State of California Department of Transportation Page 1 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 01 Location Awarded Contract Bid + CCOs Approved %Time Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 01-DN-101-8.2/8.7 IN DEL NORTE COUNTY NEAR KLAMATH AT GOLDEN STATE BRIDGE, INC. CLAYTON MALMBERG $18,916,414 04/21/20 40% 01-0B0904 $5,572,556 05/08/20 PANTHER CREEK BRIDGE #01-0025 AND AT 3701 MALLARD DRIVE; 207 PROCE MALL 29% $385,880 08/05/22 HUNTER CREEK BRIDGE #01-0003 CRESCENT CITY, CA 95531 BENICIA CA 94510 REPLACE BRIDGE (707)496-5581 (925)372-8000 HA21

01-DN-101-12.5/15.5 IN DEL NORTE COUNTY NEAR KLAMATH FROM G R SUNDBERG, INC. SANDERS, KAREN $11,985,000 02/16/16 100% 01-0G1004 $11,984,109 05/04/16 0.4 MILE SOUTH OF WILSON CREEK BRIDGE 5211 BOYD ROAD 207 PRICE MALL 100% $0 04/09/21 TO 1.7 MILES NORTH OF RUDISIL ROAD CRESCENT CITY, CA 95531 ARCATA, CA 95521 DIR'S EMERGENCY F. (707)498-4009 OVER RUN (707)825-6565 ROADWAY STABILIZATION AND RETAINING 20.20 WALL R 201130 01-DN-101-25.5/27.4 IN DEL NORTE COUNTY IN AND NEAR S.T. RHOADES CONSTRUCTION, KAREN SANDERS $6,277,368 12/08/20 39% 01-0C6604 $1,808,077 12/29/20 CRESCENT CITY FROM 0.2 MILE SOUTH OF INC. 207 PROCE MALL 29% ACNH-Q101-(382)E $360,883 12/20/21 ELK VALLEY ROAD TO 0.2 MILE NORTH OF 8585 COMMERCIAL WAY; CRESCENT CITY CA 95531 --() WILSON AVENUE & BURTCHE (707)498-4009 SUSPENDED REDDING CA 96002 CRESCENT CITY ADA (530)223-9322

01-DN-101-39.8/39.8 IN DEL NORTE COUNTY NEAR SMITH RIVER MCCULLOUGH CONSTRUCTION INC KAREN SANDERS $4,677,632 05/28/20 76% 01-0F3104 $3,918,692 06/18/20 AT DOMINIE CREEK 57 ALDERGROVE RD; 207 PRCE MALL 83% $426,678 09/29/21 FISH PASSAGE MITIGATION CRESCENT CITY CA 95531 ARCATA CA 95521 (707)498-4009 SUSPENDED (707)825-1014 HA42

01-DN-101-39.8/46.4 IN DEL NORTE COUNTY NEAR SMITH RIVER INTERMOUNTAIN SLURRY SEAL, $673,673 06/03/21 0% 01-0K4704 $0 06/22/21 FROM 0.2 MILE NORTH OF ROWDY CREEK INC. 0% $0 BRIDGE TO THE OREGON STATE LINE 1120 TERMINAL WAY;

MICRO-SURFACING RENO NV 89502 (775)358-1355

01-DN-101-42.0/42 IN DEL NORTE COUNTY ON ROUTE 101 AT MCCULLOUGH CONSTRUCTION INC. VALLEY, AARON $285,000 04/28/21 100% 01-0L0704 $15,235 05/19/21 PM 42.01. DIR'S EMERGENCY F.A. 57 ALDER GROVE ROAD 207 PRICA MALL 5% $0 06/21/21 CONTRACT TO REPAIR A CULVERT SYSTEM CRESCENT CITY, CA 95531 ARCATA, CA 95521 (707)815-5620

20.20 201130 State of California Department of Transportation Page 2 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 01 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 01-DN-101-120.0/16.5 IN DEL NORTE COUNTY ABOUT 8 MILES GR SUNDBERG INC. VALLEY, AARON $13,985,000 02/17/21 24% 01-0L0404 $6,531,295 04/05/21 SOUTH OFCRESCENT CITY FROM 0.2 MILE 5211 BOYD RD 270 PRICE MALL 47% $0 02/01/22 SOUTH OF LAGOON CR. CO PK TO BEG CRESCENT CITY, CA 95531 ARCATA, CA 95521 PASSING LANE LT. DIR'S EMER (707)498-4009

SLIDE REPAIR 20.20 201130 01-DN-101-151.0/15.5 IN DEL NORTE COUNTY ABOUT 10 MILES STEWART ENGINEERING, INC. VALLEY, AARON $13,985,000 06/21/21 0% 01-0L2304 $0 07/21/21 SOUTH OF CRESCENT CITY FROM 1.3 MILES P.O. BOX 990010 207 PRICE MALL 0% $0 04/30/22 TO 1.9 MILES NORTH OF RUDISILL ROAD CRESCENT CITY, CA 95531 REDDING, CA 96099 DIR'S EMERGENCY L.B. (707)815-5620

ROADWAY STABILIZATION & RETAINING 20.20 WALL REP 201130 01-DN-101-/15.5 STABILIZE A SECTION OF DAMAGED GOLDEN STATE BRIDGE, INC SANDERS, KAREN $26,085,000 11/15/17 0% 01-0H6904 $15,351,295 03/09/18 HIGHWAY ANDIMPROVE THE ALIGNMENT VIA 3701 MALLARD DRIVE 207 PRICE MALL SUITE 59% $0 11/13/23 REPAIRS TO FOUR RETAINING WALLS, NEW 100 BENICIA, CA 94510 RW, PLACEMENT OF A MECHAN CRESCENT CITY, CA 95531

ROADWAY STABILIZATION & RETAINING (707)498-4009 20.20 WALL 201130 01-DN-199-6.5/36.3 IN DEL NORTE COUNTY NEAR HIOUCHI FROM GR SUNDBERG INC. VALLEY AARON $1,310,859 08/03/20 14% 01-488014 $338,960 08/20/20 0.3 MILE NORTH OF MYRTLE CREEK BRIDGE 5211 BOYD ROAD; 207 PRICE MALL 26% $297,365 03/16/22 TO 0.1 MILE SOUTH OF OREGON STATE CRESCENT CITY CA 95531 ARCATA CA 95521 LINE (707)498-4009 (707)825-6565 REHAB CULVERTS

01-DN-199-9.9/9.9 IN DEL NORTE COUNTY ON ROUTE 199 AT MCCULLOUGH CONSTRUCTION INC. VALLEY, AARON $285,000 05/21/21 77% 01-0L3204 $69,364 06/15/21 PM 9.93 DIR'S EMERGENCY F.A. 57 ALDER GROVE ROAD 207 PRICE MALL 24% $0 07/21/21 REPAIR ACCELERATED PAVEMENT DAMAGE CRESCENT CITY, CA 95531 ARCATA, CA 95521 (707)815-5620

20.20 201130 01-DN-199-27.5/36.4 IN DEL NORTE COUNTY NEAR IDLEWILD TIDEWATER CONTRACTORS, INC. SANDERS, KAREN $7,485,000 09/11/20 100% 01-0K7904 $3,598,717 10/27/20 FROM 0.6 MI. SOUTH OF IDLEWILD MAINT P.O. BOX 1956 207 PRICE MALL 48% $0 07/30/21 STATION RD. TO THE OREGON STATE CRESCENT CITY, CA 95531 BROOKINGS, OR 97415 LINEDIR'S EMERGENCY F.A. (707)498-4009 OVER RUN (541)469-5341 REPAIR WILDFIRE DAMAGE 20.20 201130 State of California Department of Transportation Page 3 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 01 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 01-DN-199-335.0/33.9 IN DEL NORTE COUNTY NEAR IDLEWILD AT G R SUNDBERG, INC. MALMBERG, CLAYTON $4,985,000 06/04/19 100% 01-0J5704 $3,647,309 09/06/19 COLLIER TUNNEL TO 0.4 MILE EAST OF 5211 BOYD ROAD 270 PRICE MALL 73% $0 07/30/21 COLLIER TUNNEL. DIR'S EMERGENCY F.A. CRESCENT CITY, CA 95531 ARCATA, CA 95521 REMOVE AERIALLY DEPOSITED (707)496-5581 OVER RUN

LEAD&PROVIDE POW 20.20 201130 01-DN-999-/0 IN DEL NORTE COUNTY AT VARIOUS TRUESDELL CORPORATION OF $1,769,769 05/27/21 0% 01-0J8604 $0 06/18/21 LOCATIONS CALIFORNIA, INC. 0% $0 REHAB BRIDGE DECKS 1310 W 23RD STREET

TEMPE AZ 85282 (602)437-1711

01-HUM-36-5.2/30.9 IN HUMBOLDT COUNTY AT VARIOUS WYLATTI RESOURCE MANAGEMENT, TAJ MORGAN MARBAIT $498,888 10/20/20 83% 01-0F8404 $484,399 11/05/20 LOCATIONS ON ROUTE 36 FROM 0.43 INC 187 SANDY BRAIRIE CT 96% $382,526 07/27/21 MILES EAST OF YAGER CREEK BRIDGE TO 23601 CEMETERY LN STE.E

0.99 MILES EAST OF LITTLE LARAB FORTUNA CA 95501 COVELO CA 95428 REHAB CULVERTS (707)834-0219 HM (707)983-8135

01-HUM-36-17.9/23.9 IN HUMBOLDT AND LAKE COUNTIES AT AMERICAN CIVIL CONSTRUCTORS $1,690,420 06/30/21 0% 01-0F5004 $0 07/22/21 VARIOUS LOCATIONS WEST COAST LLC 0% $0 FOUR BRIDGES DECK PRESERVATION 2990 BAY VISTA COURT, SUITE D

BENICIA CA 94510 HA21 (707)746-8028

01-HUM-36-40.4/45.6 IN HUMBOLDT COUNTY AT AND NEAR MERCER-FRASER COMPANY $2,078,078 06/04/21 0% 01-0K5704 $0 06/29/21 DINSMORE FROM VAN DUZEN RIVER BRIDGE 77 2ND ST 0% $0 TO TRINITY COUNTY LINE EUREKA CA 95501 OVERLAY (707)443-6371

01-HUM-36-314.0/0 IN HUMBOLDT COUNTY NEAR BRIDGEVILLE GOLDEN STATE BRIDGE, INC. KING, ROBERT $21,185,000 08/03/18 90% 01-0J1704 $14,165,650 10/31/18 FROM 1.2 MILE EAST OF MCCLELLAN 3701 MALLARD DRIVE 1487 SANDY PRAIRIE 67% $0 08/26/21 MOUNTAIN ROAD DIR'S EMERGENCY L.B. COURT STE. E BENICIA, CA 94510 STORM DAMAGE REPAIR FORTUNA, CA 95501

(707)725-7190 20.20 201130 State of California Department of Transportation Page 4 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 01 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 01-HUM-96-16.8/23.1 IN HUMBOLDT COUNTY NEAR HOOPA FROM AMERICAN PAVEMENT SYSTEMS, $1,455,893 05/14/21 0% 01-0K4304 $0 06/14/21 ROCK CHUTE VIADUCT TO KLAMATH RIVER INC. 0% $0 BRIDGE 1012 11TH STREET;

MAINTENANCE CAP SEAL MODESTO CA 95354 (209)522-2277

01-HUM-96-22.9/0 IN HUMBOLDT COUNTY IN WEITCHPEC AT MERCER-FRASER COMPANY NATHANIEL STEEN $1,173,953 04/20/20 83% 01-0F0804 $938,611 05/08/20 PEARSON LANE 77 2ND AVE 5065 BOYD RD 80% HSST-P096-(062)E $356,258 08/04/21 CONSTRUCT FENCE ARCATA, CA 95521 --() EUREKA CA 95501 (707)498-2122 (707)443-6371 HB1

01-HUM-101-17.9/87.8 IN HUMBOLDT COUNTY AT SOUTH FORK EEL FREYSSINET INC JOAQUIN RODRIGUEZ $9,137,280 01/21/20 44% 01-0E7704 $2,825,814 02/19/20 RIVER BR & SEP #04-0065 & AT ARCATA 44880 FALCON PLACE, SUITE 100 1487 SANDY PRAIRIE 31% ACNH-Q101-(360)E $225,037 01/21/22 OVERHEAD #040-0079R COURT STE.E --() STERLING VA 20166 STRENGTHEN 2 BRIDGES FORTUNA CA 95501 (703)378-2500 (707)621-0000

01-HUM-101-23.0/102.3 IN HUMBOLDT COUNTY NEAR TRINIDAD AT R. BROWN CONSTRUCTION WINTER, BRIAN $955,000 07/30/20 45% 01-0K7104 $405,350 09/03/20 0.5 MILE SOUTH OF TRNIDAD S/B REST COMPANY,INC. 5065 BOYD RD SUITE H 42% $0 05/02/21 AREA DIR'S EMERGENCY L.B. P.O. BOX 406 ARCATA, CA 95521

REPAIR CULVERT (707)834-1151 WILLOW CREEK, CA 95573 20.20 (509)629-3702 201130 01-HUM-101-48.3/58.8 IN HUMBOLDT COUNTY NEAR SCOTIA FROM VSS INTERNATIONAL, INC. MORGAN-MARBET, TAI- $3,180,120 05/10/21 0% 01-0K5404 $0 06/03/21 EEL RIVER BOH (RICHARD FLEISCHER 3785 CHANNEL DRIVE; AQUA 0% $0 09/30/21 MEMORIAL) TO 1.1 MILES NORTH OF 1487 SANDY PRAIRIE WEST SACRAMENTO CA 95691 ROUTE 36/101 SEPARATION COURT STE E (916)373-1500 MICRO-SURFACING FORTUNA, CA 95501

(707)834-0219 01-HUM-101-65.5/69.9 IN HUMBOLDT COUNTY AT BEATRICE FROM PAVEMENT COATINGS CO. MORGAN-MARBET, TRI- $1,075,075 05/11/21 0% 01-0K4504 $0 06/10/21 0.4 MILE SOUTH OF LOLETA DRIVE 2150 BELL AVE. AQUA 0% $0 09/30/21 OVERCROSSING TO 0.7 MILE SOUTH OF 1487 SANDY PRAIRIE SACRAMENTO, CA 95838 TOMPKINS HILL ROAD OVERHEAD COURT STE-E (916)642-1751 PAVEMENT RESTORATION FORTUNA, CA 95501

(707)834-0219 State of California Department of Transportation Page 5 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 01 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 01-HUM-101-69.8/75.2 IN HUMBOLDT COUNTY NEAR EUREKA FROM MERCER-FRASER COMPANY JOAQUIN RODRIGUEZ $16,285,580 11/09/20 41% 01-0C5704 $4,839,909 12/02/20 0.8 MILE SOUTH OF TOMPKINS HILL ROAD 77 2ND ST 1487 SANDY PRAIRIE 30% ACNH-Q101-(386)E $468,030 10/18/21 OH TO 0.4 MILE NORTH OF HERRICK COURT STE.E --() EUREKA CA 95501 AVENUE OC FORTUNA CA 95501 (707)443-6371 ROADWAY REHAB (707)621-0000 HA22

01-HUM-101-75.1/77.4 IN HUMBOLDT COUNTY IN EUREKA FROM 0.4 CALIFORNIA HIGHWAY BRIAN FINCK $3,748,288 11/16/20 30% 01-0B6204 $1,411,960 12/09/20 MILE NORTH OF THE HERRICK AVENUE CONSTRUCTION GROUP, INC. 5065 BOYD RD 38% ACNH-Q101-(384)E $734,969 02/01/22 OVERCROSSING TO 0.1 MILE SOUTH OF 1647 WILLOW PASS RD #150; ARCATA CA 95521 --() 14TH STREET (707)498-3489 SUSPENDED CONCORD CA 94520 ADA CURB RETURNS/RAMPS UPGRADES HB1 (925)766-7014

01-HUM-101-78.0/79.8 IN HUMBOLDT COUNTY IN EUREKA ON 4TH GR SUNDBERG INC. BRIAN FINCK $8,797,147 12/12/19 87% 01-0E68U4 $6,110,974 12/24/19 STREET FROM BROADWAY AND 5TH STREET 5211 BOYD ROAD 5065 BOYD RD 66% HSNH-Q101-(361)E $194,162 03/02/22 TO EUREKA SLOUGH BRIDGE ARCATA,CA 95521 --() ARCATA CA 95521 SAFETY IMPROVEMENTS AND CAPM (707)498-3489 (707)825-6565

01-HUM-101-78.0/79.1 IN HUMBOLDT COUNTY IN EUREKA ON WAHLUND CONSTRUCTION INC. WINTER, BRIAN $485,000 11/30/20 100% 01-0K9004 $244,208 12/30/20 SOUTHBOUND 101 FROM M STREET TO P.O. BOX 6486 5065 BOYD ROAD SUITE 100% $0 05/24/21 LITTLE 4TH STREET DIR'S EMERGENCY H EUREKA, CA 95502 07/15/21 F.A. ARCATA, CA 95521 COMPLETED

REPLACE CULVERT &RESTORE (707)834-1151 20.20 SIDEWALK/PAVEMENT 201130 01-HUM-101-80.1/84.3 IN HUMBOLDT COUNTY NEAR EUREKA FROM MERCER-FRASER COMPANY NATHANIEL STEEN/DAWN $6,569,076 01/08/20 100% 01-0F2204 $6,335,648 02/06/20 0.3 MILES SOUTH OF COLE AVENUE TO 0.4 77 2ND ST FRIEND 93% ACNH-Q101-(368)E $0 01/19/22 MILE NORTH OF THE BAYSIDE CUTOFF 5065 BOYD ROAD --() EUREKA CA 95501 ACCELERATION/DECELERATION LANES ARCATA CA 95521 OVER RUN (707)443-6371 (707)498-2122 HB4N

01-HUM-101-84.4/84.8 IN HUMBOLDT COUNTY NEAR ARCATA FROM GOLDEN STATE BRIDGE, INC. NATHANIEL $8,289,405 01/29/20 54% 01-0E0004 $5,477,942 02/13/20 JACOBY CREEK BRIDGE TO GANNON SLOUGH 3701 MALLARD DRIVE; STEEN/OE:DAWN FRIEND 66% $103,743 11/01/21 BRIDGE 5065 BOYD RD BENICIA CA 94510 REPLACE JACOBY CREEK BRIDGE LT, ARACTA CA 95521 (925)372-8000 (707)498-2122 HA21 State of California Department of Transportation Page 6 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 01 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 01-HUM-101-87.8/90.1 IN HUMBOLDT COUNTY IN AND NEAR ARCATA MERCER-FRASER COMPANY BRIAN WINTER $4,385,403 06/19/20 10% 01-0J5104 $362,748 07/23/20 FROM ARCATA OVERHEAD TO ROUTE 200/101 77 2ND ST 5065 BOYD RD 8% ACST-Q101-(374)E $362,748 10/19/21 SEPARATION ARCTATA CA 95521 --() EUREKA CA 95501 OVERLAY (707)834-1151 SUSPENDED (707)443-6371

01-HUM-101-88.3/88.3 IN HUMBOLDT COUNTY IN ARCATA AT MERCER-FRASER COMPANY BRIAN WINTER $2,998,636 06/09/20 9% 01-0E6504 $931,007 07/10/20 299/101 SEPARATION 77 2ND AVE 5065 BOYD RD 31% HSNH-X023-(042)E $616,545 10/14/21 CURVE IMPROVEMENT ARCATA CA 95521 --() EUREKA CA 95501 (707)834-1151 (707)443-6371 HB1

01-HUM-101-124.5/0 IN HUMBOLDT COUNTY NEAR ORICK AT 0.22 MCCULLOUGH CONSTRUCTION INC KAREN SANDERS $4,286,259 11/06/19 100% 01-0F9604 $4,238,988 12/10/19 MILES SOUTH OF LOST MAN CREEK BRIDGE 57 ALDER GROVE RD 207 PRICE MALL 98% $0 10/14/21 #01-0030 CRESCENT CITY, CA 95531 ARCATA CA 95521 REPLACE BOX CULVERT WITH BRIDGE (707)496-5581 OVER RUN (707)825-1014 HA21

01-HUM-101-595.0/0 IN FORTUNA MAINTENANCE STATION AND MOUNTAINSIDE CONSTRUCTION RODRIGUEZ, JOAQUIN $245,000 02/21/20 100% 01-0K4204 $253,358 05/03/20 SOME ELECTRICAL SYSTEM REHABILITATION 13884 SHANGRILA DRIVE 1487 SANDY PRAIRIE 100% $0 02/02/21 AT THE LEGGETT MAINTENANCE STATION. COURT STE. E REDDING, CA 96003 DIR'S EMERGENCY L.B. FORTUNA, CA 95501

REPAIR TO PREVENT FURTHER POWER (707)725-1020 20.80 OUTAGES 524000 01-HUM-255-6.0/7.6 IN HUMBOLDT COUNTY NEAR ARCATA FROM STEELHEAD CONSTRUCTORS JV NATHANIEL STEEN $3,000,777 07/01/20 6% 01-3660U4 $1,829,472 07/23/20 PACHACO LN TO V ST 2940 INNSBRUCK DR 5065 BOYD ROAD 61% ACST-P255-(011)E $0 06/22/21 COMBINED ENVIRONMENTAL MITIGATION ARCATA, CA 95521 --() REDDING CA 96003 (707)498-2122 SUSPENDED (530)226-6400

01-HUM-299-1.8/1.8 IN HUMBOLDT COUNTY NEAR ARCATA AT STEELHEAD CONSTRUCTORS JV $3,395,401 09/02/20 0% 01-0F5304 $0 10/02/20 ROUTE 200/299 SEPARATION 2940 INNSBRUCK DR 0% $0 PERMIT REQUIREMENTS FOR BRIDGES REDDING CA 96003 SUSPENDED (530)226-6400

State of California Department of Transportation Page 7 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 01 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 01-HUM-299-8.5/9 IN HUMBOLDT COUNTY NEAR BLUE LAKE G. R. SUNDBERG, INC. STEEN, NATHANIEL $2,985,000 05/03/19 26% 01-0J8004 $2,124,577 06/12/19 FROM 1.3 TO 2.8 MILES EAST OF BUCKLEY 5211 BOYD RD. 5065 BOYD ROAD 71% $0 03/04/22 ROAD DIR'S EMERGENCY F.A. ARCATA, CA 95521 ARCATA, CA 95521 REPAIR SINK (707)498-2122

20.20 201130 01-HUM-299-16.1/26.6 IN HUMBOLDT COUNTY AT VARIOUS R. BROWN CONSTRUCTION COMPANY,BRIAN FINCK/OE:DAWN $1,500,818 12/04/19 100% 01-0E0304 $1,428,649 12/24/19 LOCATIONS FROM 5.1 MILES EAST OF INC. FRIEND 92% $3,200 10/15/21 NORTH FORK MAD RIVER BRIDGE TO 4.3 18 CHINA CREEK ROAD 5065 BOYD RD

MILES EAST OF REDWOOD CREEK BRID ARCATA, CA 95521 OVER RUN WILLOW CREEK CA 95573 SLOPE REPAIR AND DRAINAGE (707)498-3489 (530)629-3702

01-HUM-299-20.5/30.2 IN HUMBOLDT COUNTY AT VARIOUS MCCULLOUGH CONSTRUCTION INC NATHANIEL STEEN/DAWN $7,044,714 08/20/20 55% 01-0F4604 $2,687,237 09/11/20 LOCATIONS FROM 1.5 MILES EAST OF BAIR 57 ALDERGROVE RD; FRIEND 38% HSST-P299-(208)E $621,148 11/24/21 ROAD TO 0.4 MILE WEST OF CEDAR CREEK 5065 BOYD RD --() ARCATA CA 95521 ROAD ARCATA, CA 95521 (707)825-1014 WIDEN SHOULDERS & INSTALL RUMBLE (707)498-2172 HB1

01-HUM-299-30.7/37.7 IN HUMBOLDT COUNTY NEAR WILLOW CREEK MERCER-FRASER COMPANY BRIAN WINTER $10,326,449 11/19/20 25% 01-0F4704 $2,136,850 12/09/20 FROM 0.1 MILE EAST OF CEDAR CREEK RD 77 2ND ST 5065 BOYD RD 21% HSST-P299-(209)E $505,128 03/28/22 (7L100) TO 1.1 MILES WEST OF ROUTE 96 ARCATA CA 95521 --() EUREKA CA 95501 WIDEN SHOULDERS & INSTALL RUMBLE (707)834-1151 SUSPENDED (707)443-6371 HB1

01-HUM-299-38.9/39.5 IN HUMBOLDT COUNTY AT WILLOW CREEK R. BROWN CONSTRUCTION COMPANY,BRIAN FINCK/OE DAWN $2,979,943 11/19/20 60% 01-0F6804 $665,785 12/09/20 FROM 0.1 MI WEST OF WILLOW RD TO INC. FRIEND 22% HSST-P299-(210)E $417,321 08/17/21 PANTHER ROAD 18 CHINA CREEK RD 5065 BOYD RD --() WIDEN SHOULDERS ARCATA CA 95521 SUSPENDED WILLOW CREEK CA 95573 (707)498-3489 HB1 (530)629-3702

01-HUM-999-/0 IN HUMBOLDT COUNTY ON ROUTE 36 AT CERTIFIED COATINGS COMPANY J0AQUIN RODRIGUEZ $1,496,894 05/29/20 100% 01-0J1904 $1,423,762 06/18/20 SOUTH FORK VAN DUZEN RIVER BRIDGE AND 2320 CORDELIA ROAD; 1487 SANDY PRAIRIE CT 100% $0 06/28/21 ON ROUTE 169 AT PECWAN CREEK BRIDGE FORTUNA, CA 95540 FAIRFIELD CA 94534 06/29/21 BRIDGE PAINT & RAIL RECAST (707)621-0000 COMPLETED (707)639-4414 HM3 State of California Department of Transportation Page 8 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 01 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 01-HUM-999-/0 IN HUMBOLDT COUNTY ON ROUTES 96 & 101 STEELHEAD CONSTRUCTORS JV BRIAN WINTER $2,243,878 06/19/20 72% 01-0A1204 $1,346,240 07/10/20 AT VARIOUS LOCATIONS 2940 INNSBRUCK DR 5065 BOYD RD SUITE H 60% $118,976 09/09/21 BRIDGE SEISMIC RETROFIT ARCATA CA 95521 REDDING CA 96003 (707)834-1151 (530)226-6400 HA21

01-LAK-20-.7/5.2 IN LAKE COUNTY NEAR UPPER LAKE FROM GHILOTTI CONSTRUCTION CO. $4,015,671 06/16/21 0% 01-0K4804 $0 07/08/21 0.1 MI WEST OF BLUE LAKES RD TO 0.4 246 GHILOTTI AVE; 0% $0 MI WEST OF WITTER SPRINGS RD & FROM SANTA ROSA CA 95407 0.1 MI EAST OF BACHEL (707)585-1221

01-LAK-20-5.1/6.3 IN LAKE COUNTY NEAR UPPER LAKE FROM O.C. JONES & SONS, INC. KATHERINE PERRIN $8,215,278 11/19/20 100% 01-0G33U4 $1,077,953 12/09/20 0.4 MILE WEST OF WITTER SPRINGS ROAD 1520 FOURTH STREET; 6301 N STATE STREET 13% HSNH-P020-(193)E $786,240 10/28/21 TO 0.4 MILE EAST OF BACHELOR CREEK REDWOOD VALLEY, CA 95470 --() BERKELEY CA 94710 BRIDGE (707)496-5840 OVER RUN (510)526-3424 COMBINED SAFETY AND BRIDGE REHAB

01-LAK-20-12.2/45.9 IN LAKE COUNTY AT VARIOUS LOCATIONS GRANITE CONSTRUCTION COMPANY $632,927 05/26/21 0% 01-0K5004 $0 06/15/21 ON ROUTE 20 FROM 0.4 MILE EAST OF 1324 S. STATE STREET; 0% $0 PYLE RD/NICE-LUCERNE CUTOFF TO 0.5 UKIAH CA 95482 MILE WEST OF END OF COUNT (707)467-4100 CULVERT REHAB/REPLACEMENT

01-LAK-20-37.0/41.7 IN LAKE COUNTY FROM NORTH FORK CACHE ALL-AMERICAN CONSTRUCTION, $1,949,575 05/25/21 0% 01-0K4604 $0 06/22/21 CK BRIDGE TO 4.78 MILE WEST OF THE INC. 0% $0 COLUSA COUNTY LINE 2048 PASEO RD.;

LIVE OAK CA 95953 (530)617-5111

01-LAK-29-12.7/14.5 IN LAKE COUNTY NEAR LOWER LAKE FROM GHILOTTI CONSTRUCTION CO. DAN KRAFT $9,721,371 07/07/20 19% 01-0E7204 $6,595,861 07/23/20 0.8 MILE NORTH OF SPRUCE GROVE RD- 246 GHILOTTI AVE; 15513 40TH AVENUE 67% HSST-P029-(150)E $1,521,507 08/30/21 SOUTH TO 0.4 MILE SOUTH OF HOFACKER CLEARLAKE CA 95422 --() SANTA ROSA CA 95407 LANE (707)994-5074 (707)585-1221 WIDEN SHOULDER

State of California Department of Transportation Page 9 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 01 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 01-LAK-29-17.7/20.7 IN LAKE COUNTY AT LOWER LAKE AT O.C. JONES & SONS, INC. DAN KRAFT $5,269,287 02/05/20 100% 01-0E7304 $5,196,545 03/02/20 VARIOUS LOCATIONS FROM 0.1 MI SOUTH 1520 FOURTH STREET; 6301 N STATE ST 99% HSST-P029-(149)E $3,690 11/30/21 OF C ST TO 0.2 MI NORTH OF BELL PARK REDWOOD VALLEY, CA 95470 --() BERKELEY CA 94710 AVENUE (707)496-4363 OVER RUN (510)526-3424 WIDEN SHOULDERS/CREATE TRUCK CLIMB

01-LAK-29-28.5/31.6 IN LAKE COUNTY NEAR KELSEYVILLE ON O.C. JONES & SONS, INC. KRAFT, DAN $55,033,322 11/07/19 55% 01-2982U4 $32,796,234 12/02/19 RTE 29 FROM 0.6 MI TO 3.7 MILES 1520 FOURTH STREET; 15513 40TH AVE 59% ACNH-P029-(148)E $1,298,604 02/17/22 NORTH OF RTE 281 AND ON RTE 175 FROM CLEARLAKE, CA 95422 --() BERKELEY CA 94710 SO JCT RTE 29 TO 0.3 MI (530)713-7864 SUSPENDED (510)526-3424 CONSTRUCT EXPRESSWAY

01-LAK-175-.2/.4 IN LAKE COUNTY NEAR HOPLAND FROM THE GRANITE CONSTRUCTION COMPANY DAN KRAFT $827,817 05/21/21 0% 01-0H4604 $6,575 06/03/21 MENDOCINO COUNTY LINE TO 1.8 MILES 1324 S. STATE STREET; PO BOX 457 1% HSST-P175-(010)E $6,575 10/01/21 WEST OF MATHEWS ROAD LOWER LAKE CA 95457 --() UKIAH CA 95482 CURVE REALIGNMENT & SHOULDER (530)713-7864 (707)467-4100 HB1

01-LAK-175-25.0/27.5 IN LAKE COUNTY NEAR MIDDLETOWN FROM GHILOTTI CONSTRUCTION CO. INC.KRAFT, DAN $8,420,112 10/15/18 100% 01-0A0404 $8,239,815 11/08/18 0.1 MI EAST OF PUTAH CREEK BR#14-21 246 GHILOTTI AVENUE 15513 40TH AVENUE 99% HSST-P175-(009)E $5,150 01/14/22 TO DRY CREEK BR#14-20 CLEARLAKE, CA 95457 --() SANTA ROSA CA 95407 SHOULDER WIDENING (530)713-7864 SUSPENDED (707)585-1221 HB1

01-LAK-999-/0 IN LAKE COUNTY AT VARIOUS LOCATIONS MYERS & SONS CONSTRUCTION, LLC $2,622,621 05/27/21 0% 01-0J8804 $0 06/18/21 REHAB BRIDGE DECKS 4600 NORTHGATE BLVD, SUITE 10 0% $0 SACRAMENTO CA 95834

(916)283-9950

01-MEN-1-43.7/43.7 IN MENDOCINO COUNTY AT ALBION AT EURO STYLE MANAGEMENT ROZBEH HADIPOUR $579,386 03/04/21 96% 01-0E2014 $400,200 03/25/21 ALBION RIVER BRIDGE #10-0136 3600 MADISON AVE # 51B; 925 NORTH FRANKLIN ST 69% $102,150 07/21/21 REHAB BRIDGE FORT BRAGG CA 95437 NORTH HIGHLANDS CA 95660 (707)496-4368 (916)331-4858 HM3 State of California Department of Transportation Page 10 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 01 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 01-MEN-1-75.5/76.5 IN MENDOCINO COUNTY NEAR WESTPORT, GRANITE CONSTRUCTION COMPANY HADIPOUR, ROOZBEH $35,085,000 07/29/16 100% 01-0G4504 $29,209,448 10/27/16 FROM 0.6 TO 1.4 MILES NORTH OF BLUE 1324 S. STATE STREET 925B NORTH FRANKLIN 100% $0 07/12/21 SLIDE GULCH BRIDGE DIR'S EMERGENCY STREET UKIAH, CA 95482 07/21/21 L.B. FORT BRAGG, CA 95437 (707)467-1400 RECONSTRUCT ROADWAY (707)498-5978 20.20 201130 01-MEN-20-16.8/17.2 IN MENDOCINO COUNTY NEAR FORT BRAGG GRANITE CONSTRUCTION COMPANY MOJTABA $2,794,575 10/08/19 16% 01-0E8604 $2,666,506 10/24/19 FROM 0.5 MILES WEST OF ROAD 200A TO 1324 S. STATE STREET; MOSALLAI/OE:VICKI H. 97% ACST-P020-(190)E $3,352 11/23/21 0.1 MILES WEST OF ROAD 200A 998 HEARST ROAD --() UKIAH CA 95482 CURVE IMPROVEMENT AND SHOULDER WILLITS, CA 95490 (707)467-4100 (707)498-5816

01-MEN-20-24.6/24.8 IN MENDOCINO COUNTY NEAR WILLITS FROM REGE CONSTRUCTION, INC. MOJTABA MOSALLAI $1,942,823 10/23/20 7% 01-0G4304 $240,196 11/17/20 1.0 TO 0.8 MILE WEST OF THREE CHOP 600 SANTANA DRIVE; 21340 BAECHTEL ROAD 12% HSST-P020-(192)E $0 06/15/21 ROAD WILLITS CA 9590 --() CLOVERDALE CA 95425 WIDEN SHOULDERS (707)498-5816 SUSPENDED (707)894-5143 HB1

01-MEN-101-3.7/5.3 IN MENDOCINO COUNTY NEAR HOPLAND FROM O.C. JONES & SONS, INC KRAFT, DAN $16,522,698 10/13/16 100% 01-0B5004 $15,980,798 11/03/16 0.1 MI SOUTH OF COMMINSKY STA RD-103 1520 FOURTH STREET PO BOX 457 92% NHER-19C7-(004)E $383,189 12/01/22 TO 0.6 MI NORTH OF PIETA CR BRIDGE LOWER LAKE, CA 95457 --() BERKELEY CA 94710 #10-83 (530)713-7864 (510)526-3424 REPAIR SLIDES HA23

01-MEN-101-36.0/38 IN MENDOCINO COUNTY NEAR WILLITS FROM GHILOTTI CONSTRUCTION MOSALLAI, MOJTABA $26,985,000 03/15/19 100% 01-0J7104 $19,519,651 03/29/19 1.5 MILES NORTH OF REEVES CANYON ROAD COMPANY,INC. 998 HEARST RD. 72% $13,557 09/20/21 TO 3.4 MILES SOUTH OF RIDGEWOOD RANCH 246 GHILOTTI AVENUE WILLITS, CA 95490

ROAD. DIR'S EMER (707)223-0791 OVER RUN SANTA ROSA, CA 95407 STORM DAMAGE REPAIRS 20.20 201130 01-MEN-101-58.9/82.5 IN MENDOCINO COUNTY NEAR LAYTONVILLE MERCER-FRASER COMPANY MOJTABA MOSALLAI $8,863,996 12/16/20 39% 01-0C4504 $3,730,243 01/14/21 AT MOSS COVE ROADSIDE REST AREA PO BOX 1006; 21340 BAECHTEL ROAD 42% CNHG-Q101-(387)E $802,415 04/14/22 (SRRA); ALSO AT IRVINE LODGE SRRA & WILLITS CA 95490 --() EUREKA CA 95502 EMPIRE CAMP SRRA (707)498-5816 (707)443-6371 REHAB SAFETY ROADSIDE REST AREA HA26 State of California Department of Transportation Page 11 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 01 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 01-MEN-101-79.0/81.5 IN MENDOCINO COUNTY FROM 0.6 MILE ARGONAUT CONSTRUCTORS $1,180,939 06/08/21 0% 01-0K5604 $0 07/01/21 NORTH OF SPYROCK ROAD TO 1.0 MILE 360 SUTTON PLACE 0% $0 SOUTH OF EMPIRE CAMP SAFETY ROADSIDE SANTA ROSA CA 95407 REST AREA (707)542-4862 OVERLAY

01-MEN-101-490.0/81.5 IN MENDOCINO COUNTY NEAR WILLITS & WYLATTI RESOURCE MANAGEMENT, MOSALLAI, MOJTABA $4,785,000 01/28/21 80% 01-0L0104 $4,543,923 03/19/21 LAYTON VILLE FROM GX-N WILLITS RR INC. 21340 BAECHTEL ROAD 95% $0 08/20/21 XING TO 0.1 MI NORTH OF RATTLESNAKE P.O. BOX 575 WILLITS, CA 95490

CR BR #10-27 DIR'S EMERGE (707)498-5816 COVELO, CA 95428 REPAIR STORM DAMAGE 20.20 201130 01-MEN-101-510.0/55 IN MENDOCINO COUNTY NEAR WILLITS FROM BOUTHILLIER'S CONSTRUCTION INCMOSALLAI, MOJTABA $1,385,000 10/08/20 58% 01-0K8304 $940,416 10/30/20 0.2 MILE NORTH OF REYNOLDS HWY. TO 1571 SOUTH MAIN STREET 21340 BAECHTEL ROAD 68% $0 09/10/21 BIG TRAIKS DR-RD 301D. DIR'S WALLITS, CA 95490 WILLITS, CA 95490 EMERGENCY F.A. (707)498-5816

REPAIR WILDFIRE DAMAGE 20.20 201130 01-MEN-128-358.0/35.8 IN MENDOCINO COUNTY ON ROUTE 128 AT REGE CONSTRUCTION INC. ANDERSON, MICHAEL $285,000 04/30/21 100% 01-0L1804 $154,597 05/18/21 PM 35.84. DIR'S EMERGENCY F.A. 600 SANTANA DRIVE 21340 BAECHTEL ROAD 100% $0 06/10/21 HANLET CREEK CULVERT REPAIR WILLITS, CA 95490 CLOVERDALE, CA 95425 07/06/21 (707)354-1072 COMPLETED

20.20 201130 01-MEN-999-/0 IN MENDOCINO COUNTY AT VARIOUS GRANITE CONSTRUCTION COMPANY MORGAN-MARBET, TAI- $676,395 06/03/21 12% 01-484204 $86,349 06/22/21 LOCATIONS 1324 S. STATE STREET; AQUA 13% $86,349 08/17/21 REHABILITATE CULVERTS 1487 SANDY PRAIRIE UKIAH CA 95482 COURT STE E (707)467-4100 FORTUNA, CA 95501

(707)834-0219 01-MEN-999-/0 IN MENDOCINO COUNTY AT VARIOUS TRUESDELL CORPORATION OF $2,414,414 05/14/21 0% 01-0J8704 $0 06/18/21 LOCATIONS CALIFORNIA, INC. 0% $0 REHAB BRIDGE DECKS 1310 W. 23RD STREET;

TEMPE AZ 85282 (602)437-1711 State of California Department of Transportation Page 12 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 01 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 01-VAR-101-84.0/85.5 IN MENDOCINO COUNTY ON RT 101 FROM STEELHEAD CONSTRUCTIONS, INC. SEYOUM, KASSAYE $5,985,000 03/31/17 100% 01-0H1204 $5,401,364 05/25/17 TRUCK PASSING LANE RT TO 0.4 MILE P.O. BOX 997 6301 NORTH STATE 90% $0 05/04/21 NORTH OF END TRUCK PASSING LANE RT & STREET PALO CEDRO, CA 96073 ON RT 271 FROM 3.5DIR'S REDWOOD VALLEY, CA 95470 OVER RUN

SLOPE STABILIZATION & RECONSTRUCT (707)485-1010 20.20 ROADWAY 201130 01-VAR--/0 IN LAKE, MENDOCINO, HUMBOLDT AND DEL MERCER-FRASER COMPANY MOJTABA MOSALLAI $1,389,885 07/09/20 63% 01-0G0504 $1,135,130 08/07/20 NORTE COUNTIES AT VARIOUS LOCATIONS 77 2ND ST 21340 BAECHTEK ROAD 81% HSST-000C-(520)E $0 06/10/21 REPLACE CURVE WARNING SIGNS WILLITS ,CA 95490 --() EUREKA CA 95501 (707)498-5816 (707)443-6371 HB1

Totals: Authorized Final Amt: $453,782,179 Completed to Date: $253,426,551 Work This Month: $11,593,373 State of California Department of Transportation Page 13 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 02 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 02-BUT-70-41.9/42.3 IN BUTTE COUNTY NEAR PULGA FROM 2.5 SERVICES INC. DBA JOHN YOLTON $5,560,591 05/07/20 94% 02-0H9004 $5,389,419 05/19/20 MILES WEST OF PENSTOCK UNDERCROSSING TIMBERWORKS 1187 HWY 36 94% $59,145 07/30/21 TO 2.1 MILES WEST OF PENSTOCK 509 S MT SHASTA BLVD CHESTER CA 96020

UNDERCROSSING. (530)864-9033 MOUNT SHASTA CA 96067 INSTALL FISH PASSAGE (530)926-4093

02-LAS-36-6.0/14.6 IN LASSEN COUNTY NEAR WESTWOOD FROM HAT CREEK CONSTRUCTION & JOHN YOLTON $31,605,010 05/08/20 49% 02-4E46U4 $20,461,559 06/03/20 1.3 MILES WEST OF GOODRICH CREEK MATERIALS, INC. 1187 HWY 36 65% ACST-S036-(115)E $887,781 01/12/22 BRIDGE TO 1.0 MILE WEST OF WILLARD 24339 STATE HIGHWAY 89 N.; CHESTER, CA 96020 --() CREEK ROAD (530)864-9033 BURNEY CA 96013 REHABILITATE ROADWAY AND REPLACE (530)335-5501

02-LAS-299-18.5/25.6 IN LAS AND MOD COUNTIES ON RTE 139 AT HAT CREEK CONSTRUCTION & MIKE ZDENEK $16,521,539 07/28/20 36% 02-4E4504 $9,705,681 08/13/20 0.1 MI N OF LAS COUNTY LINE AND ON MATERIALS, INC. 1031 BUTTE ST STE205 59% ACST-000C-(519)E $2,653,193 01/05/22 RTE 299 AT VAR LOC FROM 0.4 MI W OF 24339 STATE HIGHWAY 89 N.; MS60 --() BOYD HILL LOOKOUT RD REDDING,CA 96001 BURNEY CA 96013 ROADWAY REHABILITATION (530)229-0559 (530)335-5501

02-LAS-299-25.6/25.6 IN LASSEN COUNTY ABOUT 11 MILES EAST WALSH CONSTRUCTION COMPANY II,MIKE ZDENEK $13,791,837 12/04/19 81% 02-1H1104 $12,551,144 12/31/19 OF BIEBER AT ADIN MAINTENANCE LLC 1031 BUTTE STREET 91% $454,357 11/02/21 STATION. 1390 WILLOW PASS ROAD STE 950 REDDING, CA 96001

REHABILITATE MAINTENANCE STATION (530)229-0559 CONCORD CA 94520 (925)627-1700

02-LAS-395-900.0/0 IN LASSEN AND SIERA COUNTIES NEAR HORIZON DESIGN INTERNATIONAL $888,958 06/01/21 0% 02-4H8104 $0 06/29/21 HALLELUJAH JUNCTION FROM NEVADA LLC DBA HORIZON STEEL & 0% $0 STATE LINE TO 0.7 NORTH OF SCOTT IRONWORKS

ROAD. 8549 WILSHIRE BLVD;

BEVERLY HILLS CA 90211 (323)848-4488 02-MOD-299-20.0/38 IN MODOC COUNTY AT VARIOUS LOCATIONS AMERICAN PAVEMENT SYSTEMS, ANWAR TOFAEL $1,213,574 12/14/20 100% 02-1J4404 $1,008,528 12/31/20 FROM 1.8 MILES WEST OF ROUTE 139 TO INC. 1031 BUTTE ST 100% $0 07/16/21 0.3 MILE WEST OF RATTLESNAKE CREEK 1012 11TH STREET; REDDING, CA 96001 07/19/21 BRIDGE (530)225-3172 COMPLETED MODESTO CA 95354 AR CHIP SEAL (209)522-2277 State of California Department of Transportation Page 14 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 02 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 02-PLU-49-/7.5 IN PLUMAS COUNTY AT AND NEAR VINTON ALL-AMERICAN CONSTRUCTION, $1,361,865 04/05/21 0% 02-2J0004 $0 04/16/21 FROM SIERRA COUNTY LINE TO ROUTE 70 INC. 0% $0 HMA OVERLAY WITH DIGOUTS 2048 PASEO RD.;

LIVE OAK CA 95953 (530)617-5111

02-PLU-70-.4/29.7 IN PLUMAS COUNTY AT VARIOUS LOCATIONS STIMPEL-WIEBELHAUS ASSOCIATES,JOHN YOLTON $2,268,706 12/08/20 12% 02-0H5504 $199,679 12/29/20 FROM 0.4 MILE EAST OF BUTTE COUNTY INC. 1187 HWY 36 9% $199,679 11/18/21 LINE TO 3.3 MILES WEST OF ROUTE 89. 1168 INDUSTRIAL STREET CHESTER CA 96020

DRAINAGE REHABILITATION (530)864-9033 REDDING CA 96002 (530)223-6605

02-PLU-70-10.0/25 IN PLUMAS COUNTY AT AND NEAR BELDEN DIG IT CONSTRUCTION, INC $3,388,064 03/30/21 0% 02-1J5004 $0 04/15/21 FROM 1.0 MILE EAST OF CHAMBERS CREEK 803 LORRAINE DR 0% $0 BRIDGE TO 0.7 MILE EAST OF VIRGILIA CHESTER CA 96020 ROAD (530)258-3306 AC OVERLAY

02-PLU-70-36.8/62.5 IN PLUMAS COUNTY AT VARIOUS LOCATIONS STEWART ENGINEERING INC $1,717,618 06/16/21 0% 02-1H7904 $0 06/28/21 ROCK FALL FENCE 5323 EASTSIDE ROAD 0% $0 REDDING CA 96001

(530)244-8464

02-SHA-5-3.8/11.7 IN SHASTA COUNTY IN AND NEAR J.F. SHEA CONSTRUCTION, INC. BENNER, HENRY $126,754,075 11/06/18 86% 02-4C40V4 $114,410,106 11/30/18 ANDERSON FROM ROUTE 5/273 SEPARATION PO BOX 494519 2658 GATEWAY DR 90% B1IM- 005-(359)E $4,108,782 11/05/21 TO 0.4 MILE SOUTH OF CHURN CREEK ANDERSON, CA 96007 --() REDDING CA 96049 ROAD OVERCROSSING (530)949-8132 (530)246-4292 WIDENING TO 6 LANES, BRIDGE

02-SHA-5-4.9/5.1 IN SHASTA COUNTY IN ANDERSON FROM J.F. SHEA CONSTRUCTION, INC. ALEXANDER, NATHAN $270,000 12/06/17 100% 02-4H1504 $140,841 03/07/18 ANDERSON CREEK OVERFLOW TO 0.1 MILE P. O. BOX 494519 1031 BUTTE STREET 52% $0 01/13/18 NORTH OF ANDERSON CREEK BRIDGE. REDDING, CA 96001 REDDING, CA 96049 DIR'S EMERGENCY L.B. (530)604-5102 OVER RUN

REMOVE 1.8 FEET OF EMBANKMENT UNDER 20.20 BRIDGE 201130 State of California Department of Transportation Page 15 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 02 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 02-SHA-5-31.0/31.7 IN SHASTA COUNTY ABOUT 9 MILES NORTH ABACUS CONSTRUCTION, INC. NATHAN ALEXANDER $1,734,193 06/19/20 51% 02-4G5804 $1,384,802 07/23/20 OF SHASTA LAKE CITY FROM O'BRIEN 6850 HAAS ROAD 1031 BUTTE ST. 80% ACIM-005 -(643)E $269,845 09/16/21 SAFETY ROADSIDE REST AREA TO 0.4 MILE REDDING CA 96001 --() ANDERSON CA 96007 SOUTH OF O'BRIEN UNDER (530)225-2922 (530)215-3104 INSTALL POTABLE, NONPOTABLE AND

02-SHA-5-32.0/32.3 IN SHASTA COUNTY ABOUT 10 MILES GOLDEN STATE BRIDGE, INC. NATHAN ALEXANDER $2,196,640 01/24/20 100% 02-1H3904 $2,250,527 02/06/20 SOUTH OF LAKEHEAD AT O'BRIEN 3701 MALLARD DRIVE; 1031 BUTTE ST. SUITE 100% $0 07/17/20 UNDERCROSSING 205 MS-60 BENICIA CA 94510 06/24/21 REHABILIATE BRIDGE DECK AND RAIL. REDDING, CA 96001 COMPLETED (925)372-8000 (530)604-5102

02-SHA-5-56.6/67 IN SHASTA AND SISKIYOU COUNTIES J.F. SHEA CONSTRUCTION, INC. NICOLE MALLORY $15,750,690 08/26/19 98% 02-4G41U4 $14,215,769 09/06/19 ABOUT 7 MI N/O POLLARD FLAT FR 0.8 MI 17400 CLEAR CREEK RD 1625 MOTT RD 91% B1IM- 005-(362)E $470,398 07/23/21 S TO 0.7 MI N/O SIMS RD UC AND FROM MT. SHASTA CA 96067 --() REDDING CA 96001 0.6 MI S/O CRAG VIEW DR (530)605-5871 (530)246-4292 REPLACE BRIDGES

02-SHA-89-29.1/29.4 IN SHASTA COUNTY ABOUT 13 MILES NORTH GOLDEN STATE BRIDGE, INC. DURAN, RYAN $1,125,000 02/05/21 100% 02-2J1604 $551,217 03/08/21 OF BURNEY FROM 0.1 MILE SOUTH OF LAKE 3701 MALLARD DRIVE 13700 HWY 36E 49% $0 07/30/21 BRITTONBRIDGE TO 0.6 MILE SOUTH OF RED BLUFF, CA 96080 BENICIA, CA 94510 LAKE BRITTON RDIR'S (530)605-5864 OVER RUN

REPLACE ORIGINAL STYLE BRIDGE RAIL 20.20 TO PRE 201130 02-SHA-273-4.4/12.3 IN SHASTA COUNTY AT VARIOUS LOCATIONS CAL ELECTRO, INC. ALEXANDER NATHAN $777,194 12/18/19 93% 02-2H9704 $752,056 01/15/20 FROM BARNEY ROAD TO 0.2 MILE NORTH OF 3710 ELECTRO WAY; 1031 BUTTE ST. SUITE 96% $0 02/24/21 CLEAR CREEK ROAD 205 MS-60 REDDING CA 96002 INSTALL CMS, CCTV REDDING, CA 96001 (530)223-5937 (530)604-5102

02-SIS-3-38.0/38.6 IN SISKIYOU COUNTY ABOUT 6 MILES STEELHEAD CONSTRUCTORS JV NICOLE MALLORY $4,164,676 04/05/21 36% 02-4G4404 $1,189,105 04/16/21 NORTH FORT JONES FROM 0.3 MILE SOUTH 2940 INNSBRUCK DRIVE 1625 MOTT RD 28% $542,298 10/12/21 TO 0.3 MILE NORTH OF LOWER MOFFETT MT SHASTA CA 96067 REDDING CA 96002 CREEK ROAD (530)605-5871 (530)226-6400 BRIDGE REPLACEMENT

State of California Department of Transportation Page 16 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 02 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 02-SIS-5-8.3/8.3 IN SISKIYOU COUNTY NEAR MOUNT SHASTA ABACUS CONSTRUCTION, INC. ANDY O'SULLIVAN $1,646,187 03/02/21 14% 02-1H4004 $85,226 03/25/21 AT AZALEA ROAD OVERCROSSING. 8490 HARTMEYER LANE 1031 BUTTE STREET 5% $85,226 10/14/21 DECK AND RAIL REHABILIATION REDDING, CA 96001 REDDING CA 96002 (530)515-0639 (530)215-3104

02-SIS-5-15.3/16.5 IN SISKIYOU COUNTY NEAR WEED FROM 0.1 J.F. SHEA CONSTRUCTION, INC. NICOLE MALLORY/GINNY $8,433,217 07/30/18 70% 02-4F5404 $4,697,496 08/15/18 MILE SOUTH OF DEETZ ROAD P.O. BOX 494519 1031 BUTTE STREET 56% B1IM- 005-(179)E $1,161,572 10/12/21 UNDERCROSSING TO 0.6 MILE NORTH OF REDDING, CA 96001 --() REDDING CA 96049 BLACK BUTTE OVERHEAD 02-0004L (530)515-0639 SUSPENDED (530)246-4292 BRIDGE REPLACEMENT - SOUTHBOUND

02-SIS-5-25.4/25.9 IN SISKIYOU COUNTY ABOUT 5 MILES S.T.RHOADES CONSTRUCTION, INC.HENRY, AUSTIN $818,269 06/25/21 0% 02-0J4104 $0 07/22/21 NORTH OF WEED FROM 0.2 MILE NORTH OF 8585 COMMERCIAL WAY; 1625 MOTT RD. 0% $0 NORTH EDGEWOOD OVERHEAD TO 0.3 MILE MT. SHASTA, CA 96067 REDDING CA 96002 NORTH OF WEED SAFETY ROA (530)605-5861 (530)223-9322 CONSTRUCT BARRIER WALL

02-SIS-5-25.4/25.9 IN SISKIYOU COUNTY NEAR WEED FROM 0.2 STEWART ENGINEERING INC JEFF STEPPAT $1,226,514 04/12/21 8% 02-2H1304 $157,879 04/30/21 MILE SOUTH TO 0.3 MILE NORTH OF WEED 5323 EASTSIDE ROAD 3442 CARLSBAD LANE 13% $157,879 01/10/22 SAFETY ROADSIDE REST AREA REDDING CA 96002 REDDING CA 96001 REHABILITATE SEWER AND WATER (530)515-0639 (530)244-8464

02-SIS-89-3.2/0 IN SHASTA AND SISKIYOU COUNTIES AT CAL ELECTRO, INC. JEFF STEPPAT $3,344,481 10/18/19 78% 02-4G6304 $2,603,902 11/04/19 VARIOUS LOCATIONS. 3710 ELECTRO WAY; 1031 BUTTE STREET 78% $0 06/28/21 CCTV AND RWIS UPGRADE REDDING, CA 96001 REDDING CA 96002 (530)225-3288 SUSPENDED (530)223-5937

02-SIS-89-14.0/19 IN SISKIYOU COUNTY ABOUT 6 MILES S.T.RHOADES CONSTRUCTION, INC.AUSTIN HENRY $955,342 12/08/20 95% 02-1J4504 $906,544 12/29/20 NORTH OF BARTLE FROM 0.4 MILE NORTH 8585 COMMERCIAL WAY; 1625 MOTT ROAD 94% $20,734 07/21/21 OF EDISON CREEK ACCESS ROAD TO 2.0 MT.SHASTA CA 96067 REDDING CA 96002 MILES SOUTH OF MUD CREEK B (530)235-9814 (530)223-9322 AC OVERLAY

State of California Department of Transportation Page 17 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 02 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 02-SIS-96-7.3/15.9 IN SISKIYOU AND TRINITY COUNTIES AT MYERS & SONS CONSTRUCTION, LLCJOEL GASIK $8,646,316 01/14/20 70% 02-4F6004 $6,705,583 02/06/20 VARIOUS LOCATIONS. 4600 NORTHGATE BLVD, STE 100 1031 BUTTE ST STE205. 77% $830,217 10/28/21 DECK REHABILITATION MS60 SACRAMENTO CA 95834 REDDING, CA 96001 (916)283-9950 (530)229-2964

02-SIS-96-34.5/92 IN SISKIYOU COUNTY NEAR HAPPY CAMP TULLIS, INC. AUSTIN HENRY $2,000,705 02/02/21 97% 02-1J4604 $2,026,545 03/01/21 FROM 0.1 MI EAST OF OAK FLAT CREEK BR 16951 CLEAR CREEK ROAD 1625 MOTT RD 99% $1,612,248 07/19/21 TO 0.1 MI EAST OF BENJAMIN CREEK RD MT. SHASTA CA 96067 REDDING CA 96001 AND FROM 0.3 MI WEST (530)605-5861 SUSPENDED (530)241-5105 AC OVERLAY

02-SIS-96-369.0/37.3 IN SISKIYOU COUNTY NEAR HAPPY CAMP HAYES & SONS, INC. HENRY, AUSTIN $3,985,000 02/19/21 74% 02-2J5104 $1,593,145 04/08/21 FROM 2.5 MILES EAST OF OAK FLAT CREEK P.O. BOX 258 1625 MOTT ROAD 40% $0 09/09/21 BRIDGE TO1.4 MILES WEST OF BENJAMIN MT. SHASTA, CA 96067 HAPPY CAMP, CA 96039 CREEK ROAD DIR'S EMER (530)235-9814

OPEN HIGHWAY ONE WAY, REMOVE SLIDE 20.20 MATERIA 201130 02-SIS-96-/0 IN SISKIYOU COUNTY ABOUT 8 MILES GOLDEN STATE BRIDGE, INC. NICOLE MALLORY $18,623,452 12/14/18 87% 02-2E4804 $17,566,228 12/21/18 NORTH OF YREKA ON ROUTE 96 FROM 0.5 3701 MALLARD DRIVE 2150 EDWARDO ST 94% B1ST-X093-(009)E $458,417 09/22/21 MILE WEST TO 0.2 MILE EAST OF RTE 263 REDDING CA 96002 --() BENICIA CA 945101195 AND ON ROUTE 263 FROM 0 (530)941-9542 (925)372-8000 BRIDGE REPLACEMENT

02-SIS-161-17.5/18.5 IN SISKIYOU COUNTY NEAR TULELAKE FROM HAT CREEK CONSTRUCTION & AUSTIN HENRY $1,054,989 05/11/21 67% 02-0J4004 $1,078,805 06/03/21 0.3 MILE EAST OF MALONE ROAD TO 1.2 MATERIALS, INC. 1625 MOTT RD 99% $1,078,805 08/02/21 MILES EAST OF HILL ROAD. 24339 HWY 89N; MT. SHASTA CA 96067

ROADWAY REHABILITATION (530)605-5861 BURNEY CA 96013 (530)335-5501

02-TEH-5-25.4/25.4 IN TEHAMA COUNTY IN RED BLUFF AT GOLDEN STATE BRIDGE, INC. MIKE ZDENEK $13,452,681 06/29/20 27% 02-4F5904 $4,537,605 07/23/20 SACRAMENTO RIVER BRIDGE. 3701 MALLARD DRIVE; 1031 BUTTE STREET 34% $103,314 11/23/22 BRIDGE RETROFIT REDDING, CA 96001 BENICIA CA 94510 (530)229-0559 (925)372-8000

State of California Department of Transportation Page 18 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 02 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 02-TEH-32-14.0/20 IN TEHAMA COUNTY ABOUT 28 MILES EAST DIG IT CONSTRUCTION, INC JOHN YOLTON $1,008,282 02/02/21 0% 02-1J4904 $0 03/01/21 OF FOREST RANCH FROM 1.1 MILE EAST OF 803 LORAINE DR. 1187 HWY 36 0% $0 DEER CREEK BRIDGE #08-0068 TO 0.4 CHESTER,CA96020 CHESTER CA 96020 MILE WEST OF SLATE C (530)864-9033 (530)258-3306 AC OVERLAY

02-TEH-36-67.5/69 IN TEHAMA COUNTY NEAR PAYNES CREEK MITCHELL JOHNSON CONSTRUCTION,TOFAEL ANWAR $1,032,876 04/05/21 1% 02-4H7704 $68,475 04/16/21 FROM 0.3 MILE EAST TO 1.8 MILES EAST INC 1031 BUTTE STREET 7% $68,475 11/05/21 OF PAYNES CREEK ROAD 1304 EAST STREET #218; REDDING CA 96001

CONSTRUCT ROCK FENCE (530)225-3172 REDDING CA 96001 (530)338-8077

02-TEH-36-87.0/87.8 IN TEHAMA COUNTY NEAR MINERAL FROM DIG IT CONSTRUCTION, INC TODD KELLY $555,409 12/04/19 96% 02-0H3904 $541,445 01/02/20 0.2 MILE EAST OF PAYNES CREEK ROAD TO 803 LORRAINE DR 1031 BUTTE ST 99% $0 07/28/21 0.1 MILE WEST OF ROUTE 89. REDDING CA 96003 CHESTER CA 96020 INSTALL CCTV AND RWIS (530)605-5874 SUSPENDED (530)258-3306

02-TEH-36-87.8/89.1 IN TEHAMA COUNTY NEAR MINERAL FROM STEVE MANNING CONSTRUCTION, TOFAEL MD ANWAR $6,196,454 10/11/19 100% 02-1H74U4 $6,178,875 10/24/19 0.1 MILE EAST TO 1.5 MILES EAST OF INC. 3504 LARAMIE STREET 99% ACST-P036-(112)E $9,888 09/22/21 ROUTE 89. 5211 CHURN CREEK ROAD REDDING CA 96002 --() 07/23/21 CURVE IMPROVEMENT AND TRUCK (530)225-3172 OVER RUN REDDING CA 96002 (530)222-0810

