Presentation Name WATER SUPPLY SYSTEM FOR PUNE CITY PROJECT OVERVIEW “REVISED DPR” DPR & DER DELIVERY AND PRESENTATIONS (1/2) • DPR & DER submitted on July 12, 2013 • PPTs and Discussions on July 31, September 5 • PMC communicated observations vide Minutes of meeting with SGI & internal meetings • All Ex. Engineers provided updated info on existing distribution pipes • Detailed discussions with Ex. Engineers DPR & DER DELIVERY AND PRESENTATIONS (2/2) • Revision and modifications based on comments received from Ex. Engineers presented on 29th January 2014 • Final DPR modified and submitted on 18th February 2014. • Final DER modified and submitted on 24th February 2014. Objectives of study • Review existing Water Supply System • Population and Water Demand Projections • Design of Proposed Water System on 24x7 basis: Clear Water Transmission, Storage & Distribution • Preparation of Capital, O & M cost • Project Financial Analysis and Viability JOINT SITE VISITS • Confirmation of sites for Service Reservoirs • Check suitability of new sites for Service Reservoirs and Pump stations • Feasibility of the alignments for transmission and Trunk distribution mains New sites of Service Reservoirs No. of Sr. No. New Location Earlier location SRs 1 PARVATI ZONE Amenity space in Rohan 1.1 Parvati WTP compound 2 Kritika Police lines SR 1.2 Sarasbag Kothi 2 compound 2 WARJE ZONE 2.1 Near SNDT HLR Gandhi Bhavan 1 2.2 Fergusson college Pune University 1 2.3 Khairewadi Pune University 3 Chikhalwadi 2.4 Pune Univesrity 2 Ambedkar stadium 2.5 Panchavati hill Panchavati Garden 1 New sites of Service Reservoirs No. of Sr. No. New Location Earlier location SRs 3 VADGAON ZONE Shivneri-Brahma 3.1 Seminary GSR 1 Amenity space Near Annad nagar 3.2 Hadpsar Bus Depot 3 Garden-survey no.46G Dorabji Paradise 3.3 Part of Cloud Nine 1 Amenity Space Dorabji Paradise 3.4 Nyati Amenity Space 1 Amenity Space High Bliss Society 3.5 Ujjwal Terrace 1 Amenity Space 3.6 Near Institute ESR Charwad Wasti 1 New sites of Service Reservoirs No. of Sr. No. New Location Earlier location SRs 4 BHAMA-ASKHED ZONE 4.1 Bishops school Wadgaon Sheri PS 2 Vegetable Market-Plot33 Sanjay Park-Rohan 4.2 2 Near 509 Mithila Gairan in Lohegaon near 4.3 Gurudwara Wasti 2 Haran Tala Palm Garden opposite to Mental 4.4 Near Stone Querry 2 Corner(Vishrantwadi zone) SR sites not finalised No. of Sr. No. Location WS zone SRs Survey no.7-Behind 1 Kharadi bypass 1 Raddison Hotel MAJOR ISSUES IN PARVATI Sr. No. Description Clarification Shifting of ESRs from WTP 1 Site shifted to Rohan Kritika Utilization of newly laid Planned to be used for gravity 2 900mm MS gravity main system from Parvati BPT Shifting of Sarasbag Kothi Existing SRs and sump proposed to 3 ESRs to Police lines be demolished Transfer of supply to PCWW LLR Zone Is now proposed from 4 for area- Jalmandir GSR to be reconstructed Sangam bridge to Bund Seminary GSRs to be Parvati PS-BPT-Padmavati- Seminary 5 supplied from Padmavati PS will result in higher head pumping MAJOR ISSUES IN VADGAON Sr. No. Description Clarification Now a BPT is proposed near Institute ESR which will supply to Ujjwal Terrace Utilization of WW tank as 1 Zone. ( High Bliss ESR) and Venkatesh BPT Serenity ESR Alignment of Gravity system After joint site visit, the Alignments are 2 from New Vadgaon sump- revised Sudatta Sankul-forest area Pumping main from Vadgaon, to be Non availability of site for extended. 