Lakeside Energy (Pr Vate) Limited

Total Page:16

File Type:pdf, Size:1020Kb

Lakeside Energy (Pr Vate) Limited BEFORE THE NATIONAL elECTRIC POWER REGULATORY AUTHORITY APPLICATION FOR GENERATION LICENCE IN RESPECT OF 50 MW WIND POWER PROJECT IN JHIMPIR, DISTRICT THATTA, PROVINCE OF SINDH, PAKISTAN Dated: 25.05.2017 Filed for and behalf of: LAKESIDE ENERGY (PR VATE) LIMITED Through: RIAA BARKER GILLETTE 68, NAZIMUDDIN ROAD, F-8/4, ISLAMABAD UAN: (051) 111-LAWYER WEBSITE: www.riaabarkergillette.com 31.05.2017 Registrar National Electric Power Regulatory Authority NEPRA Tower, Ataturk Avenue (East), Sector G-5/1 Islamabad, Pakistan. SUBJECT: APPLICATION FOR GRANT OF GENERATION LICENCE I, Brigadier (Retired) Tariq Izaz, Chief Operating Officer, being the duly authorized representative of Lakeside Energy {Private} Limited by virtue of a board resolution dated 15.01.2017, hereby to the National Electric Power Regulatory Authority {NEPRA} for the grant of a generation licence to pursuant to section 15 of the Regulation of Generation, Transmission and Distribution of Electric Power Act, 1997. I certify that the documents-in-support attached with this application are prepared and submitted in conformity with the provision of National Electric Power Regulatory Authority (NEPRA) Licensing (Application and Modification Procedure) Regulations, 1999, and undertake to abide by the terms and provisions of above-said regulations. I further undertake and confirm that the information provided in the attached documents-in-support is true and corrected to the best of my knowledge and belief. A pay order in the sum of Rupees Three Hundred Thousand Three Thirty Six (PKR 300,336/-), being the non-refundable application processing fee calculated in accordance with Schedule-ll to National Electric Power Regulatory Authority Licensing (Application and Modification Procedure) Regulations, 1999, is also attached herewith. Brigadier zaz Chief Operating 0 fleer Lakeside Energy (Private) Limited " . APPLICATION FOR THE GRANT OF A GENERATION LICENSE UNDER SECTION 15 OF THE ACT AND REGULATION 3 OF THE AMP REGULATIONS 1. NEPRA's Participation in the Process 1.1. Section 15 of the Regulation of Generation, Transmission, and Distribution of Electric Power Act, 1997 (the "Act") provides, inter alia, that: "(1) No person except under the authority of a license issued by the Authority under this Act and subject to the conditions specified in this Act and as may be imposed by the Authority, construct own 01' operate a generation facility. (2) An application for the grant of a license f01' a generation facility shall specify- (i) the type of facility for which the license is applied; (ii) the location of the qeneration facilitu; and (iii) the expected life of the qeneration faciliti;" 1.2. Furthermore, Regulation 3 of the National Electric Power Regulatory Authority (Application and Modification Procedure) Regulations, 1999 (the "AMP Regulations") provides that an application for a license shall be made in the form specified in the AMP Regulations and further enumerates the documents required • ' to be submitted to the Authority along with the requisite application. 1.3. This Application for the grant of a generation license is made pursuant to Section 15of the Act and Regulation 3 of the AMP Regulations (this "Application"). 2. Introduction of the Applicant/Sponsor 2.1. As required under the Section 24 of Act Lakeside Energy (Pvt.) Limited (the "Applicant" or the "Company" or the "Project Company") is a private limited company incorporated under the Companies Ordinance, 1984, to act as a special purpose vehicle (the "SPV") and develop a 50 MW wind power generation facility located at Jhimpir, district Thatta Sindh (the "Project"). The constitutive " , documents, other pertinent details of the Applicant and description of the Project are annexed herewith as Annex- A hereto. Pmject Sponsors 2.2. By way of background and introduction, Naveena Exports Limited (NEL) and Alkaram Textile Mills Pvt. Ltd. (AKTM) (the "Sponsors") are pursuing development of a 50 MW wind power project in order to assist Pakistan overcome its current energy crises. Naveena Group was formed in 1967, as an embroidery unit. Since then it has grown to become one of the leading manufacturers of yarn and fabric in Pakistan. The group has expertise in producing both blended and 100% cotton fabrics, which includes fabric, twills, drills, duck, satin, and dobby, 2·3· The group's current production capacity allows it to produce 42 million lbs of yarn per annum along with 50 million meters of fabric per annum. The group had an annual turnover of Rs. 9,197,340 in 2014. Their total assets amounted up to Rs. 11,180,461 whereas net assets equaled to Rs. 4,906,471 that year. Naveena's major customers include: Levi's, GAP, Next, ,JCPenny and Jordache. Alkararn Textile Mills Pvt. Ltd. was founded in 1986 as a vertically integrated textile mill having expertise in spinning, weaving, processing & printing, cone dyeing and stitching. It also has self- generated power. The Group's current production capacity allows it to produce 1,360 tons of cotton and blended yarn per month and has one of the largest weaving capacities of dyed fabric in Pakistan. The group had an annual turnover of Rs. 17,253,157 in 2014. Their total assets amounted up to Rs. 13,826,825 whereas net assets equaled to Rs. 2,970,250 that year. Alkararn's major customers include: Carrefour, Kohl's, Macy's, Walmart, Ikea and West Elm. As such, the Applicant is interested in setting up a Wind Power Project of 50 MW capacity in Jhimpir, Sindh, Pakistan . • 3. 