02-TEH-99-12.0/12.6 IN TEHAMA COUNTY AT LOS MOLINOS FROM TULLIS, INC. TOFAEL ANWAR $4,917,782 10/09/19 100% 02-1H3204 $4,808,682 11/12/19 JOSEPHINE STREET TO LOS MOLINOS 16951 CLEAR CREEK RD 97% ACNH-P099-(643)E $743 10/07/21 CREEK BRIDGE. --() REDDING CA 96001 CONSTRUCT CURB RAMPS AND SIDEWALKS OVER RUN (530)241-5105

02-TRI-3-22.4/30.4 IN TRINITY COUNTY AT VARIOUS S.T.RHOADES CONSTRUCTION, INC. $1,288,923 06/25/21 0% 02-3H5604 $0 07/20/21 LOCATIONS FROM 3.2 MILES SOUTH OF 8585 COMMERCIAL WAY; 0% $0 LITTLE CREEK BRIDGE TO 0.5 MILE REDDING CA 96002 SOUTH OF TRINITY RIVER BRIDGE. (530)223-9322 CULVERT REHABILITATION

State of California Department of Transportation Page 19 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 02 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 02-TRI-3-32.8/57.9 IN TRINITY COUNTY AT VARIOUS R. BROWN CONSTRUCTION COMPANY, $2,007,334 10/28/20 0% 02-0H5404 $0 11/17/20 LOCATIONS FROM 0.5 MILE SOUTH OF INC. 0% $0 TRINITIY RIVER BRIDGE TO 1.6 MILES 18 CHINA CREEK RD

NORTH OF BOWERMAN RIDGE ROAD WILLOW CREEK CA 95573 DRAINAGE REHABILITATION (530)629-3702

02-TRI-3-46.7/67.7 IN TRINITY COUNTY NEAR TRINITY CENTER J.F. SHEA CONSTRUCTION, INC. MANDHIR GREWAL $1,529,007 12/18/20 100% 02-1J4704 $1,572,707 01/12/21 FROM 0.7 MILE NORTH OF CEDAR STOCK 17400 CLEAR CREEK RD 1031 BUTTE ST 100% $0 06/24/21 ROAD TO DIENER MINE VIADUCT AND FROM REDDING CA 96001 REDDING CA 96001 06/30/21 2.3 MILES NORTH OF E (530)604-5107 COMPLETED (530)246-4292 AC OVERLAY

02-TRI-3-58.7/60.7 IN TRINITY COUNTY NEAR TRINITY CENTER MCCULLOUGH CONSTRUCTION INC MANDHIR GREWAL $12,159,009 02/25/21 15% 02-4F2204 $1,480,028 03/25/21 FROM 0.7 MILE NORTH OF PREACHER 57 ALDERGROVE RD; 1031 BUTTE STREET 12% ACST-P003-(036)E $1,011,500 05/20/22 MEADOWS ROAD TO 0.7 MILE SOUTH OF EL REDDING, CA96001 --() ARCATA CA 95521 DORADO WAY (530)604-5107 (707)825-1014 BRIDGE REPLACEMENT

02-TRI-36-26.7/27.1 IN TRINITY COUNTY ABOUT 9 MILES EAST STEELHEAD CONSTRUCTORS, INC. JOEL GASIK $12,383,580 11/02/18 90% 02-4F8604 $11,295,761 11/20/18 OF FOREST GLEN FROM 0.6 MILE WEST TO 2940 INNSBRUCK DRIVE 1031 BUTTE STREET 90% HSST-S036-(108)E $587,475 09/09/21 0.1 MILE WEST OF ROUTE 3. REDDING, CA 96001 --() REDDING CA 96003 CURVE IMPROVEMENT (530)751-6116 (530)226-6400

02-TRI-36-34.7/35.3 IN TRINITY COUNTY ABOUT 15 MILES WEST STEVE MANNING CONSTRUCTION, JOEL GASIK $5,028,458 05/27/20 100% 02-2H0504 $4,961,353 06/09/20 OF PLATINA FROM 3.7 MILES TO 3.0 INC. 1031 BUTTE STREET 100% HSST-P036-(116)E $0 06/09/21 MILES WEST OF HAYFORK CREEK BRIDGE. 5211 CHURN CREEK ROAD REDDING CA 96001 --() 07/13/21 CURVE IMPROVEMENT (530)751-6116 COMPLETED REDDING CA 96002 (530)222-0810

02-TRI-36-207.0/20.7 IN TRINITY COUNTY NEAR FOREST GLEN AT J.F.SHEA CONSTRUCTION GREWAL, MANDHIR $9,985,000 02/10/21 79% 02-2J4704 $6,396,881 04/29/21 0.2 MILE EAST OF UPPER RATTLESNAKE P.O.BOX 494519 1031 BUTTE STREET 64% $0 08/03/21 CREEK BRIDGE. DIR'S EMERGENCY F.A. REDDING, CA 96001 REDDING, CA 96047 REMOVING THE UPPER PORTION AND (530)229-0542

INCREASING 20.20 201130 State of California Department of Transportation Page 20 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 02 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 02-TRI-36-/29 IN TRINITY COUNTY NEAR MAD RIVER FROM J.F. SHEA CONSTRUCTION, INC. GASIK, JOEL $22,985,000 10/08/20 82% 02-2J1404 $18,490,290 10/19/20 HUMBOLDT COUNTY LINE TO 0.4 MILE P. O. BOX 494519 1031 BUTTE STREET 80% $0 08/11/21 EAST OF ROUTE 3. DIR'S EMERGENCY REDDING, CA 96001 REDDING, CA 96049 L.B. (530)229-0542

REMOVAL OF HAZARD TREES, 20.20 RECONSTRUCTION 201130 02-TRI-299-1.9/2.3 IN TRINITY COUNTY NEAR SALYER FROM MERCER-FRASER COMPANY GREWAL MANDHIR $4,076,886 10/01/19 100% 02-4G5004 $3,997,183 10/24/19 0.1 MILE EAST TO 0.6 MILE EAST OF 77 W SECOND STREET 1031 BUTTE STREET 100% HSNH-P299-(205)E $0 06/22/21 WHITE HOUSE GULCH ROAD. REDDING, CA 96001 --() EUREKA CA 95501 07/19/21 INCREASE CLEAR RECOVERY (530)229-0542 COMPLETED (707)443-6371

02-TRI-299-3.5/0 IN TRINITY COUNTY NEAR SALYER AT S.T. RHOADES CONSTRUCTION, JOEL GASIK $1,416,154 10/27/20 56% 02-4G6204 $717,277 11/20/20 FRANCIS B MATHEWS SAFETY ROADSIDE INC. 1031 BUTTE STREET 51% $283,954 09/15/21 REST AREA 8585 COMMERCIAL WAY; REDDING CA 96001

UPGRADE WATER SYSTEM (530)751-6116 REDDING CA 96002 (530)223-9322

02-TRI-299-5.2/5.7 IN TRINITY COUNTY NEAR SALYER FROM MERCER-FRASER COMPANY $1,033,299 05/14/21 0% 02-4H3404 $0 06/15/21 0.3 MILE WEST OF DENNY ROAD TO 0.2 77 2ND ST 0% $0 MILE WEST OF PONY BAR CREEK BRIDGE. EUREKA CA 95501 INSTALL LEFT TURN LANE (707)443-6371

02-TRI-299-112.0/11.2 IN TRINITY COUNTY NEAR BURNT RANCH ACCESS LIMITED CONSTRUCTION ALEXANDER, NATHAN $985,000 03/10/21 0% 02-2J5304 $162,104 05/20/21 AT 0.3 MILE WEST OF BURNT RANCH 1102 PIKE LANE 1031 BUTTE ST. SUITE 16% $0 07/30/21 ROAD. DIR'S EMERGENCY F.A. 205, MS60 OCEANO, CA 93445 REPAIR ROCK MESH DRAPERY & INCREASE REDDING, CA 96001

HEIGH (530)604-5102 20.20 201130 02-TRI-299-/0 IN SHASTA AND TRINITY COUNTIES AT TULLIS, INC. MANDHIR GREWAL $2,355,260 11/04/19 100% 02-4G6104 $2,349,046 11/19/19 VARIOUS LOCATIONS 16951 CLEAR CREEK ROAD 1031 BUTTE ST 100% ACST-000C-(504)E $0 01/14/21 WORKER SAFETY IMPROVEMENTS REDDING, CA 96001 --() REDDING CA 96001 06/23/21 (530)229-0542 SUSPENDED (530)241-5105

State of California Department of Transportation Page 21 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 02 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 02-TRI-299-/0 IN LASSEN, SHASTA, AND TEHAMA SERAFIX ENGINEERING TOFAEL ANWAR $1,914,020 10/16/20 33% 02-4G5304 $781,746 10/29/20 COUNTIES AT VARIOUS LOCATIONS COUNTY CONTRACTORS, INC 1031 BUTTE ST 41% $607,514 09/24/21 LINE TO 0.2 MILE EAST OF GRASS 7 CROW CANYON COURT SUITE 250 REDDING CA 96001

VALLEY CREEK BRIDGE. (530)225-3172 SAN RAMON CA 94583 SCOUR PREVENTIVE MAINTENANCE (925)552-8253

02-VAR--/0 IN LASSEN, PLUMAS, SHASTA, SISKIYOU T & S DVBE, INC. ZDENEK, MIKE $2,510,000 12/02/19 100% 02-1J2404 $1,230,707 02/07/20 AND TEHAMA COUNTIES AT VARIOUS P.O. BOX 608 1031 BUTTE STREET 49% $0 07/31/21 LOCATIONS. DIR'S EMERGENCY L.B. REDDING, CA 96001 ANDERSON, CA 96007 PSPS STREETLIGHT BACKING PLATES (530)229-0559 OVER RUN

20.20 201130 02-VAR--/0 IN MODOC AND SISKIYOU COUNTIES AT AND AMERICAN PAVEMENT SYSTEMS, AUSTIN HENRY $2,400,925 03/02/21 95% 02-1J5204 $2,166,609 03/25/21 NEAR NEWELL FROM 3.3 MILES NORTH OF INC. 1625 MOTT RD 90% $580,465 07/22/21 PEREZ OVERHEAD TO ROUTE 161. 1012 11TH STREET; MT,SHASTA CA 96067

AR CHIP SEAL (530)605-5861 MODESTO CA 95354 (209)522-2277

02-VAR--/0 IN SHASTA AND TRINITY COUNTIES AT AND NORTHWEST PAVING, INC NATHAN ALEXANDER $1,514,327 02/05/21 57% 02-1J4804 $380,990 03/09/21 NEAR PLATINA FROM 0.4 MI EAST OF 8115 SECLUDED VALLEY DRIVE; 1031 BUTTE ST. SUITE 25% $0 07/08/21 MIDDLE FORK COTTONWOOD CREEK BR TO 205, MS60 REDDING CA 96001 BEEGUM CR BR AND FROM 1. REDDING, CA 96001 (530)246-4388 AR CHIP SEAL (530)604-5102

02-VAR--/0 IN LASSEN, MODOC AND SHASTA COUNTIES AMERICAN CIVIL CONSTRUCTORS $2,244,000 06/03/21 0% 02-0J9104 $0 06/22/21 AT VARIOUS LOCATIONS WEST COAST LLC 0% $0 BRIDGE MAINTENANCE 2990 BAY VISTA COURT, SUITE D

BENICIA CA 94510 (707)746-8028

Totals: Authorized Final Amt: $396,804,362 Completed to Date: $293,749,546 Work This Month: $18,303,902 State of California Department of Transportation Page 22 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 03 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 03-BUT-5-/0 IN VARIOUS COUNTIES ON VARIOUS ROUTES TIM PAXIN'S PACIFIC RAKESH CHANDER $11,181,302 07/19/19 75% 03-0H4104 $10,471,134 08/15/19 AT VARIOUS LOCATIONS EXCAVATIONINC 3855 NORTH FREEWAY 94% B1ST-000C-(499)E $0 11/30/21 REPAIR AND INSTALL PERMANENT 9796 KENT STREET; BLVD, ST200 --() SACRAMENTO, CA 95834 SUSPENDED ELK GROVE CA 95624 (916)799-2649 (916)686-2800

03-BUT-70-5.6/9.1 IN BUTTE COUNTY NEAR OROVILLE, FROM BALDWIN CONTRACTING COMPANY DAN RECHS $14,300,352 06/16/20 16% 03-3H72U4 $6,325,496 07/02/20 0.3 MILES NORTH OF COX LANE TO 0.2 INC. DBA. KNIFE RIVER 2707 NORTE DAME BLVDQ 44% ACNH-P070-(141)E $864,119 10/29/21 MILES NORTH OF PALERMO ROAD CONSTRUCTION CHICO, CA 95928 --() CONSTRUCT TWO-WAY LEFT-TURN 1764 SKYWAY; (530)895-5245

CHICO CA 95928 (530)891-6555 03-BUT-70-154.0/15.4 IN BUTTE COUNTY ON ROUTE 70 AT THE MCM CONSTRUCTION, INC. WOOD, JUSTIN $785,000 03/17/21 0% 03-1J9204 $0 06/16/21 GRAND AVE OC 12-107 DIR'S EMERGENCY P.O. BOX 620 1930 FEATHER RIVER 0% $0 06/17/21 F.A. BLVD NORTH HIGHLANDS, CA 95660 INSTALLATION OF TEMPORARY FALSEWORK OROVILLE, CA 95965

SYSTEM (530)682-3831 20.20 201130 03-BUT-99-13.2/45.9 IN AND NEAR CHICO, FROM NORTH OF BRIDGEWAY CIVIL CONSTRUCTORS, RYAN JOHNSON $4,820,705 04/21/20 96% 03-0H3304 $4,515,367 05/08/20 ROUTE 162 TO NORTH OF BROYLES ROAD. INC. 2707 NORTE DAME BLVD 92% $0 07/30/21 NORTH OF BROYLES 3333 VACA VALLEY PARKWAY; CHICO, CA 95928

BRIDGE RAIL UPGRADE AT SIX (530)895-5245 VACAVILLE CA 95688 (707)455-7033

03-BUT-99-14.9/15.7 IN BUTTE COUNTY ABOUT 10 MILES NORTH TEICHERT CONSTRUCTION DAN RECHS/DEBRA $6,283,800 09/24/20 45% 03-0F2904 $2,015,124 10/09/20 OF GRIDLEY FROM 0.3 MILES SOUTH TO 400 SUNRISE AVE. STE. #300 2707 NOTRE DAME BLVD 32% ACNH-P099-(658)E $845,147 10/25/21 0.5 MILE NORTH OF NELSON AVENUE. CHICO, CA 95928 --() ROSEVILLE CA 95661 REPLACE AND REALIGN SCOUR-CRITICAL (530)895-5245

HA21

03-BUT-99-29.3/T37.8 IN BUTTE COUNTY IN AND NEAR CHICO AT ST. FRANCIS ELECTRIC, LLC $7,965,000 03/08/21 0% 03-1H8604 $0 03/30/21 VARIOUS LOCATIONS FROM SOUTHGATE 975 CARDEN STREET; 0% $0 AVENUE TO GARNER LANE SAN LEANDRO CA 94577 INSTALL TRAFFIC MANAGEMENT SYSTEM (510)639-0639

State of California Department of Transportation Page 23 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 03 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 03-BUT-99-30.5/30.6 IN BUTTE COUNTY IN THE CITY OF CHICO ST. FRANCIS ELECTRIC, LLC $652,000 04/29/21 0% 03-1J3504 $0 05/20/21 ON NB SR 99 AT THE SKYWAY ROAD SLIP 975 CARDEN STREET; 0% $0 AND LOOP ONRAMPS. SAN LEANDRO CA 94577 INSTALL RAMP METERS. (510)639-0639

03-BUT-99-34.0/34 IN BUTTE, PLACER AND SACRAMENTO AMERICAN CIVIL CONSTRUCTORS $3,055,000 06/09/21 0% 03-0J9004 $0 06/29/21 COUNTIES AT VARIOUS LOCATIONS. WEST COAST LLC 0% HSNH-000C-(530)E $0 APPLY HIGH FRICTION SURFACE 2990 BAY VISTA COURT, SUITE D --()

BENICIA CA 94510 (707)746-8028

03-BUT-99-/0 IN BUTTE COUNTY IN AND NEAR OROVILLE LAMASSU UTILITY SERVICES, INC. $227,154 05/25/21 0% 03-1G9604 $0 06/10/21 AT VARIOUS LOCATIONS FROM 0.1 MILE 3193 ENTERPRISE CT; 0% $0 SOUTH OF RICHVALE EAST ROAD TO 0.1 LOOMIS CA 95650 MILE EAST OF MIDDLEHOF (916)259-1576 CULVERT REHAB.

03-BUT-162-25.0/31 IN BUTTE COUNTY, ON SR 162, FROM LAMON CONSTRUCTION CO. INC. RECHS, DANIEL $7,966,754 09/14/20 100% 03-1J7604 $6,199,405 10/27/20 POSTMILE 25 TO 31.07 871 VON GELDERN WAY 2707 NOTRE DAME BLVD. 78% $0 08/30/21 REPLACE GUARDRAIL AND PAVEMENT CHICO, CA 95928 YUBA CITY, CA 95991 (530)218-1567 OVER RUN

20.20 201130 03-COL-5-5.0/6.8 IN COLUSA COUNTY IN THE TOWN OF GORDON N. BALL, INC. GRIFFITH, GARETT $897,887 11/19/20 59% 03-0J1804 $845,220 12/09/20 ARBUCKLE AT HILLGATE ROAD UC (BR#15- 333 CAMILLE AVENUE; 379 COLUSA AVENUE 94% $0 07/30/21 47) YUBA CITY, CA 95991 ALAMO CA 94507 UPGRADE BRIDGE RAIL. (530)682-3842 (925)838-5675

03-COL-5-24.3/24.3 IN COLUSA COUNTY ABOUT 2.9 MILES TSI ENGINEERING, INC. JAMES RALSTON $4,037,036 01/28/20 76% 03-4F4304 $3,976,330 02/20/20 SOUTH OF MAXWELL AT THE MAXWELL 4600 ROSEVILLE ROAD, STE 140 2707 NORTE DAME BLVD 97% CIMG- 005-(099)E $0 07/19/21 SAFETY ROADSIDE REST AREA CHICO CA 95973 --() NORTH HIGHLANDS CA 95660 UPGRADE WATER AND WASTEWATER (530)713-7871 SUSPENDED (916)571-5731 HB33 State of California Department of Transportation Page 24 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 03 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 03-COL-5-24.4/24.5 ELECTRIC VEHICLE CHARGING STATIONS SHASTA SERVICES INC. DBA DANIEL RECHS/OE:STEVEN $1,477,101 09/18/19 93% 03-2H5504 $1,381,808 10/04/19 (EVCS) IN GLENN, COLUSA AND NEVADA TIMBERWORKS MATRANG 94% $0 05/24/21 COUNTIES AT VARIOUS LOCATIONS 509 S MOUNT SHASTA BLVD 2707 NOTRE DAME BLVD

INSTALL ZEV CHARGING STATIONS AT CHICO, CA 95928 SUSPENDED MOUNT SHASTA CA 96067 (530)218-1567 (530)926-4093

03-COL-20-31.8/32.8 IN COLUSA, BETWEEN MARKET ST AND A. TEICHERT & SON, INC. DBA GRANADOS, $13,493,308 10/15/18 97% 03-2F9804 $14,060,478 11/08/18 BUTTE VISTA WAY. TEICHERT CONSTRUCTION ANTHONY/OE:DEBRA B 99% B1NH-P020-(187)E $66,063 01/07/22 PAVEMENT REHABILITATION 400 SUNRISE AVE, SUITE 300 2707 NOTRE DAME BLVD. --() CHICO, CA 95928 ROSEVILLE CA 95661 (530)682-6584 HA22 (916)757-6400

03-COL-45-/19.8 IN COLUSA COUNTY ON ROUTE 45 FROM THE S.T.RHOADES CONSTRUCTION, INC. $2,137,046 04/06/21 0% 03-2G0804 $0 04/30/21 COUNTY LINE TO JCT RTE 20 IN THE CITY 8585 COMMERCIAL WAY; 0% $0 OF COLUSA. REDDING CA 96002 DIGOUTS (530)223-9322

03-ED-49-9.6/14.2 IN EL DORADO COUNTY IN AND NEAR GEORGE REED INC PHILLIPS, JODY $1,551,923 05/13/21 31% 03-2G1004 $994,316 06/15/21 PLACERVILLE FROM PLEASANT VALLEY ROAD 140 EMPIRE AVE 3976 DUROCK RD 64% $980,966 09/01/21 TO 0.2 MILE SOUTH OF GILMORE STREET STE102A MODESTO CA 95354 COLDPLANE SHINGLE SPRINGS, CA (209)523-0734 95682

(916)799-7651 03-ED-49-10.0/11.7 IN EL DORADO COUNTY IN AND NEAR SAK CONSTRUCTION, LLC $249,222 04/29/21 0% 03-2G2104 $0 06/15/21 DIAMOND SPRINGS AT VARIOUS LOCATIONS 864 HOFF ROAD; 0% $0 FROM 0.1 MILE SOUTH OF KOKI LANE TO O'FALLON MO 63366 0.1 MILE NORTH OF DIAMON (636)385-1000 CULVERT REHAB.

03-ED-49-16.5/23.9 IN EL DORADO COUNTY NEAR PLACERVILLE VSS INTERNATIONAL, INC. JODY PHILLIPS $877,120 04/28/21 100% 03-2G0904 $816,486 05/07/21 FROM DIANA STREET TO 0.3 MILE SOUTH 3785 CHANNEL DRIVE; 3976 DUROCK ROAD STE 100% $0 06/11/21 OF LOTUS ROAD. 102A WEST SACRAMENTO CA 95691 06/21/21 CHIPSEAL SHINGLE SPRINGS, CA COMPLETED (916)373-1500 95682

(916)799-7951 State of California Department of Transportation Page 25 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 03 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 03-ED-50-18.5/24.2 NEAR PLACERVILLE AND CAMINO FROM 0.2 SECURITY PAVING COMAPNY INC NATHAN ALTERON $24,135,848 05/04/20 67% 03-4E62U4 $8,497,335 06/03/20 MILES WEST OF STILL MEADOWS ROAD TO 3075 TOWNSGATE ROAD, STE 200 3065 BALIRS LN 35% ACNH-P050-(152)E $1,719,548 11/16/21 0.4 MILE EAST OF UPPER CARSON RD. PLACERVILLE CA 95667 --() WESTLAKE VILLAGE CA 91361 INSTALL MEDIAN BARRIER, WIDEN (530)957-1110 (818)362-9200

03-ED-50-33.8/34.2 IN EL DORADO COUNTY AT FRESH POND BRIDGEWAY CIVIL CONSTRUCTORS, JODY PHILLIPS $11,428,062 06/29/20 52% 03-3H4504 $5,901,266 07/23/20 FROM 0.6 TO 0.2 MILE WEST OF FOREST INC. 3979 DUROCK RD STE 52% $437,333 01/20/22 ROAD/OUTER LIMITS LANE 3333 VACA VALLEY PARKWAY; 102A

REPAIR SLIPOUT SHINGLE SPRINGS CA 95682 VACAVILLE CA 95688 (916)799-7951 (707)455-7033

03-ED-50-/80.4 IN EL DORADO COUNTY FROM SACRAMENTO TIM PAXIN'S PACIFIC EXCAVATIONJUANAH KOKER $8,975,061 08/13/20 42% 03-0H5204 $4,452,048 08/27/20 COUNTY LINE TO NEVADA STATE LINE INC DBA PACIFIC EXCAVATION 3976 DUROCK ROAD 49% ACNH-P050-(153)E $938,061 11/09/21 INSTALL AWS IN PLACERVILLE, IMPROVE 9796 KENT STREET; SUITE 102 --() SHINGLE SPRING CA 95682 SUSPENDED ELK GROVE CA 95624 (916)416-7612 (916)686-2800

03-GLE-5-7.4/17 IN AND NEAR WILLOWS, AT FOUR BALDWIN CONTRACTING COMPANY ANTHONY GRANADOS $1,614,226 01/04/21 73% 03-3F5004 $1,532,540 01/26/21 INTERCHANGES BETWEEN COUNTY ROAD 57 INC. DBA. KNIFE RIVER 2707 NOTRE DAME BLVD 94% $244,615 08/05/21 TO COUNTY ROAD 33. CONSTRUCTION CHICO, CA 95928

PAVE BEYOND THE GORE AREAS, AND 1764 SKYWAY; (530)895-5245

HB34 CHICO CA 95928 (530)891-6555 03-GLE-5-14.4/14.7 IN GLENN COUNTY, ON INTERSTATE 5, 4.6 STUDEBAKER BROWN ELECTRIC, $721,115 06/22/21 0% 03-2H5104 $0 07/20/21 MILES NORTH OF WILLOWS AT THE WILLOWS INC. 0% $0 SAFETY ROADSIDE REST AREA. 3237 RIPPEY ROAD STE.100;

UPGRADE LIGHTING. LOOMIS CA 95650 (916)259-2395

03-GLE-5-14.6/14.6 IN GLENN COUNTY 4.8 MILES NORTH OF TSI ENGINEERING, INC. RALSTON, JAMES $4,210,574 09/24/20 53% 03-4F4204 $2,770,578 10/09/20 WILLOWS AT THE WILLOWS SAFETY 4600 ROSEVILLE ROAD, SUITE 14 2707 NOTRE DAME 66% ACIM-0057-(100)E $593,901 12/06/21 ROADSIDE REST AREA BOULEVARD --() NORTH HIGHLANDS CA 95660 UPGRADE POTABLE WATER AND CHICO, CA 95928 (916)571-5731 (530)713-7871

State of California Department of Transportation Page 26 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 03 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 03-GLE-162-66.6/76.3 PAVEMENT REHABILITATION PROJECT IN BALDWIN CONTRACTING COMPANY RECHS, DANIEL $5,057,984 05/06/21 6% 03-2G1104 $189,027 05/19/21 GLENN COUNTY ON ROUTE 162. INC. DBA. KNIFE RIVER 2707 NORTE DAME BLVD. 4% $189,027 09/03/21 COLD IN-PLACE RECYCLE CONSTRUCTION CHICO, CA 95928

1764 SKYWAY; (530)895-5245

CHICO CA 95928 (530)891-6555 03-NEV-49-8.3/8.7 IN NEVADA COUNTY ON ROUTE 49 FROM 0.1 BALDWIN CONTRACTING COMPANY CHRIS FALLBECK $1,300,702 08/07/20 86% 03-3H6504 $1,148,806 08/20/20 MILE SOUTH OF ROUND VALLEY ROAD TO INC. DBA. KNIFE RIVER 138 NEW MOHAWK ROAD. 90% HSNH-P049-(182) $0 06/29/21 0.1 MILE NORTH OF QUAIL CREEK DRIVE CONSTRUCTION SUITE B --() IMPROVE SAFETY BY CONSTRUCTING A 1764 SKYWAY; NEVADA CITY, CA 95959 SUSPENDED

(530)682-7746 CHICO CA 95928 (530)891-6555 03-NEV-49-30.0/32.1 IN NEVADA COUNTY ON ROUTE 49, FROM CCFG CONSTRUCTION CATANIA, DAVID $960,891 05/21/21 7% 03-2G0004 $27,731 06/10/21 OAK TREE RD TO 0.5 MILE SOUTH OF THE 17750 WARDS FERRY RD; 138 NEW MOHAWK RD. 3% $27,731 09/17/21 MIDDLE YUBA RIVER BRIDGE (BR#17-09). STE B SONORA CA 95370 CULVERT REHAB NEVADA CITY, CA 95959 (209)743-4911 (530)218-1752

03-NEV-49-/7.5 NEAR HIGGINS CORNER, FROM THE PLACER LAMASSU UTILITY SERVICES, INC.CHRIS FALLBECK $1,680,148 06/18/21 0% 03-0H2104 $0 07/08/21 COUNTY LINE TO 0.3 MILE NORTH OF LIME 3193 ENTERPRISE CT; 138 NEW MOHAWK RD 0% $0 11/15/21 KILN ROAD; ALSO IN PLACER COUNTY, AT SUITE LOOMIS CA 95650 PM R8.42 AND PM R1 NEVADA CITY CA 95959 (916)259-1576 REHABILITATE DRAINAGE SYSTEMS (530)682-7746

03-NEV-80-10.1/29.5 IN AND NEAR TRUCKEE, AT VARIOUS GRANITE CONSTRUCTION COMPANY BOJANA GUTIERREZ $7,531,507 03/17/21 61% 03-1H8404 $4,764,828 04/01/21 LOCATIONS FROM 1.0 MILE EAST OF 585 WEST BEACH STREET 10183 TRUCKEE AIRPORT 63% SIMG-080 -(210)E $2,196,204 08/30/21 DONNER LAKE UNDERCROSSING TO FARAD RD SE202 --() WATSONVILLE CA 95076 UNDERCROSSING. TRUCKEE CA 96161 (775)358-8792 REPLACE GUARDRAIL WITH CONCRETE (916)801-3455

03-NEV-80-19.3/19.3 IN NEVADA COUNTY ON ROUTE 80 NEAR ICENOGLE CONSTRUCTION $545,687 05/28/21 0% 03-2H30A4 $0 06/29/21 TRUCKEE AT THE DONNER PASS CHP MANAGEMENT, INC. 0% $0 INSPECTION FACILITY 70 OTIS STREET;

REHAB/UPGRADEFACILITY SAN FRANCISCO CA 94103 (415)349-8297 State of California Department of Transportation Page 27 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 03 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 03-NEV-80-28.3/28.7 NEAR TRUCKEE AND FLORISTON, FROM 0.2 ROAD AND HIGHWAY BUILDERS, RANDY STELLHORN $3,669,111 02/09/21 51% 03-1H0104 $1,560,274 03/09/21 MILE EAST OF TRUCKEE RIVER BRIDGE TO LLC. 10183 TRUCKEE AIRPORT 42% ACIM-080 -(209)E $353,630 09/02/21 0.8 MILE WEST OF FARAD ROAD. 950 E MUSTANG RD ,STE 202 --() CONSTRUCT MEASURES TO ADDRESS CUT TRUCKEE, CA 96161 SPARKS NV 89434 (530)919-3936 (775)852-7283

03-NEV-174-3.0/3.9 IN NEVADA COUNTY, BETWEEN COLFAX AND DESILVA GATES CONSTRUCTION LP JEFF JOHNSON $12,216,657 01/24/20 51% 03-4F3704 $7,340,453 02/19/20 GRASS VALLEY, FROM MAPLE WAY TO YOU 11555 DUBLIN BLVD.; 138 NEW MOHAWK RD 60% HSST-P174-(014)E $1,547,839 01/07/22 BET ROAD SUITE B --() DUBLIN CA 94568 REALIGN ROADWAY CURVES NEVADA CITY CA95659 (925)829-9220 (530)632-6714 HB1

03-NEV-174-4.6/5.3 IN NEVADA COUNTY NEAR PEARDALE AT LAMASSU UTILITY SERVICES, INC.CHRIS FALLBECK $336,559 04/12/21 49% 03-1G9704 $70,688 05/19/21 VARIOUS LOCATIONS FROM YOU BET ROAD 536 STONE RD , SUITE D; 138 NEW MOHAWK RD STE 21% $70,688 08/20/21 TO 0.3 MILE EAST OF MEADOW VIEW B BENICIA CA 94510 DRIVE. NEVADA CITY CA 95945 (707)750-5130 CULVERT REHAB (530)682-7746

03-NEV-174-8.5/9.7 IN NEVADA COUNTY NEAR GRASS VALLEY AT CCFG CONSTRUCTION CHRIS FALLBECK $397,089 05/05/21 47% 03-1G9804 $104,339 05/19/21 VARIOUS LOCATIONS FROM 0.3 MILE NORTH 17750 WARDS FERRY RD; 138 NEW MOHAWK RD STE 26% $104,339 08/20/21 OF RATTLESNAKE RD TO 0.1 MILE SOUTH B SONORA CA 95370 OF GOLD HILL ROAD NEVADA CITY, CA 95959 (209)743-4911 CULVERT REHAB (530)682-7746

03-PLA-28-10.2/10.2 IN PLACER COUNTY IN KINGS BEACH FROM MARTIN BROTHERS CONSTRUCTION $827,173 05/19/21 0% 03-0J2504 $0 06/18/21 CHIPMUNK STREET TO BEAVER STREET 8801 FOLSOM BLVD SUITE 260; 0% $0 INSTALL STORM DRAIN. SACRAMENTO CA 95826

(916)381-0911

03-PLA-49-3.1/7.5 IN PLACER COUNTY IN AND NEAR AUBURN FLATIRON WEST, INC. JEFF JOHNSON/BARBARA $32,403,967 02/28/19 98% 03-2F3404 $30,740,932 03/21/19 FROM 0.1 MILE SOUTH OF ROUTE 49/80 2100 GOODYEAR RD WHITE 93% B1NH-P049-(177)E $1,843,843 07/29/21 SEPARATION TO 0.1 MILE NORTH OF DRY 138 NEW MOHAWK RD, --() BENICIA CA 94510 CREEK ROAD SUITE B (707)742-6000 WIDEN SHLDRS, RET WALL, REPLACE NEVADA CITY, CA 95959

MBGR, (530)632-6714 State of California Department of Transportation Page 28 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 03 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 03-PLA-65-4.8/4.9 IN PLACER COUNTY IN ROSEVILLE AND LAMON CONSTRUCTION $1,056,845 05/21/21 0% 03-2G1404 $0 06/15/21 ROCKLIN FROM THE 65/80 SEPARATION TO 871 VON GELDERN WAY; 0% $0 1 MILE WEST OF ROCKLIN ROAD YUBA CITY CA 95991 MILL AND REPLACE WITH DIGOUTS (530)845-2282

03-PLA-65-12.9/13.1 IN PLACER COUNTY IN LINCOLN AT THE MCCUEN CONSTRUCTION, INC BERHANE TESFAGABR $1,110,826 09/02/20 82% 03-4H5604 $821,688 09/21/20 SOUTH INGRAM SLOUGH BRIDGE (BR#19- 3267 SWETZER ROAD 2520 WARREN DRIVE 74% $0 06/30/21 0188 L/R) ROCKLIN CAS 95677 LOOMIS CA 95650 07/26/21 INSTALL SLOPE STABILIZATION AND (916)869-7335 (916)652-7824

03-PLA-80-1.3/63.5 IN AND NEAR VARIOUS CITIES, AT HIGHWAY SPECIALTY COMPANY INC ANDREW MARTIN $2,767,645 01/12/21 76% 03-0H7204 $1,923,545 02/11/21 VARIOUS LOCATIONS FROM 0.3 MILE WEST 6591 EASTSIDE ROAD 33 DEPOT STREET PO 70% SIMG-0804-(334) $616,468 08/19/21 OF DOUGLAS BOULEVARD TO 0.2 MILE BOX 1807 --() REDDING CA 96001 EAST OF HAMPSHIRE ROCKS UND COLFAX CA 95713 (530)949-5631 UPGRADE GUARDRAIL TO CURRENT (530)812-6343

03-PLA-80-2.6/3.1 IN PLACER COUNTY ON WB I-80 AT THE MYERS & SONS CONSTRUCTION, LLCJUSTIN KUNERT $7,649,057 11/16/20 36% 03-0H4604 $3,106,229 12/15/20 ATLANTIC BLVD ON-RAMP 4600 NORTHGATE BLVD, SUITE 10 2520 WARREN DR SUITE 41% ACIM-080 -(251)E $734,043 02/04/22 WIDEN EXISTING ON-RAMP AND A --() SACRAMENTO CA 95834 ROCKLIN, CA 95677 (916)283-9950 (530)812-6938

03-PLA-80-11.4/17.5 IN PLACER COUNTY ON ROUTE 80 NEAR LAMON CONSTRUCTION CO INC MARTIN CLARK $3,969,909 02/19/21 68% 03-2G1304 $2,874,342 03/09/21 AUBURN FROM APPROX. 0.1 MILE EAST OF 871 VON GELDERN WAY; 33 DEPOT ST/PO BOX 72% $2,393,366 08/06/21 PENRYN ROCK SPRING UNDERCROSSING TO 1807 YUBA CITY CA 95991 ROUTE 80/49 SEPARATION. COLFAX, CA 95713 (530)671-1370 REPLACE OG. (916)825-6388

03-PLA-80-31.5/36.8 FROM ILLINOIS TOWN OC TO EAST OF CAPE LAMASSU UTILITY SERVICES, INC.TAD SAMPSON $3,036,615 06/04/20 93% 03-1E0504 $1,950,501 07/10/20 HORN UC 3193 ENTERPRISE CTE D; 33 DEPOT STREET P.O 64% $678,145 07/28/21 CULVERT REHABILITATION BOX 1807 LOMMIS CA 95650 COLFAX, CA 95713 (707)750-5130 (707)750-5130

State of California Department of Transportation Page 29 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 03 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 03-PLA-80-38.8/41.4 NEAR MAGRA, FROM SECRET TOWN SAK CONSTRUCTION, LLC SAMPSON, TAD $1,964,880 04/21/21 29% 03-1H0304 $196,510 05/16/21 OVERCROSSING TO THE GOLD RUN SAFETY 864 HOFF ROAD; 33 DEPOT ST/ PO BOX 11% $196,510 10/14/21 ROADSIDE REST AREA (SRRA). 1807 O'FALLON MO 63366 REHABILITATE DRAINAGE SYSTEMS. COLFAX, CA 95713 (636)385-1000 (916)799-4858

03-PLA-80-46.3/63.5 IN PLACER COUNTY AT VARIOUS LOCATIONS WALSH CONSTRUCTION COMPANY II,TAD SAMPSON $29,273,986 09/23/20 28% 03-2F5704 $8,589,688 10/09/20 FROM CRYSTAL SPRINGS ROAD LLC 33 DEPOT ST PO BOX 29% ACIM- 080-(207)E $2,460,335 03/14/22 OVERCROSSING TO CISCO OVERCROSSING 1390 WILLOW PASS ROAD, STE 95 1807 --() REPLACE BRIDGES AT FOUR LOCATIONS. COLFAX CA 95713 CONCORD CA 94520 (916)799-4858 (925)627-1700

03-PLA-80-56.9/58.2 NEAR EMIGRANT GAP, FROM 0.8 MILE NEAR NEIL'S CONTROLLED BLASTING, LP $1,093,230 07/01/21 0% 03-0J8804 $0 07/27/21 EMIGRANT GAP, FROM 0.8 MILE EAST TO 490 MAIN ST 0% ACIM- 080-(211)E $0 2.1 MILES EAST OF CARPENTER FLAT --() NEWCASTLE CA 95658 UNDERCROSSING, AT TWO L (916)663-2500 RESTORE THE STRUCTURAL INTEGRITY OF

03-PLA-193-3.0/10.1 IN PLACER COUNTY NEAR LINCOLN FROM A. TEICHERT AND SON, INC. DBA CLARK, MARTIN $3,010,888 05/11/21 0% 03-2G1504 $0 06/15/21 SIERRA COLLEGE BOULEVARD TO 0.1 MILE TEICHERT CONSTRUCTION 33 DEPOT ST/PO BOX 0% $0 09/23/21 WEST OF CLARK TUNNEL RD AND 0.1 MILE 400 SUNRISE BLVD.; 1807

EAST OF MANDARIN HIL COLFAX, CA 95713 ROSEVILLE CA 95661 MILL & FILL/OVERLAY. (916)825-6388 (916)757-6400

03-SAC-5-.2/34.3 IN SACRAMENTO COUNTY ON ROUTES 5, 80 DREAMBUILDER OLGUIN, JORGE $2,647,135 04/19/19 100% 03-4F6404 $2,313,487 05/21/19 AND 99 AT VARIOUS LOCATIONS 18543 YORBA LINDA BLVD # 376; 2777 DEL MONTE STREET 87% SNHG-X067-(080)E $0 11/22/19 UPGRADE METAL BEAM GUARD RAIL AND WEST SACRAMENTO, CA --() YORBA LINDA CA 92886 95691 SUSPENDED (714)646-3697 (916)952-1149

03-SAC-5-9.7/24.9 IN SACRAMENTO, FROM 1.1 MILES SOUTH NOR CAL PAVING CHARLIE MAHAN $268,833,043 05/01/19 56% 03-0H10U4 $197,173,053 05/31/19 OF ELK GROVE BLVD OVERCROSSING TO 400 SUNRISE AVE. SUITE 300; 1016 NORTH MARKET 73% B1IM- 005-(349)E $12,187,980 04/09/22 ROUTE 50 AT AMERICAN RIVER BR (BR#24- BLVD. STE.60 --() ROSEVILLE CA 95661 68) SACRAMENTO, CA 95834 SUSPENDED (916)757-6400 ROADWAY REHABILITATION, CONSTRUCT (530)682-6707

State of California Department of Transportation Page 30 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 03 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 03-SAC-5-33.8/33.8 IN SACRAMENTO COUNTY ABOUT 10.8 MDS ENGINEERING & SUSHMA LEE $3,177,799 08/23/19 100% 03-4F5804 $3,099,115 10/04/19 MILES NORTH OF SACRAMENTO AT THE CONSTRUCTIONINC. 379 COLUSA AVENUE 96% CIMG- 005-(356)E $0 12/16/21 ELKHORN SAFETY ROADSIDE REST AREA. 14771 WONDERLAND BLVD YUBA CITY CA 95991 --() UPGRADE WATER AND SEWAGE SYSTEM TO (916)799-5518 SUSPENDED REDDING CA 96003 (530)275-2779

03-SAC-5-/0 IN SACRAMENTO, YOLO, PLACER, AND MAY-HAN ELECTRIC INC DBA M&M PEDRO DIAZ $2,824,687 07/16/19 89% 03-4H0204 $2,481,502 08/05/19 GLENN COUNTIES AT VARIOUS LOCATIONS ELECTRIC INC 3855 NORTH FREEWAY 83% HSNH-000C-(495)E $0 06/11/21 ON ROUTES 5, 16, 45, 49, 50, 65, 80, 1600 AUBURN BLVD.; SUITE#120 --() 99, 113, AND 174. SACRAMENTO, CA 95834 SACRAMENTO CA 95815 INSTALL VARIOUS SAFETY (530)682-5440 (916)929-0150

03-SAC-12-.6/.6 IN SACRAMENTO COUNTY NEAR RIO VISTA O.C. JONES & SONS, INC. HOWARD GIANG $5,033,695 05/20/20 47% 03-2H6404 $2,850,250 06/18/20 ON ROUTE 12 FROM 0.6 MILE EAST OF 1520 FOURTH STREET; 2777 DEL MONTE STREET 57% $349,893 02/14/22 SACRAMENTO RIVER BRIDGE TO 5.2 MILES WEST SACRMANEOT CA 95691 BERKELEY CA 94710 WEST OF MOKELUMNE RIVER (916)825-7987 (510)526-3424 INTERSECTION IMPROVEMENTS

03-SAC-50-.2/6.1 IN SACRAMENTO COUNTY ON ROUTE 50 FROM FLATIRON WEST,, INC. ROD MURPHY $387,765,991 04/29/20 21% 03-0H08U4 $133,952,208 06/30/20 I-5 JUNCTION TO WATT AVE. 2100 GOODYEAR ROAD 2520 WARREN DRIVE 35% $5,610,328 07/02/24 ADD HIGH OCCUPANCY VEHICLE LANE AND SUITE A BENICIA, CA 94510 ROCKLIN CA 95677 (707)920-1057 (916)717-1533

03-SAC-50-2.6/3.8 IN THE CITY AND COUNTY OF SACRAMENTO O.C. JONES & SONS, INC SHAH, MRUDANG $2,668,035 03/04/19 100% 03-1F1904 $2,398,786 03/21/19 FROM 65TH STREET UNDERCROSSING TO THE 1520 FOURTH ST 2777 DEL MONTE ST 94% ACNH-P050-(148)E $0 04/14/21 WESTBOUND ONRAMP FROM NORTHBOUND HOWE SACRAMENTO, CA 95691 --() BERKELEY CA 94710 ADD AUXILIARY LANE (530)682-7172 OVER RUN (510)526-3424

03-SAC-50-7.7/9.5 IN AND NEAR RANCHO CORDOVA, FROM DESILVA GATES CONSTRUCTION EPHREM TEWELDEBERHAN $3,747,747 02/05/21 51% 03-1F1504 $1,587,303 03/04/21 BRADSHAW ROAD TO MATHER FIELD ROAD. 11555 DUBLIN BLVD.; 2777 DEL MONTE ST 42% ACNH-P050-(155)E $1,134,200 09/15/21 OPERATIONAL IMPROVEMENTS THAT WEST SACRAMENTO CA 95691 --() DUBLIN CA 94568 (916)372-0172 (925)829-9220 HB4N State of California Department of Transportation Page 31 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 03 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 03-SAC-50-15.8/23.1 IN SACRAMENTO AND EL DORADO COUNTIES ST. FRANCIS ELECTRIC, LLC JUANAH KOKER $4,268,000 02/19/21 70% 03-1H8204 $108,341 03/18/21 IN AND NEAR FOLSOM FROM HAZEL AVENUE 975 CARDEN STREET; 3976 DUROCK RD SUITE 3% $98,679 10/07/21 TO SILVA VALLEY PARKWAY 102 SAN LEANDRO CA 94577 INSTALL FIBER OPTIC CABLE AND SHINGLE SPRING CA 95682 (510)639-0639 (916)616-7612

03-SAC-50-/L.5 IN SACRAMENTO COUNTY IN SACRAMENTO AT ABACUS CONSTRUCTION, INC. $307,258 03/12/21 0% 03-1G7404 $0 03/25/21 SACRAMENTO RIVER VIADUCT AND RAMP A4 8490 HARTMEYER LN 0% $0 REMOVE BOLTS AND ADD PAINTED REDDING CA 96002

(530)215-3104

03-SAC-80-9.6/12.9 NEAR THE CITY OF SACRAMENTO,FROM 0.2 A. TEICHERT AND SON, INC. DBA $11,777,612 06/18/21 0% 03-1H1904 $0 07/08/21 MILE EAST OF LONGVIEW DRIVE TO 0.4 TEICHERT CONSTRUCTION 0% $0 MILE EAST OF MADISON AVENUE AUBURN 400 SUNRISE BLVD.;

BLVD TO CONNECTOR TO I ROSEVILLE CA 95661 PAVEMENT REHABILITATION. (916)757-6400

03-SAC-80-/0 IN SACRAMENTO COUNTY IN SACRAMENTO AT GEORGE REED, INC. DEYAEDEEN ELGHASSEIN $554,662 05/26/21 35% 03-2G0604 $156,191 06/22/21 NORTHGATE MAINTENANCE STATION AT 3940 140 EMPIRE AVE 3855 N FREEWAY BLVD# 28% $156,191 08/06/21 ROSIN COURT 120 MODESTO CA 95352 MAINTENANCE STATION PAVEMENT REPAIR SACRAMENTO, CA 95834 (209)523-0734 (916)263-4929

03-SAC-99-4.5/5.5 IN SACRAMENTO COUNTY ON SR 99 AT S. BROSAMER & WALL , INC MOHSSEN CHASSEMI/OE $19,584,306 01/24/20 58% 03-3F5404 $15,532,931 02/13/20 LAGOON CREEK BRIDGE (BR# 24-0028L), 1777 OAKLAND BLVD , SUITE 300 MICHAEL P 78% ACNH-X067-(081)E $1,336,587 11/22/21 LAGOON CREEK BRIDGE (BR# 24-0045L), 2777 DEL MONTE ST --() WALNUT CREEK CA 94596 AND N LAGOON CREEK BRI SACRAMENTO CA 95691 (925)395-5207 REPLACE 4 BRIDGES. (916)375-8366

03-SAC-99-7.1/9.4 IN AND NEAR ELK GROVE FROM 0.3 MILE GRANITE CONSTRUCTION COMPANY MASOUD SAED $17,302,818 05/14/20 99% 03-0F2844 $16,882,525 05/18/20 IN AND NEAR ELK GROVE FROM 0.3 MILE PO BOX 742478 2777 DEL MONTE ST 97% $406,345 07/21/21 SOUTH OF DILLARD RD OC TO 0.6 MILE SACRMANETO, CA 95691 LOS ANGELES CA 900742478 SOUTH OF GRANT LINE RD. (530)682-7172 (831)768-4002 BRIDGE REPLACEMENT. CONSTRUCT

State of California Department of Transportation Page 32 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 03 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 03-SAC-99-7.1/9.4 IN AND NEAR ELK GROVE FROM 0.3 MILE GRANITE CONSTRUCTION COMPANY MASOUD SAED $65,894,133 06/24/20 56% 03-0F2864 $48,249,044 06/30/20 SOUTH OF DILLARD RD OC TO 0.6 MILE PO BOX 50085 2777 DEL MONTE ST 73% ACNH-P099-(663)N $4,832,249 05/04/22 SOUTH OF GRANT LINE RD. WEST SACRAMENTO, CA --() WATSONVILLE, CA 95076 REMOVE AND REPLACE COSUMNES RIVER 95691 (831)724-1011 (916)375-8366

03-SAC-99-7.1/9.4 IN AND NEAR ELK GROVE, FROM 0.3 MILE GRANITE CONSTRUCTION COMPANY JEFFREY HAMM $48,067,013 01/21/21 22% 03-0F2804 $21,908,384 01/21/21 SOUTH OF DILLARD ROAD OVERCROSSING TO P O BOX 50085 2777 DEL MONTE ST 45% NHS- -( ) $1,922,471 02/10/23 0.6 MILE SOUTH OF GRANT LINE ROAD SACRAMENTO, CA 95691 --() WATSONVILLE, CA 95077-5085 (REPLACE COSUMNES RI (916)508-3716 (831)724-1011 BRIDGE REPLACEMENT HA21

03-SAC-99-11.8/21.6 IN SAC COUNTY ON SR 99 NEAR GALT FROM MERCER-FRASER COMPANY HANI EISAA $35,621,350 08/20/19 70% 03-0H4804 $29,470,916 10/25/19 SJ COUNTY LINE TO SIMMERHORN RD OC PO BOX 1006 3855 N FREEWAY BLVD 83% B1NH-P099-(637)E $3,643,592 09/30/21 AND FROM 0.7 MILES SOUTH OF ELK GROVE SACRAMENTO, CA 95834 --() EUREKA CA 95502-1006 BLVD OC TO MLK BLVD (916)718-8055 SUSPENDED (707)443-6371 RHMA OVERLAY

03-SAC-99-21.9/23.6 IN SACRAMENTO COUNTY, IN THE CITY OF BRIDGEWAY CIVIL CONSTRUCTORS, HOWARD GIANG $3,963,682 11/13/20 100% 03-0H3424 $3,637,471 12/17/20 SACRAMENTO ON STATE ROUTE 99 AT 21ST INC. 2777 DEL MONTE STREET 92% $143,428 08/23/21 AVE UC (BR# 24-0154) 3333 VACA VALLEY PKWY #2000 B WEST SACRAMENTO CA 95691

REPLACE BRIDGE DECK (916)372-8920 SUSPENDED VACAVILLE CA 95688 (707)455-7033

03-SAC-160-20.9/45 IN SACRAMENTO COUNTY AT NORTH MYERS & SONS CONSTRUCTION, LLCMOHSSEN GHASSEMI $28,785,711 10/10/19 55% 03-3F0904 $26,864,329 10/25/19 SACRAMENTO UNDERCROSSING 24-0111L AND 4600 NORTHGATE BLVD, SUITE 10 2777 DEL MONTE STREET 93% B1NH-000C-(494)E $979,097 01/18/22 SACRAMENTO RIVER BRIDGE 24-0053 AND WEST SACRAMENTO, CA --() SACRAMENTO CA 95834 IN SAN JOAQUIN COUNTY AT M 95691 (916)283-9950 SEISMIC RETROFIT ON 4 BRIDGES (916)952-1149 HA21

03-SIE-49-9.2/24.7 IN SIERRA COUNTY ON ROUTE 49 AT GORDON N. BALL, INC. CHRIS FALLBECK $6,652,734 05/29/20 91% 03-4H1004 $5,393,896 06/18/20 VARIOUS LOCATIONS. 333 CAMILLE AVENUE; 138 NEW MOHAWK RD 81% ACST-31S7-(004)E $575,309 08/11/21 REPAIR WASHOUT BY INSTALLATION OF SUITE B --() ALAMO CA 94507 NEVADA CITY, CA 95959 (925)838-5675 (530)682-7746

State of California Department of Transportation Page 33 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 03 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 03-SUT-20-/0 IN YUBA AND SUTTER COUNTIES, IN YUBA CALIFORNIA ENGINEERING MANOHARAN SELVENDRAN $18,286,595 02/11/21 20% 03-3F5604 $4,290,731 03/09/21 CITY AND MARYSVILLE, AT THE FEATHER CONTRACTORS, INC. 379 COLUSA AVENUE 23% ACNH-P020-(194) $914,010 06/17/22 RIVER BRIDGE AND OVERHEAD. 20 HAPPY VALLEY ROAD; YUBA CITY CA 95991 --() SCOUR MITIGATION AND RETROFIT (530)218-3679 PLEASANTON CA 94566 HA21 (925)461-1500

03-SUT-99-39.2/41.4 IN SUTTER COUNTY, IN AND NEAR LIVE DESILVA GATES CONSTRUCTION LP DWAYNE GRANDY $33,510,779 05/15/20 52% 03-3F99U4 $21,874,272 06/09/20 OAK, FROM SOUTH OF COLEMAN AVENUE TO 11555 DUBLIN BLVD.; 2707 NOTRE DAME BLVD 65% ACNH-P099-(649)E $1,837,825 11/30/21 NEVADA STREET (NORTH INTERSECTION). CHICO, CA 95928 --() DUBLIN CA 94568 REHABILITATE PAVEMENT, IMPROVE (530)713-7814 (925)829-9220

03-SUT-99-313.0/31.3 IN SUTTER COUNTY ON ROUTE 99, AT THE NORDIC INDUSTRIES, INC. MANOHARAN, SELVENDRAN $735,000 03/27/20 24% 03-1J2104 $550,116 07/02/20 QUEENPUMP PLANT, PM 31.30, 1437 FURNEAUX ROAD 379 COLUSA AVE. 75% $0 09/08/21 APPROXIMATELY LOCATEAT THE SOUTHEAST YUBA CITY, CA 95991 OLIVEHURST, CA 95961 CORNER OF THE INTERSECTIODIR' (530)218-3679

REMOVE & REPLACE EXISTING PUMPS 20.20 201130 03-VAR-12-/.4 IN SACRAMENTO COUNTY, NEAR RIO VISTA, GOLDEN STATE BRIDGE, INC. HAMM, JEFF $24,235,000 08/13/18 73% 03-4H6904 $8,987,057 08/30/18 SACRAMENTO RIVER (RIO VISTA) BRIDGE; 3701 MALLARD DRIVE 2777 DEL MONTE STREET 37% $339,884 06/15/22 BR. NO. 23-0024 DIR'S EMERGENCY F.A. WEST SACRAMENTO, CA BENICIA, CA 94510 REPAIR DAMAGED BRIDGE 95691 (925)372-8000 (916)508-3719 20.20 201130 03-VAR-70-14.0/14.7 STATE ROUTE 70 AND 99 IN YUBA AND GEORGE REED INC. MYERS &SONS WARD, DONALD $25,725,000 06/08/20 100% 03-1J1904 $16,576,179 06/23/20 SUTTER COUNTY AT VARIOUS LOCATIONS CONSTRUCTION LP JV 2520 WARREN DRIVE, 64% $0 07/15/21 DIR'S EMERGENCY L.B. P.O. BOX 4760 SUITE A 07/26/21 CAMPFIRE DEBRIS REMOVAL PAVEMENT ROCKLIN, CA 95677 OVER RUN MODESTO, CA 95352 DAMAGE RE (916)801-3478 20.20 201131 03-VAR-149-/5.3 IN BUTTE, YUBA AND SUTTER COUNTIES ON A. TEICHERT & SON, INC. DBA GRANDY, DWAYNE $2,485,000 06/14/19 100% 03-0J3504 $1,828,973 07/24/19 ROUTES 65, 70, 99, 149 AND 191 AT TEICHERT CONSTRUCTION 2707 NOTRE DAME 74% $0 03/29/21 VARIOUS LOCATIONS. DIR'S EMERGENCY 400 SUNRISE AVE STE 300 BLVD.,

L.B. CHICO, CA 95928 ROSEVILLE CA 95661 CAMP FIRE MISSION TASKS (530)713-7814 20.20 201130 State of California Department of Transportation Page 34 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 03 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 03-VAR-999-/0 IN SACRAMENTO COUNTY AT FOUR BRIDGES GOLDEN STATE BRIDGE, INC. OLGUIN, JORGE $19,985,000 03/01/19 100% 03-4H9504 $9,041,024 05/03/19 (BR# 24-51/52/53/121). DIR'S 3701 MALLARD DRIVE 2777 DEL MONTE STREET 45% $282,029 11/23/21 EMERGENCY L.B. WEST SACRAMENTO, CA BENICIA, CA 94510 REPAIR AND MODERNIZE 95691 OVER RUN

ELECTROMECHANICAL BR. (916)952-1149 20.80 315000 03-VAR--/0 IN NEVADA, PLACER, SACRAMENTO, AND PTM GENERAL ENGINEERING PEDRO DIAZ $2,390,039 05/01/20 25% 03-2H57U4 $1,123,857 06/18/20 YOLO COUNTIES ON ROUTES 5, 51, 65, SERVICES, INC. 3855 NORTH FREEWAY 47% $0 08/12/21 80, 99 AND 113. 5942 ACORN STREET; BLVD, SU120

REPAIR DAMAGED INDUCTIVE LOOPS AND SACRAMENTO, CA95860 RIVERSIDE CA 92504 (530)682-5440 (951)710-1000

03-VAR--/0 IN PLACER AND NEVADA COUNTY ON ROUTE RV CONCRETE $1,947,000 05/20/21 0% 03-2G1204 $0 06/15/21 80 AT VARIOUS LOCATIONS_____ 605 E. COMMERCIAL ST.; 0% $0 NEV 80 RAMPS-HM ANAHEIM CA 92801

(714)855-4201

03-VAR--/0 IN NEVADA AND PLACER COUNTIES ON MYERS & SONS CONSTRUCTION, LLC $2,213,999 05/26/21 0% 03-1G7604 $0 06/22/21 ROUTES 20 AND 80 AT VARIOUS 4600 NORTHGATE BLVD, SUITE 10 0% $0 LOCATIONS. SACRAMENTO CA 95834 HM3 PRESERVATION WORK (DECK (916)283-9950

03-VAR--/0 VARIOUS LOCATIONS IN DISTRICT 3. TENNYSON ELECTRIC, INC. CHANDER, RAKESH $8,258,930 05/07/20 54% 03-0H4204 $5,320,937 07/02/20 REPAIR EXISTING CONTINUOUS COUNT 7275 NATIONAL DR SUITE A-2; 3855 NORTH FREEWAY 64% $315,514 03/14/22 BLVD LIVERMORE CA 94550 SACRAMENTO, CA 95834 (925)606-1038 (916)263-4916

03-VAR--/0 IN SACRAMENTO AND PLACER COUNTIES ON ST. FRANCIS ELECTRIC, LLC HANI EISSA $10,557,929 05/01/20 56% 03-0H5404 $9,677,172 06/09/20 ROUTE 80 FROM 0.3 MILE EAST OF BRYTE 975 CARDEN ST.; 3855 NORTH FREEWAY 91% ACIM- 080-(249)E $169,710 11/12/21 BEND BRIDGE TO 0.4 MILE EAST OF BLVD --() SAN LEANDRO CA 94577 RIVERSIDE INTERCHANGE SACRMENTO, CA 95834 (510)639-0639 INSTALL FIBER OPTIC CABLE (916)416-7513

State of California Department of Transportation Page 35 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 03 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 03-VAR--/0 VARIOUS LOCATIONS IN DISTRICT 3 ALFARO COMMUNICATIONS RAKESH CHANDER $1,572,430 04/15/20 4% 03-0H4004 $71,708 05/08/20 UPGRADING EMS SIGNS TO LED. CONSTRUCTION,INC 3855 NORTH FREEWAY 5% $71,708 10/13/21 15614 S. ATLANTIC AVENUE; BLVD SUT120

SACRAMENOT, CA 95834 COMPTON CA 90221 (916)263-4919 (310)669-8949

03-VAR--/0 IN BUTTE, COLUSA, GLENN, SUTTER AND TRUESDELL CORPORATION OF MANOHARAN SELVENDRAN $1,389,391 12/16/20 90% 03-1G5104 $1,248,313 01/12/21 YOLO COUNTIES AT 14 LOCATIONS CALIFORNIA, INC. 379 COLUSA AVENUE 89% $26,554 07/21/21 THE PROJECT PROPOSES TO REMOVE 1310 W. 23RD STREET; YUBA CITY CA 95991

(530)218-3679 TEMPE AZ 85282 (602)437-1711

03-YOL-16-15.4/19.8 IN YOLO COUNTY NEAR QUINDA AT VARIOUS ROLL'N ROCK CONSTRUCTION INC $345,005 05/10/21 0% 03-1G9904 $0 06/10/21 LOCATIONS FROM 0.3 MILE EAST OF 5527 TRUCK VILLAGE DR.; 0% $0 COUNTY ROAD 68 TO 3.0 MILE EAST OF MOUNT SHASTA CA 96067 CACHE CREEK CASINO. (530)925-1408 CULVERT REHAB

03-YOL-16-27.5/28.3 IN ESPARTO, FROM ORLEANS STREET TO FBD VANGUARD CONSTRUCTION, HOWARD GIANG $2,764,425 02/16/21 0% 03-4F1714 $0 03/09/21 COUNTY ROAD 21A. INC. 2777 DEL MONTE STREET 0% HSNH-P016-(042)E $0 09/03/21 IMPROVE PEDESTRIAN SAFETY BY 550 GREENVILLE ROAD; WEST SACRAMENTO, CA --() 95691 LIVERMORE CA 94550 (916)825-7987 (925)245-1300

03-YOL-80-11.1/11.7 IN YOLO AND SACRAMENTO COUNTIES IN AMERICAN CIVIL CONSTRUCTORS EPHREM TEWELDERBERHAN $17,827,880 08/21/20 54% 03-0F2504 $9,342,634 09/11/20 AND NEAR WEST SACRAMENTO AND WEST COAST LLC 2777 DEL MONTE ST 52% ACIM-080 -(250)E $1,638,253 12/30/21 SACRAMENTO FROM 0.1 MILE WEST OF REED 2990 BAY VISTA COURT, SUITE D WEST SACRAMENTO, CA --() AVENUE OVERCROSSING TO 0.1 95691 BENICIA CA 94510 REHABILITATE BRIDGE (530)218-4812 HA21 (707)746-8028