3 BPT & PS at wonder city- Pumps for Agam Mandir 2 zones to be Katraj housed in New RG PS Site for New RG PS shifted Proposals are modified with location at 4 to Truck Terminus location Santosh Nagar MAJOR ISSUES IN VADGAON Sr. No. Description Clarification Alternate site for Ujjawal Terrace- PMC informed on Amenity space of High bliss society November 11, 2013 that confirmed by joint site visit. 5 sites for Charwad vasti & Alternate location for Charwad vasti Ujjwal terrace not available and new BPT is considered at the site adjacent to the existing Institute ESR. Shivneri zone divided in to 2, one from Additional SR at Seminary 6 ex. Site(Brahma Amenity) and other at SR site Seminary MAJOR ISSUES IN CANTONMENT Sr. No. Description Clarification The capacity of existing GSR is a 1 Revision of Bakri hill zones constraint. The existing zones retained Utilization of ex.1000mm Accepted. The proposal will be 2 pumping main For Sicilia modified Utilization of 600mm main The existing pipeline will be utilized, 3 from Ram Tekdi-Tukai Tekadi adequate up to 2032 SR One higher elevation DMA proposed to be supplied from new ESR in the Alternative SR site for part 4 premises of Dorabji ESR of Cloud nine zone Lower areas from the existing location 5 MAJOR ISSUES IN WARJE Sr. No. Description Clarification The new location for 4 Ml capacity Supply to Ideal colony zone 1 ESR identified by PMC. The design is from SNDT revised Confirmation of site for The new site identified by PMC. The 2 Sutardhara Booster design is revised Revision of Bhosale nagar, PMC identified 3 new sites, 1 at 3 Bopodi and Model colony Khairewadi & 2 at Chikhal wadi. zones Designs are revised Holkar WTP is proposed to Supply 4 Supply from Holkar WW Chikhalwadi ESRs i.e. Bopodi Zone and Khadaki Cantonment Area 5 Supply to Sangam wadi zone Sangam wadi from BA gravity system MAJOR ISSUES IN WARJE Sr. No. Description Clarification Utilization of new ESR in 6 Not proposed to be used in PMC area Khadki Cant. area Transmission main for Baner The alignment is now modified along 7 link Rd ESR high contour line, as per joint site visit High elevation areas along SNDT HLR zone modified to include 8 Law college rd. on SNDT HLR this. Alignment of Dukkar khind The alignment is modified, as per joint 9 SR alignment through Forest site visit This has been utilized as transmission Utilization of 864mm diam. 10 main, for supply to Pashan & pipeline from CC to Pashan Panchavati SRs Utilization of 711mm MS This will be used in the proposed 11 pumping main-Pashan to gravity system from CC BPT to Sus and Sus other SRs MAJOR ISSUES IN WARJE Sr. No. Description Clarification Asha nagar SR can not be supplied Supply to MAFCO & Asha from SNDT HLR/Existing BPT 12 nagar SRS from HLR, instead A new BPT in SNDT area is proposed to of pumping from MLR-sump supply MAFCO, Asha nagar and Khaire Wasti SRs by gravity Reorganization of SNDT HLR The zone boundaries are modified and 13 and SNDT MLR zones designs are revised. MAJOR ISSUES IN BHAMA -ASKHED Sr. No. Description Clarification Shifting of ESRs from Two ESRS at new site-Bishops school-zones 1 Wadgaon sheri PS 2& 5 Earlier Demand worked out based on DP and Metro corridor norms Discussed revised DP on October 18. The 2 Khulewadi zone revised 2032 demand 4.60Mld(20.69 mld). This zone is merged in Kharadi zone 3 and the ESR capacity of the zone is increased to 4.5 ML 3 Thakarsi SRS Capacities & levels shall be as per DPR MAJOR ISSUES IN BHAMA -ASKHED Sr. No. Description Clarification Meeting with PMC. The locations and WS zones finalised Identification of 7 SRs to be 4 hydraulic levels as per SGI design. tendered If staging height is