Merrimack Canal

Total Page:16

File Type:pdf, Size:1020Kb

Merrimack Canal Contents Articles Pawtucket Canal 1 Middlesex Canal 2 Lowell Power Canal System and Pawtucket Gatehouse 4 Merrimack Canal 6 References Article Sources and Contributors 7 Image Sources, Licenses and Contributors 8 Article Licenses License 9 Pawtucket Canal 1 Pawtucket Canal The Pawtucket Canal was finished in 1796. It was built to circumvent the Pawtucket Falls of the Merrimack River in East Chelmsford, Massachusetts (now Lowell, Massachusetts). It is a major component of the → Lowell canal system. The Pawtucket Falls are a mile long series of falls and rapids in which the Merrimack River drops 32 feet. The falls hampered the shipment of inland goods, mostly lumber, to the mouth of the Merrimack and Newburyport, Massachusetts. Newburyport was then one of the largest shipbuilding centers in New England, Pawtucket Canal in context and a steady supply of wood from New Hampshire was critical to its industry. The original canal was built by wealthy Boston merchants who formed a limited liability corporation called the Proprietors of Locks and Canals, one of the first of its kind in the United States. However, within a decade of its construction the → Middlesex Canal was completed, connecting the Merrimack directly with Boston, Massachusetts. Bringing goods directly to Boston was more advantageous for merchants, and the Pawtucket Canal fell out of favor for inland transport. The investors in the Boston Manufacturing Company having successfully built upon Francis Cabot Lowell and Paul Moody's work in builing a successfully integrated cotton mill at Waltham, Massachusetts on the Charles River were looking for a site that offered more waterpower and the Pawtucket Falls offered what they needed. In 1821 they bought the Proprietors of Locks and Canals and with it the water rights of the Merrimack River upstream from the Pawtucket Falls. The Pawtucket Canal was deepened to become a power canal, and the first of 5.6 miles of canals in the soon to be named City of Lowell, Massachusetts. The first canal built off the Pawtucket Canal was the Merrimack Canal, which powered the Merrimack Manufacturing Company, thus starting the Lowell experiment, and the first planned industrial city in the United States. The canal is operated today by Boott Hydro, LLC. Middlesex Canal 2 Middlesex Canal The Middlesex Canal was a 27 mile (44 km) barge canal connecting the Merrimack River with the port of Boston. When operational it was 30 feet (9.1 m) wide, and 3 feet (0.9 m) deep, with 20 locks, each 80 feet (24 m) long and between 10 and 11 feet (3.0 and 3.4 m) wide. It also had 8 aqueducts. The canal was chartered on June 22, 1793 with a signature by Governor John Hancock, and was built between 1795 and 1803 under the engineering guidance of Loammi Baldwin, with the aim of opening up the vast interior of New England to merchant capital. In 1795 ground was broken at North Billerica Mills and Shawsheen River Aqueduct, Middlesex Canal, Billerica/Wilmington the first boat operated on April 22, 1802. Town Line, Massachusetts. The opening of the canal ended the commercial viability of the port of Newburyport, Massachusetts, the outlet of the Merrimack River, since all trade from the Merrimack Valley in New Hampshire now went via the canal to Boston, rather than through the sometimes difficult to navigate river.[2] The canal ran from Middlesex Village in East Chelmsford, Massachusetts, later Lowell, through several Middlesex County towns. At first it terminated in Medford, but was later extended to Charlestown, Massachusetts with a branch near Medford Center to the Mystic River.[1] A series of other canals along the Merrimack allowed freight to be transported as far inland as Concord, New Hampshire. The water source Map of the Middlesex Canal, 1801, before it was extended south of for the canal was the Concord River at North Billerica. [1] Medford. This was also the highest point of the canal, and is the present location of the Middlesex Canal Association's museum. Freight boats required 18 hours from Boston up to Lowell, and 12 hours down, thus averaging 2.5 miles per hour; passenger boats were faster, at 12 and 8 hours, respectively (4 miles per hour). A roundtrip between Boston and Concord, New Hampshire usually took 7-10 days. The canal was one of the main thoroughfares in New England until the advent of the railroad. In fact, the Boston and Lowell Railroad (now a part of the MBTA Commuter Rail system) was built using the plans from the original surveys for the canal. Portions of the line follow the canal route closely, and the canal was used to transport the construction materials for the railroad. The canal was no longer economically viable after the introduction of railroad competition, and the company went bankrupt in 1851. The Middlesex Turnpike, incorporated 1805, also contributed to its downfall. The