03-YOL-80-/0 IN YOLO COUNTY AT VARIOUS LOCATIONS. APEX FENCE CO., INC DUNG, SY $1,883,511 01/26/21 98% 03-1H8704 $946,571 02/11/21 REPLACE GUARDRAIL AND PLACE 19896 ALEXANDER AVE; 2777 DEL MONTE STREET 50% SNHG-P113-(037)E $437,981 07/21/21 WEST SACRAMENTO, CA --() ANDERSON CA 96007 95691 SUSPENDED (530)365-3316 (530)155-7296

State of California Department of Transportation Page 36 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 03 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 03-YOL-113-6.8/11.1 IN YOLO COUNTY ON ROUTE 113 IN FBD VANGUARD CONSTRUCTION, $1,834,928 05/05/21 0% 03-2G1704 $0 06/02/21 WOODLAND FROM MULLEN OH FROM ON/OFF INC. 0% $0 RAMP FROM SB ROUTE 5. 550 GREENVILLE ROAD;

SLAB REPLACEMENT LIVERMORE CA 94550 (925)245-1300

03-YOL-128-/9.8 IN YOLO COUNTY IN AND NEAR WINTERS LAMON CONSTRUCTION $2,640,371 05/11/21 0% 03-2G2004 $0 06/18/21 FROM PUTAH CREEK BRIDGE TO ROUTE 871 VON GELDERN WAY; 0% $0 128/505 SEPARATION (#22-0110). YUBA CITY CA 95991 DIGOUTS, GRIND 0.20', PLACE 0.20' (530)845-2282

03-YUB-20-1.6/3.4 IN YUBA COUNTY IN AND NEAR MARYSVILLE KNIFE RIVER CONSTRUCTION GRIFFITH, GARRETT $1,738,233 05/22/18 98% 03-1G0104 $1,529,739 06/19/18 FROM BUCHANAN STREET TO 0.1 MILE EAST 1764 SKYWAY 379 COLUSA AVENUE 91% ACNH-P020-(183)E $0 03/01/21 OF LEVEE ROAD. YUBA CITY, CA 95991 --() CHICO CA 95928 RHMA OVERLAY,DIKE,PCC ISLAND (530)682-3842 (530)891-6555

03-YUB-20-13.3/18.2 IN YUBA COUNTY FROM MARYSVILLE ROAD A. TEICHERT & SON INC. DBA GARRETT GRIFFITH $37,395,119 01/02/20 57% 03-0A5704 $29,110,781 01/22/20 TO THE YUBA RIVER BRIDGE TEICHERT CONSTRUCTION 379 COLUSA AVE 75% ACNH-P020-(191)E $1,518,727 02/01/22 ROADWAY REHABILITATION AND SHOULDER 400 SUNRISE AVE. SUITE 300; YUBA CITY, CA 95991 --() (530)682-3842 ROSEVILLE CA 95661 (916)757-6400

03-YUB-20-18.1/M20.1 IN YUBA COUNTY NEAR SMARTSVILLE FROM FLATIRON WEST INC. AARON CHAMBERLIN $34,130,437 10/31/19 77% 03-3F5104 $32,907,519 11/19/19 THE YUBA RIVER BRIDGE TO 0.3 MILE 2100 GOODYEAR RD; 1930 FEATHER RIVER 93% HSNH-P020-(189)E $511,816 11/15/21 EAST OF SMARTVILLE ROAD BOULEVARD --() BENICIA CA 94510 REALIGNMENT AND WIDENING OROVILLE CA 95965 SUSPENDED (707)742-6000 (916)996-0601 HB1

03-YUB-65-80.0/8 IN YUBA COUNTY ON ROUTE 65, AT THE NORDIC INDUSTRIES, INC. MANOHARAN, SELVENDRAN $1,985,000 10/29/19 29% 03-1J0704 $1,004,449 02/21/20 MCGOWANPUMP PLANT, PM R8.01. 1437 FURNEAUX ROAD 379 COLUSA AVE. 51% $0 09/02/21 APPROXIMATELY 1.14 MILES SOUTH OF THE YUBA CITY, CA 95991 OLIVEHURST, CA 95961 RTE 65/70 SEP (16-42). DIR'S (530)218-3679

MCGOWAN PUMP PLANT 20.20 201130 State of California Department of Transportation Page 37 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 03 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 03-YUB-70-15.5/16.5 IN YUBA COUNTY NEAR MARYSVILLE FROM M.C.M. CONSTRUCTION, INC. SELVENDRAN MANOHARAN $42,627,481 07/31/19 85% 03-1E0604 $40,721,309 08/23/19 0.1 MILE NORTH OF BINNEY JUNCTION 6413 32ND STREET; 1930 FEATHER RIVER 93% B1NH-P070-(137)E $1,276,144 11/01/21 UNDERPASS TO 0.3 MILE NORTH OF BLVD. --() NORTH HIGHLANDS CA 95660 LAURELLEN ROAD OROVILLE, CA 95928 (916)334-1221 REPLACE SIMMERLY SLOUGH BRIDGE # (916)996-0601 HA21

Totals: Authorized Final Amt: $1,472,845,841 Completed to Date: $850,377,585 Work This Month: $62,818,419 State of California Department of Transportation Page 38 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 04 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 04-ALA-13-5.2/5.5 AT VARIOUS LOCATIONS FBD VANGUARD CONSTRUCTION, MUKHERJEE, RABINDRA $5,334,939 12/11/19 100% 04-1J9904 $5,198,118 01/02/20 INSTALL FREEWAY SAFETY LIGHTING INC. 2525 STANWELL DRIVE 100% ACHS-NH00-(C50)7 $0 06/28/21 550 GREENVILLE ROAD; SUITE #100 --() 07/09/21 CONCORD, CA 94520 COMPLETED LIVERMORE CA 94550 (925)906-8015 HB1 (925)245-1300

04-ALA-13-10.9/12 IN ALAMEDA COUNTY, IN BERKELEY AT CALIFORNIA HIGHWAY RUZIC, JOHN $782,000 10/28/20 100% 04-2G4604 $755,055 11/17/20 VARIOUS LOCATIONS FROM PINE AVENUE TO CONSTRUCTION GROUP, INC. 3401 REGATTA BLVD 92% ACNH-P013-(037)E $0 06/17/21 STREET 1647 WILLOW PASS RD #150; RICHMOND, CA 94804 --() UPGRADE CURB RAMPS TO CURRENT (510)812-6336 CONCORD CA 94520 (925)766-7014

04-ALA-13-12.1/13.4 IN BERKELEY FROM SHATTUCK AVE. TO 7TH RAY'S ELECTRIC RUZIC, JOHN $1,698,709 08/28/19 100% 04-2G4824 $1,602,598 09/17/19 ST. UPGRADE CURB RAMPS AND SIDEWALKS. 411 PENDLETON WAY SUITE B 3401 REGATTA BLVD 100% ACNH-P013-(036)E $0 06/01/21 UPGRADE CURB RAMPS AND SIDEWALKS. RICHMOND, CA 94804 --() OAKLAND CA 94621 07/09/21 (510)812-6336 COMPLETED (510)577-7700

04-ALA-13-/0 IN ALAMEDA COUNTY ON ROUTES 13, 24, ST. FRANCIS ELECTRIC, LLC ZHANG, RUI $1,294,000 04/13/21 0% 04-3K3104 $0 05/17/21 580, AND 880 AT VARIOUS LOCATIONS. 975 CARDEN STREET; 25100 SANTA CLARA 0% B1NH-X001-(645)E $0 11/18/21 REPAIR AND REPLACE EXISTING STREET --() SAN LEANDRO CA 94577 HAYWARD,C A 94544 (510)639-0639 (510)867-6031

04-ALA-13-/0 IN ALAMEDA COUNTY AT VARIOUS STURGEON ELECTRIC CALIFORNIA, RUZIC, JOHN $1,769,950 10/28/19 91% 04-3J1104 $1,575,682 11/22/19 LOCATIONS LLC. 3401 REGATTA BLVD. 89% HSNH-X001-(663) $0 04/06/21 INSTALL ACCESSIBLE PEDESTRIAN 13501 BENSON AVE; RICHMOND, CA 94804 --() (510)812-6336 CHINO CA 91710 (909)591-0000

04-ALA-24-5.9/6.2 IN ALAMEDA AND CONTRA COSTA COUNTIES, BENTANCOURT BROS. RIHANI, RAIF $12,370,400 02/14/20 100% 04-0AC904 $6,010,020 02/14/20 IN OAKLAND AND ORINDA, AT THE CONSTRUCTION, INC. 5675 B GIBRALTAR 49% $0 07/30/21 CALDECOTT TUNNELS DIR'S ORDER 8015 WEST 11TH STREET DRIVE

EMERGENCY F.A. PLEASANTON, CA 94588 OVER RUN TRACY, CA 95304 INSTALL MD VOLTAGE ELECT GENERATOR (510)715-7421 20.20.201 (209)832-7631 SYSTEMS 130 State of California Department of Transportation Page 39 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 04 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 04-ALA-24-59.0/6.2 NEAR OAKLAND AT THE CALDECOTT TUNNEL MONTEREY MECHANICAL CO RIHANI, RAIF $17,485,000 09/13/18 100% 04-1Q8404 $8,517,941 09/13/18 RPR FIRE PROTECT, VENT, ELECT SYST & 8275 SAN LEANDRO ST. 5675-B GIBRALTER 49% $0 11/10/21 SCADA DRIVE OAKLAND, CA 94621 PLEASANTON, CA 94588 OVER RUN (510)632-3173 (510)715-7421 20.20.201 130 04-ALA-80-1.9/4 IN ALAMEDA COUNTY AT VARIOUS PACIFIC INFRASTRUCTURE TRINH, JASON $2,305,610 12/30/20 54% 04-2J8304 $812,923 02/02/21 LOCATIONS CONSTRUCTION LLC 3401 REGATTA BLVD 35% $0 09/16/21 INSTALL TRANSPORTATION MANAGEMENT 871 COTTING COURT STE A; RICHMOND, CA 94804

(510)774-6007 VACAVILLE CA 95688 (707)449-3604

04-ALA-80-4.5/7.6 IN BERKELEY AND ALBANY, FROM ROUTE FBD VANGUARD CONSTRUCTION, CARROLL, GREGORY $10,281,867 11/16/20 63% 04-3J7004 $6,285,570 12/02/20 13/80 SEPARATION (NORTH) TO 0.4 MILE INC. 3401 REGATTA BLVD. 60% SIMG-0801-(118)E $876,643 11/03/21 EAST OF EL CERRITO SEPARATION AND 550 GREENVILLE ROAD; RICHMOND,C A 94804 --() OVERHEAD (510)867-4480 LIVERMORE CA 94550 INSTALL MEDIAN SAFETY LIGHTING AND (925)245-1300

04-ALA-80-5.7/5.8 IN THE CITY OF BERKELEY AT QA CONSTRUCTORS TRAN, TRANG $2,709,000 05/19/21 0% 04-1W9904 $0 06/10/21 UNIVERSITY AVE INSTALL FENCING, 850 S VAN NESS AVE. STE 35 3401 REGATTA AVE. 0% $0 03/01/22 REMOVE HAZ WASTE, TREE PROTECTION RICHMOND, CA 94804 SAN FRANCISCO, CA 94110 DIR'S ORDER EMERGENCY F.A. (510)714-7041 (408)210-5508 INSTALL FENCING,REMOVE HAZ 20.20.201 WASTE,TREE PROT 130 04-ALA-80-6.4/6.6 IN ALAMEDA COUNTY IN AND NEAR GOLDEN STATE BRIDGE, INC. TRINH, JASON $21,046,290 05/03/21 3% 04-0A7714 $379,616 05/13/21 BERKELEY FROM 0.6 MILE NORTH OF 3701 MALLARD DRIVE; 3401 REGATTA BLVD. 2% ACIM-080 -(119)E $376,616 01/12/23 UNIVERSITY AVENUE OVERCROSSING TO 0.1 RICHMOND, CA 94804 --() BENICIA CA 94510 MILE SOUTH OF GILMAN STREET U (510)774-6007 (925)372-8000 CONSTRUCT THE GILMAN

04-ALA-84-13.0/13.6 ALAMEDA CREEK BRIDGE REPLACEMENT VIKING CONSTRUCTION COMPANY TUN, YANNAING $17,628,456 11/17/20 15% 04-160304 $3,536,651 12/15/20 PROJECT 11315 SUNRISE GOLD CIR, STE A 5675 B GIBRALTAR 20% ACNH-P084-(054)E $1,170,455 08/25/23 REPLACE BRIDGE DRIVE --() RANCHO CORDOVA CA 95742 PLEASANTON, CA 94588 (916)852-5530 (510)867-6181 HA21 State of California Department of Transportation Page 40 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 04 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 04-ALA-84-13.6/18 IN FREMONT, FROM ROUTE 238 (MISSION BAY CITIES PAVING & GRADING, SINGH DAVINDER $15,992,351 02/22/21 8% 04-2A3324 $4,037,152 03/11/21 BOULEVARD) TO ROUTE 680. INC. 5675 B GIBRALTAR 25% HSNH-P084-(055)E $1,870,091 12/12/22 WIDEN SHOULDERS, INSTALL TRAFFIC 1450 CIVIC CT,BUILDING B #400 DRIVE --() PLEASANTON, CA 94588 CONCORD, CA 94524-6227 (510)385-7169 (925)227-6296

04-ALA-84-17.9/22.9 IN AND NEAR SUNOL, PLEASANTON AND BAY CITIES PAVING & GRADING, NGO, HUNG $134,062,176 02/22/21 3% 04-297634 $1,691,162 03/11/21 LIVERMORE ON RTE 680 FROM 1.2 MI INC. 5675 B GIBRALTAR 1% $0 04/02/24 SOUTH TO 1.8 MI NORTH OF RTE 84 AND 1450 CIVIC CT;BUILDING B #400 DRIVE

ON RTE 84 FROM 0.1 MI EAST PLEASANTON, CA 94588 CONCORD, CA 94524-6227 WIDENING ROUTE 84 TO EXPRESSWAY AND (510)224-6790 (925)227-6296

04-ALA-84-21.9/21.9 IN ALAMEDA COUNTY, NEAR LIVERMORE, AT REDGWICK CONSTRUCTION CO. PANDHER, PARAMJIT $16,650,000 07/16/19 94% 04-4Q2604 $5,047,625 08/14/19 1.1 MILE WEST OF RUBY HILLS DRIVE 21 HEGENBERGER CT. 5675-B GIBRALTAR DR, 30% $0 10/29/21 RECONSTRUCT SLOPE WITH RSP PLEASANTON, CA 94588 OAKLAND CA 94621 (510)867-6694 (510)792-1727 20.20.201 130 04-ALA-260-1.1/1.9 IN ALAMEDA COUNTY, IN OAKLAND AND MONTEREY MECHANICAL CO PATEL, ASUTA $4,242,000 02/24/20 63% 04-0W0204 $2,620,125 02/24/20 ALAMEDA, AT THE POSEY-WEBSTER TUBES 8275 SAN LEANDRO STREET 5675-B GIBRALTAR 62% $0 12/31/21 DIR'S ORDER EMERGENCY F.A. DRIVE OAKLAND, CA 94621 RENT & PLACE TEMPORARY BACKUP PLEASANTON, CA 94588 (510)812-4031 GENERATORS (510)385-8168 20.20.201 130 04-ALA-260-1.1/1.9 IN OAK AND ALA AT POSEY WEBSTER TUBES MONTEREY MECHANICAL CO PATEL, ASUTA $21,830,000 03/04/19 100% 04-3K2004 $19,507,545 03/04/19 RPR FIRE PROTECTION,VENT, ELECT 8275 SAN LEANDRO ST 5675-B GIBRALTAR 89% $0 12/31/21 SYSTEM DRIVE OAKLAND, CA 94621 PLEASANTON, CA 94588 OVER RUN (510)812-4031 (510)385-8168 20.801350 000 04-ALA-580-8.0/8 NEAR LIVERMORE, NEAR GREENVILLE ROAD TRUESDELL CORPORATION OF DIKE, EDDIE $602,048 11/13/20 100% 04-0J5204 $594,394 12/09/20 AT GREENVILLE OVERHEAD BRIDGE NO. 33- CALIFORNIA, INC. 5675 B GIBRALTAR 100% $0 05/28/21 0121R. 1310 W. 23RD STREET; DRIVE 07/21/21 REHABILITATE WESTBOUND STRUCTURE. PLEASANTON, CA 94588 TEMPE AZ 85282 (925)250-5611 (602)437-1711 State of California Department of Transportation Page 41 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 04 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 04-ALA-580-21.0/27 IN ALAMEDA COUNTY IN AND NEAR FBD VANGUARD CONSTRUCTION, PANDHER, PARAMJIT $917,220 04/23/21 0% 04-0W3404 $0 06/17/21 PLEASANTON 0.2 MILE WEST OF ROUTE INC. 5675-B GIBRALTAR 0% $0 11/02/21 680/580 SEPARATION TO EAST CASTRO 550 GREENVILLE ROAD; DRIVE

VALLEY BOULEVARD UNDERCROSSING PLEASANTON, CA 94588 LIVERMORE CA 94550 PCC SLABS REPLACEMENT. (510)867-6694 (925)245-1300

04-ALA-580-30.8/46.5 IN ALAMEDA COUNTY AT VARIOUS TENNYSON ELECTRIC, INC. ZHANG, RUI $6,078,858 03/26/21 0% 04-3J0504 $0 04/16/21 LOCATIONS FROM 0.2 MILE EAST OF 7275 NATIONAL DRIVE; 25100 SANTA CLARA 0% ACIM-5801-(981)E $0 01/03/22 ADELINE STREET UNDERCROSSING IN STREET --() LIVERMORE CA 94550 OAKLAND TO 0.3 MILE WEST OF ROUTE HAYWARD, CA 94544 (925)606-1038 INSTALL AND UPGRADE TRANSPORTATION (510)867-6031

04-ALA-580-30.8/41.5 IN SAN LEANDRO AND OAKLAND, FROM DESILVA GATES CONSTRUCTION RAIF, RIHANI $35,839,299 01/07/19 95% 04-270104 $34,598,565 01/30/19 ROUTES 580/238 SEPARATION TO 11555 DUBLIN BLVD. 5675 B. GIBRALTAR 98% B1IM-580 -(076)E $0 06/30/21 FRUITVALE AVENUE UNDERCROSSING DRIVE --() DUBLIN CA 94568 06/30/21 REHABILITATE PAVEMENT. PLEASANTON, CA 94588 COMPLETED (925)829-9220 (510)715-7421 HA22

04-ALA-580-44.4/44.4 IN ALAMEDA COUNTY, AT BRIDGE #33- REDWOOD ENGINEERING RUZIC, JOHN $791,538 02/08/21 100% 04-1W5404 $422,717 03/17/21 02895 INSTALL WROUGHT IRON FENCING CONSTRUCTION 401 REGATTA BLVD. 53% $0 09/17/21 AND ACCESS GATES DIR'S ORDER 416 D STREET RICHMOND, CA 94804

EMERGENCY F.A. (510)812-6336 REDWOOD CITY, CA 94063 INSTALL WROUGHT IRON FENCING & 20.20.201 (925)819-2960 ACCESS GATE 130 04-ALA-580-47.4/48 BUCHANAN STREET TO CONTRA COSTA BAY CITIES PAVING & GRADING, $1,145,149 06/08/21 0% 04-3Q3904 $0 06/22/21 COUNTY LINE INC. 0% $0 MILL AND REPLACE WITH RHMA 1450 CIVIC CT;

CONCORD CA 94520 (925)687-6666

04-ALA-680-2.2/6.6 IN ALAMEDA COUNTY IN FREMONT FROM 0.2 BORTOLUSSI & WATKIN, INC BALINGIT, JOSE $1,303,320 12/07/17 0% 04-2537H4 $1,148,991 12/26/17 MILE SOUTH OF MISSION BLVD/ ROUTE 77 LARKSPUR STREET 3401 REGATTA BLVD. 0% $2,501 01/04/22 262 SEPARATION TO 0.3 MILE NORTH OF RICHMOND, CA 94804 SAN RAFAEL CA 94901 MISSION BLVD/ROUTE 23 (510)867-4515 PLANT EST (415)453-4675 REPLACEMENT HIGHWAY PLANTING SATIS

State of California Department of Transportation Page 42 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 04 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 04-ALA-680-2.4/12.4 IN ALAMEDA COUNTY., ALA-680 FROM SR- BAY CITIES PAVING & GRADING, TUN, YANNAING $115,302,556 11/16/17 97% 04-4G0564 $112,690,941 01/04/18 262 (MISSION BOULEVARD) IN FREMONT TO INC. 5675 B GIBRALTAR 98% ACIM- 680-(079)E $53,537 09/24/21 KOOPMAN ROAD UNDERCROSSING. 1450 CIVIC CENTER BLDG B#400 DRIVE --() REHABILITATE ROADWAY AND CONSTRUCT PLEASANTON, CA 94588 CONCORD, CA 94520 (925)460-3529 (925)687-6666

04-ALA-880-11.4/12.2 IN FREMONT, FROM 0.4 MILE SOUTH TO O.C. JONES & SONS, INC. PHOEN, LINDA $7,585,079 01/04/21 32% 04-0J5304 $2,533,718 01/26/21 0.4 MILE NORTH OF PATTERSON SLOUGH 1520 FOURTH STREET; 25100 SANTA CLARA 34% ACIM-8801-(910)E $822,446 02/02/22 BRIDGE NO. 33-0250 (PM 11.8). STREET --() BERKELEY CA 94710 BRIDGE REHABILITATION. HAYWARD, CA 94587 (510)909-9601 (408)595-4007

04-ALA-880-20.9/20.9 IN ALAMEDA COUNTY IN SAN LEANDRO AT A. TEICHERT AND SON, INC. DBA NGUYEN, VERNON $2,895,449 12/29/20 50% 04-4J7304 $962,448 01/21/21 WASHINGTON AVENUE TEICHERT CONSTRUCTION 25100 SANTA CLARA 33% HSIM-8801-(911) $40,748 11/30/21 RECONSTRUCT RAMPS. 400 SUNRISE BLVD.; STREET --() HAYWARD, CA 94542 ROSEVILLE CA 95661 (510)867-6119 (916)757-6400

04-ALA-880-34.1/34.6 HOMELESS FENCING IN OAKLAND, ON MARINSHIP DEVELOPMENT SAEED SAFI $2,375,184 05/05/21 0% 04-2W3404 $0 06/17/21 WOOD STREET DIR'S ORDER EMERGENCY INTERESTLLC 25100 SANTA CLARA 0% $0 07/30/21 F.A. 1485 BAYSHORE BLVD SUITE 200 STREET,

HOMELESS FENCING HAYWARD, CA 94544 SAN FRANCISCO CA 94124 (510)714-7039 20.20.201 (415)852-1752 130 04-CC-4-16.7/16.7 IN CONTRA COSTA COUNTY AT VARIOUS MYERS & SONS CONSTRUCTION, LLCRANDHAWA, PERVEZ $1,499,123 03/30/21 31% 04-2Q0204 $194,684 04/15/21 LOCATIONS 4600 NORTHGATE BLVD, SUITE 10 2525 STANWELL DRIVE 13% $155,264 10/27/21 TREAT BRIDGE DECK WITH METHCRYLATE, SUITE #100 SACRAMENTO CA 95834 CONCORD, CA 94520 (916)227-6299 (510)867-6021

04-CC-4-23.6/25.2 IN CONTRA COSTA CO IN PITTSBURG AND EMPIRE LANDSCAPING INC BARTEL, DAVID $1,096,944 10/27/17 0% 04-2J0304 $920,666 11/30/17 ANTIOCH FROM 0.3 MILE WEST OF PO BOX 35 3401 REGATTA BLVD. 0% $3,240 08/06/21 LOVERIDGE RD OC TO 0.2 MILE EAST OF RICHMOND, CA 94804 DAVIS, CA 95617 CENTURY BLVD UC (510)385-6755 PLANT EST (530)400-3943 REPLACEMENT PLANTING & IRRIGATATION SATIS HB4C State of California Department of Transportation Page 43 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 04 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 04-CC-4-23.8/23.8 IN CITY OF PITTSBURG, EB HWY 4, AT BAY CITIES PAVING & GRADING, MUKHERJEE, RABINDRA $885,000 06/15/21 0% 04-2W6704 $0 07/16/21 OUTSIDE SHOULDER DIR'S ORDER INC 2525 STANWELL, SUITE 0% $0 10/08/21 EMERGENCY F.A. 1450 CIVIC CT, BLDG B STE 400 100,

REPLACE FIRE-DAMAGED CULVERTS CONCORD, CA 94520 CONCORD, CA 94520 (510)774-4383 20.20.201 (925)687-6666 130 04-CC-4-25.8/28.3 IN CONTRA COSTA CO IN PITTSBURG AND JJ NGUYEN, INC. BARTEL, DAVID $2,574,086 05/21/18 0% 04-2J0414 $2,222,245 06/28/18 ANTIOCH FROM 0.2 MILE WEST OF 3172 SALEM DR 3401 REGATTA BLVD. 0% $6,156 09/30/22 SOMERSVILLE ROAD UC TO 0.1 MILE EAST RICHMOND, CA 94804 SAN JOSE CA 95127 OF CAVALLO ROAD UC (510)385-6755 PLANT EST (408)259-7982 REPLACEMENT HIGHWAY PLANTING SATIS

04-CC-4-28.7/31 IN CONTRA COSTA COUNTY IN ANTIOCH JJ NGUYEN, INC. BARTEL, DAVID $1,757,143 01/18/19 0% 04-2J0424 $1,502,343 02/11/19 FROM 0.2 MILE WEST OF HILLCREST AVE 3172 SALEM DR 3401 REGATTA BLVD. 0% $3,510 11/22/22 OC TO BART PED OC AND FROM 0.2 MILE RICHMOND, CA 94804 SAN JOSE CA 95127 WEST OF ROUTE 4/160 SEPA (510)385-6755 PLANT EST (408)899-6841 REPLACEMENT HIGHWAY PLANTING SATIS

04-CC-4-38.0/39.9 IN CONTRA COSTA COUNTY NEAR BYRON BAY CITIES PAVING & GRADING, RABINDRA, MUKHERJEE $1,166,921 03/18/21 100% 04-3Q9504 $1,162,904 04/01/21 FROM VASCO ROAD TO SELLERS AVE INC. 2525 STANWELL DRIVE, 93% $155,705 08/30/21 MILL AND REPLACE WITH RHMA OVERLAY 1450 CIVIC CT; STE #400

CONCORD, CA 94520 CONCORD CA 94520 (925)906-8015 (925)687-6666

04-CC-4-/0 IN CONTRA COSTA COUNTY AT VARIOUS TBC RANDHAWA, PERVEZ $865,819 12/18/20 100% 04-2Q0304 $866,419 01/19/21 LOCATIONS 5400 HANNAH RANCH RD 2525 STANWELL DRIVE 96% $750 08/30/21 REPLACE JOINT SEALS, REPAIR SUITE #100 NOVATO CA 94945 CONCORD, CA 94520 (415)456-8972 (510)867-6021

04-CC-24-6.6/7.4 FROM PLEASANT HILL ROAD ONRAMP TO BAY CITIES PAVING & GRADING, RANDHAWA, PERVEZ $829,000 01/15/21 100% 04-0W6104 $533,803 01/15/21 CENTRAL LAFAYETTE OFFRAMP GROUTING, INC. 2525 STANWELL DRIVE 64% $0 07/30/21 REPLACE FAILED CULVERTS, 1450 CIVIC CT, BLDG B STE 400 SUITE #100

GRINDING/PAVING DIR'S ORDER EMERGEN CONCORD, CA 94520 OVER RUN CONCORD, CA 94520 GROUT,REPLACE FAILED (510)867-6021 20.20.201 (925)687-6666 CULVERTS,GRIND/PAVE 130 State of California Department of Transportation Page 44 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 04 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 04-CC-24-/0 AT VARIOUS LOCATIONS THROUGHOUT BAY CITIES PAVING & GRADING, MUKHERJEE, RABINDRA $1,645,000 10/11/19 100% 04-0AC704 $1,525,934 10/11/19 ALAMEDA, CONTRA COSTA, SANTA CLARA, INC. 2525 STANWELL DRIVE 93% $0 07/30/21 AND SOLANO COUNTIES DIR'S ORDER 1450 CIVIC CT., BLDG B,STE400 SUITE #150

EMERGENCY F.A. CONCORD, CA 94520 OVER RUN CONCORD, CA 94520 INSTALL ALT PWR SOURCE,TRAFFIC (510)774-4383 20.20.201 (925)766-1918 CONTROL & 130 04-CC-160-1.1/.6 IN CONTRA COSTA COUNTY IN ANTIOCH GRANITE ROCK COMPANY MUKHERJEE, RABINDRA $337,230 05/10/21 0% 04-0W3904 $0 06/03/21 FROM 0.2 MILE SOUTH OF MAIN STREET TO 2280 BATES AVENUE, SUITE 200 2525 STANWELL DRIVE 0% $0 09/21/21 0.1 MILE NORTH OF WILBUR AVENUE SUITE #100 CONCORD, CA 94520 REPLACE RESURFACING CONCORD, CA 94520 (408)574-1400 (925)906-8015

04-CC-242-/1.6 IN CONCORD, FROM ROUTE 680 TO 0.1 FBD VANGUARD CONSTRUCTION, HATEFI, AMIR $8,890,343 12/04/20 62% 04-269804 $6,696,068 12/17/20 MILES NORTH OF CONCORD AVENUE INC. 2525 STANWELL DRIVE 73% ACNH-P242-(004)E $3,561,893 10/21/21 PAVEMENT REHABILITATION 550 GREENVILLE ROAD; SUITE #100 --() CONCORD, CA 94520 LIVERMORE CA 94550 (510)867-6034 HA22 (925)245-1300

04-CC-580-.9/1.5 IN RICHMOND, AT STEGE DRAIN RIDGE NO. GORDON N. BALL, INC. GURUNG, BARDAN $8,008,312 02/25/21 36% 04-2J7204 $2,320,034 03/11/21 28-0091. 333 CAMILLE AVENUE; 3401 REGATTA BLVD 29% ACIM-5802-(368)E $791,782 12/08/22 BRIDGE REPLACEMENT RICHMOND, CA 94804 --() ALAMO CA 94507 (510)406-5829 (925)838-5675

04-CC-580-5.8/5.8 IN CITY OF RICHMOND IN CONTRA COSTA GOLDEN STATE BRIDGE INC TRINH, JASON $15,037,724 04/01/21 10% 04-4G8914 $1,958,079 04/13/21 COUNTY ON ROUTE 580, AT SCOFIELD 901 HOWE RD 3401 REGATTA BLVD 13% $1,696,794 08/30/22 AVENUE UNDERCROSSING NO. 28... RICHMOND, CA 94804 MARTINEZ CA 94553 SEISMIC RETROFIT (510)774-6007 (925)372-8000

04-CC-580-6.1/7.7 IN CONTRA COSTA AND MARIN COUNTIES ON ALLIED PAINTING, INC. HALALI, BEHZAD $38,679,661 01/14/21 13% 04-3G4744 $4,578,893 02/09/21 ROUTE 580 AT THE RICHMOND SAN 4 LARWIN ROAD 3401 REGATTA BLVD. 12% $3,779,670 05/23/23 REMOVE TRAVELERS, PAINT STRUCTURAL RICHMOND, CA 94804-4594 CHERRY HILL, NJ 08034 (510)867-6107 (856)429-3400

State of California Department of Transportation Page 45 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 04 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 04-CC-580-6.7/7.8 ON THE RICHMOND SAN RAFAEL BRIDGE, FLATIRON WEST INC HALALI, BEHZAD $12,135,000 01/11/20 100% 04-2W1204 $196,378 03/17/21 I580 STRENGTHEN GUSSET PLATES AT 2100 GOODYEAR RD. 3401 REGATTA BLVD 2% $0 07/01/22 VARIOUS LOCATIDIR'S ORDER EMERGENCY RICHMOND, CA 94804-4594 BENICIA CA 94510 F.A. (510)867-6107 (707)742-6000 STRENGTHEN GUSSET PLATES AT VARIOUS 20.20.201 LOCATI 130 04-CC-680-20.4/24.3 IN CONTRA COSTA COUNTY AT PACHECO AND BAY CITIES PAVING & GRADING, MUKHERJEE, RABINDRA $2,397,094 04/20/21 67% 04-0W3304 $1,789,763 05/14/21 NEAR MARINEZ FROM CENTER AVENUE INC. 2525 STANWELL DRIVE 75% $635,159 08/20/21 UNDERCROSSING TO MOCOCO OVERHEAD 1450 CIVIC CT., BLDG B #400; SUITE #100

COLD PLANE AC PAVEMENT AND RHMA CONCORD, CA 94520 CONCORD CA 94520 (510)774-4383 (925)687-6666

04-CC-680-24.9/25.5 IN SACRAMENTO COUNTY NEAR ANITOCH ON PERRY ELECTRIC INCORPORATED WONG, DUDLEY $4,873,896 02/04/21 27% 04-3G3014 $1,785,390 03/09/21 ROUTE 160 FROM 0.2 MILE NORTH OF 130 MURWOOD COURT 25100 SANTA CLARA ST. 37% $511,654 02/17/22 SACRAMENTO COUNTY LINE TO 0.4 MILE HAYWARD,C A 94544 WALNUT CREEK CA 94596 NORTH OF SACRAMENTO COUNT (510)385-7628 (925)766-2778 REPLACE FOG HORNS, RADAR BEACONS HA21

04-CC-680-/7.6 IN CONTRA COSTA COUNTY, IN SAN RAMON FBD VANGUARD CONSTRUCTION, RANDHAWA, PERVEZ $771,800 06/01/21 0% 04-0W7704 $0 06/22/21 AND DANVILLE FROM ALCOSTA BOULEVARD INC. 2525 STANWELL DRIVE 0% $0 10/28/21 OVERCROSSING TO DIABLE ROAD 550 GREENVILLE ROAD SUITE #100

UNDERCROSSING CONCORD, CA 94520 LIVERMORE CA 94550 REPLACE PCC SLABS (510)867-6021 (925)245-1300

04-LAK-29-/0 COUNTIES LAK, MRN, NAP, SON, SOL ON THE PROFESSIONAL TREE CARE CO.CRAWFORD, PAUL $12,485,000 09/16/19 85% 04-0Q8504 $9,808,586 09/16/19 RTES 29, 1, 101, 131, 128, 80, 680, 2828 8TH STREET 1009 CLEGG CT., STE. 79% $0 08/31/21 780, 12 AND116 AT VARIOUS LOCATIONS G BERKELEY, CA 94710 DIR'S ORDER EMERGENCY PETALUMA, CA 94954 (510)549-3954 REMOVE DROUGHT-DAMAGED TREES (510)867-6793 20.20.201 130 04-MRN-0-/0 AT VARIOUS LOCATIONS THROUGHOUT GHILOTTI BROS., INC. DAVID, JOSE $2,385,000 10/23/19 100% 04-0AC804 $2,068,617 10/23/19 MARIN, NAPA, SAN FRANCISCO, SAN 525 JACOBY STREET 585 LINDA MAR BLVD. 87% $0 12/31/21 MATEO, AND SONOMA COUNTIES PACIFICA, CA 94044 SAN RAFAEL, CA 94901 ALT POWER SOURCE TRFFC CNTRL & (510)754-0001 (415)454-7011 DETOUR 20.20.201 130 State of California Department of Transportation Page 46 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 04 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 04-MRN-101-.2/0 IN MARIN COUNTY NEAR SAUSALITO AT 0.1 MAGGIORA & GHILOTTI, INC. RUSSELL, STEVE $765,765 03/29/21 0% 04-4J4204 $0 05/27/21 MILE SOUTH OF SAUSALITO ROAD 555 DUBOIS ST. 756 W. FRANCISCO 0% STER-27F5-(001)E $0 12/01/22 UNDERCROSSING BLVD. --() SAN RAFAEL CA 94901 INSTALL FLOOD GATES AND MODIFY BOX SAN RAFAEL, CA 94901 (415)459-8640 (510)774-6297

04-MRN-101-.4/2.2 IN AND NEAR SAUSALITO AND SAN RAFAEL, GHILOTTI BROS., INC. RUSSELL, STEVE $5,327,000 10/29/20 67% 04-1W3804 $4,741,408 10/29/20 AT VARIOUS LOCATIONS FROM 0.4 MILE 525 JACOBY STREET 756 FRANCISCO BLVD. 89% $0 09/30/21 NORH OF GOLDEN GATE BRIDGE TO LUCAS WEST SAN RAFAEL, CA 94901 VALLEY ROAD DIR'S ORD SAN RAFAEL, CA 94901 (415)454-7011 GRIND,REPLACE & APPLY HIGH FRICTION (510)774-6297 20.20.201 SURFA 130 04-MRN-101-.7/15.8 IN MARIN, SOLANO AND SONOMA COUNTIES PTM GENERAL ENGINEERING $4,097,079 05/21/21 0% 04-3K3504 $0 06/09/21 AT VARIOUS LOCATIONS SERVICES, INC. 0% B1NH-000C-(481)E $0 VEHICLE DETECTION SYSTEM 5942 ACORN STREET; --()

RIVERSIDE CA 92504 (951)710-1000

04-MRN-101-3.5/4.8 MARIN 101-3.5/4.75 REPAIR FAILED DISNEY CONSTRUCTION INC HABTESELASSIE, DAWIT $678,400 01/14/21 20% 04-1W5804 $49,788 01/14/21 FINGER JOINT AT HINGE 10 AND 20. 533 AIRPORT BLVD, SUITE 120 756 FRANCISCO BLVD 7% $0 05/21/21 REPAIR AFFECTED CONCRETE RAILING WEST BURLINGAME CA 94010 DIR'S ORDER EMERGENCY F.A. SAN RAFAEL, CA 94901 (650)259-9545 REPAIR FINGER JOINTS/AFFECTED CONC (510)385-6980 20.20.201 RAILING 130 04-MRN-101-8.4/8.7 IN MARIN COUNTY, FROM TAMALPIAS DISNEY CONSTRUCTION, INC. PERALTA, MARIANNE $9,456,360 11/30/20 22% 04-1A6614 $2,630,022 12/22/20 DRIVE INTERCHANGE IN CORTE MADERA TO 533 AIRPORT BLVD., SUITE 120 756 FRANCISCO BLVD 28% $840,674 01/03/23 SIR FRANCIS DRAKE BLVD. IN LARKSPUR, WEST BURLINGAME CA 94010 IMPROVEMENTS ON SB AND SAN RAFAEL, CA 94901 (650)259-9545 CONSTRUCT MULTIUSE BIKEPATH. (510)754-0001

04-MRN-101-8.9/0 IN MARIN COUNTY IN LARKSPUR AT 0.4 GHILOTTI BROS., INC. RUSSELL, STEVE $328,941 05/26/20 0% 04-0Q7304 $0 07/17/20 MILE NORTH OF CORTE MADERA CREEK 525 JACOBY STREET; 756 FRANCISCO BLVD 0% $0 06/04/21 BRIDGE WEST SAN RAFAEL CA 94901 MODIFY DRAINAGE SYSTEM AND EROSION SAN RAFAEL, CA 94901 SUSPENDED (415)454-7011 (510)774-6297

State of California Department of Transportation Page 47 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 04 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 04-MRN-101-10.6/10.8 IN SAN RAFAEL, FROM ROUTE 101 GORDON N. BALL, INC. HABTESLASSIE, DAWIT $12,434,781 05/05/20 47% 04-4G8204 $4,365,955 05/26/20 NORTHBOUND OFF-RAMP TO 2ND STREET 333 CAMILLE AVENUE; 756 FRANCISCO BLVD 35% B1NH-Q101-(343) $448,424 01/24/22 REPLACE BRIDGE. WEST --() ALAMO CA 94507 SAN RAFAEL, CA 94901 (925)838-5675 (510)867-6033

04-MRN-101-15.4/15.4 NEAR SAN RAFAEL ON ROUTE 101 AT GORDON N. BALL, INC. DAWIT, HABTESELASSIE $647,751 01/16/18 72% 04-4G8714 $523,601 02/09/18 MILLER CREEK BRIDGE NO. 27-0004 333 CAMILLE AVENUE 756 FRANCISCO BLVD 93% BRNH-Q101-(327)E $2,374 10/31/22 BRIDGE SCOUR MITIGATION. WEST --() ALAMO CA 94507 WEST RAFAEL, CA 94901 (925)838-5675 (510)385-8178

04-MRN-131-.8/.9 IN MARIN COUNTY, IN TIBURON AT GHILOTTI BROS., INC. LI, TIFFANY $1,537,988 12/24/20 55% 04-4J4504 $292,708 02/11/21 GREENWOOD COVE DRIVE/BLACKFIELD 525 JACOBY STREET; 756 FRANCISCO BLVD 19% ACNH-P131-(002)E $277,391 03/30/22 DRIVE WEST --() SAN RAFAEL CA 94901 ADA CURB RAMP UPGRADE AND SAN RAFAEL, CA 94901 (415)454-7011 (510)385-6980

04-NAP-29-20.4/20.8 IN NAPA COUNTY NEAR YOUNTVILLE FROM EMPIRE LANDSCAPING INC BARTEL, DAVID $354,141 10/28/16 0% 04-2594A4 $317,696 11/28/16 0.2 MILE SOUTH TO 0.2 MILE NORTH OF PO BOX 35 3401 REGATTA BLVD. 0% $2,880 04/29/22 WASHINGTON STREET RICHMOND, CA 94804 DAVIS, CA 95617 REPLACEMENT HIGHWAY PLANTING. (510)867-4515 PLANT EST (530)400-3943 SATIS

04-NAP-29-33.5/48.5 ON ROUTE 29 AND ROUTE 12, AT VARIOUS TEAM GHILOTTI, INC. CRAWFORD, PAUL $8,667,000 09/29/20 86% 04-1W6304 $4,093,309 09/29/20 LOCATIONS REPAIR FIRE DAMAGE DIR'S 2531 PETALUMA BLVD. SO. 1009 CLEGG COURT, 47% $0 12/31/21 ORDER EMERGENCY F.A. STE. G PETALUMA, CA 94952 REPAIR FIRE DAMAGE PETALUMA, CA 94954 (707)763-8700 (510)867-6793 20.20.201 130 04-NAP-121-.5/1 IN NAPA COUNTY ON STATE ROUTE 121 AT GORDON N. BALL, INC. PATENIA, DANILO $5,755,208 05/19/21 1% 04-4G2104 $69,600 06/10/21 HUICHICA CREEK 333 CAMILLE AVENUE; 324 CAMPUS LANE, 1% HSNH-P121-(132)E $69,600 07/27/22 WIDEN ROADWAY AT HUICHICA CREEK. SUITE T --() ALAMO CA 94507 FAIRFIELD, CA 94534 (925)838-5675 (510)224-6309

State of California Department of Transportation Page 48 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 04 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 04-NAP-121-16.1/22.1 IN NAPA AND SOLANO COUNTIES ON ROUTE O.C. JONES & SONS, INC. PATENIA, DANILO $12,118,000 08/21/20 76% 04-1W4804 $10,588,310 08/21/20 121 AND 128 AT VARIOUS LOCATIONS. 1520 FOURTH STREET, 324 CAMPUS LANE STE 87% $0 10/21/21 DIR'S ORDER EMERGENCY F.A. T, BERKELEY CA 94710 FIRE DAMAGE REPAIR FAIRFIELD, CA 94533

(510)224-6309 20.20.201 130 04-NAP-121-18.6/18.6 NEAR NAPA, AT CAPELL CREEK BRIDGE NO. GHILOTTI CONSTRUCTION CO. BRAR, PARAMDEEP $1,177,449 11/02/20 15% 04-4J2104 $761,186 12/09/20 21-0064. 246 GHILOTTI AVE. 324 CAMPUS LANE, 65% $492,473 10/21/21 BRIDGE REHABILITATION. SUITE T SANTA ROSA CA 95407 FAIRFAIED, CA 94534 (707)585-1221 (925)260-6460

04-NAP-121-20.6/20.6 IN NAPA COUNTY, NEAR THE CITY OF GRANITE ROCK COMPANY PATENIA, DANILO $889,833 11/19/18 100% 04-2J5704 $859,089 12/10/18 NAPA, AT SOUTH OF ROUTE 128. 5225 HELLYER AVENUE 324 CAMPUS LANE SUITE 95% $0 10/29/21 EMBANKMENT STABILIZATION AND T SAN JOSE CA 95138 FAIRFIELD, CA 94534 OVER RUN (408)574-1400 (510)224-6309

04-NAP-128-7.4/7.4 NEAR RUTHERFORD, AT CONN CREEK BRIDGE GHILOTTI CONSTRUCTION CO. INC.BRAR, PARAMDEEP $8,381,556 03/29/19 100% 04-1G4304 $7,959,855 04/22/19 NO. 21-0021 246 GHILOTTI AVENUE 324 CAMPUS LANE, 98% B1ST-P128-(061)E $1,848 01/11/22 REPLACE BRIDGE. SUITE T --() SANTA ROSA CA 95407 FAIRFIELD, CA 94534 OVER RUN (707)585-1221 (925)260-6460 HA21

04-NAP-128-20.1/20.4 IN NAPA COUNTY, NEAR CITY OF NAPA AT GORDON N. BALL, INC. ISADA, DARREN $13,679,049 02/19/19 98% 04-4G8404 $12,331,392 03/13/19 CAPELL CREEK BRIDGE (BRIDGE NO. 21- 333 CAMILLE AVENUE 324 CAMPUS LANE STE T 90% B1ST-P128-(062)E $380,236 07/30/21 0078). FAIRFIELD, CA 94534 --() ALAMO CA 94507 REPLACE BRIDGE (925)250-5595 (925)838-5675 HA21

04-SCL-9-3.6/6.9 0.3 MILE EAST OF SARATOGA CREEK TO GRANITE CONSTRUCTION COMPANY $1,308,465 06/03/21 0% 04-3Q3804 $0 06/22/21 SPRINGER AVENUE. 715 COMSTOCK ST; 0% $0 MILL AND REPLACE WITH RHMA OVERLAY SANTA CLARA CA 95054

(408)327-7000

State of California Department of Transportation Page 49 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 04 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 04-SCL-17-2.8/13.9 IN AND NEAR LOS GATOS, CAMPBELL AND GRANITE ROCK COMPANY NIKZAD, ALI $41,043,031 04/30/21 0% 04-1J9704 $0 05/19/21 SAN JOSE, FROM HEBARD WAY TO ROUTE 5225 HELLYER AVENUE STE 220 1007 KNOX AVE 0% ACNH-P017-(117)E $0 04/18/23 280 SAN JOSE, CA 95122 --() SAN JOSE CA 95138 PAVEMENT REHABILITATION. (108)867-6047 (408)574-1400

04-SCL-17-5.1/13.3 IN SANTA CLARA COUNTY ON ROUTES 17, ST. FRANCIS ELECTRIC, LLC NGUYEN, VERNON $3,759,000 05/06/21 0% 04-3K3304 $0 06/03/21 85, 87, 101, 280 AND 680 AT VARIOUS 975 CARDEN STREET; 25100 SANTA CLARA 0% B1NH-X085-(061)E $0 03/08/22 LOCATIONS STREET --() SAN LEANDRO CA 94577 REPAIR AND REPLACE EXISTING HAYWARD, CA 94542 (510)639-0639 (510)867-6119

04-SCL-17-/3.4 IN SANTA CLARA COUNTY IN REDWOOD AMERICAN CIVIL CONSTRUCTORS MINH HINH $5,939,691 04/02/20 79% 04-2K1404 $5,022,431 04/21/20 ESTATE AND HOLY CITY FROM 0.1 MILE WEST COAST LLC 1007 KNOX AVE. 83% HSNH-P017-(116)E $0 08/05/21 SOUTH OF SUMMIT ROAD OVERCROSSING TO 2990 BAY VISTA COURT, SUITE D SAN JOSE, CA 95122 --() ALMA COLLEGE RD (408)592-3785 BENICIA CA 94510 RUMBLE STRIPS, LIGHTING, BEACONS & (707)746-8028

04-SCL-35-/9.5 NEAR LOS GATOS, AT 0.3 MILES NORTH BRANNON CORPORATION PATEL, NIM $1,152,500 09/17/20 46% 04-0W1704 $109,392 09/17/20 OF LAS CUMBRES ROAD RECONST SLOPE 10492 DOUGHERTY AVENUE 1007 KNOX AVE. 9% $0 07/23/21 AND IMPROVE DRAINAGE DIR'S ORDER SAN JOSE, CA 95122-2124 MORGAN HILL, CA 95037 EMERGENCY F.A. (408)254-5703 (408)294-2910 RECONST SLOPE AND IMPROVE DRAINAGE 20.20.201 130 04-SCL-82-9.8/10.4 IN THE CITIES OF SAN JOSE AND SANTA BAY CITIES PAVING & GRADING, NGUYEN, HUNG $2,156,077 10/16/19 81% 04-4J2824 $1,953,113 11/12/19 CLARA FROM MCKENDRIE STREET IN SAN INC. 1007 KNOX AVENUE 90% $0 08/31/21 JOSE TO THE ALAMEDA IN SANTA CLARA 1450 CIVIC CT; SAN JOSE, CA 95122

PAVEMENT REHABILITATION AND ADA (408)254-5700 CONCORD CA 94520 (925)687-6666

04-SCL-85-5.6/17.8 IN SANTA CLARA COUNTY FROM GUADALUPE CENTRAL STRIPING SERVICE, INC.NIKZAD, ALI $433,750 12/31/20 0% 04-3Q4704 $0 02/02/21 RIVER BRIDGE TO 0.1 MILE NORTH OF 3489 LUYUNG DRIVE; 1004 KNOX AVENUE 0% $0 04/21/21 STEVENS CREEK BOULEVARD OVERCROSSING SAN JOSE, CA 95122 RANCHO CORDOVA CA 95742 FOG SEAL ON SHOULDERS (510)867-6047 SUSPENDED (916)635-5175

State of California Department of Transportation Page 50 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 04 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 04-SCL-85-18.0/24.1 IN ALAMEDA COUNTY AND SANTA CLARA DREAMBUILDER CONSTRUCTION CORPNIKZAD, ALI $1,936,528 11/13/19 90% 04-2G7304 $1,625,020 11/26/19 COUNTY AT VARIOUS LOCATIONS DBA DREAMBUILDER 1004 KNOX AVENUE 84% ACNH-000C-(506)E $0 05/19/21 UPGRADE CURB RAMPS TO ADA STANDARDS 550 PORTER WAY SAN JOSE, CA 95122 --() (510)867-6047 PLACENTIA, CA 92870 HB71 (714)646-3697

04-SCL-87-.1/4 IN SANTA CLARA COUNTY AT VARIOUS TRUESDELL CORPORATION OF HINH, MINH $2,418,418 02/18/21 0% 04-2Q0504 $0 03/09/21 LOCATIONS CALIFORNIA, INC. 1007 KNOX AVE 0% $0 11/29/21 TREAT BRIDGE DECK WITH 1310 W. 23RD STREET; SAN JOSE, CA 95122

(408)592-3785 SUSPENDED TEMPE AZ 85282 (602)437-1821

04-SCL-87-5.2/5.2 IN SANTA CLARA COUNTY ON ROUTES 87, CONSTRUCTION H, INC NGUYEN, HUNG V. $803,566 06/16/20 60% 04-3Q8304 $734,570 07/10/20 101, AND 880 AT VARIOUS LOCATIONS 2766 CARLTON COURT 1007 KNOX AVE. 91% $0 08/31/21 TO REPLACE ELECTRICAL CONTROL SAN JOSE, CA 95122 SAN PABLO, CA 94806 (408)254-5700 (510)734-4666

04-SCL-101-33.2/33.2 IN THE CITY OF SAN JOSE, AT THE REDGWICK CONSTRUCTION COMPANY MALONZO GENE EARL $1,162,851 06/14/21 0% 04-2W3904 $0 07/01/21 TULLY ROAD NORTHBOUND ENTRANCE 21 HEGENBERGER CT, 1007 KNOX AVENUE, 0% $0 10/25/21 REPLACE FAILED CULVERT SAN JOSE, CA 95122 OAKLAND CA 94621 (408)595-4019 (510)792-1727 20.20.201 130 04-SCL-101-/4.2 IN SANTA CLARA COUNTY AT VARIOUS MYERS & SONS CONSTRUCTION, LLCPHUNG, THANH $6,777,777 03/29/21 8% 04-0J5604 $200,794 04/15/21 LOCATIONS 4600 NORTHGATE BLVD.; 1007 KNOX AVENUE 3% ACNH-X085-(063)E $200,794 06/08/22 BRIDGE RAILING REPLACEMENT AT 5 SAN JOSE, CA 95122 --() SACRAMENTO CA 95834 (408)569-0401 (916)473-0931

04-SCL-130-11.2/22.5 ON MT HAMILTON RD, FROM QUIMBY ROAD O'GRADY PAVING, INC. PHUNG, THANH $5,000,000 09/24/20 89% 04-1W6204 $4,861,564 09/24/20 TO OBSERVATORY PEAK RD FIRE DAMAGE 2513 WYANDOTTE STREET 1007 KNOX AVE. 97% $37,537 08/20/21 REPAIR DIR'S ORDER EMERGENCY F.A. SAN JOSE, CA 95122 MOUNTAIN VIEW, CA 94043 FIRE DAMAGE REPAIR (408)569-0401 (650)966-1926 20.20.201 130 State of California Department of Transportation Page 51 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 04 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 04-SCL-130-15.0/21.5 ON MT HAMILTON RD, FROM 0.8 MILE WEST ANVIL BUILDERS INC PHUNG, THANH $1,807,000 08/31/20 100% 04-1W5104 $880,186 08/31/20 OF SMITH CREEK TO 1.0 MILE WEST OF 1475 DONNER AVE 2ND FL, 1007 KNOX AVE., 49% $0 08/20/21 OBSERVATORY PEAK RD DIR'S ORDER SAN JOSE, CA 95122-2124 SAN FRANCISCO,CA 94124 EMERGENCY F.A. (408)569-0401 (415)285-5000 FIRE DAMAGE REPAIR 20.20.201 130 04-SCL-152-13.2/0 NEAR GILROY, ON CANADA ROAD, 5.2 MILE EMPIRE LANDSCAPING INC BALINGIT, JOSE $1,473,124 03/14/17 0% 04-2A4414 $1,405,859 04/12/17 EAST OF ROUTE 152/CANADA ROAD 118 HICKORY LANE 3401 REGATTA BLVD. 0% HSNH-P152-(091)E $4,590 12/12/22 INTERCHANGE. RICHMOND, CA 94804 --() DAVIS, CA 95616 PLANTING AND ENVIRONMENTAL (510)385-8163 PLANT EST (530)400-3943 SATIS HB1

04-SCL-152-21.8/35.2 ON ROUTE 152 , IN SANTA CLARA COUNTY, CORAL CONSTRUCTION COMPANY NIKZAD, ALI $3,859,611 08/25/20 67% 04-0J8004 $3,665,657 09/11/20 BETWEEN 2.2 MILES EAST OF DUNNE 10780 SW CLUTTER ROAD 1007 KNOX AVE 92% SNHG-P152-(097)E $344,157 09/03/21 LANE/FELIPE RD AND MERCED COUNTY SAN JOSE, CA 95122 --() SHERWOOD OR 97140 LINE (510)867-6047 (503)427-2609 CONSTRUCT MEDIAN BARRIER

04-SCL-152-/6.2 NEAR GILROY, AT VARIOUS LOCATIONS CCFG CONSTRUCTION MALONZO, GENE EARL $1,049,299 11/15/18 38% 04-2A2514 $827,463 12/10/18 FROM POLE LINE ROAD TO BURCHELL 393 MORNING STAR DR 1007 KNOX AVE. 79% HSST-P152-(095)E $5,400 10/04/24 ROAD. PLANTING AND ENVIRONMENTAL SAN JOSE, CA 95122 --() SONORA CA 95370 MITIGATION. (408)595-4019 (209)743-4911 PLANTING AND ENVIRONMENTAL

04-SCL-237-.2/1 IN SANTA CLARA COUNTY FROM 0.2 MILES A. TEICHERT AND SON, INC. DBA DIETRICH, DIGNA $1,144,300 06/14/21 0% 04-3Q4104 $0 06/28/21 EAST OF ROUTE 82 TO 0.4 MILES WEST OF TEICHERT CONSTRUCTION 1007 KNOX AVE. 0% $0 12/31/21 ROUTE 101 400 SUNRISE BLVD.; SAN JOSE,C A 95122

MILL AND REPLACE WITH RHMA OVERLAY (510)376-8232 ROSEVILLE CA 95661 (916)757-6400

04-SCL-280-7.9/7.9 IN CITY OF CUPERTINO, AT CALABAZAS ABSL CONSTRUCTION DIETRICH, DIGNA $676,764 03/08/21 33% 04-0W4204 $557,887 04/29/21 CREEK STABILIZE ROADWAY SETTLEMENT 29393 PACIFIC ST. 1007 KNOX AVE. 82% $0 08/30/21 DIR'S ORDER EMERGENCY F.A. SAN JOSE, CA 95122 HAYWARD, CA 94544 STABILIZE ROADWAY SETTLEMENT (408)667-9673 (510)727-0900 20.20.201 130 State of California Department of Transportation Page 52 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 04 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 04-SCL-280-11.3/11.3 IN SANTA CLARA COUNTY IN CUPERTINO GRANITE ROCK COMPANY NGUYEN, HUNG $281,147 11/05/20 88% 04-3J7104 $223,047 12/15/20 AND LOS ALTOS AT FOOTHILL EXPRESSWAY 5225 HELLYER AVENUE, SUITE 22 1007 KNOX AVE. 79% HSIM-2801-(151)E $0 12/31/21 UNDERCROSSING SAN JOSE, CA 95122 --() SAN JOSE, CA 95138 INSTALL TRAFFIC SIGNALS AND UPGRADE (408)254-5700 (408)574-1400

04-SCL-280-11.5/20.6 IN AND NEAR LOS ALTOS, LOS ALTOS O.C. JONES & SONS, INC. KHAN, ARIF $44,484,195 01/29/20 41% 04-3J3204 $39,802,397 02/19/20 HILLS, AND PALO ALTO, FROM FOOTHILL 1520 FOURTH STREET; 1007 KNOX AVE. 86% ACNH- 280-(150)E $3,520,391 11/30/21 BOULEVARD TO NORTH OF SAND HILL ROAD SAN JOSE, CA 95122 --() BERKELEY CA 94710 (ALSO IN SAN MATEO COUNT (408)393-9648 (510)526-3424 PAVEMENT REHABILITATION

04-SCL-680-7.6/M9.9 IN SANTA CLARA AND ALAMEDA COUNTIES JJ NGUYEN, INC. BALINGIT, JOSE $1,270,052 12/18/17 0% 04-2537C4 $1,171,955 02/09/18 IN MILPITAS AND FREMONT FROM 0.02 3172 SALEM DR 3401 REGATTA BLVD. 0% $3,500 03/17/22 MILE SOUTH OF ROUTE 237 TO EAST RICHMOND, CA 94804 SAN JOSE CA 95127 WARREN AVENUE UNDERCROSSING (510)867-4515 PLANT EST (408)259-7902 REPLACEMENT PLANTING SATIS

04-SCL-999-/0 IN SANTA CLARA COUNTY AR VARIOUS MYERS & SONS CONSTRUCTION, LLCPHOEN, LINDA $1,957,651 04/20/21 12% 04-2Q0604 $44,100 05/11/21 LOCATIONS. 4600 NORTHGATE BLVD, SUITE100 25100 SANTA CLARA 2% $44,100 11/10/21 TREAT BRIDGE DECKS WITH STREET SACRAMENTO CA 95834 HAYWARD CA 94587 (916)990-6307 (408)595-4007

04-SF-1-.7/5.9 IN THE CIITY OF SAN FRANCISCO, ON BAY AREA LIGHTWORKS, INC KOOS, CHARLES $1,923,050 04/20/21 0% 04-3J8904 $0 05/13/21 ROUTES 1, 35, 80, 101 AND 280 AT 1460 YOSEMITE AVE.; 585 LINDA MAR BLVD 0% SNHG-X75 -(048)E $0 11/16/21 VARIOUS LOCATIONS PACIFICA, CA 94044 --() SAN FRANCISCO CA 94124 CROSSWALK SAFETY ENHANCEMENTS. (510)715-6644 (415)822-2336

04-SF-1-6.3/6.8 IN THE CITY AND COUNTY OF SAN NORCAL GENERAL CONSTRUCTION KOOKS, CHARLES $2,571,982 12/06/19 87% 04-3J3004 $2,571,982 12/31/19 FRANCISCO ON ROUTE 1 AT THE GENERAL CORPORATION 585 LINDA MAR BLVD 100% ACNH-P001-(665)E $28,485 08/31/21 DOUGLAS MACARTHUR TUNNEL 751 MABURY RD; PACIFICA, CA 94044 --() REPLACE EXISTING LIGHTING SYSTEM (510)715-6644 SAN JOSE CA 95133 (408)886-0335 State of California Department of Transportation Page 53 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 04 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 04-SF-1-/.9 ON STATE ROUTE 1, IN THE CITY & GHILOTTI BROS., INC. KOOS, CHARLES $16,075,321 03/14/19 99% 04-4K1104 $15,934,093 04/05/19 COUNTY OF SAN FRANCISCO FROM SM/SF 525 JACOBY STREET 585 LINDA MAR BLVD 99% B1NH-P001-(654)E $27,568 08/31/21 COUNTY LINE TO HOLLOWAY AVE AND FROM PACIFICA, CA 94044 --() SAN RAFAEL CA 94901 LINCOLN WAY TO RUCKMAN A (650)738-3827 (415)454-7011 REHABILITATE ROADWAY AND UPGRADE

04-SF-80-3.8/5 IN THE CITY AND COUNTY OF SAN F D THOMAS INC KOOS CHARLES $20,587,873 04/20/21 0% 04-2J8024 $0 06/04/21 FRANCISCO FROM 16TH STREET TO 4TH 217 BATEMAN DRIVE; 585 LINDA MAR BLVD 0% ACIM-0801-(120)E $0 05/24/24 STREET PACIFICA CA 94044 --() CENTRAL POINT OR 97502 BRIDGE PAINTING. (510)715-6644 (541)664-3010