increased, the network analysis to be revised. PMC confirmed excluding these 7 SRs from SGI estimates Cost of all SRs included in Cost of 11 SRs is not considered 5 DPR. by SGI as advised by PMC The WS zones from PCWW to BA PMC informed supply of 200 Kharadi zones 1,2& 3 Mld from BA & 22 Mld from 10 Kharadi bypass Chikhali in 2032 (285 MLD Chandan nagar zones 1& 2 in 2047) Wadgaon sheri zone 4 DETAILS OF 7 SERVICE RESERVOIRS No. Staging WS Zone Location of GL LDL FSL height SRs Dhanori zone 1 Dhanori-Amenity 1 588.85 609.63 615.63 21m space m m m Lohgaon Lake Dhanori-Amenity 1 588.13 610.00 646.00 22m zone 1 space m m m Vadgaon Sheri Vadgaon Sheri PS 2 566.07 585.00 591.00 19m zone 3 premises m m m Sainath nagar Sainath nagar 1 552.68 568.00 574.00 16m Amenity space m m m Bhange vasti Bhange vasti- 1 556.95 576.00 582.00 19m Amenity space m m m Tingare nagar Nyati Amenity 1 565.47 581.00 587.00 16m space m m m DETAILS OF ADDITIONAL 4 SERVICE RESERVOIRS No. Staging WS Zone Location of GL LDL FSL height SRs Lohegaon Lake Dhanori-Amenity 1 588.99m 610.00m 616.00m 21.00m Zone 1 space Munjaba wasti Munjaba Wasti ESR 1 584.04m 603.59m 609.59m 20.00m Laxmi Nagar/Ram Thakarsi Proposed 1 574.43m 582.22m 588.22m 8.00m Nagar ESR 4 Navi Khadki K. Bhaurao Patil ESR 1 563.94m 581.00m 587.00m 17.00m Yerwada COMMON POINTS ON DPR Clarification Sr. No. Description A. Pumping Mains Based on Techno-economic analysis Water Hammer Velocity-0.60m/sec to 2.5m/sec A. Gravity Mains Transmission main- Min. Ensure min. terminal head 3m 1 diam. 450mm Velocity-0.60m/sec to 2.5m/sec Minimum 450mm diam. will reduce the velocity <0.60m/sec Designs are modified with 450 mm as minimum diameter. COMMON POINTS ON DPR Clarification Sr. No. Description Design criteria agreed with PMC A. Pumping Mains Up to 450mm DI Above 450mm-MS Transmission mains 2 Matreial -steel for all B.
Recommended publications
  • Stps of Pune 0.Pdf
    CMYK Pune Municipal Corporation Sewerage Project Award From Government Of Maharashtra Taking into consideration the works completed and Planned by Pune Municipal Corporation, for Sewage Management, Government of Maharashtra under the “Sant Ghadgebaba cleanliness Drive” felicitated Pune Municipal Corporation by giving a special award of Rs. 10 Lakh for Sewage Management in the year 2004. tt n me develop vironment & sustainable d clean env ards RecycledRecycled CleanClean WWaterater Tow Wastewater Treatment Development Engineer Sewerage Project Wastewater Management Pune Municipal Corporation Tilak Road , Pune Tel : 91-20-2550 8121 Fax : 91-20-2550 8128 6 0 / E E K A N A J CMYK Clean city, healthy city Pune Municipal Corporation has been working & planning towards making our city environment STP friendly & healthy in every possible way. Sewage Treatment Projects is one of the most At Bopodi important aspect of this entire exercise. In the year 2005, we have completed phase I and this year, in 2006 we are planning for phase II and phase III. This is one effort to The plant is located near Harris Bridge, introduce you about the projects and planning. Bopodi and its capacity is at 18 MLD. The extended aeration process is used How does it work? ge to treat the waste water. f Sewa stem o tion Sy Sewerage system consists of Collec Treated Water The sewage generated from Aundh ITI, collection network, conveyance Main Gravity Aundhgaon, Sindh Colony, Bopodi, and lines, pumping stations and Sewage Rising Main Bopodi Gaothan, NCL, Raj Bhavan etc. Treatment Plants. Collection Pumping Station area is treated in this plant.
