Quick viewing(Text Mode)

List of Tariffs, Entry and Exit Points and Provisions Regarding Invoicing for Transmission of Gas (“Pricelist”)

List of Tariffs, Entry and Exit Points and Provisions Regarding Invoicing for Transmission of Gas (“Pricelist”)

List of Tariffs, Entry and Exit Points and Provisions regarding Invoicing for Transmission of Gas (“Pricelist”)

of

Gasunie Deutschland Transport Services GmbH, Hanover

1. October 2021, (valid 01.10.2021 6:00 – 01.01.2022 6:00)

Page 1 of 33 Vers.Nr. 20211001-20220101_03_20201125 Pricelist of GUD as of 1. October 2021 (valid from 01.10.2021 6:00 to 01.01.2022 6:00)

Table of contents

Introduction ...... 4 Explanation...... 5 1. Capacity charge for yearly standard capacity products [I.] ...... 6 a. Entry Points in the H-Gas Transmission System to be booked ...... 6 b. Exit-Zones/-Points in the H-Gas Transmission System to be booked ...... 9 c. Exit-Zones/-Points in the H-Gas Transmission System to be ordered ...... 13 d. Entry Points in the L-Gas Transmission System to be booked ...... 19 e. Exit-Zones/-Points in the L-Gas Transmission System to be booked ...... 20 f. Exit-Zones/-Points in the L-Gas Transmission System to be ordered ...... 21 2. Capacity charge on storage connection points ...... 23 a. Entry Storage Points into the H-Gas Transmission System to be booked ...... 24 b. Exit Storage Points from the H-Gas Transmission System to be booked ...... 26 c. Entry Storage Points into the L-Gas Transmission System to be booked ...... 28 d. Exit Storage Points from the L-Gas Transmission System to be booked ...... 28 3. Interruptible capacity charge (interruptible) ...... 29 4. Dynamically-allocable capacity charge (DZK) ...... 30 5. Charges for products with a duration of less than one year and for withinday products ...... 30 6. Increased charge in case of capacity-overruns incorporated and ordered capacity (Section 30, Paragraph 4 GT&C-EEC) ...... 31 7. Invoicing charge for meter operation and metering ...... 31 8. Biogas levy ...... 31 9. Market Conversion Levy („Marktraumumstellungs-Umlage“) ...... 31 10. Conditions concerning transport tariffs charges and payments (Section 25, Paragraph 11 GT&C-EEC) ...... 32 11. Invoicing and payments on account (Section 26, Paragraph 1 First Sentence GT&C-EEC) ...... 32 12. Default interest ...... 32 13. Additional Settlements for invoicing for downstream network operators according to Sections 18, 53 KoV ...... 33

Page 2 of 33 Vers.Nr. 20211001-20220101_03_20201125

Pricelist of GUD as of 1. October 2021 (valid from 01.10.2021 6:00 to 01.01.2022 6:00)

Only and exclusively the German version of this pricelist is legally binding. Any other versions of this pricelist created in a language other than German are meant only to serve as a source of information and are for convenience only. If there is any contradiction between what the English (or any language other than German) language version of this pricelist and the German language version of this pricelist stipulates, the German language version shall take precedence.

Page 3 of 33 Vers.Nr. 20211001-20220101_03_20201125

Pricelist of GUD as of 1. October 2021 (valid from 01.10.2021 6:00 to 01.01.2022 6:00)

Introduction This pricelist contains supplemental provisions to the shippers’ capacity contracts for which also the “General Terms and Conditions En- try / Exit Contracts (entry / exit system) – GT&C-EEC of Gasunie Deutschland Transport Services GmbH (“GUD”) as amended (“GT&C-EEC”) apply. Furthermore this pricelist contains supplemental provisions to the contracts on a capacity ordering of the down- stream transmission system operators for which also the “Kooperationsvereinbarung zwischen den Betreibern von in Deutschland gele- genen Gasversorgungsnetzen” (“KoV”) as amended applies.

The GT&C-EEC as well as the KoV are published at https://www.gasunie.de..

This pricelist implements in particular the provisions based on the following decisions of the Federal Network Agency (Bundesnetz- agentur): - decision concerning the periodic decision making regarding the reference price methodology and the other points listed in Article 26(1) of Regulation (EU) No 2017/460 applicable to all tramsmission system operators (“REGENT 2021”, BK9-19/610) - decision concerning the determination of the level of multipliers, the determination of a discount at entry points from LNG facilities and at entry points from and exit points to infrastructure developed with the purpose of ending the isolation of Member States in respect of their gas transmission systems and the determination of the level of discounts for interruptible standard capacity prod- ucts at all interconnection points for the calendar year 2021 (“MARGIT 2021”, BK9-19/612) as well as - regarding requirements for conversion of annual demand charges to demand charges for capacity rights for periods of less than a year and reguirements for proper determination of transportation tariffs in accordance with Section 15, Paragraph 2 to 7 GasNEV („BEATE 2.0“, BK9-18/608)including the - amendment of this order concerning the discount of capacity fees for interreuptible capacitiy products in the H-Gas network to be calculated in accordance with operative part 2 lit. b) (BK9-20/608).

Due to regulatory requirements (decisions “REGENT-GP” (BK9-18/611-GP) and “AMELIE”(BK9-18/607)), a postage stamp RPM is in place since 01.01.2020 and reference prices of GUD have been calculated accordingly. The regulatory requirements REGENT and AMELIE have been appealed by third parties. The Higher Court OLG Düsseldorf dismissed the appeals in 16th September 2020. The complainants have appealed to the Federal Court of Justice (BGH) against the decision of the OLG Düsseldorf. For the new german Market area Trading Hub Europe (“THE”) two new descisions REGENT 2021 (BK9-19/610) and AMELIE (BK9-19/607) were enacted by the BNetzA. These decisions have been appealed by third parties, too. As a result of possible legal disputes it cannot be excluded that regulatory requirements could be changed and thus the reference prices could be increased both for the future and retroactively. This is why GUD reserves the right to amend the reserve prices on the basis of legal / regulatory decisions. In addition, GUD reserves the right to request the difference be- tween the reference price paid by the shipper and the new reference price established on the basis of a legal / regulatory decision.

Page 4 of 33 Vers.Nr. 20211001-20220101_03_20201125

Pricelist of GUD as of 1. October 2021 (valid from 01.10.2021 6:00 to 01.01.2022 6:00)

Explanation a) „net point type (Type)“: GÜP cross border interconnection point NKP net connection point to downstream network operators BIOGAS biogas connection point STORAGE storage connection point NAP net access point, end consumers OTHERS other connection point b) „complex point“: Complex points according to section 13 (paragraphs 6 and 7), GT&C-EEC are particularly characterized by special services in the course of a matching procedure by third parties which are required or by the necessity of manual processes for the implementation of the matching on at least one side, foreign network operators are affected or at least on one side of a net connection point a pipeline is affected, which is in the ownership of several network operators (“Bruchteilseigentum”). The respective points are marked in in column „remarks“ of the pricelist. The implementation period according to section 13 (paragraph 5) GT&C-EEC has to be considered.

c) transport charge: The claim to payment of an entry and/or an exit capacity charge (transport charge in accordance with the present Number 1 to 10 of this pricelist) arises at the beginning of the initial day of the transmission customer’s relevant capacity contract in accordance with Sections 1, 3, 4 GT&C-EEC, or of the contract or-dering capacity (IB) for a downstream network operator in accordance with Section 11 of KoV as amended applies. The definitions contained in the GT&C-EEC of GUD are applicable. Unless otherwise expressly stipulated or evident from the relevant con- text, terms used in the singular form also apply to the plural form and vice-versa.