04-SF-80-5.6/7.6 IN THE CITY AND COUNTY OF SAN CALIFORNIA ENGINEERING LARWIN, THOMAS $17,601,769 03/22/18 100% 04-3G4424 $15,236,608 04/17/18 FRANCISCO AT THE SAN FRANCISCO CONTRACTORS INC. 171 BURMA ROAD, BLDG 100% $0 02/25/21 OAKLAND BAY BRIDGE 20 HAPPY VALLEY ROAD #4

REPLACE SEISMIC DAMPERS ON SFOBB OAKLAND, CA 94607 PLEASANTON CA 94566 (510)867-4545 HA21 (925)461-1500

04-SF-80-7.7/7.7 IN CITY AND COUNTY OF SAN FRANCISCO, CALIFORNIA ENGINEERING LARWIN, THOMAS $13,081,610 02/19/21 67% 04-1W0604 $238,346 04/05/21 AT YERBA BUENA ISLAND REHABILITATE CONTRACTORS, INC. 585 LINDA MAR BLVD. 2% $0 06/14/22 FIRE PROTECTION SYSTEM DIR'S ORDER 20 HAPPY VALLEY ROAD PACIFICA, CA 94044

EMERGENCY F.A. (510)867-4545 PLEASANTON, CA 94566 REHABILITATE FIRE PROTECTION SYSTEM 20.20.201 (925)461-1500 130 04-SF-80-7.9/7.9 IN SAN FRANCISCO COUNTY, AT YERBA BCM SERVICE & ENGINEERING, INCWONG, DUDLEY $1,147,000 11/14/19 100% 04-1AA404 $1,129,813 11/14/19 BUENA ISLAND DIR'S ORDER EMERGENCY 1418 MARIANI COURT SUITE 160 25100 SANTA CLARA ST. 100% $0 05/28/21 FA HAYWARD, CA 94545 TRACY, CA 95376 06/29/21 REPLACE TWO AIR COMPRESSORS (510)385-7628 OVER RUN (209)830-7033 20.20.201 130 04-SF-101-1.5/2 IN THE CITY AND COUNTY OF SAN MYERS AND SONS CONSTRUCTION, DAVID, JOSE $35,935,935 02/20/20 100% 04-3G6204 $34,723,655 03/03/20 FRANCISCO AT ALEMANY CIRCLE LLC 585 LINDA MAR BLVD. 97% ACNH-Q101-(366)E $318,606 01/25/22 UNDERCROSING 4600 NORTHGATE BLVD #100; PACIFICA, CA 94044 --() REHABILITATE BRIDGE. (510)754-0001 OVER RUN SACRAMENTO CA 95834 HA21 (916)283-9950 State of California Department of Transportation Page 54 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 04 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 04-SF-101-4.1/5.1 IN THE CITY AND COUNTY OF SAN CERTIFIED COATINGS COMPANY WASHINGTON, MARCUS $25,857,230 04/02/21 1% 04-2J8014 $57,910 04/16/21 FRANCISCO, FROM 17TH STREET TO SOUTH 2320 CORDELIA ROAD; 585 LINDA MAR BLVD. 0% ACNH-Q101-(389)E $57,910 03/11/24 VAN NESS AVENUE PACIFICA CA 94044 --() FAIRFIELD CA 94534 BRIDGE PAINTING (650)222-7516 (707)639-4414

04-SF-101-4.3/L4.3 REPAIR CONCRETE BARRIER AND GUARDRAIL YERBA BUENA ENGINEERING & WASHINGTON, MARCUS $596,080 01/26/21 0% 04-1W9804 $0 01/26/21 IN SAN FRANCISCO COUNTY, ROUTE 101, CONSTRUCTION INC 585 LINDA MAR BLVD. 0% $0 09/30/21 BRIDGE 34-0077 DIR'S ORDER EMERGENCY 1340 EGBERT AVE. PACIFICA, CA 94044

F.A. (650)222-7516 SAN FRANCISCO, CA 94124 REPAIR CONCRETE BARRIER AND 20.20.201 (415)822-4400 GUARDRAIL 130 04-SF-101-6.7/8.1 IN THE CITY AND COUNTY OF SAN BAY CITIES PAVING & GRADING, KOOS, CHARLES $3,436,835 11/20/20 81% 04-3E6024 $3,225,477 12/15/20 FRANCISCO FROM VAN NESS AVENUE TO INC. 585 LINDA MR BLVD 95% $36,491 07/26/21 LYON STREET 1450 CIVIC CT; PACIFICA, CA 94044

REHABILITATE PAVEMENT. (650)738-3827 CONCORD CA 94520 HA22 (925)687-6666

04-SF-101-/4.2 IN THE CITY AND COUNTY OF SAN FBD VANGUARD CONSTRUCTION, WASHINGTON, MARCUS $19,071,601 01/29/21 35% 04-4J3904 $8,527,640 02/18/21 FRANCISCO ON RTE 101 FROM THE SAN INC. 585 LINDA MAR BLVD. 43% HSNH-Q101-(379)E $895,354 12/31/21 MATEO COUNTY LINE TO THE BAYSHORE 550 GREENVILLE ROAD; PACIFICA, CA 94044 --() VIADUCT (650)222-7516 LIVERMORE CA 94550 COLD PLANE AND OVERLAY AC REPLACE (925)245-1300

04-SM-1-17.9/47 IN SAN MATEO COUNTY AT VARIOUS GOLDEN STATE BRIDGE, INC. BORJA, ROBERTO $1,347,843 03/29/21 13% 04-2Q0804 $220,419 04/13/21 LOCATIONS 3701 MALLARD DRIVE; 1700 S AMPHLETT 16% $220,419 11/23/21 TREAT RC APPROACH SLAB WITH BOULEVARD BENICIA CA 94510 SAN MATEO, CA 94402 (925)372-8000 (510)385-7107

04-SM-1-39.0/39 IN SAM MATEO COUNTY, NEAR PACIFICA, MONTEREY MECHANICAL CO WONG, DUDLEY $7,955,435 08/20/19 100% 04-1AA004 $5,584,661 08/20/19 AT TOM LANTOS (DEVILS SLIDE) TUNNELS 8275 SAN LEANDRO STREET 171 BURMA ROAD BLDG 4 70% $0 07/30/21 DIR'S ORDER EMERGENCY F.A. OAKLAND, CA 94607 OAKLAND, CA 94621 INSTALL MD VOLT ELECT GENERATOR (510)385-7628 OVER RUN

SYSTEM 20.20.201 130 State of California Department of Transportation Page 55 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 04 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 04-SM-1-/10.6 IN SAN MATEO COUNTY NEAR PESCADERO GRANITE ROCK COMPANY BOOSHEHRI, FRED $8,178,424 06/30/20 65% 04-0C9304 $7,400,397 07/28/20 FROM SAN MATEO AND SANTA CRUZ COUNTY 5225 HELLYER AVENUE 2350 PAGE MILL ROAD 86% ACNH-P001-(671)E $1,452,214 09/30/21 LINE TO 0.1 MILE SOUTH OF BEAN HOLLOW PALO ALTO, CA 94304 --() SAN JOSE CA 95138 ROAD (650)222-7241 (408)574-1400 PAVEMENT REHABILITATION AND HA22

04-SM-35-21.7/L22.8 SM-280-R12.64 (ON-RAMP NOT MAINLINE) A. TEICHERT AND SON, INC. DBA BORJA, ROBERTO $910,486 04/16/21 47% 04-3Q3604 $294,207 05/07/21 ROUTE 280 AT SOUTHBOUND OFF-RAMP TEICHERT CONSTRUCTION 1700 SOUTH AMPHLETT 32% $294,207 08/11/21 COLD PLANE AC PAVEMENT AND PLACE 400 SUNRISE BLVD.; BLVD

SAN MATEO, CA 94402 ROSEVILLE CA 95661 (510)385-7107 (916)757-6400

04-SM-84-17.2/17.2 IN SAN MATEO COUNTY, 0.1 MILE EAST GRANITE CONSTRUCTION COMPANY BOOSHEHRI, FRED $2,400,200 01/14/21 14% 04-0W1204 $219,866 01/14/21 OF FOX HILL ROAD CONSTRUCT RETAINING 715 COMSTOCK ST. 2350 PAGE MILL RD. 9% $0 12/31/21 WALL AND BARRIER DIR'S ORDER PALO ALTO, CA 94304 SANTA CLARA, CA 95054 EMERGENCY F.A. (650)222-7241 (408)327-7000 CONSTRUCT RETAINING WALL AND BARRIER 20.20.201 130 04-SM-84-24.6/25 IN SAN MATEO COUNTY, IN REDWOOD CITY A. TEICHERT AND SON, INC. DBA BORJA, ROBERTO $605,200 06/04/21 0% 04-0P1104 $0 06/21/21 FROM 0.3 MILE NORTH OF HESS ROAD TO TEICHERT CONSTRUCTION 1700 SOUTH AMPHLETT 0% $0 09/24/21 0.1 MILE SOUTH OF MIDDLEFIELD ROAD 400 SUNRISE BLVD. BLVD

COLD PLANE AC PAVEMENT AND PLACE SAN MATEO, CA 94402 ROSEVILLE CA 95661 (510)385-7107 (916)757-6400

04-SM-92-9.5/10.4 IN SAN MATEO COUNTY ON ROUTE 92 FROM GRANITE ROCK COMPANY BORJA, ROBERTO $713,164 05/18/21 0% 04-0W3804 $0 06/15/21 WEST HILLSDALE BLVD UNDERCROSSING TO 5225 HELLYER AVENUE; 1700 SOUTH AMPHLETT 0% $0 09/17/21 ALAMEDA LAS PULGAS OVERCROSSING BLVD SAN JOSE CA 95138 COLD PLANE AC PAVEMENT AND OVERLAY SAN MATEO, CA 94402 (408)574-1400 (510)385-7107

04-SM-92-11.8/11.8 IN SAN MATEO COUNTY AT VARIOUS T.P.A. CONSTRUCTION, INC. YAN, ANDREW $1,134,704 06/06/19 91% 04-0P4304 $930,271 07/08/19 LOCATIONS 2406 CLUBHOUSE DRIVE 585 LINDA MAR BLVD 81% $162,150 08/31/21 TREAT BRIDGE DECKS WITH PACIFICA, CA 94044 ROCKLIN CA 95765 (415)923-4248 (916)919-1624 HM3 State of California Department of Transportation Page 56 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 04 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 04-SM-92-14.4/18.8 ON THE RICHMOND-SAN RAFAEL BRIDGE GOLDEN STATE BRIDGE, INC. ATAKO, KINGSTON $17,412,231 12/31/19 68% 04-3G4544 $12,065,827 01/14/20 REPAIR SPALLED CONCRETE COLUMNS AND 3701 MALLARD DRIVE; 25100 SANTA CLARA ST. 67% $164,980 03/04/22 HAYWRD, CA 94544 BENICIA CA 94510 (650)222-7529 (925)372-8000 HA21

04-SM-101-3.1/3.1 IN SAN MATEO COUNTY, AT HENDERSON GRANITE ROCK COMPANY BOOSHEHRI, FRED $781,600 02/02/21 23% 04-2W3104 $197,281 02/02/21 PUMP STATION DIR'S ORDER EMERGENCY 5225 HELLYER AVENUE STE 220 2350 PAGE MILL RD, 25% $0 12/31/21 F.A. MATEO COUNTY PALO ALTO, 94304 SAN JOSE CA 95138 REPAIR FAILED DISCHARGE PIPE (650)222-7241

20.20.201 130 04-SM-101-22.6/23.1 IN SAN MATEO COUNTY AT VARIOUS NORCAL GENERAL CONSTRUCTION $1,027,154 06/18/21 0% 04-3K3404 $0 07/13/21 LOCATIONS CORPORATION 0% B1NH-000C-(480)E $0 VEHICLE DETECTION SYSTEM 751 MABURY RD; --()

SAN JOSE CA 95133 (408)886-0335

04-SM-101-/6.6 IN SAN MATEO AND SANTA CLARA KIEWIT INFRASTRUCTURE WEST CO INORI, DOUGLAS $65,590,440 12/21/18 96% 04-1J5614 $64,730,639 01/23/19 COUNTIES BETWEEN 0.3 MILE NORTH OF 4650 BUSINESS CENTER DRIVE 1700 SOUTH AMPHLETT 100% $25,480 08/18/21 SAN ANTONIO ROAD INTERCHANGE AND BLVD, #101 FAIRFIELD, CA 94534 WHIPPLE AVENUE INTERCHANGE SAN MATEO, CA 94402 (925)754-0624 REMOVE CONCRETE BARRIER, INSTALL (650)333-4036

04-SM-101-/21.8 US 101 BETWEEN 0.3 MILE NORTH OF SAN KIEWIT INFRASTRUCTURE WEST CO SCHRAM, DARRYL $340,528,668 12/03/19 53% 04-1J5694 $236,277,187 01/09/20 ANTONIO IC (SCL PM 50.6) IN SANTA 4650 BUSINESS CENTER DR 1700 S AMPHLETT BLVD 68% $15,719,870 09/09/22 CLARA COUNTY AND 0.3 MILE SOUTH OF SUITE 101 FAIRFIELD CA 94534 RAND AVENUE INTERCHANG SAN MATEO, CA 94402 (707)439-7300 THE CONTRACT WILL WIDEN ROUTE 101, (650)222-7242

04-SM-280-20.2/20.6 IN SAN BRUNO FROM WHITMAN WAY AMERICA PACIFIC CONSTRUCTION BORJA, ROBERTO $571,208 12/10/20 100% 04-4J0804 $505,424 02/04/21 UNDERCROSSING TO 0.1 MILE SOUTH OF 7161 CITRUS VALLEY AVE; 1700 S. AMPHLETT 87% STER-27F4-(001)E $0 06/24/21 SAN BRUNO AVENUE UNDERCROSSING BOULEVARD --() EASTVALE CA 92880 RECONSTRUCT CONCRETE LINED DITCH SAN MATEO, CA 94402 (559)577-9999 (510)385-7107

State of California Department of Transportation Page 57 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 04 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 04-SOL-80-.3/1 IN VALLEJO, AT THE CARQUINEZ BRIDGE O.C. JONES & SONS, INC. DOS SANTOS, FERNANDO $5,145,000 01/28/20 93% 04-2AC104 $4,187,467 01/28/20 TOLL PLAZA DIR'S ORDER EMERGENCY 1520 FOURTH STREET 324 CAMPUS LANE, STE. 81% $0 06/15/21 F.A. T BERKELEY, CA 94710 REMOVE TREES, INSTALL EROSION FAIRFIELD, CA 94534 (916)439-4712 CONTROL (510)385-6774 20.20.201 130 04-SOL-80-.5/1 IN VALLEJO, AT THE CARQUIZEZ BRIDGE JDI ELECTRICAL SERVICES, INC. DOS SANTOS, FERNANDO $885,000 11/13/19 100% 04-2AC504 $329,565 11/13/19 TOLL PLAZA DIR'S ORDER EMERGENCY 624 COMMERCE CT. 324 CAMPUS LANE, STE. 37% $0 03/31/21 F.A. T MANTECA, CA 95336 REPAIR FIRE-DAMAGED ELECTRICAL FAIRFIELD, CA 94534 OVER RUN

EQUIPMENT (510)385-6774 20.20.201 130 04-SOL-80-.8/1.6 IN SOLANO COUNTY IN VALLEJO ON ROUTE O.C. JONES & SONS, INC. AQUINO, NOEL $17,983,947 03/26/21 8% 04-2K8404 $651,595 04/23/21 80 FROM 0.2 MILE NORTH OF CARQUINEZ 1520 FOURTH STREET; 324 CAMPUS LANE, STE 4% ACIM-0802-(374)E $0 02/16/23 BRIDGE TOLL PLAZA TO 0.3 MILE SOUTH T --() BERKELEY CA 94710 OF MAGAZINE STREET O FAIRFIELD, CA 94534 (510)526-3424 STRENGTHEN BRIDGE STRUCTURE DUE TO (707)580-4429

04-SOL-80-1.8/4.4 IN SOLANO COUNTY IN VALLEJO AT BROSAMER & WALL , INC TRAN, QUANG $21,887,212 03/17/20 29% 04-0J7104 $8,531,084 04/16/20 VARIOUS LOCATIONS 1777 OAKLAND BLVD , SUITE 300 324 CAMPUS LANE, 39% $197,792 08/24/23 RAISE THE O/C- VERTICAL CLEARANCE SUITE T WALNUT CREEK CA 94596 FAIRFIELD, CA 94534 (925)395-5207 (510)773-8499

04-SOL-80-12.0/13.1 IN SOLANO COUNTY. EB. SR-12 (JAMESON KIEWIT INFRASTRUCTURE WEST CO DOS SANTOS, FERNANDO $62,282,103 08/13/20 35% 04-0A5394 $29,618,464 08/19/20 CANYON) TO EB. I-80 CONNECTOR 4650 BUSINESS CENTER DR 324 CAMPUS LANE, 48% $4,418,280 11/06/22 CONSTRUCTION EASTBOUND SR 12W TO SUITE T FAIRFIELD CA 94534 FAIRFIELD, CA 94534 (707)439-7300 (510)385-6774

04-SOL-80-13.9/13.9 NEAR FAIRFIELD, AT DAN WILSON CREEK BRIDGEWAY CIVIL CONSTRUCTORS, TRAN, QUANG $2,861,634 01/11/19 99% 04-3G6904 $2,667,028 02/05/19 BRIDGE NO. 23-0006. REHABILITATE INC. 324 CAMPUS LANE, 97% BHIM-080 -(370)E $3,696 11/10/20 BRIDGE. 3333 VACA VALLEY PARKWAY,2000 SUITE T --() BRIDGE DECK REPLACEMENT FAIRFIELD, CA 94534 VACAVILLE, CA 95688 (510)773-8499 HA21 (707)455-7033 State of California Department of Transportation Page 58 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 04 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 04-SOL-80-14.1/15.1 NEAR FAIRFIELD, AT SUISUN CREEK GORDON N. BALL, INC. TRAN, QUANG $1,019,591 02/22/21 9% 04-4G8724 $33,822 03/11/21 BRIDGE NO. 23-0007. 333 CAMILLE AVENUE 324 CAMPUS LANE, 3% $0 11/12/21 SCOUR MITIGATION. SUITE T ALAMO CA 94507 FAIRFIELD, CA 94534 (925)838-5675 (510)773-8499

04-SOL-80-34.5/34.5 IN AND NEAR DIXON AND VACAVILLE, AT VIKING CONSTRUCTION COMPANY, AQUINO NOEL $2,000,003 03/12/21 27% 04-0J6004 $540,162 04/01/21 MCCUNE CREEK BRIDGE NO. 23-0084 L/R INC. 324 CAMPUS LANE, STE 27% $198,401 11/24/21 AND HORSE CREEK BRIDGE NO. 23-0077 11315 SUNRISE GOLD CR STE A T

INSTALL PCC CUT-OFF WALL, INSTALL FAIRFIELD, CA 94533 RANCHO CORDOVA CA 95742 (707)580-4429 (916)852-5530

04-SON-1-9.1/16.1 IN SONOMA COUNTY AT AND NEAR BODEGA GHILOTTI BROS., INC. CRAWFORD PAUL $3,643,562 02/18/21 8% 04-3Q4204 $108,189 03/09/21 BAY FROM DORAN PARK ROAD TO 0.8 MILE 525 JACOBY STREET; 1009 CLEGG COURT, 3% $105,564 03/01/22 NORTH OF SCOTTY CREEK BRIDGE SUITE G SAN RAFAEL CA 94901 RHMA OVERLAY PETALUMA, CA 94954 (415)455-7011 (510)867-6793

04-SON-1-15.0/15.7 IN SONOMA COUNTY NEAR BODEGA BAY, O.C. JONES & SONS BRIDGEWAY VALEH, SYD $22,158,006 05/04/21 0% 04-0A0204 $0 06/14/21 FROM 0.2 MILE SOUTH TO 0.4 MILE CIVIL CONSTRUCTORS A JOINT 4030 OCCIDENTAL ROAD 0% $0 07/19/23 NORTH OF SCOTTY CREEK CULVERT VENTURE SANTA ROSA, CA 95401

REALIGN ROADWAY 1520 FOURTH STREET (510)385-6972

HA23 BERKELEY CA 94710 (510)526-3424 04-SON-1-27.3/31.5 REPAIR FIRE DAMAGE FROM NORTH OF GRANITE CONSTRUCTION COMPANY VALEH, SYD $15,672,000 08/27/20 65% 04-1W5004 $9,938,167 08/27/20 MEYERS GRADE RD TO SOUTH OF FORT ROSS 1324 SOUTH STATE STREET 4030 OCCIDENTAL ROAD 63% $1,516,012 04/12/22 STATE PARK DIR'S ORDER EMERGENCY UNIT A UKIAH, CA 95482 F.A. SANTA ROSA, CA 95401 (707)467-4100 REPAIR FIRE DAMAGE (510)385-6972 20.20.201 130 04-SON-12-35.1/38.9 INAND NEAR SONOMA, FROM VALLEJO BAY CITIES PAVING & GRADING, CRAWFORD, PAUL $6,057,822 03/04/21 24% 04-1J3604 $710,850 03/25/21 AVENUE TO EAST OF LEVERONI ROAD/NAPA INC. 1009 CLEGG COURT, 12% $555,448 08/01/22 ROAD. 1450 CIVIC CT; SUITE G

PAVEMENT REHABILITATION. PETALUMA, CA 94954 CONCORD CA 94520 (510)867-6793 (925)687-6666 State of California Department of Transportation Page 59 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 04 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 04-SON-37-.3/2 IN SONOMA COUNTY FROM 0.3 MILE EAST GHILOTTI BROS., INC. DUNCAN, RICHARD $2,149,788 05/21/21 20% 04-0W5404 $1,991,399 06/15/21 OF MARIN COUNTY LINE TO LAKEVILLE 525 JACOBY STREET; 1009 CLEGG CT. SUITE 91% $0 09/15/21 ROAD G SAN RAFAEL CA 94901 AC RESURFACING PETALUMA, CA 94954 (415)454-7011 (510)812-6444

04-SON-37-3.9/6.1 IN SONOMA COUNTY ABOUT 7 MILES WEST GRANITE CONSTRUCTION COMPANY BRAJNIKOFF, LEONARD $553,572 06/04/21 0% 04-0W3704 $0 06/22/21 OF VALLEJO FROM ROUTE 121 TO SONOMA 1324 SOUTH STATE STREET 4030 OCCIDENTAL ROAD 0% $0 08/31/21 CREEK BRIDGE SANTA ROSA, CA 95401 UKIAH CA 95482 COLD PLANE FAILED AC PAVEMENT AND (707)249-7557 (707)467-4100

04-SON-101-3.7/7.2 IN SONOMA COUNTY, IN PETALUMA FROM GHILOTTI CONSTRUCTION CO. DUNCAN, RICHARD $82,137,462 08/08/19 49% 04-2640F4 $52,884,325 09/17/19 ROUTE 101/116 SEPARATION TO 0.4 MILE 246 GHILOTTI AVE; 1009 GLEGG CT., ST G 64% ACNH-Q101-(353)N $1,352,025 12/23/22 NORTH OF CORONA ROAD OVERCROSSING. PETALUMA, CA 94954 --() SANTA ROSA CA 95407 CONSTRUCT HOV LANES INCLUDING SOUND (510)812-6444 (707)585-1221 HB1

04-SON-101-9.0/9 NEAR PETALUMA, NORTH OF PEPPER ROAD. HANFORD APPLIED RESTORATION & CHOI, GINA $742,782 12/26/19 96% 04-0J1004 $656,923 01/14/20 REPAIR SLIDE. CONSERVATION 1009 CLEGG COURT 98% $490 07/30/23 765 BAYWOOD DRIVE, SUITE 237; PETALUMA, CA 94954

(510)385-8178 PETALUMA CA 94954 (707)996-6633

04-SON-101-22.3/23.3 IN SONOMA COUNTY IN SANTA ROSA FROM BORTOLUSSI & WATKIN, INC. SIMPSON, JOHN $560,973 05/28/19 0% 04-1Q8604 $431,403 06/20/19 0.2 MILE SOUTH OF BICENTENNIAL WAY 77 LARKSPUR STREET 3401 REGATTA BLVD. 0% $3,109 05/03/23 OVERCROSSING TO 0.5 MILE NORTH OF RICHMOND, CA 94804 SAN RAFAEL CA 94901 MENDOCINO AVENUE OVERCROS (510)867-4515 PLANT EST (415)453-4675 TREE PLANTING SATIS

04-SON-101-32.8/54.2 IN AND NEAR WINDSOR, HEALDSBURG, AND O.C. JONES & SONS, INC. VALEH, SYD H. $55,329,622 12/24/19 32% 04-0J6424 $45,657,928 01/14/20 CLOVERDALE, FROM OLD REDWOOD HIGHWAY 1520 FOURTH STREET 4030 OCCIDENTAL ROAD 81% $1,176,922 12/10/21 TO 2.0 MILES SOUTH OF MENDOCINO UNIT A BERKELEY CA 94710 COUNTY LINE. SANTA ROSA, CA 95401 (510)526-3424 ROADWAY REHABILITATION. (510)385-6972

State of California Department of Transportation Page 60 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 04 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 04-SON-116-18.6/25 IN SONOMA COUNTY, NEAR SEBASTOPOL ARGONAUT CONSTRUCTORS BRAJNIKOFF, LEONARD $865,151 04/14/21 78% 04-3Q4504 $856,445 05/07/21 FROM 0.1 MILE WEST OF GREEN VALLEY 360 SUTTON PLACE 4030 OCCIDENTAL ROAD 97% $856,445 08/30/21 CREEK BRIDGE TO MILL STATION ROAD. SANTA ROSA, CA 95401 SANTA ROSA CA 95407 COLD PLANE AC PAVEMENT AND PLACE (707)249-7557 (707)542-4862

04-SON-116-30.9/31.4 NEAR COTATI FROM 0.3 MI EAST OF GHILOTTI CONSTRUCTION CO. INC.BRAJNIKOFF, LEONARD $5,635,002 03/15/19 100% 04-4G3804 $5,503,872 04/09/19 HESSEL ROAD TO 0.1 MI EAST OF 246 GHILOTTI AVENUE 4030 OCCIDENTAL RD., 96% HSNH-P116-(050)E $1,620 09/16/21 BARTLESON ROAD SUITE A --() SANTA ROSA CA 95407 CONSTRUCT BRIDGE, RET WALLS, TRAFF SANTA ROSA, CA 95401 (707)585-1221 SIGNAL (707)249-7557

04-SON-116-39.3/41.8 IN SONOMA COUNTY NEAR PENTALUMA FROM GHILOTTI BROS., INC. CHOI, GINA $1,063,203 02/16/21 100% 04-3Q9804 $997,265 03/09/21 LAKEVILLE HWY TO OLD ADOBE ROAD 525 JACOBY STREET; 1009 CLEGG COURT 100% $0 06/30/21 AC RESURFACING PETALUMA, CA 94954 SAN RAFAEL CA 94901 07/06/21 (510)385-8178 COMPLETED (415)454-7011

04-SON-128-5.0/24.7 IN AND NEAR HEALDSBURG, AT VARIOUS TEAM GHILOTTI, INC. CRAWFORD, PAUL $4,735,000 11/06/19 100% 04-2AC004 $4,635,763 11/06/19 LOCATIONS 2531 PETALUMA BLVD. SOUTH 1009 CLEGG CT., STE. 100% $0 06/04/21 RECONSTRUCT FIRE-DAMAGED ROADWAY G PETALUMA, CA 94952 07/09/21 FACILITIE PETALUMA, CA 94954-1143 OVER RUN (707)763-8700 (510)867-6793 20.20.201 130 04-SON-128-16.8/17.6 IN THE CITY OF HEALDSBURG, FROM 1 VALENTINE CORPORATION CHI, JONATHAN $1,219,000 03/23/21 63% 04-2W3304 $160,110 04/09/21 MILE EAST OF KRECK RD TO 0.3 MILES 111 PELICAN WAY 4030 OCCIDENTAL, BLDG 13% $0 08/12/21 EAST OF MAACAMA CREEK BRIDGE DIR'S A, SAN RAFAEL CA 94901 ORDER EMERGENCY F.A. SANTA ROSA, CA 95401 (415)453-3732 REGRADE SLOPE, IMPROVE DRAINAGE, (510)376-8218 20.20.201 INSTALL U 130 04-SON-128-24.2/24.7 IN SONOMA AND NAPA COUNTIES FROM 0.1 BORTOLUSSI & WATKIN, INC. SIMPSON, JOHN $654,730 05/21/19 0% 04-1Q8704 $438,084 06/05/19 MILE EAST OF BIDWELL CREEK BRIDGE TO 77 LARKSPUR STREET 3401 REGATTA BLVD. 0% $5,341 03/30/23 0.7 MILE WEST OF BENNETT LANE AND 0.4 RICHMOND, CA 94804 SAN RAFAEL CA 94901 MILE WEST OF KNOXV (510)867-4515 PLANT EST (415)453-4675 HIGHWAY PLANTING & TREE REMOVAL SATIS

State of California Department of Transportation Page 61 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 04 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 04-SON-128-/12.2 IN SONOMA COUNTY FROM TEAM GHILOTTI, INC. BRAJNIKOFF, LEONARD $1,852,142 05/10/21 0% 04-3Q4604 $0 06/10/21 MENDOCINO/SONOMA COUNTY LINE TO 2531 PETALUMA BLVD SOUTH; 4030 OCCIDENTAL ROAD 0% $0 08/26/21 NORTH JUNCTION 101/128 AND FROM SANTA ROSA, CA 95401 PETALUMA CA 94952 SOUTH JUNCTION 101/128 TO SAUSAL (707)249-7557 (707)763-8700 CREEK BRI

DIGOUTS

Totals: Authorized Final Amt: $1,724,966,983 Completed to Date: $954,931,330 Work This Month: $52,985,862 State of California Department of Transportation Page 62 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 05 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 05-MON-1-15.0/29.6 HW 1, CLEAR CULVERT INLET AREA OF S CHAVES CONSTRUCTION INC SILVA, RICK $3,985,000 02/02/21 100% 05-1N4204 $3,218,945 02/02/21 DEBIS & MUD. ROCKFALL PROTECTION 11545 LOS OSOS VALLEY RD #C-3 775 ARLINGTON ST 81% $0 07/29/21 SYSTEM CLEANED & REPAIRED. PROVIDE CAMBRIA, CA 93428 SAN LUIS OBISPO CA 93405 TRAFFIC CONTROL DIRS EFA 05A (805)927-4559 OVER RUN

CLEAR CULVERTS AND ROCKFALL 20.201201 PROTECTION 130 05-MON-1-20.4/20.4 IN MONTEREY COUNTY NEAR LUCIA AT 0.6 SERAFIX ENGINEERING SILVA, RICK $789,393 09/11/20 0% 05-0Q5004 $0 09/24/20 MILE SOUTH OF LIMEKILN CREEK BRIDGE CONTRACTORS, INC 775 ARLINGTON ST. 0% $0 09/09/21 REPLACE CULVERT AND REPAIR EROSION 7 CROW CANYON COURT SUITE 250 CAMBRIA, CA 93428

(805)471-2102 SAN RAMON CA 94583 (925)552-8253

05-MON-1-27.2/27.6 REPAIR ROADWAY WASHOUT, PAPICH CONSTRUCTION CO INC SILVA, RICK $15,685,000 01/28/21 59% 05-1N4104 $12,516,820 03/02/21 REMOVE/DISPOSE OF DEBRIS FLOW 398 SUNRISE TERRACE 775 ARLINGTON ST 80% $0 07/29/21 MATERIALS, REPAIR OTHER RAIN RELATED CAMBRIA, CA 93428 ARROYO GRANDE, CA 93420 DAMAGE, TEMP TRAFFIC CONTROL. DIRS (805)927-4559

EFA 20.20.201 REPAIR ROADWAY WASHOUT/OTHER RAIN 130 DAMAGE 05-MON-1-28.1/28.1 IN MONTEREY COUNTY NEAR LUCIA AT THE TRUESDELL CORPORATION OF RODGER JOHNSON $10,716,143 04/24/19 95% 05-1K1604 $10,680,197 05/28/19 BIG CREEK BRIDGE CALIFORNIA, INC. 1529 HWY 68 97% $321,850 08/20/21 ELECTROCHEMICAL CHLORIDE 1310 W. 23RD STREET; MONTEREY, CA 93940

(831)455-5707 SUSPENDED TEMPE AZ 85282 HM (602)437-1711

05-MON-1-39.8/74.6 IN MONTEREY COUNTY NEAR BIG SUR FROM GRANITE ROCK COMPANY DUSSELL PATRICK $23,635,427 11/05/19 92% 05-1F6804 $23,828,126 11/22/19 TORRE CANYON BRIDGE TO SAN LUIS 5225 HELLYER AVENUE STE 220 1529 HWY 68 98% ACST-P001-(662)E $464,147 08/25/21 STREET (N) MONTEREY, CA 93940 --() SAN JOSE CA 95138 PAVEMENT PRESERVATION (831)427-4706 SUSPENDED (408)574-1400 HA22

05-MON-1-44.3/-44.3 AT COASTLANDS WALL II. INSTALL SOIL, ACCESS LIMITED CONSTRUCTION BUCKMAN, HOLLEE $735,000 05/03/21 0% 05-1N4304 $0 06/09/21 NAIL WALL, PROVIDE TRAFFIC CONTROL. 1102 PIKE LANE 8115 PRUNEDALE NORTH 0% $0 08/16/21 PERFORM ORTHER SUPPORTING WORK. DIRS RD OCEANO, CA 93445 EFA 05A2346 PRUNEDALE, CA 93907

INSTALL SOIL, NAIL WALL, TRAFFIC (831)277-4190 20.20.201 CONTROL 130 State of California Department of Transportation Page 63 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 05 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 05-MON-1-59.4/59.5 ON/BENEATH BIXBY BRIDGE, PERFORM TRUESDELL CORPORATION OF JOHNSON, RODGER $318,000 06/05/21 0% 05-1N5004 $0 06/30/21 CONCRETE REPAIR. PERVIDE TRAFFIC CALIFORNIA, INC 1529 HWY 68/SALINAS 0% $0 09/20/21 CONTROL AND PERFORM OTHER SUPPORTING 1310 W 23RD STREET HWY

WORK DIRS EFA 05A2354 MONTEREY, CA 93940 TEMPE, AZ 85282 CONCRETE REPAIR AND TRAFFIC CONTROL (805)455-5707 20.20.201 130 05-MON-1-63.0/63 IN MONTEREY COUNTY ABOUT 11.3 MILES FEC FUTURE CONTRACTORS AND $6,491,782 07/07/21 0% 05-1H4604 $0 07/20/21 SOUTH OF CARMEL AT GARRAPATA CREEK ENGINEERS, INC. 0% $0 BRIDGE 184 TECHNOLOGY DRIVE, SUITE 2

ELECTROCHEMICAL CHLORIDE EXTRACTION IRVINE CA 92618 HA22 (949)328-9758

05-MON-1-64.4/64.4 IN MONTEREY COUNTY NEAR CARMEL BY THE AMERICAN CIVIL CONSTRUCTORS RODGER JOHNSON $4,437,400 04/05/21 1% 05-1K7004 $7,700 04/30/21 SEA AT GRANITE CANYON BRIDGE WEST COAST LLC 1529 HWY 68 0% $7,700 11/21/22 ELECTROCHEMICAL CHLORIDE EXTRACTION 2990 BAY VISTA COURT, SUITE D MONTEREY, CA 93940

(831)455-5707 SUSPENDED BENICIA CA 94510 HM (707)746-8028

05-MON-1-73.7/0 IN MONTEREY COUNTY NEAR CARMEL BY THE TAYLOR JANE CONSTRUCTION LP DUSSELL, PATRICK $457,805 02/08/21 0% 05-1M5204 $0 03/11/21 SEA AT OCEAN AVENUE 131 W DANA ST STE A AND C 8115 N PRUNEDALE RD 0% $0 REHABILITATE CULVERTS SALINAS, CA 93907 NIPOMO CA 93444 (831)427-4706 (805)929-2297 HM

05-MON-1-80.3/0 IN MONTEREY, SAN BENITO AND SANTA PETERSON-CHASE GENERAL FARSHAD KESHAVARZI $1,611,141 03/16/21 34% 05-1M3904 $49,160 04/01/21 CRUZ COUNTIES AT VARIOUS LOCATIONS ENGINEERING CONSTRUCTION, INC.140 DUBOIS STREET 3% $49,160 10/20/21 TREAT BRIDGE DECK WITH METHACRYLATE 16351 CONSTRUCTION CIRCLE WES SUITE E

SANTA CRUZ, CA 95060 IRVINE CA 92606 (831)427-4706 HM (949)252-0441

05-MON-1-/0 MON CNTY ALONG MULTIPLE ROUTES (HWY CAL VALLEY CONSTRUCTION INC DUSSELL, PATRICK $318,000 02/19/21 20% 05-1M9804 $13,460 03/17/21 1,68, 101 & 218), DRAINAGE ISSUES. 5125 N GATES AVE STE 102 8115 PRUNEDALE NORTH 4% $0 09/01/21 LINE CULVERT,RESTORE SHOULDER,REPLACE RD FRESNO CA 93722 DIKE,TRAFFIC CONTDIRS PRUNEDALE, CA 93907

LINE CULVERT, RESTORE (831)663-8966 20.20.201 SHOULDR,REPLACE DIKE 130 State of California Department of Transportation Page 64 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 05 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 05-MON-1-/0 IN MONTEREY COUNTY AT VARIOUS SPECIALIZED PAVEMENT MARKING, RODGER JOHNSON $781,194 03/08/21 47% 05-1K8604 $227,656 04/01/21 LOCATIONS INC. 1529 HWY 68 29% SNHG-X053-(031)E $220,531 11/03/21 INSTALL RUMBLE STRIPS 11095 SW INDUSTRIAL WAY; MONTEREY, CA 93940 --() (831)455-5707 TUALATIN OR 97062 HB1 (503)885-0420

05-MON-1-/0 ON VARIOUS ROUTES IN MONTEREY AND PETERSON-CHASE GENERAL $271,613 10/20/20 0% 05-1H0404 $0 11/16/20 SANTA CRUZ COUNTIES ENGINEERING CONSTRUCTION, INC. 0% $0 REPLACE OVERHEAD GUIDE SIGNS WITH 16351 CONSTRUCTION CIR W;

IRVINE CA 92606 HA22 (949)252-0441

05-MON-1-/0 VARIOUS RTS & COUNTIES TO CONVERT PTM GENERAL ENGINEERING BRAR, BALJINDER $318,000 05/06/20 71% 05-1M7004 $313,786 05/22/20 EXISTINGELEC SERVS FROM 480V TO 240V SERVICES INC 8115 PRUNEDALE NORTH 99% $0 08/16/21 & AUTOMATING TRAFFIC CENSUS 5942 ACORN ST RD

STANTIONS, WORKERS SAFETY DIRS PRUNEDALE, CA 93907 RIVERSIDE, CA 92504 ELECTRICAL SERVICE CONVERSIONS (805)610-8215 20.20.201 130 05-MON-1-/0 PROJECT LOCATED IN MON AND SCR ALFARO COMMUNICATIONS JOHNSON, RODGER $958,785 04/03/20 100% 05-1G7604 $882,106 05/08/20 COUNTIES ON VARIOUS ROUTES CONSTRUCTION,INC 1529 HWY 68 92% ANHG-0001-(513)E $0 06/25/21 ELECTRICAL / SIGNS / MARKINGS / 15614 S. ATLANTIC AVENUE; MONTEREY, CA 93940 PL62-05 0-(5) (831)375-5920 --() COMPTON CA 90221 HB1 (310)669-8949

05-MON-68-16.8/20 IN MONTEREY COUNTY IN AND NEAR GRANITE CONSTRUCTION COMPANY BALJINDER BRAR $1,946,629 04/20/21 46% 05-1M0104 $184,442 05/07/21 SALINAS FROM 0.9 MILE EAST OF TORO 580 WEST BEACH STREET; 8115 PRUNEDALE NORTH 9% $155,223 08/27/21 PARK UNDERCROSSING TO BLANCO ROAD ROAD WATSONVILLE CA 95076 OVERLAY WITH RUBBERIZED HOT MIX PRUNEDALE, CA 93907 (831)763-6100 (805)610-8215 HM

05-MON-101-3.1/5.2 IN MONTEREY COUNTY NEAR BRADLEY AT NEWTON CONSTRUCTION MANAGEMENT $4,155,333 02/16/21 0% 05-1H0204 $0 03/11/21 THE CAMP ROBERTS SAFETY ROADSIDE REST INC 0% ACNH-Q101-(378)E $0 AREAS 2436 BROAD ST; --() INFRASTRUCTURE UPGRADES SAN LUIS OBISPO CA 93401 HA25 (805)544-5583 State of California Department of Transportation Page 65 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 05 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 05-MON-101-6.7/6.7 IN MONTEREY COUNTY NEAR KING CITY AT WHITAKER CONSTRUCTION GROUP, $4,018,501 09/18/20 33% 05-1F8204 $3,564,500 10/09/20 THE SAN ANTONIO RIVER BRIDGE INC. 88% ACNH-Q101-(376)E $176,641 08/10/21 SEISMIC RETROFIT 2 BRIDGES 2752 CONCRETE CT.; --() (805)226-9217 PASO ROBLES CA 93446 HA21 (805)226-4020

05-MON-101-28.0/30.6 IN MONTEREY COUNTY NEAR SAN LUCAS PAPICH CONSTRUCTION COMPANY NORRIS, AMY $26,129,352 04/03/19 100% 05-1F7404 $25,246,161 05/01/19 FROM 0.1 MILES SOUTH OF PARIS VALLEY 398 SUNRISE TERRACE 102 S. WHITLEY 100% B1NH-Q101-(348)E $0 06/23/21 ROAD OC TO RANCHO UC GARDENS DRIVE --() ARROYO GRANDE, CA 93420 06/23/21 PAVEMENT REHABILITATION (2R) PASO ROBLES, CA 93446 COMPLETED

(805)550-1306 HA22

05-MON-101-36.9/47.7 IN MONTEREY COUNTY, IN AND NEAR KING OHL USA INC LANG, TIM $81,224,498 01/16/19 74% 05-1F75U4 $47,414,718 02/11/19 CITY FROM 0.4 MILES SOUTH OF WILD 1920 MAIN STREET #310 3230 RIVERSIDE AVENUE 62% 1NHG-Q101-(338)E $1,568,866 03/25/22 HORSE ROAD OC TO TEAGUE AVENUE #130 --() IRVINE CA 92614 PAVEMENT REHABILITATION, SEISMIC PASO ROBLES, CA 93446 (949)242-4432 (805)550-4651 HA22

05-MON-101-73.0/96.8 IN MONTEREY AND SAN BENITO COUNTIES A. TEICHERT AND SON, INC. DBA BRAR, BALJINDER $4,675,234 09/21/20 77% 05-1F9004 $3,232,072 10/09/20 AT VARIOUS LOCATIONS FROM 4.1 MILES TEICHERT CONSTRUCTION 8115 PRUNEDALE NORTH 69% ACNH-Q101-(377)E $202,647 08/30/21 NORTH OF NORTH GONZALES OVERCROSSING 400 SUNRISE BLVD.; ROAD --() TO 0.3 MILE NORTH OF PRUNEDALE, CA 93907 ROSEVILLE CA 95661 ROADSIDE SAFETY IMPROVEMENTS (805)610-8215 (916)757-6400

05-MON-101-87.3/91.5 ON ROUTE 101 IN MONTEREY COUNTY IN GRANITE ROCK COMPANY TYLER LAVERING $38,027,660 12/13/18 63% 05-1C8904 $37,678,992 01/07/19 THE CITY OF SALINAS BETWEEN EAST 5225 HELLYER AVENUE STE 220 8115 PRUNEDALE NORTH 95% B1NH-Q101-(342)E $691,643 08/04/21 MARKET STREET OVERCROSSING AND 0.3 ROAD --() SAN JOSE CA 95138 MILES SOUTH OF RUSSELL/ESPI PRUNEDALE, CA 93907 (408)574-1400 ROADWAY REHABILITATION (831)262-6572 HA22

05-MON-101-91.2/99.2 IN MONTEREY COUNTY, IN AND NEAR JJ NGUYEN, INC. SANTIAGO GARCIA $2,484,506 04/04/17 100% 05-0161H4 $2,160,995 04/26/17 PRUNEDALE AT VARIOUS LOCATIONS, FROM 3172 SALEM DR 8115 PRUNEDALE NORTH 87% ACNH-Q101-(311)E $15,873 03/16/22 0.2 MILES NORTH OF LITTLE BEAR CREEK ROAD --() SAN JOSE CA 95127 UNDERCROSSING TO 0.3 M PRUNEDALE, CA 93907 (408)259-7982 LANDSCAPE MITIGATION (831)455-5466

State of California Department of Transportation Page 66 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 05 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 05-SB-1-13.3/0 IN SANTA BARBARA AT VARIOUS LOCATIONS MYERS & SONS CONSTRUCTION, LLCDAVID BALLENTINE $2,557,303 11/19/20 27% 05-1K6904 $2,396,744 12/15/20 BRIDGE PREVENTATIVE MAINTENANCE. 4600 NORTHGATE BLVD, SUITE 10 270 E HWY 246,SUITE 93% $230,618 01/12/22 203 SACRAMENTO CA 95834 BUELLTON, CA 93427 (916)283-9950 (805)748-1087 HM3

05-SB-1-15.6/0 ON ROUTE 1 IN SANTA BARBARA COUNTY CALPORTLAND COMPANY BENNETZEN, LILIAN $5,813,850 12/14/18 100% 05-0A0504 $5,709,453 01/09/19 NEAR LOMPOC AT THE SALSIPUEDES CREEK 1625 E DONOVAN RD 2053 PREISKER LANE 96% B1NH-P001-(641)E $0 11/18/21 BRIDGE (NO. 51-0095) STE E --() SANTA MARIA CA 93454 BRIDGE REPLACEMENT SANTA MARIA, CA 93454 OVER RUN (805)345-3581 (805)922-1611 HA21

05-SB-1-29.9/49.2 IN SANTA BARBARA COUNTY ABOUT 5.8 CALPORTLAND CONSTRUCTION THOMAS PETERSEN $6,442,631 07/08/20 52% 05-1G1304 $4,771,012 08/07/20 MILES NORTH OF LOMPOC FROM CALIFORNIA 1625 E. DONOVAN ROAD; 2053 PREISKER LANE 74% $2,506,958 09/23/21 BOULEVARD TO ROUTE 166 NEAR GUADALUPE STE E SANTA MARIA CA 93454 PAVEMENT REHABILITATION SANTA MARIA CA 93454 (805)345-3581 (805)441-7943 HA22

05-SB-101-1.4/4.8 IN SANTA BARBARA COUNTY IN GRANITE CONSTRUCTION COMPANY MERLO, TAYLOR $87,691,009 04/01/20 51% 05-0N71U4 $60,533,523 04/02/20 CARPINTERIA FROM 0.2 MILE SOUTH OF P O BOX 50085 PO BOX 996 69% ACNH-Q101-(373)N $2,519,655 09/13/22 BAILARD AVENUE OVERCROSSING TO 0.7 CARPINTERIA, CA 93014 --() WATSONVILLE, CA 95077 MILE SOUTH OF SOUTH PADARO LANE (805)722-8935 (831)724-1011 CONSTRUCT HOV LANES

05-SB-101-2.2/3.3 IN SANTA BARBARA COUNTY IN CCFG CONSTRUCTION JONES,DAVID $2,541,056 09/20/19 0% 05-448214 $2,320,355 10/04/19 CARPINTERIA FROM 0.2 MILE SOUTH OF 17750 WARDS FERRY RD; PO BOX 996 0% $5,628 05/31/24 CARPINTERIA CREEK BRIDGE TO FRANKLIN CARPINTERIA, CA 93014 SONORA CA 95370 CREEK BRIDGE (805)748-5218 PLANT EST (209)743-4911 MITIGATION PLANTING SATIS

05-SB-101-4.4/7.7 IN SANTA BARBARA COUNTY, IN AND NEAR GRANITE CONSTRUCTION COMPANY TAYLOR MERLO $151,385,000 06/05/21 4% 05-0N72U4 $4,836,749 06/05/21 CARPINTERIA AND AT SUMMERLAND FROM P O BOX 50085 P.O. BOX 996 3% $1,586,958 10/21/24 0.9 MILE SOUTH OF SOUTH PADARO LANE CARPINTERIA CA WATSONVILLE CA 950775085 UNDERCROSSING TO 0.6 (805)722-8935 (831)724-1011 CONSTRUCT HOV LANES AND

State of California Department of Transportation Page 67 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 05 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 05-SB-101-7.3/9.6 IN SANTA BARBARA COUNTY, IN AND NEAR GRANITE CONSTRUCTION COMPANY TRISTAN GEBHART $102,786,812 10/22/20 24% 05-0N73U4 $33,150,687 10/22/20 SUMMERLAND FROM 0.2 MILES NORTH OF PO BOX 742478 P.O. BOX 996 32% $2,551,219 09/05/23 PADARO LANE OVERCROSSING TO SAN CARPINTERIA, CA 93013 LOS ANGELES CA 90074-2478 YSIDRO CREEK BRIDGE. (805)440-3057 (831)768-4002 CONSTRUCT HOV LANES AND

05-SB-101-22.3/23 IN SANTA BARBARA COUNTY IN GOLETA CCFG CONSTRUCTION JONES, DAVID $487,433 02/16/18 0% 05-0G0714 $450,237 04/03/18 FROM 0.2 MILE EAST OF FAIRVIEW AVENUE 393 MORNING STAR DR 3690 SANTA CLAUS LN. 0% $2,880 10/31/21 OVERCROSSING TO 0.2 MILE WEST OF SAN CARPINTERIA, CA 93014 SONORA CA 95370 PEDRO CREEK BRIDGE (805)748-5218 PLANT EST (209)743-4911 LANDSCAPE MITIGATION SATIS HA22

05-SB-101-46.6/47.1 IN SANTA BARBARA COUNTY NEAR GAVIOTA SPECIALTY CONSTRUCTION, INC. MICHAEL MORTENSEN $4,695,284 12/16/20 6% 05-1E0104 $525,730 01/14/21 AT THE GAVIOTA SAFETY ROADSIDE REST 645 CLARION CT; 35S LAPATERA LANE 11% CSTG-Q101-(362)E $445,033 02/28/22 AREA GOLETA CA 93117 --() SAN LUIS OBISPO CA 93401 WASTEWATER SYSTEM UPGRADE (805)698-2601 (805)543-1706 HA25

05-SB-101-55.9/56.2 IN SANTA BARBARA COUNTY NEAR SPECTRUM CONSTRUCTION GROUP, BALLENTINE, DAVID $5,895,831 08/20/20 9% 05-1F7904 $1,015,250 09/21/20 BUELLTON FROM 0.1 MILE SOUTH OF INC. 270 E HWY 246 #203 17% $122,021 06/09/22 NOJOQUI CREEK BRIDGE TO 0.3 MILE 16 GOODYEAR, STE. 140; BUELLTON, CA 93427

SOUTH OF SANTA ROSA ROAD OVERCROSS (805)688-5920 IRVINE CA 92618 BRIDGE RAIL UPGRADE HA21 (949)299-1400

05-SB-101-56.2/58 IN SANTA BARBARA COUNTY IN AND NEAR LANDSCAPE SUPPORT SERVICES BALLENTINE, DAVID $3,479,981 07/31/20 100% 05-1E0004 $3,468,138 08/27/20 BUELLTON FROM 0.26 MILE SOUTH OF 12610 SATICOY ST SOUTH; 270 E HWY 246 #203 97% $515,995 07/20/21 SANTA ROSA ROAD OVERCROSSING TO 0.34 BUELLTON, CA 93427 NORTH HOLLYWOOD CA 91605 MILE NORTH OF NORTH BUE (805)688-5920 (818)475-0680 ROADSIDE SAFETY IMPROVEMENTS HA25

05-SB-101-70.6/71.2 ON ROUTE 101, FROM 0.3 MILE SOUTH TO CALPORTLAND CONSTRUCTION $10,636,325 11/17/20 25% 05-1F5004 $2,747,347 12/15/20 0.3 MILE NORTH OF ROUTE 101/135 1625 E. DONOVAN ROAD; 26% ACST-X083-(019)E $334,897 08/10/22 SEPARATION AND ON ROUTE 135 AT ROUTE --() SANTA MARIA CA 93454 101/135 SEPARATION. (805)922-1611 (805)345-3581 REPLACE BRIDGES HA21 State of California Department of Transportation Page 68 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 05 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 05-SB-101-/0 VARIOUS LOCATIONS THROUGHOUT THE TRAFFIC LOOPS CRACKFILLING, RODGER JOHNSON $4,439,520 12/09/20 45% 05-1H9904 $1,371,083 01/21/21 DISTRICT INC. 1529 HWY 68/ SALINAS 31% $232,075 12/06/21 REPLACE FAILED TRAFFIC MANAGEMENT 946 S EMERALD ST; HWY

MONTEREY, CA 93940 ANAHEIM CA 92804 (831)455-5707 HB4N (714)520-4026

05-SB-135-1.0/7.2 IN SANTA BARBARA COUNTY, NEAR LOS GRANITE CONSTRUCTION COMPANY BENNETZEN, LILIAN $4,003,997 04/12/21 0% 05-1N1704 $14,367 04/30/21 ALAMOS, FROM 0.3 MILE NORTH OF DEN 5335 DEBBIE LANE 0% $0 12/31/21 STREET TO SAN ANTONIO CREEK BRIDGE SANTA BARBARA CA 93111 PARTIAL DEPTH RECYCLING (805)441-6935 (805)964-9951

05-SB-135-16.5/0 IN SANTA BARBARA COUNTY IN SANTA FEC FUTURE CONTRACTORS AND PETERSEN, THOMAS $1,399,782 05/27/21 0% 05-1J4704 $0 06/22/21 MARIA AT BUNNY AVENUE AND FROM ROEMER ENGINEERS, INC. 0% HSNH-P135-(009)E $0 WAY TO PREISKER LANE 184 TECHNOLOGY DRIVE, SUITE 2 --() SIGNALS, LIGHTING, SIDEWALKS AND (805)922-1611 IRVINE CA 92618 HB1 (949)328-9758

05-SB-144-.9/2 IN SANTA BARBARA COUNTY, IN SANTA CALPORTLAND CONSTRUCTION OMID VAZIRI $572,664 03/08/21 10% 05-1N0804 $31,701 03/25/21 BARBARA, FROM ALAMEDA PADRE SERRA TO 1625 E. DONOVAN 35 S LA PATERA LANE 6% $31,701 08/27/21 ROUTE 192 GOLETA CA, 93117 SANTA MARIA CA 93454 RUBBERIZED HMA OVERLAY (805)888-1601 (805)345-3581 HM

05-SB-154-21.3/0 IN SANTA BARBARA COUNTY NEAR LAKE TAYLOR JANE CONSTRUCTION LP DAVID COOPER $881,689 03/15/21 9% 05-1H6304 $217,280 04/13/21 CACHUMA AT 0.31 MILE WEST OF 131 W DANA ST, STE A & C 35S LAPATER LANE 25% $77,964 11/21/22 PARADISE ROAD. GOLETA, CA 93117 NIPOMO CA 93444 CULVERT INVERT PAVING WITH FISH (817)913-3747 (805)723-5129 HA23

05-SB-154-22.9/23.2 IN SANTA BARBARA COUNTY ABOUT 9 CERTIFIED COATINGS COMPANY MICHAEL MORTENSEN $7,424,761 11/25/20 14% 05-1C4204 $3,555,449 12/15/20 MILES NORTH OF SANTA BARBARA FROM 1.4 2320 CORDELIA ROAD; 35 S LAPATERA LANE 48% ACST-S154-(001)E $518,379 02/28/24 MILES SOUTH OF PARADISE ROAD TO 0.2 GOLETA,CA 93117 --() FAIRFIELD CA 94534 MILE NORTH OF STAGECOAC (805)698-2601 (707)639-4414 INFRASTRUCTURE MAINTENANCE HA21 State of California Department of Transportation Page 69 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 05 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 05-SB-166-8.1/8.1 IN SANTA BARBARA COUNTY IN SANTA LEE WILSON ELECTRIC COMPANY, $522,230 04/27/21 0% 05-1K1004 $0 05/13/21 MARIA AT MILLER STREET INC. 0% HSNH-P166-(033)E $0 MODIFY SIGNAL, RECONSTRUCT CURB 1151 EL CAMINO REAL; --()

ARROYO GRANDE CA 93420 HB1 (805)489-4216

05-SB-192-7.0/13.7 IN SANTA BARBARA COUNTY AT VARIOUS TORO ENTERPRISES, INC. $1,792,307 04/27/21 0% 05-1N1904 $0 05/19/21 LOCATIONS FROM COLD SPRING ROAD TO 2101 E. VENTURA BLVD 0% $0 0.9 MILE WEST OF NIDEVER ROAD OXNARD CA 93036 GRIND AND OVERLAY WITH RUBBERIZED (805)483-4515 HM1

05-SB-192-17.4/21 IN SANTA BARBARA COUNTY IN AND NEAR CALPORTLAND CONSTRUCTION OMID VAZIRI $1,745,180 04/06/21 7% 05-1N0604 $6,355 04/27/21 CARPINTERIA FROM LINDEN AVENUE TO 1625 E. DONOVAN ROAD; 35 S LAPATERA LANE 0% $6,355 08/27/21 ROUTE 150 GOLETA CA, 93117 SANTA MARIA CA 93454 GRIND AND OVERLAY WITH RUBBERIZED (805)888-1601 (805)345-3581 HM

05-SB-246-13.6/15.2 IN SANTA BARBARA COUNTY NEAR LOMPOC CCFG CONSTRUCTION JONES, DAVID $575,083 08/31/18 100% 05-0C6414 $470,850 11/08/18 FROM 0.8 MILE EAST OF CEBADA CANYON 393 MORNING STAR DR PO BOX 996 82% $4,200 04/22/22 ROAD TO 0.4 MILE EAST OF TULAROSA CARPINTERIA, CA 93014 SONORA CA 95370 ROAD AND AT HAPGOOD ROAD (805)319-1237 OVER RUN (209)743-4911 PLANTING MITIGATION HE13

05-SBT-25-46.7/49.8 IN SAN BENITO COUNTY, IN AND NEAR CAL VALLEY CONSTRUCTION, INC. $1,335,222 02/05/21 0% 05-1M0404 $0 03/01/21 HOLLISTER, FROM 0.1 MILE NORTH OF 5125 N. GATES AVENUE, SUITE 1 0% $0 BEST ROAD TO PLAZA DRIVE FRESNO CA 93722 RHMA-G OVERLAY AND SLURRY SEAL (559)274-0300 HM1

05-SCR-1-10.2/17.5 IN AND NEAR SANTA CRUZ FROM NORTH GRANITE CONSTRUCTION COMPANY MUNES NASH $24,382,870 02/19/19 93% 05-1C85U4 $23,513,408 03/21/19 APTOS UP TO JCT ROUTE 9 580 WEST BEACH STREET 140 DUBOIS STREET 93% B1NH-P001-(649)E $0 05/12/21 PAVEMENT REHABILITATION, ADA CURB SUITE E --() WATSONVILLE CA 95076 SANTA CRUZ, CA 95060 (831)763-6100 (831)427-4706 HA22 State of California Department of Transportation Page 70 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 05 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 05-SCR-1-16.7/17 IN SANTA CRUZ COUNTY, IN SANTA CRUZ A. TEICHERT AND SON, INC. DBA IAN NGUYEN $5,149,408 10/23/20 26% 05-1H0604 $1,155,063 11/16/20 FROM 0.3 MILE SOUTH OF ROUTE 1/17 TEICHERT CONSTRUCTION 140 DUBOIS STREET 22% HSNH-X087-(032)E $170,970 10/20/21 SEPARATION ON ROUTE 1 TO 0.4 MILE 400 SUNRISE BLVD.; SUITE E --() SOUTH OF PASATIEMPO OVERCR SANTA CRUZ, CA 95060 ROSEVILLE CA 95661 CONSTRUCT RAMP SAFETY IMPROVEMENTS (831)427-4706 HB1 (916)757-6400

05-SCR-1-/0 SC CNTY ON RTE 1,9, & 236 @ VAR GRANITE CONSTRUCTION COMPANY NGUYEN, IAN $12,985,000 08/26/20 15% 05-1M6504 $7,734,288 08/26/20 LOCATIONS.BURNED TREE REMOVAL, 580 WEST BEACH STREET 140 DUBOIS STREET STE 60% $0 10/20/21 RESTORE GUARDRAIL, TIMBER LAGGING & E WATSONVILLE, CA 95076 SIGNS, ROADWAY REPAIR. DIRS EFA SANTA CRUZ, CA 95060

RESTORE 15/20 MILES OF BURNED STATE (831)427-4706 20.20.201 HIWAYS 130 05-SCR-9-.1/7.5 IN SANTA CRUZ COUNTY IN AND NEAR DISNEY CONSTRUCTION, INC. IAN NGUYEN $2,033,333 02/10/21 42% 05-1F9204 $14,380 03/04/21 SANTA CRUZ FROM ROUTES 1 AND 9 TO 0.4 533 AIRPORT BLVD SUITE 120; 140 DUBOIS STREET 1% ACST-S009-(026)E $14,380 10/20/21 MILES NORTH OF GLEN ARBOR ROAD SUITE E --() BURLINGAME CA 94010 UPGRADE DRAINAGE SYSTEMS AND SANTA CRUZ, CA 95060 (650)259-9545 (831)427-4706

05-SCR-9-20.0/20 ON ROUTE 9 IN SANTA CRUZ COUNTY NEAR GORDON N. BALL, INC. NASH MUNES $2,930,774 05/17/21 10% 05-1K1304 $346,710 06/17/21 BOULDER CREEK ABOUT 1.1 MILE SOUTH OF 333 CAMILLE AVENUE; 140 DUBOIS STREET, 12% STER-31TP-(004) $346,710 10/20/21 JUNCTION 236 / 9 SUITE E --() ALAMO CA 94507 SOLDIER PILE TIEBACK RETAINING WALL SANTA CRUZ, CA 95060 (925)838-5675 (831)427-4706 HA23