    [Show full text]
  • Water Quality of Pashan Lake and Manas Lake Interconnected by Ramnadi River – a Case Study 1Prof
    International Journal for Research in Engineering Application & Management (IJREAM) ISSN : 2454-9150 Vol-04, Issue-02, May 2018 Water Quality of Pashan Lake and Manas Lake Interconnected by Ramnadi River – A Case study 1Prof. Sagar M. Gawande, 2Shivani R. Bankar, 3Akshay M.Deshmukh, 4Chaitanya R. Dindkar, 5Trusha B. Gawde, 1,2,3,4,5Anantrao Pawar College of Engineering & Research, Pune, India. [email protected], [email protected], [email protected], [email protected], [email protected] Abstract Water pollution has been one of the major topics in the environmental issue of urban India. Pashan Lake and Manas Lake is an important lake in Pune city which attracts migratory birds. Deforestation on nearby hills has caused heavy siltation resulting in decreasing the depth of the lake. The surface water quality of Pashan Lake is severely degraded due to the pollution from surrounding areas directly entering the water. Eight surface sampling points are selected to evaluate the water quality. The study presents the physicochemical characteristics of the lake water and suggests the means to improve the water quality through eco remediation measures for restoration. Water analysis are done for the parameters like pH, Dissolved oxygen (DO), Biochemical oxygen Demand (BOD), Chemical oxygen Demand (COD), Alkalinity , Electrical Conductivity for testing the suitability for drinking, agricultural purposes. Keywords - Water Pollution, Lake Water Quality, Industrial Waste, Physico-Chemical Characteristic, Sampling, Mean Sea Level. I. INTRODUCTION there is scarcity of water. A time may come where we would need to use this contaminated water which may lead Pune situated in Indian state of Maharashtra is the second to serious health effects so it is necessary to save and largest city after Mumbai.
    [Show full text]
  • EIA: India: Pune Nirvana Hills Slum Rehabilitation Project
    Environment and Social Impact Assessment Report and Environment and Social Management Plan Project Number: 44940 March 2012 IND: Pune Nirvana Hills Slum Rehabilitation Project Prepared by: Kumar Urban Development Limited This report is made publicly available in accordance with ADB’s Public Communications Policy (2005). It does not necessarily reflect the views of ADB. Environmental and Social Impact Assessment for Project Nirvana: Pune, India Kumar Sinew Developers Private Final Report Limited March 2012 www.erm.com Delivering sustainable solutions in a more competitive world FINAL REPORT Kumar Sinew Developers Private Limited Environmental and Social Impact Assessment for Project Nirvana: Pune, India 23 March 2012 Reference : I8390 / 0138632 Rutuja Tendolkar Prepared by: Consultant Reviewed & Neena Singh Approved by: Partner This report has been prepared by ERM India Private Limited, with all reasonable skill, care and diligence within the terms of the Contract with the client, incorporating our General Terms and Conditions of Business and taking account of the resources devoted to it by agreement with the client. We disclaim any responsibility to the client and others in respect of any matters outside the scope of the above. This report is confidential to the client and we accept no responsibility of whatsoever nature to third parties to whom this report, or any part thereof, is made known. Any such party relies on the report at their own risk. EXECUTIVE SUMMARY ERM India Private Limited has been engaged by M/s Kumar Sinew Urban Developers Limited (hereinafter referred to as ‘KUL’ or ‘the client’) on the behest of the Asian Development Bank (ADB), to update the Environmental Impact Assessment report of the “Nirvana Hills Phase II” Project (hereinafter referred to as ‘Project Nirvana’) located at Survey No.
