyeh 2005 OEAC Co. Gas Development Projects(SPGD) 72 Civil Works of Optic Utility Project Hashtgerd 2001 N.A.G. Co. 7374 Steel Structure works-Asia Housing Complex Tehran City 2012 Taavoni jahad tosee co. www.tosee-siloha.com ﺮ ﻮ ﻪ ﯿﻮ

PROVISION S/N TITLE OF PROJECT LOCATION AL A.C. CLIENT DATE 74 Saadat Abad Housing Complex Tehran City 2005 Tosee Siloha Co. 75 Jihadgaran Cultural/Sports Complex Tehran City 1997 Jihad Constructive Ministry Building of Educational & Research 76 Tehran City 1993 Jihad Constructive Deputy-Jihad C9nstructive Ministry Ministry 77 Toga Industrial Turbine-civil works Fardis City 2012 Mapna Turbine 78 Mes 40 koreh zahedan City 2014 Melli sanaye mes iran Co. 79 Iran Khodro over Bridge Tehran City 2003 Iran Khodro Co. 80 Kan Bridge-Old Karaj Road Tehran City 1997 Municipality Dis.9 81 Iran Khodro Under Bridge Tehran City 1996 Iran Khodro Co. 82 Kan Bridge-Special Karaj Road Tehran City 1996 Municipality Dis.9 Civil Works of Karaj Poulterer Research Technical Dept.-Jihad 83 Karaj City 1997 Center Constractive Ministry Civil Works of Sari Poulterer Technical Dept.-Jihad 84 Sari City 1997 Research Center Constractive Ministry Civil Works of Ahwaz Poulterer Research Technical Dept.-Jihad 85 Ahwaz City 1997 Center Constractive Ministry 86 Civil Works of Haftom Tir Tomb Tehran City 1995 Private Sector

www.tosee-siloha.com ﺮ ﻮ ﻪ ﯿﻮ

silo projects

www.tosee-siloha.com TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : GONBAD SILO CITY : GONBAD YEAR OF PROVISIONAL ACCEPTANCE : 1992 CLIENT : JAHAD - E - SAZANDEGI BASIC DATA : Bins : Number : 12 / Capacity : 50,000 tons / Height : 31 m Diameter : 16 m / Wall thickness : 30 cm Working - House : Height : 45 m / Length : 25 m / Width : 10.4 m Major Works Slipform :44,000 m2 / Re - bars : 2,650 tons Concrete : 39,000 m3 / steelwork : 460 tons Excavation : 251,000 m3 / Formwork : 23,000 m2 TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : KERMAN SILO & FLOUR MILL CITY : KERMAN YEAR OF PROVISIONAL ACCEPTANCE : 1992 CLIENT : JAHAD - E - SAZANDEGI BASIC DATA : Bins : Number : 36 / Capacity : 100,000 tons / Height : 52 m Diameter : 10 m / Wall thickness : 25 cm Working - House : Height : 63.5 m / Length : 32.6 m / Width : 10 m Major Works Slipform :130,000 m2 / Re - bars : 5,500 tons Concrete : 54,000 m3 / steelwork : 970 tons Excavation : 90,000 m3

TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : SHIRAZ SILO CITY : SHIRAZ YEAR OF PROVISIONAL ACCEPTANCE : 1992 CLIENT : JAHAD - E - SAZANDEGI BASIC DATA : Bins : Number : 36 / Capacity : 120,000 tons / Height : 50.5 m Diameter : 9.8 m / Wall thickness : 27.5 cm Working - House : Height : 68.3 m / Length : 24.15 m / Width : 9 m Major Works Slipform :125,000 m2 / Re - bars : 3,300 tons Concrete : 37,000 m3 / steelwork : 650 tons Excavation : 150,000 m3

TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : IMAM KHOMEINI TRANSIT SILO CITY : BANDAR IMAM KHOMEINI YEAR OF PROVISIONAL ACCEPTANCE : 1992 CLIENT : PORTS & SHIPPING ORGANIZATION

BASIC DATA : Bins(Small Size) : No. : 30 units / Dia. : 7.25 m /Wall thickness : 18 cm / Height : 31 m

(Large Size) : No. : 5 units/ Dia. : 19.8 m /Wall thickness : 35 cm / Height : 31.5 m Working - House : Height :60 m / Length : 27 m / Width : 15.5 m Capacity 50,000 tons

TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : HAMEDAN SILO CITY : HAMEDAN YEAR OF PROVISIONAL ACCEPTANCE : 1994 CLIENT : JAHAD - E - SAZANDEGI BASIC DATA : Bins : Number : 18 / Capacity : 80,000 tons / Height : 51.2 m Diameter : 12 m / Wall thickness : 27.5 cm Working - House : Height : 64.5 m / Length : 24.9 m / Width : 8.5 m Major Works Slipform :80,000 m2 / Re - bars : 2,545 tons Concrete : 23,000 m3 / steelwork : 332 tons Excavation : 39,900 m3

TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : ZAHEDAN SILO CITY : ZAHEDAN YEAR OF PROVISIONAL ACCEPTANCE : 1998 CLIENT : JAHAD - E - SAZANDEGI BASIC DATA : Bins : Number : 18 / Capacity : 67,000 tons / Height : 48.9 m Diameter : 12.2 m / Wall thickness : 27.5 cm Working - House : Height : 56.4 m / Length : 25.5 m / Width : 10.05 m Major Works Slipform :56,000 m2 / Re - bars : 3,000 tons Concrete : 39,000 m3 / steelwork : 806 tons Excavation : 50,000 m3

TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : KERMANSHAH SILO CITY : KERMANSHAH YEAR OF PROVISIONAL ACCEPTANCE : 1998 CLIENT : JAHAD - E - SAZANDEGI BASIC DATA : Bins : Number : 27 / Capacity : 100,000 tons / Height : 46.6 m Diameter : 12.2 m / Wall thickness : 27.5 cm Working - House : Height : 61.7 m / Length : 25.52 m / Width : 10.05 m Major Works Slipform :130,000 m2 / Re - bars : 4,600 tons Concrete : 40,000 m3 / steelwork : 520 tons Excavation : 21,000 m3

TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : KASHAN SILO CITY : KASHAN YEAR OF PROVISIONAL ACCEPTANCE : 1998 CLIENT : GRAIN ORGANIZATION BASIC DATA : Bins : Number : 12 / Capacity : 27,500 tons / Height : 43 m Diameter : 10 m / Wall thickness : 25 cm Working - House : Height : 53 m / Length : 27 m / Width : 8 m Major Works Slipform :38,000 m2 / Re - bars : 1,721 tons Concrete : 18,000 m3 / steelwork : 467 tons Excavation : 42,000 m3 TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : NEYSHABOOR SILO CITY : NEYSHABOOR YEAR OF PROVISIONAL ACCEPTANCE : 1998 CLIENT : GRAIN ORGANIZATION BASIC DATA : Bins : Number : 12 / Capacity : 27,500 tons / Height : 43 m Diameter : 10 m / Wall thickness : 25 cm Working - House : Height : 53 m / Length : 27 m / Width : 8 m Major Works Slipform :38,000 m2 / Re - bars : 1,600 tons Concrete : 16,000 m3 / steelwork : 455 tons Excavation : 20,000 m3 TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : ABADEH SILO CITY : ABADEH YEAR OF PROVISIONAL ACCEPTANCE : 1998 CLIENT : GRAIN ORGANIZATION BASIC DATA : Bins : Number : 12 / Capacity : 27,500 tons / Height : 43 m Diameter : 10 m / Wall thickness : 25 cm Working - House : Height : 53 m / Length : 27 m / Width : 8 m Major Works Slipform :38,000 m2 / Re - bars : 1,675 tons Concrete : 14,000 m3 / steelwork : 484 tons Excavation : 34,000 m3 TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : BOJNORD SILO CITY : BOJNORD YEAR OF PROVISIONAL ACCEPTANCE : 2001 CLIENT : GRAIN ORGANIZATION BASIC DATA : Bins : Number : 12 / Capacity : 27,500 tons / Height : 43 m Diameter : 10 m / Wall thickness : 25 cm Working - House : Height : 53 m / Length : 27 m / Width : 8 m Major Works Slipform :38,000 m2 / Re - bars : 1,581 tons Concrete : 13,000 m3 / steelwork : 137 tons Excavation : 20,000 m3 TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : TURKMENISTAN SILOS ( 6 )

CITY : BAYRAMALI-GOLANLI-YASHLIK-PARAKHAT-GHEZELARVAT-TASHAOZ YEAR OF PROVISIONAL ACCEPTANCE : 2001

CLIENT : MINISTRY OF AGRICULTURE & FOOD INDUSTRIES OF TURKMENISTAN BASIC DATA : Bins : Number : 6 / Capacity : 30,000 tons / Height : 16.75 m

Diameter : 21.84 m Working - House : Height : 31.20 m / Length : 8 m / Width : 8 m Major Works FORMWORK : 21,912 m2 X 6 / Re - bars : 1,671 tons X 6 Concrete : 24,405 m3 X 6 / steelwork : 1,105 tons X 6 Excavation : 92,040 m3 X 6

TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : SYRIAN 100,000 TONS SILO PROJECTS (10 ) TITLES/LOCATIONS : KABAKA-SABAH ALKHEIR-ALIA-TAL HAMIS-HONAIDI- SHARAKRAK-SARAKEB-SERRIN-SHINSHAR-DARAA YEAR OF PROVISIONAL ACCEPTANCE : 2010 GENERAL COMPANY FOR CEREAL SILOS CLIENT : (SYRIAN MINISTRY OF ECONOMY) BASIC DATA ( EVERY SILO ): Bins : Number : 54 / Capacity : 100,000 tons / Height : 37 m Diameter : 9.5 m / Clauster :28.5 m Working - House : Height : 56 m / Length : 22.8 m / Width : 13.3 m TOTAL 10 SILOS Major Works SLIPFORM &CLIMBING FORM : 1,368,000 m2 Excavation : 800,000 m3 /Re-Bars : 58,500 tons Concrete : 480,000 m3 / Steelwork : 6,500 tons General Formwork : 632,000 m2 / : 45,000 m3

TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : SYRIAN SILO EXTENSION PROJECTS (5 ) TITLES/LOCATIONS : KABAKA,SABAH ALKHEIR,ALIA,SHARAKRAK,SERRIN SILOS YEAR OF PROVISIONAL ACCEPTANCE : 2012 GENERAL COMPANY FOR CEREAL SILOS CLIENT : (SYRIAN MINISTRY OF ECONOMY) BASIC DATA ( EVERY SILO ): Bins : Number : 18/ Capacity : 33,300 tons / Height : 37 m Diameter : 9.5 m / Clauster :28.5 m TOTAL 5 SILOS Major Works SLIPFORM : 210,000 m2 Excavation : 24,500 m3 /Re-Bars : 8,000 tons Concrete : 68,500 m3 / Steelwork : 580 tons General Formwork : 75,000 m2 TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : BIJAR SILO

CITY : BIJAR YEAR OF PROVISIONAL ACCEPTANCE : 2004 CLIENT : JAHAD - E - SAZANDEGI BASIC DATA : Bins : Number : 18 / Capacity : 50,000 tons / Height : 48.2 m Diameter : 9.75 m / Wall thickness : 26 cm Working - House : Height : 60.2 m / Length : 18.85 m / Width : 10.5 m Major Works Slipform : 60,000 m2 / Re - bars : 2,500 tons Concrete : 30,000 m3 / steelwork : 700 tons Excavation : 20,000 m3

TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : KHORAMABAD SILO

CITY : KHORAMABAD YEAR OF PROVISIONAL ACCEPTANCE : 2001 CLIENT : JAHAD - E - SAZANDEGI BASIC DATA : Bins : Number : 18 / Capacity : 50,000 tons / Height : 41 m Diameter : 11 m / Wall thickness : 27.50 cm Working - House : Height : 52.70 m / Length : 17 m / Width : 9.50 m Major Works Slipform : 53,000 m2 / Re - bars : 1,940 tons Concrete : 22,800 m3 / steelworks : 405 tons Excavation : 68,000 m3 TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : GONBAD MECHANIZED WAREHOUSE CITY : GALIKESH / GONBAD YEAR OF PROVISIONAL ACCEPTANCE : 2001 CLIENT : JAHAD - E - SAZANDEGI BASIC DATA : Length : 219.5 m Width : 64 m Height : 14.8 m Major Works FORMWORK : 20,000 m2 / Re - bars : 1,300 tons Concrete : 25,000 m3 / steelwork : 300 tons Excavation : 70,000 m3 / Capacity : 50,000 tons

TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

CONSTRUCTION OF COLLIER PRODUCTION UNIT PROJECT NAME : ISFEHAN STEEL MILL LOCATIONS : ISFEHAN CITY YEAR OF PROVISIONAL ACCEPTANCE : 2005 CLIENT : ISFEHAN STEEL MILL Co. CONSULTANT : NumbersFOULAD: 18 / Capacity TECHNIC: 50,000 Co. ton/ Height:48.2m Clausters Diameter : 9.75 m / Shell tickness : 26 cm Concrete work : 32000 m3 Re-bars : 3900 Tons Basic Data Formworks : 59000 m2 Major Works Excavation : 83,000 m3 Sleepform : 82500 Steel works :680 Tons ﺮ ﻮ ﻪ ﯿﻮ

power plant projects

www.tosee-siloha.com TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : POWER PLANT & UTILITY OF FAJR PETROCHEMICAL COMPLEX CITY : MAHSHAHR PORT FREE ZONE YEAR OF PROVISIONAL ACCEPTANCE : 2001 CLIENT : FAJR PETROCHEMICAL CO. BASIC DATA : Gas turbine 5 UNITS OF 117 MW

Major Works Concrete : 22,000 m3 /Re - bars : 2,520 tons Formwork : 39,000 m2 / Excavation : 30,000 m3

TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : ZANJAN GAS TURBINE POWER PLANT CITY : ZANJAN YEAR OF PROVISIONAL ACCEPTANCE : 2010 CLIENT : MAPNA CO . BASIC DATA : Gas turbine 4 X 159 MW UNITS

Major Works Concrete :41,663 m3 /Re - bars : 3,062 tons Formwork : 108,070 m2 / Excavation : 298,679 m3 STEEL WORKS : 2,996 Tons TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME DAMAVAND GAS TURBINE P.P.-CIVIL WORKS LOCATIONS : PAKDASHT- GARMSAR ROAD YEAR OF PROVISIONAL ACCEPTANCE : 2008 CLIENT : MAPNA GROUP CONSULTANT : MAPNA Co. Major Numbers of Turbine : 6 Specifications Turbine capacity : 156 MW Concrete work : 35,000 m3 Basic Data Re-bars : 3,000 Tons Major Works Formworks : 125,000 m2 Excavation : 130,000 m3 TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : KAZEROON GAS TURBINE POWER PLANT CITY : KAZEROON YEAR OF PROVISIONAL ACCEPTANCE : 2004 CLIENT : MAPNA CO . BASIC DATA : Gas turbine 4 X 159 MW/ UNITS