05-SCR-17-.2/.5 IN SANTA CRUZ FROM 0.5 TO 0.3 MI. GRANITE ROCK COMPANY IAN NGUYEN $5,203,569 02/08/19 100% 05-1C6704 $5,214,882 03/04/19 SOUTH OF PASATIEMPO OVERCROSSING 5225 HELLYER AVENUE 140 DUBOIS STREET 97% HSNH-P017-(115)E $48,330 10/20/21 DRIVE SUITE E --() SAN JOSE CA 95138 SHOULDER WIDENING AND SOIL NAIL SANTA CRUZ, CA 95060 (408)574-1400 (831)427-4706 HB1

05-SCR-17-1.1/1.4 IN SANTA CRUZ COUNTY, NEAR SANTA CRUZ JOHN SEMSEN LANDSCAPING CO INCSANTIAGO GARCIA $321,775 08/30/19 0% 05-0Q6014 $241,849 10/04/19 FROM 0.3 MI NORTH PASATIEMPO DRIVE 21161 LYONS BALD MNT RD; 8115 PRUNEDALE NORTH 0% $4,428 12/29/22 OVERCROSSING TO BEULAH PARK ROAD SONORA CA 95370 UNDERCROSSING. PRUNEDALE, CA 93907 PLANT EST (209)743-6809 PROPOSED LANDSCAPE SPLIT FROM (831)455-5466 SATIS

State of California Department of Transportation Page 71 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 05 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 05-SCR-17-2.1/2.2 ADDRESS SINKHOLE IN MEDIAN ADJACENT A. TEICHERT & SONS INC DBA NGUYEN, IAN $583,718 01/22/21 0% 05-1M8104 $0 03/02/21 TO THE SOUTHBOUND LANES IN SANTA CRUZ TEICHERT CONSTRUCTION 140 DUBOIS STREET STE 0% $0 09/30/21 CO ON RTE 17. DIRS EFA 05A2314 400 SUNRISE AVE STE 300 E

ADDRESS SINKHOLE ON RTE 17 SANTA CRUZ, CA 95060 ROSEVILLE, CA 95661 (831)427-4706 20.20.201 130 05-SCR-17-7.4/12.4 SANTA CRUZ COUNTY AT VAR ROUTES AND GRANITE CONSTRUCTION COMPANY BUCKMAN HOLLEE $318,000 05/28/20 40% 05-1N2304 $229,284 06/25/20 PM'S. CLEAN & SLURRY BACKFILLING 580 WEST BEACH STREET 140 DUBOIS STREET STE 72% $0 04/15/21 EXISTING VOIDS IN THE CULVERTS. E WATSONVILLE, CA 95076 REPAIR OR REPLACE DRAINS.DIRS SANTA CRUZ, CA 95060 SUSPENDED

LINE AND REPAIR CULVERTS (831)763-6100 20.20.201 130 05-SCR-129-1.4/1.4 IN SANTA CRUZ COUNTY NEAR DREAMBUILDER CONSTRUCTION CORPIAN NGUYEN $3,050,061 10/20/20 50% 05-1G9904 $723,155 11/05/20 WATSONVILLE AT LAKEVIEW ROAD DBA DREAMBUILDER 140 DUBOIS STREET 24% SSTG-S129-(019)E $168,465 10/20/21 CONSTRUCT INTERSECTION SAFETY 18543 YORBA LINDA BLVD # 376; SUITE E --() SANTA CRUZ, CA 95060 YORBA LINDA CA 92886 (831)427-4706 HB1 (714)646-3697

05-SCR-236-2.1/15.5 SANTA CRUZ CNTY ON HWY 236. DEBRIS ARBORWORKS INC NGUYEN, IAN $13,985,000 09/23/20 15% 05-1M7904 $9,046,007 09/23/20 AND BURNED TREE REMOVAL ON FORESTED 40094 HWY 49 STE A 140 DUBOIS STREET STE 65% $0 06/20/21 STATE HWYSDISPOSAL OF DEBRIS/TREES. E OAKHURST, CA 93644 TRAFFIC CONTROL DIRS EF SANTA CRUZ, CA 95060

REMOVAL OF BURNED TREES AND DEBRIS (831)427-4706 20.20.201 130 05-SLO-1-32.6/0 IN SAN LUIS OBISPO COUNTY IN MORRO SOUZA ENGINEERING CONTRACTING, $5,759,455 03/08/21 0% 05-0L7214 $0 04/01/21 BAY AT TORO CREEK BRIDGE INC. DBA SOUZA CONSTRUCTION 0% $0 REPLACE BRIDGE 4027 SANTA FE ROAD

SAN LUIS OBISPO CA 93401 HA21 (805)546-8288

05-SLO-1-64.0/66.9 IN SAN LUIS OBISPO COUNTY ABOUT 9 EMPIRE LANDSCAPING INC SILVA,RICK $2,608,524 06/11/18 100% 05-492824 $2,234,546 06/28/18 MILES NORTH OF SAN SIMEON, FROM PO BOX 35 775 ARLINGTON ST. 86% ACST-S001-(638)E $18,800 04/01/22 PIEDRAS BLANCAS LIGHTHOUSE ROAD TO CAMBRIA, CA 93428 --() DAVIS CA 95616 ARROYO DE LA CRUZ BRIDGE. (805)471-2102 OVER RUN (530)400-3943 LANDSCAPE PLANTING AND WETLAND HA42 State of California Department of Transportation Page 72 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 05 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 05-SLO-1-71.5/72 IN SLO CNTY 1.3 MILES SOUTH TO .8 SOUZA ENGINEERING CONTRACTING SILVA, RICK $4,078,944 04/17/19 100% 05-1M1704 $3,162,288 04/29/19 MILES SOUTH OF RAGGED POINT. INC. DBA SOUZA CONSTRUCTION 775 ARLINGTON ST 78% $0 06/30/21 CONSTRUCT SIDEHILL VIADUCT RESTORE PO BOX 3810 CAMBRIA, CA 93428

RDWY FACILITIES,TRAFFIC CTDIRS E (805)927-4559 OVER RUN SAN LUIS OBISPO, CA 93403 CONSTRUCT VIADUCT, RESTORE 20.20.201 FACILITIES 130 05-SLO-41-14.2/15.9 IN ATASCADERO, FROM SAN GABRIEL ROAD SOUZA ENGINEERING CONTRACTING,IMAN, HASSAN $5,050,989 12/12/19 100% 05-1F6304 $4,703,030 01/14/20 TO ROUTE 101 SOUTHBOUND RAMPS. INC. DBA SOUZA CONSTRUCTION 3230 RIVERSIDE AVE 91% ACNH-P041-(141)E $69,317 07/20/21 IMPROVE AND CONSTRUCT NEW ADA 4027 SANTA FE RD #130 --() PASO ROBLES CA 93446 SAN LUIS OBISPO CA 93401 (805)748-2342 HB71 (805)546-8288

05-SLO-46-17.2/17.6 IN SAN LUIS OBISPO ON ROUTE 46, NEAR CALPORTLAND CONSTRUCTION SILVA, RICK $4,737,144 04/07/20 5% 05-1H9304 $4,385,767 05/08/20 TEMPLETON FROM 0.2 MILE WEST TO 0.2 1625 E DONOVAN ROAD 775 ARLINGTON STREET 90% SSTG-P046-(060)E $213,536 06/14/22 MILE EAST OF VINEYARD DRIVE CAMBRIA, CA 93428 --() SANTA MARIA CA 93454 CONSTRUCT ROUNDABOUT (805)471-2102 (805)345-3581 HB1

05-SLO-46-37.0/41.2 IN SAN LUIS OBISPO COUNTY NEAR PASO PAPICH CONSTRUCTION CO., INC. NORRIS, AMY $3,099,999 03/11/21 0% 05-1N0504 $0 04/13/21 ROBLES FROM GENESEO ROAD TO 0.6 MILE 398 SUNRISE TERRACE; 102 S WHITLEY GARDENS 0% $0 09/28/21 EAST OF ALMOND DRIVE DR ARROYO GRANDE CA 93420 OVERLAY WITH RUBBERIZED BONDED PASO ROBLES, CA 93446 SUSPENDED (805)473-3016 (805)550-1306 HM

05-SLO-46-49.6/49.6 IN SAN LUIS OBISPO COUNTY NEAR TSI ENGINEERING, INC. NORRIS, AMY $1,198,525 10/02/20 24% 05-1G3704 $577,631 10/19/20 SHANDON AT THE SHANDON SAFETY 4600 ROSEVILLE ROAD, SUITE 14 102 S WHITLEY GARDENS 48% $52,570 11/22/21 ROADSIDE REST AREA DR NORTH HIGHLANDS CA 95660 EXPAND WASTEWATER TREATMENT PASO ROBLES, CA 93446 (916)571-5731 (805)550-1306

05-SLO-46-/0 IN SAN LUIS OBISPO COUNTY AT VARIOUS LEE WILSON ELECTRIC COMPANY, $2,217,632 04/02/21 0% 05-0N2204 $0 05/07/21 LOCATIONS INC. 0% $0 INSTALL VEHICLE DETECTION SYSTEMS, 1151 EL CAMINO REAL;

ARROYO GRANDE CA 93420 HB4N (805)489-4216 State of California Department of Transportation Page 73 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 05 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 05-SLO-58-3.1/0 IN SAN LUIS OBISPO COUNTY ON HWY 58 SOUZA ENGINEERING CONTRACTING,PETERSEN, THOMAS $4,571,363 06/25/20 12% 05-0L7234 $2,463,386 07/17/20 NEAR SANTA MARGARITA AT TROUT CREEK INC. DBA SOUZA CONSTRUCTION 2053 PRESIKER LANE, 54% $1,247,536 03/24/22 BRIDGE 4027 SANTA FE RD STE E

REPLACE BRIDGE SANTA MARIA, CA 93454 SAN LUIS OBISPO CA 93401 (805)922-1611 HA21 (805)546-8288

05-SLO-58-4.9/9.9 IN SAN LUIS OBISPO COUNTY AT VARIOUS VELARDE CONCRETE CONSTRUCTION,THOMAS PETERSEN $1,906,621 02/18/21 22% 05-1M3804 $15,489 03/16/21 LOCATIONS INC. 2053 PREISKER LANE, 1% $15,489 11/29/21 TREAT BRIDGE DECKS WITH METHACYLATE 523 S. BRAND BLVD.; STE. E

SANTA MARIA, CA 93454 SAN FERNANDO CA 91340 (805)441-7943 HM (818)898-2300

05-SLO-101-35.6/42 IN SAN LUIS OBISPO COUNTY, IN AND PAPICH CONSTRUCTION CO., INC. LANG, TIM $3,944,755 06/17/21 0% 05-1K2804 $0 07/08/21 NEAR ATASCADERO, FROM CUESTA 398 SUNRISE TERRACE; 3230 RIVERSIDE AVE 0% $0 OVERHEAD TO 0.3 MILE SOUTH OF SANTA #130 ARROYO GRANDE CA 93420 BABARA ROAD OVERCROSSING PASO ROBLES, CA 93446 (805)473-3016 OGFC(BWC) AND MICRO-SURFACING (805)550-4651 HM

05-SLO-101-37.8/46 IN SAN LUIS OBISPO COUNTY IN AND NEAR FBD VANGUARD CONSTRUCTION, $6,656,409 06/09/21 0% 05-1N3504 $0 07/01/21 ATASCADERO FROM ROUTE 58 TO TRAFFIC INC. 0% ACNH-Q101-(393)E $0 WAY 550 GREENVILLE ROAD; --() REPLACE #1 LANE PCC PAVEMENT AND LIVERMORE CA 94550 (925)245-1300

05-SLO-101-38.5/39.4 IN SAN LUIS OBISPO COUNTY NEAR SANTA PAPICH CONSTRUCTION CO., INC. LANG, TIM $1,809,999 10/01/20 44% 05-1J7104 $1,115,908 10/19/20 MARGARITA FROM 0.5 MILE NORTH OF 398 SUNRISE TERRACE; 3230 RIVERSIDE AVE 62% HSNH-Q101-(383)E $1,094,608 09/14/21 SANTA MARGARITA CREEK BRIDGE (49- #130 --() ARROYO GRANDE CA 93420 153) TO 2.9 MILE SOUTH OF PASO ROBLES, CA 93446 (805)473-3016 SUPERELEVATION CORRECTION AND OGFC (805)550-4651 HB1

05-SLO-101-54.9/55.7 IN SLO CO IN PASO ROBLES ON RTE 101 SOUZA ENGINEERING CONTRACTING,IMAN, HASSAN $2,582,604 10/23/20 32% 05-1F4904 $1,304,142 11/20/20 FM 0.8 MI N OF RTE 101/46 SEP TO SD INC. DBA SOUZA CONSTRUCTION 3230 RIVERSIDE AVE 50% SNHG-X079-(030)E $99,982 11/19/21 PASO ROBLES OH AND IN ATASCADERO ON 4027 SANTA FE ROAD #130 --() RTE 41 FROM OLD MORRO PASO ROBLES, CA 93446 SAN LUIS OBISPO CA 93401 ROUTE 101 AND ROUTE 41 BARRIER (805)748-2342 HB1 (805)546-8288 State of California Department of Transportation Page 74 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 05 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 05-SLO-101-55.4/58.4 IN SAN LUIS OBISPO COUNTY FROM 0.2 BORTOLUSSI & WATKIN, INC. $423,607 03/26/21 0% 05-1H3604 $0 05/07/21 MILE NORTH OF THE SOUTH PASO ROBLES 77 LARKSPUR STREET; 0% $0 OVERHEAD TO 0.4 MILE SOUTH OF THE SAN RAFAEL CA 94901 NORTH PASO ROBLES OVERHEA (415)453-4675 UPGRADE IRRIGATION TO RECYCLED HA22

Totals: Authorized Final Amt: $764,866,422 Completed to Date: $366,993,360 Work This Month: $19,131,936 State of California Department of Transportation Page 75 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 06 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 06-FRE-0-/0 IN FRESNO, KERN, KINGS, MADERA AND ST. FRANCIS ELECTRIC, LLC $3,537,000 06/14/21 0% 06-0W1804 $0 07/07/21 TULARE COUNTIES AT VARIOUS 975 CARDEN STREET; 0% $0 REPAIR TMS DETECTION AND METERING SAN LEANDRO CA 94577

(510)639-0639 HB4N

06-FRE-5-20.0/21 IN FRESNO COUNTY FROM 2 MILES NORTH GRANITE CONSTRUCTION COMPANY DADAWALLA, DIN $2,606,599 02/18/21 94% 06-1A9404 $2,305,624 03/09/21 OF ROUTE 5/33/145 SEPARATION TO S 2716 GRANITE COURT; 3240 N. MILLBROOK 86% $782,268 07/20/21 DERRICK AVE OC AND FROM 1 MILE NORTH AVENUE FRESNO CA 93706 OF ROUTE 5/33 SEPARATIO FRESNO, CA 93726 (559)441-5700 COLPLANE, DIG OUTS, AND CONSTRUCT (559)417-5927 HM1

06-FRE-5-/0 IN FRESNO AND KINGS COUNTIES AT MYERS & SONS CONSTRUCTION, LLCAMOBI, EDMUND $1,815,568 03/15/21 27% 06-0X1904 $810,889 04/01/21 VARIOUS LOCATIONS 4600 NORTHGATE BLVD, SUITE 10 2750 N. PARKWAY DRIVE 45% $746,083 11/18/21 METHACRYLATE, JOINT SEALS, APPROACH FRESNO, CA 93722 SACRAMENTO CA 95834 (209)470-8819 (916)283-9950 HM1

06-FRE-41-.5/5.7 IN FRESNO CO. ABOUT 6 MILES NORTH OF CAL VALLEY CONSTRUCTION, INC. MARK MENGONI $7,024,676 05/04/21 53% 06-1C6504 $2,526,713 05/19/21 LEMOORE FROM 0.5 MILES NORTH OF 5125 N. GATES AVENUE, SUITE 1 3240 N. MILLBROOK 36% $2,510,953 08/21/21 EXCELSIOR AVE UC TO 0.4 MILES SOUTH FRESNO, CA 93726 FRESNO CA 93722 OF ELKHORN AVE. (559)258-4877 (559)274-0300 TEMPORARY MEDIAN BARRIER

06-FRE-41-6.3/20.1 NEAR EASTON FROM ELKHORN AVENUE TO BUSH ENGINEERING INC. CARY CRUZ $649,215 11/18/20 98% 06-0Y0304 $554,328 12/15/20 NORTH AVENUE UNDERCROSSING 518 N. REDINGTON STREET; 3240 N MILLBROOK 85% SNHG-P041-(143)E $121,333 07/21/21 CONSTRUCT SHOULDER RUMBLE STRIPS FRESNO CA 93726 --() HANFORD CA 93230 (559)243-3888 (559)840-0599 HB1

06-FRE-41-39.9/41.2 ON KERN 5, 46 AND KINGS 5, 41 AND ON TRUESDELL CORPORATION OF $1,069,069 04/22/21 0% 06-0Y7004 $0 06/11/21 FRESNO 198 AT VARIOUS LOCATIONS ON 10 CALIFORNIA, INC. 0% $0 BRIDGES 1310 W. 23RD STREET;

DECK MAINTENANCE TEMPE AZ 85282 HM3 (602)437-1711 State of California Department of Transportation Page 76 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 06 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 06-FRE-41-/0 IN FRESNO AND MADERA COUNTIES ON PTM GENERAL ENGINEERING MARK MENGONI $1,551,051 11/04/20 71% 06-0V9304 $559,457 11/17/20 ROUTES 41, 99, 168, AND 180 AT SERVICES, INC. 3240 N. MILLBROOK 36% $111,750 08/31/21 VARIOUS LOCATIONS 5942 ACORN STREET; FRESNO, CA 93726

UPGRADE AND REPAIR TMS ELEMENTS (559)259-4877 RIVERSIDE CA 92504 HB4N (951)710-1000

06-FRE-99-.9/5 IN AND NEAR KINGSBURG FROM SR 99/201 GRANITE CONSTRUCTION COMPANY MOHAMMAD SAMIMI $34,488,273 12/05/19 96% 06-0S4604 $32,292,359 12/24/19 SEPARATION TO 0.3 MI. SOUTH OF SECOND 2716 GRANITE COURT; 3240 N. MILLBROOK 93% ACNH-P099-(644)E $893,745 08/02/21 STREET UNDERCROSSING FRESNO, CA 93726 --() FRESNO CA 93706 PAVEMENT REHABILITATION (2R) (559)243-3814 (559)441-5700 HA22

06-FRE-99-4.9/11.6 IN AND NEAR SELMA FROM 0.1 MI SOUTH SECURITY PAVING COMPANY INC DONALD HIURA $61,035,942 02/25/21 3% 06-0U4204 $754,026 03/18/21 OF SECOND STREET UC TO 0.5 MI NORTH 3075 TOWNSGATE ROAD, SUITE 20 3240 N. MILLBROOK 1% ACNH-P099-(666)E $754,026 01/11/23 OF MERCED STREET UC FRESNO, CA 93726 --() WESTLAKE VILLAGE CA 91361 PAVEMENT REHABILITATION (2R) (559)341-2795 (818)362-9200 HA22

06-FRE-99-/0 IN FRESNO, MADERA AND FRESNO KOCH & KOCH INC KIMURA, JUSTIN $4,743,700 04/24/20 50% 06-0U2304 $1,653,056 06/03/20 COUNTIES AT VARIOUS LOCATIONS 16510 SOUTHRIDGE DR 2750 N. PARKWAY 35% $460,886 02/10/22 UPGRADE STORMWATER PUMPING PLANTS FRESNO, CA 93722 PENN VALLEY CA 95946 (559)974-5337 (530)432-4000

06-FRE-145-/6 IN FRESNO COUNTY NEAR FIVE POINTS GRANITE CONSTRUCTION COMPANY $1,320,074 03/18/21 6% 06-1A8804 $70,605 04/15/21 FROM ROUTE 145/5 SEPARATION TO COLUSA 2716 GRANITE COURT; 5% $70,605 09/03/21 AVENUE FRESNO CA 93706 DIGOUTS AND 0.10' RHMA (GAP GRADED) (559)441-5700 HM1

06-FRE-168-18.6/T25.5 NEAR PRATHER FROM SAMPLE ROAD TO OAK CAL VALLEY CONSTRUCTION, INC. MARK MENGONI $4,093,888 06/16/20 12% 06-0U4504 $24,825 07/02/20 CREEK ROAD 5125 N. GATES AVENUE, SUITE 1 3240 N. MILLBROOK 1% $0 12/14/21 PAVEMENT PRESERVATION (CAPM) FRESNO, CA 93726 FRESNO CA 93722 (559)243-3543 (559)274-0300 HA22 State of California Department of Transportation Page 77 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 06 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 06-FRE-168-27.4/39.7 IN FRESNO COUNTY NEAR PRATHER FROM AMERICAN PAVEMENT SYSTEMS, MARK MENGONI $1,194,985 04/15/21 44% 06-0Y1004 $602,679 05/11/21 0.1 MILE EAST OF LODGE ROAD TO 0.1 INC. 3240 N. MILLBROOK 50% $602,679 08/05/21 MILE WEST OF CRESSMAN ROAD 1012 11TH STREET; FRESNO, CA 93726

CONSTRUCTION ON STATE HIGHWAY (559)259-4877 MODESTO CA 95354 (209)522-2277

06-FRE-168-/11.7 IN FRESNO AND CLOVIS FROM EAST180- CLEAN CUT LANDSCAPE INC MOHAMMAD SAMIMI $1,431,216 01/22/21 69% 06-0U7604 $674,983 03/04/21 EAST168 CONNECTOR OC TO SHEPHERD AVE 8406 N ARMSTRONG AVE; 3240 N. MILLBROOK 47% $262,894 08/26/21 UPGRADE IRRIGATION SYSTEM FRESNO, CA 93726 CLOVIS CA 93619 (559)250-6305 (559)322-2041 HA25

06-FRE-198-22.6/22.9 ON STATE ROUTE 198 IN FRESNO COUNTY GRANITE CONSTRUCTION COMPANY $484,989 05/07/21 0% 06-0U0304 $0 06/03/21 AT STATE ROUTE 33 2716 GRANITE COURT; 0% $0 2-LANE CONVENTIONAL HIGHWAY FRESNO CA 93706

(559)441-5700 HB4N

06-FRE-198-26.3/26.8 IN FRESNO COUNTY 0.50' MILES WEST OF GRANITE CONSTRUCTION COMPANY $637,705 05/12/21 0% 06-1A5304 $0 06/15/21 198/5 SEPARATION TO THE 198/5 2716 GRANITE COURT; 0% $0 SEPARATION FRESNO CA 93706 REMOVE AND REPLACE 0.25' HMA (559)441-5700 HA22

06-KER-0-/0 IN KERN COUNTY AT VARIOUS LOCATIONS T.P.A. CONSTRUCTION, INC. SAM DHALIWAL $2,182,470 04/15/20 84% 06-0X1804 $1,197,327 06/03/20 BRIDGE DECK MAINTENANCE 2406 CLUBHOUSE DRIVE; 1824 NORRIS ROAD 54% $0 07/19/21 BAKERSFIELD, CA 93308 ROCKLIN CA 95765 07/23/21 (661)565-5462 (916)919-1624 HM1

06-KER-5-4.4/15.8 IN KERN COUNTY AT GRAPEVINE FROM 0.4 RV CONCRETE $2,253,581 05/06/21 0% 06-1A9004 $0 05/27/21 MILE NORTH OF LEBEC ROAD 605 E. COMMERCIAL ST.; 0% $0 OVERCROSSING TO ROUTE 5/99 SEPARATION ANAHEIM CA 92801 PCC PANEL REPLACEMENT (714)855-4201

State of California Department of Transportation Page 78 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 06 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 06-KER-5-6.4/8.8 IN KERN COUNTY NEAR LEBEC ON ROUTE 5 HIGHLAND CONSTRUCTION, INC. $2,057,828 08/08/19 23% 06-0Q8204 $387,199 08/23/19 FROM 0.6 MILE NORTH OF FORT TEJON 133 N. PIXLEY STREET; 19% $0 12/18/20 OVERCROSSING TO 1.3 MILE SOUTH OF ORANGE CA 92868 GRAPEVINE UNDERCROSSING (714)538-5156 REPAIR CONCRETE CHANNEL

06-KER-5-7.5/9 NEAR GRAPEVINE FROM 2.5 MI NORTH OF BUGLER CONSTRUCTION SAM DHALIWAL $3,722,632 08/25/20 57% 06-0W1604 $1,966,811 09/11/20 FORT TEJON OVERCROSSING TO 1.2 MI 4847 HOPYARD RD; 1824 NORRIS ROAD 53% $705,848 10/04/21 SOUTH OF GRAPEVINE UNDERCROSSING BAKERSFIELD, CA 93308 PLEASANTON CA 94588 UPGRADE DRAINAGE SYSTEMS (661)565-5462 (925)416-0700 HB71

06-KER-5-56.6/58.1 IN KERN COUNTY NEAR BUTTONWILLOW FROM BIG DOG EQUIPMENT SERVICES, $678,074 05/07/21 0% 06-1A9304 $0 06/10/21 7TH STANDARD ROAD (RD) OVERCROSSING INC. 0% $0 (OC) TO 0.1 MILE NORTH OF ROWLEE RD 12418 GRUEN ST;

OC & NEAR LOST HILLS PACOIMA CA 91331 INDIVIDUAL SLAB REPLACEMENT AND (818)834-6783

06-KER-5-81.7/87 IN KERN AND KINGS COUNTIES FROM 0.7 PAPICH CONSTRUCTION COMPANY, DADAWALLA, DIN $25,095,729 08/13/20 70% 06-0U4704 $8,405,057 08/27/20 MILE SOUTH OF TWISSELMAN ROAD INC 3240 N. MILLBROOK 33% ACIM-005 -(204)E $540,810 10/14/21 OVERCROSSING TO 0.3 MILE NORTH OF 398 SUNRISE TERRACE; AVENUE --() KERN/KINGS COUNTY LINE FRESNO, CA 93726 ARROYO GRANDE CA 93420 PAVEMENT REHABILITATION (2R) (559)417-5927 (805)473-3016

06-KER-5-/5 ON NORTHBOUND KERN 5 FROM THE KERN/LA GRIFFITH COMPANY DHALIWAL, AMARJIT $1,385,000 06/29/20 37% 06-1A6004 $399,545 06/30/20 COUNTY LINE TO 5.0 MILES NORTH OF THE 3050 E BIRCH STREET 1824 NORRIS ROAD 29% $0 03/18/21 KERN/LA COUNTY LINE BAKERSFIELD, CA 93308 BREA, CA 92821 REPAIR FAILED PAVEMENT (661)391-4766

20.20.201 130 06-KER-5-/0 IN FRESNO COUNTIES FROM LOS ANGELES PTM GENERAL ENGINEERING CARY CRUZ $1,009,901 10/13/20 63% 06-0T0304 $702,593 11/16/20 COUNTY LINE TO MERCED COUNTY LINE SERVICES, INC. 3240 N. MILLBROOK 70% $195,383 08/27/21 INSTALL VEHICLE DETECTION SYSTEMS 5942 ACORN STREET; FRESNO, CA 93726

(559)243-3888 RIVERSIDE CA 92504 (951)710-1000 State of California Department of Transportation Page 79 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 06 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 06-KER-33-34.2/40 IN KERN CO AT MCKITTRICK ON RTE 33 FM AMERICAN PAVEMENT SYSTEMS, SAM DHALIWAL $1,429,500 12/30/20 76% 06-1B0004 $1,331,875 01/14/21 0.1 MI S OF G ST TO 1.1 MI S OF INC. 1824 NORRIS ROAD 90% $0 07/07/21 LOKERN RD AND ABOUT 9 MI E OF TAFT ON 1012 11TH STREET; BAKERSFIELD, CA 93308

RTE 119 FM 0.1 MI W OF (661)565-5462 MODESTO CA 95354 PMA MED CHIP SEAL HM1 (209)522-2277

06-KER-43-.1/9.3 IN KERN COUNTY ON STATE ROUTE 43, GRANITE CONSTRUCTION COMPANY AMARJIT DHALIWAL $7,032,374 02/02/21 56% 06-0U1004 $4,278,853 02/18/21 NEAR BAKERSFIELD FROM STATE ROUTE 119 585 WEST BEACH ST 1824 NORRIS ROAD 61% ACST-X029-(148)E $662,894 09/17/21 TO 0.3 MILE SOUTH OF NOREIGA ROAD & BAKERSFIELD, CA 93308 --() WATSONVILLE CA 95076 ON STATE ROUTE 199 FRO (661)333-5825 (831)724-1011 PAVEMENT PRESERVATION (CAPM) HA22

06-KER-43-25.2/38.8 IN KERN COUNTY NEAR WASCO FROM ROUTE GRIFFITH COMPANY $3,629,629 03/24/21 0% 06-1A8904 $0 04/13/21 46 TO TULARE COUNTY LINE 1128 CARRIER PARKWAY AVENUE; 0% $0 DIGOUTS AND 0.10' RHMA (GAP GRADED) BAKERSFIELD CA 93308

(661)392-6640 HM1

06-KER-46-29.7/31.9 ON STATE ROUTE 46, FROM THE GRANITE CONSTRUCTION COMPANY AMARJIT DHALIWAL $19,417,854 01/08/21 0% 06-442554 $1,348,751 02/02/21 INTERSECTION OF BROWNS MATERIAL ROAD 3005 JAMES ROAD 1824 NORRIS ROAD 7% PLUL-6206-(031)N $858,700 01/03/23 TO 0.3 MILES EAST OF LOST HILLS ROAD. BAKERSFIELD, CA 93308 --() BAKERSFIELD CA 93308 2-LANE CONVENTIONAL HIGHWAY TO (661)391-4766 (661)399-3361 HE13

06-KER-46-51.2/57.8 IN KERN CO ON SR 46 FROM N JUNCTION GRANITE CONSTRUCTION COMPANY AMARJIT DHALIWAL $3,139,056 04/27/21 20% 06-1A9504 $710,580 05/13/21 RTE 43 TO RTE 46/99 SEPARATION AND ON 3005 JAMES ROAD 1824 NORRIS ROAD 22% $710,580 09/09/21 SR 65 FROM 0.1 MILE NORTH OF 7TH BAKERSFIELD, CA 93308 BAKERSFIELD CA 93308 STANDARD ROAD TO 0.1 MI (661)333-5825 (661)399-3361 COLD PLANE AC PAVEMENT & PLACE RHMA HM

06-KER-58-52.7/55.5 IN BAKERSFIELD FROM ROUTE 58/99 SECURITY PAVING COMPANY, INC. AMARJIT DHALIWAL $22,650,446 05/01/18 100% 06-0G8514 $21,492,914 05/29/18 SEPARATION TO COTTONWOOD ROAD 3075 TOWNSGATE ROAD STE, 200 1824 NORRIS ROAD 95% ACNH-P058-(128)E $0 08/31/21 ROADWAY REHABILITATION (3R) BAKERSFIELD, CA 93308 --() WESTLAKE VILLAGE CA 91361 (661)391-4766 OVER RUN (818)362-9200 HA22 State of California Department of Transportation Page 80 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 06 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 06-KER-58-76.1/76.6 IN KERN CO. ON ROUTE 58 FROM PM 76.10 GRIFFITH COMPANY DHALIWAL, AMARJIT $2,485,000 05/03/21 0% 06-1C7204 $0 05/03/21 TO 76.60 1128 CARRIER PARKWAY AVE 1824 NORRIS ROAD 0% $0 08/12/21 REMOVE AND REPLACE BROKEN SLABS BAKERSFIELD, CA 93308 BAKERSFIELD, CA 93308 (661)331-7215

20.20.201 130 06-KER-99-10.4/21.2 IN AND NEAR BAKERSFIELD FROM 0.4 MI GRIFFITH-ATKINSON JV $50,642,205 12/08/20 0% 06-0Q9204 $0 12/31/20 SOUTH OF OLD US-99 OVERCROSSING (S. 3050 E. BIRCH STREET; 0% ACNH-P099-(660)E $0 UNION AVE.) TO 0.1 MI NORTH OF WHITE --() BREA CA 92821 LANE OVERCROSSING (661)392-6640 PAVEMENT REHABILITATION AND IMPROVE

06-KER-99-23.6/28.4 IN KERN COUNTY IN AND NEAR BROSAMER & WALL, INC. HUGO CAMBEROS $65,437,995 10/03/18 94% 06-0Q2804 $51,145,653 10/25/18 BAKERSFIELD FROM BRUNDAGE LANE OC TO 1777 OAKLAND BLVD. 1824 NORRIS ROAD 79% B1NH-X029-(143)E $1,429,144 10/09/21 BEARDSLEY CANAL BAKERSFIELD, CA 93308 --() WALNUT CREEK CA 94596 ROADWAY REHABILITATION (661)391-4742 (925)932-7900 HA22

06-KER-99-/0 IN KERN AND KINGS COUNTIES AT VARIOUS CAL ELECTRO, INC. AMARJIT DHALIWAL $4,693,800 03/24/20 42% 06-0U2404 $4,189,658 04/16/20 LOCATIONS 3710 ELECTRO WAY; 1824 NORRIS ROAD 89% $190,380 02/17/22 UPGRADE STORMWATER PUMPING PLANTS BAKERSFIELD, CA 93308 REDDING CA 96002 (661)391-4766 (530)223-5937

06-KER-99-/11.2 NEAR BAKERSFIELD FROM RTE 5/99 GRIFFITH-VANGUARD JOINT SAM DHALIWAL $62,598,495 01/07/19 100% 06-0T20U4 $59,288,621 02/06/19 SEPARATION TO 0.3 MI NORTH OF US 99 VENTURE 1824 NORRIS ROAD 94% B1NH-P099-(636)E $487,693 08/06/21 OVERCROSSING 3050 E BIRCH STREET BAKERSFIELD, CA 93308 --() REHABILITATE PAVEMENT/VERTICAL (661)565-5462 BREA CA 93308 HA22 (661)392-6640

06-KER-119-9.8/13.3 ON ROUTE 119 IN KERN COUNTY FROM 0.75 BOSCO CONSTRUCTORS, INC. JAMES BURFORD $897,963 05/15/19 100% 06-0X2004 $808,131 06/05/19 MI WEST OF CHERRY AVENUE TO TUPMAN 21353 MAYALL ST.; 1824 NORRIS ROAD 90% $0 11/07/21 ROAD BAKERSFIELD, CA 93308 CHATSWORTH CA 91311 REPAIR AND INSTALL DRAINAGE SYSTEMS (559)977-4455 (818)700-0304

State of California Department of Transportation Page 81 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 06 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 06-KER-155-35.5/37.5 IN KERN NEAR GLENVILLE ON SR 155 FROM GRANITE CONSTRUCTION COMPANY $946,946 05/19/21 0% 06-1B0204 $0 06/15/21 3.3 MILES EAST OF BLUE MOUNTAIN RD TO 585 WEST BEACH STREET 0% $0 0.8 MI W OF GRANITE RD & FROM 2.2 MI WATSONVILLE CA 95076 E OF PASCOE RD TO (661)392-6640 OVERLAY HMA, SHOULDER BACKING & HM

06-KER-178-10.4/57 IN KERN COUNTY ON ROUTE 178 FROM 0.2 GRIFFITH COMPANY AMARJIT DHALIWAL $2,480,642 02/11/21 68% 06-0X5204 $1,925,058 03/01/21 MILE EAST OF MIRAMONTE DRIVE TO KELSO 3050 EAST BIRCH STREET; 1824 NORRIS ROAD 78% SSTG-X029-(149)E $815,024 08/11/21 VALLEY ROAD AND ON ROUTE 223 FROM BAKERSFIELD, CA 93308 --() BREA CA 92821 SOUTH VINELAND ROAD T (661)333-5825 (714)984-5500 CONSTRUCT CENTERLINE AND SHOULDER HB1

06-KER-178-24.6/44.2 IN KERN COUNTY AT MIRACLE HOT SPRINGS TALLEY OIL, INC $1,993,509 05/10/21 0% 06-0Y1104 $0 06/08/21 FROM 2 MILES SOUTH OF DEMOCRAT 12483 ROAD 29; 0% $0 SPRINGS ROAD TO 0.1 MILE SOUTH OF MADERA CA 93638 LAKE ISABELLA BOULEVARD (559)673-9011 PME MED CHIP SEAL

06-KER-204-5.6/5.7 IN KERN COUNTY ON ROUTE 204 FROM 1.5 GRIFFITH COMPANY DHALIWAL, AMARJIT $800,000 03/25/21 0% 06-1C1304 $0 04/16/21 MILES WEST OF ROUTE 204/178 JUNCTION 1128 CARRIER PARKWAY 1824 NORRIS ROAD 0% $0 07/31/21 TO 1.1 MILES EAST OF AIRPORT DRIVE BAKERSFIELD, CA 93308 BAKERSFIELD, CA 93308 UNDERCROSSING (661)391-4766

REPAIR BRIDGE SCOUR 20.20.201 130 06-KER-223-21.2/21.2 IN ARVIN AT DERBY STREET (EL TEJON GRIFFITH COMPANY AMARJIT DHALIWAL $1,764,447 02/09/21 0% 06-0S5104 $0 03/04/21 HIGHWAY) 12200 BLOOMFIELD AVE.; 1824 NORRIS ROAD 0% HSST-S223-(012)E $0 SIGNALIZATION AND CHANNELIZATION BAKERSFIELD, CA 93308 IP62-06 0-(9) SANTA FE SPRINGS CA 90670 (661)333-5825 --() (562)929-1128 HB1

06-KIN-43-/3.2 IN KINGS COUNTY IN AND NEAR CORCORAN GRANITE CONSTRUCTION COMPANY CARY CRUZ $2,102,877 11/17/20 9% 06-0X3904 $2,054,137 12/24/20 FROM TULARE COUNTY LINE TO SANTA FE 2716 GRANITE COURT; 3240 N MILLBROOK 95% $49,392 08/02/21 AVENUE FRESNO CA 93726 FRESNO CA 93706 PAVEMENT PRESERVATION (MULTI-ASSET (559)243-3888 (559)441-5700 HA22 State of California Department of Transportation Page 82 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 06 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 06-MAD-49-.1/9.1 IN MADERA COUNTY IN OAKHURST AT GRANITE CONSTRUCTION COMPANY KHAMPRASEUTH, ANOURACK $1,943,116 04/27/21 0% 06-1A8704 $0 05/27/21 VARIOUS LOCATIONS 2716 GRANITE COURT; 2750 N. PARKWAY 0% $0 SAFETY/TRAFFIC OPERATIONS/TSM AVENUE FRESNO CA 93706 FRESNO, CA 93722 SUSPENDED (559)441-5700 (559)355-7868

06-MAD-99-1.5/7.4 IN MADERA COUNTY NEAR THE CITY OF A TEICHERT & SON INC DBA VAQUILAR, FELIX $1,985,000 03/16/21 100% 06-1C1604 $1,647,956 04/15/21 MADERA FROM 0.5 MILES NORTH OF AVE 7 TEICHERT CONSTRUCTION 2750 PARKWAY AVE 83% $0 06/29/21 OVERCROSSING TO AVE 13 OVERCROSSING 5771 SOUTH TOYOTA PLACE FRESNO, CA 93722

REMOVE AND REPLACE EXISTING HMA AND (559)813-3100 OVER RUN FRESNO, CA 93725 STRIPE 20.80.110 000 06-MAD-99-7.5/15.1 IN MADERA COUNTY IN AND NEAR MADERA SECURITY PAVING COMPANY, INC. FERNANDO DEALBA $67,002,704 03/14/19 100% 06-470904 $61,593,568 04/05/19 FROM AVENUE 12 OVERCROSSING TO 0.9 3075 TOWNSGATE RD #200 3240 N. MILLBROOK 91% B1NH-P099-(635)E $2,667,405 08/20/21 MILES SOUTH OF AVENUE 17 AVENUE --() WESTLAKE VILLAGE, CA 91361 OVERCROSSING FRESNO, CA 93726 OVER RUN (818)362-9200 WIDEN FREEWAY FROM 4 LANES TO 6 (559)246-7337 HE13

06-MAD-99-14.0/14.5 IN AND NEAR MADERA, FROM 0.2 MILE GRANITE CONSTRUCTION COMPANY CARRUBA, DAVID $7,157,769 04/01/21 0% 06-0U5204 $0 04/16/21 SOUTH TO 0.3 MILE NORTH OF AVE 17 2716 GRANITE COURT; 2750 N. PARKWAY DRIVE 0% ACNH-P099-(667)E $0 OVERCROSSING AND FROM 0.9 MILE NORTH FRESNO, CA 93722 --() FRESNO CA 93706 AVE 17 OVERCROSSING TO 0. (559)974-5337 (559)441-5700 PAVEMENT REHABILITATION (CAPM) HA22

06-MAD-145-8.1/9.6 ON STATE ROUTE 145 IN MADERA COUNTY PTM GENERAL ENGINEERING VAQUILAR, FELIX $1,233,127 11/05/20 0% 06-0W3604 $0 11/17/20 IN THE CITY OF MADERA FROM AVENUE 13 SERVICES, INC. 2750 N. PARKWAY 0% $0 TO SIXTH STREET. 5942 ACORN STREET; FRESNO, CA 93722

UPGRADE/INSTALL ADA CURB RAMPS AND (559)360-1951 SUSPENDED RIVERSIDE CA 92504 HB71 (951)710-1000

06-MAD-145-8.6/8.6 IN MADERA COUNTY IN MADERA AT THE GRANITE CONSTRUCTION COMPANY VAQUILAR, FELIX $294,994 05/11/21 100% 06-1C0014 $291,789 06/03/21 CALTRANS MAINTENANCE STATION AT 125 2716 GRANITE COURT; 2750 N. PARKWAY DRIVE 99% $291,789 07/20/21 WEST ALMOND AVENUE FRESNO, CA 93722 FRESNO CA 93706 PARKING LOT RESURFACING WITH COLD (559)360-1951 (559)441-5700

State of California Department of Transportation Page 83 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 06 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 06-MAD-152-/15.5 IN MADERA COUNTY NEAR CHOWCHILLA FROM CAL VALLEY CONSTRUCTION, INC. AMOBI, EDMUND $849,700 03/08/21 56% 06-1A9204 $604,526 03/25/21 ROUTE 59/152 SEPARATION TO 0.1 MILE 5125 N. GATES AVENUE, SUITE 1 2750 N. PARKWAY DRIVE 88% $0 07/06/21 WEST OF ROUTE 99/152 SEPARATION FRESNO, CA 93722 FRESNO CA 93722 REMOVE CONCRETE PAVEMENT AND PLACE (209)470-8819 (559)274-0300

06-TUL-0-/0 IN KINGS AND TULARE COUNTIES ON STURGEON ELECTRIC CALIFORNIA, HUERTA JAVIER $10,816,315 03/17/20 76% 06-0U3004 $7,667,482 04/08/20 VARIOUS ROUTES AT VARIOUS LOCATIONS LLC. 8530 W ROOSEVELT 71% ACNH-000C-(514)E $463,018 10/12/21 WIRE THEFT RESTORATION 13501 BENSON AVE; VISALIA CA 93291 --() (559)651-8319 CHINO CA 91214 HA23 (909)591-0000

06-TUL-43-/22.7 IN KERN AND TULARE COUNTIES AT AMERICAN PAVEMENT SYSTEMS, $3,125,573 04/29/21 0% 06-1A9904 $0 05/20/21 VARIOUS LOCATIONS INC. 0% $0 PME MED CHIP SEAL 1012 11TH STREET;

MODESTO CA 95354 (209)522-2277

06-TUL-63-/0 NEAR VISALIA ON STATE ROUTES 137 & 63 BUSH ENGINEERING INC. $851,923 03/08/21 0% 06-0U0404 $200,944 04/01/21 AT VARIOUS LOCATIONS 518 N. REDINGTON STREET; 24% SSTG-X107-(020)E $200,944 10/15/21 INSTALL CENTERLINE AND SHOULDER --() HANFORD CA 93230

(559)840-0599 HB1

06-TUL-65-6.9/10 IN TULARE COUNTY AT VARIOUS LOCATIONS NORTHWEST PAVING, INC $2,227,777 04/30/21 0% 06-1A9804 $0 05/28/21 PME MED CHIP SEAL 8115 SECLUDED VALLEY DRIVE; 0% $0 REDDING CA 96001

(530)246-4388

06-TUL-65-17.5/22 IN PORTERVILLE FROM 0.4 MI NORTH OF A.M. CONCRETE, INC. GARCIA JAKE $2,978,057 09/28/20 82% 06-0U7304 $2,385,426 10/29/20 AVE 136 TO 0.2 MI NORTH OF LINDA P.O.BOX 3367 8530 W. ROOSEVELT 80% ACNH-X107-(018)E $357,030 08/12/21 VISTA AVE; ALSO ON RTE 190 FROM 0.2 VISALIA CA 93291 --() THOUSAND OAKS CA 91359 MI WEST OF RTE 190/65 SEP (559)905-1299 (818)362-8300 INSTALL MVPS, GORE PAVING AND

State of California Department of Transportation Page 84 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 06 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 06-TUL-65-/0 IN TULARE COUNTY IN AND NEAR GRANITE CONSTRUCTION COMPANY $1,334,034 10/27/20 76% 06-0X0404 $1,207,522 12/02/20 PORTERVILLE ON ROUTES 65 & 190 AT 2716 GRANITE COURT; 90% SSTG-X107-(019)E $107,483 08/11/21 VARIOUS LOCATIONS --() FRESNO CA 93706 INSTALL CENTERLINE AND SHOULDER (559)441-5700 HB1

06-TUL-99-6.1/12.8 IN TULARE COUNTY ON ROUTE 99 AT VIKING CONSTRUCTION COMPANY, JAKE GARCIA $2,611,593 06/03/21 0% 06-0U2704 $0 06/28/21 VARIOUS LOCATIONS INC. 8530 W ROOSEVELT 0% $0 BRIDGE RAIL UPGRADE 11315 SUNRISE GOLD CIR.,STE A VISALIA CA 93291

(559)905-1299 RANCHO CORDOVA CA 95742 HA21 (916)852-5530

06-TUL-99-19.2/19.8 IN TULARE COUNTY NEAR TIPTON FROM GRANITE CONSTRUCTION COMPANY $8,049,654 09/25/20 14% 06-0Q9104 $1,513,930 10/13/20 0.3 MILE SOUTH TO 0.3 MILE NORTH OF 2716 GRANITE COURT; 19% ACNH-P099-(957)E $674,855 03/03/22 AVENUE 152 OVERCROSSING --() FRESNO CA 93706 BRIDGE DECK AND OUTSIDE GIRDER (559)441-5700 HA21

06-TUL-99-30.6/35.2 ON ROUTE 99 IN TULARE COUNTY NEAR SECURITY PAVING COMPANY, INC. $48,856,761 04/26/21 0% 06-360244 $0 06/11/21 TULARE FROM PROSPERITY AVE TO 1.2 3075 TOWNSGATE ROAD; 0% ACNH-P099-(665)E $0 MILES SOUTH OF AVENUE 280 --() WESTLAKE VILLAGE CA 91361 OVERCROSSING (BR NO. 46-0195) (818)362-9200 4F TO 6F HE13

06-TUL-99-31.2/32.5 IN TULARE COUNTY IN TULARE AT WABO LANDSCAPE & CONSTRUCTION $1,126,123 09/28/17 0% 06-332214 $1,096,913 10/27/17 CARTMILL AVENUE OVERCROSSING 726 ALFRED NOBEL DR. 0% $3,710 07/21/21 LANDSCAPE MITIGATION HERCULES CA 94547 07/21/21 PLANT EST (510)741-9226 SATIS HA25

06-TUL-99-41.3/52 IN TULARE COUNTY NEAR GOSHEN FROM 0.2 CAL VALLEY CONSTRUCTION, INC. $999,725 02/02/21 100% 06-1A9604 $902,963 02/18/21 MI NORTH OF GOSHEN OH TO 0.2 MILE 5125 N. GATES AVENUE, SUITE 1 90% $428,968 07/30/21 NORTH OF DODGE AVE OC FRESNO CA 93722 SB #3 LAN REMOVE AND REPLACE 0.10' (559)274-0300 HM1 State of California Department of Transportation Page 85 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 06 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 06-TUL-137-16.5/16.6 IN TULARE AT ROUTE 137/99 SEPARATION CAL VALLEY CONSTRUCTION, INC. $2,156,807 06/25/21 0% 06-0T3504 $0 07/15/21 RAMP INTERSECTIONS 5125 N. GATES AVENUE, SUITE 1 0% ACNH-P137-(010)E $0 INSTALL SIGNALS NB & SB; WIDEN N/B --() FRESNO CA 93722

(559)274-0300

06-TUL-137-16.6/0 ON TUL-137, NEAR TULARE, FROM 16.6 BEADOR CONSTRUCTION COMPANY, $405,700 04/27/21 0% 06-1A0404 $0 06/14/21 MILES EAST OF THE KIN CO LINE TO 1 INC. 0% $0 MILE WEST OF THE RTE 137/63 JCT 26320 LESTER CIRCLE;

BRIDGE BENT CAP REPAIRS CORONA CA 92883 HM1 (951)674-7352

06-TUL-190-15.1/16.9 IN PORTERVILLE FROM PROSPECT ST. TO WABO LANDSCAPE & CONSTRUCTION, $309,320 04/10/19 0% 06-0S3114 $302,394 05/01/19 PLANO ST. INC. 0% $7,575 07/20/21 REPLACEMENT PLANTING 726 ALFRED NOBEL DR.

PLANT EST HERCULES CA 94547 SATIS (510)741-9226

Totals: Authorized Final Amt: $586,527,674 Completed to Date: $283,877,721 Work This Month: $19,165,845 State of California Department of Transportation Page 86 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 07 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 07-LA-1-2.8/2.8 IN LONG BEACH, INTERSECTION OF PCH INTERNATIONAL LINE BUILDERS, TURAY, SULAIMAN $371,974 08/13/20 0% 07-341704 $0 09/11/20 AND ANAHEIM ST/ LOS ALTOS AVE INC. 13230 FIRESTONE 0% SSTG-P001-(668) $0 10/12/21 INSTALL LEFT TURN PHASE AND ADA 3955 TEMESCAL CANYON ROAD; BLVD., STE E-2 --() SANTA FE SPRINGS, CA SUSPENDED CORONA CA 92883 90670 (951)682-2982 (562)345-3134 07-LA-1-3.5/3.5 IN LOS ANGELES, IN LONG BEACH AT LOS BEADOR CONSTRUCTION COMPANY, TON, THANG $497,499 11/07/19 100% 07-299104 $493,940 11/26/19 ALAMITOS TRAFFIC CIRCLE INC. 18000 STUDEBAKER RD 97% $0 10/30/21 INSTALL PAVEMENT DELINEATION, 26320 LESTER CIRCLE; SUITE 360

CERRITOS CA 90703 CORONA CA 92883 (562)860-3085 HB1 (951)674-7352

07-LA-1-6.0/6 IN LOS ANGELES COUNTY, CITY OF LONG CROSSTOWN ELECTRICAL & DATA, ALONZO, BERNARD $249,973 04/16/20 0% 07-339804 $358 05/14/20 BEACH ON PACIFIC COAST HIGHWAY AT INC. 13230 FIRESTONE BLVD. 0% HSTG-P001-(667)E $0 11/15/21 ATLANTIC AVENUE 5454 DIAZ STREET; STE. E-2 --() TRAFFIC SAFETY IMPROVEMENT SANTA FE SPRINGS, CA SUSPENDED IRWINDALE CA 91706 90670 HB1 (626)813-6693 (562)345-3145 07-LA-1-10.7/10.7 IN LOS ANGELES COUNTY IN LOS ANGELES KDC INC., DBA DYNALECTRIC FREMPONG, S. $479,332 09/19/18 93% 07-331704 $437,858 10/25/18 AT FRIES AVENUE 4462 CORPORATE CENTER DR. 13230 FIRESTONE BLVD 89% SSTG-P001-(644)E $0 07/31/22 INSTALL TRAFFIC SIGNALS AND UPGRADE UNIT A --() LOS ALAMITOS CA 90720 SANTA FE SPRINGS, CA (714)828-7000 90670 HB1 (562)345-9865 07-LA-1-34.5/35.4 IN LOS ANGELES COUNTY AT VARIOUS ALDRIDGE ELECTRIC, INC. SHIN, F. $5,632,720 01/24/20 65% 07-316904 $2,760,047 04/08/20 LOCATIONS 844 E. ROCKLAND ROAD; 12975 CULVER BLVD. 49% HSST-X037-(220)E $674,315 12/31/21 ENHANCE TUNNEL LIGHTING,INST QUEUE LOS ANGELES, CA. 90066 --() LIBERTYVILLE IL 60048 (310)213-3136 (847)247-5214 HA22

07-LA-1-46.9/50.4 IN LOS ANGELES COUNTY, IN AND NEAR DREAMBUILDER CONSTRUCTION CORPSHAKERI, SAEID $1,263,951 06/09/20 96% 07-3W8704 $16,588 07/02/20 MALIBU, FROM MALIBU LAGOON BRIDGE TO DBA DREAMBUILDER 1525 RANCHO CONEJO 1% ACST-P001-(669)E $3,150 09/30/21 SOLSTICE CANYON CREEK 18543 YORBA LINDA BLVD # 376; BLVD STE102 --() SLURRY SEAL DIGOUTS, SLABS THOUSAND OAKS, CA 91320 YORBA LINDA CA 92886 (213)808-7976 HM1 (714)646-3697 State of California Department of Transportation Page 87 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 07 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 07-LA-1-48.7/50.6 IN MALIBU AT MALIBU SEAFOOD FRESH YAKAR QUACH, BEN $667,800 04/12/21 0% 07-4V0104 $0 04/30/21 FISH MARKET & PATIO CAFE (25653 CA-1) 689 EAST SAN BERNARDINO RD; 13171 TELFAIR AVE, 0% SNHG-P001-(672)E $0 10/30/21 INSTALL PEDESTRIAN SIGNAL CROSSING, SUITE 101 --() COVINA CA 91723 SYLMAR, CA 91342 SUSPENDED (909)599-1612 (213)817-0223

07-LA-1-56.5/56.9 IN LOS ANGELES COUNTY IN MALIBU FROM STACY AND WITBECK, INC. LEON, DAN $10,781,073 02/18/21 0% 07-291404 $69,500 03/09/21 GUERNSEY AVE TO TRANCAS CANYON ROAD 2800 HARBOR BAY PARKWAY; 12975 W CULVER BLVD 1% ACST-P001-(674)E $23,100 09/29/21 BRIDGE REPLACEMENT LOS ANGELES, CA 90066 --() ALAMEDA CA 94502 (310)345-6270 SUSPENDED (510)748-1870 HA21

07-LA-1-567.0/56.7 IN CITY OF MALIBU TRANCAS CREEK ON SUMMER CONSTRUCTION INC LEON, DAN $570,000 01/19/18 50% 07-1XG104 $9,987 02/27/18 PCH TO PLACE CLASS IV ROCKS AROUND TO P.O. BOX 30 12975 W. CULVER BLVD. 2% $0 04/08/21 PREVENT FURTHER SCOURING OF BRIDGE LOS ANGELES, CA 90066 SANTA PAULA, CA 93061 FOOTINGS DIR'S EMERGEN (310)345-6270

PROTECT BRIDGE SPREAD FOOTING 20.20 201130 07-LA-2-14.2/14.2 IN LOS ANGELES COUNTY, IN VARIOUS CHUMO CONSTRUCTION INC CHAUDHARI, SUSHILKUMAR $3,130,945 03/01/21 2% 07-288304 $83,077 04/30/21 CITIES ON ROUTES 2, 60, 164 AND 210 14425 JOANBRIDGE STREET; 1201 BALDWIN PARK 3% ACNH-X037-(221)E $83,077 03/16/23 AT VARIOUS LOCATIONS BLVD --() BALDWIN PARK CA 91706 TARGET POLLUTANTS (STORM WATER BALDWIN PARK, CA 91706 (626)960-9502 (213)308-2033 HA42

07-LA-2-14.9/22.6 IN LOS ANGELES COUNTY AND VENTURA PTM GENERAL ENGINEERING PHAM, RYAN $11,647,077 12/17/18 86% 07-340604 $9,794,466 02/05/19 COUNTY AT VARIOUS LOCATIONS SERVICES, INC. 1041 W BADILLO ST, 84% B1NH-000C-(486)E $307,030 09/09/21 INTELLIGENT TRANSPORTATION SYSTEM 5942 ACORN ST. #112 --() COVINA, CA 91722 RIVERSIDE CA 92504 (213)793-7193 HB4N (951)710-1000

07-LA-2-37.5/48 IN LA COUNTY RT 2 ANGELES NATIONAL BURNS PACIFIC CONSTRUCTION INCWIDJAJA, DANIEL $4,085,000 10/12/20 26% 07-1XS204 $3,474,404 10/28/20 FOREST REPAIR & REPLACE ALL FIRE 505 E THOUSAND OAKS BLVD 2090 FERN LN 99% $0 06/30/21 DAMAGE DUE TO BOBCAT FIRE INCL GLENDALE, CA 91208 THOUSAND OAKS, CA 91360 MBGR,DRAING SYSTEMS ETC DIR'S E (213)792-5056

REPAIR BOBCAT FIRE DAMAGE 20.20 201130 State of California Department of Transportation Page 88 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 07 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 07-LA-5-1.7/1.7 IN SANTA FE SPRINGS AT 14044 FREEWAY SPECTRUM CONSTRUCTION GROUP, FREMPONG, SAM $19,956,100 05/07/19 100% 07-325704 $18,272,258 06/07/19 DRIVE ADJACENT TO I-5 BETWEEN VALLEY INC. 13230 S FIRESTONE 91% $484,500 09/30/22 VIEW AVE AND ALONDRA BOULEVARD. 32 EDELMAN; BLVD SUITE A

CONSTRUCT SOUTHERN REGIONAL SANTA FE SPRINGS CA IRVINE CA 92618 90670 HA11 (949)299-1400 (562)345-9865 07-LA-5-5.8/6.8 IN SANTA FE SPRIRINGS FROM NORTH OF SECURITY PAVING COMPANY INC TON, THANG $90,559,085 04/24/14 89% 07-215954 $86,560,975 05/13/14 ORR AND DAY OVERHEAD TO ROUTE 605 13170 TELFAIR AVENUE 18000 STUDEBAKER RD. 94% CMLN-6207-(068)N $94,499 04/30/22 INTERCHANGE SUITE 360 --() SYLMAR CA 91342 ROADWAY WIDENING & STRIPING (SEG 5) CERRITOS CA 90703 (818)362-9200 (562)916-7962 HB5

07-LA-5-9.0/59 IN LOS ANGELES COUNTY ON ROUTE 5 J. FRANCIS COMPANY FERRER, JOSE $1,980,283 12/04/20 66% 07-4W5604 $1,826,071 12/24/20 APPLY METHACRYLATE ON DECK, REPAIR 16197 KRAMERIA AVE. 11229 SOUTH WOODRUFF 89% $344,735 09/15/21 AVENUE RIVERSIDE CA 92504 DOWNEY, CA 90241 (951)776-9100 (562)401-3333 HM3

07-LA-5-10.3/10.4 ON LA, CITY OF COMMERCE, REMOVE & SEBASTIAN WATERWORKS INC. ROBILLOS, RAMON $585,000 01/28/21 100% 07-1XT004 $579,144 04/23/21 REPLACE DAMAGED NATURAL GAS AND 221 W. POMONA BLVD. 13230 FIRESTONE BLVD. 97% $0 06/21/21 SERVICE LINES TO THE BUILDINGS AND SANTA FE SPRINGS, CA MONTEREY PARK, CA 91754 OTHER RELATED WORK. DIR'S EME 90670 OVER RUN

REMOVE & REPLACE NATURAL GAS/SERVICE (562)345-3301 20.20 LINES 201130 07-LA-5-11.0/14 IN LOS ANGELES COUNTY AT VARIOUS SHIMMICK CONSTRUCTION COMPANY,ARABE, JEROME $5,527,133 11/27/19 90% 07-317504 $5,400,956 01/02/20 LOCATIONS INC. 13230 SOUTH FIRESTONE 98% $0 12/31/21 DRAINAGE IMPROVEMENT 530 TECHNOLOGY DR.; BLVD

SANTA FE SPRINGS CA SUSPENDED IRVINE CA 92618 90670 HA22 (949)333-1500 (562)345-3113 07-LA-5-14.2/53.4 IN LOS ANGELES COUNTY ON ROUTE 5 RV CONCRETE MINOVI, SEPAND $1,822,781 05/12/21 0% 07-4W7904 $0 06/03/21 APPLY DECK METHACRYLATE, REPLACE 605 E. COMMERCIAL ST.; 902 SAN GABRIEL BLVD 0% $0 02/22/22 ROSEMEAD CA 91770 ANAHEIM CA 92801 (909)322-2462 (714)855-4201 HM3 State of California Department of Transportation Page 89 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 07 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 07-LA-5-18.2/18.2 IN LOS ANGELES COUNTY, SR-5 PM 18.26 WESTCOAST PUBLIC WORKS INC PATEL, PRAVIN $1,474,424 11/27/19 36% 07-332704 $1,386,443 12/24/19 AT THE CONNECTOR FROM WESTBOUND ROUTE 20058 VENTURA BLVD, #318; 902 SAN GABRIEL BLVD 92% SHIM- 005-(128)E $0 06/06/22 10 TO SOUTHBOUND ROUTE 5 ROSEMEAD, CA 91770 --() WOODLAND HILLS CA 91364 APPLY HIGH FRICTION SURFACE (213)798-6053 (818)256-9401 HB1

07-LA-5-18.3/18.8 IN LOS ANGELES COUNTY IN LOS ANGELES J. MCLOUGHLIN ENGINEERING CO.,IZADPANAH, MOE $2,760,974 09/27/18 76% 07-318404 $2,036,223 10/22/18 ON ROUTE 5 FROM STATE STREET INC. 3212 ROSEMEAD BLVD 76% ACIM-X037-(207)E $0 05/01/21 OVERCROSSING TO MISSION ROAD 10641 FULTON COURT SUITE 100 --() UNDERCROSSING AND ON ROUTE 10 FROM EL MONTE, CA 91731 RANCHO CUCAMONGA CA 91730 HIGH FRICTION & UPGRADE LIGHTING (626)572-6732 HB1 (909)944-1037

07-LA-5-19.6/19.9 IN LOS ANGELES CITY, FROM 0.1 MILE SEMA CONSTRUCTION, INC. CHAUDHARI, SUSHILKUMAR $3,150,356 05/25/18 0% 07-308004 $46,865 06/19/18 SOUTH OF NORTH BROADWAY AVENUE 42690 RIO NEDO, SUITE G 1201 BALDWIN PARK 2% ACIM- 005-(107)E $0 03/04/22 OVERCROSSING TO 0.1 MILE NORTH OF BLVD. --() TEMECULA, CA 92590 PASADENA AVENUE OVERCROSSING BALDWIN PARK, CA 91706 SUSPENDED (949)470-0500 PAVEMENT PRESERVATION (626)337-8252 HA22