    [Show full text]
  • €»JIFTBI3 Chapter - 3 Study Area, Data Base and Methodology Data Is the Backbone of Any Research
    S,s. ,^ ,M-,td rally'.; •••? /''?'„ •"•'":X-, . "t^ To Mum 12a i •5 \ 'f^ P •: • o c1« <> ^jLine vlH ••^''^ m ^j ,, ^^ , Mula Mutha river NH-i Vi.- €»JIFTBI3 Chapter - 3 Study area, Data base and Methodology Data is the backbone of any research Pune the city, selected for the study of urban sprawling is one of the fast developing urban agglomerations in Asia and ranks eight at national level (Census 2001). It has grown manifolds over the past two decades in terms of population, area and habitation. The city limits have expanded considerably and areas like Aundh, Kothrud and others were mere villages a decade ago have emerged as one of the fastest growing suburbs. From the cosmopolitan areas of the camp to the traditional city area and the Deccan- the educational hub, Pune in all of its localities offers everything a society needs. The growth and development of the city is likely to continue in the coming decades and therefore there will be a need for judicious planning and management, while improving the existing infrastructural facilities. In order to monitor this rapid development, it is essential to go for modem tools and sophisticated techniques such as Remote Sensing and GIS, to prepare and continuously update the existing land use maps and other relevant informations. 3.1 Geographical setting: Pune city lies between latitudes 18°25'N and 18°37'N and longitudes between 73°44'E and 73° 57'E and cover an area of 243.96 sq.km. It is located in a saucer shaped basin at an average altitude of 560m from m.s.l.
    [Show full text]
  • ERSS Was Published in 2012 Under the Name Cirrhinus Fulungee
    Deccan White Carp (Gymnostomus fulungee) Ecological Risk Screening Summary U.S. Fish & Wildlife Service, October 2012 Revised, February 2019 Web Version, 5/31/2019 1 Native Range and Status in the United States Native Range From Froese and Pauly (2019): “Asia: Maharashtra and Karnataka in India; probably in other parts of Indian peninsula.” From Dahanukar (2011): “Cirrhinus fulungee is widely distributed in the Deccan plateau. It is recorded from Krishna and Godavari river system from Maharashtra, Karnataka, Andhra Pradesh, Madhya Pradesh and Chhattisgarh. Record of this species from Cauvery river system (Menon 1999) is doubtful. In Maharashtra, the species is known from Mula-Mutha river of Pune (Fraser 1942, Tonapi and Mulherkar 1963, Kharat et al. 2003, Wagh and Ghate 2003), Pashan lake in Pune (Fraser 1942, Tonapi and Mulherkar 1963), Pavana River near Pune (Chandanshive et al. 2007), Ujni Wetland (Yazdani and Singh 1990), Neera river near Bhor (Neelesh Dahanukar, Mandar Paingankar, Rupesh Raut and S.S. Kharat, manuscript submitted), Krishna river near Wai (S.S. Kharat, Mandar Paingankar and Neelesh Dahanukar, manuscript in preparation), Koyna river at Patan (Jadhav et al. 2011), Panchaganga river in Kolhapur (Kalawar and Kelkar 1956), Solapur district 1 (Jadhav and Yadav 2009), Kinwat near Nanded (Hiware 2006) and Adan river (Heda 2009). In Andhra Pradesh, the species is known from Nagarjunasagar (Venkateshwarlu et al. 2006). In Karnataka, the species is reported from Tungabhadra river (Chacko and Kuriyan 1948, David 1956, Shahnawaz and Venkateshwarlu 2009, Shahnawaz et al. 2010), Linganamakki Reservoir on Sharavati River (Shreekantha and Ramachandra 2005), Biligiri Ranganathswamy Temple Wildlife Sanctuary (Devi et al.