Major Works Concrete : 12,300 m3 /Re - bars : 972 tons Steelwork : 71 tons / Excavation : 80,000 m3 TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : SOUTH PARS (BESAT) CERNTERIZED P.P. (CIVIL WORKS) LOCATION : SOUTH PARS PROJECTS (ASALUYEH) YEAR OF PROVISIONAL ACCEPTANCE : 2010 CLIENT : MANAGEMENT OF POWER PLANT PROJECT OF IRAN (MAPNA) CONSULTANT : MAPNA Co. Numbers of Turbine : 6 Specifications Turbine Capacity : 160 MW Excavation : 452,000 m3 BASIC DATA : Formwork : 77,000 m2 Major Works Re-Bar : 2,500 tons Concrete : 35,000 m3 / Steelworks : 3,700 tons TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : TABAN C.C.POWER PLANT- 400 MV SUBSTATION TITLES/LOCATIONS : YAZD CITY YEAR OF PROVISIONAL ACCEPTANCE : 2016 CLIENT : MAPNA GROUP Concrete work :4,500 m3 Re-bars :333 Tons Basic Data Major Works Formwork 14,000 m2 Excavation :3,800 m3 Steel works :300 Tons TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : YAZD COMBINE CYCLE POWER PLANT- CIVIL WORKS CITY : YAZD CITY YEAR OF PROVISIONAL ACCEPTANCE : 2014 CLIENT : MANAGEMENT OF POWER PLANT PROJECT OF IRAN (MAPNA) CONSULTANT : MAPNA Co. Numbers of Turbine : 2 Specifications Turbine Capacity : 450 MW Excavation : 285,000 m3 BASIC DATA : Formwork : 83,000 m2 Major Works Re-Bar : 3,800 tons Concrete : 43,000 m3 / steelworks : 464 tons TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : MAHSHAHR GAS TURBINE POWER PLANT TITLES/LOCATIONS : BANDAR MAHSHAHR COMMENCEMENT / DURATION 2015 / 18 MONTHS CLIENT : MAPNA GROUP

Capacity 4 Units of 162 MW

Concrete work : 19,000 m3 BASIC DATA Re-bars : 1,770 Tons Major Works Formwork : 41,000 m2 Excavation : 65,000 m3 Steel works : 133 Tons TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : DAMAVAND GAS TURBINE POWER PLANT CITY : VARAMIN YEAR OF PROVISIONAL ACCEPTANCE : 2010 CLIENT : MAPNA CO . BASIC DATA : Gas turbine 6 X 159 MW/ UNITS

Major Works Concrete : 33,000 m3 /Re - bars : 2,754 tons Formwork : 100,000 m2 / Excavation : 1,104,500 m3 TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : MONTAZER GHAEM POWER PLANT COOLING TOWERS CITY : KARAJ YEAR OF PROVISIONAL ACCEPTANCE : 2000 CLIENT : MAPNA CO . BASIC DATA : Height : 92 m X 3 Cooling Tower Diameter : Bottom : 66.34 m / top : 48.86 m Wall thickness Bottom :115 cm / top : 18 cm Major Works Slipform :72,000 m2 / Re - bars : 6,500 tons Concrete : 22,000 m3 / steelwork : 750 tons Excavation : 190,000 m3 X-legs : Number : 30 / Height : 19.40 m TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : SHAHID RAJAEE POWER PLANT COOLING TOWERS CITY : QAZVIN YEAR OF PROVISIONAL ACCEPTANCE : 2002 CLIENT : MAPNA CO . BASIC DATA : Height : 102 m X 3 Units of Cooling Towers Diameter : Bottom : 62.42 m / top : 50.77 m Wall thickness Bottom : 115 cm / top :17 cm Major Works Slipform : 82,000 m2 / Re - bars : 6,000 tons Concrete : 23,000 m3 /Steelwork : 750 tons Excavation : 22,000 m3 X-legs : Number : 30 / Height : 19.40 m / Diameter : 1.00 X 0.70 m

TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : NEYSHABOOR POWER PLANT COOLING TOWERS CITY : NEYSHABOOR YEAR OF PROVISIONAL ACCEPTANCE : 2003 CLIENT : MAPNA CO . BASIC DATA : Height : 106 m X 3 Cooling Towers Diameter : Bottom : 62.44 m / top : 51.47 m Wall thickness Bottom : 115 cm / top :17 cm Major Works Slipform : 87,000 m2 / Re - bars : 5,850 tons Concrete : 25,000 m3 /Steelworks : 780 tons Excavation : 140,000 m3 X-legs : Number : 30 / Height : 19.40 m TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : KHOY POWER PLANT COOLING TOWER & AUXILIARY BLDS. CITY : KHOY YEAR OF PROVISIONAL ACCEPTANCE : 2002 CLIENT : MAPNA CO . BASIC DATA : Height : 104 m Diameter : Bottom : 62.93 m / top : 56.28 m Wall thickness Bottom : 125 cm / top :16 cm Major Works Slipform :28,500 m2 / Re - bars : 6,000 tons Concrete : 30,000 m3 /steelwork : 320 tons Excavation : 25,000 m3 X-legs : Number : 30 / Height : 19.4 m / Diameter : 1.15 * 0.75 m

TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : SHARIATY POWER PLANT COOLING TOWER & AUXILIARY BLD. CITY : MASHHAD YEAR OF PROVISIONAL ACCEPTANCE : 2003 CLIENT : MAPNA CO . BASIC DATA : Height : 110 m Diameter : Bottom : 62.44 m / top : 51.24 m Wall thickness Bottom : 120 cm / top :18 cm Major Works Slipform :29,000 m2 / Re - bars : 1,900 tons Concrete : 8,000 m3 /steelwork : 250 tons Excavation : 15,000 m3 X-legs : Number : 30 / Height : 20.38 m

TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : SYRIAN POWER PLANT'S COOLING TOWERS (2 Projects) TITLES/LOCATIONS : TESHREEN & JANDAR YEAR OF PROVISIONAL ACCEPTANCE : 2010 & 2012 CLIENT : MAPNA CO . BASIC DATA : Height : 111 & 123 m Diameter : Bottom : 71 & 73 m / top : 59 & 66 m Wall thickness: Bottom : 125 cm / top :18 cm Major Works Climbing form :38,000 & 39,500 m2 Re - bars :3,200 tons/Each Concrete:11,000&12,000m3/Steelwork:279&350 tons Excavation : 26,770 & 20,000 m3 General Formwork: 12,480 & 9,500 m2 X-legs : Number : 32/Each / Height : 24.4 m/Each TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : YAZD COMBINE CYCLE POWER PLANT- COOLING TOWER CITY : YAZD CITY YEAR OF PROVISIONAL ACCEPTANCE : 2005 CLIENT : TURHAN INDUSTRIES & BEHIN SAMAN SARZAMIN NumberS of Turbine : 1 Specifications Turbine Capacity : 160 MW Excavation : 23,080 m3 BASIC DATA : Formwork : 36,200 m2 Major Works Re-Bar : 2,560 tons Concrete : 11,200 m3 / steelworks : 294 tons ﺮ ﻮ ﻪ ﯿﻮ

chimney projects

www.tosee-siloha.com TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : BISTOON POWER PLANT CHIMNEY CITY : KERMANSHAH YEAR OF PROVISIONAL ACCEPTANCE : 1992 CLIENT : SIKOM CO. BASIC DATA : Height : 160 m Diameter : Bottom : 19.8 m / top : 13.5 m Wall thickness Bottom : 50 cm / top : 25 cm Major Works Slipform :18,500 m2 / Re - bars : 800 tons Concrete :6,000 m3 / steelwork : 560 tons Excavation : 5,000 m3 TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : SAVEHJAM CHIMNEY CITY : SAVEH YEAR OF PROVISIONAL ACCEPTANCE : 1990 CLIENT : SAVEHJAM GLASS CO. BASIC DATA : Height : 80 m Diameter : Bottom : 6.25 m / top : 3.75 m Wall thickness Bottom : 25 cm / top : 25 cm Major Works Slipform :2,200 m2 / Re - bars : 50 tons Concrete :450 m3 / steelwork : 8 tons Brickwork : 1,000 m2 TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : GHARB POWER PLANT CHIMNEY CITY : HAMEDAN YEAR OF PROVISIONAL ACCEPTANCE : 1992 CLIENT : TAVANIR CO. BASIC DATA : Height : 150 m Diameter : Bottom : 22.4 m / top : 19.02 m Wall thickness Bottom : 70 cm / top : 30 cm Major Works Slipform :20,000 m2 / Re - bars : 1,252 tons Concrete :11,000 m3 / steelwork : 124 tons Excavation : 17,400 m3 TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : SHAZAND POWER PLANT CHIMNEYS CITY : ARAK YEAR OF PROVISIONAL ACCEPTANCE : 2001 CLIENT : MAPNA CO . BASIC DATA : Height : 200 m X 2 Chimneys Diameter : Bottom : 21.6 m / top : 8.21 m Wall thickness Bottom : 65 cm / top : 20 cm Major Works Slipform :34,400 m2 / Re - bars : 1,363 tons Concrete :7,680 m3 / steelwork : 57 tons Brickwork : 17,000 m2 / Excavation : 13,500 m3 TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : ISFEHAN STEEL MILL CHIMNEYS & STEEL STRUCTURE LOCATION : ISFEHAN STEEL MILL FACTORY-ISFEHAN CITY YEAR OF PROVISIONAL ACCEPTANCE : 2007 CLIENT/CONSULTANT : ISFEHAN STEEL MILL Co. / FOULAD TECHNIC Co. Height : 80 m / Bottom Diameter : 6.25 m Chimney Spec. Top Diameter : 3.75 m/Concrete shell tickness : 25 cm Slipform : 2,200 m2 Basic Data Formwork : 100 m2 / Excavation :1,900 m3 Major Works Concrete work :450 m3 / Steel works : 8 Tons Re-bars :50 Tons TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : QAZVIN FLOAT GLAZING FACTORY CHIMNEY LOCATION : QAZVIN , TAKESTAN- ABHAR ROAD YEAR OF PROVISIONAL ACCEPTANCE : 2008 CLIENT/CONSULTANT : QAZVIN GLAZING COMPANY / CLIENT'S REPRESENTATIVE Height : 102 m / Bottom Dia. : 6.85 m /Top Dia. :5.74 m Chimneys Spec. Concrete shell tickness : Bottom : 65 cm / Top : 20 cm Slipform : 33,200 m2 Basic Data Formwork : 2,380 m2 / Excavation :1,250 m3 Major Works Concrete work :2,100 m3 / Steel works : 32 Tons Re-bars : 415 Tons ﺮ ﻮ ﻪ ﯿﻮ