proprietors proposed to convert it into an aqueduct to bring drinking water to Boston, but this effort was unsuccessful. Parts of the canal bed were covered by roads in the 20th century, including the Mystic Valley Parkway in portions of Middlesex Canal 3 Medford and Winchester. Though significant portions of the Middlesex Canal are still visible, urban and suburban sprawl is quickly overcoming many of the remains. The Middlesex Canal Association has made an effort to erect markers along much of the canal's path. Prominent portions of the canal that are still visible include water-filled portions near Baldwin House (near I-95 in Woburn), and dry sections in Winchester, most notably a section at the Mystic Lakes where an aqueduct was situated. A particularly fine segment of the canal; most Map of lower stretch of Middlesex Canal, 1852. has reverted to nature or vanished. External links • Middlesex Canal Association [3] • History of Middlesex Canal, with links [4] • New England Magazine article, January 1898 [5] • Early Canal Transportation: The Boats of the Middlesex Canal [6] • Paintings: Middlesex Canal by Joseph Payro 1930s [7] • Report of the Joint Special Committee Upon the Subject of the Flowage of Meadows on the Concord and Sudbury Rivers [8], by Massachusetts, General Court, published 1860. This is how the Middlesex Canal Corporation was dissolved. Middlesex Canal 4 References [1] http:/ / www. medfordhistorical. org/ middlesexcanal. php [2] Muir, Diana, Reflections in Bullough's Pond, University Press of New England, p.112 [3] http:/ / www. middlesexcanal. org/ [4] http:/ / www. geocities. com/ Athens/ Troy/ 6034/ [5] http:/ / cdl. library. cornell. edu/ cgi-bin/ moa/ pageviewer?coll=moa& root=/ moa/ newe/ newe0023/ & tif=00527. TIF& view=50& frames=1 [6] http:/ / library. uml. edu/ clh/ MC/ Mc. Html [7] http:/ / library. uml. edu/ clh/ MidCan. Html [8] http:/ / books. google. com/ books?id=2MQOAAAAYAAJ& pg=PA84& source=gbs_toc_r& cad=0_0#PPR1,M1 Lowell Power Canal System and Pawtucket Gatehouse Main Article History of Lowell, Massachusetts The Lowell Power Canal System is the largest power canal system in the United States, at 5.6 miles in length. The system's estimated output is 10,000 horsepower, operating six major canals on two levels, controlled by numerous gates. The system was begun in the 1790s, beginning its life as a transportation canal called the → Pawtucket Canal, which was constructed to get logs from New Hampshire down the Merrimack River to shipbuilding centers at Newburyport, Massachusetts, bypassing the 30-plus foot drop of the Pawtucket Falls. Lowell's Canal System In the early 1820s, Associates of the recently-deceased Francis Cabot Lowell bought up the old Pawtucket Canal in what was then East Chelmsford, Massachusetts. Within a few years, the new industrial center that became Lowell was using canals feeding off of a widened and deepened Pawtucket Canal as a direct power source for their textile mills. The first of these canals was the → Merrimack Canal, which powered the Merrimack Manufacturing Company. The repurposing of the Proprietors of Locks and Canals allowed the Associates to sell water power to other companies, starting with the Hamilton Canal, leading to the explosive growth of the town, and then shortly thereafter, city, of Lowell. Lowell Power Canal System and Pawtucket Gatehouse 5 By the late 1840s, Lowell's canal system was producing as much power as possible. However, the Chief Engineer of Locks and Canals, an Englishman by the name of James B. Francis divised the Northern Canal and the Moody Street Feeder, to increase the capacity of, and availability of water to various parts of, the whole system. The Pawtucket Gatehouse was constructed to control flow from behind the Pawtucket Dam into the Northern Canal. The dam itself, which was built twenty years earlier, was lengthened at this time, diverting the entire Merrimack (during periods of lower flow) into the two Pawtucket Gatehouse, from the above the falls side canal system entrances above it. It is a stone dam topped with wooden flashboards - a system still used on this dam today. The level of the water is regulated by the flashboards and the metal pins that hold them back. When there is too much water going over the top of the dam, the pins bend backwards, releasing the boards, and the outflow of the dam is increased. The Gatehouse contains ten wooden gates that control the flow of the Merrimack into the canal. Originally, they were opened by a Francis Turbine, also an invention of James B. Today, the Gatehouse is controlled electrically and remotely by Boott Hydroelectric, who is partially a continuation of the Proprietors of Locks and Canals, and who operates a 24 Megawatt hydroplant on the Northern Canal. The Canal System and the Gatehouse became Historic Mechanical Engineering Landmarks in 1985 and are part of Lowell National Historical Park.