07-LA-5-29.4/31.6 IN LOS ANGELES COUNTY IN BURBANK FROM SECURITY PAVING COMPANY INC GURFINKEL, VLADIMIR $257,468,407 11/29/12 81% 07-1218W4 $238,635,465 12/20/12 WEST MAGNOLIA BOULEVARD OVERCROSSING 13170 TELFAIR AVENUE 13171 TELFAIR AVE, 92% IM- 005-(078) $2,124,512 03/02/23 TO 0.3 MILE NORTH OF BUENA VISTA STE 101 --() SYLMAR, CA 91342 STREET/WINONA AVENUE SYLMAR, CA 91342 (818)362-9200 REALIGN ROUTE 5 AND RAILROAD TRACKS (562)572-5538 HB5 SWPPP

07-LA-5-32.5/32.5 INSTALLATION OF TRAFFIC SIGNALS AT CALPROMAX ENGINEERING, INC. KWAN, KIN $523,113 12/28/18 100% 07-4T9804 $502,639 01/25/19 SOUTH BOUND LA 5 OFF-RAMP TO 650 N. ROSE DR. #186 2090 FERN LANE 100% $0 05/21/21 HOLLYWOOD WAY GLENDALE, CA 91208 PLACENTIA CA 92870 07/02/21 INSTALL TRAFFIC SIGNAL (562)572-6016 COMPLETED (714)573-4599 HB4N

07-LA-5-33.2/39.1 IN LOS ANGELES COUNTY IN CITY OF LOS MARTINEZ LANDSCAPE CO., INC LAO, ARTURO $845,282 12/19/18 0% 07-4U0604 $799,900 01/15/19 ANGELES ON ROUTE 5 FROM 0.1 MILE 12357 SAN FERNANDO ROAD 9225 CRANFORD AVE 0% $0 08/30/21 SOUTH OF ROSCOE BOULEVARD PACOIMA, CA 91331 SYLMAR CA 91342 OVERCROSSING TO PAXTON STREET UND (818)768-1939 PLANT EST (818)364-9188 LA-5, ROADSIDE REHABILITATION SATIS HA25 State of California Department of Transportation Page 90 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 07 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 07-LA-5-34.6/34.6 IN LOS ANGELES COUNTY,ON RTE 5 AT SUN CERTIFIED COATINGS COMPANY MOHSENZADEH, ALI $3,284,109 07/10/20 0% 07-314204 $0 07/28/20 VALLEY OVERHEAD 2320 CORDELIA ROAD; 13171 TELFAIR AVE. 0% $0 09/30/21 BRIDGE PAINT #101 FAIRFIELD CA 94534 SYLMAR, CA. 91342 (707)639-4414 (818)746-0669 HA21

07-LA-5-42.6/47.9 LA 5/14 & LA 5/210 IN CITY OF SYLMAR BALTAZAR CONSTRUCTION INC OSORIO, OSCAR $14,735,000 12/09/19 100% 07-1XP104 $10,429,002 01/10/20 IN LACOUNTY SADDLE RIDGE FIRE DAMAGE 236 E. ARROW HWY 25061 W. AVE STANFORD 71% $0 08/27/21 REPAIR, REPLACE/INSTALL EROSION #70 COVINA, CA 91722 CONTROL BMP'S DIR'S EMER VALENCIA, CA 91355 OVER RUN

REPAIR SADDLE RIDGE FIRE DAMAGE (661)257-0273 20.20 201130 07-LA-5-44.9/88.6 IN LOS ANGELES COUNTY ON ROUTE 5 AND TRUESDELL CORPORATION OF OSORIO, OSCAR $1,918,965 06/21/19 100% 07-4W1504 $1,658,639 07/11/19 118,FROM PM R44.86 TO R88.57 CALIFORNIA, INC. 25061 W AVENUE 82% $33,500 10/01/21 COLUMN REPAIR, DECK METHACRYLATE 1310 W. 23RD STREET STANFORD STE 70

VALENCIA, CA 91355 OVER RUN TEMPE AZ 85282 (661)257-0273 HM3 (602)437-1711

07-LA-5-73.5/88.6 IN LOS ANGELES COUNTY FROM 1.0 MILE HARBER COMPANIES, INC OSORIO, OSCAR $3,083,790 06/24/21 0% 07-3W8004 $0 07/22/21 SOUTH OF VISTA DEL LAGO ROAD 1880 RIVERVIEW DRIVE; 26061 W. AVENUE 0% $0 UNDERCROSSING TO THE LOS ANGELES / STANFORD, #70 SAN BERNARDINO CA 92408 KERN COUNTY LINE VALENCIA, CA 91355 (909)478-1957 PCC PROFILE GRIND AND SLAB (661)257-0273 HM1

07-LA-5-/1.5 IN LOS ANGELES AND ORANGE COUNTIES IN SECURITY PAVING COMPANY, INC. SAKER, GEORGE $151,870,382 05/27/16 71% 07-2159U4 $124,597,693 07/15/16 BUENO PARK, LA MIRADA, CERRITOS SANTA 13170 TELFAIR AVE 13230 FIRESTONE BLVD 82% NHPI-0052-(981)N $1,463,682 04/13/23 FE SPRINGS FROM ARTESIA BLVD SANTA FE SPRINGS, CA MO06-62 0-(062)N SYLMAR CA 91342 UNDERCROSSING TO NORTH FO 90670 --() (818)362-9200 WIDEN AND REALIGN FREEWAY (SEGMENT (562)345-3125 HB5

07-LA-5-/0 IN LA COUNTY AT VAR LOCS LA-5, FERREIRA CONSTRUCTION CO INC MOHSENZADEH, ALI $694,000 07/17/19 85% 07-1XM604 $494,422 08/12/19 134,210&405TO REMOVE X-LITE TERMINAL DBA FERREIRA COASTAL CONSTR CO13171 TELFAIR AVE 71% $0 08/30/21 AND REPLACE WITHMASH APPROVED 10370 COMMERCE CENTR DR B-200 SYLMAR, CA 91342

TERMINAL SYSTEM DIR'S ORDER EMER (818)746-0669 SUSPENDED RANCHO CUCAMONGA, CA 91730 REPLACE X-LITE TERMINAL WITH MASH 20.20 SYSTEM 201130 State of California Department of Transportation Page 91 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 07 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 07-LA-10-.4/21.1 IN LOS ANGELES COUNTY IN AND NEAR LOS BOSCO CONSTRUCTORS, INC. CHAUDHARI, SUSHILKUMAR $1,872,883 11/05/19 0% 07-304304 $1,760,260 11/19/19 ANGELES FROM 0.3 MILE EAST OF CESAR 21353 MAYALL ST.; 1201 BALDWIN PARK 0% HSIM- 010-(853)E $3,272 06/01/22 CHAVEZ OVERCROSSING TO CAMPUS ROAD BLVD --() CHATSWORTH CA 91311 OVERCROSSING BALDWIN PARK, CA 91706 PLANT EST (818)700-0304 PAVING BEYOND GORES AND VEGETATION (626)337-8252 SATIS HB34

07-LA-10-2.1/11.1 IN LOS ANGELES COUNTY IN SANTA MONICA SPECTRUM CONSTRUCTION GROUP, SAYKALI, ZARIF $3,372,526 10/02/19 65% 07-304204 $3,104,693 11/19/19 AND LOS ANGELES FROM 0.1 MILE WEST INC. 12975 W. CULVER BLVD 92% HSIM- 010-(850)E $38,131 04/30/22 OF ROUTE 1/10 SEPARATION TO 0.1 MILE 32 EDELMAN; LOS ANGELES, CA 90066 --() EAST OF WEST BOULEV (310)821-1847 IRVINE CA 92618 RELOCATE APPURTENANCES; ADD HB34 (949)299-1400

07-LA-10-2.1/18.4 IN LA COUNTY IN SANTA MONICA & LA ON SECURITY PAVING COMPANY, INC. RAM, MAHINDA $29,043,416 11/19/18 97% 07-301504 $28,596,017 12/12/18 RTE 1 FROM 0.1 MILE WEST OF MAIN 13170 TELFAIR AVENUE 12975 CULVER BLVD 94% ACIM- 010-(844)E $1,001,704 08/11/21 STREET OC TO RTE 1/10 SEP, & ON RTE LOS ANGELES CA 90066 --() SYLMAR CA 91342 10 FROM RTE 1/10 SEP TO (310)920-7449 (818)362-9200 PAVEMENT PRESERVATION HA22

07-LA-10-2.2/10.6 IN LOS ANGELES COUNTY ON ROUTE 10. PETERSON-CHASE GENERAL RAM, MAHINDA $448,967 12/22/20 1% 07-4W5704 $9,500 01/21/21 FROM ROUTE 1/10 SEPARATION TO 0.2 ENGINEERING CONSTRUCTION, INC.12975 W. CULVER BLVD 2% $0 12/17/21 MILE EAST OF LA BREA AVENUE 16351 CONSTRUCTION CIR W; LOS ANGELES, CA 90066

UNDERCROSSING (310)920-7449 IRVINE CA 92606 REPLACE SIGNS WITH TYPE XI HM4 (949)252-0441

07-LA-10-12.4/14.9 IN THE CITY AND COUNTY OF LOS ANGELES CHUMO CONSTRUCTION INC SAYKALI, ZARIF $14,795,058 12/16/20 12% 07-332604 $3,209,604 01/12/21 FROM 0.1 MILE EAST OF ARLINGTON 14425 JOANBRIDGE STREET; 12975 W. CULVER BLVD 22% SIMG- 010-(854)E $795,148 04/30/24 AVENUE OVERCROSSING TO 0.7 MILE EAST LOS ANGELES, CA 90066 --() BALDWIN PARK CA 91706 OF ROUTE 10/110 SEPARAT (310)821-1847 (626)960-9502 REPLACE RAISED ISLAND WITH CONCRETE HB1

07-LA-10-15.0/18.3 IN LOS ANGELES AT VARIOUS LOCATIONS CL COATINGS, INC DBA CL PATEL, PRAVIN $29,542,401 06/04/18 70% 07-296604 $20,367,431 06/29/18 FROM 0.1 MILE EAST OF ROUTE 10/110 INDUSTRIAL COATINGS, INC 902 SAN GABIEL BLVD 69% ACIM- 010-(840)E $473,026 08/08/22 SEPARATION TO ROUTE 10/5/101 SEPARA 26713 MADISON AVE ROSEMEAD, CA 91770 --() TION (626)572-6700 MURRIETA, CA 92562 PAINT AND REHABILITATE BRIDGE AND HA21 (562)285-6520 State of California Department of Transportation Page 92 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 07 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 07-LA-10-15.8/15.8 CITY & COUNTY OF LA ON MAPLE AVE & E KORMEX INDUSTRIES INC IZADPANAH, MOE $751,000 02/22/21 100% 07-1XS804 $743,937 03/23/21 16TH TO REPAIR &SECURE STATE OWNED 13089 PEYTON DR #C461 3212 ROSEMEAD 97% $0 08/01/21 PROPERTY DUETO VANDALISM,ARSON & BOULEVARD, SUITE 100 CHINO HILLS, CA 91709 HOMELESS ENCAMPMENTS DIR' EL MONTE, CA 91731 OVER RUN

REPAIR DAMAGE TO STATE PROPERTY (626)572-6732 20.20 201130 07-LA-10-16.6/30.1 IN LOS ANGELES COUNTY ON ROUTE 10 POWELL CONSTRUCTORS INC HAILU, MESFIN $9,542,185 01/29/21 13% 07-260804 $1,891,392 02/11/21 BETWEEN EAST OF SOUTH CENTRAL AVE 8555 BANANA AVENUE; 1201 BALDWIN PARK 20% ACNH-X037-(222)E $742,925 06/19/23 UNDERCROSSING AND WEST OF COGSWELL RD BLVD --() FONTANA CA 92335 UNDERCROSSING AND ON ROU BALDWIN PARK, CA 91706 (909)356-8880 STORM WATER MITIGATION (TRASH TMDL) (213)453-7555 HA42

07-LA-10-17.2/42.1 IN LOS ANGELES COUNTY ON ROUTE 10 TRUESDELL CORPORATION OF AZIMA, HASSAN $2,694,669 01/29/21 29% 07-4W5304 $2,149,672 03/01/21 METHACRYLATE DECK, SPALL REPAIR AND CALIFORNIA, INC. 3212 ROSEMEAD BLVD., 79% $0 06/22/21 1310 W. 23RD STREET; STE 100

EL MONTE, CA 91731 TEMPE AZ 85282 (626)572-6732 HM3 (602)437-1711

07-LA-10-26.3/26.3 IN LOS ANGELES COUNTY AT SAN GABRIEL KANAAN CONSTRUCTION INC. AZIMA, HASSAN $463,500 04/28/20 57% 07-4P2404 $323,420 06/03/20 ELECTRICAL MAINTENANCE STATION 230 S. IRWINDALE AVE.; 3212 ROSEMEAD BLVD, 70% $28,470 08/30/21 REMODEL EXISTING BUILDING SUITE 100 AZUSA CA 91702 EL MONTE, CA 91731 (626)334-5775 (626)572-6732

07-LA-10-31.2/37.2 IN LOS ANGELES COUNTY IN BALDWIN PARK SECURITY PAVING COMPANY, INC. KAROUT, REDA $45,059,406 11/25/20 10% 07-303904 $8,844,432 12/17/20 AND WEST COVINA FROM 0.1 MILE EAST OF 3075 TOWNSGATE ROAD; 1041 W. BADILLO SUITE 20% ACIM-010 -(855)E $1,878,574 06/07/24 THE 10/605 SEPARATION TO 0.3 MILE 112 --() WESTLAKE VILLAGE CA 91361 WEST OF CITRUS STREE COVINA, CA 91722 (818)362-9200 LANE REPLACEMENT (213)798-6049 HA22

07-LA-10-31.3/31.3 IN LOS ANGELES COUNTY ON ROUTE 10 (PM O'DONNELL CONSTRUCTION, INC. KHAN, MOHAMMAD Z. $646,102 03/16/21 0% 07-4V1604 $0 04/08/21 31.3) , AND ON ROUTE 126 (PM 559 W. COVINA BLVD.; 25061 W. AVENUE 0% $0 11/27/24 R5.0/R5.3) AT VARIOUS LOCATIONS STANFORD, # 70 SAN DIMAS CA 91773 RESTORE EXISTING BEST MANAGEMENT VALENCIA, CA 91355 SUSPENDED (909)394-4510 (661)257-0273 HA42 State of California Department of Transportation Page 93 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 07 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 07-LA-10-33.2/37.2 LA COUNTY IN CITY OF BALDWIN PARK AND AMES CONSTRUCTION, INC. PUNJABI, RAJ $100,737,410 02/10/14 84% 07-1170U4 $97,077,923 02/27/14 WEST COVINA FROM PUENTE AVENUE TO 2000 AMES DRIVE 1041 W. BADILLO, 95% CMLN-6207-(059) $0 09/21/21 CITRUS STREET SUITE 112 --() BURNSVILLE, MN 55306 CONSTRUCT HOV LANES & SOUNDWALLS COVINA, CA 91722 (952)435-7106 (626)339-1601 HB5

07-LA-10-37.2/42.4 IN LA COUNTY FROM CITRUS STREET IN GUY F. ATKINSON CAO, RUDY $188,976,561 11/16/15 75% 07-1193U4 $183,342,759 12/08/15 WEST COVINA TO ROUTE 57 IN POMONA 18201 VON KARMAN AVE STE 800 1370 VALLEY VISTA DR, 96% NHPI- 010-(829)E $1,001,514 02/27/23 WIDEN FREEWAY, CONSTRUCT HOV LANES STE 150 LN62-07 0-(0) IRVINE CA 92612 DIAMOND BAR, CA 91765 --() (949)382-7172 (909)594-3739 HB5

07-LA-14-28.9/29.2 IN THE CITY OF SANTA CLARITA, NEAR SEMA CONSTRUCTION, INC. AMADI, PATRICIA $4,461,831 10/15/20 38% 07-337604 $1,573,020 11/05/20 SOUTHBOUND OFFRAMP TO SIERRA HIGHWAY 42690 RIO NEDO STE. G; 13171 TELFAIR AVE, 35% $24,631 03/03/22 REPLACE DAMAGED DRAINAGE SYSTEM SUITE #101 TEMECULA CA 92590 SYLMAR, CA 91342 (303)627-2600 (818)364-2760 HA22

07-LA-14-32.1/60.7 IN SANTA CLARITA AND PALMDALE FROM MYERS AND SONS CONSTRUCTION, MOHSENZADEH, ALI $5,974,684 06/29/17 87% 07-3W4504 $5,705,318 07/27/17 0.2 MILE NORTH OF SANTA CLARA RIVER LP 13171 TELFAIR AVE 92% NHP0-1407-(E ) $0 07/30/21 TO TECHNOLOGY DRIVE UNDERCROSSING 4600 NORTHGATE BLVD SUITE 100 #101 --() PCC GRIND, SLABS REPAIR, CPOL SYLMAR, CA 91342 SACRAMENTO CA 95834 (818)746-0669 HM1 (858)243-8272

07-LA-14-35.0/53.5 IN LOS ANGELES FROM 0.7 MILE SOUTH DREAMBUILDER CONSTRUCTION MOHSENZADEH, ALI $3,706,061 01/11/19 93% 07-312804 $3,758,907 02/05/19 SOLEDAD CANYON ROAD/ 0.3 MILE SOUTH CORP. 13171 TELFAIR AVE 98% ACNH-P014-(079) $0 09/30/21 MOUNTAIN SPRING ROAD OC 18543 YORBA LINDA BLVD #376 #101 --() STORM WATER MITIGATION SYLMAR, CA 91342 YORBA LINDA, CA 92886 (818)746-0669 HA42 (714)646-3697

07-LA-14-35.7/39.8 IN CITY OF SANTA CLARITA LA-14 TO ORTIZ ENTERPRISES INC CHAVEZ, EFRAIM $4,035,000 11/27/19 100% 07-1XP504 $3,200,476 12/20/19 INSTALL VEGETATION CNTRL, ROCK 6 CUSHING STE 200 13171 TELFAIR AVE 79% $0 07/30/21 SCALING,REPAIR ERODSLOPE & BURN AREA SUITE 101 IRVINE, CA 92618 DUE TO TICK FIRE DIR'S EMERG SYLMAR, CA 91342 OVER RUN

REPAIR BURN AREAS DUE TO TICK FIRE (805)857-7053 20.20 201130 State of California Department of Transportation Page 94 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 07 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 07-LA-14-54.6/66.2 IN LOS ANGELES COUNTY FROM VINCENT WESTCOAST PUBLIC WORKS INC KHAN, MOHAMMAD $2,492,483 08/07/20 99% 07-311104 $1,559,536 08/27/20 RAMP UNDERCROSSING TO AVENUE K8 20058 VENTURA BLVD, #318; 25061 W AVENUE 62% ACNH-P014-(082)E $407,090 08/27/21 OVERCROSSING STANFORD STE 70 --() WOODLAND HILLS CA 91364 ROADSIDE SAFETY IMPROVEMENTS VALENCIA, CA 91355 (818)256-9401 (661)257-0273 HB34

07-LA-18-/4.5 IN LOS ANGELES COUNTY FROM 263RD GRANITE CONSTRUCTION COMPANY TIEU, FRED $1,783,617 05/26/21 0% 07-4W6104 $0 06/15/21 STREET EAST RT TO JCT RTE 138 4820 MCGRATH ST. STE. 101; 0% $0 DIGOUTS COLD PLANE/AC OVERLAY, VENTURA CA 93003

(805)765-6867 HM1

07-LA-39-17.8/38.2 IN LOS ANGELES COUNTY, FROM SAN DREAMBUILDER CONSTRUCTION CORPHONG, HAI $3,095,061 11/18/20 44% 07-3W7304 $1,010,407 12/09/20 GABRIEL BRIDGE TO CRYSTAL LAKE ROAD DBA DREAMBUILDER 1041 W. BADILLOS 32% $346,073 11/10/21 SLURRY SEAL, SHOULDER BACKING, 18543 YORBA LINDA BLVD # 376; SUITE 112

COVINA, CA 91722 YORBA LINDA CA 92886 (951)232-3742 HM1 (714)646-3697

07-LA-39-31.2/31.2 IN LOS ANGELES COUNTY, ON ROUTE 39 AT OHL USA, INC. HONG, HAI $13,476,412 10/30/19 23% 07-343404 $4,169,609 11/12/19 NORTH FORK SAN GABRIEL RIVER BRIDGE 1920 MAIN STREET STE 310 1041 W BADILLO, SUITE 31% HSST-P039-(038)E $261,441 01/23/24 (BR. NO. 53-3069) 112 --() IRVINE CA 92614 REPLACE BRIDGE COVINA, CA 91722 SUSPENDED (949)242-4432 (626)339-1601 HA21

07-LA-39-180.0/30.9 LA-39 S/B SAN GABRIEL RESERVOIR & BALTAZAR CONSTRUCTION, INC HONG, HAI $1,905,000 10/16/20 81% 07-1XS404 $900,752 11/24/20 ANGELES NATIONAL FOREST REPAIR FIRE 236 E. ARROW HWY 1041 W. BADILLO ST 47% $0 08/09/21 DAMAGE MBGR &DRAINAGE SUITE 112 COVINA, CA 91722 SYSTEMS,BASINS&EROSION CONTROL DIR'S COVINA, CA 91722

E (951)232-3742 20.20 REPAIR BOBCAT FIRE DAMAGE 201130 07-LA-47-3.4/4.6 IN LOS ANGELES COUNTY IN LONG BEACH M C M CONSTRUCTION INC LEON, DAN $391,723,200 06/30/11 91% 07-138204 $386,878,397 07/13/11 AND LOS ANGELES ON ROUTE 47 FROM 460 N. HENRY FORD AVENUE 450 N. HENRY FORD 99% NHBR-P047-(010)N $116,698 05/26/22 OCEAN BOULEVARD TO ROUTE 103 AVENUE --() WILMIMGTON, CA 90744 JUNCTION AND ON ROUTE 103 FROM WILMIMGTON, CA 90744 (562)432-4343 REPLACE STEEL BRIDGE WITH CIP (562)472-6032 HA21 SWPPP State of California Department of Transportation Page 95 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 07 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 07-LA-57-7.7/11.8 IN LOS ANGELES COUNTY IN SAN DIMAS HIGHLAND CONSTRUCTION, INC. KAROUT, REDA $2,154,464 01/15/20 48% 07-301804 $2,187,782 02/13/20 AND GLENDORA FROM ROUTE 57/10 133 N. PIXLEY STREET; 1041 W BADILLO STE 97% ACNH-P057-(068)E $0 02/10/22 SEPARATION TO ROUTE 57/210 SEPARATION 112 --() ORANGE CA 92868 ROADSIDE SAFETY IMPROVEMENTS COVINA, CA 91722 (714)538-5156 (626)339-1601 HB34

07-LA-57-/4.5 IN LOS ANGELES COUNTY IN DIAMOND BAR GRIFFITH COMPANY - FBD SANDOVAL, MARTIN $62,331,317 06/11/20 20% 07-304504 $10,697,024 06/29/20 AND CITY OF INDUSTRY FROM ORANGE VANGUARD CONSTRUCTION INC. 1370 VALLEY VISTA DR, 17% HSNH-P057-(069)E $576,304 02/10/25 COUNTY LINE TO ROUTE 57/60 SEPARATION JOINT VENTURE STE 150 --() LANE REPLACEMENT 12200 BLOOMFIELD AVE.; DIAMOOOND BAR, CA 91765

(909)396-7574 HA22 SANTA FE SPRINGS CA 90670 (562)929-1128 07-LA-60-.6/29.4 IN LOS ANGELES COUNTY AT VARIOUS VELARDE CONCRETE CONSTRUCTION,MINOVI, SEPAND $2,258,687 04/14/21 0% 07-4W7704 $0 05/07/21 LOCATIONS FROM ROUTE 60/5 SEPARATION INC. 902 SAN GABRIEL BLVD 0% $0 02/23/22 TO GAREY AVENUE UNDERCROSSING 523 S. BRAND BLVD.; ROSEMEAD, CA 91770

METHACRYLATE DECK, SPALL PATCHING, (909)322-4628 SAN FERNANDO CA 91340 HM3 (818)898-2300

07-LA-60-2.8/11.8 IN LOS ANGELES COUNTY, IN THE CITIES GUY F. ATKINSON CONSTRUCTION, MINOVI, SEPAND $118,850,629 06/03/19 36% 07-301104 $109,269,179 06/26/19 OF MONTEREY PARK, MONTEBELLO, AND LLC 902 SAN GABRIEL BLVD 89% ACNH-X037-(211)E $3,239,794 02/23/24 SOUTH EL MONTE BETWEEN I-710 AND I- 18201 VON KARMAN AVE STE 800 ROSEMEAD, CA 91770 --() 605 (909)322-4628 IRVINE CA 92612 MAJOR PAVEMENT REHABILITATION & HA22 (949)855-9755

07-LA-60-11.0/12 IN LOS ANGELES COUNTY IN AND NEAR O'DONNELL CONSTRUCTION, INC. WANG, MIKE $2,389,661 10/29/19 71% 07-304004 $2,371,925 11/14/19 CITY OF INDUSTRY ON I-605 FROM 0.4 559 W. COVINA BLVD.; 1041 W BADILLO SUITE 98% HSNH-X037-(215)E $840 01/13/22 MILE S/O ROUTE 60 TO VALLEY 112 --() SAN DIMAS CA 91773 BOULEVARD; AND ON (SR 60) FROM PE COVINA, CA 91722 (909)394-4510 WORKER SAFETY (626)339-1601 HB34

07-LA-60-11.5/18.3 ON RTE 605 FROM 0.3 MI SOUTH TO 0.3 DIVERSIFIED LANDSCAPE CO. DOUGHLY, JOE $886,492 06/14/21 0% 07-4V2204 $0 06/28/21 MI NORTH OF RTE 60/605 SEPARATION AND 21730 BUNDY CANYON ROAD; 1370 VALLEY VISTA DR 0% $0 ON ROUTE 60 FROM 0.1 MI WEST OF RTE #150C WILDOMAR CA 92595 60/605 SEPARATION T DIAMOND BAR, CA 91765 (951)245-1686 HIGHWAY PLANTING RESTORATION (818)400-4669 HA25 State of California Department of Transportation Page 96 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 07 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 07-LA-60-/21.5 IN LOS ANGELES COUNTY IN VARIOUS PETERSON-CHASE GENERAL PATEL, PRAVINKUMAR $2,049,571 11/19/20 49% 07-317304 $787,842 12/15/20 CITIES FROM ROUTE 5 TO ROUTE 710, AND ENGINEERING CONSTRUCTION, INC.902 SAN GABRIEL BLVD. 38% ACNH-P060-(158) $41,510 05/27/22 FROM ROUTE 605 TO FAIRWAY DRIVE 16351 CONSTRUCTION CIRCLE WES ROSEMEAD, CA 91770 --() REPLACE EXISTING SIGNS WITH (213)798-6053 IRVINE CA 92606 HA22 (949)252-0441

07-LA-71-1.2/4.3 LA-71 PM 1.20/4.31 AND LA-57 PM PETERSON-CHASE GENERAL DOUGHLY, JOE $980,079 06/01/21 0% 07-4W7604 $0 06/22/21 R3.17/R11.79 AND LA-210 PM ENGINEERING CONSTRUCTION, INC.1370 VALLEY VISTA 0% $0 02/16/22 R48.08/R51.72 16351 CONSTRUCTION CIR W; DR.,STE.150

APPLY METHACRYLATE ON DECK,OVERLAY DIAMOND BAR, CA 91765 IRVINE CA 92606 (818)400-4669 HM3 (949)252-0441

07-LA-71-1.6/4.8 LA COUNTY ROUTE 71 PM R1.6/4.8 IN OHL USA, INC. CHOU, MICHAEL $86,610,262 02/05/21 5% 07-210624 $1,482,594 03/16/21 POMONA FROM MISSION BLVD TO RTE 60 1920 MAIN STREET, SUITE 310; 1041 W BADILLO, SUITE 2% $568,218 01/24/25 UPGRADE FROM EXPRESSWAY TO FREEWAY 112 IRVINE CA 92614 COVINA, CA 91722 (949)242-4432 (310)261-9100 HE13

07-LA-90-1.8/1.8 LA COUNTY IN LOS ANGELES CITY, RTE 90 CROSSTOWN ELECTRICAL AND DATA,TURAY, SULAIMAN $765,290 05/19/21 0% 07-4V0304 $0 06/18/21 ON/OFF RAMP AT CULVER BOULEVARD INC. 13230 FIRESTONE 0% $0 11/19/21 SIGNAL IMPROVEMENT; PROTECTED LEFT 5454 DIAZ STREET; BLVD., STE E2

SANTA FE SPRINGS, CA IRWINDALE CA 91706 90670 (626)813-6693 (562)345-3134 07-LA-91-10.0/10.3 IN LOS ANGELES COUNTY IN COMPTON FROM O'DONNELL CONSTRUCTION, INC. HERRERA, EDGAR $882,767 06/09/21 0% 07-4V1004 $0 06/29/21 0.2 MILE WEST TO COMPTON CREEK BRIDGE 559 W. COVINA BLVD.; 18730 S. WILMINGTON 0% AVNH-P091-(150)E $0 AND OVERHEAD AVE., #103 --() SAN DIMAS CA 91773 ACCESS ROAD, FENCE, K-RAIL, RANCHO DOMINGUEZ, CA (909)394-4510 90220 HB34 (310)345-6267 07-LA-91-12.1/20.7 IN LOS ANGELES COUNTY IN LONG BEACH PETERSON-CHASE GENERAL TON, THANG $1,503,335 06/02/21 7% 07-4W9504 $4,710 06/22/21 AND CERRITOS FROM ATLANTIC AVE UC TO ENGINEERING CONSTRUCTION, INC.18000 STUDEBAKER RD 0% $4,710 01/26/22 THE ORANGE COUNTY LINE 16351 CONSTRUCTION CIR W; SUITE 360

SLAB REPLACEMENT CERRITOS, CA 90703 IRVINE CA 92606 (310)261-8467 HM1 (949)252-0441 State of California Department of Transportation Page 97 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 07 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 07-LA-91-14.1/15.2 IN LOS ANGELES COUNTY IN AND NEAR MARINA LANDSCAPE, INC BUI, KEVIN $624,082 09/05/19 69% 07-304104 $609,125 10/24/19 BELLFLOWER FROM 0.1 MILE WEST OF 3707 WEST GARDEN GROVE BLVD; 11229 SOUTH WOODRUFF 95% $0 07/31/21 DOWNEY AVENUE UNDERCROSSING TO 0.2 AVENUE ORANGE CA 92868 MILE EAST OF CLARK AVENUE UN DOWNEY, CA 90241 (714)939-6600 WORKER SAFETY (562)401-3333 HB34

07-LA-91-17.1/17.1 LA COUNTY INSTALL&UPGRADE SECURITY KANAAN CONSTRUCTION INC PATEL, PRAVIN $985,000 04/23/21 65% 07-1XU704 $793,759 04/30/21 SYSTEM REMOVE/REPLACE FENCES @ 5 230 S IRWINDALE AVE 902 SAN GABRIEL BLVD 81% $0 08/18/21 MAINTENANCE ROSEMEAD, CA 91770 AZUSA, CA 91702 STATFOOTHILL,WHITTIER,FLORENCE,ROSEME (213)798-6053

AD,CERRITDIR' 20.80 ELB TO UPGRADE/INSTALL SECURITY HM524 SYSTEMS 07-LA-101-1.5/29.1 IN LOS ANGELES COUNTIES IN LOS POWELL CONSTRUCTORS INC VENKATARAMAN, $16,283,339 02/21/18 97% 07-300404 $15,673,639 03/20/18 ANGELES AND NEAR CALABASAS FROM 0.1 8555 BANANA AVENUE KALYANAKRISHNAN 94% ACNH-Q101-(332)E $171,418 11/30/21 MILE SOUTH OF ROUTE 101/110 9225 CRANFORD ST --() FONTANA CA 92335 SEPARATION TO 0.1 MILE NORTH OF MUR PACOIMA, CA 91331 (909)356-8880 SOIL STABILIZATION & STORM WATER (714)376-2022 HA42

07-LA-101-1.7/6.8 IN THE CITY OF LOS ANGELES, FROM SPECTRUM CONSTRUCTION GROUP, AZIMA, HASSAN $4,411,439 12/18/19 100% 07-311404 $2,730,293 01/22/20 BEAUDRY AVENUE TO 0.1 MILE SOUTH OF INC. 3212 ROSEMEAD BLVD, 62% HSNH-Q101-(364)E $8,280 05/30/24 N. GOWER STREET. 16 GOODYEAR, STE 140 STE 100 --() STABILIZE SOIL AND EROSION CONTROL EL MONTE, CA 91731 OVER RUN IRVINE CA 92618 (626)572-6732 HA42 (949)299-1400

07-LA-101-8.0/27.3 IN THE CITY AND COUNTY OF LOS OHL USA VENKATARAMAN, $34,156,426 12/19/19 33% 07-303704 $10,656,465 01/22/20 ANGELES, FROM PILGRIMAGE OVERCROSSING 1920 MAIN STREE; KALYANAKRISHNAN 31% SNHG-Q101-(363)E $835,645 01/02/23 TO VALLEY CIRCLE BOULEVARD 9225 CRANFORD AVE --() IRVINE CA 92614 OVERCROSSING PACOIMA, CA 91331 (949)242-4432 UPGRADE MEDIAN BARRIER (818)262-8853 HB1

07-LA-101-11.8/31.1 IN THE CITIES OF LOS ANGELES, ALFARO COMMUNICATIONS LAO, ARTURO $5,899,490 09/21/20 38% 07-307504 $1,348,989 10/13/20 CALABASAS, AND HIDDEN HILLS, FROM CONSTRUCTION,INC 9225 CRANFORD AVENUE 23% $367,830 11/22/21 ROUTE 170 TO LAS VIRGENES ROAD. 15614 S. ATLANTIC AVENUE; PACOIMA, CA 91331

CAPITAL MAINTENANCE, PAVEMENT (562)254-5060 COMPTON CA 90221 HA22 (310)669-8949 State of California Department of Transportation Page 98 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 07 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 07-LA-101-31.1/35.1 LA CO. RTE 101 IN THE CITIES OF CALMEX ENGINEERING INC WASSEF, MENA $945,494 12/22/20 38% 07-4U0404 $798,693 01/21/21 CALABASAS AND AGOURA HILLS 2764 S. VISTA AVE; 1525 RANCHO CONEJO 84% $3,954 09/30/21 REPLACE ASPHALT DIKES BLVD # 102 BLOOMINGTON CA 92316 THOUSAND OAKS CA 91320 (909)546-1311 (213)793-7333

07-LA-101-273.0/36.2 LA COUNTY 101 FROM VALLEY CIRCLE TO ORTIZ ENTERPRISES INC VENKATARAMAN, $6,420,000 11/19/18 100% 07-1XK004 $5,888,166 01/04/19 REYES ADOBE RD TO REPAIR & REPLACE 6 CUSHING STE 200 KALYANAKRISHNAN 92% $0 07/30/21 DAMAGED MBGR &EROSION CONTROL BMP'S 9225 CRANFORD AVE IRVINE, CA 92618 DUE TO WOOLSEY FIREDIR' PACOIMA, CA 91331

REPAIR & CLEAN FIRE DAMAGE (818)262-8853 20.20 201130 07-LA-101-/1 MAINLINE CPOL, RAMPS, SHOULDERS, GORE SULLY-MILLER CONTRACTING PATEL, PRAVIN $2,283,000 05/06/21 0% 07-4W9404 $0 06/11/21 AREAS- JCT10/101 TO SPRING ST OC COMPANY 902 SAN GABRIEL BLVD 0% $0 02/07/22 MAINLINE CPOL, RAMPS, SHOULDERS, 135 S. STATE COLLEGE BLVD.; ROSEMEAD, CA 91770

(213)798-6053 BREA CA 92821 HM1 (714)578-9600

07-LA-105-2.0/2.2 IN LA COUNTY WITHIN 105-405 TUNNELS CROSSTOWN ELECTRICAL&DATA INC MANNAA, HASSAN $5,274,465 01/01/20 64% 07-1XP304 $4,623,277 04/22/20 BRDG# 53-2436G, 53-2437G, 53-2441F TO 5454 DIAZ STREET 13171 TELFAIR AVENUE 88% $0 07/31/21 REPAIR FIRE SYSTEMS & UPGRADE FIRE STE 101 IRWINDALE, CA 91706 SYSTEMS DIR'S EMERGEN SYLMAR, CA 91342

REPAIR & UPGRADE TUNNEL FIRE SYSTEM (562)345-3136 20.20 201130 07-LA-105-6.6/8 IN LOS ANGELES COUNTY AT I-105/I-110 ALDRIDGE ELECTRIC, INC. OREGEL, MARTIN $2,665,511 11/15/16 78% 07-297404 $1,715,847 01/11/17 INTERCHANGE 844 EAST ROCKLAND ROAD 11229 S. WOODRUFF 64% ACHS-IMGX-(371)9 $0 08/30/21 INSTALL SAFETY LIGHTING AT AVE. --() LIBERTYVILLE IL 60048 DOWNEY, CA 90241 (847)247-5274 (562)401-3333 HB1

07-LA-105-7.8/10.3 IN LOS ANGELES COUNTY IN AND NEAR LOS GRIFFITH COMPANY HERRERA, EDGAR $2,486,266 10/17/19 0% 07-317404 $2,025,539 11/12/19 ANGELES AND AT WILLOWBROOK FROM MAIN 3050 EAST BIRCH STREET; 18730 S. WILMINGTON 0% ACIM- 105-(021)E $6,030 04/30/24 STREET UNDERCROSSING TO MONA AVE. #103 --() BREA CA 92821 BOULEVARD RANCHO DOMINGUEZ, CA. PLANT EST (714)984-5500 SLOPE STABALIZATION AND STORM WATER 90220 SATIS HA42 (310)609-0364 State of California Department of Transportation Page 99 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 07 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 07-LA-105-14.6/16.4 IN LOS ANGELES COUNTY ON I-105, HIGHLAND CONSTRUCTION, INC. FREMPONG, SAM $660,655 06/14/21 0% 07-328604 $0 06/23/21 PARAMOUNT BLVD OC BRIDGE # 53-2425 133 N. PIXLEY STREET; 0% $0 12/30/21 AND ARDIS AVE OC BRIDGE # 53-2572 ORANGE CA 92868 REMOVE AND INSTALL A NEW TYPE OF (714)538-5156

07-LA-105-20.0/2.2 IN CITY OF LA 3 TUNNELS E105-S405, CROSSTOWN ELECTRICAL & DATAINCYAZDANI, FRED $4,150,013 09/04/18 69% 07-1XH104 $2,359,496 09/24/18 E105- N405,& W105-S405, TO REPAIR & 5454 DIAZ STREET 13171 TELFAIR AVENUE 57% $0 08/31/21 REPLACE BROKEN/DAMAGED FIRE DETECTION SUITE 101 IRWINDALE, CA 91706 SYSTEMS DIR'S EMERGEN SYLMAR, CA 91342

REPAIR FIRE DETECTION SYSTEM IN (818)364-2760 20.20 TUNNELS 201130 07-LA-105-/12.9 IN LA CO ON ROUTE 105 ON PM 0.0 / PM CALMEX ENGINEERING, INC. FERRER, JOSE $3,779,740 06/25/21 0% 07-4W9304 $0 07/15/21 12.9 CORRIDOR 2764 S. VISTA AVE 11229 SOUTH WOODRUFF 0% $0 01/15/22 RAMPS - DIG OUTS / SLURRY AVENUE BLOOMINGTON CA 92316 DOWNEY, CA 90241 (909)546-1311 (562)401-3333 HM1

07-LA-107-/4.8 IN TORRANCE FROM ROUTE 1 TO REDONDO AUTOBAHN CONSTRUCTION, INC. TON, THANG $6,759,451 12/31/19 91% 07-3118U4 $6,670,500 01/22/20 BEACH BOULEVARD 933 N. BATAVIA ST.; 1800 STUDEBAKER RD 94% $159,158 08/23/21 PAVEMENT REHABILITATION CERRITOS, CA. 90703 ORANGE CA 92867 (310)261-8467 (714)769-7025 HA22

07-LA-110-.7/26.1 IN LOS ANGELES COUNTY, AT VARIOUS TEICHERT ENERGY & UTILITIES WANG, PAUL $28,565,932 02/10/20 47% 07-312004 $9,764,534 03/03/20 LOCATIONS GROUP, INC. 13230 FIRESTONE BLVD 34% HSNH-X037-(218)E $1,506,155 08/09/22 UPGRADE EXISTING TRAFFIC MANAGEMENT 3500 AMERICAN RIVER DRIVE; SUITE E-2 --() SANTA FE SPRINGS CA SACRAMENTO CA 95864 90760 HB4N (909)536-3150 (562)345-3144 07-LA-110-3.8/5.6 IN LOS ANGELES AND CARSON AT VARIOUS POWELL CONSTRUCTORS INC GALLARDO, SAM $1,255,910 10/23/19 74% 07-276104 $1,233,387 11/12/19 LOCATIONS, FROM WEST M ST TO 0.1 MILE 8555 BANANA AVENUE; 18730 S WILMINGTON 95% ACIM- 110-(846)E $4,432 12/22/21 NORTH OF SEPULVEDA BLVD OC AVE, #103 --() FONTANA CA 92335 GSRD'S OR OTHER TRATMNT BMP'S TO RE RANCHO DOMINGUEZ, CA SUSPENDED (909)356-8880 90220 HA42 (310)609-0266 State of California Department of Transportation Page 100 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 07 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 07-LA-110-5.4/16.9 IN LOS ANGELES COUNTY ON ROUTE 110 JABRE CONTRACTING INC. MARTINEZ, FRANCISCO $514,900 05/25/21 0% 07-4W7404 $0 06/18/21 CLEAN AND LINE CULVERTS 1813 MANZANITA LANE; 13230 FIRESTONE 0% $0 12/31/21 BLVD., STE A2 MANHATTAN BEACH CA 90266 SANTA FE SPRINGS, CA (310)720-0277 90670 HM2 (562)345-9894 07-LA-110-6.8/19.5 07-110- PM 6.8/19.5 AUTOBAHN CONSTRUCTION, INC. HERRERA, EDGAR $2,144,981 04/26/21 0% 07-4W7804 $0 05/20/21 APPLY DECK METHACRYLATE, REPLACE 933 N. BATAVIA ST.; 18730 S. WILMINGTON 0% $0 12/24/21 AVE #103 ORANGE CA 92867 RANCHO DOMINGUEZ, CA SUSPENDED (714)769-7025 90220 HM3 (310)345-6267 07-LA-110-8.0/9 IN LOS ANGELES COUNTY, FROM 405/110 OHL USA, INC GALLARDO, SAM $18,704,872 02/27/18 100% 07-293704 $18,962,776 03/09/18 INTERCHANGE TO TORRANCE BLVD OFF- 1920 MAIN STREET STE 310 18730 S. WILMINGTON 98% ACIM-X037-(199)E $23,304 11/29/21 RAMP AVE #103 --() IRVINE CA 92614 WIDEN SHOULDER & AUXILIARY LANE RANCHO DOMINGUEZ, CA OVER RUN (949)242-4432 90220 HB4N (310)609-0266 07-LA-110-13.4/23.1 IN LOS ANGELES COUNTY IN LOS ANGELES IBARRA GENERAL ENGINEERING INCCHAUDHARI, SUSHILKUMAR $3,518,660 10/22/19 0% 07-238304 $3,445,725 12/13/19 AT VARIOUS LOCATIONS FROM 120TH 4325 TYROLITE ST; 1201 BALDWIN PARK 0% HSIM- 110-(848)E $4,449 05/10/22 STREET OVERCROSSING TO 3RD STREET BLVD --() RIVERSIDE CA 92509 OVERCROSSING BALDWIN PARK, CA 91706 PLANT EST (909)342-8447 STORM WATER MITIGATION FOR LA RIVER (626)337-8252 SATIS HA42

07-LA-110-18.8/23.8 IN LA AT VARIOUS LOCATIONS FROM 47TH PETERSON-CHASE GENERAL IZADPANAH, MOE $3,539,650 11/27/19 100% 07-309104 $3,253,561 12/16/19 ST OC TO SUNSET BLVD OC ENGINEERING CONSTRUCTION, INC.3212 ROSEMEAD BLVD 94% SNHG-P110-(022)E $0 04/30/21 UPGRADE MBGR,END TREATMENT,CRASH 16351 CONSTRUCTION CIRCLE WES SUITE 100 --() EL MONTE, CA 91731 OVER RUN IRVINE CA 92606 (626)572-6732 HB1 (949)252-0441

07-LA-110-20.5/20.7 N/B LA 110 OFFRAMP TO ADAMS BLVD TO DIVERSIFIED LANDSCAPE COMPANY MINOVI, SEPAND $4,975,000 06/04/21 67% 07-1XV304 $435,396 06/17/21 ADAMS OC & ADJACEN AREAS TO CLEANUP, 21730 BUNDY CANYON ROAD 902 SAN GABRIEL BLVD 9% $0 08/02/21 MITIGATE HOMELESS ROSEMEAD, CA 91770 WILDOMAR CA 92595 ENCAMPMENT,STORAGE&LANDSCAPE/ELECDIR' (909)322-4628

S 20.20 REPAIR/REPLACE 201130 LANDSCAPE,FENCING&ELECTRICL State of California Department of Transportation Page 101 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 07 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 07-LA-110-24.0/30.4 IN LA COUNTY IN LOS ANGELES AND PETERSON-CHASE GENERAL PATEL, PRAVIN $7,025,059 03/23/18 65% 07-2975U4 $5,648,798 04/17/18 SOUTH PASADENA FROM COLLEGE STREET ENGINEERING CONSTRUCTION, INC.9020 SAN GABRIEL BLVD 78% HNHG-P110-(019)E $179,861 10/21/21 OVERCROSSING TO GRAND AVENUE OVERCR 16351 CONSTRUCTION CIRCLE WES ROSEMEAD, CA 91770 --() OSSING (626)572-6700 IRVINE CA 92606 INSTALL CONCRETE BARRIER, LIGHTING, HB1 (949)252-0441

07-LA-118-9.0/9.9 ROUTE 118 AND 405: IN LOS ANGELES CHUMO CONSTRUCTION INC YOUNG, FRED $1,639,974 06/17/19 79% 07-310704 $1,603,110 07/08/19 COUNTY, ON ROUTE 118 FROM WOODLEY 14425 JOANBRIDGE STREET; 13171 TELFAIR AVE 95% ACNH-X037-(212)E $3,462 12/17/21 AVENUE TO ROUTE 118/I- 405 SUITE 101 --() BALDWIN PARK CA 91706 INTERCHANGE AND ON I-405 AT ROUTE 1 SYLMAR CA 91342 (626)960-9502 PAVE AREAS BEYOND GORE, INSTALL (805)797-1348 HB34

07-LA-118-11.3/12.8 LA COUNTY W/B&E/B 118 @LAUREL CNY ORTIZ ENTERPRISES INC VENKATARAMAN, $8,977,030 12/01/20 91% 07-1XS704 $2,018,565 02/03/21 BL&N/B 5@PENROSE TO 6 CUSHING STE 200 KALYANAKRISHNAN 22% $0 08/30/21 RECONSTRUCT/STABILIZE 9225 CRANFORD AVE IRVINE, CA 92618 ENBANKMTSLOPES,FENCES,RSP,DS,HAZ PACOIMA, CA 91331

WASTE REMOVAL GRADIR' (818)262-8853 20.20 REPAIR DAMAGE DUE TO HOMELESS 201130 ENCAMPMENT 07-LA-118-57.0/5.8 IN LA COUNTY W/B LA-118 RESEDA BLVD ORNELAS CONSTRUCTION, INC CHAVEZ, EFRAIM $1,935,000 08/03/20 2% 07-1XP904 $74,803 09/01/20 OFFRMPTO REPAIR DEPRESSED PAVEMENT 1024 N MACLAY AVENUE SUITE J 13171 TELFAIR AVE 4% $0 12/31/21 AND REPAIR FAILED DRAINAGE SYSTEM & SUITE 101 SAN FERNANDO, CA 91340 EMBANKMENTS DIR'S EMERG SYLMAR, CA 91342

REPAIR FAILED DRAINAGE SYSTEM (818)364-2760 20.20 201130 07-LA-134-2.6/4.8 IN LOS ANGELES COUNTY IN BURBANK & ACCU CONSTRUCTION, INC. SHIH, JAMES $1,250,719 07/29/20 51% 07-311604 $659,937 08/20/20 LOS ANGELES FROM BOB HOPE DRIVE 2098 S. GRAND AVE. SUITE A; 601 S GLENOAKS BLVD 52% ACNH-P134-(041)E $236,954 01/15/25 UNDERCROSSING TO VICTORIA BOULEVARD STE 310 --() SANTA ANA CA 92705 /RIVERSIDE DRIVE OVERCROSS BURBANK, CA 91502 (714)641-4730 STABILIZE SOIL AND EROSION CONTROL (213)880-6090 HA42

07-LA-134-/13.3 IN LOS ANGELES COUNTY IN LOS PETERSON-CHASE GENERAL SHIH, JAMES $39,207,523 04/16/20 28% 07-311704 $8,948,572 05/08/20 ANGELES, BURBANK, GLENDALE AND ENGINEERING CONSTRUCTION, INC.601 S GLENOAKS BLVD 23% HSNH-P134-(040)E $1,450,423 04/05/23 PASADENA FROM ROUTE 101/134 16351 CONSTRUCTION CIR W; STE 310 --() SEPARATION TO JUNCTION OF ROUTE BURBANK CA 91502 IRVINE CA 92606 210/710 (213)880-6090 HA22 (949)252-0441 PAVEMENT PRESERVATION State of California Department of Transportation Page 102 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 07 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 07-LA-138-49.4/49.4 IN PALMDALE, AT THE INTERSECTION OF CROSSTOWN ELECTRICAL & DATA, YAZDANI, FRED $250,989 08/18/20 89% 07-332904 $223,544 09/08/20 AVENUE R-8 COUNTY OF LOS ANGELES. INC. 13171 TELFAIR AVE 89% SNHG-P138-(064)E $0 07/07/21 UPGRADE TRAFFIC SIGNAL SYSTEM, CURB 5454 DIAZ STREET; SUITE 101 --() 07/07/21 SYLMAR, CA 91342 COMPLETED IRWINDALE CA 91706 (818)364-2760 HB1 (626)813-6693

07-LA-138-55.2/56.3 IN LOS ANGELES COUNTY, AT GRANITE CONSTRUCTION COMPANY TIEU, FRED $9,825,843 03/14/19 62% 07-286204 $9,221,766 04/05/19 LITTLEROCK, FROM 87TH STREET EAST TO 213 E COLUMBIA WAY 39115 TRADE CTR DR 88% STPL-6207-(063)E $1,222,934 08/24/22 0.2 MILE EAST OF 96TH STREET EAST SUITE 210 --() LANCASTER CA 93535 WIDEN CONVENTIONAL HIGHWAY (SEG 6) PALMDALE CA 93551 (661)726-4447 (213)792-4663 HE13

07-LA-138-/36.9 IN LOS ANGELES ON ROUTE 138 FROM FROM C. A. RASMUSSEN, INC. TIEU, FRED $17,081,336 10/17/19 68% 07-310404 $18,077,076 11/04/19 I-5 (GORMAN POST ROAD) TO JUNCTION OF 28548 LIVINGSTON AVENUE; 39115 TRADE CTR DR 98% ACNH-P138-(062)E $4,619 06/14/22 SR-138/14 PALMDALE CA 93551 --() VALENCIA CA 91355 PAVEMENT PRESERVATION (661)273-3001 (661)367-9040 HA22

07-LA-210-24.9/24.9 IN LOS ANGELES COUNTY, IN PASADENA AT DREAMBUILDER CONSTRUCTION CORPWIDJAJA, DANIEL $2,928,072 04/30/20 100% 07-311004 $2,695,261 05/19/20 ROUTE 134/710 SEPARATION DBA DREAMBUILDER 2090 FERN LANE 89% $210,966 08/20/21 PAVING BEYOND THE GORE AND NARROW 18543 YORBA LINDA BLVD # 376; GLENDALE, CA 91208

(213)792-5056 YORBA LINDA CA 92886 HB34 (714)646-3697

07-LA-210-25.7/32.8 IN LOS ANGELES IN PASADENA AND BOSCO CONSTRUCTORS, INC. HAILU, MESFIN $2,428,124 10/09/19 86% 07-303604 $2,363,556 11/12/19 ARCADIA FROM FAIR OAKS TO HUNTINGTON 21353 MAYALL ST.; 1201 BALDWIN PARK 97% HSIM- 210-(847)E $0 07/20/21 DR BLVD --() CHATSWORTH CA 91311 07/14/21 ROADSIDE SAFETY IMPROVEMENT BALDWIN PARK, CA 91706 COMPLETED (818)700-0304 (213)453-7555 HB34

07-LA-210-34.9/35.8 CITY OF DUARTE, AT CENTRAL / BUENA CALPROMAX ENGINEERING INC. FARDOUN, M. $434,164 05/07/20 67% 07-4V0604 $320,553 06/09/20 VISTA 650 N.ROSE DR.#186; 1041 W BADILLO, SUITE 74% $92,132 08/17/21 INSTALL TRAFFIC SIGNAL 112 PLACENTIA CA 92870 COVINA, CA 91722 (714)573-4599 (626)339-1601

State of California Department of Transportation Page 103 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 07 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 07-LA-210-38.6/38.9 IN LOS ANGELES COUNTY AT VARIOUS BEADOR CONSTRUCTION COMPANY, IZADPANAH, MOE $5,866,300 03/18/20 65% 07-309304 $3,534,508 04/30/20 LOCATIONS INC. 3212 ROSEMMEAD BLVD, 60% $299,540 11/01/21 SEISMIC RETROFIT 26320 LESTER CIRCLE; SUITE 100

EL MONTE, CA 91731 CORONA CA 92883 (626)572-6732 HA21 (951)674-7352

07-LA-210-252.0/28.8 LA-210 TO REPLACE DAMAGED INDIVIDUAL AUTOBAHN CONSTRUCTION, INC HAILU, MESFIN $733,000 11/06/20 55% 07-1XR704 $698,255 11/23/20 SLABSAT SPOT LOCATIONS & REPLACE 933 NORTH BATAVIA ST 1201 BALDWIN PARK 95% $0 07/21/21 BROKEN SLABS BETWEEN SIERRA MADRE BLVD ORANGE, CA 92867 BLVD & FAIR OAKS AVE DIR'S BALDWIN PARK, CA 91706

REPAIR/REPLACE DAMAGED SLABS (213)453-7555 20.20 201130 07-LA-210-/9.7 IN LOS ANGELES COUNTY IN LOS ANGELES FLATIRON WEST, INC. SALMAN, RIDWAN $136,571,070 04/03/20 24% 07-3096U4 $52,764,472 05/08/20 FROM INTERSTATE 5 TO WHEATLAND 16470 W. BERNARDO DRIVE #120 25061 W AVENUE 39% $3,817,463 10/24/24 AVENUE UNDERCROSSING STANFORD STE 70 SAN DIEGO CA 92127 PAVEMENT REHABILITATION VALENCIA, CA 91355 (760)916-9100 (661)257-0273

07-LA-213-2.2/2.2 IN SAN PEDRO, RTE 213 (WESTERN AVE) CROSSTOWN ELECTRICAL & DATA, ALONZO, BERNARD $456,949 06/19/20 0% 07-4V0204 $130 07/10/20 AT CRESTWOOD STREET INC. 13230 FIRESTONE BLVD 0% $0 11/15/21 TRAFFIC SIGNAL IMPROVEMENT 5454 DIAZ STREET; STE E2-F2

SANTA FE SPRINGS, CA SUSPENDED IRWINDALE CA 91706 90670 (626)813-6693 (562)345-3145 07-LA-213-6.2/6.2 INTERSECTION OF WESTERN AVE (SR-213) CROSSTOWN ELECTRICAL AND DATA,TURAY, SULAIMAN $623,377 03/18/21 0% 07-4V1404 $0 04/08/21 AND 242ND PLACE IN THE CITY OF LA INC. 13230 FIRESTONE 0% $0 10/11/21 INSTALL TRAFFIC SIGNAL AND ADA 5454 DIAZ STREET; BLVD.,STE E-2

SANTA FE SPRINGS, CA IRWINDALE CA 91706 90670 HB4N (626)813-6693 (562)345-3134 07-LA-213-/8 IN THE CITIES OF RANCHO PALOS VERDES, KDC INC., DBA DYNALECTRIC ROBILLOS, RAMON $2,974,142 12/11/19 72% 07-306604 $1,306,071 01/07/20 LOMITA AND LOS ANGELES, FROM W 25TH 4462 CORPORATE CENTER DR.; 13230 FIRESTONE BLVD 44% HSST-P213-(007)E $228,027 10/30/21 STREET TO W CARSON STREET AT VARIOUS UNIT A --() LOS ALAMITOS CA 90720 LOCATIONS. SANTA FE SPRINGS CA (714)828-7000 UPGRADE CURB RAMPS, SIDEWALKS AND 90670 HB71 (562)345-9901 State of California Department of Transportation Page 104 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 07 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 07-LA-405-.3/6.7 IN LOS ANGELES COUNTY IN LONG BEACH DREAMBUILDER CONSTRUCTION CORPFERRER, JOSE $1,728,829 05/22/20 100% 07-3W9004 $1,662,303 06/18/20 FROM ATHERTON ST UC TO PACIFIC AVE UC DBA DREAMBUILDER 11229 SOUTH WOODRUFF 95% $0 06/30/21 SHOULDER DIGOUTS/CPOL, AUX LANE 18543 YORBA LINDA BLVD # 376; AVE 07/14/21 DOWNEY CA 90241 COMPLETED YORBA LINDA CA 92886 (562)401-3333 HM1 (714)646-3697

07-LA-405-.8/47.7 IN LOS ANGELES COUNTY FROM 0.2 MILE PETERSON-CHASE GENERAL HERRERA, EDGAR $2,079,304 06/02/21 0% 07-4W5104 $0 06/22/21 WEST OF STEARNS AVENUE UNDERCROSSING ENGINEERING CONSTRUCTION, INC.18730 S. WILMINGTON 0% $0 04/25/22 TO RINALDI STREET UNDERCROSSING 16351 CONSTRUCTION CIR W; AVE., #103

REPAIR AC OVERLAY, REPLACE JOINT RANCHO DOMINGUEZ, CA IRVINE CA 92606 90220 HM4 (949)252-0441 (310)345-6267 07-LA-405-11.9/13.2 REHABILITATE AND UPGRADE EXISTING POWELL CONSTRUCTORS INC GALLARDO, SAM $7,628,206 01/09/19 76% 07-289104 $7,215,739 01/30/19 CARSON COMMERCIAL VEHICLE 8555 BANANA AVENUE 18730 S WILMINGTON 94% $144,950 10/01/21 ENFORCEMENT FACILITY (CVEF) ON AVE, STE103 FONTANA, CA 92335 SOUTHBOUND LA-405, FROM DEL AMO RANCHO DOMINGUEZ CA SUSPENDED (909)356-8880 BOULEV 90220 HA42 RECONSTRUCT ABANDONED TRUCK WEIGHT (310)609-0266

07-LA-405-13.8/39.7 IN LOS ANGELES COUNTY ON ROUTE 405 PETERSON-CHASE GENERAL LEON, DAN $1,775,492 06/17/19 64% 07-4W1004 $1,831,497 07/05/19 FROM SEPULVEDA BL UC TO BEL AIR RD ENGINEERING CONSTRUCTION, INC.12975 W CULVER BLVD 95% $0 09/29/21 UC, RTE 10 FR BUDLONG AV UC TO WB RTE 16351 CONSTRUCTION CIR WEST LOS ANGELES CA 90066

10/RTE 405 CONNECTOR,R (562)572-5852 IRVINE CA 92606 PLACE POLYESTER CONCRETE, HM3 (949)252-0441

07-LA-405-14.3/15.8 IN LOS ANGELES COUNTY, IN TORRANCE, ORTIZ ENTERPRISES, INC. NJOYA, DAVID $41,584,604 05/26/21 0% 07-293604 $0 06/16/21 FROM WESTERN AVENUE UNDERCROSSING TO 6 CUSHING SUITE 200; 0% ACIM-405 -(999)E $0 182ND STREET UNDERCROSSING --() IRVINE CA 92618 INTERCHANGE IMPROVEMENTS AND NEW (949)753-1414

07-LA-405-20.5/28 IN LOS ANGELES COUNTY FROM 0.2 MILE FBD VANGUARD CONSTRUCTION, GALLARDO, SAMUEL $777,000 04/27/21 41% 07-4V1704 $18,250 05/19/21 NORTH OF EL SEGUNDO BOULEVARD INC. 18730 WILMINGTON AVE 2% $11,600 09/24/21 UNDECROSSING TO VENICE BOULEVARD 550 GREENVILLE ROAD; STE 103

SEPARATION RANCHO DOMINGUEZ, CA LIVERMORE CA 94550 PCC GRINDING, SLAB REPLACEMENT, AND 90220 HA22 (925)245-1300 (310)609-0266 State of California Department of Transportation Page 105 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 07 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 07-LA-405-41.3/41.3 LOS ANGELES COUNTY, IN LOS ANGELES, ALFARO COMMUNICATIONS MOHSENZADEH, ALI $496,909 04/25/19 7% 07-4U0504 $401,715 05/28/19 ON ROUTE 405 AT WEST VAN NUYS OH AND CONSTRUCTION,INC 13171 TELFAIR AVE 81% $0 09/30/21 VICTORY BOULEVARD 15614 S. ATLANTIC AVENUE; SUITE #101

