MCO Arrival Wayfnding Map

Total Page:16

File Type:pdf, Size:1020Kb

MCO Arrival Wayfnding Map MCO Arrival Wayfnding Map N SIDE Gates 1-29 Level 1 Gates 100-129 Ground Transportation & Baggage Claim (8A) Level 2 Baggage Claim Gates 10-19 Gates Ticketing Locations 20-29 Gates 100-111 A-1 A-2 Level 3 A-3 A-4 2 1 Gates Gates 1-9 112-129 Hyatt Regency - Lvl.4 - Lvl.4 Regency Hyatt Security Checkpoint To Gates 70 - 129 70 Gates To Food Court To Gates 1-59 1-59 Gates To Security Checkpoint Gates 70-79 Gates 50-59 To Parking “C” Gates 3 90-99 4 B-1 B-2 Level 3 B-3 B-4 Gates Gates 30-39 Ticketing Locations Gates 80-89 40-49 Gates 70-99 Level 2 Gates 30-59 Baggage Claim Level 1 Ground Transportation & Baggage Claim (28B) SIDE C Check-in and baggage claim locations subject to change. Please check signage on arrival. *Map not to scale Find it ALL in One Place Welcome to Orlando Download the Orlando MCO App Available for International Airport (MCO) OrlandoAirports.net /flymco @MCO @flymco Flight Arrival Guide 03/18 To reach the Main Terminal, The journey to the To retrieve checked baggage, take follow directions on the overhead Main Terminal (A-Side or B-Side) the stairs, escalator or elevator down signage to the shuttle station 2 takes just over one minute. As the 4 6 to the Arrivals/Baggage Claim on which is located in the center train transports you, observe the Level 2. Check the monitors to of the Airside Terminal. signage and listen to the instructions determine the correct carousel directing you to either Baggage Claim A for your flight. Welcome to The Main Terminal, (A-Side and B-Side) or Baggage Claim B. The shuttle will arrive is open to the public as well as to arriving on Level 3 of the Main Terminal. Orlando and departing passengers. It is where the airline ticket counters, baggage claim, tour operators, rental cars, International shops, restaurants, hotels, currency exchange and ground transportation Airport (MCO) can be found. Curbside pick-up by private car Domestic passengers will and ride shares are on the Arrivals/ leave the aircraft via a jetway Baggage Claim Level (Level 2). which takes you into a gate area 1 7 in an Airside Terminal that is separated Rental Cars, Economy (Satellite) Parking from the Main terminal. Facilities including Once you are inside Shuttles, Taxis, Express Pick-Up, Shuttle restrooms, shops, restaurants, ATM’s and The shuttle doors will the Main Terminal, look for Vans, Resort Transportation, and Buses telephones can be found in this area. automatically open when it is the large letters depicting are on Ground Transportation 3 time for you to board. 5 Baggage Claim A or Level (Level 1). Baggage Claim B. .
Recommended publications
  • Valley & Spruce Project Initial Study and Mitigated
    VALLEY & SPRUCE PROJECT INITIAL STUDY AND MITIGATED NEGATIVE DECLARATION Prepared for: City of Rialto December 2017 VALLEY & SPRUCE PROJECT INITIAL STUDY AND MITIGATED NEGATIVE DECLARATION Prepared For: City of Rialto 150 S. Palm Avenue Rialto, CA 92376 Prepared By: Kimley-Horn and Associates, Inc. 401 B Street, Suite 600 San Diego, California 92101 December 2017 095894012 Copyright © 2017 Kimley-Horn and Associates, Inc. TABLE OF CONTENTS I. Initial Study ............................................................................................................................................ 1 II. Description of Proposed Project ........................................................................................................... 2 III. Required Permits ................................................................................................................................... 8 IV. Environmental Factors Potentially Affected ......................................................................................... 9 V. Determination ........................................................................................................................................ 9 VI. Environmental Evaluation .................................................................................................................. 10 1. Aesthetics ................................................................................................................................ 10 2. Agricultural and Forestry Resources .....................................................................................