Recommended publications
  • Kyan St OOC Extension Request
    The City of Lowell • Dept. of Planning and Development • Division of Development Services Lowell City Hall, Rm. 51 • 375 Merrimack Street • Lowell, MA 01852 P: 978.674.4144 • www.LowellMA.gov LAND USE BOARD: MAIN APPLICATION The following application is made to the City of Lowell Division of Development Services in accordance with the provisions of The Code of Ordinances, City of Lowell, Massachusetts, Chapter 270, Zoning Code. 1. Application Information Address of Property Location: _________________________________________________________________ Owner: _____________________________Telephone No. _________________Email: ___________ Address (if different) ________________________City: _____________State: ______Zip Code: ____________ Second Owner (if applicable): ________________ Telephone No. ________________Email: _____ Address (if different) ________________________City: _____________State: ______Zip Code: ____________ Applicant: (If different from Owner): ___________________________ Telephone No: ____________________ Email: ___________ ______Title (Tenant/Lessee/Purchaser/Etc.): _____________________________ Address _____________________________City: __________________State: ______Zip Code: _____________ Owner’s Agent (if applicable): ____________________________Telephone No. _________________________ Email: ___________ ______Title: (Attorney/Architect/Contractor/Etc.):________________________ Address _____________________________City: __________________State: ______Zip Code: _____________ 2. Please check all Board/Commission Approval(s)
    [Show full text]
  • Lowell, Massachusetts ) 3-27420 )
    COMMONWEALTH OF MASSACHUSETTS IN THE MATTER OF ) BROWNFIELDS COVENANT ) NOT TO SUE AGREEMENT TRINITY APPLETON FOUR LIMITED ) PARTNERSHIP AND TRIITY APPLETON ) LIMITED PARTNERSHIP ) REDEVELOPMENT OF ) MassDEP RTNs 3-26095 219,265 AND 307 JACKSON STREET, ) 3-26424 LOWELL, MASSACHUSETTS ) 3-27420 ) i. STATEMENT OF PURPOSE A. This Agreement is made and entered into by and between the Office of the Attorney General (the "OAG") on behalf of the Commonwealth of Massachusetts (the "Commonwealth") and Trinity Appleton Four Limited Partnership and Trinity Appleton Limited Partnership (the "Trinity Entities"). Collectively, the OAG and the Trinity Entities are referred to as the "Parties." B. This Agreement is entered into pursuant to the Massachusetts Oil and Hazardous Material Release Prevention and Response Act, as amended and codified in Massachusetts General Laws Chapter 2lE ("G.L. c. 21E"), and the OAG's Brownfields Covenant Not to Sue Agreement Regulations at 940 CMR 23.00 ("Brownfields Covenant Regulations"), with reference to the Massachusetts Contingency Plan, 310 CMR 40.0000 (the "MCP"). This Agreement relates to the remediation of property now known as 219, 265 and 307 Jackson Street in the Hamilton Canal District of Lowell, Massachusetts more fully shown on the plan in Exhibit A, attached and incorporated by reference into this Agreement, which is recorded in Middlesex North Registry of Deeds in Plan Book 228, Page 127 (the "Property"). As more fully described and shown in Exhibit A, the Property contains parcels 6, 7, 8, 9 and portions of parcel 10 and Street D. Parcels 6 and 7 are owned by the Trinity Entities. Parcels 8, 9, 10 and Street Dare owned by the City of Lowell.
