List of Tariffs, Entry and Exit Points and Provisions Regarding Invoicing for Transmission of Gas (“Pricelist”)
Total Page:16
File Type:pdf, Size:1020Kb
List of Tariffs, Entry and Exit Points and Provisions regarding Invoicing for Transmission of Gas (“Pricelist”) of Gasunie Deutschland Transport Services GmbH, Hanover 1. October 2021, (valid 01.10.2021 6:00 – 01.01.2022 6:00) Page 1 of 33 Vers.Nr. 20211001-20220101_03_20201125 Pricelist of GUD as of 1. October 2021 (valid from 01.10.2021 6:00 to 01.01.2022 6:00) Table of contents Introduction ...................................................................................................................................................... 4 Explanation....................................................................................................................................................... 5 1. Capacity charge for yearly standard capacity products [I.] ............................................................................ 6 a. Entry Points in the H-Gas Transmission System to be booked ........................................................................ 6 b. Exit-Zones/-Points in the H-Gas Transmission System to be booked ............................................................... 9 c. Exit-Zones/-Points in the H-Gas Transmission System to be ordered .............................................................. 13 d. Entry Points in the L-Gas Transmission System to be booked ........................................................................ 19 e. Exit-Zones/-Points in the L-Gas Transmission System to be booked ............................................................... 20 f. Exit-Zones/-Points in the L-Gas Transmission System to be ordered .............................................................. 21 2. Capacity charge on storage connection points .............................................................................................. 23 a. Entry Storage Points into the H-Gas Transmission System to be booked ......................................................... 24 b. Exit Storage Points from the H-Gas Transmission System to be booked .......................................................... 26 c. Entry Storage Points into the L-Gas Transmission System to be booked ......................................................... 28 d. Exit Storage Points from the L-Gas Transmission System to be booked .......................................................... 28 3. Interruptible capacity charge (interruptible) ................................................................................................. 29 4. Dynamically-allocable capacity charge (DZK) ............................................................................................... 30 5. Charges for products with a duration of less than one year and for withinday products ..................................... 30 6. Increased charge in case of capacity-overruns incorporated and ordered capacity (Section 30, Paragraph 4 GT&C-EEC) ......................................................................................................... 31 7. Invoicing charge for meter operation and metering ....................................................................................... 31 8. Biogas levy .............................................................................................................................................. 31 9. Market Conversion Levy („Marktraumumstellungs-Umlage“) .......................................................................... 31 10. Conditions concerning transport tariffs charges and payments (Section 25, Paragraph 11 GT&C-EEC) ................. 32 11. Invoicing and payments on account (Section 26, Paragraph 1 First Sentence GT&C-EEC) .................................. 32 12. Default interest ........................................................................................................................................ 32 13. Additional Settlements for invoicing for downstream network operators according to Sections 18, 53 KoV ........... 33 Page 2 of 33 Vers.Nr. 20211001-20220101_03_20201125 Pricelist of GUD as of 1. October 2021 (valid from 01.10.2021 6:00 to 01.01.2022 6:00) Only and exclusively the German version of this pricelist is legally binding. Any other versions of this pricelist created in a language other than German are meant only to serve as a source of information and are for convenience only. If there is any contradiction between what the English (or any language other than German) language version of this pricelist and the German language version of this pricelist stipulates, the German language version shall take precedence. Page 3 of 33 Vers.Nr. 20211001-20220101_03_20201125 Pricelist of GUD as of 1. October 2021 (valid from 01.10.2021 6:00 to 01.01.2022 