Page 5 of 33 Vers.Nr. 20211001-20220101_03_20201125

Pricelist of GUD as of 1. October 2021 (valid from 01.10.2021 6:00 to 01.01.2022 6:00)

1. Capacity charge for yearly standard capacity products [I.]

In the following tables the specific charges for firm freely allocable capacities (FZK) on entry and exit points in accordance with Sec- tion 9 Paragraph 1 lit a) to d) of the GTC-EEC and the charge for the actual ordering capacity according Section 18 Paragraph 1 of the KoV in the amended version are declared with an order period of 365 consecutive days (366 consecutive days in a leap year).

a. Entry Points in the H-Gas Transmission System to be booked

specific capaci- Adjacent Net- Capacity type Name Type EIC ID ty fee Allocation rule Remarks work Operator at the pont [€/(kWh/h)/a]

BAHNSEN OTHERS Connection from H153 3.80 FZK, Allocated as metered Currently no connec- production facili- interruptible tion to GUD grid, com- ties plex point. marketlocationID: 51564159833

DEUTSCHNEUDORF GÜP NET4GAS, s.r.o. 21Z0000000004839 H292 3.80 interruptible Allocated as nomina- Complex point. EUGAL BRANDOV ted

DOETLINGEN UE H OTHERS Connection from 37Z0000000069807 H078 3.80 FZK, Allocated as metered Complex point. production facili- interruptible marketlocationID: ties 51564159867

DORNUM GÜP Gassco AS 21Z000000000053Y H151 3.80 FZK, Allocated as nomina- Complex point. interruptible ted

ELLUND GÜP Energinet.dk 21Z000000000144V H106 3.80 FZK, Allocated as nomina- interruptible ted

EMDEN-EPT1 GÜP Gassco AS 21Z0000000000511 H071 3.80 FZK, Allocated as nomina- interruptible ted

GREIFSWALD / VIEROW GÜP Nord Stream AG 21Z000000000255M H207 3.80 FZK, Allocated as nomina- interruptible ted

GROOTHUSEN OTHERS Connection from 37Z000000006987U H072 3.80 FZK, Allocated as metered Complex point. production facili- interruptible marketlocationID: ties 51564159776

HAURUP H BIOGAS Energie des 37Z000000007504Y H638 0,00 FZK, Allocated as metered Complex point. Nordens GmbH interruptible marketlocationID: & Co. KG 51564159908

Page 6 of 33 Vers.Nr. 20211001-20220101_03_20201125

Pricelist of GUD as of 1. October 2021 (valid from 01.10.2021 6:00 to 01.01.2022 6:00)

specific capaci- Adjacent Net- Capacity type Name Type EIC ID ty fee Allocation rule Remarks work Operator at the pont [€/(kWh/h)/a]

HUSUM H OTHERS Connection from H262 3.80 FZK, Allocated as metered Currently no connec- production facili- interruptible tion to GUD grid, com- ties plex point. marketlocationID: 51564159768

IMBROCK OTHERS Connection from 37Z0000000069823 H076 3.80 FZK, Allocated as metered Complex point. production facili- interruptible marketlocationID: ties 51564159742

KOLSHORN THOENSE H OTHERS Connection from 37Z000000006988S H280 3.80 FZK, Allocated as metered Complex point. production facili- interruptible marketlocationID: ties 51564159784

LEER EGM OTHERS Connection from 37Z000000007001N H073 3.80 FZK, Allocated as metered Complex point. production facili- interruptible marketlocationID: ties 51564159817

LUBMIN II Nord Stream AG 21Z0000000004790 H282 3.80 DZK-products Allocated as nomina- Complex point. ted assignments published at https://www.gasunie.de

NORDERSCHUBYFELD BIOGAS Bioenergie 37Z000000007016A H193 0,00 FZK, Allocated as metered Complex point. Schuby GmbH interruptible marketlocationID: 51564159700

OUDE STATENZIJL H GÜP Gasunie Trans- 21Z000000000076M H104 3.80 FZK, Allocated as nomina- port Services interruptible ted B.V.

ROSCHE BIOGAS uegas GmbH & 37Z000000007002L H198 0,00 FZK, Allocated as metered Complex point. Co. KG interruptible marketlocationID: 51564159718

SOLTAU WUESTHOF H BIOGAS Biomethan 37Z0000000075021 H639 0,00 FZK, Allocated as metered Complex point. Soltau GmbH interruptible marketlocationID: 51564159916

UNTERLUESS H OTHERS Connection from 37Z000000006986W H635 3.80 FZK, Allocated as metered Complex point. production facili- interruptible marketlocationID: ties 51564159859

Page 7 of 33 Vers.Nr. 20211001-20220101_03_20201125

Pricelist of GUD as of 1. October 2021 (valid from 01.10.2021 6:00 to 01.01.2022 6:00)

specific capaci- Adjacent Net- Capacity type Name Type EIC ID ty fee Allocation rule Remarks work Operator at the pont [€/(kWh/h)/a]

VIP-TTF-GASPOOL-H GÜP Gasunie Trans- 21Z000000000500Z H298 3.80 FZK, uK Allocated as nomina- Virtual Interconnection port Services ted Point B.V. Contains available capacity of the IPs Bunde from GASCADE and Oude Statenzijl H (H104) from GUD

VISSELHOEVEDE MEEG OTHERS Connection from 37Z0000000069831 H075 3.80 FZK, Allocated as metered Complex point. production facili- interruptible marketlocationID: ties 51564159734

Page 8 of 33 Vers.Nr. 20211001-20220101_03_20201125

Pricelist of GUD as of 1. October 2021 (valid from 01.10.2021 6:00 to 01.01.2022 6:00)

b. Exit-Zones/-Points in the H-Gas Transmission System to be booked

specific capaci- Capacity Adjacent Net- Name Type EIC ID ty fee type at the Allocation rule Remarks work Operator [€/(kWh/h)/a] pont

BETRIEB SPEICHER NAP Storengy H293 3.80 FZK, Allocated as metered MarketlocationID: HARSEFELD Deutschland interruptible 51564159883 GmbH

BETRIEB SPEICHER NAP EWE Gasspei- H211 3.80 FZK, Allocated as metered MarketlocationID: cher GmbH interruptible 51564159586

BETRIEB SPEICHER NAP Storengy H624 3.80 FZK, Allocated as metered MarketlocationID: LESUM H Deutschland interruptible 51564159677 GmbH

BETRIEB SPEICHER NAP Storengy H294 3.80 FZK, Allocated as metered MarketlocationID: UELSEN Deutschland interruptible 51564159891 GmbH

DEUTSCHNEUDORF GÜP NET4GAS, s.r.o. 21Z0000000004839 H283 3.80 DZK-products Allocated as nominated Complex point. EUGAL BRANDOV assignments published at https://www.gasunie.de

DOETLINGEN BETRIEB NAP BEB Erdgas und H192 3.80 FZK, Allocated as metered MarketlocationID: Erdöl GmbH & interruptible 51564159536 Co. KG

DORNUM GÜP Gassco AS 21Z000000000053Y H451 3.80 interruptible Allocated as nominated Complex point. Re- verse flow capacity.