    [Show full text]
  • Towpath Topics Middlesex Canal Association P.O
    Towpath Topics Middlesex Canal Association P.O. Box 333 Billerica, MA 01821 www.middlesexcanal.org Volume 50 No. 3 March 2012 MCA ACTIVITIES Mark your calendars! A Middlesex Canal Bicycle Ride will be conducted on Sunday, April 1, along the length of the canal, from Middlesex Village on the north - south to Charlestown. The MCA-AMC Spring Walk will take place on Sunday, April 15, in North Billerica. The Annual Meeting will be held at the museum on Sunday, April 29, beginning at 1 PM. Nancy Lusignan Schultz, author of the book “Fire and Roses”, will be our speaker. There will also be an election of officers. See the Calendar, beginning on page 3, for more information on our activi- ties. Also included in the calendar are meetings and tours, sponsored by other organizations, in which you may want to participate. Please also check our web site periodically, at the URL noted above, which often lists canal-related events and topics of potential interest. PRESIDENT’S MESSAGE by J. Jeremiah Breen, President; [email protected] Now is a good time to walk the towpath of the historic Middlesex Canal. With the leaves fallen and the undergrowth withered, all the canal remnants found by Burt VerPlanck and published in his “Middlesex Canal Guide and Maps” are more visible. And if walkers this time of year still can’t find a sluice used to drawdown the canal into Content Brook or other remnant, Roger Hago- pian is available to answer questions. He walked the proof of the Guide after If you can say Welcome!, you can be a volunteer at the museum.
    [Show full text]
  • 1 American Canal Society
    National Canal Museum Archives Delaware & Lehigh National Heritage Corridor 2750 Hugh Moore Park Road, Easton PA 18042 610-923-3548 x237 – [email protected] ------------------------------------------------------------------------------------- American Canal Society – Stephen M. Straight Collection, 1964-1984 2000.051 Stephen M. Straight was apparently an amateur historian who collected material relating to North American canals, primarily in the New England area. His collection was given to Stetson University, which sent it on to the American Canal Society. The ACS then sent it to the National Canal Museum. Extent: 2/3 linear feet Box 1: Folder 0: Miscellaneous Correspondence • Letter from Sims D. Kline, director, DuPont-Ball Library, Stetson University, to American Canal Society (ACS) re: Stephen M. Straight material. 3-20-98. • Letter from ACS (William H. Shank, publisher, American Canals) to Sims D. Kline re: Stephen M. Straight material. 11-16-98. Folder 1: New England Canals, Book One • “America’s First Canal,” by Edward Rowe Snow, and “America’s First Canal Mural Series,” Yankee, March 1966. • “New England’s Forgotten Canal,” by Prescott W. Hall, Yankee, March 1960. • Letter from R. G. Knowlton, vice president, Concord Electric Company, to Stephen M. Straight (SS) • Xerox copies from Lyford’s History of Concord, N.H., pp. 9, 340-41, 839-40. • Letter from Elizabeth B. Know, corresponding secretary, The New London County Historical Society, New London, CT, to SS. • Editorial by Eric Sloane. Unknown source. • Typed notes (2 pages) from History of Concord, N.H., vol. II, 1896, pp. 832-40. • Letter from Augusta Comstock, Baker Memorial Library, Dartmouth College, to SS. • Xerox copies of map of Connecticut River, surveyed by Holmes Hutchinson, 1825.