GRIND EXISTING CONCRETE PAVEMENT SYLMAR, CA 91342 SUSPENDED COMPTON CA 90221 (818)746-0669 HA22 (310)669-8949

07-LA-405-42.9/0 IN LOS ANGELES COUNTY IN LOS ANGELES C. A. RASMUSSEN, INC. AMADI, PATRICIA $2,580,870 12/20/19 100% 07-305104 $2,472,993 01/14/20 AT SATICOY STREET UNDERCROSSING 28548 LIVINGSTON AVENUE; 13171 TELFAIR AVE., 100% ACIM- 405-(057)E $0 06/02/21 REPLACE & UPGRADE WEIGH IN MOTION SUITE #101 --() VALENCIA CA 91355 07/12/21 SYLMAR, CA 91342 COMPLETED (661)367-9040 (805)391-3555 HA42

07-LA-405-/29.5 LA&VEN 4 MAINTENANCE STATIONS ENHANCE QUALITY FENCE CO INC SHIN, FRANK $785,000 04/22/21 0% 07-1XV004 $0 05/07/21 THEFT DETERRENCE, FENCING & ELECTRIC 14929 GARFIELD AVENUE 12975 W. CULVER BLVD 0% $0 12/31/21 GATESIMPROVE SECURITY/ALARM SYSTEMS LOS ANGELES, CA 90066 PARAMOUNT, CA 90723 DIR'S EMERGENCY FOR (310)213-3136

UPGRAGE&INSTALL SECURITY SYSTEM, 20.20 FENCING 201130 07-LA-605-10.2/20.2 IN LOS ANGELES COUNTY AT VARIOUS RV CONCRETE BUI, KEVIN $1,350,000 06/08/21 0% 07-4W8604 $0 06/22/21 LOCATIONS FROM TELEGRAPH ROAD 605 E. COMMERCIAL ST.; 11229 S. WOODRUFF AVE 0% $0 01/31/22 UNDERCROSSING TO ROUTE 605/10 DOWNEY, CA 90241 ANAHEIM CA 92801 SEPARATION (562)572-5983 (714)855-4201 SLABS REPAIR HM1

07-LA-605-23.4/23.6 IN IRWINDALE,AT ROUTE 605 NORTHBOUND LOS ANGELES ENGINEERING, INC. FERRER, JOSE $1,304,190 12/11/20 97% 07-318804 $1,202,359 01/19/21 RAMP TO WESTBOUND LIVE OAK AVENUE. 633 N. BARRANCA AVE; 11229 SOUTH WOODRUFF 92% CIMG-6052-(994)E $134,481 10/20/21 REALIGN AND WIDEN RAMP,CONSTRUCT AVE. --() COVINA CA 91723 DOWNEY, CA. 90241 (626)454-5222 (562)401-3333 HB1

07-LA-605-/26 IN LOS ANGELES COUNTY AT VARIOUS CROSSTOWN ELECTRICAL & DATA, ALONZO, BERNARD $6,827,900 10/22/19 19% 07-311904 $1,134,599 11/14/19 LOCATIONS INC. 13230 FIRESTONE 17% HSNH-X037-(214)E $455,101 09/12/22 UPGRADE TRANSPORTATION MGMT SYSTEM 5454 DIAZ ST.; BLVD., STE E2 --() SANTA FE SPRINGS, CA. IRWINDALE CA 91706 90670 HB4N (626)813-6693 (562)345-3145 State of California Department of Transportation Page 106 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 07 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 07-LA-710-17.3/26.3 IN LOS ANGELES COUNTY AT VARIOUS VELARDE CONCRETE CONSTRUCTION,WANG, MIKE $1,047,869 03/30/16 100% 07-2W9404 $974,346 04/18/16 LOCATIONS ON ROUTES 710, 60 AND 10. INC. 11229 S. WOODRUFF 100% $0 03/04/20 PLACE METHACRYLATE ON BRIDGE DECK, 523 S. BRAND BLVD. STE 201 AVENUE 06/23/21 DOWNEY, CA 90241 COMPLETED SAN FERNANDO CA 91340 (213)798-5970 HM3 (818)898-2300

07-LA-710-20.9/24.6 IN LA COUNTY IN COMMERCE AND BELL FLATIRON WEST, INC. BUI, KEVIN $85,689,914 02/16/18 77% 07-202124 $87,826,236 03/09/18 FROM SOUTH ATLANTIC BLVD TO TRIGGS 1770 LA COSTA MEADOWS DRIVE 11229 S WOODRUFF 100% ACIM- 710-(839)E $6,547 03/20/22 STREET AVENUE --() SAN MARCOS CA 92078 PAVEMENT REHAB & BRIDGE WIDENING DOWNEY, CA. 90241 (909)597-8413 (562)401-3333 HA22

07-LA-710-23.3/25.6 IN LOS ANGELES COUNTY IN LOS ANGELES ACCU CONSTRUCTION, INC. HAILU, MESFIN $3,507,589 07/22/19 44% 07-304404 $3,197,405 08/02/19 AND MONTEREY PARK ON ROUTE 60 FROM 2098 S. GRAND AVE. SUITE A; 1201 BALDWIN PARK 88% ACNH-X037-(210)E $3,720 09/15/23 EASTERN AV OC TO MEDNICK AV OC AND BLVD --() SANTA ANA CA 92705 RTE 71O FROM OLYMPIC B BALDWIN PARK CA 91706 (714)641-4730 STABILIZE SOIL AND EROSION CONTROL (213)453-7555 HA42

07-VEN-0-/0 IN VENTURA COUNTY TO ADDRESS PSPS SPECTRUM CONSTRUCTION GROUP INIRA, ALFRED $2,165,000 04/02/20 99% 07-1XQ504 $452,806 04/13/20 EVENTS INSTALL BACKPLATES 16 GOODYEAR STE 140 1525 RANCHO CONEJO 21% $0 07/30/21 W/2"REFLECTIVE BORDERS&PLACE SIGNAL BLVD SUITE 102 IRVINE, CA 92618 07/07/21 AHEAD PAVEMENT MARKINGS DIR'S EMER THOUSAND OAKS, CA 91320 COMPLETED

INSTALL BACKPLATES @ 54 LOCATIONS (805)480-4928 20.20 201130 07-VEN-1-1.5/1.6 IN VEN COUNTY CITY OF MALIBU VEN-1 BURNS PACIFIC CONSTRUCTION INCIRA, ALFRED $1,465,000 04/11/20 54% 07-1XQ704 $1,285,237 05/06/20 PCH TO REPAIR ROCK SLOPE PROTECTION 505 E THOUSAND OAKS BLVD 1525 RANCHO CONEHO 88% $0 08/31/21 DAMAGE DUETO HIGH WAVE ACTIVITY DIR'S BLVD SUITE 102 THOUSAND OAKS, CA 91360 EMERGENCY FORCE ACCOU THOUSAND OAKS, CA 91320 (805)371-4171 REPAIR & REINFORCE RSP (805)480-4928 20.20 201130 07-VEN-1-9.7/15.1 DIGOUTS SLURRY SEAL SHOULDER BACKING INTERMOUNTAIN SLURRY SEAL, SHAKERI, SAEID $1,693,693 03/23/21 0% 07-4W6204 $0 04/08/21 IN VENTURA COUNTY FROM JUST S/O INC. 1525 RANCHO CONEJO 0% $0 11/30/21 CALLEGUAS CR BR 52-10 L&R TO PLEASANT 1120 TERMINAL WAY; BLVD #102

VALLEY OC 52-0443 THOUSAND OAKS, CA 91320 RENO NV 89502 DIGOUTS SLURRY SEAL SHOULDER (213)808-7976 HM1 (775)358-1355 State of California Department of Transportation Page 107 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 07 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 07-VEN-23-3.3/11.5 IN VENTURA COUNTY, FROM US-101 TO SECURITY PAVING COMPANY, INC. DAVIS, ALAN $65,091,021 02/06/20 49% 07-302504 $47,484,756 03/02/20 STATE ROUTE 118 3075 TOWNSGATE RD, STE 200 1525 RANCHO CONEJO 67% HSST-P023-(041)E $1,924,377 06/27/25 PAVEMENT REHABILITATION WESTLAKE VILLAGE CA 91361 BLVD, #102 --() 3075 TOWNSGATE ROAD; THOUSAND OAKS, CA 91320

(805)480-4928 HA22 WESTLAKE VILLAGE CA 91361 (818)362-9200 07-VEN-33-7.6/7.6 IN VENTURA COUNTY, NEAR CASITAS SECURITY PAVING COMPANY, INC. SHAKERI, SAEID $5,024,991 06/18/21 0% 07-291304 $0 06/30/21 SPRINGS, AT SAN ANTONIO CREEK 3075 TOWNSGATE ROAD; 1525 RANCHO CONEJO 0% $0 04/19/24 BRIDGE STRUCTURE REHABILITATION AND BLVD STE102 WESTLAKE VILLAGE CA 91361 THOUSAND OAKS, CA 91320 (818)362-9200 (213)808-7976 HA21

07-VEN-33-11.2/48.5 IN VENTURA COUNTY ON ROUTE 33 FROM INTERMOUNTAIN SLURRY SEAL, SHOHET, HOUSHANG $3,550,550 05/26/21 0% 07-4W5904 $0 06/15/21 WEST OJAI AVENUE TO TULE CREEK AND INC. 1525 RANCHO CONEJO 0% $0 10/25/21 FROM 1.0 MILE NORTH OF ADOBE CANYON 1120 TERMINAL WAY; BLVD #102

TO LOCKWOOD VALLEY ROAD THOUSAND OAKS, CA 91320 RENO NV 89502 DIGOUTS, SLURRY SEAL, SHOULDER (805)857-7072 HM1 (775)358-1355

07-VEN-33-15.7/15.8 IN VEN ALONG NB LN @ VICINITY OF PM C. A. RASMUSSEN, INC. IRA, ALFRED $9,213,348 11/28/16 74% 07-305204 $9,337,492 12/21/16 15.7 OF PM 15.7 28548 LIVINGSTON AVENUE 1525 RANCHO CONEJO 100% ST-47C8-(004)E $3,564 04/19/22 REPAIR SLOPE FAILURE BLVD #102 --() VALENCIA CA 91355 THOUSAND OAKS, CA 91320 (661)367-9040 (805)480-4928 HA23

07-VEN-33-22.1/22.1 IN VENTURA COUNTY CITY OF OJAI N/B CASE PACIFIC COMPANY DAVIS, ALAN $7,468,349 06/21/19 100% 07-1XM404 $5,814,872 06/28/19 SR-33TOREPAIR CRACKS ON AC 2121 ARDMORE ROAD 1525 RANCHO CONEJO 78% $0 08/31/21 PAVEMNT,REPAIR SHOULDRCONSTRUCT BLVD SUITE 102 PASO ROBLES, CA 93446 TIEBACK WALL,HYDROSEEDING&REPAIRDIR' THOUSAND OAKS, CA 91320 OVER RUN

WINTER STORM DAMAGE REPAIR (805)480-4928 20.20 201130 07-VEN-101-.1/4.5 IN VENTURA COUNTY IN THE CITY OF DIVERSIFIED LANDSCAPE CO. IRA, A. $681,909 05/22/18 100% 07-4U0004 $613,043 06/14/18 THOUSAND OAKS FROM COUNTY LINE TO 21730 BUNDY CANYON ROAD 1525 RANCHO CONEJO 89% $0 10/29/21 MOORPARK ROAD UNDERCROSSING BLV. STE102 WILDOMAR CA 92595 HIGHWAY PLANTING, SINGS, ELECTRICAL THOUSAN OAKS, CA. 93065 OVER RUN (951)245-1686 (805)480-4928 HB4N State of California Department of Transportation Page 108 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 07 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 07-VEN-101-7.9/38.9 IN VENTURA COUNTY ON ROUTE 101 TRUESDELL CORPORATION OF IRA, ALFRED $2,669,669 05/21/21 0% 07-4W8004 $0 06/16/21 APPLY DECK METHACRYLATE, REPLACE CALIFORNIA, INC. 1525 RANCHO CONEJO 0% $0 04/29/22 1310 W. 23RD STREET; BLVD STE102

THOUSAND OAKS, CA 91320 SUSPENDED TEMPE AZ 85282 (805)857-7070 HM3 (602)437-1711

07-VEN-101-8.9/11.5 IN VENTURA CO, IN THOUSAND OAKS AND GRANITE CONSTRUCTION COMPANY RILEY, JAMES $2,798,917 04/22/19 55% 07-4W2704 $2,672,016 05/13/19 CAMARILLO, FROM 1.1 MILE WEST OF 213 E COLUMBIA WAY; 1525 RANCHO CONEJO 97% $0 08/29/21 WENDY DR TO ARROYO CONEJO CREEK BR BLVD STE102 LANCASTER CA 93535 PLACE RHMA-G BWC-G GAP GRADED THOUSAND OAKS CA 91320 (661)726-4447 (213)507-7938 HM1

07-VEN-101-9.1/9.1 07-VEN 101 PM 9.09 AND VARIOUS ROUTES JABRE CONTRACTING INC. SHOHET, HOUSHANG $732,168 04/29/21 17% 07-4W9104 $242,538 06/14/21 LINE AND REPAIR CULVERTS 1813 MANZANITA LANE; 1525 RANCHO CONEJO 32% $242,538 11/04/21 BLVD #102 MANHATTAN BEACH CA 90266 THOUSAND OAKS, CA 91320 (310)720-0277 (805)857-7072 HM2

07-VEN-101-17.7/17.7 IN VENTURA COUNTY, ON ROUTE 101 AT BEADOR CONSTRUCTION COMPANY, SHAKERI, SAEID $1,177,826 05/21/20 100% 07-4W8204 $1,156,088 06/19/20 CENTRAL AVENUE, OC. INC. 1525 RANCHO CONEJO BL 100% $0 03/22/21 GIRDER AND BRIDGE RAIL REPLACEMENT 26320 LESTER CIRCLE; STE 102 07/16/21 THOUSAND OAKS CA 91320 COMPLETED CORONA CA 92883 (213)808-7976 HM3 (951)674-7352

07-VEN-101-26.7/31 SLABS REPAIR, IN VENTURA COUNTY, IN J. MCLOUGHLIN ENGINEERING CO.,ARROYO, HECTOR $1,078,171 04/15/21 0% 07-4W6504 $0 04/30/21 VENTURA, FROM MAIN ST UNDERCROSSING INC. 1525 RANCHO CONEJO 0% $0 09/30/21 TO 0.1 MILE NORTH OF JCT 33/101 10641 FULTON CT. BLVD #102

SEPARATION THOUSAND OAKS, CA 91320 RANCHO CUCAMONGA CA 91730 SLABS REPAIR, IN VENTURA COUNTY, IN (818)974-8391 HM1 (909)944-1037

07-VEN-101-27.5/31 IN VENTURA COUNTY ON ROUTE 101 FROM LANDSCAPE SUPPORT SERVICES SHAKERI, SAEID $1,999,419 10/09/19 37% 07-311304 $1,773,537 11/04/19 0.8 MILE SOUTH OF SEAWARD AVE TO 0.4 15260 VENTURA BLVD STE 1150 1525 RANCHO CONEJO 88% HSNH-Q101-(358)E $6,787 09/20/23 MILE WEST OF ROUTE 33/101 SEP AND ON BLVD, #102 --() SHERMAN OAKS CA 91403 RTE 33 FROM RTE 101/ THOUSAND OAKS, CA 91320 (818)475-0680 STORMWATER SOURCE CONTROL (213)507-7938 HA42 State of California Department of Transportation Page 109 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 07 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 07-VEN-101-36.3/40.6 IN VEN FROM 0.4 MILE SOUTH OF PADRE GRANITE CONSTRUCTION COMPANY ARROYO, HECTOR $34,133,593 11/17/20 8% 07-302404 $757,634 12/24/20 JUAN CANYON OC TO 0.3 MILE NORTH OF 5860 EL CAMINO REAL; 1525 RANCHO CONEJO 2% B1NH-Q101-(385)E $428,775 03/07/23 PUNTA GORDA PEDESTRIAN UC BLVD #102 --() CARLSBAD CA 92008 PAVEMENT REHABILITATION THOUSAND OAKS CA 91320 (760)444-1032 (818)974-8391 HA22

07-VEN-118-.5/32.4 IN VENTURA AND LOS ANGELES COUNTIES J. FRANCIS COMPANY SHOHET, HOUSHANG $999,790 05/27/21 0% 07-4W5004 $0 06/18/21 AT VARIOUS LOCATIONS 16197 KRAMERIA AVE 1525 RANCHO CONEJO 0% $0 11/30/21 APPLY METHACRYLATE ON DECK, REPAIR BLVD #102 RIVERSIDE CA 92504 THOUSAND OAKS, CA 91320 (951)776-9100 (805)857-7072 HM4

07-VEN-118-24.1/29.7 IN VEN FR CALDWELL AV/ YOSEMITE ST BOSCO CONSTRUCTORS, INC. IRA, ALFRED $2,539,570 11/26/19 53% 07-316504 $2,568,498 12/13/19 ROADSIDE SAFETY IMPROVEMENT 21353 MAYALL ST.; 1525 RANCHO CONEJO 94% HSNH-P118-(067)E $0 08/30/21 BLVD STE102 --() CHATSWORTH CA 91311 THOUSAND OAKS CA 91320 (818)700-0304 (805)480-4928 HB34

07-VEN-126-1.0/8.2 IN VENTURA COUNTY ON VEN 126 FROM 0.5 GRANITE CONSTRUCTION COMPANY ARROYO, HECTOR $3,310,152 01/03/19 100% 07-312204 $3,270,805 01/18/19 MILE WEST OF VICTORIA AVE. TO 3.2 213 E. COLUMBIA WAY 1525 RANCHO CONEJO 92% ACNH-P126-(057)E $0 08/31/21 MILES EAST OF JCT 118 BLVD #102E --() LANCASTER CA 93535 INSTALLATON OF 21 BMP DEVICES THOUSAND OAKS, CA 91320 OVER RUN (661)726-4447 (805)480-4928 HA42

07-VEN-126-10.0/13 IN VENTURA COUNTY FROM TODD LN UNDER FBD VANGUARD CONSTRUCTION, SHAKERI, SAEID $515,348 03/05/20 60% 07-4W6604 $509,625 03/26/20 CROSSING TO 0.2 MILE WEST OF HALLOCK INC. 1525 RANCHO CONEJO 97% $0 08/30/21 DRIVE 550 GREENVILLE ROAD; BLVD #102

REMOVE/REPLACE INDIVIDUAL CONCRETE THOUSAND OAKS, CA 91320 LIVERMORE CA 94550 (213)808-7976 HM1 (925)245-1300

07-VEN-126-10.2/12.7 IN SANTA PAULA FR 0.2M WO PECK RD TO WESTCOAST PUBLIC WORKS INC IRA, ALFRED $1,928,293 09/24/19 37% 07-311504 $1,769,996 10/29/19 SANTA PAULA CREEK 20058 VENTURA BLVD, #318; 1525 RANCHO CONEJO 91% HSNH-P126-(058)E $1,500 11/30/23 STORMWATER SOURCE CONTROL BLVD #102 --() WOODLAND HILLS CA 91364 THOUSAND OAKS, CA 91320 (818)256-9401 (805)480-4928 HA42 State of California Department of Transportation Page 110 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 07 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 07-VEN-126-13.6/34.6 IN VEN FR HAUN CRK BRIDGE / CNTY LN GRANITE CONSTRUCTION COMPANY DAVIS, ALAN $19,935,816 01/11/18 100% 07-301404 $19,358,592 02/02/18 SLAB REPLACE & CP OL AC 5335 DEBBIE RD 1525 RANCHO CONEJO 98% ACNH- 126-(055)E $0 06/30/21 BLVD STE102 --() SANTA BARBARA CA 93111 THOUSAND OAKS, CA 91320 OVER RUN (805)964-9951 (805)480-4928 HA22

07-VEN-126-20.3/20.3 VEN COUNTY CITY OF FILLMORE VEN-126 CALSTATE CONTRACTORS INC IRA, ALFRED $2,185,000 02/16/21 32% 07-1XT904 $164,618 03/18/21 WEST VENTURA ST TO REPAIR DAMAGED 432 QUAIL CT 1525 RANCHO CONEJO 8% $0 02/28/22 MAINTENANCE FILLMORE STATION DUE TO BLVD SUITE 102 FILLMORE, CA 93015 WINDS&FALLEN TREESDIR'S THOUSAND OAKS, CA 91320

REPAIR FILLMORE MAINTENANCE STATION (805)857-7070 20.20 201130 07-VEN-126-/13.6 IN VENTURA COUNTY ON VEN 126 FROM C. A. RASMUSSEN, INC. ARROYO, HECTOR $13,559,531 01/24/18 100% 07-302204 $12,289,965 02/21/18 ROUTE 101 TO HAUN CREEK BRIDGE 28548 LIVINGSTON AVENUE 1525 RANCHO CONEJO 100% ACNH-P126-(056)E $0 07/30/21 PAVEMENT REHAB BLVD STE102 --() VALENCIA CA 91355 THOUSAND OAKS, CA 91320 (661)367-9040 (805)480-4928 HA22

Totals: Authorized Final Amt: $2,490,172,261 Completed to Date: $1,819,953,139 Work This Month: $31,387,148 State of California Department of Transportation Page 111 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 08 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 08-RIV-10-6.5/6.7 IN THE CITY OF BEAUMONT ON RTE 10 EVERLEVEL HOLDINGS, LLC $460,229 06/25/21 0% 08-0R5704 $0 07/15/21 FROM 6TH STREET ON-RAMP TO I-10 WB 52 E. HARRIET; 0% SNHG-000C-(529)E $0 AND ON ROUTE 210 IN SAN BERNARDINO --() ALTADENA CA 91001 FROM 0.1 MI TO 0.2 MI EAST (951)966-9153 INSTALL MIDWEST GUARDRAIL SYSTEM HB1

08-RIV-10-6.7/25.1 IN BEAUMONT & BANNING FROM JCT 10/60 COFFMAN SPECIALTIES, INC LENART, ELVIRA $184,887,741 11/26/19 49% 08-1C38U4 $97,171,564 12/16/19 SEP TO JCT 10/111 SEP 9685 VIA EXCELENCIA STE 200; 850 VIA LATA SUITE 53% ACIM- 010-(110)E $5,713,673 11/16/22 PAVEMENT REPLACEMENT LANES 3 & 4 & 104 --() SAN DIEGO CA 92126 COLTON, CA 92324 (858)536-3100 (951)232-8949

08-RIV-10-27.6/0 NEAR PALM SPRINGS @ WHITEWATER RIVER ROCKFORCE CONSTRUCTION, LLC KOURY, PETER $9,965,840 12/26/19 100% 08-1E5704 $9,968,503 01/22/20 BRIDGE (56-0004 L&R) 26772 VISTA TERRACE; 73800 DINAH SHORE DR. 99% $138,163 07/30/21 REHAB BRIDGE #104 LAKE FOREST CA 92630 07/26/21 PALM DESERT, CA 92211 (949)441-5200 (909)844-0619

08-RIV-10-104.9/134.2 NEAR BLYTHE, FROM SR 10/177 SEP TO FISHER SAND & GRAVEL CO. NGUYEN, IRVIN $267,839,839 03/24/21 0% 08-1C0824 $0 04/15/21 NEAR BLYTHE, FROM SR 10/177 SEP TO 1302 W. DRIVERS WAY; 73800 DINAH SHORE 0% B1IM-010 -(112)E $0 06/30/25 1.05 MI W/O WILEY'S WELL RD OC #104 --() TEMPE AZ 85284 REHABILITATE MAINLINE PAVEMENT, PALM DESERT, CA 92211 SUSPENDED (480)730-1033 (951)453-8943

08-RIV-10-139.0/155 IN BLYTHE FR ISORA DITCH (BR #56- TRUESDELL CORPORATION OF VU, KHOI $2,191,350 05/08/20 70% 08-1K1404 $1,982,106 06/09/20 0015L) TO RTE 10/95 SEPARATION (BR CALIFORNIA, INC. 73800 DINAH SHORE DR. 93% $0 08/19/21 #56-0598L/R) 1310 W. 23RD STREET; STE 104

POLYESTER CONCRETE OVERLAY, COLUMN PALM DESERT, CA 92211 TEMPE AZ 85282 (951)232-6263 (602)437-1711

08-RIV-10-/156.5 ALSO RIV-15-R0.0/37.2, RIV-71- PETERSON-CHASE GENERAL AVILA, XAVIER $3,869,330 09/17/19 100% 08-1F3724 $3,758,095 10/04/19 R0.0/G3.0, RIV-215-0.0/R38.4; ON RTE ENGINEERING CONSTRUCTION, INC.119 N. MAPLE SUITE A 97% ACNH-X065-(117)E $325,388 07/21/21 10 FROM SBD/RIV CO LN TO ARIZONA STA 16351 CONSTRUCTION CIRCLE WES CORONA, CA 92880 --() LN & ON RTE 15 FROM SD/R (951)830-6837 IRVINE CA 92606 REPLACE EXISTING GUIDE SIGNS WITH (949)252-0441 State of California Department of Transportation Page 112 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 08 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 08-RIV-15-3.0/29.1 IN TEMECULA FROM TEMECULA RIVER O'DONNELL CONSTRUCTION, INC. BERGEVIN, MIKE $590,180 04/09/21 32% 08-1K7404 $402,718 04/27/21 BRIDGE (BR #56 0047R) TO HORSETHIEF 559 W. COVINA BLVD.; 9225 STELLAR COURT 67% $206,088 10/26/21 CANYON WASH (BR #56 0678R) NEAR SUITE B SAN DIMAS CA 91773 ELSINORE CORONA, CA 92883 (909)394-4510 METHACRYLATE BRIDGE DECKS, REPLACE (951)232-3739

08-RIV-15-8.2/23.9 IN RIVERSIDE COUNTY IN AND NEAR RV CONCRETE $3,895,822 04/30/21 0% 08-1L6804 $0 05/20/21 CORONA AND MURIETTA ON RTE 91 FROM 605 E. COMMERCIAL ST.; 0% $0 RTE 15/91 SEP TO 0.4 MI EAST OF ANAHEIM CA 92801 TYLER ST AND ON RTE 15 FROM 1 (714)855-4201 SLAB REPLACEMENT ON MAIN LANES,

08-RIV-15-23.9/33.4 FROM NICHOLS RD TO 0.2 MI N/O GLEN MYERS & SONS CONSTRUCTION, LLCSOSTROM DENISE P $16,650,448 09/05/19 73% 08-1F1424 $15,090,385 09/23/19 IVY 4600 NORTHGATE BLVD, SUITE 10 119 N. MAPLE ST. STE 91% B1IM- 015-(248)E $102,307 01/03/22 SLAB REPLACEMENT A --() SACRAMENTO CA 95834 CORONA, CA 92880 SUSPENDED (858)243-8272 (951)232-7608

08-RIV-15-38.2/51.5 FROM 0.5 MI S/O ONTARIO AVE TO JCT MYERS & SONS CONSTRUCTION, LLCCHINICHIAN, ALI $22,887,374 12/04/20 28% 08-1F1434 $9,786,298 12/22/20 RTE 60 4600 NORTHGATE BLVD, SUITE 10 4334 LATHAM STREET 43% ACIM-015 -(166)E $2,242,612 07/22/22 SLAB REPLACEMENT STE 100 --() SACRAMENTO CA 95834 RIVERSIDE, CA 92501 (916)283-9950 (951)232-7346

08-RIV-15-/3.1 IN AND NEAR TEMECULA, IN RIV CO FROM SECURITY PAVING COMPANY, INC. BERGEVIN, MIKE $28,637,464 01/02/20 84% 08-1F1414 $23,144,566 01/30/20 SD CO LN TO NORTH OF TEMECULA RIVER 3075 TOWNSGATE ROAD; 9225 STELLAR CT, 80% ACIM-015 -(208)E $979,344 10/08/21 BR & IN SD CO FR 0.1 MI S/O RIV CO LN SUITE B --() WESTLAKE VILLAGE CA 91361 TO RIV CO LN CORONA, CA 92883 (818)362-9200 REPLACE TWO OUTSIDE LANES IN BOTH (951)232-3739

08-RIV-15-/0 IN RIVERSIDE COUNTY ON ROUTES 10, IN NELSON ABUD (PM) SELECT JAY CARILLO $4,443,730 05/06/19 100% 08-1H5304 $4,257,989 05/28/19 RIVERSIDE COUNTY ON ROUTES 10, 15, 60 ELECTRIC, INC. 790 VIA LATA SUITE 100% B1ST-000C-(491)E $0 07/09/21 & 215 AND IN SAN BERNARDINO COUNTY ON 2790 BUSINESS PARK DR.; 100 --() 07/16/21 ROUTES 10, 15, 60 COLTON, CA 92324 COMPLETED VISTA CA 92081 REPAIR DETECTION SITES (951)830-6819 (562)454-9540 State of California Department of Transportation Page 113 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 08 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 08-RIV-60-.4/15.9 IN RIV CO ON RTE 60 FR E60/N15 CONN J. MCLOUGHLIN ENGINEERING CO.,ALAM, MAHFUAL $3,346,553 04/02/21 13% 08-1K7304 $573,520 04/15/21 OC IN ONTARIO TO INDIAN ST OC IN INC. 4334 LATHAM ST SUITE 17% $573,520 02/02/22 MORENO VALLEY AND ON RTE 215 10641 FULTON CT.; 100

METHACRYLATE BRIDGE DECKS, RIVERSIDE, CA 92501 RANCHO CUCAMONGA CA 91730 (951)830-6853 (909)944-1037

08-RIV-62-6.7/9.2 COUNTIES IN AND NEAR YUCCA VALLEY AND MATICH CORPORATION VU, KHOI $22,532,000 12/11/20 25% 08-1E8404 $4,829,862 01/14/21 IN TWENTYNINE PALMS FROM 0.2 MILE 1596 HARRY SHEPPARD BLVD 73800 DINAH SHORE DR 21% ACNH-P062-(046)E $898,646 06/07/22 NORTH OF INDIAN CANYON DRIVE TO 0.6 STE 104 --() SAN BERNARDINO CA 92408 MILE WEST OF UTAH TRAI PALM DESERT, CA 92211 (909)382-7400 MILL AND OVERLAY MAINLINE & (951)232-6263

08-RIV-74-12.9/12.9 IN LAKE ELSINORE FROM GRAND AVE TO YAKAR FENG, PERCY $295,154 06/03/21 0% 08-1L7304 $0 06/23/21 COLLIER AVE 689 EAST SAN BERNARDINO RD; 790 S. VIA LATA, 0% $0 12/23/21 INSTALL CHANGEABLE MESSAGE SIGN SUITE 100 COVINA CA 91703 COLTON, CA 92324 (909)599-1612 (951)232-9010

08-RIV-74-13.2/34 IN RIVERSIDE COUNTY AT VARIOUS ORTIZ ENTERPRISES, INC. TRUONG, NICK $5,337,906 12/29/20 9% 08-1C6804 $1,767,706 01/19/21 LOCATIONS 6 CUSHING SUITE 200; 9225 STELLAR COURT 33% $333,224 03/04/22 BRIDGE RAIL REPLACEMENT, REPLACE 1 CORONA, CA 92883 IRVINE CA 92618 (951)830-6835 (949)753-1414 HA21

08-RIV-74-28.1/37.4 IN & NR MENIFEE & HEMET FROM 0.62 MI GRANITE CONSTRUCTION COMPANY TRUONG, NICK $22,287,556 03/12/19 99% 08-0N6704 $20,148,016 04/05/19 E/O RTE 215 TO 0.4 MI W/O ACACIA 38000 MONROE STREET; 9225 STELLAR COURT 85% HSNH-P074-(067)E $1,321,520 07/30/21 AVENUE CORONA, CA 92883 PH- -( ) INDIO CA 92203 CONSTRUCT RAISED CURB MEDIAN & LEFT (951)830-6835 (760)775-7500 HB1

08-RIV-74-36.9/43.6 IN THE CITY OF HEMET ON RTE 74 FR ALFARO COMMUNICATIONS SMITH, CHRISTOPHER $2,311,885 06/04/20 81% 08-1F5904 $1,831,256 07/17/20 WARREN RD TO SOBOBA ST CONSTRUCTION,INC 9225 STELLAR COURT 76% ACNH-P074-(070)E $377,547 09/02/21 CONSTRUCT SIDEWALKS, CURB RAMPS, 15614 S. ATLANTIC AVENUE; SUITE B --() CORONA, CA 92883 COMPTON CA 90221 (951)830-6835 (310)669-8949 State of California Department of Transportation Page 114 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 08 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 08-RIV-74-48.1/64.3 IN RIVERSIDE COUNTY TO THE WEST AND AMES CONSTRUCTION NGUYEN, NHAN $21,067,688 09/07/18 100% 08-1K3004 $14,839,195 09/10/18 NORTH OF JUNCTION ROUTE 74 &ROUTE 391 N. MAIN STREET, STE 302 850 SOUTH VIA LATA, 70% $128,608 07/30/21 243 DIR'S ORDER EMERGENCY F.A. SUITE 104 CORONA, CA 92880 REPAIR/REPLACE DRAINAGE SYSTEM COLTON, CA 92324

(909)821-8164 20.20 201130 08-RIV-74-/5.8 NR LAKE ELSINORE, FROM ORANGE COUNTY GRANITE CONSTRUCTION COMPANY ABDALLA, OSAMA $40,270,534 11/12/20 12% 08-1C8504 $8,024,323 12/24/20 LINE TO MONTE VISTA STREET 38000 MONROE STREET; 9225 STELLAR CT, 20% HSST-S074-(071)E $1,392,754 03/03/23 WIDEN EXISTING LANES TO PROVIDE 12' SUITE B --() INDIO CA 92203 CORONA, CA 92883 (760)775-7500 (951)830-9182 HB1

08-RIV-79-25.6/26.4 IN & NR HEMET AT VARIOUS LOCATIONS FR AUTOBAHN CONSTRUCTION, INC. HUTCHINSON, MICHAEL $1,503,392 11/12/20 12% 08-1F6004 $124,698 12/09/20 EAST FLORIDA AVE TO EAST MENLO AVE 933 N. BATAVIA ST.; 937 SOUTH VIA 8% $112,243 04/29/22 CONSTRUCT AND UPGRADE EXISTING LATA,STE 650/700 ORANGE CA 92867 COLTON, CA 92324 (714)769-7025 (951)232-7519

08-RIV-91-1.0/20.3 FROM W 91 - GREEN RIVER RD OFF-RAMP RV CONCRETE SOSTROM, DENISE $1,353,474 04/13/21 18% 08-1K7604 $42,192 04/27/21 OH (BR #56 0865K) NEAR CORONA TO 14TH 605 E. COMMERCIAL ST.; 119 N. MAPLE STREET 3% $42,192 11/12/21 STREET WB OFF-RAMP (BR #56 0837K) IN STE A ANAHEIM CA 92801 RIVERSIDE CORONA, CA 92880 (714)855-4201 METHACRYLATE BRIDGE DECKS, REPLACE (951)232-7608

08-RIV-95-14.5/35.6 AT VAR LOCS FR 4 MI N/O PALO VERDE DREAMBUILDER CONSTRUCTION CORPKOURY, PETER $5,539,061 11/04/20 100% 08-1G0004 $3,796,475 11/20/20 DAM RD TO 0.6 MI S/O SAN BERNARDINO DBA DREAMBUILDER 73800 DINAH SHORE DR 69% ACST-S095-(036)E $651,179 08/31/21 CO LINE 18543 YORBA LINDA BLVD # 376; #104 --() CONSTRUCT CONCRETE/RSP APRONS & PALM DESERT, CA 92211 OVER RUN YORBA LINDA CA 92886 (909)844-0619 (714)646-3697

08-SBD-2-2.4/0 NEAR WRIGHTWOOD AT SHEEP CREEK BRIDGE BEADOR CONSTRUCTION COMPANY, SANTOS, JOHN $3,033,711 09/28/18 100% 08-0H4704 $3,019,862 10/22/18 #54-0360 INC. 12522 BEAR VALLEY 99% B1ST-P002-(040)E $3,968 07/21/21 UPGRADE BRIDGE RAILING AND WIDEN TO 26320 LESTER CIRCLE ROAD --() HESPERIA, CA 92345 CORONA CA 92883 (951)538-5315 HA21 (951)674-7352 State of California Department of Transportation Page 115 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 08 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 08-SBD-10-21.6/23.6 IN COLTON FROM 0.36 MI W/O RANCHO AVE GRIFFITH COMPANY BENSON, DAVID $1,823,217 11/28/18 100% 08-1F44U4 $1,766,965 12/19/18 OC TO WARM CREEK BRIDGE 3050 EAST BIRCH STREET 590 S. VIA LATA SUITE 94% $2,711 03/23/23 NSTALL GORE PAVING, PAVE UNDER 100 BREA CA 92821 COLTON, CA 92324 OVER RUN (714)984-5500 (951)232-6478

08-SBD-10-23.8/23.8 IN COLTON AT SANTA ANA RIVER BRIDGE PETERSON-CHASE GENERAL YOUSSEF, MAGED $15,075,745 01/30/19 80% 08-0Q9104 $10,573,606 03/04/19 (BR #54-0292G, BR #54-0292 LT AND BR ENGINEERING CONSTRUCTION, INC.850 SOUTH VIA LATA 69% B1IM-010 -(267)E $748,269 09/17/21 #54-0292 RT) 16351 CONSTRUCTION CIRCLE WES SUITE 100A --() BRIDGE REHABILITATION AND SEISMIC COLTON, CA 92324 IRVINE CA 92606 (951)538-3087 HA21 (949)252-0441

08-SBD-10-27.9/28 IN REDLANDS AT CALIFORNIA ST UC O'DONNELL CONSTRUCTION, INC. GEORGES, SAMER $790,167 05/22/20 100% 08-1G2914 $792,281 06/18/20 EASTBOUND EXIT RAMP 559 W. COVINA BLVD.; 850 S. VIA LATA SUITE 99% $0 05/21/21 WIDEN EB OFF RAMP 100A SAN DIMAS CA 91773 COLTON, CA 92324 OVER RUN (909)394-4510 (951)232-3748

08-SBD-10-29.4/39.2 IN REDLANDS & YUCAIPA FR 0.1 MI E/O STURGEON ELECTRIC CALIFORNIA, TAHA, ISSA $5,992,810 10/30/19 99% 08-384234 $4,195,445 11/22/19 ALABAMA ST TO COUNTY LINE RD LLC. 790 VIA LATA SUITE 70% $151,016 09/30/21 INSTALL TMS FIELD ELEMENTS 13501 BENSON AVE; 100

COLTON, CA 92324 CHINO CA 91214 (951)906-9916 HB4N (909)591-0000

08-SBD-10-34.2/36.8 NEAR YUCAIPA FROM 0.10 MI W/O WABASH GENUINE ENGINEERING INC ARIAS, MARTHA $955,188 12/31/19 100% 08-1C3004 $878,507 01/22/20 AVE OC TO 0.2 MI W/O LIVE OAK CANYON 13306 INDIAN BOW CIR; 967 S. VIA LATA SUITE 100% $0 06/22/21 RD 650 CORONA CA 92883 06/22/21 SLOPE PAVING (ROCK BLANKET ON COLTON, CA 92324 SUSPENDED (951)674-5000 (951)232-3778 HA28

08-SBD-10-36.9/39.1 IN YUCAIPA FROM 0.2 MI W/OLIVE OAK COFFMAN SPECIALTIES, INC GAYED, EZZ $30,264,417 11/09/18 100% 08-0K2934 $30,316,078 11/30/18 CANYON ROAD TO COUNTY LINE ROAD UC 9685 VIA EXCELENCIA SUITE 200 850 S VIA LATA 100A 99% B1IM-010 -(266)E $0 08/13/21 REHABILITATE EXISTING PCCP WB & EB COLTON, CA 92324 --() SAN DIEGO CA 92126 (951)830-6954 (858)536-3100 HA22 State of California Department of Transportation Page 116 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 08 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 08-SBD-10-/29.8 IN VARIOUS CITIES FROM MONTCLAIR AT PETERSON-CHASE GENERAL OOI, KEE $3,597,444 05/12/20 94% 08-1K2204 $3,393,722 06/18/20 MILLS AVENUE UC (BR #54 0453) TO ENGINEERING CONSTRUCTION, INC.9540 CENTER AVENUE 92% $0 06/29/21 REDLANDS AT LUGONIA AVENUE UC (BR #54 16351 CONSTRUCTION CIR W; #120 07/08/21 0931H) RANCHO CUCAMONGA, CA COMPLETED IRVINE CA 92606 REPLACE DETERIORATED ROADWAY SLABS 91730 (949)252-0441 (951)840-8323 08-SBD-15-12.5/14.8 FROM SIERRA AVENUE UC TO GLEN HELEN OHL USA, INC. NGUYEN, VU $23,739,995 12/23/19 100% 08-0K1214 $22,924,939 01/22/20 PARKWAY UNDERCROSSING 1920 MAIN STREET STE 310 9540 CENTER AVENUE, 94% ACIM-015 -(165)E $416,746 04/28/21 REHABILITATE EXISTING MAINLINE AND #120 --() IRVINE CA 92614 RANCHO CUCAMONGA, CA OVER RUN (949)579-0737 91730

(951)232-3784 08-SBD-15-16.1/169.4 IN SBD CO IN & NEAR HESPERIA AT VELARDE CONCRETE CONSTRUCTION,PHAM, THANH $1,898,921 02/05/21 46% 08-1K1904 $1,425,865 03/04/21 VARIOUS LOCATIONS FROM CAJON CREEK TO INC. 222 E MAIN ST 75% $281,834 11/15/21 MICRO DITCH (BR #54 0619L) 523 S. BRAND BLVD.; BARSTOW, CA 92311

DECK APPROACH AND DEPARTURE (951)232-7262 SAN FERNANDO CA 91340 (818)898-2300

08-SBD-15-23.5/29.1 FROM 0.8 MI NORTH OF NORTH ALRAY AMERICA PACIFIC CONSTRUCTION AL-KHATEEB, TAGHREED $625,600 12/31/20 66% 08-1H3514 $617,220 02/04/21 OVERHEAD TO 0.5 MILE NORTH OF OAK 7161 CITRUS VALLEY AVE; 15255 BEAR VALLEY 99% $7,280 07/06/21 HILL ROAD OVERCROSSING ROAD EASTVALE CA 92880 CULVERT LINING & INVERT PAVING HESPERIA, CA 92345 (559)577-9999 (951)232-7793

08-SBD-15-40.3/40.7 IN VICTORVILLE NR PALMDALE ROAD IN ACCU CONSTRUCTION, INC. BENSON, DAVID $333,610 04/23/19 0% 08-1H2714 $251,714 05/13/19 VICTORVILLE NR PALMDALE ROAD (ROUTE 2098 S. GRAND AVE. SUITE A; 790 VIA LATA SUITE 0% $3,780 08/10/22 18) AND INTERSTATE 15 100 SANTA ANA CA 92705 PERMANENT RESTORATION OF IRRIGATION COLTON, CA 92324 PLANT EST (714)641-4730 (951)232-6478 SATIS

08-SBD-15-40.4/0 IN VICTORVILLE FR 0.1 MI S/O DREAMBUILDER CONSTRUCTION CORPLOZA, SHAUN $1,023,807 06/15/20 100% 08-1F9904 $1,018,658 07/10/20 PALMDALE RD TO 0.4 MI S/O PALMDALE RD DBA DREAMBUILDER 15255 BEAR VALLEY 98% $0 06/25/21 OC 18543 YORBA LINDA BLVD # 376; BLVD

LENGTHEN SB ACCELERATION LANE HESPERIA, CA 92345 YORBA LINDA CA 92886 (909)545-1085 (714)646-3697 State of California Department of Transportation Page 117 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 08 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 08-SBD-15-42.5/46 IN SAN BERNARDINO COUNTY IN AMES CONSTRUCTION INC. AL-KHATEEB, TAGHREED $80,832,102 11/05/15 0% 08-3555V4 $83,095,437 11/25/15 VICTORVILLE FROM 0.5 MI N/O MOJAVE 2000 AMES DRIVE 15255 BEAR VALLEY 0% NHPI-015 -(237)1 $0 04/01/21 DRIVE TO 1.5 MI N/O STODDARD WELLS ROAD E- -(STP)L BURSNVILLE, MN 55306 ROAD OVERCROSSING HESPERIA, CA 92345 PLANT EST (951)356-1275 WIDEN I-15 (951)232-7793 SATIS

08-SBD-15-64.6/75.3 FROM 1.2 MI. S/O SIDEWINDER ROAD OC SULLY-MILLER CONTRACTING AL-KHATEEB, TAGHREED $15,854,476 06/03/20 67% 08-0K1234 $15,405,431 06/29/20 TO MOJAVE RIVER BRIDGE COMPANY 15255 BEAR VALLEY 95% $596,588 10/25/21 REHABILITATE EXISTING MAINLINE AND 135 S. STATE COLLEGE BLVD.; ROAD

HESPERIA, CA 92345 BREA CA 92821 (951)232-7793 (714)319-6309

08-SBD-18-31.9/38.5 IN SBD CO FR 0.1 MI E/O HILLTOP MATICH CORPORATION $2,944,000 04/05/21 0% 08-1H4904 $0 04/27/21 CONNECTOR TO 0.5 MI E/O SIERRA CREEK 1596 HARRY SHEPPARD BLVD 0% $0 PREVENTATIVE MAINTENANCE - OVERLAY SAN BERNARDINO CA 92408

(909)382-7400

08-SBD-18-68.5/87.9 IN SAN BERNARDINO COUNTY ON RTE 18 CALMEX ENGINEERING INC SANTOS, JOHN $1,604,607 05/21/20 46% 08-1J9404 $1,107,208 06/18/20 FROM 1.4 MI N/O CAMP ROCK RD TO 2764 S. VISTA AVE; 15255 BEAR VALLEY RD 80% ACST-X071-(072)E $0 07/16/21 CENTRAL RD AND ON RTE 247 FROM 0.1 MI HESPERIA, CA 92395 --() BLOOMINGTON CA 92316 S/O RABBIT SPRINGS RD TO (951)538-5315 (909)635-8237 PLACE A PREVENTATIVE TREATMENT ON

08-SBD-18-97.0/99.5 IN VICTORVILLE FROM AMARGOSA RD TO SULLY-MILLER CONTRACTING CANUTI, LARRY $4,857,000 02/23/21 27% 08-1E0604 $1,306,477 03/11/21 COBALT RD COMPANY 15255 BEAR VALLEY 27% HSNH-P018-(063)E $608,462 01/06/22 WIDEN ROADBED & CONSTRUCT RAISED 135 S. STATE COLLEGE BLVD.; ROAD --() HESPERIA, CA 92345 BREA CA 92821 (760)985-5825 HB1 (714)578-9600

08-SBD-38-11.3/26.5 SLOPE STABILIZATION. REMOVING DEBRIS RIVERSIDE CONSTRUCTION CO INC TRAN, KEN $3,698,752 09/25/20 88% 08-1L9404 $2,758,487 09/26/20 AND HAZARDOUS BURNED TREES, 4225 GARNER ROAD 850 S VIA LATA SUITE 75% $71,741 08/11/21 EXCAVATION AND CLEARING CULVERT INLET 104 RIVERSIDE, CA 92501 BASINS DIR'S EMERGENCY F.A. COLTON, CA 92324 (951)682-8308 SLOPE STABILIZATION (909)844-3312 20.20 201130 State of California Department of Transportation Page 118 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 08 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 08-SBD-38-11.3/26.5 WATERSHED/DEBRIS FLOW MITIGATION: POWELL CONSTRUCTORS INC TRAN, KEN $19,985,000 12/23/20 1% 08-1L9804 $163,392 12/28/20 REPAIR/REPLACE/INSTALL DRAINAGE 8555 BANANA AVE 850 S VIA LATA SUITE 1% $157,024 12/16/21 SYSTEMS AND REPAIR/REPLACE DEBRIS 104 FONTANA, CA 92335 BARRIERS DIR'S EMERGENCY ORDER COLTON, CA 92324

FLOW MITIGATION (909)844-3312 20.20 201130 08-SBD-38-47.5/59.4 AT VARIOUS LOCATIONS FR ZACA DR TO DREAMBUILDER CONSTRUCTION CORPBENJAMIN, AMGAD $1,884,061 10/13/20 31% 08-0G8004 $183,595 11/16/20 STA RTE 18 AT BIG BEAR LAKE DAM DBA DREAMBUILDER 850 S VIA LATA STE 10% $150,725 12/24/21 RELINE OR REPLACE CULVERTS 18543 YORBA LINDA BLVD # 376; 104

COLTON, CA 92324 YORBA LINDA CA 92886 (909)844-9731 HA42 (714)646-3697

08-SBD-40-28.9/28.9 IN SAN BERNARDINO COUNTY NEAR RV CONCRETE PHAM, THANH $1,354,992 03/09/21 22% 08-1G5504 $571,025 04/06/21 NEWBERRY SPRINGS AT 3.6 MILES WEST OF 605 E. COMMERCIAL ST.; 222 E MAIN ST 42% ACIM-040 -(088)E $0 08/26/21 HECTOR ROAD UNDERCROSSING BARSTOW, CA 92311 --() ANAHEIM CA 92801 REMOVE EXISTING WIM AND INSTALL NEW (951)232-7262 (714)855-4201

08-SBD-40-50.0/75 NEAR LUDLOW FROM CRUCERO ROAD TO FISHER SAND & GRAVEL CO. PHAM, THANH $35,420,839 09/07/18 100% 08-0R1604 $34,285,570 10/09/18 BADGER WASH 1302 W DRIVERS WAY 222 E MAIN ST #207 96% HSIM- 040-(084)E $25,548 08/16/22 REGRADE MEDIAN CROSS SLOPE BARSTOW, CA 92311 --() TEMPE AZ 85284 (951)232-7262 OVER RUN (480)730-1033 HB1

08-SBD-40-75.0/100 BETWEEN BADGER WASH TO ESSEX ROAD OC GRANITE CONSTRUCTION COMPANY DAVIS, DARCY $17,197,071 12/06/19 88% 08-0R1504 $16,572,154 12/31/19 REGRADE MEDIAN CROSS SLOPE 38000 MONROE STREET; 1044 E BROADWAY ST 94% HSIM-040 -(086)E $2,750 10/06/21 NEEDLES, CA 92363 --() INDIO CA 92203 (760)326-4684 (760)391-6351 HB1

08-SBD-40-125.0/154.6 NEAR LUDLOW FR 4.5 MI E/O HOMER WASH AMES CONSTRUCTION, INC. DAVIS, DARCY $14,008,149 08/26/20 29% 08-0R1424 $5,450,139 09/21/20 BR TO ARIZONA STATE LINE 391 N. MAIN STREET; 1044 EAST BROADWAY 39% HSIM- 040-(066)E $1,217,497 04/01/22 REGRADE MEDIAN CROSS SLOPE NEEDLES. CA 92363 --() CORONA CA 92880 (760)326-4684 (951)356-1275

State of California Department of Transportation Page 119 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 08 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 08-SBD-60-.7/3 IN CHINO FR PIPELINE AVE OC TO BENSON SEMA CONSTRUCTION, INC. LOPEZ, JOSEPH $19,649,146 03/07/19 64% 08-0F0304 $15,914,004 04/09/19 AVE OC 42690 RIO NEDO, SUITE G 119 N MAPLE SUITE A 81% B1NH-P060-(153)E $746,286 05/23/22 REMOVE & REPLACE OC STRUCTURES CORONA, CA 92880 --() TEMECULA CA 92590 (951)232-8957 (303)627-2600 HA21

08-SBD-60-4.6/9.9 60/91/215 IC IN ONTARIO FR EUCLID J. MCLOUGHLIN ENGINEERING CO.,MOHAMED, ASHRAF $142,656,342 04/18/19 86% 08-0Q75U4 $129,263,920 05/13/19 AVE IC TO RIV CO LN & NEAR RIVERSIDE INC. 4334 LATHAM STREET, 90% ACHS-NHP0-(014)9 $2,620,903 10/29/21 FROM SBD CO LN TO COUNTRY VILLAGE RD 10641 FULTON COURT STE 100 --() & FROM 0.7 MILES W/O RIVERSIDE, CA 92501 RANCHO CUCAMONGA CA 91730 REPLACEMENT OF TWO OUTSIDE LANES (951)232-3859 (909)721-1011

08-SBD-60-7.3/10 IN ONTARIO FR 0.2 MI W/O CUCAMONGA AMES CONSTRUCTION, INC. $24,215,254 04/26/21 0% 08-0E33U4 $0 05/27/21 CREEK BR TO MILLIKEN AVE 391 N. MAIN STREET; 0% ACNH-P060-(159)E $0 ADD WB AUX LANE, ADD EB --() CORONA CA 92880

(951)356-1275

08-SBD-62-106.0/142.3 IN SAN BERNARDINO COUNTY AT VARIOUS JAZZAR CONSTRUCTION GROUP, VU KHOI $2,940,420 05/08/20 100% 08-1H9004 $2,994,984 06/03/20 LOCATIONS INC. 73800 DINAH SHORE DR. 98% $0 05/19/21 PREVENTATIVE MAINTENANCE SEAL COAT 192 TECHNOLOGY DRIVE, SUITE M PALM DESERT, CA 92211

(951)232-6263 IRVINE CA 92618 (714)922-3569

08-SBD-62-124.8/142 AT VAR LOCS, FR 1.8 MI W/O JCT RTE 95 GRANITE CONSTRUCTION COMPANY DAVIS, DARCY $3,606,282 10/21/20 93% 08-1G0104 $3,008,262 11/05/20 TO 0.3 MI W/O PARKER DAM RD 38000 MONROE STREET; 1044 EAST BROADWAY 83% ACST-S062-(046)E $692,491 11/20/21 CONSTRUCT CONCRETE/RSP APRONS AT 10 NEEDLES, CA 92363 --() INDIO CA 92203 (760)326-4684 (760)775-7500

08-SBD-71-4.7/4.7 IN CHINO HILLS AT THE SOQUEL CANYON RIVERSIDE CONSTRUCTION DOMINIC EHIRIM $917,005 06/18/19 100% 08-1J4104 $961,739 07/15/19 SOUTHBOUND OFF-RAMP COMPANY, INC. 9540 CENTER AVENUE 100% $0 07/01/21 WIDEN SB EXIT-RAMP TO ADD A RIGHT 4225 GARNER ROAD RANCHO CUCAMONGA, CA 07/01/21 91730 SUSPENDED RIVERSIDE CA 92501 (951)232-3523 (951)682-8308 State of California Department of Transportation Page 120 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 08 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 08-SBD-71-/8.5 IN SAN BERNARDINO AND RIVERSIDE SELECT ELECTRIC, INC. RAUDEL RUIZ, MANUEL $6,763,527 10/08/20 10% 08-0G7904 $165,077 11/17/20 COUNTIES IN AND NEAR CHINO AND CHINO MARTINEZ 790 S VIA LATA 2% ACNH-P071-(074)E $91,545 08/09/22 HILLS FROM LOS ANGELES COUNTY LINE TO 2790 BUSINESS PARK DR. COLTON, CA 92324 --() ROUTE 91 (951)965-6327 VISTA CA 92081 INSTALL RMS, CCTV, CMS, VDS & FIBER HB4N (619)460-6060

08-SBD-71-/8.5 IN SAN BERNARDINO AND RIVERSIDE MYERS & SONS CONSTRUCTION, LLC $4,191,590 03/02/21 0% 08-1H9314 $0 03/25/21 COUNTIES IN AND NEAR CHINO AND CHINO 4600 NORTHGATE BLVD, SUITE 10 0% $0 HILLS FROM LOS ANGELES COUNTY LINE TO SACRAMENTO CA 95834 0.2 MILE SOUTH OF SANT (916)283-9950 PREVENTATIVE MAINTENANCE - SLAB

08-SBD-138-15.3/15.3 NEAR HESPERIA AT CAJON MTCE STA STANCE CONSTRUCTION COMPANY $444,813 06/17/21 0% 08-1J4904 $0 06/24/21 STATION 5314 MARINER LN; 0% $0 CONVERT OR RECONFIGURE THE EXISTING CHINO CA 91710

(626)274-3156

08-SBD-173-18.6/18.7 NEAR CEDAR GLEN AT 0.1 MI SOUTH OF OF STRONGHOLD ENGINEERING HOSSAIN, SADIQUE $7,785,447 08/20/20 8% 08-1H2904 $229,680 09/21/20 HOSPITAL ROAD 150 W WALNUT AVE 850 VIA LATA STE 104 3% ACST-S173-(004)E $95,942 05/31/23 REPLACE MBGR WITH CONCRETE BARRIER COLTON, CA 92336 --() PERRIS, CA 92571 (951)830-6828 (951)684-9303

08-SBD-210-1.5/21.5 IN VARIOUS CITIES FROM MOUNTAIN PETERSON-CHASE GENERAL OOI, KEE $930,046 03/24/21 0% 08-1K6704 $0 04/13/21 AVENUE OC (BR #54 1144) IN UPLAND TO ENGINEERING CONSTRUCTION, INC.9540 CENTER AVE #120 0% $0 10/13/21 27TH STREET UC (BR #54 1087G/L/R) IN 16351 CONSTRUCTION CIR W; RANCHO CUCAMONGA, CA

SAN BERNARDINO. 91730 SUSPENDED IRVINE CA 92606 METHACRYLATE BRIDGE DECKS AND (951)840-8323 (949)252-0441

08-SBD-210-10.5/12.7 ALSO SBD 15-7.4/9.0, IN RANCHO ALFARO COMMUNICATIONS YAACOUB, LAWRANCE $3,332,264 10/01/19 99% 08-1G2104 $3,090,696 10/24/19 CUCAMONGA & FONTANA AT ROUTE 210/15 CONSTRUCTIONS,INC 790 S. VIA LATA 93% $0 06/30/21 SEPARATION. 15614 S. ATLANTIC AVENUE; COLTON, CA 92324

INSTALL NEW FREEWAY TO FREEWAY RAMP (213)434-9325 SUSPENDED COMPTON CA 90221 (310)669-8949 State of California Department of Transportation Page 121 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 08 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 08-SBD-210-/0 IN AND NEAR UPLAND AND RANCHO ACCU CONSTRUCTION, INC. BENSON, DAVID $699,475 06/08/21 7% 08-1L7604 $19,765 06/24/21 CUCAMONGA FROM 0.5 MILE WEST OF 2098 S. GRAND AVE. SUITE A; 937 SOUTH VIA LATA 3% $19,765 12/15/22 MOUNTAIN AVE OC TO GOLDEN AVE UC SUITE 650 SANTA ANA CA 92705 RESTORE PLANT ESTABLISHMENT COLTON, CA 92324 (714)641-4730 (951)232-6478

08-SBD-215-2.2/3.2 IN COLTON FR0M 0.3 MI SOUTH TO 0.3 SECURITY PAVING COMPANY INC MOHDANKIR HUSAM $16,653,318 03/04/21 4% 08-1F7304 $145,030 03/25/21 N/O WASHINGTON ST OC 3075 TOWNSGATE ROAD, SUITE 20 850 S VIA LATA SUITE 1% B1IM-215 -(251)E $145,030 05/24/23 REPLACE OVERCROSSING 100A --() WESTLAKE VILLAGE CA 91361 COLTON, CA 92324 (818)362-9200 (951)538-5830

08-SBD-215-4.8/5.8 IN SAN BERNARDINO FROM 0.5 MI S/O BEADOR CONSTRUCTION COMPANY, MINEO,NICHOLAS $5,559,700 06/10/20 99% 08-1H7704 $3,870,566 06/29/20 ORANGE SHOW/AUTO PLAZA RD OC TO 0.2 INC. 850 S. VIA LATA, 69% HSIM- 215-(249)E $662,842 07/22/21 MI N/O INLAND CENTER DRIVE OC 26320 LESTER CIRCLE; SUITE 100A --() LANE RECONFIGURATION & PAVEMENT COLTON, CA 92324 CORONA CA 92883 (951)232-8549 (951)674-7352

08-SBD-215-7.0/17.8 IN SBD ON RTE 215 FR I-10/I-215 JCT ALDRIDGE ELECTRIC, INC. YAACOUB, LAWRANCE $5,886,622 10/30/20 38% 08-476424 $1,984,293 12/15/20 TO I-215/I-15 JCT AND ON RTE 259 FR 844 E. ROCKLAND ROAD; 790 S VIA LATA 34% $487,425 03/28/22 I-215/SR-259 JCT TO SR-259/SR-210 JCT COLTON, CA 92324 LIBERTYVILLE IL 60048 INSTALL TMS FIELD ELEMENTS (8.4 MI (213)434-9325 (847)276-1127

08-SBD-215-/2.7 IN GRAND TERRACE AT BARTON ROAD MYERS-RADOS A JOINT VENTURE YOUSSEF MAGED $48,323,087 10/17/17 100% 08-0J0704 $48,449,914 11/06/17 INTERCHANGE 12210 MICHIGAN ST, SUITE D 850 SOUTH VIA LATA 100% 04LN-6208-(023) $0 06/23/21 RECONSTRUCT INTERCHANGE SUITE 100A --() GRAND TERRACE, CA 92313 07/01/21 COLTON, CA 92324 COMPLETED (951)403-2960 (951)538-3087 HE13

08-SBD-247-39.0/42 IN SAN BERNARDINO COUNTY AT LUCERNE CALMEX ENGINEERING, INC. NGUYEN, KHOA $3,213,880 04/14/21 28% 08-1K8404 $2,172,431 05/07/21 VALLEY FROM 0.5 MI S/O CAMP ROCK RD 2764 S. VISTA AVE.; 222 E MAIN ST STE 208 67% $2,107,793 10/11/21 TO 0.1 MI S/O MIDWAY AVE AND FROM 1.1 BARSTOW, CA 92311 BLOOMINGTON CA 92316 MI S/O HOLMES RD TO (951)232-8611 (909)546-1311 MILL AND OVERLAY PAVEMENT AND

State of California Department of Transportation Page 122 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 08 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 08-SBD-259-/1.5 IN SAN BERNARDINO COUNTY ON ROUTES ALL AMERICAN ASPHALT GEORGES, SAMER $6,513,159 05/07/20 78% 08-1H3414 $1,421,832 06/09/20 210, 215 AND 259 AT VARIOUS LOCATIONS 400 E SIXTH STREET 850 S. VIA LATA SUITE 22% ACNH-X071-(073)E $0 07/06/21 PREVENTATIVE MAINTENANCE - OVERLAY 100A --() CORONA CA 92879 COLTON, CA 92324 SUSPENDED (951)736-7600 (951)232-3748

08-SBD-5726-/0 SBD MTCE STA (REGIONAL OFFICE) AT 175 PCN3 INC. BRIAN ABGHARI MINEO, NICHOLAS $4,358,510 01/09/20 96% 08-0K8404 $4,089,162 02/06/20 CLUSTER ST 5450 KATELLA AVE;#101 850 S. VIA LATA, 94% $115,441 08/03/21 DEMOLISH EXISTING OFFICE & SUITE 100A LOS ALAMITOS CA 90720 COLTON, CA 92324 (562)492-4124 (951)232-8549 HA12