cement factorys

www.tosee-siloha.com TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : ARDEBIL CEMENT FACTORY CITY : ARDEBIL YEAR OF PROVISIONAL ACCEPTANCE : 1995 CLIENT : SIMAN ARDEBIL CO . BASIC DATA : Capacity : 2,300 tons / day Slipform : 30,000 m2

Major Works Concrete : 70,000 m3 /Re - bars : 8,000 tons Steelwork: 3,000 tons / Excavation : 110,000 m3 TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : NEYRIZ CEMENT FACTORY CITY : NEYRIZ YEAR OF PROVISIONAL ACCEPTANCE : 1995 CLIENT : SIMAN NEYRIZ CO . BASIC DATA : Capacity : 500 tons / day Slipform : 15,000 m2

Major Works Concrete : 55,000 m3 /Re - bars : 700 tons Steelwork: 500 tons / Excavation : 120,000 m3 TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : ISFAHAN CEMENT FACTORY CITY : ISFAHAN YEAR OF PROVISIONAL ACCEPTANCE : 2000 CLIENT : ISFAHAN CEMENT CO . BASIC DATA : Capacity Extention: 900 tons / day up to 2,300 tons / day Slipform : 12,100 m2

Major Works Concrete : 22,000 m3 /Re - bars : 2,558 tons Steelwork: 421 tons / Excavation : 34,000 m3 TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : FARSNO CEMENT FACTORY CITY : SHIRAZ YEAR OF PROVISIONAL ACCEPTANCE : 2005 CLIENT : SIMAN FARSNO CO . BASIC DATA : Capacity : 3,000 tons / day Slipform : 31,000 m2

Major Works Concrete : 71,150 m3 /Re - bars :9,100 tons Steelwork: 3,150 tons / Excavation : 105,000 m3 General formwork : 131,000 TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : MOMTAZAN 3,300 TON/DAY CEMENT FACTORY LOCATIONS : KERMAN CITY YEAR OF PROVISIONAL ACCEPTANCE : 2007 CLIENT/CONSULTANT : KERMAN MOMTAZAN CEMENT Co. / SAZE ANDISHAN Co. Concrete work :105,500 m3 Re-bars : 9,150 Tons Formwork 173,300 m2 Basic Data Major Works Excavation :294,044 m3 Steel works :3,552 Tons Slipform :29,000 m2 TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : LARESTAN CEMENT FACTORY CITY : LARESTAN YEAR OF PROVISIONAL ACCEPTANCE : 2005 CLIENT : SIMAN LARESTAN CO . BASIC DATA : Capacity : 700 tons / day Slipform : 15,000 m2

Major Works Concrete : 24,200 m3 /Re - bars : 2,306 tons Steelwork: 1,473 tons / Excavation : 53,500 m3 TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : ABYEK 7,500 TON/DAY CEMENT FACTORY LOCATIONS : QAZVIN CITY - ABYEK YEAR OF PROVISIONAL ACCEPTANCE : 2008 CLIENT/CONSULTANT : Abyek Cement Company/Pardis Rooz Company Concrete work :25,720 m3 Re-bars :4,084 Tons Formwork : 43,813 m2 Basic Data Major Works Excavation :18,608 m3 Steel works :3,151 Tons Slipform :9,712 m2 TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : GILAN SABZ 3,400 TON/DAY CEMENT FACTORY LOCATIONS : GILAN PROVINCE - SIAHKAL YEAR OF PROVISIONAL ACCEPTANCE : 2009 CLIENT/CONSULTANT : Gilan Sabz Industries Co./Andisheh Sazan Pars Co. Concrete work :52,000 m3 Re-bars :6,400 Tons Formwork 8,500 m2 Basic Data Major Works Excavation :142,500 m3 Steel works :6,630 Tons Slipform :20,000 m2 TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : MOND-DASHTI CEMENT PRODUCTION LINE-PHASE 1 LOCATIONS : BUSHEHR CITY YEAR OF PROVISIONAL ACCEPTANCE : 2013 CLIENT : MOND - DASHTI CEMENT Co. CONSULTANT : JAM PURCHASING AND MANUFACTURING Co. Major Specifications 3,300 Ton/Day Concrete work : 11,800 m3 Basic Data Re-bars : 1,952 Tons Major Works Formworks : 27,000 m2 Excavation : 294,044 m3 Steel works : 640 Tons TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : TEHRAN CEMENT FACTORY-SUBSTITUTE PROJECT TITLES/LOCATIONS : TEHRAN CITY YEAR OF PROVISIONAL ACCEPTANCE : 2016 CLIENT : Tehran Cement Company Concrete work :34,000 m3 Re-bars :9,800 Tons Formwork 44,000 m2 Basic Data Major Works Excavation :37,000 m3 Steel works :195 Tons Slipform :15,000 m2 ﺮ ﻮ ﻪ ﯿﻮ

other projects

www.tosee-siloha.com TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : 7th. TIR MARTYRS MONUMENT CITY : TEHRAN YEAR OF PROVISIONAL ACCEPTANCE : 1998 CLIENT : PRIVATE SECTOR BASIC DATA : Area : 2,000 m2