ELLUND GÜP Energinet.dk 21Z000000000144V H094 3.80 FZK, DZK, Allocated as nominated Complex point. interruptible assignments published at https://www.gasunie.de

EMDEN-EPT1 GÜP Gassco AS 21Z0000000000511 H371 3.80 interruptible Allocated as nominated Reverse flow capacity.

FALLINGBOSTEL MON- NAP Mondelez H227 3.80 FZK, Allocated as metered MarketlocationID: DELEZ Deutschland interruptible 51564159643 Production GmbH & Co. KG

Page 9 of 33 Vers.Nr. 20211001-20220101_03_20201125

Pricelist of GUD as of 1. October 2021 (valid from 01.10.2021 6:00 to 01.01.2022 6:00)

specific capaci- Capacity Adjacent Net- Name Type EIC ID ty fee type at the Allocation rule Remarks work Operator [€/(kWh/h)/a] pont

HEIZKRAFTWERK NAP Stadtwerke 37Z000000007003J H215 3.80 FZK, Allocated as metered Nominations may be FLENSBURG Flensburg GmbH interruptible required Correspondent meter- ing point: DE70112124983HN111480000 G001RA001 MarketlocationID: 51564159651

INDUSTRIEPARK WALS- NAP DDP Speciality 37Z000000006976Z H226 3.80 FZK, Allocated as metered MarketlocationID: RODE Products Germa- interruptible 51564159544 ny GmbH & Co. KG

ITTERBECK OTHERS Erdgas Münster H044 3.80 FZK, Allocated as metered Exit to the upstream GmbH interruptible pipeline system of Erdgas Münster GmbH in accordance with § 3 No. 39 EnWG.

KOLSHORN (THOEN- OTHERS BEB Erdgas und H279 3.80 FZK, Allocated as metered Complex point. Market- SE) H Erdöl GmbH & interruptible locationID: Co. KG 51564159841

KRAFTWERK MEHRUM H NAP Kraftwerk H264 3.80 FZK, Allocated as metered Nominations may be Mehrum GmbH interruptible required. Correspond- ent metering point: DE70087631249000KWMEHR UMMESSSUMME MarketlocationID: 51564159635

KRAFTWERK MITTELS- NAP Gemeinschafts- 37Z0000000070178 H210 3.80 FZK, Allocated as metered Nominations may be BÜREN kraftwerk Bremen interruptible required. Correspond- GmbH & Co. KG ent metering point: DE7008762823700000000GKB MESSSUMME MarketlocationID: 51564159594

LANDESBERGEN H NAP Statkraft Markets 37Z0000000069734 H236 3.80 FZK, Allocated as metered Nominations may be GmbH interruptible required. Correspond- ent metering point: DE70087631628LANDESBER GENSUMME000 MarketlocationID: 51564159669

Page 10 of 33 Vers.Nr. 20211001-20220101_03_20201125

Pricelist of GUD as of 1. October 2021 (valid from 01.10.2021 6:00 to 01.01.2022 6:00)

specific capaci- Capacity Adjacent Net- Name Type EIC ID ty fee type at the Allocation rule Remarks work Operator [€/(kWh/h)/a] pont

NIENBURG NAP Ardagh Glass H239 3.80 FZK, Allocated as metered Nominations may be GLASHUETTE H GmbH interruptible required. Correspond- ent metering point: DE70087630177000000000V0 0504S00X0 MarketlocationID: 51564159528

NIENBURG NAP Industriepark H240 3.80 FZK, Allocated as metered Nominations may be KALI CHEMIE H Nienburg GmbH interruptible required. Correspond- ent metering point: DE70087631582KALICHEMIE STRECKESUM MarketlocationID: 51564159627

NIENHAGEN H NAP BEB Erdgas und H634 3.80 FZK, Allocated as metered Due to regional circum- Erdöl GmbH & interruptible stances gas from Ger- Co. KG man domestic produc- tion with a Wobbe- Index up to 10 kWh/m³ can be provided in group L as in accord- ance to specifications. MarketlocationID: 51564159825.

OUDE STATENZIJL H GÜP Gasunie Trans- 21Z000000000076M H095 3.80 FZK, Allocated as nominated port Services interruptible B.V.

SITTENSEN ZIEGELEI NAP Wienerberger H056 3.80 FZK, Allocated as metered Currently no connection Ziegelindustrie interruptible to GUD gas transmis- GmbH sion system, complex point. MarketlocationID: 51564159693

STADE AOS NAP Aluminium Oxid 37Z000000006942F H034 3.80 FZK, Allocated as metered Nominations may be Stade GmbH interruptible required. MarketlocationID: 51564159502

STADE DOW NAP Dow Deutschland 37Z0000000069750 H050 3.80 FZK, Allocated as metered Nominations may be Anlagengesell- interruptible required. schaft mbH MarketlocationID: 51564159552

Page 11 of 33 Vers.Nr. 20211001-20220101_03_20201125

Pricelist of GUD as of 1. October 2021 (valid from 01.10.2021 6:00 to 01.01.2022 6:00)

specific capaci- Capacity Adjacent Net- Name Type EIC ID ty fee type at the Allocation rule Remarks work Operator [€/(kWh/h)/a] pont

STAHLWERKE BREMEN NAP ArcelorMittal 37Z000000006977X H043 3.80 FZK, Allocated as metered Nominations may be Bremen GmbH interruptible required. MarketlocationID: 51564159510

VIP-TTF-GASPOOL-H GÜP Gasunie Trans- 21Z000000000500Z H299 3.80 FZK, uK Allocated as metered Virtual Interconnection port Services Point B.V. Contains available capacity of the IPs Bunde from GASCADE and Oude Statenzijl H (H095) from GUD

VWK WOLFSBURG H NAP VW Kraftwerk 37Z000000006978V H617 3.80 FZK, Allocated as metered from1st of October GmbH interruptible 2021 Physical stations: - H618 VWK WOLFSBURG SUED H, - H619 VWK WOLFSBURG PRODUKTION H - H640 VWK WOLFSBURG NORD H - H637 VWK WOLFSBURG WEST H Correspondent meter- ing point: DE70087638436VWWOBGHK WKWNORDSUMME. marketlocationID: 51564159685Physical stations:

WALSRODER CASINGS NAP DDP Speciality H237 3.80 FZK, Allocated as metered Complex point. Products Germa- interruptible MarketlocationID: ny GmbH & Co. 51564159560 KG

ZEMENTWERK HANNO- NAP HeidelbergCe- H277 3.80 FZK, Allocated as metered MarketlocationID: VER ment AG interruptible 51564159619

Page 12 of 33 Vers.Nr. 20211001-20220101_03_20201125

Pricelist of GUD as of 1. October 2021 (valid from 01.10.2021 6:00 to 01.01.2022 6:00)

c. Exit-Zones/-Points in the H-Gas Transmission System to be ordered

specific capacity Adjacent Net- Capacity type Name Type ID fee Allocation rule Remarks work Operator at the pont [€/(kWh/h)/a]

ABBENDORF (EWE) NKP EWE NETZ H006 3.80 IB Allocated as metered GmbH

ACHIM H NKP Stadtwerke Achim H252 3.80 IB Allocated as metered Physical stations: AG - H253 LANGWEDEL-ETELSEN H, - H254 OTTERSBERG- WUEMMINGEN H.