111eProject Overview 3.1 Project Company 3.1.1 The Company is developing its Project under the NEPRA Upfront Tariff regime. The Letter Of Intent (the "LOI") has been awarded by Energy Department, Government of Sindh (the "EDGOS") to the Applicant dated 24 July, 2015. The Project Company is diligently working towards the early implementation of the Project. The construction of 50 MW wind power plant on Double Fed Induction Generator technology will take approximately 15 months from the issuance of notice to proceed to the project contractors, so that plant commissioning is expected within 18 months after Financial Close. The LOI for this Project is annexed as Annex-J hereto. 3.2 Issuance of "Letter of Intent" 3.2.1 The project development phase has recently started after getting the Letter of Intent (LOI) from EDGOS on 24 July, 2015. 3.2.2 Although the Applicant will opt for the Upfront Tariff and as such all risks associated with the Project are to be borne by the Applicant, nevertheless, the Company has undertaken various studies to assess the feasibility of the Project. These studies inter alia include the following: a. Wind resources assess men t; b. Geo technical investigation; c. Digital topographic map; d. Initial environmental examination; and e. Grid interconnection study. A complete feasibility study is annexed as Annex-H hereto. 4. Power Purchaser The electricity generated from this Project would be supplied to NTDCjCPPAG The power generated by the Project will be sold for the term of 20 years under the standard Energy Purchase Agreement (the "EPA") starting from commencement of commercial operations . .' 5.1. The proposed Project site is located at Jhimpir, District Thatta, Province of Sindh, Pakistan (the "Site"). The Site proposed for the implementation of the Project has been selected by considering the following: a. Location in the wind corridor; b. Wind conditions at the Site; c. Topographic conditions; d. Site accessibility; and e. Location of the grid with reference to the Site for interconnection. 5.2. The site is located within the wind corridor identified by AEDB and the land has been allotted by the GOS to the project sponsors. The site is located in Jhimpir, District Thatta, Sindh, which is one of the most promising areas where wind power projects can be viably installed. The Project site is located 110 km from Port Qasim Karachi with easy road access. 5.3. Lakeside Energy (Pvt.) Ltd is the Project Company for a 50 MW Wind Power Project to be located in Jhimpir District Thatta, Sindh that is towards the East of Karachi. The National Highway and Superhighway are the major connecting roads to the Project site, having a distance of approximately 110 km from Port Qasirn. The wind farm Project is located in .Ihimpir, which is located approximately 120 km from Karachi, Pakistan's commercial hub and main coastal/port city. The Project site consists of approximately 345 acres of land, which was allocated by the GOS to the Applicant. The Jhimpir wind corridor is identified as a potential area for the • development of wind power projects. The overview of the project site is shown in the figure below: • , ,_ 5-4. The Project Site is exposed to very strong westerly winds, wind data analysis of the area suggests that, 80% wind blows from the south west direction. The terrain of the area is flat with small change in altitude. The proposed site lies under roughness class 1.5 as there is low vegetation. 'I11esite is easily accessible through metallic roads. The ground is hard and rocky; the subsurface soil also includes clay and silt. 5·5· The proposed wind farms lies on a flat inland area with hard and rocky ground conditions. The site would be categorized as inland wind development as opposed to offshore/coastal wind project development (which is more difficult to develop due to tides and soft subsoil clay). The general terrain at the site can be described as simple and flat terrain. Internal access roads are the roads connecting the single wind turbine locations with each other and the external access roads and grid station would be constructed during the civil works of the wind farm . S. NtJ, Latlturle ' ..:'''.~i:1 ~. .'LtJt1gUud~, '. y, .- ~':,?7b,4~'~,;¢:3:',§.,I.\y -. .,. • Wind Farms Layout at the Project Site The wind farms site is in long and narrow in shape, the topography is relatively flat and the elevation above sea level is approximately lOS-160m.