    [Show full text]
  • Air Service Incentive Program
    ASIP5 AIR SERVICE INCENTIVE PROGRAM MIAMI INTERNATIONAL AIRPORT THE MIA AIR SERVICE INCENTIVE PROGRAM INTRODUCTION: The Miami-Dade Aviation Department (MDAD), op- destination (city) from MIA will qualify for 100% erator of Miami International Airport (MIA), is pleased abatement of landing fees on the new service, for a to offer ASIP5, the latest and most dynamic of its air 12-month Promotional Period. The service must be service incentive programs. The MIA ASIP5 comple- operated for 12 consecutive months. The incen- ments the strategies and objectives of the airport’s tive is available for any domestic U.S or Cana- air service development efforts while encouraging in- dian city pair regardless of present service levels cumbent carriers at MIA to consider expansion and to and from MIA by the applicant carrier or an- new market development. other carrier on that specific route. MIA OBJECTIVES: 2. New International Passenger Air Service: A. Any air carrier establishing scheduled, year-round • Stimulate domestic and international passenger passenger service to an international destination (city air service at MIA and / or airport) not currently served from MIA by any • Stimulate international freighter service to MIA carrier, will qualify for 100% abatement of landing • Increase non-aeronautical revenues at MIA fees on the qualifying service, for a 12-month Pro- • Reduce costs per enplaned passenger at MIA motional Period. Any secondary airports within the same destination will be deemed a new interna- ASIP5 PROGRAM COMPONENTS: tional route and will qualify for the incentive. For example, a carrier commencing London-Gatwick The MIA ASIP5 offers features that include: service will qualify for the incentive even though • An incentive for domestic passenger routes and MIA is already served from London-Heathrow.
    [Show full text]
  • Texas U.S. Ports of Entry
    Texas U.S. Ports of Entry www.BusinessInTexas.com TEXAS PORTS OF ENTRY Overview U.S. Ports of Entry Ports of Entry are officially designated areas at U.S. For current or further information on U.S. and Texas land borders, seaports, and airports which are ports, check the CBP website at approved by U.S. Customs and Border Protection www.cbp.gov/border-security/ports-entry or contact (CBP). There are 328 official ports of entry in the the CBP at: U.S. and 13 preclearance offices in Canada and the Caribbean. 1300 Pennsylvania Avenue, N.W. Washington, D.C. 20229 Port personnel are the face at the border for most Inquiries (877) 227-5511 cargo and visitors entering the United States. At International Callers (202)325-8000 Ports, CBP officers or Port employees accept entries of merchandise, clear passengers, collect duties, Texas Ports of Entry enforce the import and export laws and regulations of the U.S. federal government, and conduct Texas currently has 29 official U.S. ports of entry, immigration policy and programs. Ports also perform more than any other state, according to the CBP agriculture inspections to protect the nation from website. The map below provides details. potential carriers of animal and plant pests or diseases that could cause serious damage to the Information on the Texas ports of entry follows, in nation's crops, livestock, pets, and the environment. alphabetical order, in the next section. U.S. Ports of Entry In Texas 1 TEXAS PORTS OF ENTRY Texas Ports of Entry P ort of Entry: Addison Airport Port Information Port Code: 5584 Port Type: User Fee Airport Location Address: 4300 Westgrove Addison, TX 75001 General Phone: (469) 737-6913 General Fax: (469) 737-5246 Operational Hours: 8:30 AM-5:00 PM (Central) Weekdays (Monday-Friday) Brokers: View List Directions to Port Office DFW Airport: Take hwy 114 to Addison Airport Press Office Field Office Name: Houston Location Houston, TX Address: 2323 S.