BLUMBERG NKP NBB Netzgesell- H003 3.80 IB Allocated as metered schaft Berlin- Brandenburg mbH &Co.KG

BOMLITZ NKP Avacon Hoch- H219 3.80 IB Allocated as metered drucknetz GmbH

BREMEN H NKP wesernetz Bre- H255 3.80 IB Allocated as metered Physical stations: men GmbH - H256 BREMEN OST H, - H257 BREMEN SUED BOLLEN H - H275 BREMEN SUED BRINKUM H - H276 BREMEN DREYE H

BREMERHAVEN H NKP wesernetz Bre- H627 3.80 IB Allocated as metered Physical stations: merhaven GmbH - H628 BREMERHAVEN 1 H, & Co. KG - H629 BREMERHAVEN 2 H.

BREMEN NORD H NKP wesernetz Bre- H625 3.80 IB Allocated as metered men GmbH

BREMEN WEST H NKP wesernetz Bre- H603 3.80 IB Allocated as metered Physical stations: men GmbH - H604 BREMEN-HUCHTING H, - H605 BREMEN-GASWERK H, - H606 BREMEN- RIEDEMANNSTRASSE H.

CURAU NKP Gemeindewerke H179 3.80 IB Allocated as metered Stockelsdorf GmbH

Page 13 of 33 Vers.Nr. 20211001-20220101_03_20201125

Pricelist of GUD as of 1. October 2021 (valid from 01.10.2021 6:00 to 01.01.2022 6:00)

specific capacity Adjacent Net- Capacity type Name Type ID fee Allocation rule Remarks work Operator at the pont [€/(kWh/h)/a]

CUXHAVEN H NKP EWE NETZ H630 3.80 IB Allocated as metered Physical stations: GmbH - H631 MIDLUM H, - H632 CUXHAVEN-GUDENDORF H, - H633 CUXHAVEN-HUMPHRY- DAVY-STR H.

DELMENHORST H NKP Stadtwerke Del- H601 3.80 IB Allocated as metered menhorst GmbH

DELMENHORST IPRUMP H NKP Stadtwerke Del- H602 3.80 IB Allocated as metered menhorst GmbH

EDEWECHT NKP EWE NETZ RVN H177 3.80 IB Allocated as metered GmbH

ELB-ENERGIE NDS H NKP ElbEnergie GmbH H296 3.80 IB Allocated as metered Physical stations: - H031 HARSEFELD, - H062 WINSEN, - H020 BUCHHOLZ, - H019 DOHREN.

EMS-VECHTE NKP EEV Energie- H184 3.80 IB Allocated as metered Physical stations: Ems-Vechte - H017 WACHENDORF EEV GmbH & Co. KG - H180 ESCHE EEV, - H181 EMSBUEREN EEV.

GOCKENHOLZ H NKP Erdgas Münster H642 3.80 IB Allocated as metered GmbH

HAMBURG NKP Gasnetz Hamburg H195 3.80 IB Allocated as metered Physical stations: GmbH - H021 LEVERSEN, - H035 TORNESCH.

HANNOVER NORD H NKP Avacon Hoch- H241 3.80 IB Allocated as metered Physical stations: drucknetz GmbH - H245 DOERVERDEN H, - H243 HAEMELHAUSEN H - H244 ROHRSEN H, - H258 SCHERENBOSTEL H, - H263 WENDENBORSTEL H.

HANNOVER OST H NKP Avacon Hoch- H269 3.80 IB Allocated as metered Physical stations: drucknetz GmbH - H270 GROSSBURGWEDEL 1 H - H271 GROSSBURGWEDEL 2 H - H272 AHLTEN 2 H - H273 SOPHIENTAL H - H274 STEINWEDEL H

Page 14 of 33 Vers.Nr. 20211001-20220101_03_20201125

Pricelist of GUD as of 1. October 2021 (valid from 01.10.2021 6:00 to 01.01.2022 6:00)

specific capacity Adjacent Net- Capacity type Name Type ID fee Allocation rule Remarks work Operator at the pont [€/(kWh/h)/a]

HATTEN-SANDKRUG H NKP EWE NETZ RVN H290 3.80 IB Allocated as metered GmbH

HEILSHORN H NKP Osterholzer H626 3.80 IB Allocated as metered Stadtwerke GmbH & Co. KG

HERRNBURG NKP HanseGas GmbH H025 3.80 IB Allocated as metered

HERRNBURG- NKP GETEC net H147 3.80 IB Allocated as metered LUEDERSDORF GmbH

HETLINGEN NKP Stadtwerke H007 3.80 IB Allocated as metered Wedel GmbH

HOLLERN - NKP EWE NETZ H068 3.80 IB Allocated as metered TWIELENFLETH GmbH

HUSUM GWN H NKP GELSENWAS- H242 3.80 IB Allocated as metered SER Energienetze GmbH

ISERNHAGEN H NKP Avacon Hoch- H265 3.80 IB Allocated as metered drucknetz GmbH

KOLSHORN NKP Avacon Hoch- H281 3.80 IB Allocated as metered Exit to the upstream pipeline system of (ALTWARMBUECHEN) H drucknetz GmbH Avacon Hochdrucknetz GmbH in accord- ance with § 3 No. 39 EnWG.

LESCHEDE NKP Westnetz GmbH H220 3.80 IB Allocated as metered

LUEBECK NKP TraveNetz GmbH H162 3.80 IB Allocated as metered Physical stations: - H026 LUEBECK-GASWERK 2, - H027 LUEBECK STUBBENDORF, - H080 LUEBECK FLUGHAFEN.

LUENEBURG NKP Avacon Hoch- H172 3.80 IB Allocated as metered Physical stations: drucknetz GmbH - H149 MELBECK, - H037 SCHNELLENBERG, - H054 VIERHOEFEN.

NEUSTADT H NKP LeineNetz GmbH H259 3.80 IB Allocated as metered Physical stations: - H260 NEUSTADT-HAGEN H, - H261 NEUSTADT-SUTTORF H.

Page 15 of 33 Vers.Nr. 20211001-20220101_03_20201125

Pricelist of GUD as of 1. October 2021 (valid from 01.10.2021 6:00 to 01.01.2022 6:00)

specific capacity Adjacent Net- Capacity type Name Type ID fee Allocation rule Remarks work Operator at the pont [€/(kWh/h)/a]

NIENBURG H NKP Stadtwerke Nien- H246 3.80 IB Allocated as metered Physical stations: burg/Weser - H247 NIENBURG LANGENDAMM H, GmbH - H248 NIENBURG ERICHSHAGEN H, - H249 NIENBURG GROSSE DRA- KENBURGER STRASSE H, - H250 NIENBURG- SCHAEFERHOF H.