Recommended publications
  • The Land of Five Rivers and Sindh by David Ross
    THE LAND OFOFOF THE FIVE RIVERS AND SINDH. BY DAVID ROSS, C.I.E., F.R.G.S. London 1883 Reproduced by: Sani Hussain Panhwar The land of the five rivers and Sindh; Copyright © www.panhwar.com 1 TO HIS EXCELLENCY THE MOST HONORABLE GEORGE FREDERICK SAMUEL MARQUIS OF RIPON, K.G., P.C., G.M.S.I., G.M.I.E., VICEROY AND GOVERNOR-GENERAL OF INDIA, THESE SKETCHES OF THE PUNJAB AND SINDH ARE With His Excellency’s Most Gracious Permission DEDICATED. The land of the five rivers and Sindh; Copyright © www.panhwar.com 2 PREFACE. My object in publishing these “Sketches” is to furnish travelers passing through Sindh and the Punjab with a short historical and descriptive account of the country and places of interest between Karachi, Multan, Lahore, Peshawar, and Delhi. I mainly confine my remarks to the more prominent cities and towns adjoining the railway system. Objects of antiquarian interest and the principal arts and manufactures in the different localities are briefly noticed. I have alluded to the independent adjoining States, and I have added outlines of the routes to Kashmir, the various hill sanitaria, and of the marches which may be made in the interior of the Western Himalayas. In order to give a distinct and definite idea as to the situation of the different localities mentioned, their position with reference to the various railway stations is given as far as possible. The names of the railway stations and principal places described head each article or paragraph, and in the margin are shown the minor places or objects of interest in the vicinity.
    [Show full text]
  • Parcel Post Compendium Online Pakistan Post PKA PK
    Parcel Post Compendium Online PK - Pakistan Pakistan Post PKA Basic Services CARDIT Carrier documents international Yes transport – origin post 1 Maximum weight limit admitted RESDIT Response to a CARDIT – destination Yes 1.1 Surface parcels (kg) 50 post 1.2 Air (or priority) parcels (kg) 50 6 Home delivery 2 Maximum size admitted 6.1 Initial delivery attempt at physical Yes delivery of parcels to addressee 2.1 Surface parcels 6.2 If initial delivery attempt unsuccessful, Yes 2.1.1 2m x 2m x 2m No card left for addressee (or 3m length & greatest circumference) 6.3 Addressee has option of paying taxes or Yes 2.1.2 1.5m x 1.5m x 1.5m Yes duties and taking physical delivery of the (or 3m length & greatest circumference) item 2.1.3 1.05m x 1.05m x 1.05m No 6.4 There are governmental or legally (or 2m length & greatest circumference) binding restrictions mean that there are certain limitations in implementing home 2.2 Air parcels delivery. 2.2.1 2m x 2m x 2m No 6.5 Nature of this governmental or legally (or 3m length & greatest circumference) binding restriction. 2.2.2 1.5m x 1.5m x 1.5m Yes (or 3m length & greatest circumference) 2.2.3 1.05m x 1.05m x 1.05m No 7 Signature of acceptance (or 2m length & greatest circumference) 7.1 When a parcel is delivered or handed over Supplementary services 7.1.1 a signature of acceptance is obtained Yes 3 Cumbersome parcels admitted No 7.1.2 captured data from an identity card are Yes registered 7.1.3 another form of evidence of receipt is No Parcels service features obtained 5 Electronic exchange of information
    [Show full text]
  • Development of High Speed Rail in Pakistan
    TSC-MT 11-014 Development of High Speed Rail in Pakistan Stockholm, June 2011 Master Thesis Abdul Majeed Baloch KTH |Development of High Speed Rail In Pakistan 2 Foreword I would like to express my sincere gratitude to my supervisors, Anders Lindahl, Bo-Lennart Nelldal & Oskar Fröidh for their encouragement, patience, help, support at different stages & excellent guidance with Administration, unique ideas, feedback etc. Above all I would like to thank my beloved parents ’Shazia Hassan & Dr. Ali Hassan’ , my brothers, sisters from soul of my heart, for encouragement & support to me through my stay in Sweden, I wish to say my thanks to all my friends specially ‘ Christina Nilsson’ for her encouragement, and my Landlord ‘Mikeal & Ingmarie’ in Sweden . Finally I would like to say bundle of thanks from core of my Heart to KTH , who has given me a chance for higher education & all people who has been involved directly or in-directly with completion of my thesis work Stockholm, June 2011 Abdul Majeed Baloch [email protected] KTH |Development of High Speed Rail In Pakistan 3 KTH |Development of High Speed Rail In Pakistan 4 Summary Passenger Railway service are one of the key part of the Pakistan Railway system. Pakistan Railway has spent handsome amount of money on the Railway infrastructure, but unfortunately tracks could not be fully utilized. Since last many years due to the fall of the Pakistan railway, road transport has taken an advantage of this & promised to revenge. Finally road transport has increased progressive amount of share in his account. In order to get the share back, in 2006 Pakistan Railway decided to introduce High speed train between Rawalpindi-Lahore 1.According Pakistan Railway year book 2010, feasibility report for the high speed train between Rawalpindi-Lahore has been completed.