    [Show full text]
  • GOOGLE LLC V. ORACLE AMERICA, INC
    (Slip Opinion) OCTOBER TERM, 2020 1 Syllabus NOTE: Where it is feasible, a syllabus (headnote) will be released, as is being done in connection with this case, at the time the opinion is issued. The syllabus constitutes no part of the opinion of the Court but has been prepared by the Reporter of Decisions for the convenience of the reader. See United States v. Detroit Timber & Lumber Co., 200 U. S. 321, 337. SUPREME COURT OF THE UNITED STATES Syllabus GOOGLE LLC v. ORACLE AMERICA, INC. CERTIORARI TO THE UNITED STATES COURT OF APPEALS FOR THE FEDERAL CIRCUIT No. 18–956. Argued October 7, 2020—Decided April 5, 2021 Oracle America, Inc., owns a copyright in Java SE, a computer platform that uses the popular Java computer programming language. In 2005, Google acquired Android and sought to build a new software platform for mobile devices. To allow the millions of programmers familiar with the Java programming language to work with its new Android plat- form, Google copied roughly 11,500 lines of code from the Java SE pro- gram. The copied lines are part of a tool called an Application Pro- gramming Interface (API). An API allows programmers to call upon prewritten computing tasks for use in their own programs. Over the course of protracted litigation, the lower courts have considered (1) whether Java SE’s owner could copyright the copied lines from the API, and (2) if so, whether Google’s copying constituted a permissible “fair use” of that material freeing Google from copyright liability. In the proceedings below, the Federal Circuit held that the copied lines are copyrightable.
    [Show full text]
  • Assessment of the Ability of Existing Airport Gate Infrastructure to Accommodate Transport Category Aircraft with Increased Wingspan for Improved Fuel Efficiency
    ASSESSMENT OF THE ABILITY OF EXISTING AIRPORT GATE INFRASTRUCTURE TO ACCOMMODATE TRANSPORT CATEGORY AIRCRAFT WITH INCREASED WINGSPAN FOR IMPROVED FUEL EFFICIENCY Kristina C. Bishop and R. John Hansman This report is based on the Masters Thesis of Kristina C. Bishop submitted to the Department of Aeronautics and Astronautics in partial fulfillment of the requirements for the degree of Master of Science at the Massachusetts Institute of Technology. Report No. ICAT-2012-4 May 2012 MIT International Center for Air Transportation (ICAT) Department of Aeronautics & Astronautics Massachusetts Institute of Technology Cambridge, MA 02139 USA [This Page Intentionally Left Blank] 2 ASSESSMENT OF THE ABILITY OF EXISTING AIRPORT GATE INFRASTRUCTURE TO ACCOMMODATE TRANSPORT CATEGORY AIRCRAFT WITH INCREASED WINGSPAN FOR IMPROVED FUEL EFFICIENCY By Kristina Bishop Submitted to the Department of Aeronautics and Astronautics On May 24th, 2012 in Partial Fulfillment of the Requirements for the Degree of Master of Science in Aeronautics and Astronautics. Abstract The continuous trend of rising fuel prices increases interest in improving the fuel efficiency of aircraft operations. Additionally, since fuel burn is directly linked to aircraft CO2 emissions, reducing fuel consumption has environmental benefits. One approach to reducing airline cost and mitigating environmental impacts of aviation is to achieve higher fuel efficiency by increasing aircraft wingspan. One concern is that airports may not be able to accommodate increased-wingspan aircraft since existing gate infrastructure may have been sized for the past and current aircraft. This results in a potential tradeoff for airlines; increasing wingspan increases fuel efficiency, but it also limits the number of gates available to maintain current aircraft operations.