PEINE H NKP Stadtwerke Peine H266 3.80 IB Allocated as metered Physical stations: GmbH - H267 PEINE OST / INDUSTRIE H, - H268 PEINE WEST H.

RATZEBURG-MOELLN NKP Vereinigte Stadt- H163 3.80 IB Allocated as metered Physical stations: werke Netz GmbH - H029 SIEBENBAEUMEN, - H030 HARMSDORF-MOELLN, - H063 BERKENTHIN, - H081 HARMSDORF-RATZEBURG.

ROTENBURG- NKP Stadtwerke H067 3.80 IB Allocated as metered LUHNE Rotenburg (Wümme) GmbH

SARKWITZ NKP ZVO Energie H028 3.80 IB Allocated as metered GmbH

SCHLESWIG- NKP Schleswig- H160 3.80 IB Allocated as metered Physical stations: HOLSTEIN 1 Holstein Netz AG - H008 UETERSEN BASSHORN, - H009 BOKHOLT-HANREDDER, - H010 QUARNSTEDT, - H012 KROPP, - H013 SCHUBY, - H046 HANDEWITT, - H047 TARP-EGGEBEK, - H058 UETERSEN-GR.TWIETE, - H059 HEIST, - H060 JUEBEK, - H232 KLEIN OFFENSETH.

SCHLESWIG- NKP Schleswig- H194 3.80 IB Allocated as metered Physical stations: HOLSTEIN 2 Holstein Netz AG - H021 LEVERSEN, - H035 TORNESCH.

SCHNEVERDINGEN - NKP Stadtwerke H217 3.80 IB Allocated as metered SUEDRING Schneverdingen- Neuenkirchen GmbH

Page 16 of 33 Vers.Nr. 20211001-20220101_03_20201125

Pricelist of GUD as of 1. October 2021 (valid from 01.10.2021 6:00 to 01.01.2022 6:00)

specific capacity Adjacent Net- Capacity type Name Type ID fee Allocation rule Remarks work Operator at the pont [€/(kWh/h)/a]

SITTENSEN EWE NKP EWE NETZ H042 3.80 IB Allocated as metered GmbH

SOLTAU WEISSENKAMP NKP Stadtwerke Soltau H069 3.80 IB Allocated as metered GmbH & Co. KG

STADE NKP Stadtwerke Stade H164 3.80 IB Allocated as metered Physical stations: GmbH - H032 STADE-BRUNNENWEG, - H045 STADE-AGATHENBURG, - H052 STADE-SCHNEE, - H064 STADE-HAGEN.

UELZEN NKP Stadtwerke H154 3.80 IB Allocated as metered Uelzen GmbH

UELZEN NORD NKP Celle-Uelzen Netz H165 3.80 IB Allocated as metered Physical stations: GmbH - H036 BAD BEVENSEN, - H053 BATENSEN, - H065 STEDDORF.

UELZEN SUED NKP Celle-Uelzen Netz H167 3.80 IB Allocated as metered Physical stations: GmbH - H169 UNTERLUESS (SVO), - H170 SUDERBURG, - H155 BOLLENSEN, - H183 FASSBERG, - H182 MUEDEN.

VERDEN H NKP Stadtwerke Ver- H609 3.80 IB Allocated as metered Zugeordnete physikalische Netzpunkte: den GmbH - H610 VERDEN 1 H, - H611 VERDEN 2 H.

WALSRODE- NKP Stadtwerke Böh- H221 3.80 IB Allocated as metered Physical stations: FALLINGBOSTEL metal GmbH - H222 WALSRODE OST, - H223 FALLINGBOSTEL SW BOEHMETAL, - H224 WALSRODE WEST, - H225 FALLINGBOSTEL OERBKE.

WENDLAND NKP Avacon Hoch- H173 3.80 IB Allocated as metered Physical stations: drucknetz GmbH - H156 GISTENBECK, - H157 DANNENBERG, - H159 LUECHOW.

ZEVEN NKP Stadtwerke Zeven H213 3.80 IB Allocated as metered Physical stations: GmbH - H039 ZEVEN ASPE, - H057 ZEVEN BRAUEL.

Page 17 of 33 Vers.Nr. 20211001-20220101_03_20201125

Pricelist of GUD as of 1. October 2021 (valid from 01.10.2021 6:00 to 01.01.2022 6:00)

specific capacity Adjacent Net- Capacity type Name Type ID fee Allocation rule Remarks work Operator at the pont [€/(kWh/h)/a]

ZEVEN BRAUEL H (EWE) NKP EWE Netz RVN H291 3.80 IB Allocated as metered GmbH

Page 18 of 33 Vers.Nr. 20211001-20220101_03_20201125

Pricelist of GUD as of 1. October 2021 (valid from 01.10.2021 6:00 to 01.01.2022 6:00)

d. Entry Points in the L-Gas Transmission System to be booked

specific capaci- Capacity Adjacent Net- Name Type EIC ID ty fee type at the Allocation rule Remarks work Operator [€/(kWh/h)/a] pont

DOETLINGEN UE L OTHERS Connection from 37Z0000000069815 L112 3.80 FZK, Allocated as metered Complex point. production facili- interruptible MarketlocationID: ties 51564159726

LEHRINGEN RI LUTTUM OTHERS Connection from 37Z000000006985Y L115 3.80 FZK, Allocated as metered Complex point. production facili- interruptible ties MarketlocationID: 51564159792

OUDE STATENZIJL L GÜP Gasunie Trans- 21Z000000000078I L139 3.80 FZK, Allocated as nominated port Services interruptible B.V.

VIP-TTF-GASPOOL-L GÜP Gasunie Trans- 21Z000000000499V L195 3.80 DZK, FZK, Allocated as nominated Virtual Interconnection port Services uK Point, assignments B.V. published at https://www.gasunie.de Contains available capacity of the IPs Oude Statenzijl from GTG Nord and Oude Statenzijl L (L139) from GUD

Page 19 of 33 Vers.Nr. 20211001-20220101_03_20201125

Pricelist of GUD as of 1. October 2021 (valid from 01.10.2021 6:00 to 01.01.2022 6:00)

e. Exit-Zones/-Points in the L-Gas Transmission System to be booked

specific capaci- Capacity Adjacent Net- Name Type EIC ID ty fee type at the Allocation rule Remarks work Operator [€/(kWh/h)/d] pont

KIRCHLENGERN NAP Energieservice 37Z0000000069742 L038 3.80 FZK, Allocated as metered Nominations may be Westfalen Weser interruptible required. Correspond- GmbH ent metering point: DE70114032278KIRCHLENGE RNSUMME000 MarketlocationID: 51564159578

OUDE STATENZIJL L GÜP Gasunie Trans- 21Z000000000078I L138 3.80 interuptible Allocated as nominated Reverse flow capacity. port Services B.V.

VIP-TTF-GASPOOL-L GÜP Gasunie Trans- 21Z000000000499V L196 3.80 uK Allocated as nominated Virtual Interconnection port Services Point B.V. Contains available capacity of the IPs Oude Statenzijl from GTG Nord and Oude Statenzijl L (L138) from GUD. Reverse flow capacity.