    [Show full text]
  • Pollution Status of River Mula (Pune City) Maharashtra, India
    J. Ecophysiol. Occup. Hlth. 11 (2011) 81-90 ©2011 The Academy of Environmental Biology, India Pollution status of river Mula (Pune city) Maharashtra, India A.D.Kshirsagar and V.R. Gunale Department of Botany, University of Pune, Pune – 411 007, (MS, India). Abstract : Present work deals with the seasonal variations in physico-chemical parameters of river Mula at Pune city. Water samples were collected monthly from selected sampling stations (Station I- Wakad; II- Aundh and III- Dapodi) in winter, summer and monsoon seasons during October 2007 to September 2008. The analysis was carried out for temperature, pH, dissolved oxygen (DO), free carbon dioxide (free CO2), total alkalinity, total hardness, biological oxygen demand (BOD), chemical oxygen demand (COD), chloride, nitrate and phosphate. It was observed that, temperature, chloride, BOD, COD, total alkalinity, total hardness, nitrate and phosphate content was high during summer than winter and less during monsoon seasons. Whereas, the DO content decreased in the summer and increased in the winter followed by monsoon seasons. The quality of water at station II and station III were high in term of nutrient loads, due to influent domestic wastewater. These results suggest that the water quality of river Mula is adversely affected and impaired by the discharge of domestic waste. Key Words: Mula river, Physico-chemical parameters, Water pollution. Introduction Numerous researchers have studied the physico-chemical parameters of various river According to the United Nation’s World Water water in the India. It has been found that the Development Report (2003), 70% of the earth’s water quality of the river lying in the vicinities of surface is covered by water; of which only 2.5% urban areas is heavily polluted due to industrial of water is fresh and only 0.3% water is and domestic wastes.
    [Show full text]
  • RANWA the Contonment (Research and Action in Natural Wealth Administration) Pune Becomes C-26/1, Ketan Heights, Near Karve Statue, Kothrud, Pune, 411 029
    MEASURES TO CLEAN OUR RIVERS WATER CONSERVATION WHEN THE RIVER STARTS SPEAKING § Increase the capacity and efficiency of Water shortage has now become a reality for sewage disposal works. us today. Insufficient rainfall has compelled the § Check the flow of industrial toxins into the river. Irrigation Department to cut down our water supply. In INTRODUCTION § Construct sullage treatment plants for waste such a situation, it is very important to harvest rain disposal. from our roofs, and recycle as much water in our Pune, the cultural capital of Maharashtra, the § Make pollution control equipment and other homes as possible. This way we will be less dependent Oxford of the East and the sister city of Bremen was related sophisticated gadgets available at a on the PMC and PCMC too! once better known as Punyapur or Punyanagari, which subsidized rate. reflects on the purifying power of its rivers. 1. I can monitor and control substances going § Take legal action, impose fines and punishments Pune is the only city in our country with three into my drain. whenever and wherever necessary. rivers flowing through it and merging here. Mhatre Bridge 2. I can replace harsh chemicals like phenyl, The river Mula emerges at Deoghar, 70 km strong detergents, chemical pesticides and West of Pune, and meets Pavana at Dapodi. Then, it What can fertilizers used in my house with mild, joins the Mutha at Sangam and together they flow as I do to The pride of Pune City lies in having the largest environment friendly alternatives. the Mula- Mutha to Bhima along with Indrayani and save my number of bridges over its rivers in India.
    [Show full text]
  • Kumar & Potnis
    Architect Avinash Nawathe Architects R.C.C. Consultant Sunil Mutalik & Associates Landscape Design Landart Designs Developers Kumar & Potnis DISCOVER A PRICELESS LIFESTYLE CORPORATE OFFICE - PUNE : Kumar Capital, 2413, East Street, Camp, Pune - 411 001, India. Tel : +91-20-3052 8888, 3058 3661/62 Fax : 2635 3365 e'14 MUMBAI : 21, Hazarimal Somani Marg, Waudby Road, Opp. Bombay Gymkhana, Fort, Mumbai - 400 001, India. Tel : +91-22-2209 4876, 2209 4797 Fax : 2209 4796 un J BENGALURU : No. 33, Crescent Road, High Grounds, Opp. Taj West End Hotel - Back Gate, Bengaluru - 560 001, India. Tel : +91-80-4128 0992 om/ a.c di Sales Enquiry : 9595 110011, 9595 660066, 9595 770077 o-in un E-mail : [email protected] o er Follow us on .num w w w . k u m a r w o r l d . c o m www AWAKEN THE CONNOISSEUR IN YOU AND WALK INTO A TREASURE TROVE OF LUXURY. FOR THE DISCERNING EYE, HERE’S A BOX OF SPARKLING OPULENCE. 'KUMAR PINAKIN' BECKONS YOU TO INDULGE IN A PRICELESS EXPERIENCE OF FINE LIVING. D I S C O V E R A P R I C E L E S S L I F E S T Y L E 2 & 3 b e d r o o m l u x u r i o u s a p a r t m e n t s MOHAN NAGAR, BANER H i n j a w a d i I T P a r k : 5 k m P R E C I O U S L O C A T I O N Kumar Pinakin’s advantage is its brilliant location.