    [Show full text]
  • Gunderboom Technology & Projects Overview
    1050 Central Park Drive Sanford, FL 32771 Toll Free 888-345-2666 (BOOM) Tel 407-548-2200 Fax 407-548-2230 www.gunderboom.com Gunderboom Technology & Projects Overview Technology Overview Gunderboom, Inc. provides project specific, Engineered Aquatic Filter Barrier systems. The Gunderboom team designs barrier systems individually for each project that takes into consideration all the parameters of the site, project goals, physical site characteristics, “means and methods” and dynamic forces that will be transmitted into the barrier. That design is then fabricated in the Gunderboom facility under direct supervision of the design engineers. The Gunderboom fabrication facility was purpose built to assemble these special barrier systems so that the very high tensile strengths required can be achieved. It is not uncommon for connection/mooring point design loads, as an example, to reach 50,000 lbs and be 1.5” thick when all the elements are combined together (See Attachment A – GeoComposite Example). Typically, the Aquatic Filter Barrier can be described as a full depth, permeable barrier constructed of “GeoComposites” (either floating or fixed) that allows water to pass while retaining/excluding, from side to side, suspended sediments (including contaminated sediments or sediments that carry bacteria), fish/larvae/eggs or sound. In certain applications these barrier systems may be impermeable, or partially impermeable to accommodate differing strata within the water body. There are also some cases where the barriers have not been full water depth, again for site specific requirements. Marine Design & Construction * Commercial Diving * Technical Dredging * Salvage * Environmental Contracting 1050 Central Park Dr. ● Sanford, FL 32771 ● Toll Free 888-345-2666 (BOOM) ● Tel 407-548-2200 ● Fax 407-548-2230 Project Examples Marine Life Exclusion System (MLES™) Lovett Generating Station – Hudson River – New York Floating, full water depth, boom system to exclude all life stages, including fish eggs, down to 0.5 mm from 425,000 gpm cooling water intake system.
    [Show full text]
  • Siting of Renewable Energy Facilities Within the Montachusett and North
    SITING OF RENEWABLE ENERGY FACILITIES WITHIN THE MONTACHUSETT AND NORTHERN MIDDLESEX REGIONS Funded by: Prepared by the Montachusett Regional Planning Commission (MRPC) and the Northern Middlesex Council of Governments (NMCOG) October 2014 I EXECUTIVE SUMMARY Expenditures for conventional energy and fuel costs provide little direct economic benefit for our regional economies. Utilization of renewable energy and improvements to energy efficiency has the ability to keep more of those dollars in our local communities and regional economy. This involves siting and promoting renewable energy facilities in appropriate locations, increasing reliance on renewable energy sources, and making these energy sources more practical and affordable. Renewables are not subject to fossil fuel price volatility, enabling residents to more efficiently deal with temperature extremes. Energy prices in a region with both high efficiency and renewable energy are likely to see less volatility and lower average power prices because price spikes will be reduced. However, at this time, there are insufficient siting standards for renewables. As a result, developers of renewable energy do not know what criteria they need to meet in order to develop wind, solar, geothermal, hydropower and other facilities. Renewable energy facilities also provide complementary economic development benefits by generating investment and employment in different sectors of the economy, which expands the total economic stimulus effect. Renewable energy also has a high job growth rate, reflected in efforts at Fitchburg State College, Mount Wachusett Community College, and University of Massachusetts - Lowell to educate and train people in the skill areas necessary to fuel the clean energy transition. This report was developed, in part, to serve as a template for other Regional Planning Agencies (RPAs) throughout the Commonwealth to promote renewable energy and enhance economic development in their regions.
    [Show full text]
  • Water Power in Lowell, Massachusetts
    WATER POWER IN LOWELL, MASSACHUSETTS prepared by Patrick M. Malone Assistant Professor of American Civilization & History Brown University and Larry D. Lankton Assistant Curator, Power & Shop Machinery The Henry Ford Museum Photographs by Lyn Van Buskirk submitted to the Field Investigation Presentation of Subcommittee on National Parks and Recreation of the House Committee on Interior and Insular Affairs April 26, 1974 Lowell, Massachusetts became America’s first great industrial city because of the power of the Merrimack River. The textile mills which brought pros­ perity to early Lowell depended on water power delivered by a complex system of canals. These man-made waterways were, and still are, an engineering marvel. They greatly affected the patterns of urban development in Lowell and earned the city its reputation as the "Venice of America." An 1821 map of' "Pawtucket in the town of Chelmsford" shows the rural area which would soon become the city of Lowell. Here the Concord River joins the Merrimack below the Pawtucket Falls. Lowell historian Henry Miles described the falls as "a descent of thirty-two feet— not perpendicular, but over several rapids, in circuitous channels, with a violent current amidst sharp- pointed r o c k s . In earlier times the Indians had fished at the falls, but by the late eighteenth century the rapids seriously interrupted the flow of goods, principally lumber, that came down the Merrimack to Newburyport on the coast. In 1792 a corporation known as the Proprietors of Locks and Canals on the Merrimack River was established with a plan to by-pass this natural obstacle.