WUESEKE PADERBORN NAP Paul Wüseke L192 3.80 FZK, Allocated as metered MarketlocationID: Kalksandstein- interruptible 51564159875 werk GmbH & Co. KG

Page 20 of 33 Vers.Nr. 20211001-20220101_03_20201125

Pricelist of GUD as of 1. October 2021 (valid from 01.10.2021 6:00 to 01.01.2022 6:00)

f. Exit-Zones/-Points in the L-Gas Transmission System to be ordered

specific capacity Adjacent Net- Capacity type Name Type ID fee Allocation rule Remarks work Operator at the pont [€/(kWh/h)/d]

BIELEFELD NKP SWB Netz GmbH L158 3.80 IB Allocated as metered Physical stations: - L079 BIELEFELD- VILSENDORF 2- VIL2 - L041 BIELEFELD- VILSENDORF 1 - VIL1 - L042 BIELEFELD-BABENHAUSEN- BABH - L044 BIELEFELD-SENNESTADT- SENN.

DIEPHOLZ NKP Stadtwerke EVB L040 3.80 IB Allocated as metered Huntetal GmbH

ENGER NKP Stadtwerke L171 3.80 IB Allocated as metered Herford GmbH

HANNOVER OST NKP Avacon Hoch- L168 3.80 IB Allocated as metered Physical stations: drucknetz GmbH - L080 WATENBUETTEL, - L124 BRAUNSCHWEIG (Abzweig), - L048 PEINE STAHLWERKE, - L051 BUCHLER, - L052 ALLERBUETTEL. The balancing conversion from L- to H- Gas will take place1st of November 2021.

HASSEL NKP Avacon Hoch- L101 3.80 IB Allocated as metered Bounded supply Westen/Hassel, point is drucknetz GmbH provided with gas only through the up- streamed production network.

HATTEN-SANDKRUG L NKP EWE NETZ RVN L194 3.80 IB Allocated as metered Conversion from L- to H-Gas is expected GmbH to take place step-by-step until Decem- ber 2022 (H290)

MITTELSBUEREN NKP Open Grid L020 3.80 IB Allocated as metered Currently no connection to GUD gas Europe GmbH transmission system.

PADERBORN- NKP Westfalen Weser L045 3.80 IB Allocated as metered FISCHTEICHE Netz GmbH

STEINHAGEN - NKP Gemeindewerke L043 3.80 IB Allocated as metered OBERER STEINWEG Steinhagen GmbH

Page 21 of 33 Vers.Nr. 20211001-20220101_03_20201125

Pricelist of GUD as of 1. October 2021 (valid from 01.10.2021 6:00 to 01.01.2022 6:00)

specific capacity Adjacent Net- Capacity type Name Type ID fee Allocation rule Remarks work Operator at the pont [€/(kWh/h)/d]

STEMWEDE- NKP Westnetz GmbH L108 3.80 IB Allocated as metered LEVERN

VISSELHOEVEDE (AVA- NKP Avacon Hoch- L157 3.80 IB Allocated as metered Exit to the upstream pipeline system of CON) drucknetz GmbH Avacon Hochdrucknetz GmbH in ac- cordance with § 3 No. 39 EnWG.

WESTEN NKP Avacon Hoch- L100 3.80 IB Allocated as metered Bounded supply Westen/Hassel, point is drucknetz GmbH provided with gas only through the up- streamed production network.

Page 22 of 33 Vers.Nr. 20211001-20220101_03_20201125

Pricelist of GUD as of 1. October 2021 (valid from 01.10.2021 6:00 to 01.01.2022 6:00)

2. Capacity charge on storage connection points

For capacity bookings at storages a uniform discount of 75 % on the capacity charge for firm freely allocable capacity will be granted in accordance with REGENT 2021 Tenor no. 2. This discount is applied to the capacity charge for the booked capacity product.

Divergent are storages which allows access to a market of a cross-border country. At such storages GUD is obliged to offer a capacity charge without discount. Only if the storage operator can prove beforehand and in due time the compliance with the conditions listed in BK9-19/610 (REGENT 2021) Tenor no. 2 GUD is obliged to offer a discounted tariff. If one or more of the conditions named above are not being fullfilled anymore within the year 2021, GUD is obliged to only offer a non discounted tariff at the affected network point with im- mediate effect.

If a discounted capacity shall subsequently used for exit to a market of a neighbouring country, no separate capacity bookings are re- quired according to the REGENT 2021-decision, boundary-number 547-551. Instead of such bookings, GUD may, on application of the Shipper, subsequently charge the corresponding specific capacity fees and transfer the capacity into a non-discount account. The shipper shall inform GUD of this with a lead time of 5 working days using using the storage re-booking data sheet, published in the download ar- ea. The duration a rebooking must be at least one gas day.

The following table shows the discounted and non-discounted specific capacity fee at storage network points for firm freely allocable ca- pacities (FZK) based on an order period of 365 consecutive days (366 days in a leap year). The discounted capacity charge is only shown if the conditions named in Section 2 are fullfilled.

Page 23 of 33 Vers.Nr. 20211001-20220101_03_20201125

Pricelist of GUD as of 1. October 2021 (valid from 01.10.2021 6:00 to 01.01.2022 6:00)

a. Entry Storage Points into the H-Gas Transmission System to be booked

specific capaci- Capacity Adjacent Net- Name Type EIC ID ty fee type at the Allocation rule Remarks work Operator [€/(kWh/h)/a] pont

UGS ETZEL STORAGE Etzel- 21Z000000000291I H152 3.80 FZK-unrab, Allocated as nominated Complex point. Kavernenbe- interruptible- triebsgesellschaft unrab mbH & Co.KG 0.95 FZK-rab, interruptible- rab

UGS ETZEL CRYSTAL STORAGE Friedeburger 21Z000000000326P H230 0.95 FZK-rab, Allocated as nominated Complex point. Speicherbetriebs- interruptible- gesellschaft mbH rab "Crystal"

UGS ETZEL EGL STORAGE Equinor Deutsch- 37Z000000007248Q H285 0.95 FZKrab Allocated as nominated Complex point. land Storage interruptible- GmbH, rab Uniper Energy Storage GmbH; Total Etzel Gas- lager GmbH

UGS ETZEL ESE STORAGE Uniper Energy 21Z000000000292G H196 3.80 FZK-unrab, Allocated as nominated Complex point. Storage GmbH; interruptible- Gas-Union Stor- unrab age GmbH; OMV Gas Stora- ge Germany GmbH; VNG Gasspei- cher GmbH 0.95 FZK-rab, interruptible- rab

UGS HARSEFELD STORAGE Storengy 21Z000000000293E H102 0.95 FZK-rab, Allocated as nominated Deutschland interruptible- GmbH rab

Page 24 of 33 Vers.Nr. 20211001-20220101_03_20201125

Pricelist of GUD as of 1. October 2021 (valid from 01.10.2021 6:00 to 01.01.2022 6:00)

specific capaci- Capacity Adjacent Net- Name Type EIC ID ty fee type at the Allocation rule Remarks work Operator [€/(kWh/h)/a] pont

UGS JEMGUM EWE STORAGE EWE Gasspei- 21Z000000000339G H199 3.80 FZK-unrab, Allocated as nominated cher GmbH interruptible- unrab 0.95 FZK-rab, interruptible- rab

UGS LESUM H SPEICHER Storengy 21Z000000000294C H622 0.95 FZK-rab, Allocated as nominated Deutschland interruptible- GmbH rab