    [Show full text]
  • VTP Solitarire
    Baner-Pashan Link Road, Baner A project by The hub of lifestyle. The hotspot of socializing. The favourite of West Pune. BANER. That's where VTP Solitaire is arriving soon. 2 & 3 bedroom homes True to its name, VTP Solitaire is designed to accentuate the lifestyle that the well-travelled Pune-ites look for. The optimized unit layouts will make you cherish the time we have spent in planning the usable space thoughtfully. Space that will make room for all those little things which you always wanted to buy, but had to customize in or compromise for. Homes adorned with interior fittings that will surely increase the value of your home. Premium flooring giving an impression of bigger space, a flawless modular kitchen, premium bath & sanitary fittings inside the homes, coupled with safe and smart exteriors like – designer entrance lobby with a waiting lounge, designer lift, three-tier security are a trademark of VTP Realty homes. A clubhouse with infinity edge pool and finite games and garden spaces are a must too. PLAN BY MASTERS 6M DRIVEWAY Entry (15m. Access road) UP A B C 6M DRIVEWAY Amenity 426.3 SQ.M FUTURE EXPANSION 6M DRIVEWAY 6M DRIVEWAY DN UP UP DG 8.5 x 5.2 m OPEN SPACE 851.58 sq.m. OWC Lawn 3 x 2.4 m BABY S W POOL I M M I NG STP PO OL N Multipurpose Hall 1. Amphitheater, innity swimming pool, 7. Garden/ party lawn baby pool, club house with gymnasium, etc. 8. Broad band and DTH setup 2. Lavish entrance lobby with security deal 9.
    [Show full text]
  • Table of Contents Lakes in North India
    Table of Contents Lakes in North India ........................................................................................... 2-8 Sukhna Lake, Chandigarh ...................................................................................... 2 Dal Lake, Srinagar .................................................................................................. 6 Lakes in South India ......................................................................................... 9-14 Bellandur Lake, Bangalore ..................................................................................... 9 Vembanad Lake, Kerala ....................................................................................... 12 Lakes in West India ........................................................................................ 15-21 Poai Lake, Muai…………………………………………………………………………………………15 Pashan Lake, Pune……………………………………………………………………………………………. Lakes in North-East India ............................................................................... 22-28 Deepor Beel, Assam…………………………………………………………………………………………. 22 Loktak Lake, Maipu…………………………………………………………………………………………26 * Satellite Images from Google Earth Lakes in India Page 1 LAKES IN NORTH INDIA Sukhna Lake, Chandigarh Site Name: Sukhna Lake Region: North India Location: Punjab Coordinates: 30°44'31.70" N 76°49'07.52" E Characteristics: Located in the north east corner of Chandigarh city, the lake was conceptualized and created by Le Corbusier and Chief Engineer P.L.Verma in 1958 by damming the Sukhna Choe, a seasonal
    [Show full text]