    [Show full text]
  • Part-I: Post Code Directory of Delivery Post Offices
    PART-I POST CODE DIRECTORY OF DELIVERY POST OFFICES POST CODE OF NAME OF DELIVERY POST OFFICE POST CODE ACCOUNT OFFICE PROVINCE ATTACHED BRANCH OFFICES ABAZAI 24550 Charsadda GPO Khyber Pakhtunkhwa 24551 ABBA KHEL 28440 Lakki Marwat GPO Khyber Pakhtunkhwa 28441 ABBAS PUR 12200 Rawalakot GPO Azad Kashmir 12201 ABBOTTABAD GPO 22010 Abbottabad GPO Khyber Pakhtunkhwa 22011 ABBOTTABAD PUBLIC SCHOOL 22030 Abbottabad GPO Khyber Pakhtunkhwa 22031 ABDUL GHAFOOR LEHRI 80820 Sibi GPO Balochistan 80821 ABDUL HAKIM 58180 Khanewal GPO Punjab 58181 ACHORI 16320 Skardu GPO Gilgit Baltistan 16321 ADAMJEE PAPER BOARD MILLS NOWSHERA 24170 Nowshera GPO Khyber Pakhtunkhwa 24171 ADDA GAMBEER 57460 Sahiwal GPO Punjab 57461 ADDA MIR ABBAS 28300 Bannu GPO Khyber Pakhtunkhwa 28301 ADHI KOT 41260 Khushab GPO Punjab 41261 ADHIAN 39060 Qila Sheikhupura GPO Punjab 39061 ADIL PUR 65080 Sukkur GPO Sindh 65081 ADOWAL 50730 Gujrat GPO Punjab 50731 ADRANA 49304 Jhelum GPO Punjab 49305 AFZAL PUR 10360 Mirpur GPO Azad Kashmir 10361 AGRA 66074 Khairpur GPO Sindh 66075 AGRICULTUR INSTITUTE NAWABSHAH 67230 Nawabshah GPO Sindh 67231 AHAMED PUR SIAL 35090 Jhang GPO Punjab 35091 AHATA FAROOQIA 47066 Wah Cantt. GPO Punjab 47067 AHDI 47750 Gujar Khan GPO Punjab 47751 AHMAD NAGAR 52070 Gujranwala GPO Punjab 52071 AHMAD PUR EAST 63350 Bahawalpur GPO Punjab 63351 AHMADOON 96100 Quetta GPO Balochistan 96101 AHMADPUR LAMA 64380 Rahimyar Khan GPO Punjab 64381 AHMED PUR 66040 Khairpur GPO Sindh 66041 AHMED PUR 40120 Sargodha GPO Punjab 40121 AHMEDWAL 95150 Quetta GPO Balochistan 95151
    [Show full text]
  • Government of Sindh Road Resources Management (RRM) Froject Project No
    FINAL REPORT Mid-Term Evaluation /' " / " kku / Kondioro k I;sDDHH1 (Koo1,, * Nowbshoh On$ Hyderobcd Bulei Pt.ochi 7 godin Government of Sindh Road Resources Management (RRM) Froject Project No. 391-0480 Prepared for the United States Agency for International Development Islamabad, Pakistan IOC PDC-0249-1-00-0019-00 * Delivery Order No. 23 prepared by DE LEUWx CATHER INTERNATIONAL LIMITED May 26, 1993 Table of Contents Section Pafle Title Page i Table of Contents ii List of Tables and Figures iv List of Abbieviations, Acronyms vi Basic Project Identification Data Sheet ix AID Evaluation Summary x Chapter 1 - Introduction 1-1 Chapter 2 - Background 2-1 Chapter 3 - Road Maintenance 3-1 Chapter 4 - Road Rehabilitation 4-1 Chapter 5 - Training Programs 5-1 Chapter 6 - District Revenue Sources 6-1 Appendices: - A. Work Plan for Mid-term Evaluation A-1 - B. Principal Officers Interviewed B-1 - C. Bibliography of Documents C-1 - D. Comparison of Resources and Outputs for Maintenance of District Roads in Sindh D-1 - E. Paved Road System Inventories: 6/89 & 4/93 E-1 - F. Cost Benefit Evaluations - Districts F-1 - ii ­ Appendices (cont'd.): - G. "RRM" Road Rehabilitation Projects in SINDH PROVINCE: F.Y.'s 1989-90; 1991-92; 1992-93 G-1 - H. Proposed Training Schedule for Initial Phase of CCSC Contract (1989 - 1991) H-1 - 1. Maintenance Manual for District Roads in Sindh - (Revised) August 1992 I-1 - J. Model Maintenance Contract for District Roads in Sindh - August 1992 J-1 - K. Sindh Local Government and Rural Development Academy (SLGRDA) - Tandojam K-1 - L.
    [Show full text]
  • Senate Secretariat Orders of the Day
    SENATE SECRETARIAT ORDERS OF THE DAY for the meeting of the Senate to be held at 02:00 p.m. on Wednesday, the 23rd November, 2016. 1. Recitation from the Holy Quran. QUESTIONS 2. Questions entered in a separate list to be asked and answers given. CONSIDERATION OF ADMISSIBILITY OF ADJOURNMENT MOTIONS 3. Admissibility of the following Adjournment Motions will be determined:- (i) Adj. Motion No. 1 (6-255/2016-M), notice given of by Senator Col. (R) Syed Tahir Hussain Mashhadi to discuss the unfortunate incident of bomb blast at Civil Hospital, Quetta which resulted into loss of nearly hundred lives and injuries to over one hundred and fifty people. (ii) Adj. Motion No. 2 (12-255/2016-M), notice given of by Senator Dr. Jehanzeb Jamaldini, to discuss the Tobacco Industry’s advertisement, promotion, sponsorship and CSR (Corporate Social Responsibility) i.e. funding in charity to cover up the fact that they sell deadly products. (iii) Adj. Motion No. 3 (16-255/2016-M), notice given of by Senator Sirajul Haq to discuss the report of the Auditor General of Pakistan for the year 2014-15 in which the financial irregularities of 182 billion rupees has been pointed out in Federal Board of Revenue’s Inland Revenue Service. CALLING ATTENTION NOTICE 4. SENATORS SHERRY REHMAN, MUKHTIAR AHMED DHAMRAH @ AAJIZ, KARIM AHMED KHAWAJA, SALEEM MANDVIWALA AND SAEEDUL HASSAN MANDOKHAIL to draw attention of the Minister for Railways, towards the train accident at Landhi Railway Station which resulted into loss of more than twenty precious lives of innocent citizens and injuries to many.