    [Show full text]
  • Aviation Suzanne Pinkerton
    University of Miami Law School Institutional Repository University of Miami Inter-American Law Review 9-1-1978 Aviation Suzanne Pinkerton Follow this and additional works at: http://repository.law.miami.edu/umialr Recommended Citation Suzanne Pinkerton, Aviation, 10 U. Miami Inter-Am. L. Rev. 530 (1978) Available at: http://repository.law.miami.edu/umialr/vol10/iss2/11 This Report is brought to you for free and open access by Institutional Repository. It has been accepted for inclusion in University of Miami Inter- American Law Review by an authorized administrator of Institutional Repository. For more information, please contact [email protected]. LAWYER OF THE AMERICAS AVIATION REPORT SUZANNE C. PINKERTON* United Nations In September 1977, the International Civil Aviation Organization (ICAO) held its Twenty-second Assembly. Among the resolutions adopted was Resolution A 22-16,1 in which the Assembly requested those member states which had not previously done so, to become parties to the Conven- tion for the Suppression of Unlawful Seizure of Aircraft (Hague, 1970)2 and the Convention for the Suppression of Unlawful Acts against the Safety of Civil Aviation (Montreal, 1971).1 On November 3, 1977, the United Nations General Assembly, in response to the concern voiced by the ICAO, adopted by consensus Resolution 32/84 on the safety of international civil aviation. In adopting the resolution the General Assembly reaffirmed its condemna- tion of aerial hijacking and other interference with civil air travel. Two days earlier the Special Political Commitee had approved, by consensus, the resolution in draft form? In its final form, Resolution 32/8 is divided into five paragraphs.
    [Show full text]
  • Skyteam Global Airline Alliance
    Annual Report 2005 2005 Aeroflot made rapid progress towards membership of the SkyTeam global airline alliance Aeroflot became the first Russian airline to pass the IATA (IOSA) operational safety audit Aeroflot annual report 2005 Contents KEY FIGURES > 3 CEO’S ADDRESS TO SHAREHOLDERS> 4 MAIN EVENTS IN 2005 > 6 IMPLEMENTING COMPANY STRATEGY: RESULTS IN 2005 AND PRIORITY TASKS FOR 2006 Strengthening market positions > 10 Creating conditions for long-term growth > 10 Guaranteeing a competitive product > 11 Raising operating efficiency > 11 Developing the personnel management system > 11 Tasks for 2006 > 11 AIR TRAFFIC MARKET Global air traffic market > 14 The passenger traffic market in Russia > 14 Russian airlines: main events in 2005 > 15 Market position of Aeroflot Group > 15 CORPORATE GOVERNANCE Governing bodies > 18 Financial and business control > 23 Information disclosure > 25 BUSINESS IN 2005 Safety > 28 Passenger traffic > 30 Cargo traffic > 35 Cooperation with other air companies > 38 Joining the SkyTeam alliance > 38 Construction of the new terminal complex, Sheremetyevo-3 > 40 Business of Aeroflot subsidiaries > 41 Aircraft fleet > 43 IT development > 44 Quality management > 45 RISK MANAGEMENT Sector risks > 48 Financial risks > 49 Insurance programs > 49 Flight safety risk management > 49 PERSONNEL AND SOCIAL RESPONSIBILITY Personnel > 52 Charity activities > 54 Environment > 55 SHAREHOLDERS AND INVESTORS Share capital > 58 Securities > 59 Dividend history > 61 Important events since December 31, 2005 > 61 FINANCIAL REPORT Statement
    [Show full text]
  • Trolleybuses: Applicability of UN Regulation No
    Submitted by the expert from OICA Informal document GRSG-110-08-Rev.1 (110th GRSG, 26-29 April 2016, agenda item 2(a)) Trolleybuses: Applicability of UN Regulation No. 100 (Electric Power Train Vehicle) vs. UN Regulation No. 107 Annex 12 (Construction of M2/M3 Vehicles) for Electrical Safety 1. At 110th session of GRSG Belgium proposes to amend UN R107 annex 12 by deleting the requirements for trolleybuses (see GRSG/2016/05) and transfer the requirements into UN R100 (see GRSP/2016/07), which will be on the agenda of upcoming GRSP session in May 2016. 2. Due to the design of a trolleybus and stated in UN Regulation No. 107, trolleybuses are dual- mode vehicles. They can operate either: (a) in trolley mode, when connected to the overhead contact line (OCL), or (b) in bus mode when not connected to the OCL. When not connected to the OCL, they can also be (c) in charging mode, where they are stationary and plugged into the power grid for battery charging. 3. The basic principles of the design of the electric powertrain of the trolleybus and the connection to the OCL is based on international standards developed for trams and trains and is implemented and well accepted in the market worldwide. 4. Due to the fact that the trolleybus is used on public roads the trolleybus has to fulfil the regulations under the umbrella of the UNECE regulatory framework due to the existing national regulations (e.g. European frame work directive). 5. Therefore the annex 12 in UN R107 was amended to align the additional safety prescriptions for trolleybuses with the corresponding electrical standards.