Major Works Concrete : 3,000 m3 /Re - bars : 600 tons Formwork : 7,000 m2 TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : NAVVAB ADMINISTRATIVE COMPLEX BUILDING LOCATIONS : TEHRAN CITY YEAR OF PROVISIONAL ACCEPTANCE : 1993 CONSTRUCTIVE JIHAD MINISTRY-RESEARCH & CLIENT / CONSULTANT : EDUCATION DEPUTY Major No. of Stoories : 18 / Building Space : 45,000 m2 Specifications Height of Building : 46 m Concrete work : 1,500 m3 Basic Data Re-bars : 100 Tons Major Works Formworks : 2,600 m2 Excavation : 8,000 m3 Steel works : 800 Tons

TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : JAHAD GARAN SPORTS & CULTURAL COMPLEX CITY : TEHRAN YEAR OF PROVISIONAL ACCEPTANCE : 1998 CLIENT : AGRICULTURAL JIHAD MINISTRY BASIC DATA : Area : 20,000 m2

Major Works Concrete : 2,549 m3 /Re - bars : 161 tons Steelwork: 8,352 tons / Excavation : 2,660 m3 General Formwork : 6,613 m2 / Brick work : 996 m3 TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : SAADAT ABAD HOUSING COMPLEX - CIVIL WORKS LOCATIONS : TEHRAN CITY YEAR OF PROVISIONAL ACCEPTANCE : 2005 CLIENT : TOSEE SILOHA Co. CONSULTANT : MAHSA POL Co. Major No. of Stoories : 19 / No. of Phases : 5 Specifications Building Space : 45,000 m2 / Units per Phase : 64 Concrete work : 3,000 m3 Basic Data Re-bars : 600 Tons Major Works Formworks : 7,000 m2 Excavation : 60,000 m3 Steel works : 7,200 Tons TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : CIVIL CONSTRUCTION OF IRAN-KHODRO UNDER BRIDGE LOCATIONS : TEHRAN CITY- Km 8th. OF KARAJ SPECIAL Rd. YEAR OF PROVISIONAL ACCEPTANCE : 1996 CLIENT : IRAN KHODRO Co. CONSULTANT : SAZEH PARDAZI IRAN Co. Major Length of Bridge : 147 m Specifications Width of Bridge : 6.55 m m Concrete work : 3,200 m3 Basic Data Re-bars : 338 Tons Major Works Formworks : 2,500 m2 Excavation : 27,500 m3 Steel works : 22 Tons

TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : PHASE 9 & 10 ONSHORE FACILITIES( CIVIL & BUILDING PORTION) CITY : ASALOYE YEAR OF PROVISIONAL ACCEPTANCE : 2006 CLIENT : OIEC BASIC DATA : 50 000 000 M3/DAY SWEET GAS REFINERY 400 TONS /DAY 1 000 000 TONS LPG/YEAR Major Works Concrete : 110,000 m3 /Re - bars : 13 000 tons Steelwork:0 tons / Excavation :669,000 m3 General Formwork : 269,000 m2 / Brick work :0 m3 TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : TOGA INDUSTRIAL TURBINE PROJECT - CIVIL WORKS LOCATION : KARAJ CITY YEAR OF PROVISIONAL ACCEPTANCE : 2012 CLIENT : MAPNA ENGINEERING AND TURBINE MANUFACTURING Co. CONSULTANT : NOHOW Co. Numbers of Turbine : 5 Specifications Turbine Capacity : 117 MW Excavation : 25,000 m3 BASIC DATA : Formwork : 8,500 m2 Major Works Re-Bar : 1,200 tons Concrete : 16,000 m3 / Steelworks : 200 tons TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : ASIA HOUSING COMPLEX STEEL STRUCTURE LOCATION : TEHRAN - ASIA BOULEVARD YEAR OF PROVISIONAL ACCEPTANCE : 2011 CLIENT : JIHAD TOSEE RESIDENCY COOPERATIVE Co. CONSULTANT : ABNIEH NO ANDISH Co. No. of Stories : 12 / No. of Phses : 3 Major Spec. Building space : 20,000 m2 / No, of Units in Phase:153 Basic Data Formwork : 24,000 m2 / Excavation :20,000 m3 Major Works Concrete work : 4,600 m3 / Re-bars : 646 Tons Steel Works : 1,200 tons TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