    [Show full text]
  • FROM MALIR RIVER WITHIN KARACHI Raheela Sharmeen M.Sc
    1 IMPACT OF HEAVY METALS ON OREOCHROMIS MOSSAMBICUS (PETERS, 1852) FROM MALIR RIVER WITHIN KARACHI Raheela Sharmeen M.Sc. DEPARTMENT OF ZOOLOGY UNIVERSITY OF KARACHI KARACHI-75270 PAKISTAN 2014 2 IMPACT OF HEAVY METALS ON OREOCHROMIS MOSSAMBICUS (PETERS, 1852) FROM MALIR RIVER WITHIN KARACHI Raheela Sharmeen M.Sc. Thesis submitted in partial fulfillment of the requirements for the degree of Doctor of Philosophy in Zoology (Limnology) DEPARTMENT OF ZOOLOGY UNIVERSITY OF KARACHI KARACHI-75270 PAKISTAN 2014 3 DEDICATION Affectionately dedicated to my beloved parents, husband and sons i LIST OF CONTENTS PAGE NO. LIST OF TABLES ¡¡ LIST OF FIGURES xiii ABSTRACT (ENGLISH) xix ABSTRACT (URDU) xxii ACKNOWLEDGEMENT xxv INTRODUCTION 1 REVIEW OF LITERATURE 13 MATERIALS AND METHODS 16 RESULTS 19 DISCUSSION 135 CONCLUSION 149 REFERENCES 150 APPENDIX 168 PUBLICATIONS ii TABLE NO. LIST OF TABLES PAGE NO. Table No. 1. Average concentrations of cadmium (ppm) in surface and deep water samples at Murad Memon Goth (2007- 2010) 43 Table No. 1a. Statistical data analysis of cadmium concentrations (ppm) in surface and deep water samples at Murad Memon Goth Table No. 2. Average concentrations of chromium (ppm) in surface and deep water samples at Murad Memon Goth (2007- 43 2010) Table No. 2a. Statistical data analysis of chromium concentrations (ppm) in surface and deep water samples at Murad Memon Goth Table No. 3. Average concentrations of copper (ppm) in surface and deep water samples at Murad Memon Goth (2007- 2010) 44 Table No. 3a. Statistical data analysis of copper concentrations (ppm) in surface and deep water samples at Murad Memon Goth Table No.
    [Show full text]
  • Climate Change Profile of Pakistan
    Climate Change Profi le of Pakistan Catastrophic fl oods, droughts, and cyclones have plagued Pakistan in recent years. The fl ood killed , people and caused around billion in damage. The Karachi heat wave led to the death of more than , people. Climate change-related natural hazards may increase in frequency and severity in the coming decades. Climatic changes are expected to have wide-ranging impacts on Pakistan, a ecting agricultural productivity, water availability, and increased frequency of extreme climatic events. Addressing these risks requires climate change to be mainstreamed into national strategy and policy. This publication provides a comprehensive overview of climate change science and policy in Pakistan. About the Asian Development Bank ADB’s vision is an Asia and Pacifi c region free of poverty. Its mission is to help its developing member countries reduce poverty and improve the quality of life of their people. Despite the region’s many successes, it remains home to a large share of the world’s poor. ADB is committed to reducing poverty through inclusive economic growth, environmentally sustainable growth, and regional integration. Based in Manila, ADB is owned by members, including from the region. Its main instruments for helping its developing member countries are policy dialogue, loans, equity investments, guarantees, grants, and technical assistance. CLIMATE CHANGE PROFILE OF PAKISTAN ASIAN DEVELOPMENT BANK 6 ADB Avenue, Mandaluyong City 1550 Metro Manila, Philippines ASIAN DEVELOPMENT BANK www.adb.org Prepared by: Qamar Uz Zaman Chaudhry, International Climate Technology Expert ASIAN DEVELOPMENT BANK Creative Commons Attribution 3.0 IGO license (CC BY 3.0 IGO) © 2017 Asian Development Bank 6 ADB Avenue, Mandaluyong City, 1550 Metro Manila, Philippines Tel +63 2 632 4444; Fax +63 2 636 2444 www.adb.org Some rights reserved.