    [Show full text]
  • Minutes of Claremore Public Works Authority Meeting Council Chambers, City Hall, 104 S
    MINUTES OF CLAREMORE PUBLIC WORKS AUTHORITY MEETING COUNCIL CHAMBERS, CITY HALL, 104 S. MUSKOGEE, CLAREMORE, OKLAHOMA MARCH 03, 2008 CALL TO ORDER Meeting called to order by Mayor Brant Shallenburger at 6:00 P.M. ROLL CALL Nan Pope called roll. The following were: Present: Brant Shallenburger, Buddy Robertson, Tony Mullenger, Flo Guthrie, Mick Webber, Terry Chase, Tom Lehman, Paula Watson Absent: Don Myers Staff Present: City Manager Troy Powell, Nan Pope, Serena Kauk, Matt Mueller, Randy Elliott, Cassie Sowers, Phil Stowell, Steve Lett, Daryl Golbek, Joe Kays, Gene Edwards, Tim Miller, Tamryn Cluck, Mark Dowler Pledge of Allegiance by all. Invocation by James Graham, Verdigris United Methodist Church. ACCEPTANCE OF AGENDA Motion by Mullenger, second by Lehman that the agenda for the regular CPWA meeting of March 03, 2008, be approved as written. 8 yes, Mullenger, Lehman, Robertson, Guthrie, Shallenburger, Webber, Chase, Watson. ITEMS UNFORESEEN AT THE TIME AGENDA WAS POSTED None CALL TO THE PUBLIC None CURRENT BUSINESS Motion by Mullenger, second by Lehman to approve the following consent items: (a) Minutes of Claremore Public Works Authority meeting on February 18, 2008, as printed. (b) All claims as printed. (c) Approve budget supplement for upgrading the electric distribution system and adding an additional Substation for the new Oklahoma Plaza Development - $586,985 - Leasehold improvements to new project number assignment. (Serena Kauk) (d) Approve budget supplement for purchase of an additional concrete control house for new Substation #5 for Oklahoma Plaza Development - $93,946 - Leasehold improvements to new project number assignment. (Serena Kauk) (e) Approve budget supplement for electrical engineering contract with Ledbetter, Corner and Associates for engineering design phase for Substation #5 - Oklahoma Plaza Development - $198,488 - Leasehold improvements to new project number assignment.
    [Show full text]
  • Transit Capacity and Quality of Service Manual (Part B)
    7UDQVLW&DSDFLW\DQG4XDOLW\RI6HUYLFH0DQXDO PART 2 BUS TRANSIT CAPACITY CONTENTS 1. BUS CAPACITY BASICS ....................................................................................... 2-1 Overview..................................................................................................................... 2-1 Definitions............................................................................................................... 2-1 Types of Bus Facilities and Service ............................................................................ 2-3 Factors Influencing Bus Capacity ............................................................................... 2-5 Vehicle Capacity..................................................................................................... 2-5 Person Capacity..................................................................................................... 2-13 Fundamental Capacity Calculations .......................................................................... 2-15 Vehicle Capacity................................................................................................... 2-15 Person Capacity..................................................................................................... 2-22 Planning Applications ............................................................................................... 2-23 2. OPERATING ISSUES............................................................................................ 2-25 Introduction..............................................................................................................