CONSTRUCTION , MOBILIZATION AND MACHINERY PROJECT NAME : PROCUREMENT OF CHEHEL KOUREH COPPER MINE LOCATIONS : ZAHEDAN CITY YEAR OF PROVISIONAL ACCEPTANCE : 2015 CLIENT : NATIONAL IRANIAN COPPER Co. CONSULTANT : KAAN AZIN Co. Major Mine Inlet Height : 27 m Specifications Mine Inlet Width : 28 m Concrete work : 2,800 m3 Basic Data Re-bars : 57 Tons Major Works Formworks : 2,000 m2 Excavation : 30000 m3 Steel works : 105 Tons ﺮ ﻮ ﻪ ﯿﻮ

inhand

projects

www.tosee-siloha.com TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : HERIS POWER PLANT CITY : HERIS YEAR OF PROVISIONAL ACCEPTANCE : 2016/36 MONTHS CLIENT : TANA ENERGY CONSULTANT : MESINAN Co. Numbers of Turbine :1 Specifications Turbine Capacity :500 MW Excavation : 82,000 m3 BASIC DATA : Formwork :54,000 m2 Major Works Re-Bar : 3,700 tons Concrete : 26,000 m3 / steelworks : 237 tons TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : ASALOYE POWER PLANT CITY : ASALOYE YEAR OF PROVISIONAL ACCEPTANCE : 2016/12 MONTHS CLIENT : MAPNA GROUP CONSULTANT : MAPNA Co. Numbers of Turbine : 4 Specifications Turbine Capacity :162 MW Excavation : 65,000 m3 BASIC DATA : Formwork :41,000 m2 Major Works Re-Bar : 1,800 tons Concrete : 22,000 m3 / steelworks : 133 tons TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : SHIRVAN C.C.POWER PLANT- COOLING TOWERS TITLES/LOCATIONS : SHIRVAN CITY COMMENCEMENT / DURATION 2015 / 17 MONTHS CLIENT : MAPNA GROUP Height 118 m Diameter Bottom:72m / Top: 62 m Wall Thickness Bottom:125 cm / Top: 18 cm X-legs Q'ty:64 ea / Height : 24.4 m Concrete work : 18,200 m3 BASIC DATA Re-bars :5,300 Tons Normal Formwork 10,500 m2 Major Works Climbing Formwork : 101,000 m2 Excavation :29,000 m3 Steel works :680 Tons

TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : EAST TEHRAN 100,000 M/T SILO PROJECT TITLES/LOCATIONS : GARMSAR / TEHRAN COMMENCEMENT / DURATION : 2014 / 36 MONTHS CLIENT : MINISTRY OF AGRICULTURAL JIHAD Number : 36 / Total Capacity : 100,000 tons / Height : 45 m Bins Diameter :11.5 m/ea Working - House Height :37m / Length : 15 m / Width : 67 m BASIC DATA Slipform: 110,000 m2 / General Formwork :29,000 m2 Major Works Excavation :36,000 m3 /Re-Bars : 6,400 tons Concrete : 39,000 m3 / Steelwork : 760 tons TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : TABAN C.C.POWER PLANT- COOLING TOWERS TITLES/LOCATIONS : YAZD CITY COMMENCEMENT / DURATION 2015 / 11 MONTHS CLIENT : MAPNA GROUP Height 120 m Diameter Bottom:72m / Top: 62 m Wall Thickness Bottom:125 cm / Top: 18 cm X-legs Q'ty:32 ea / Height : 24.4 m Concrete work :12300 m3 BASIC DATA Re-bars :3000 Tons Normal Formwork 11000 m2 Major Works Climbing Formwork : 38,000 m2 Excavation 14000 m3 Steel works :340 Tons

TOSSEE SILOHA CO . DESIGN & CONSTRUCTION OF HEAVY INDUSTRIAL PROJECTS

PROJECT NAME : HAMEDAN C.C. POWER PLANT-STEEL COOLING TOWER LOCATIONS : HAMEDAN CITY PROJECT STATUS : UNDER CONSTRUCTION CLIENT : ELECTRICITY DEVELOPMENT ORGANIZATION CONSULTANT : GHODS NIROO CONSULTANT ENGINEERS Height: 123m / Bottom Dia. : 99m / Top Dia. : 68m SPECIFICATIONS Steel shell cooling Tower Excavation : 13,340 m3 BASIC DATA Formwork : 4,692 m2 Major Works Concrete : 6,014 m3 Re-Bar : 470 tons / Steel works : 1,816 ton

ﺮ ﻮ ﻪ ﯿﻮ

awards & appreciations

www.tosee-siloha.com ﺮ ﻮ ﻪ ﯿﻮ

www.tosee-siloha.com ﺮ ﻮ ﻪ ﯿﻮ

www.tosee-siloha.com ﺮ ﻮ ﻪ ﯿﻮ

www.tosee-siloha.com ﺮ ﻮ ﻪ ﯿﻮ

www.tosee-siloha.com ﺮ ﻮ ﻪ ﯿﻮ

www.tosee-siloha.com ﺮ ﻮ ﻪ ﯿﻮ TOSEE SILOHA COMPANY

No. 3, 50th. st. , Seid Jamaleddin Asadabadi(Yousef Abad) Ave., Tehran- Iran

P.O.Box :14367 54819

Established on : Dec.8,1986

Tel. : +98 21 88063891

Facsimile : +98 21 88031340

Web site : www.tosee-siloha.com

E-Mail : [email protected]