    [Show full text]
  • Appendix - II Pakistani Banks and Their Branches (December 31, 2008)
    Appendix - II Pakistani Banks and their Branches (December 31, 2008) Allied Bank Ltd. Bhalwal (2) Chishtian (2) -Grain Market -Grain Market (743) -Noor Hayat Colony -Mohar Sharif Road Abbaspur 251 RB Bandla Bheli Bhattar (A.K.) Chitral Chungpur (A.K.) Abbottabad (4) Burewala (2) Dadu -Bara Towers, Jinnahabad -Grain Market -Pineview Road -Housing Scheme Dadyal (A.K) (2) -Supply Bazar -College Road -The Mall Chak Jhumra -Samahni Ratta Cross Chak Naurang Adda Johal Chak No. 111 P Daharki Adda Nandipur Rasoolpur Chak No. 122/JB Nurpur Danna (A.K.) Bhal Chak No. 142/P Bangla Danyor Adda Pansra Manthar Darband Adda Sarai Mochiwal Chak No. 220 RB Dargai Adda Thikriwala Chak No. 272 HR Fortabbas Darhal Gaggan Ahmed Pur East Chak No. 280/JB (Dawakhri) Daroo Jabagai Kombar Akalgarh (A.K) Chak No. 34/TDA Daska Arifwala Chak No. 354 Daurandi (A.K.) Attock (Campbellpur) Chak No. 44/N.B. Deenpur Bagh (A.K) Chak No. 509 GB Deh Uddhi Bahawalnagar Chak No. 76 RB Dinga Chak No. 80 SB Bahawalpur (5) Chak No. 88/10 R Dera Ghazi Khan (2) Chak No. 89/6-R -Com. Area Sattelite Town -Azmat Road -Dubai Chowk -Model Town -Farid Gate Chakwal (2) -Ghalla Mandi -Mohra Chinna Dera Ismail Khan (3) -Settelite Town -Talagang Road -Circular Road -Commissionery Bazar Bakhar Jamali Mori Talu Chaman -Faqirani Gate (Muryali) Balagarhi Chaprar Balakot Charsadda Dhamke (Faisalabad) Baldher Chaskswari (A.K) Dhamke (Sheikhupura) Bucheke Chattar (A.K) Dhangar Bala (A.K) Chhatro (A.K.) Dheed Wal Bannu (2) Dina -Chai Bazar (Ghalla Mandi) Chichawatni (2) Dipalpur -Preedy Gate -College Road Dir Barja Jandala (A.K) -Railway Road Dunyapur Batkhela Ellahabad Behari Agla Mohra (A.K.) Chilas Eminabad More Bewal Bhagowal Faisalabad (20) Bhakkar Chiniot (2) -Akbarabad Bhaleki (Phularwan Chowk) -Muslim Bazar (Main) -Sargodha Road -Chibban Road 415 ABL -Factory Area -Zia Plaza Gt Road Islamabad (23) -Ghulam Muhammad Abad Colony Gujrat (3) -I-9 Industrial Area -Gole Cloth Market -Grand Trunk Road -Aabpara -Gole Kiryana Bazar -Rehman Saheed Road -Blue Area ABL -Gulburg Colony -Shah Daula Road.
    [Show full text]
  • Present Status and Potential of Biomass Energy in Pakistan Based on Existing and Future Renewable Resources
    sustainability Review Present Status and Potential of Biomass Energy in Pakistan Based on Existing and Future Renewable Resources Wajahat Ullah Khan Tareen 1,2,3,4,*, Muhammad Tariq Dilbar 1, Muhammad Farhan 1 , Muhammad Ali Nawaz 1, Ali Waqar Durrani 1 , Kamran Ali Memon 5 , Saad Mekhilef 3,6 , Mehdi Seyedmahmoudian 6, Ben Horan 7 , Muhammad Amir 1 and Muhammad Aamir 4 1 Department of Electrical Engineering, International Islamic University, Islamabad 44000, Pakistan; [email protected] (M.T.D.); [email protected] (M.F.); [email protected] (M.A.N.); [email protected] (A.W.D.); [email protected] (M.A.) 2 Department of Electrical and Electronic Engineering, College of Engineering, University of Jeddah, Jeddah 21589, Saudi Arabia 3 Power Electronics and Renewable Energy Research Laboratory (PEARL), Department of Electrical Engineering, University of Malaya, Kuala Lumpur 50603, Malaysia; [email protected] 4 Department of Electrical Engineering, Bahria University, Islamabad 44000, Pakistan; [email protected] 5 School of Electronic Engineering, Beijing University of Posts and Telecommunications (BUPT), Beijing 100876, China; [email protected] 6 School of Software and Electrical Engineering, Swinburne University of Technology, Hawthorn, Melbourne, VIC 3122, Australia; [email protected] 7 School of Engineering, Deakin University, Waurn Ponds, VIC 3216, Australia; [email protected] * Correspondence: [email protected] Received: 10 October 2019; Accepted: 21 November 2019; Published: 27 December 2019 Abstract: Pakistan is a developing country that is experiencing a shortage of electricity generation due to its rapidly growing demand. The existing and upcoming energy requirements for power generation and future transportation can be met by efficient utilisation of homegrown biomass resources.