UGS NUETTERMOOR STORAGE EWE Gasspei- 21Z000000000338I H100 3.80 FZK-unrab, Allocated as nominated cher GmbH interruptible- unrab 0.95 FZK-rab, interruptible- rab

UGS UELSEN STORAGE Storengy 21Z000000000295A H098 0.95 FZK-rab, Allocated as nominated Deutschland interruptible- GmbH rab

Page 25 of 33 Vers.Nr. 20211001-20220101_03_20201125

Pricelist of GUD as of 1. October 2021 (valid from 01.10.2021 6:00 to 01.01.2022 6:00)

b. Exit Storage Points from the H-Gas Transmission System to be booked

specific capaci- Capacity Adjacent Net- Name Type EIC ID ty fee type at the Allocation rule Remarks work Operator [€/(kWh/h)/a] pont

UGS ETZEL STORAGE Etzel- 21Z000000000291I H171 3.80 FZK-unrab, Allocated as nominated Complex point. Kavernenbe- interruptible- triebsgesellschaft unrab mbH & Co.KG 0.95 FZK-rab, interruptible- rab

UGS ETZEL CRYSTAL STORAGE Friedeburger 21Z000000000326P H231 0.95 FZK-rab, Allocated as nominated Complex point. Speicherbetriebs- interruptible- gesellschaft mbH rab "Crystal"

UGS ETZEL EGL STORAGE Equinor Deutsch- 37Z000000007248Q H286 0.95 FZK-rab, Allocated as nominated Complex point. land Storage interruptible- GmbH, rab Uniper Energy Storage GmbH; Total Etzel Gas- lager GmbH

UGS ETZEL ESE STORAGE Uniper Energy 21Z000000000292G H197 3.80 FZK-unrab, Allocated as nominated Complex point. Storage GmbH; interruptible- Gas-Union Stor- unrab age GmbH; OMV Gas Stora- ge Germany GmbH; VNG Gasspei- cher GmbH 0.95 FZK-rab, interruptible- rab

UGS HARSEFELD STORAGE Storengy 21Z000000000293E H103 0.95 FZK-rab, Allocated as nominated Deutschland interruptible- GmbH rab

Page 26 of 33 Vers.Nr. 20211001-20220101_03_20201125

Pricelist of GUD as of 1. October 2021 (valid from 01.10.2021 6:00 to 01.01.2022 6:00)

specific capaci- Capacity Adjacent Net- Name Type EIC ID ty fee type at the Allocation rule Remarks work Operator [€/(kWh/h)/a] pont

UGS JEMGUM EWE STORAGE EWE Gasspei- 21Z000000000339G H200 3.80 FZK-unrab, Allocated as nominated cher GmbH interruptible- unrab 0.95 FZK-rab, interruptible- rab

UGS LESUM H SPEICHER Storengy 21Z000000000294C H623 0.95 FZK-rab, Allocated as nominated Deutschland interruptible- GmbH rab

UGS NUETTERMOOR STORAGE EWE Gasspei- 21Z000000000338I H101 3.80 FZK-unrab, Allocated as nominated cher GmbH interruptible- unrab 0.95 FZK-rab, interruptible- rab

UGS UELSEN STORAGE Storengy 21Z000000000295A H099 0.95 FZK-rab, Allocated as nominated Deutschland interruptible- GmbH rab

Page 27 of 33 Vers.Nr. 20211001-20220101_03_20201125

Pricelist of GUD as of 1. October 2021 (valid from 01.10.2021 6:00 to 01.01.2022 6:00)

c. Entry Storage Points into the L-Gas Transmission System to be booked

specific capaci- Capacity Adjacent Net- Name Type EIC ID ty fee type at the Allocation rule Remarks work Operator [€/(kWh/h)/a] pont

UGS NUETTERMOOR L STORAGE EWE Gasspei- 21Z000000000337K L187 0.95 FZK-rab, Allocated as nominated (MOORAECKER) cher GmbH interruptible- rab

d. Exit Storage Points from the L-Gas Transmission System to be booked

specific capaci- Capacity Adjacent Net- Name Type EIC ID ty fee type at the Allocation rule Remarks work Operator [€/(kWh/h)/d] pont

UGS NUETTERMOOR L STORAGE EWE Gasspei- 21Z000000000337K L188 0.95 FZK-rab, Allocated as nominated (MOORAECKER) cher GmbH interruptible- rab

Page 28 of 33 Vers.Nr. 20211001-20220101_03_20201125

Pricelist of GUD as of 1. October 2021 (valid from 01.10.2021 6:00 to 01.01.2022 6:00)

3. Interruptible capacity charge (interruptible)

In general the interruptible capacity charge in accordance with Section 9, chapter 1 GT&C-EEC for network points in the L-Gas transmis- sion system is ninety (90) percent of the specific charge stated in Article 1 and 2 of this pricelist. For interruptible internal order according to Section 11 Paragraph 8 of the KoV the same apply for L-Gas. For H-Gas, in general the interruptible capacity charge in accordance with Section 9, chapter 1 GT&C-EEC is eighty (80) percent of the specific charge stated in Article 1 and 2 of this pricelist. The same applies for interruptible internal order according to Section 11 Paragraph 8 of the KoV for network points in the H-Gas transmission system.

By way of derogation from Section 1 different discount factor for interruptible capacities according Section 9, Paragraph 1 GT&C-EECof the specific capacity fee stated in Article 1, 2 and 6 apply at the network points listed below.

Discount factor* for interruptible capacity Within-Day-product Daily prod- Monthly Quarterly Yearly product Point ID uct product product Exit DEUTSCHNEUDORF- 0.79 0.79 0.79 0.79 0.80 H283 EUGAL BRANDOV Entry Oude Statenzijl H H104 0.79 0.80 0.80 0.80 0.80 Exit Oude Statenzijl H H095 0.79 0,79 0.79 0.80 0.80 Entry Oude Statenzijl L L139 0.89 0.89 0.89 0.89 0.89 Entry VIP-TTF-GASPOOL-L L195 0.89 0.89 0.89 0.89 0.89 Exit Oude Statenzijl L L138 0.89 0.89 0.90 0.90 0.90 Exit VIP-TTF-GASPOOL-L L196 0.89 0.89 0.90 0.90 0.90 Entry GREIFSWALD / VIEROW H207 0.79 0.79 0.80 0.80 0.80 Entry LUBMIN II H282 0.79 0.79 0.80 0.80 0.80 * ”Discount factor 0.90“ corresponds to ninety (90) percent of the specific capacity charge for firm freely allocable capacity

Page 29 of 33 Vers.Nr. 20211001-20220101_03_20201125

Pricelist of GUD as of 1. October 2021 (valid from 01.10.2021 6:00 to 01.01.2022 6:00)

4. Dynamically-allocable capacity charge (DZK)

The dynamically-allocable capacity charge in accordance with Section 2, chapter 1 GT&C Supplementary Terms and Conditions is nine- ty (90) percent for L-Gas and eighty (80) percent for H-Gas of the specific charge stated in Article 1 and 2 of this pricelist. Dynamically- allocable capacities are marked in Article 1 and 2 of this pricelist.