    [Show full text]
  • Why Some Airport-Rail Links Get Built and Others Do Not: the Role of Institutions, Equity and Financing
    Why some airport-rail links get built and others do not: the role of institutions, equity and financing by Julia Nickel S.M. in Engineering Systems- Massachusetts Institute of Technology, 2010 Vordiplom in Wirtschaftsingenieurwesen- Universität Karlsruhe, 2007 Submitted to the Department of Political Science in partial fulfillment of the requirements for the degree of Master of Science in Political Science at the MASSACHUSETTS INSTITUTE OF TECHNOLOGY February 2011 © Massachusetts Institute of Technology 2011. All rights reserved. Author . Department of Political Science October 12, 2010 Certified by . Kenneth Oye Associate Professor of Political Science Thesis Supervisor Accepted by . Roger Peterson Arthur and Ruth Sloan Professor of Political Science Chair, Graduate Program Committee 1 Why some airport-rail links get built and others do not: the role of institutions, equity and financing by Julia Nickel Submitted to the Department of Political Science On October 12, 2010, in partial fulfillment of the Requirements for the Degree of Master of Science in Political Science Abstract The thesis seeks to provide an understanding of reasons for different outcomes of airport ground access projects. Five in-depth case studies (Hongkong, Tokyo-Narita, London- Heathrow, Chicago- O’Hare and Paris-Charles de Gaulle) and eight smaller case studies (Kuala Lumpur, Seoul, Shanghai-Pudong, Bangkok, Beijing, Rome- Fiumicino, Istanbul-Atatürk and Munich- Franz Josef Strauss) are conducted. The thesis builds on existing literature that compares airport-rail links by explicitly considering the influence of the institutional environment of an airport on its ground access situation and by paying special attention to recently opened dedicated airport expresses in Asia.
    [Show full text]
  • Top 20 Busiest Air Cargo Airports
    World’s 20 busiest Air Cargo Hubs (TOTAL CARGO) IATA REGION CITY COUNTRY AIRPORT NAME CODE % CHANGE Hong Kong 1 Asia-Pacific Hong Kong Hong Kong International Airport HKG 1. 4 2 North America Memphis TN United States Memphis International Airport MEM 3.1 3 Asia-Pacific Shanghai China Pudong International Airport PVG -1.5 4 Asia-Pacific Incheon Korea, Republic Of Incheon International Airport ICN 1. 0 Ted Stevens Anchorage 5 North America Anchorage AK United States International Airport ANC 3.5 United Arab 6 Middle East Dubai Emirates Dubai International Airport DXB -0.5 7 North America Louisville KY United States Louisville International Airport SDF 0.8 Taiwan Taoyuan 8 Asia-Pacific Taipei Chinese Taipei International Airport TPE 2.4 9 Asia-Pacific Tok yo Japan Narita International Airport NRT -3.2 Los Angeles 10 North America Los Angeles CA United States International Airport LAX 2.4 11 Middle East Doha Qatar Hamad International Airport DOH 8.8 12 Asia-Pacific Singapore Singapore Singapore Changi Airport SIN 1. 4 13 Europe Frankfurt Germany Flughafen Frankfurt/Main FRA -0.8 Aéroport de Paris-Charles 14 Europe Paris France de Gaulle CDG -1.8 15 North America Miami FL United States Miami International Airport MIA 2.8 Beijing Capital 16 Asia-Pacific Beijing China International Airport PEK 2.2 Guangzhou Bai Yun 17 Asia-Pacific Guangzhou China International Airport CAN 5.0 18 North America Chicago IL United States O’Hare International Airport ORD 3.6 19 Europe London United Kingdom Heathrow Airport LHR -1.3 20 Europe Amsterdam Netherlands Amsterdam Airport Schiphol AMS -2.7 Copyright © 2019 Airports Council International *Preliminary rankings for 2018, with respect to total cargo traffic.
    [Show full text]