    [Show full text]
  • Master Plan Update EXISTING CONDITIONS REPORT
    City of Lowell Massachusetts Master Plan Update EXISTING CONDITIONS REPORT Office of the City Manager Department of Planning and Development JFK Civic Center, 50 Arcand Drive Lowell, MA 01852 December, 2011 2 Existing Conditions Report | 2011 TABLE OF CONTENTS TABLE OF CONTENTS ...................................................................................................................................... 3 1.0 INTRODUCTION ........................................................................................................................................ 5 1.1 THE COMPREHENSIVE MASTER PLAN UPDATE ..................................................................................... 5 1.2 EXISTING CONDITIONS ......................................................................................................................... 7 1.3 REGIONAL CONTEXT ............................................................................................................................. 7 1.4 HISTORY ................................................................................................................................................ 7 2.0 DEMOGRAPHICS ...................................................................................................................................... 9 2.1 HISTORIC TRENDS ............................................................................................................................... 10 2.2 POPULATION & DENSITY ....................................................................................................................
    [Show full text]
  • The Legacy of James B. Francis, Engineer​
    History The Legacy of James B. Francis, Engineer for the Proprietors of Locks and Canals (PLC); a very large company that built and managed the Not relying on ncut and try" textile industry in Lowell, Massachusetts, he methods, Francis brought a took Francis with him as his assistant. By that time, Francis had established himself scientific mind to bear on a as a skilled surveyor, draftsman and project variety of problems in manager. Also, Whistler appreciated his ability hydraulics and structural to work with people at all levels to get the job done. In his first job for Whistler, Francis built engineering. steam locomotives to provide transport for the textiles produced by the Lowell mills. To engi­ KATHERINE R. WEEKS neer the parts, he stripped down a locomotive imported from England and made detailed legend in New England's Merrimack drawings of all the parts. His staff members River Valley, James B. Francis was a created new parts from his drawings, using , A structural engineer, mechanical engi­ only chisels and files, and successfully recon­ neer, hydraulic engineer and a scientific con­ structed the locomotive. tributor in the fields of hydraulics and hydrol­ At the time, Lowell's canal system consisted ogy. His contributions of safe, efficient and · of the Pawtucket Canal and three subsidiary effective water power and mill structures were canals that served six textile .mills. During vital to the prosperity of the New England tex­ Francis' tenure as assistant to Whistler, three tile industry of the 1800s. more subsidiary canals were built to serve an­ other four mills.
    [Show full text]
  • Copyright by Robert Daniel Brennan, Jr. 2009
    Copyright by Robert Daniel Brennan, Jr. 2009 The Dissertation Committee for Robert Daniel Brennan, Jr. Certifies that this is the approved version of the following dissertation: Last Breath, First Pulse: An Experiment in Modernization, Lowell, Massachusetts, 1823 - 1857 Committee: Christopher Shane Davies, Supervisor Karl Butzer William Doolittle Steven Hoelscher John Mullin Last Breath, First Pulse: An Experiment in Modernization, Lowell, Massachusetts, 1823 - 1857 by Robert Daniel Brennan, Jr., B.A., M.R.P. Dissertation Presented to the Faculty of the Graduate School of The University of Texas at Austin in Partial Fulfillment of the Requirements for the Degree of Doctor of Philosophy The University of Texas at Austin December, 2009 Dedication To those who prompt, in the words of Sophie Hannah: “Chattering teeth, a goal, a lot to lose, A granted wish, mixed motives, superstitions, Hang-ups and headaches, fear of awful news, A bubble in my throat, a dare to swallow, A crack of light under a closing door.” To the visible miracles in my life: Susan, Natalie, and Caroline Acknowledgements Many individuals now geographically and temporally dispersed, from Minnie Burdick and Kevin Ryan to Jeff Perkins and Seth Feldman, deserve recognition for their contributions to this dissertation. Unfortunately, limited space allows me to explicitly recognize only a very few individuals for their direct contributions. But first, two exceptions. I must thank my mother, my father, my sisters and my brother. No longer will they not ask me, “What are you writing about?” for fear of having to listen to an exhaustive – and exhausting – answer. Even better, never again will they ask me the simple but too often unanswerable question, “When are you going to finish?” Second, intellectual honesty demands that I acknowledge the enduring influence of the late Dr.