5. Charges for products with a duration of less than one year and for withinday products

The share value of the charge for products with a duration of less than one year is calculated by the multiplication of the capacity charge according to Sections 1 to 4 of this pricelist and the share value of 1/365 for every booked day (1/366 in leap years).

The share value of the charge for withinday products is calculated by the multiplicaton of the capacity charge according to sections 1 to 4 of this pricelist and the share value of 1/8760 for every booked hour (1/8784 in leap years).

Depending on the runtime of the booked capacity the share value, determined accourding to Section 5, sentence 1 and 2 of this pricelist, needs to be multiplicated with the following multipliers according to “MARGIT 2021” and “BEATE 2.0”:

Classification according to „MAR- runtime in days Multiplier GIT 2021“ and „BEATE 2.0“ Up to 1 Withinday-product 2.0 1 to 27 Daily product 1.4 28 to 89 Monthly product 1.25 90 to 364 Quarterly product 1.1 >= 365 Yearly product 1.0

The capacity charge for internal orders with a durtaiton of less than one year, especially in case of adjustments according to Section 15 KoV, can be calculated analogue.

Page 30 of 33 Vers.Nr. 20211001-20220101_03_20201125

Pricelist of GUD as of 1. October 2021 (valid from 01.10.2021 6:00 to 01.01.2022 6:00)

6. Increased charge in case of capacity-overruns incorporated and ordered capacity (Section 30, Paragraph 4 GT&C-EEC) If the allocated hourly gas quantities at an entry or exit point exceed one hundred (100) percent of capacity incorporated to the balancing group for an entry or exit point or one hundred (100) percent of the ordered capacity, an hourly capacity overrun occurred. In case of one or several hourly capacity overruns during a gas day, a claim of GUD to payment of a higher charge arises according to Sec- tion 18 Paragraph 7 KoV or Section 30 Paragraph 4 GT&C-EEC respectively. The higher charge shall amount to the maximum hourly over- run (difference between the capacity actually used, on the one hand, and the capacity incorporated to the balancing group or the ordered capacity, on the other hand) multiplied by three (3) times the applicable entry capacity charge or exit capacity charge for withinday- capacities in case the respective booked or ordered capacity incorporated to the balancing group or the ordered capacity is a withinday product. If the runtime of the booked or ordered capacity is a day or longer the applicable entry or exit capacity tariff on a daily-basis is applied for the abovementioned calculation.

7. Invoicing charge for meter operation and metering Pursuant to Section 13, Paragraph 3 and Section 15, Paragraph 7 GasNEV, no separate invoicing charge in accordance with Sec- tion 25, Paragraph 1 GT&C-EEC for meter operation and metering will be levied.

8. Biogas levy Pursuant to Section 7 KoV and Section 25, Paragraph 1 GT&C EEC, the biogas levy is levied in addition to the charges listed in Article 1 to 6 of this pricelist for all bookable and orderable exit capacities at exit points with the exception of cross border interconnection points (GÜP)and storage connection points (STORAGE). The uniform nationwide biogas levy for the calender year 2021 is 0.6250 [€/(kWh/h)/a].

9. Market Conversion Levy („Marktraumumstellungs-Umlage“) Pursuant to Section 10 KoV and Section 25, Paragraph 1 GT&C EEC, the specific levy for market conversion is levied in addition to the charges listed in Article 1 to 6 of this pricelist for all bookable and orderable exit capacities at exit points with the exception of cross bor- der interconnection points (GÜP)) and storage connection points (STORAGE). The uniform nationwide market conversion levy for the cal- endar year 2021 is 0.7291 [€/(kWh/h)/a.

Page 31 of 33 Vers.Nr. 20211001-20220101_03_20201125

Pricelist of GUD as of 1. October 2021 (valid from 01.10.2021 6:00 to 01.01.2022 6:00)

10. Conditions concerning transport tariffs charges and payments (Section 25, Paragraph 11 GT&C-EEC) Shippers shall pay invoice amounts, plus VAT at the applicable rate, by credit transfer to the bank account stated on the invoice within ten (10) days of receipt of invoice or not later than the 15th day of the same month, whichever is the earlier. Payments are due in Euro (€) according to SEPA procedures. Banking fees in relation to payments without SEPA will be passed on to the customer other- wise. The foregoing due dates for payment are the dates of credit of the amounts to the stated account..

11. Invoicing and payments on account (Section 26, Paragraph 1 First Sentence GT&C-EEC) 1. GUD will invoice the shipper monthly the charges in accordance with Article 1 to 7 plus the other charges in accordance with Article 8 to 9 of this pricelist and taxes in accordance with Section 27 GT&C-EEC. Number 2 of this article remain unaffected. 2. Higher tariffs due to capacity overruns in accordance with Section 4 of the Supplementary Terms and Conditions (Appendix 2 GT&C- EEC), are invoiced as soon as the necessary billing data are available. 3. All invoice amounts are calculated in Euro (€) to two decimal places in accordance with customary business practice (being rounded up if the third decimal place is five or more and rounded down if the third decimal place is four or less). The rounding-off takes place at the end of the calculation per invoice line item. GUD reserves, at rounding which breeds to a fee of zero (0) Euro, to invoice a rounded fee of one (1) Euro.

12. Default interest If a day of payment is not keeped GUD is entitled to charge interest, without prejudice of other claims. The interest is calculated ac- cording to Sections 288, 247 BGB based on the German Interest Methode (30/360).

Page 32 of 33 Vers.Nr. 20211001-20220101_03_20201125

Pricelist of GUD as of 1. October 2021 (valid from 01.10.2021 6:00 to 01.01.2022 6:00)

13. Additional Settlements for invoicing for downstream network operators according to Sections 18, 53 KoV

All fees and other charges are calculated in Euro (€) to two decimal places in accordance with customary business practice (being rounded up if the third decimal place is five or more and rounded down if the third decimal place is four or less). The rounding-off takes place at the end of the calculation. GUD reserves, at roundings which breeds to a fee of zero (0) Euro, to invoice a rounded fee of one (1) Euro.

1. GUD will invoice the downstream network operator the charges in accordance with Article 1 to 7 plus the other charges in accordance with Article 8 to 9 of this pricelist and taxes in accordance with Section 53 KoV monthly at the beginning of each calendar month. Number 2 of this article remain unaffected. 2. Charges for the overrun of ordered capacity are invoiced to the downstream network operators in accordance with Sections 18, Para- graph 6 KoV as soon as the necessary data measurements are completed. 3. The downstream network operator shall pay invoice amounts, plus VAT at the applicable rate, by credit transfer to the bank account stated on the invoice within ten (10) days of receipt of invoice or not later than the 15th day of the same month, whichever is the ear- lier. The foregoing due dates for payment are the dates of credit of the amounts to the stated account. Payments are due in Euro (€) according to SEPA procedures. Banking fees in relation to payments without SEPA will be passed on to the customer otherwise. Pay- ments must be made in accordance with Section 18, Paragraph 5 KoV. 4. If a day of payment is not keeped GUD is entitled to charge interest, without prejudice of other claims. The interest is calculated ac- cording to Sections 288, 247 BGB based on the German Interest Methode (30/360).

Page 33 of 33 Vers.Nr. 20211001-20220101_03_20201125