  • ACROSS BUDGETS. ACROSS the CITY. Insightfully Built Homes at the Best of Locations
    ACROSS BUDGETS. ACROSS THE CITY. Insightfully built homes at the best of locations. C Homes that welcome you to life. C Welcome to the world of Pate Developers It all started in 1983. A journey, whose beginning was marked by successful redevelopment of 34 wadas in the heart of Pune, has today created landmarks across the city with the stamp of Pate Developers on it. Founded by Mr. B. K. Pate, Pate Developers has evolved into one of the most trusted and reputed real estate developers of Pune, with a legacy of delivering happiness and satisfaction to more than 2000+ families. Every square foot of space built by Pate Developers is a testimony to its principles of high quality construction, timely possession and ethical conduct. These values lay the foundation of all the residential and commercial projects delivered by Pate Developers. Through its new and redevelopment projects, Pate Developers has connected with people across Pune. The organisation takes immense pride in offering a wide range of homes, both in terms of location and budget, to thousands of aspiring home buyers in all directions of Pune. SPACE LEGACY OF COMPLETED DELIVERED ONGOING PROJECTS PROJECTS 32+ 17LAKH YEARS 49+ SQ. FT. 30+ BHUKUM 1, 2 and 3 BHK Apartments Pre-launch PROJECT HIGHLIGHTS A grand community living experience with special health-based amenities spread over 20 acres (479 Apartments - in Phase I) Configuration: 1 BHK, 2 BHK (Compact), 2 BHK (Comfort ) & 3 BHK (Comfort) Apartments Size: 1 BHK: 669 sq. ft., 2 BHK (Compact): 868 & 879 sq. ft., 2 BHK (Comfort): 1,002 & 1,007 sq.
    [Show full text]
  • Pune Region Geographical Area * T Koregaon Kh
    73°40'0"E 73°45'0"E 73°50'0"E 73°55'0"E 74°0'0"E H PUNE REGION GEOGRAPHICAL AREA * T KOREGAON KH. E # P S D * PUNE CITY TALUKA,PIMPRI-CHINCHWAD MUNICIPAL CORPORATION, R PIMPRI KH. A HINJEWADI,TALEGAON-DABHADE,CHAKAN AREA COVER IN THIS MAP. # W GONAVADI O # T NASIK MIDC WATER TREATMENT PLANT AHMEDNAGAR ! ROHAKAL BHAMBOLI GM PLANTS # ð # #WASULI #VARALE ðRAS GROUP OF COMPANIES THERMAX CA-17 GHANWAT INDUSTRIAL PARK CA-16 L&T m CA-15 ð CA-19 NA BEARINGS INDIAð ! CA-14 CA-18 CA-12 CA-13 ð AMBETHAN CA-20 CA-11 NH-50 CA-01 CA-10 CA-09 JCB INDIA # CA-02 CA-03 CA-06 PUNE ¤£ CA-04 ð MUMBAI CA-05 CA-08 CA-07 o ± l TALEGAON MIDC AREA #KHARABWADI AISHWARA ANGAN SHIVAM RESIDENCYõ KISHOR MOTORS õ ð Q SAVARDARI SHOLAPUR AMBI SATARA # MTS INDIA CHAKAN (CT) # o MEDANKARWADI (N.V.) #NANOLI TARF CHAKAN #SUDUMBRE ! l #!. HYUNDAI MOTORS VICTORS GASKETSo AUTOMAG INDIA Total Population within the Geographical Area as per Census 2001 ð CHAKAN FORT ð CA-17 ð @ ! 40.05 Lacs(Approx.) Total Geographical Area (Sq.KMs) No. Charge Areas L'OREAL INDIA KADACHIWADI (N.V.) NANEKARWADI (N.V.)VISHAL GARDEN ð õ # 1053 20 VARALE COGEME PEECISION PARTS MAHALUNGE LNGALE # # BAJAJõ AUTO EAGLE AGRO VARALE I ð MAHALUNGE Charge Areas Identification Important location within N SUDUMBARE ð D ð KEIHIN FIE INDIA PVT. LTD# VOLKSWAGEN PLANT R # A VARROCð EXAHUST SYSTEM LTD. CA-01 Pashan Lake 18°45'0"N CA-16 ð YA ð N I SSK AUTOMOTIVE CA-02 Raj Bhawan VEDGAON RLYSTN.
    [Show full text]