    [Show full text]
  • Pawtucket Street Over the Pawtucket Canal
    SUMMARY OF FINDINGS REPORT PAWTUCKET STREET OVER PAWTUCKET CANAL BRIDGE NO. L-15-050 (87K) LOWELL, MA CONTRACT NO. 84000630096 CO NO. 1 BOOTT BRIDGE INSPECTIONS AND LOAD RATING SERVICES MAY 11, 2015 Copyright 2015 Kleinfelder All Rights Reserved ONLY THE CLIENT OR ITS DESIGNATED REPRESENTATIVES MAY USE THIS DOCUMENT AND ONLY FOR THE SPECIFIC PROJECT FOR WHICH THIS REPORT WAS PREPARED. Project #20152059.002 © 2015 Kleinfelder A Report Prepared for: Mr. Randald Bartlett, P.E. Northeast Operations Manager Enel Green Power North America, Inc. One Tech Drive, Suite 220 Andover, MA 01810 Reference: Contract No. 84000630096 CO No. 1 Boott Bridge Inspections and Load Rating Services SUMMARY OF FINDINGS REPORT PAWTUCKET STREET OVER PAWTUCKET CANAL BRIDGE NO. L-15-050(87K) LOWELL, MA Prepared by: Reviewed by: Michael T. Sullivan, P.E. Douglas Peterson, P.E. Structural Project Engineer Principal Engineer Matthew Steele Project Manager KLEINFELDER 215 First Street, Suite 320 Cambridge, MA 02142 Phone: 617.498.7800 Fax: 617.498.4630 May 11, 2015 Project #20152059.002 Page i of ii May 11, 2015 © 2015 Kleinfelder TABLE OF CONTENTS ____________________________________________________________________________ Section Page 1 EXECUTIVE SUMMARY............................................................................................. 1 2 EXISTING CONDITIONS ............................................................................................ 3 2.1 ROADWAY.....................................................................................................
    [Show full text]
  • In This Nington School Bus Routes - Ulnum (Erar (Tefaiksburn - Fflilminqhin
    In this nington school bus routes - Ulnum (Erar (Tefaiksburn - fflilminqhin 28TH YEAR, NO 35 COPYRIGHT 1983 Wit WWitON W WS CO IHC All BKlHlSRrStRVfD WILMINGTON. MASS. AUGUST 31. 1983 PUB NO 635 340 6582346 32 PAGES Preliminary figures in for WHS renovations The Wilmington Permanent area. The old school is to be The storage space would be Building Committee has not yet demolished shortly. used to store lawn mowers, arrived at a valid estimate of It the tennis courts stay in track hurdles, sleds, dummies costs for its project of new ad- their present position they tor lootball practice, etc. ditions to and renovation ot the should be raised six inches, the Andrea Silverman, aware ol - i : high school. committee was told. The basic the tact that the costs can 3TE£iS] As ot the close of the meeting costs to demolish, add more escalate, said that if she had to ti_ of Tuesday evening the figures gravel, and rebuild was make a choice it would be tor ■ J educational facilities "I would were: Renovation of existing estimated at $45,000. _Q- TIT buildings and facilities. To construct new courts say No, to the bleachers." $3,352,000, and construction of elsewhere would be $60,000. Another opinion was voiced by new facilities. $2,705,000. Add to basic costs. Berme LaVila. who believed the this the $35,000 already ap- The athletic tacilities are a committee was getting into to propriated from taxation and matter ol interest to many high costs. "If we keep going," he warned, "we could bet up to the figures amount to $6,092,000.
    [Show full text]