    [Show full text]
  • II Pakistani Schedule Banks Branches As on 31 December 2010
    Appendix - II Pakistani Schedule Banks Branches As on 31st December 2010 Allied Bank Ltd. -Noor Hayat Colony -Mohar Sharif Road (806) Bheli Bhattar (A.K.) Chitral Abbaspur 251 RB Bandla Bhiria Chungpur (A.K.) Dadu Abbottabad (4) Burewala (2) -Bara Towers, Jinnahabad -Grain Market Dadyal (A.K) (2) -Pineview Road -Housing Scheme -College Road -Supply Bazar -Samahni Ratta Cross -The Mall Chak Jhumra Chak Naurang Daharki Adda Johal Chak No. 111 P Danna (A.K.) Adda Nandipur Rasoolpur Chak No. 122/JB Nurpur Danyor Bhal Chak No. 142/P Bangla Darband Adda Pansra Manthar Dargai Adda Sarai Mochiwal Chak No. 220 RB Darhal Gaggan Adda Thikriwala Chak No. 272 HR Fortabbas Daroo Jabagai Kombar Alipur Chak No. 280/JB (Dawakhri) Ahmed Pur East Chak No. 34/TDA Daska (2) Akalgarh (A.K) Chak No. 354 -Kutchery road Arifwala Chak No. 44/N.B. -Village budha Attock (Campbellpur) Chak No. 509 GB Bagh (A.K) Chak No. 61 RB Daurandi (A.K.) Bahawalnagar Chak No. 76 RB Deenpur Chak No. 80 SB Deh Uddhi Bahawalpur (5) Chak No. 88/10 R Dinga Chak No. 89/6-R -Com. Area Sattelite Town Chakothi -Dubai Chowk Dera Ghazi Khan (2) -Farid Gate -Azmat Road -Ghalla Mandi Chakwal (3) -Model Town -Settelite Town -Mohra Chinna -Sabzimandi Dera Ismail Khan (3) Bakhar Jamali Mori Talu -Talagang Road -Circular Road Bhawanj -Commissionery Bazar Balagarhi Chaman -Faqirani Gate (Muryali) Balakot Chaprar Baldher Charsadda Dhamke (Faisalabad) Bucheke Chaskswari (A.K) Dhamke (Sheikhupura) Chattar (A.K) Dhangar Bala (A.K) Chhatro (A.K.) Bannu (2) Dheed Wal -Chai Bazar (Ghalla Mandi) Dhudial (Punjab) -Preedy Gate Chichawatni (2) Dina -College Road Dipalpur Barja Jandala (A.K) -Railway Road Dir Batkhela Dunyapur Behari Agla Mohra (A.K.) Chilas Ellahabad Bewal Eminabad More Bhagowal Chiniot (2) Bhakkar -Muslim Bazar (Main) Faisalabad (20) Bhaleki (Phularwan Chowk) -Sargodha Road -Akbarabad -Chibban Road Bhalwal (2) Chishtian (2) -Factory Area -Grain Market -Grain Market 335 -Ghulam Muhammad Abad -Grand Trunk Road -Bara Kahu Colony -Rehman Saheed Road -Blue Area -Gole Cloth Market -Shah Daula Road.
    [Show full text]
  • Public Notice Auction of Gold Ornament & Valuables
    PUBLIC NOTICE AUCTION OF GOLD ORNAMENT & VALUABLES Finance facilities were extended by JS Bank Limited to its customers mentioned below against the security of deposit and pledge of Gold ornaments/valuables. The customers have neglected and failed to repay the finances extended to them by JS Bank Limited along with the mark-up thereon. The current outstanding liability of such customers is mentioned below. Notice is hereby given to the under mentioned customers that if payment of the entire outstanding amount of finance along with mark-up is not made by them to JS Bank Limited within 15 days of the publication of this notice, JS Bank Limited shall auction the Gold ornaments/valuables after issuing public notice regarding the date and time of the public auction and the proceeds realized from such auction shall be applied towards the outstanding amount due and payable by the customers to JS Bank Limited. No further public notice shall be issued to call upon the customers to make payment of the outstanding amounts due and payable to JS Bank as mentioned hereunder: Customer Sr. No. Customer's Name Address Balance as on 20th August 2020 Number 1 1038553 ZAHID HUSSAIN MUHALLA MASANDPURSHI KARPUR SHIKARPUR 298,614 2 1012051 ZEESHAN ALI HYDERI MUHALLA SHIKA RPUR SHIKARPUR PK SHIKARPUR 298,107 3 1008854 NANIK RAM VILLAGE JARWAR PSOT OFFICE JARWAR GHOTKI 65110 PAK SITAN GHOTKI 553,300 4 999474 DARYA KHAN THENDA PO HABIB KOT TALUKA LAKHI DISTRICT SHIKARPU R 781000 SHIKARPUR PAKISTAN SHIKARPUR 270,709 5 1181615 FAISAL MEHMOOD GHQ SIGNAL BATTALION
    [Show full text]