6:00) Introduction This pricelist contains supplemental provisions to the shippers’ capacity contracts for which also the “General Terms and Conditions En- try / Exit Contracts (entry / exit system) – GT&C-EEC of Gasunie Deutschland Transport Services GmbH (“GUD”) as amended (“GT&C-EEC”) apply. Furthermore this pricelist contains supplemental provisions to the contracts on a capacity ordering of the down- stream transmission system operators for which also the “Kooperationsvereinbarung zwischen den Betreibern von in Deutschland gele- genen Gasversorgungsnetzen” (“KoV”) as amended applies. The GT&C-EEC as well as the KoV are published at https://www.gasunie.de.. This pricelist implements in particular the provisions based on the following decisions of the Federal Network Agency (Bundesnetz- agentur): - decision concerning the periodic decision making regarding the reference price methodology and the other points listed in Article 26(1) of Regulation (EU) No 2017/460 applicable to all tramsmission system operators (“REGENT 2021”, BK9-19/610) - decision concerning the determination of the level of multipliers, the determination of a discount at entry points from LNG facilities and at entry points from and exit points to infrastructure developed with the purpose of ending the isolation of Member States in respect of their gas transmission systems and the determination of the level of discounts for interruptible standard capacity prod- ucts at all interconnection points for the calendar year 2021 (“MARGIT 2021”, BK9-19/612) as well as - regarding requirements for conversion of annual demand charges to demand charges for capacity rights for periods of less than a year and reguirements for proper determination of transportation tariffs in accordance with Section 15, Paragraph 2 to 7 GasNEV („BEATE 2.0“, BK9-18/608)including the - amendment of this order concerning the discount of capacity fees for interreuptible capacitiy products in the H-Gas network to be calculated in accordance with operative part 2 lit. b) (BK9-20/608). Due to regulatory requirements (decisions “REGENT-GP” (BK9-18/611-GP) and “AMELIE”(BK9-18/607)), a postage stamp RPM is in place since 01.01.2020 and reference prices of GUD have been calculated accordingly. The regulatory requirements REGENT and AMELIE have been appealed by third parties. The Higher Court OLG Düsseldorf dismissed the appeals in 16th September 2020. The complainants have appealed to the Federal Court of Justice (BGH) against the decision of the OLG Düsseldorf. For the new german Market area Trading Hub Europe (“THE”) two new descisions REGENT 2021 (BK9-19/610) and AMELIE (BK9-19/607) were enacted by the BNetzA. These decisions have been appealed by third parties, too. As a result of possible legal disputes it cannot be excluded that regulatory requirements could be changed and thus the reference prices could be increased both for the future and retroactively. This is why GUD reserves the right to amend the reserve prices on the basis of legal / regulatory decisions. In addition, GUD reserves the right to request the difference be- tween the reference price paid by the shipper and the new reference price established on the basis of a legal / regulatory decision. Page 4 of 33 Vers.Nr. 20211001-20220101_03_20201125 Pricelist of GUD as of 1. October 2021 (valid from 01.10.2021 6:00 to 01.01.2022 6:00) Explanation a) „net point type (Type)“: GÜP cross border interconnection point NKP net connection point to downstream network operators BIOGAS biogas connection point STORAGE storage connection point NAP net access point, end consumers OTHERS other connection point b) „complex point“: Complex points according to section 13 (paragraphs 6 and 7), GT&C-EEC are particularly characterized by special services in the course of a matching procedure by third parties which are required or by the necessity of manual processes for the implementation of the matching on at least one side, foreign network operators are affected or at least on one side of a net connection point a pipeline is affected, which is in the ownership of several network operators (“Bruchteilseigentum”). The respective points are marked in in column „remarks“ of the pricelist. The implementation period according to section 13 (paragraph 5) GT&C-EEC has to be considered. c) transport charge: The claim to payment of an entry and/or an exit capacity charge (transport charge in accordance with the present Number 1 to 10 of this pricelist) arises at the beginning of the initial day of the transmission customer’s relevant capacity contract in accordance with Sections 1, 3, 4 GT&C-EEC, or of the contract or-dering capacity (IB) for a downstream network operator in accordance with Section 11 of KoV as amended applies. The definitions contained in the GT&C-EEC of GUD are applicable. Unless otherwise expressly stipulated