08-SBD-5730-/0 IN THE CITY OF FONTANA ON SOUTHEAST STRONGHOLD ENGINEERING $21,700,000 04/02/21 0% 08-0R4204 $0 05/03/21 QUADRANT OF STATE RTE 210 AND I-15 INCORPORATED 0% $0 INTERCHANGE 150 W WALNUT AVE

BUILD MAINTENANCE FACILITY PERRIS CA 92571 HA12 (999)999-9999

Totals: Authorized Final Amt: $1,291,300,115 Completed to Date: $681,394,596 Work This Month: $27,770,409 State of California Department of Transportation Page 123 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 09 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 09-INY-190-111.6/126.1 IN INYO COUNTY NEAR FURNACE CREEK CALMEX ENGINEERING, INC. $4,746,713 05/12/21 0% 09-387904 $0 06/08/21 FROM 0.1 MILE WEST OF BAD WATER ROAD 2764 S. VISTA AVE.; 0% $0 TO 3.6 MILES EAST OF DANTE'S VIEW BLOOMINGTON CA 92316 ROAD (909)546-1311 THN BLANKET OVERLAY WITH DIGOUTS

09-INY-395-.1/.1 IN INYO COUNTY AT VARIOUS LOCATIONS PTM GENERAL ENGINEERING ADAM ZUMSTEIN $583,149 06/03/20 33% 09-370104 $160,785 06/29/20 CONSTRUCT PEDESTRIAN ACTIVATED SERVICES, INC. 500 S MAIN ST 28% SNHG-X027-(011)E $60,687 09/01/21 5942 ACORN STREET; BISHOP CA --() (760)920-3406 RIVERSIDE CA 92504 HB1 (951)710-1000

09-INY-395-29.9/41.8 IN INYO COUNTY NEAR OLANCHA AND ALCORN FENCE COMPANY DAMON CHERENZIA $2,249,111 02/16/21 43% 09-213414 $480,924 03/11/21 CARTAGO FROM 1.4 MILES SOUTH OF LOS 9901 GLENOAKS BOULEVARD; 500 S MAIN STREET 21% ACNH-P395-(346)E $230,847 11/12/21 ANGELES AQUEDUCT BRIDGE TO 0.2 MILE BISHOP, CA 93514 --() SUN VALLEY CA 91352 SOUTH OF ASH CREEK BRIDGE (760)920-3460 (323)875-1342 CONSTRUCT FENCE HE14

09-KER-14-4.7/12.6 IN KERN COUNTY AT ROSAMOND AND AT GUY F. ATKINSON CONSTRUCTION, HARTANTO HIN $41,997,977 07/02/20 41% 09-367404 $20,352,935 08/07/20 MOJAVE FROM 1.4 MILES SOUTH OF DAWN LLC DBA GUY F. ATKINSON 16490 SIERRA HWY 14 48% ACNH-P014-(081)E $169,689 08/10/21 ROAD OVERCROSSING TO 0.5 MILE NORTH 18201 VON KARMAN AVENUE; MOJAVE CA 93501 --() OF SILVER QUEEN ROAD OVE (760)937-3243 IRVINE CA 92612 2R (949)382-7145

09-KER-14-16.6/16.6 IN KERN COUNTY IN THE TOWN OF MOJAVE JAMES E THOMPSON, INC., DBA $827,500 05/24/21 0% 09-377304 $0 06/22/21 AT THE MOJAVE HIGHWAY MAINTENANCE JTS CONSTRUCTION 0% $0 STATION L5713 7001 MCDIVITT DR STE B

CONSTRUCT PHASE THREE OF BAKERSFIELD CA 93313 (661)835-9270

09-KER-14-/0 IN KERN COUNTY AT AND NEAR INDIAN DOOLITTLE CONSTRUCTION LLC DBA $885,035 05/14/21 0% 09-385704 $0 06/23/21 WELLS FROM 3.5 MILES WEST TO 2.0 DOOLITTLE ROAD CONSTRUCTION 0% $0 MILES EAST OF FREEMAN GULCH BRIDGE 1900 118TH AVE. SE;

AND FROM 2.4 MILES WEST OF R BELLEVUE WA 98005 AR CHIP SEAL (425)455-1150 State of California Department of Transportation Page 124 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 09 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 09-KER-58-129.4/143.9 IN KERN COUNTY NEAR BORON FROM 0.3 CALMEX ENGINEERING, INC. HIN HARTANTO $842,134 05/13/21 20% 09-385804 $530,687 06/02/21 MILE W OF EDWARDS OC TO 1.3 MILES W 2764 S. VISTA AVE.; 16490 SIERRA HWY 14 63% $530,687 08/11/21 OF TWENTY MULE TEAM OC AND FROM 0.7 MOJAVE, CA 93501 BLOOMINGTON CA 92316 MILE W OF SAN BERNARDIN (760)937-3243 (909)546-1311 DIGOUTS

09-MNO-0-/0 IN MONO COUNTY AT VARIOUS LOCATIONS EVERLEVEL HOLDINGS, LLC $2,421,233 06/18/21 0% 09-366604 $0 07/15/21 IMPROVE CHAIN UP LOCATIONS 5877 PINE AVE. SUITE 120; 0% ACNH-X051-(030)E $0 --() CHINO HILLS CA 91709

(951)966-9153

09-MNO-6-26.5/32.3 IN INYO AND MONO COUNTIES ON ROUTE QUALCON CONTRACTORS, INC. STEVE E.TISELL $3,923,589 05/07/20 100% 09-380904 $3,721,721 06/03/20 178 FROM ROUTE 127 TO 5.7 MILES EAST 1669 LUCERNE ST STE B 500 S.MAIN STREET 100% ACST-000C-(516)E $0 06/21/21 OF ROUTE 127 AND ON ROUTE 6 FROM 0.9 BISHOP CA 93514 --() MINDEN NV 89423 06/21/21 MILE NORTH OF ROUTE (760)937-4594 COMPLETED (775)782-2006 THIN BLANKET OVERLAY WITH DIGOUTS HM1

09-MNO-158-6.0/15.8 IN MONO COUNTY IN AND NEAR JUNE LAKE QUALCON CONTRACTORS, INC. $2,177,650 04/29/21 0% 09-387104 $0 06/14/21 FROM 0.1 MILE EAST OF BRIDGE #47-0055 1669 LUCERNE ST, SUITE B 0% $0 TO US ROUTE 395 MINDEN NV 89423 THIN BLANKET OVERLAY WITH DIGOUTS (775)782-2006 HM1

09-MNO-266-4.3/11.7 IN MONO COUNTY AT AND NEAR ON ROAD AND HIGHWAY BUILDERS, $2,020,020 05/11/21 0% 09-386804 $0 06/15/21 ROUTE 168 AT ROUTE 266 AND ON ROUTE LLC. 0% $0 266 FROM ROUTE 168 TO THE NEVADA 950 E MUSTANG RD

STATE LINE SPARKS NV 89434 (775)852-7283

09-MNO-395-6.9/T9.6 IN MONO COUNTY NEAR TOM'S PLACE FROM POWELL CONSTRUCTORS INC [email protected] $13,574,636 02/04/21 25% 09-360704 $2,091,502 03/01/21 2.4 MILES SOUTH OF LOWER ROCK CREEK 8555 BANANA AVENUE; 500 S. MAIN ST 15% HSNH-P395-(281)E $943,331 03/28/22 ROAD TO 0.3 MILE NORTH OF LOWER ROCK BISHOP, CA 93514 --() FONTANA CA 92335 CREEK ROAD (760)937-8955 (909)356-8880 WIDEN SHOULDERS

State of California Department of Transportation Page 125 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 09 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 09-MNO-395-13.5/13.9 IN MONO COUNTY AT CROWLEY LAKE FROM TAYLOR JANE CONSTRUCTION LP $1,072,613 04/12/21 0% 09-378104 $0 05/11/21 0.4 MILE SOUTH OF CROWLEY LAKE 131 W DANA SUITE 101 A 0% $0 OVERCROSSING TO CROWLEY LAKE NIPOMO CA 93444 OVERCROSSING (805)723-5129 REPAIR SLOPE, DRAINAGE, AND HB34

09-MNO-395-39.9/44.8 IN MONO COUNTY ABOUT 7 MILES SOUTH OF HAT CREEK CONSTRUCTION & RICK MOBERLY, P.E. $4,074,989 05/13/21 18% 09-383504 $1,211,781 06/03/21 LEE VINING FROM 0.2 MILE SOUTH OF MATERIALS, INC. 500 S. MAIN ST. 30% $1,211,781 09/15/21 ROUTE 158 TO 0.6 MILE NORTH OF THE LA 24339 HWY 89N; BISHOP, CA 93514

AQUEDUCT BRIDGE (760)937-3219 BURNEY CA 96013 THIN BLANKET OVERLAY (530)335-5501

09-MNO-395-52.3/53.7 IN MONO COUNTY NEAR LEE VINING FROM PAPICH CONSTURCTION CO. INC. RICK MOBERLY $6,754,178 03/09/15 100% 09-335004 $6,403,787 03/26/15 0.4 MILES N OF VISITOR CENTER ROAD TO 398 SURISE TERRACE 500 SOUTH MAIN ST 96% HSNH-P395-(249)E $0 11/16/21 0.7 MILES N OF PICNIC GROUNDS RD BISHOP, CA 93514 --() ARROYO GRANDE, CA 93420 MITIGATE MONO LAKE ROCKFALL (760)648-7906 (805)473-3016 HB34

09-MNO-395-53.0/55.5 IN MONO COUNTY NEAR LEE VINING FROM GRANITE CONSTRUCTION COMPANY $933,570 04/23/21 0% 09-387204 $0 05/07/21 PICNIC GROUNDS ROAD TO 0.2 MILE 3005 JAMES ROAD 0% $0 SOUTH OF CEMETERY ROAD BAKERSFILED CA 93308 THIN BLANKET OVERLAY WITH DIGOUTS (661)399-3361 HM1

09-VAR--/0 IN INYO, KERN AND MONO COUNTIES AT DANNY C. HUBBS CONSTRUCTION, ADAM ZUMSTEIN $2,565,656 04/30/21 0% 09-367704 $85,149 06/14/21 VARIOUS LOCATIONS INC. 500 S MAIN ST 3% SSTG-000C-(527) $85,149 12/31/21 REMOVE AND REPLACE END TREATMENTS, 37306 VISTA VIEW DR.; BISHOP CA --() (760)920-3406 YUCAIPA CA 92399 (909)389-0531

Totals: Authorized Final Amt: $91,649,751 Completed to Date: $35,039,270 Work This Month: $3,232,170 State of California Department of Transportation Page 126 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 10 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 10-ALP-0-/0 IN ALPINE, CALAVERAS AND TUOLUMNE TRUESDELL CORPORATION OF PAWAN GARG $518,518 11/23/20 26% 10-1J7604 $512,492 12/17/20 COUNTIES AT VARIOUS LOCATIONS CALIFORNIA, INC. 850 SOUTH GUILD 94% $0 08/31/21 POLYESTER CONCRETE OVERLAY, REPLACE 1310 W. 23RD STREET; AVE.,SUITE 107

LODI CA 95240 TEMPE AZ 85282 (209)470-8777 HM3 (602)437-1711

10-ALP-0-/0 IN ALPINE CO ON SR4 AT SILVER CREEK BRIDGEWAY CIVIL CONSTRUCTORS, PAWAN GARG $5,547,372 03/18/21 2% 10-0X7504 $118,734 04/01/21 BR, ON SR 88 AT WEST FORK CARSON INC. 850 SOUTH GUILD AVE. 2% $88,614 01/25/23 RIVER BR & ON SR 89 AT MARKLEEVILLE 3333 VACA VALLEY PARKWAY; SUITE 107

CREEK BR LODI, CA 95240 VACAVILLE CA 95688 UPGRADE BRIDGE RAILINGS (209)470-8777 HA21 (707)455-7033

10-ALP-4-/0 IN ALPINE COUNTY ON STATE ROUTE 4, 88 CCFG CONSTRUCTION $3,038,010 06/21/21 0% 10-0S6804 $0 07/20/21 AND 89 WITH VARIOUS POSTMILES 17750 WARDS FERRY RD; 0% $0 CULVERT REHABILITATION SONORA CA 95370

(209)743-4911

10-ALP-88-251.0/0 IN ALPINE COUNTY ON STATE ROUTE 88 AT SINCLAIR GENERAL ENGINEERING GARG, PAWAN $385,000 03/06/20 0% 10-1M1604 $0 03/11/20 POSTMILE 25.14 P.O. BOX 1453 850 S GUILD AVE, 0% $0 05/22/20 REMOVE AND REPLACE FAILED METAL PIPE SUITE 107 OAKDALE, CA 95361 (CMP) LODI, CA 95240

(209)470-8777 20.20.201 130 10-ALP-88-/0 IN ALPINE COUNTY ON STATE ROUTES 4, CCFG CONSTRUCTION IQBAL AULAKH $3,850,757 12/30/20 39% 10-0S7504 $1,527,090 01/26/21 88 AND 207, IN AMADOR COUNTY ON 17750 WARDS FERRY RD; 850 SOUTH GUILD 40% $443,323 12/21/21 STATE ROUTES 16 AND 49, AND IN AVE.SUITE#107 SONORA CA 95370 TUOLUMNE COUNTY ON STATE ROUTE LODI, CA 95242 (209)743-4911 CULVERT REHABILITATION (209)479-3608

10-AMA-49-4.0/4.2 STATE ROUTE (SR) 49 BETWEEN PM 4.0 TO SERAFIX ENGINEERING PAWAN GARG $1,144,134 11/16/20 100% 10-1F8304 $1,134,063 12/02/20 PM 4.206, AND SR-88 BETWEEN PM 14.292 CONTRACTORS, INC 850 SOUTH GUILD AVE. 100% $0 07/09/21 TO PM 14.360 IN THE CITY OF JACKSON, 7 CROW CANYON COURT SUITE 250 SUITE107 07/09/21 IN AMADOR COUNTY. LODI, CA 95240 COMPLETED SAN RAMON CA 94583 INSTALL/UPGRADE CURB RAMPS, (209)470-8777 HB71 (925)552-8253 State of California Department of Transportation Page 127 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 10 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 10-AMA-49-8.3/10.5 IN AMADOR, ALPINE AND TUOLUMNE MYERS & SONS CONSTRUCTION, LLCPAWAN GARG $5,066,806 04/12/19 96% 10-1H6404 $4,549,645 05/01/19 COUNTIES AT VARIOUS LOCATIONS 4600 NORTHGATE BLVD, STE 100 850 SOUTH GUILD AVE. 93% $0 04/30/21 REPLACE JOINT SEALS AND APPROACH SUITE#107 SACRAMENTO CA 95834 LODI , CA 95240 (916)283-9950 (209)470-8777 HM3

10-AMA-88-14.4/15 IN AMADOR COUNTY IN AND NEAR JACKSON GEORGE REED, INC IQBAL AULAKH $828,505 02/11/21 100% 10-1L2204 $798,043 03/04/21 FROM BROADWAY TO 0.1 MILE EAST OF 140 EMPIRE AVE 850 S. GUILD AVE, 100% $0 07/06/21 COURT STREET AND FROM ROCKY CREEK SUITE # 107 MODESTO CA 95354 07/06/21 BRIDGE TO 0.1 MILE EAST LODI, CA 95240 COMPLETED (209)523-0734 0.25' MILL AND REPLACE HMA OVERLAY (209)479-3608

10-AMA-88-20.7/20.7 REMOVE DAMAGED ROCK LINED CULVERT AND SINCLAIR GENERAL ENGINEERING PAWAN GARG $2,786,000 12/21/20 0% 10-1N0204 $0 12/21/20 REPLACE WITH RCP/RG CLASS V INCLUDING CONSTRUCTION, INC. 850 SOUTH GUILD 0% $0 05/31/21 HEADWALL AND WINGWALLS, INSTALL RSP 538 SOUTH 5TH AVE., SUITE A AVE.,SUITE 107

DIRS EFA 10A2234 LODI, CA 95240 OAKDALE, CA 95361 REMOVE AND REPLACE DAMAGED CULVERT (209)470-8777 20.20.201 130 10-AMA-88-32.3/38 IN AMADOR COUNTY AT AND NEAR BARTON GEORGE REED, INC IQBAL AULAKH $1,750,041 12/30/20 100% 10-1J1704 $1,720,549 01/19/21 FROM 0.4 MILE WEST OF SILVER DRIVE TO 140 EMPIRE AVE 850 SOUTH GUILD AVE. 100% $0 06/23/21 0.2 MILE WEST OF SHAKE RIDGE ROAD SUITE#107 MODESTO CA 95354 06/23/21 HOT MIX ASPHALT OVERLAY LODI, CA 95240 COMPLETED (209)523-0734 (209)479-3607 HM1

10-AMA-104-/10.1 IN AMADOR COUNTY IN AND NEAR IONE GEORGE REED, INC. PAWAN GARG $3,136,031 04/26/21 18% 10-1J1004 $133,394 05/19/21 FROM SACRAMENTO COUNTY LINE TO 140 EMPIRE AVE 850 SOUTH GUILD AVE 4% $133,394 09/03/21 JUNCTION 49/104 SUITE#107 MODESTO CA 95354 RHMA-G OVERLAY LODI CA 95242 (209)523-0734 (470)-87-77 HM2

10-CAL-4-29.2/29.4 IN CALAVERAS COUNTY AT MURPHYS AT 0.2 DIRT DYNASTY, INC. IQBAL AULAKH $1,587,000 09/23/20 17% 10-0W8704 $310,417 10/29/20 MILE WEST OF PENNSYLVANIA GULCH RD 4110 MEADOW OAKS DRIVE 850 SOUTH GUILD AVE. 20% ACST-P004-(157)E $310,417 10/04/21 AND FROM PENN GULCH RD TO MITCHLER SUITE 107 --() VALLEY SPRINGS CA 95252 STREET LODI, CA 95240 (209)585-7171 PROVIDE TWO-WAY-LEFT-LANE WITH (209)479-3608 HB4N State of California Department of Transportation Page 128 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 10 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 10-CAL-4-58.0/65.9 IN CALAVERAS COUNTY FROM 1.8 MILES GEORGE REED, INC. PAWAN GARG $3,409,475 04/26/21 44% 10-1J1304 $2,479,034 05/27/21 WEST OF CABBAGE PATCH LOG ROAD TO 140 EMPIRE AVE 850 SOUTH GUILD AVE 73% $2,473,122 08/23/21 ALPINE COUNTY LINE AND IN ALPINE SUITE#107 MODESTO CA 95354 COUNTY FROM JUNCTION 4/207 T LODI CA 95240 (209)523-0734 0.15' HMA (A) OVERLAY PG64-28 (209)470-8777 HM1

10-MER-0-/0 IN MERCED, SAN JOAQUIN, MARIPOSA AND PACIFIC INFRASTRUCTURE $3,146,885 06/09/21 0% 10-1C8104 $0 06/22/21 STANISLAUS COUNTIES AT VARIOUS CONSTRUCTION LLC 0% $0 LOCATIONS 871 COTTING COURT STE A;

BRIDGE PREVENTATIVE MAINTENANCE VACAVILLE CA 95688 HA21 (707)449-3604

10-MER-5-.4/.9 IN MERCED COUNTY AT I-5 FOR ERRECA STUDEBAKER BROWN ELECTRIC, SCHEIBER, TROY $1,441,508 09/05/19 51% 10-1G7214 $1,037,249 09/17/19 REST AREA AT PM 0.4/0.9 AND LODI ON INC. 850 S GUILD AVE, 72% $0 06/14/21 SR-99 AT PM30.9 6643 32ND STREET STE. 106; SUITE 107

INSTALL ZEV CHARGING STATIONS LODI, CA 95240 NORTH HIGHLANDS CA 95660 (559)341-2018 HB71 (916)678-4660

10-MER-5-.7/.7 IN MERCED COUNTY NEAR FIREBAUGH ON MDS ENGINEERING & CASEY, COREY / OSHITA, $3,838,438 12/13/19 41% 10-0W6204 $3,104,036 01/22/20 ROUTE 5 AT THE JOHN "CHUCK" ERRECA CONSTRUCTION, INC. STAN 81% ACIM- 005-(153)E $0 12/31/21 SAFETY ROADSIDE REST AREA, BOTH 14771 WONDERLAND BLVD; 850 S. GUILD AVE., --() NORTHBOUND AND SOUTHBOUND L SUITE 107 SUSPENDED REDDING CA 96003 REPLACE PUBLIC WATER SYSTEM AND LODI, CA 95240 HA26 (530)275-2779 (209)608-0711 10-MER-5-17.0/22.6 IN MERCED COUNTY AT AND NEAR SANTA TEICHERT CONSTRUCTION RANBIR BHULLAR $4,065,392 12/09/20 31% 10-1H4204 $1,457,647 12/31/20 NELLA FROM 0.5 MILE SOUTH OF ROUTE 400 SUNRISE AVE. SUITE 300; 952 GOODWIN DRIVE 36% $1,107,900 09/27/21 5/152 SEPARATION TO MCCABE ROAD RIPON CA 95366 ROSEVILLE CA 95661 OVERCROSSING (209)639-4306 (916)757-6400 RHMA OVERLAY

10-MER-33-/5.7 IN MERCED COUNTY IN AND NEAR DOS CAL VALLEY CONSTRUCTION, INC. MICHAEL STEWART $2,055,029 01/29/21 23% 10-1J1204 $152,886 02/18/21 PALOS FROM FRESNO COUNTY LINE TO 0.1 5125 N. GATES AVENUE, SUITE 1 7% $0 07/06/21 MILE NORTH OF EAST JUNCTION 152 FRESNO CA 93722 RHMA OVERLAY (559)274-0300

State of California Department of Transportation Page 129 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 10 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 10-MER-99-12.7/17.8 IN AND NEAR THE CITY OF MERCED FROM A. TEICHERT & SON, INC. DBA NATHANIEL TUMMINELLO $45,970,000 01/22/21 20% 10-1C1704 $5,311,636 02/11/21 0.2 MILE SOUTH OF CHILDS AVE. TO 0.2 TEICHERT CONSTRUCTION 12% ACNH-P099-(662)E $1,086,552 10/26/22 MILE SOUTH OF FRANKLIN ROAD OC. 400 SUNRISE AVE. SUITE 300; --() PAVEMENT REHAB (2R) ROSEVILLE CA 95661 HA22 (916)757-6400

10-MER-99-20.1/24.3 IN AND NEAR ATWATER, FROM 0.4 MILE BAY CITIES PAVING & GRADING, MUHAMMAD RAHMAN $57,217,702 12/12/19 39% 10-3A7204 $25,392,138 12/31/19 SOUTH OF BUHACH ROAD TO SOUTH OF INC. 3469 YEAGER DRIVE 44% ACNH-P099-(646)E $3,329,879 11/01/22 WESTSIDE BOULEVARD. 1450 CIVIC CT; MADERA, CA. 93637 --() PAVEMENT RESURFACING AND (559)905-5501 CONCORD CA 94520 HA22 (925)687-6666

10-MER-99-28.2/37.3 IN MERCED COUNTY IN LIVINSTON ON SECURITY PAVING COMPANY INC NATHAN TUMMINELL0 $31,779,944 12/04/19 88% 10-0Q1214 $13,848,499 12/24/19 STATE ROUTE 99 FROM 0.8 MILE SOUTH OF 3075 TOWNSGATE RD #200 2374 INDUSTRIAL ROWE 44% EPNH-P099-(639)E $3,176,884 09/21/21 HAMMATT AVENUE TO MERCED/STANISLAUS TURLOCK CA 95380 --() WESTLAKE VILLAGE CA 91361 COUNTY LINE. (209)481-3597 (818)362-9200 LANE WIDENING FROM 2 TO 3 LANES

10-MER-99-/0 IN SAN JOAQUIN, MERCED, AND BENTANCOURT BROS. CONSTRUCTIONKIMURA, JUSTIN $7,491,777 11/04/20 34% 10-1G7504 $2,541,672 11/20/20 STANISLAUS COUNTIES, ON ROUTES 5, 59, INC. 2750 N. PARKWAY DRIVE 34% $387,132 06/20/22 99, AND 152 AT VARIOUS LOCATIONS. 8015 W 11TH, STREET; FRESNO, CA 93722

UPGRADE OR REPLACE INEFFICIENT AND (559)246-9536 TRACY CA 95304 (209)832-7631

10-MER-140-9.7/9.7 IN MERCED COUNTY NEAR GUSTINE FROM QUIMU CONTRACTING INC. MUHAMMAD RAHMAN $578,770 03/23/21 43% 10-1K1904 $273,725 04/13/21 1.1 MILE EAST OF SANTA FE GRADE ROAD 5830 DIXON AVENUE WEST; 3469 YEAGER DRIVE, 47% $273,725 08/14/21 TO 0.2 MILE EAST OF EDMINSTER ROAD STE 109 DIXON CA 95620 CULVERT REPLACEMENT MADERA, CA. 93637 (707)693-0289 (559)905-5501 HM2

10-MER-140-35.9/36.9 PAVEMENT REHAB IN MERCED COUNTY IN FBD VANGUARD CONSTRUCTION, SAYED HASHEMYAN $728,225 05/18/21 40% 10-1F4304 $277,251 06/03/21 MERCED CITY FROM CYPRESS WAY TO 0.3 INC. 2374 INDUSTRIAL ROWE 38% $277,251 08/25/21 MILES EAST SANTA FE AVE. 550 GREENVILLE ROAD; TURLOCK CA 95380

PAVEMENT REHAB (209)624-6397 LIVERMORE CA 94550 (925)245-1300 State of California Department of Transportation Page 130 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 10 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 10-MER-140-37.4/44.8 IN MERCED COUNTY IN AND NEAR MERCED GEORGE REED INC. MUHAMMAD RAHMAN $3,059,282 04/12/21 17% 10-1J1904 $706,081 04/30/21 FROM SANTA FE AVENUE TO HAYDEN ROAD 140 EMPIRE AVE 3469 YEAGER DRIVE, 23% $706,081 10/01/21 COLD IN-PLACE RECYCLING-FA, HMA SUITE 109 MODESTO CA 95354 MADERA, CA. 93637 (209)523-0734 (559)905-5501 HM

10-MER-140-/42.1 IN MERCED COUNTY NEAR GUSTINE ON MIDSTATE BARRIER, INC. RANBIR BHULLAR $3,085,319 09/22/20 61% 10-0Y1104 $2,296,621 10/13/20 STATE ROUTE 140 FROM I-5 TO ABOUT 6 3291 S HWY 99 952 GOODWIN DRIVE 74% HSNH-P140-(038)E $610,083 09/24/21 MILES EAST OF MERCED AT VARIOUS RIPON CA 95366 --() STOCKTON CA 95215 LOCATIONS (209)639-4306 (209)944-9565 UPGRADE GUARDRAIL, TERMINAL SYSTEM HB1

10-MER-152-15.1/15.6 IN MERCED COUNTY NEAR LOS BANOS AT GRANITE ROCK COMPANY $1,672,313 04/19/21 0% 10-1L1204 $0 05/11/21 DELTA-MENDOTA CANAL BRIDGE TO 0.2 5225 HELLYER AVENUE; 0% $0 MILE EAST OF HIGHLINE CANAL BRIDGE SAN JOSE CA 95138 BRIDGE DECK-ON-DECK REHABILITATION (408)574-1400 HM3

10-MER-152-21.0/0 INTERSECTION OF STATE ROUTE 152 AND AGEE CONSTRUCTION CORPORATION MICHAEL STEWART $792,327 01/29/21 18% 10-1J3004 $231,305 03/04/21 11TH STREET IN THE CITY OF LOS BANOS, 1039 HOBLITT AVE 2374 INDUSTRIAL ROWE. 29% SSTG-S152-(092)E $231,305 07/21/21 IN MERCED COUNTY. --() CLOVIS CA 93612 INTERSECTION CONTROL IMPROVEMENT (209)481-1689 (559)299-3290 HB1

10-MER-152-26.3/40.7 ON SR 152 AT VARIOUS LOCATIONS IN MIDSTATE BARRIER, INC. MICHAEL STEWART $2,425,428 03/01/21 43% 10-1C3704 $1,822,772 03/18/21 MERCED COUNTY. 3291 S. HIGHWAY 99 2374 INDUSTRIAL ROWE 73% SSTG-S152-(091)E $480,760 09/23/21 COLLISION REDUCTION TURLOCK, CA, 95380 --() STOCKTON CA 95215 (209)481-1689 (209)944-9565 HB1

10-MER-165-8.6/9.8 IN MERCED COUNTY AT VARIOUS LOCATIONS GEORGE REED INC FELIX VAQUILAR $2,735,331 10/30/20 50% 10-0X5204 $1,886,236 11/20/20 UPGRADE ADA FACILITIES 140 EMPIRE AVE 2750 N. PARKWAY DRIVE 68% ACST-P165-(115) $0 10/21/21 FRESNO, CA 93722 --() MODESTO CA 95354 (559)360-1951 SUSPENDED (209)523-0734

State of California Department of Transportation Page 131 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 10 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 10-MPA-49-.3/18.5 IN MARIPOSA COUNTY IN AND NEAR A. TEICHERT & SON INC. DBA OSHITA, STAN $10,956,400 10/01/20 28% 10-1C0404 $6,864,424 10/19/20 MARIPOSA CITY FROM MADERA/MARIPOSA TEICHERT CONSTRUCTION 850 SOUTH GUILD AVE., 62% ACST-P049-(184)E $2,625,730 12/31/21 COUNTY LINE TO SOUTH JUNCTION OF 400 SUNRISE AVE. SUITE 300; STE. 107 --() STATE ROUTE 49/140 LODI, CA 95240 ROSEVILLE CA 95661 PAVEMENT PRESERVATION (209)608-0711 (916)757-6400

10-MPA-140-21.2/21.8 IN MARIPOSA COUNTY IN MARIPOSA ON IBARRA GENERAL ENGINEERING INCOSHITA, STAN $2,868,257 03/02/21 27% 10-0Y6004 $569,796 03/25/21 STATE ROUTE 140 FROM SOUTH JUNCTION 4325 TYROLITE ST; 850 SOUTH GUILD AVE., 20% HSNH-P140-(037)E $119,100 12/31/21 STATE ROUTE 49 TO TWELFTH STREET STE. 107 --() RIVERSIDE CA 92509 INSTALL CROSSWALKS AND IN-ROADWAY LODI, CA 95240 (909)342-8447 (209)608-0711 HB1

10-MPA-140-42.0/42.7 NEAR EL PORTAL AND YOSEMITE NATIONAL MYERS AND SONS/RL WADSWORTH COREY CASEY $20,701,281 01/29/21 43% 10-0P9234 $6,718,812 02/23/21 PARK, FROM 1.2 MILES WEST OF SOUTH JOINT VENTURE 3663 ARCH RD STE 500 32% ACST-ER18-(005) $1,646,022 12/20/21 FORK MERCED RIVER BRIDGE TO 0.5 MILE 4600 NORTHGATE BLVD #100 STOCKTON CA 95215 PER- -( ) WEST OF SOUTH FORK ME (209)607-8789 --() SACRAMENTO CA 95834 THIS PROJECT PROPOSED TO REMOVE THE (916)283-9950

10-SJ-4-2.0/0 IN SAN JOAQUIN COUNTY ON ROUTES 4, 5, DREAMBUILDER CONSTRUCTION CORP $1,904,061 12/29/20 0% 10-1C2004 $0 02/02/21 AND 99 AT VARIOUS LOCATIONS DBA DREAMBUILDER 0% $0 CULVERT REHABILITATION 18543 YORBA LINDA BLVD # 376;

YORBA LINDA CA 92886 (714)646-3697

10-SJ-4-5.4/13.4 IN SAN JOAQUIN COUNTY NEAR STOCKTON GEORGE REED, INC. $2,837,933 05/05/21 0% 10-1L2304 $0 05/27/21 FROM 1 MILE EAST OF MIDDLE RIVER 140 EMPIRE AVE 0% $0 BRIDGE TO 0.1 MILE WEST OF JOHN TURK MODESTO CA 95354 ROAD (209)523-0734 RHMA OVERLAY HM

10-SJ-4-15.5/16.7 IN THE CITY OF STOCKTON AT ROUTE4/I-5 SECURITY PAVING COMPANY INC OSHITA, STAN $28,769,000 12/09/20 0% 10-1C5004 $71,500 12/29/20 INTERCHANGES FROM 0.1 MILE EAST OF 3075 TOWNSGATE ROAD, SUITE 20 850 SOUTH GUILD AVE., 0% ACNH-X077-(028)E $0 12/31/22 FRESNO AVE. TO CENTRAL VIADUCT STE. 107 --() WESTLAKE VILLAGE CA 91361 INCLUDING CONNECTORS. LODI, CA 95240 (818)362-9200 PAVEMENT RESURFACING AND (209)608-0711

State of California Department of Transportation Page 132 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 10 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 10-SJ-4-/0 IN SAN JOAQUIN COUNTY ON ROUTE 4 AT CALIFORNIA ENGINEERING $6,417,007 03/02/21 0% 10-1C8004 $0 03/25/21 OLD RIVER BRIDGE CONTRACTORS, INC. 0% $0 BRIDGE PREVENTATIVE MAINTENANCE 20 HAPPY VALLEY ROAD;

PLEASANTON CA 94566 HA21 (925)461-1500

10-SJ-4-/0 REPAIR EXISTING TRAFFIC MONITORING ST. FRANCIS ELECTRIC, LLC $2,287,000 06/01/21 0% 10-1G9904 $0 06/22/21 STATIONS (TMS) AT VARIOUS LOCATIONS 975 CARDEN STREET; 0% $0 IN DISTRICT 10. SAN LEANDRO CA 94577 REPAIR EXISTING TRAFFIC MONITORING (510)639-0639 HB4N

10-SJ-5-10.6/0 IN SAN JOAQUIN COUNTY, IN AND NEAR AMERICAN CIVIL CONSTRUCTORS BAL BAHADUR PAUL $2,393,300 08/25/20 39% 10-1H3424 $932,310 09/11/20 LATHROP AT PM 10.7, DEUEL OVERHEAD WEST COAST LLC 39% $153,123 10/20/21 (NO. 29-0262 R/L) 2990 BAY VISTA COURT, SUITE D

REPLACE BRIDGE RAILS AND PREVENTIVE BENICIA CA 94510 (707)746-8028

10-SJ-5-26.4/27 SAN JOAQUIN SR 5 BRIDGE DECK GOLDEN STATE BRIDGE, INC. CHRIS HANSON $3,693,355 11/03/20 89% 10-1C9404 $3,308,909 11/20/20 REHABILITATION AT STOCKTON CHANNEL 3701 MALLARD DRIVE 3663 ARCH ROAD SUITE 90% $705,671 08/13/21 VIADUCT 500 BENICIA CA 94510 REHABILITATE BRIDGE DECK STOCKTON CA 95215

(209)479-4053 HA21

10-SJ-5-33.4/33.4 IN SACRAMENTO AND SAN JOAQUIN VINTAGE PAVING CO. ARIEL MENDOZA $977,349 10/27/20 82% 10-1G4404 $710,078 11/20/20 COUNTIES NEAR THORNTON AT 0.6 MILE 119 MAIN ST.; 850 S. GUILD AVE. 73% $427,338 08/04/21 SOUTH OF TWIN CITIES ROAD OC AND IN WINTERS CA 95694 STOCKTON AT 0.7 MILE NORTH OF (209)639-4686 (530)795-0132 UPGRADE TRAVEL TIME INFORMATION HB4N

10-SJ-5-45.8/45.8 BEAVER SLOUGH BRIDGE (BRIDGE NO. 29 VIKING CONSTRUCTION CO., INC. ARIEL MENDOZA $985,000 01/29/21 27% 10-1N2004 $355,521 04/06/21 0247R)I-5 AT PM 45.86 WITHIN SAN P.O. BOX 1508 850 S. GUILD AVE., 36% $0 07/30/21 JOAQUIN SUPERSTRUCTURE REPAIRS DIRS SUTIE 107 RANCHO CORDOVA, CA 95741 EFA 10A2274 LODI, CA 95240

REPAIR OF BRIDGE GIRDERS AND (209)639-4686 20.20.201 CONCRETE DECK 130 State of California Department of Transportation Page 133 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 10 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 10-SJ-5-/0 IN SAN JOAQUIN COUNTY AT VARIOUS MYERS & SONS CONSTRUCTION, LLC $4,664,661 04/29/21 0% 10-1K9304 $0 05/13/21 LOCATIONS 4600 NORTHGATE BLVD, SUITE 10 0% $0 POLYESTER CONCRETE OVERLAY SACRAMENTO CA 95834

(916)283-9950

10-SJ-12-4.4/0 IN SAN JUAQUIN COUNTY ON ROUTE 12 AT VALENTINE CORPORATION $2,575,350 05/25/21 0% 10-1K6104 $0 06/15/21 LITTLE POTATO SLOUGH BRIDGE (AT POST 111 PELICAN WAY; 0% $0 MILE R4.4). SAN RAFAEL CA 94901 REHABILITATE ELECTROMECHANICAL (415)453-3732 HA23

10-SJ-88-22.1/0 IN SAN JOAQUIN COUNTY COLLISION O.C. JONES & SONS, INC. ARIEL MENDOZA $3,812,821 11/20/20 25% 10-1E5314 $618,376 12/15/20 REDUCTION AT SR 88 AND LIBERTY ROAD 1520 FOURTH STREET; 850 S. GUILD AVE., 16% HSNH-P088-(072)E $618,376 10/28/21 IN SAN JOAQUIN COUNTY UPGRADE SUITE 107 --() BERKELEY CA 94710 LODI, CA 95240 (510)526-3424 (209)639-4686 HB1

10-SJ-99-8.9/9.5 IN SAN JOAQUIN COUNTY IN AND NEAR WABO LANDSCAPE & CONSTRUCTION OSHITA, STANLEY / $1,805,373 03/29/18 100% 10-0E6144 $1,675,451 04/17/18 MANTECA FROM 1.0 MILE NORTH OF LOUISE 726 ALFRED NOBEL DR. CASEY, COREY 92% STPL-6210-(012) $5,720 05/31/22 AVENUE TO 0.3 MILE NORTH OF LATHROP 850 SOUTH GUILD --() HERCULES CA 94547 ROAD______AVENUE, #107 OVER RUN (510)741-9226 REPLACEMENT PLANTING AND IRRIGATION LODI, CA 95240 HE13 (209)608-0711 10-SJ-99-9.4/15 IN SJ CO IN STOCKTON FROM 0.2 MI A. TEICHERT AND SON, INC. DBA $5,731,400 02/23/21 0% 10-1J2104 $0 03/18/21 NORTH OF LATHROP ROAD OVERCROSSING TO TEICHERT CONSTRUCTION 0% $0 0.3 MI NORTH OF ARCH ROAD 400 SUNRISE BLVD.;

UNDERCROSSING ROSEVILLE CA 95661 RHMA OVERLAY (916)757-6400

10-SJ-99-14.4/29 IN AND NEAR STOCKTON AND LODI, AT PACIFIC INFRASTRUCTURE ARIEL MENDOZA $1,728,723 04/05/21 30% 10-1C7604 $785,071 04/16/21 VARIOUS LOCATIONS FROM 0.3 MILE CONSTRUCTION LLC 850 S. GUILD AVENUE, 45% ACNH-P099-(668)E $461,219 01/14/22 SOUTH OF ARCH ROAD UNDERCROSSING TO 871 COTTING COURT STE A; SUITE 107 --() SOUTH OF KETTLEMAN LANE. LODI, CA 95240 VACAVILLE CA 95688 PROVIDE ROADSIDE SAFETY (209)639-4686 (707)449-3604 State of California Department of Transportation Page 134 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 10 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 10-SJ-99-16.4/18.2 IN SAN JOAQUIN COUNTY IN AND NEAR WABO LANDSCAPE & CONSTRUCTION,STAN OSHITA $2,346,575 06/03/20 79% 10-3A1014 $1,843,499 06/26/20 STOCKTON FROM 0.1 MILE SOUTH OF DUCK INC. 850 S GUILD AVE 78% STPL-6210-(013) $17,094 12/31/24 CREEK BRIDGE TO MAIN STREET 726 ALFRED NOBEL DR.; LODI, CA 95240 --() OVERCROSSING (209)608-0711 HERCULES CA 94547 REPLACEMENT LANDSCAPE HE13 (510)741-9226

10-SJ-99-16.8/17.6 IN SAN JOAQUIN COUNTY IN STOCKTON ON BRIDGEWAY CIVIL CONSTRUCTORS, DAVID ABLEDU $7,017,264 06/30/20 68% 10-0X3104 $5,944,953 07/17/20 STATE ROUTE 4 AT STATE ROUTE 99 INC. 3663 ARCH ROAD #500 81% $488,994 10/28/21 SEPARATION (BRIDGE #29-0155) 3333 VACA VALLEY PARKWAY; STOCKTON, CA 95215

TO RAISE BRIDGE (#29-0155) TO MEET (208)483-5812 VACAVILLE CA 95688 (707)455-7033

10-SJ-99-30.9/31.3 IN SAN JOAQUIN COUNTY IN LODI ON SECURITY PAVING COMPANY, INC. TROY SCHEIBER $10,472,173 10/21/20 48% 10-1C2804 $2,265,470 11/16/20 STATE ROUTE 99 AT VICTOR ROAD 3075 TOWNSGATE ROAD; 850 S GUILD 22% ACNH-P099-(661)E $555,621 05/06/22 NORTHBOUND ON-RAMP LODI CA 95240 --() WESTLAKE VILLAGE CA 91361 RAMP REALIGNMENT (559)341-2018 (818)362-9200 HB4N

10-STA-5-12.6/0 IN STANISLAUS COUNTY AT VARIOUS TRUESDELL CORPORATION OF VINCENT LADIAO $2,683,683 03/02/21 29% 10-1J5204 $461,035 03/25/21 LOCATIONS CALIFORNIA, INC. 17% $41,191 01/21/22 BRIDGE REHABILITATION 1310 W. 23RD STREET;

TEMPE AZ 85282 (602)437-1711

10-STA-5-27.0/27.4 IN STANISLAUS AND SAN JOAQUIN RE COM DEVELOPMENT COMPANY CASEY, COREY / OSHITA, $4,753,315 01/09/20 83% 10-0W6304 $3,681,067 02/06/20 COUNTIES ABOUT 9 MILES NORTHWEST OF 2488 DIXON LANE; STAN 76% $154,613 12/31/21 PATTERSON AT THE WESTLEY SAFETY 850 SOUTH GUILD BISHOP CA 93514 ROADSIDE REST AREA AND ABOUT 0.9 AVENUE, #107 (760)873-3301 REPLACE PUBLIC WATER SYSTEM AND LODI, CA 95240 HA26 (209)608-0711 10-STA-5-27.0/27.5 IN STANISLAUS COUNTY ON SR 5 AT PM 27 STUDEBAKER BROWN ELECTRIC, SCHEIBER, TROY $1,057,026 09/09/19 85% 10-1G7224 $1,041,313 09/23/19 TO 27.5 INSTALL ZEV CHARGING INC. 850 S GUILD AVE, 96% $0 04/06/21 STATIONS INFRASTRUCTURE AT THE 6643 32ND STREET STE. 106; SUITE 107

WESTLEY SRRA. LODI, CA 95240 NORTH HIGHLANDS CA 95660 INSTALL ZEV CHARGING STATION (559)341-2018 HB71 (916)678-4660 State of California Department of Transportation Page 135 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 10 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 10-STA-99-13.4/13.8 IN STANISLAUS COUNTY ON STATE ROUTE SECURITY PAVING COMPANY, INC. NATE TUMMINELLO $3,619,643 11/04/20 84% 10-0L8704 $1,542,771 11/20/20 99 NORTHBOUND BETWEEN HATCH ROAD AND 3075 TOWNSGATE ROAD; 952 GOODWIN DRIVE 43% ACNH-P099-(664)E $313,897 08/11/21 SOUTH 9TH STREET OFF-RAMP RIPON, CA 95366 --() WESTLAKE VILLAGE CA 91361 NORTHBOUND AUXILIARY LANE (209)481-3597 (818)362-9200 HB4N

10-STA-99-13.8/17.6 STA ON SR 99 MAINTENANCE WORKER BOSCO CONSTRUCTORS, INC. VINCE LADIAO $2,807,764 09/18/20 100% 10-0X6704 $2,260,816 10/02/20 SAFETY IMPROVMENTS WOODLAND AVENUE 21353 MAYALL ST.; 952 GOODWIN DRIVE 76% ACNH-P099-(655)E $632,874 08/15/21 UNDERCROSSING RIPON CA 95366 --() CHATSWORTH CA 91311 STANISLAUS COUNTY SR 99 MAINTENANCE (209)609-4905 (818)700-0304 HB1

10-STA-99-18.0/19.7 SR 99 CARPENTER/BRIGGSMORE LANDSCAPE BORTOLUSSI & WATKIN, INC. OSHITA, STAN $506,738 12/04/18 100% 10-0X56Y4 $449,043 12/19/18 LANDSCAPE 77 LARKSPRUR STREET 850 SOUTH GUILD AVE, 88% HSNH-P099-(627)E $1,970 05/31/22 SUITE 107 --() SAN RAFAEL CA 94901 LODI, CA 95240 OVER RUN (415)453-4675 (209)608-0711 HB1

10-TUO-108-4.3/5.1 IN TUOLUMNE COUNTY ON STATE ROUTE 108 SIERRA MOUNTAIN CONSTRUCTION OSHITA, STAN $7,890,240 07/17/20 47% 10-0Y2104 $3,176,564 07/28/20 WITHIN THE EAST SONORA BYPASS STAGE INC. 850 SOUTH GUILD AVE., 40% $1,096,677 12/31/21 II LIMITS AT PEACEFUL OAK 13919 MONO WAY,; STE. 107

INTERCHANGE LODI, CA 95240 SONORA CA 95370 CONSTRUCT EASTBOUND ONRAMP AND (209)608-0711 (209)928-1900

Totals: Authorized Final Amt: $353,394,008 Completed to Date: $118,899,992 Work This Month: $25,181,650 State of California Department of Transportation Page 136 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 11 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 11-IMP-7-.4/6.3 IN IMPERIAL COUNTY AT VARIOUS FEC FUTURE CONTRACTORS AND CARLOS LOPEZ $3,219,762 06/25/21 0% 11-2N0084 $0 07/15/21 LOCATIONS. ENGINEERS, INC. 4050 TAYLOR ST 0% $0 REHABILITATE BRIDGE DECK 184 TECHNOLOGY DRIVE, SUITE 2 SAN DIEGO, CA 92110

(619)991-0827 IRVINE CA 92618 (949)328-9758

11-IMP-8-36.5/37.5 IN IMPERIAL COUNTY IN EL CENTRO FROM GRANITE CONSTRUCTION COMPANY HERNANDEZ-DUARTE, $25,077,624 01/16/20 79% 11-410404 $16,737,600 02/06/20 0.4 MILE WEST OF IMPERIAL AVENUE OC. 38000 MONROE STREET; DANIEL 66% ACIM-008 -(111)E $1,250,170 01/02/23 TO 0.1 MILE EAST OF 8TH STREET OC. 1102 MONTENEGRO WAY --() INDIO CA 92203 RECONSTRUCT I-8/ IMPERIAL AVENUE EL CENTRO, CA 92243 (760)775-7500 (760)554-2028 HA21

11-IMP-86-8.4/8.8 IN IMPERIAL COUNTY IN EL CENTRO FROM CALMEX ENGINEERING, INC. BENJAMIN HANEY $3,120,322 04/22/21 45% 11-2N0574 $2,754,711 05/07/21 0.1 MILE EAST OF NORTH IMPERIAL 2764 S. VISTA AVE. 4050 TAYLOR ST 84% $30,271 09/09/21 AVENUE TO TRESHILL ROAD. SAN DIEGO, CA 92110 BLOOMINGTON CA 92316 MICROSURFACING, COLDPLANE/RHMA. (858)518-3821 SUSPENDED (909)546-1311

11-IMP-98-32.1/32.5 IN IMPERIAL COUNTY IN CALEXICO FROM SPECTRUM CONSTRUCTION GROUP, DANIEL HERNANDEZ- $7,202,861 12/04/20 0% 11-080284 $609,176 12/24/20 OLLIE AVENUE TO 0.1 MILE EAST OF INC. DUARTE 8% ACNH-P098-(029)E $0 03/20/23 ROCKWOOD AVENUE. 16 GOODYEAR, STE. 140; 1102 MONTENEGRO WAY 1662-11 1-(4) WIDENING SR-98 HIGHWAY FROM 4 LANES EL CENTRO, CA 92243 SUSPENDED --() IRVINE CA 92618 (760)594-2008 (949)299-1400

11-IMP-111-.1/1.2 IN IMPERIAL COUNTY IN CALEXICO FROM PAL GENERAL ENGINEERING INC BENJAMIN HANEY $1,798,289 05/27/21 0% 11-2N0724 $0 06/18/21 0.1 MILE NORTH OF MEXICO BORDER TO 2364 PASEO DE LAS AMERICAS 10 4050 TAYLOR ST 0% $0 09/14/21 RTE 98 SAN DIEGO, CA 92110 SAN DIEGO CA 92154 COLD PLANE, PLACE STRESS ABSORBING (858)518-8709 (855)860-5300

11-IMP-115-8.8/L11.4 IN IMPERIAL COUNTY IN AND NEAR HAZARD CONSTRUCTION ENGR, LLC BENJAMIN HANEY $1,198,977 06/10/21 11% 11-2N0414 $60,828 06/28/21 HOLTVILLE FROM TOWLAND ROAD TO WEST 10529 VINE STREET; 4050 TAYLOR ST 5% $60,828 09/15/21 JUNCTION EVAN HEWES HIGHWAY. SAN DIEGO, CA 92110 LAKESIDE CA 92040 PLACE MICRO-SURFACING (858)518-8709 (858)587-3600

State of California Department of Transportation Page 137 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 11 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 11-SD-0-/0 IN SAN DIEGO COUNTY AT VARIOUS S&B ENGINEERING, INC. MIYOKO NAKAJIMA $2,924,377 12/09/20 52% 11-424604 $1,686,782 01/21/21 LOCATIONS. 12125 LAKESIDE AVE 1463 BROADWAY 58% SSTG-X073-(143)E $350,522 05/10/22 GRADING IMPROVEMENTS, UPGRADE EL CAJON CA 92921 --() LAKESIDE CA 92040 (619)588-9065 (619)390-6570

11-SD-5-.2/15.2 IN SAN DIEGO COUNTY AT VARIOUS HMS CONSTRUCTION, INC. VICTOR CARDENAS $17,600,000 03/11/21 0% 11-427504 $0 04/08/21 LOCATIONS 2885 SCOTT STREET; 5377 OTAY MESA RD 0% B1ST-000C-(526)E $0 03/14/23 INSTALL FIBER OPTIC LINE. SAN DIEGO, CA 92154 --() VISTA CA 92081 (619)671-7035 (760)727-9808

11-SD-5-.3/72.1 IN SAN DIEGO COUNTY, AT VARIOUS SELECT ELECTRIC, INC. GENARO GENEL-TRUJILLO $7,322,738 10/19/20 27% 11-429704 $553,547 11/20/20 LOCATIONS. 2790 BUSINESS PARK DR.; 2863 CARMEL VALLEY RD 8% ACST-X073-(140)E $0 05/23/23 REPAIR AND INSTALL VEHICLE DEL MAR, CA 92014 --() VISTA CA 92081 (858)688-1376 (619)460-6060

11-SD-5-2.3/14 IN SAN DIEGO COUNTY AT VARIOUS PAL GENERAL ENGINEERING INC SULTAN GHAZIALAM $2,737,873 10/08/20 46% 11-418104 $713,697 12/02/20 LOCATIONS. 10675 TREENA ST; 817 SWEETWATER ROAD 26% ACST-X073-(142)E $103,797 02/23/22 CONSTRUCT CURB RAMPS SPRING VALLEY, CA 91977 --() SAN DIEGO CA 92131 (619)602-0333 (855)860-5300

11-SD-5-9.0/9 IN SAN DIEGO COUNTY AT VARIOUS PETERSON-CHASE GENERAL TOCI DAVID $1,668,416 05/26/20 72% 11-2N0544 $886,105 06/18/20 LOCATIONS. ENGINEERING CONSTRUCTION, INC.4050 TAYLOR ST 53% $80,008 08/18/21 RESURFACE BRIDGE DECKS, PLACE 16351 CONSTRUCTION CIR W; SAN DIEGO CA 92110

(858)688-1599 IRVINE CA 92606 (949)252-0441

11-SD-5-13.5/14.4 IN SAN DIEGO COUNTY IN SAN DIEGO ON PAL GENERAL ENGINEERING INC SULTAN GHAZIALAM $2,868,267 02/02/21 0% 11-424704 $0 04/22/21 ROUTE 5 FROM NATIONAL AVENUE OC TO 10675 TREENA ST; 817 SWEETWATER RD. 0% SIMG-X073-(144)E $0 04/12/22 COMMERCIAL ST OVERHEAD AND ON ROUTE SPRING VALLEY,CA 91977 --() SAN DIEGO CA 92131 805 AT ROUTE 94/805 SEP (619)697-0217 (855)860-5300 UPGRADE END TREATMENTS AND INSTALL

State of California Department of Transportation Page 138 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 11 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 11-SD-5-20.5/20.5 IN SAN DIEGO COUNTY AT VARIOUS TRUESDELL CORPORATION OF CAILYN LE $4,413,358 03/12/21 27% 11-2N0534 $2,212,306 04/01/21 LOCATIONS. CALIFORNIA, INC. 4050 TAYLOR ST 50% $598,697 01/21/22 RESURFACE BRIDGE DECKS, PLACE 1310 W. 23RD STREET; SAN DIEGO, CA 92110

(858)688-1512 TEMPE AZ 85282 (602)437-1711

11-SD-5-25.9/26.8 IN SAN DIEGO COUNTY IN SAN DIEGO FROM HAZARD CONSTRUCTION COMPANY HODZIC, SEID $3,836,189 04/12/19 100% 11-420104 $3,570,704 05/13/19 ROUTE 5/52 SEPARATION TO GILMAN DRIVE 6465 MARINDUSTRY DRIVE 4001 EL CAJON 100% ACIM-005 -(641)E $0 07/08/21 UNDERCROSSING BLV.,STE 207 --() SAN DIEGO CA 92121 07/08/21 CONSTRUCT AUXILIARY LANE (N/B) SAN DIEGO, CA 92105 OVER RUN (858)587-3600 (858)688-1429 HB4N

11-SD-5-29.1/30.5 IN SAN DIEGO COUNTY IN SAN DIEGO FROM PACIFIC RESTORATION GROUP, ARINDUQUE, RAY $1,831,851 06/03/19 0% 11-2T3404 $1,474,625 06/20/19 0.4 MILE SOUTH OF GENESEE AVENUE INC. 7177 OPPORTUNITY RD 0% RSTP-6211-(137)E $10,727 09/15/23 OVERCROSSING TO SORRENTO VIADUCT 325 E ELLIS AVENUE SAN DIEGO, CA 92111 --() EXTENDED PLANT ESTABLISHMENT WITH (858)467-4084 PLANT EST PERRIS CA 92570 SATIS (951)457-4118

11-SD-5-34.9/35.1 IN SAN DIEGO COUNTY IN SAN DIEGO FROM HAZARD CONSTRUCTION COMPANY GARY LEVINE $1,303,925 05/12/20 100% 11-417504 $1,210,871 06/09/20 0.8 TO 1.0 MILE NORTH OF DEL MAR 10529 VINE STREET; 871 NORTH BROADWAY 96% $750 12/12/23 HEIGHTS ROAD OVERCROSSING ESCONDIDO CA 92025 LAKESIDE CA 92040 ENHANCEMENTS TO DETENTION BASIN AND (760)639-4430 OVER RUN (858)587-3600

11-SD-5-37.4/46.5 IN SAN DIEGO COUNTY AT VARIOUS FLATIRON-SKANSKA-STACY AND MCMILLAN, STEVE $255,428,852 12/22/16 97% 11-2T2174 $234,446,300 01/13/17 LOCATIONS FROM LOMAS SANTA FE DR. TO WITBECK A JOINT VENTURE (FSSW)2863 CARMEL VALLEY RD 91% CMST-PL62-(113)1 $650,858 08/27/22 0.5 MILE SOUTH OF PALOMAR AIRPORT 16470 W. BERNARDO DR., STE120 DEL MAR, CA 92014 IM00-51 6-(6) RD. (858)688-1435 --() SAN DIEGO, CA 92127 REPLACE THE SAN ELIJO LAGOON HWY HB5 (951)232-3522

11-SD-5-38.1/39.3 WETLAND CONSTRUCTION NEAR STATE FLATIRON-SKANSKA-STACEY AND CORBIT, JARED $88,268,270 11/21/17 100% 11-2E1504 $85,222,678 11/21/17 HIGHWAY IN SAN DIEGO COUNTY IN SOLANA WITBECK A JOINT VENTURE 3089 MANCHESTER AVE 100% $46,872 01/28/22 BEACH AND ENCINITAS AT VARIOUS 16470 W BERNADO DR., STE 120 CARDIFF, CA 92007 07/02/21 LOCATIONS (858)220-3986 SUSPENDED SAN DIEGO, CA 92127 RETORE THE SAN ELIJO LAGOON, (951)232-3522 State of California Department of Transportation Page 139 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 11 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 11-SD-5-38.4/47.3 IN SAN DIEGO COUNTY IN ENCINITAS AND FLATIRON-SKANSKA-STACY AND PAK, YONG $235,770,606 10/29/18 62% 11-2T2184 $168,095,643 10/29/18 CARLSBAD FROM SAN ELIJO LAGOON BRIDGE WITBECK A JOINT VENTURE 3089 MANCHESTER AVE 70% 6211-130 -( ) $8,455,969 12/30/22 TO 0.3 MILE NORTH OF PALOMAR AIRPORT 16740 W BERNARDO DR.,STE 120 CARDIFF, CA 92007 --() ROAD OVERCROSSING (858)688-1481 SAN DIEGO, CA 92127 CONSTRUCT HOV LANES, ITS ELEMENTS, (760)916-9100

11-SD-5-/0 IN SAN DIEGO COUNTY AT VARIOUS BC RENTALS LLC. DBA BC TRAFFICGENARO GENEL $2,530,808 05/13/20 76% 11-424904 $1,185,605 06/09/20 LOCATIONS. SPECIALIST 2863 CARMEL VALLEY RD 47% SSTG-000C-(509)E $155,492 08/20/21 UPGRADE/ INSTALL CURVE WARNING 638 W SOUTHERN AVE; DEL MAR. CA 92014 --() (858)688-1376 ORANGE CA 92865 (714)974-1190

11-SD-5-/60 IN SAN DIEGO COUNTY AT VARIOUS PETERSON-CHASE GENERAL GHAZIALAM, SULTAN $3,979,409 03/25/20 56% 11-420704 $679,721 04/16/20 LOCATIONS. ENGINEERING CONSTRUCTION, INC.517 SWEETWATER RD 17% $108,542 03/12/22 REPLACEMENT OF 24 EXISTING 16351 CONSTRUCTION CIR W; SPRING VALLEY, CA 91977

(619)602-0333 IRVINE CA 92606 (949)252-0441

11-SD-8-.3/23 IN SAN DIEGO COUNTY AT VARIOUS GRANITE CONSTRUCTION COMPANY GUSTAF SILVA $5,003,823 10/20/20 57% 11-428104 $1,943,660 11/05/20 LOCATIONS FROM MORENA BOULEVARD 5860 EL CAMINO REAL STE 200; 1463 BROADWAY 39% $651,262 06/23/22 UNDERCROSSING TO 1.1 MILES EAST OF EL CAJON, CA 92021 CARLSBAD CA 92008 LAKE JENNINGS PARK ROAD UNDERCR (858)688-1497 (760)444-1032 REPAIR, REHABILITATE, AND REPLACE HA22

11-SD-8-2.8/5 IN SAN DIEGO COUNTY AT VARIOUS PAL GENERAL ENGINEERING INC. ARINDUQUE, RAY $3,796,821 11/04/19 100% 11-411314 $3,462,164 11/22/19 LOCATIONS. 2364 PASEO DE LAS AMERICAS 7177 OPPORTUNITY ROAD 91% ACIM- 008-(326)E $0 10/30/21 ROADSIDE SAFETY IMPROVEMENTS MS.62 --() SAN DIEGO CA 92154 SAN DIEGO, CA 92111 OVER RUN (858)860-5300 (858)467-4084 HB1

11-SD-8-5.9/11.5 IN SAN DIEGO COUNTY IN THE CITIES OF ACCU CONSTRUCTION, INC. SILVA, GUS $3,418,943 07/17/20 100% 11-411334 $3,124,731 08/13/20 SAN DIEGO AND LA MESA, ABOUT 0.3 2098 S. GRAND AVE. SUITE A; 1463 BROADWAY 90% ACIM-008 -(327)E $344,813 12/15/21 MILE WEST OF FAIRMOUNT AVENUE TO 0.3 EL CAJON, CA 92021 --() SANTA ANA CA 92705 MILE WEST OF JACKSON D (858)688-1497 (714)641-4730 ROADSIDE SAFETY IMPROVEMENTS. HB1 State of California Department of Transportation Page 140 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 11 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 11-SD-8-25.1/40.1 IN SAN DIEGO COUNTY NEAR ALPINE AT HAZARD CONSTRUCTION COMPANY SILVA, GUS $4,719,854 12/23/19 60% 11-422114 $4,843,707 01/30/20 VARIOUS LOCATIONS FROM 0.6 MILE WEST 6465 MARINDUSTRY DRIVE; 1463 BROADWAY AVENUE 99% $59,200 11/16/21 OF HARBISON CANYON ROAD EL CAJON, CA 92021 SAN DIEGO CA 92121 UNDERCROSSING TO 0.4 MILE EAST O (858)688-1497 (858)587-3600 CULVERTS REHABILITATION

11-SD-8-25.9/32 IN SAN DIEGO COUNTY NEAR ALPINE FROM HANSON AGGREGATES PACIFIC ALBERT LABRADOR $4,143,666 06/18/21 0% 11-2N0954 $0 07/22/21 0.2 MILE EAST OF HARBISON CANYON SOUTHWEST LLC. DBA ATP GENERAL4050 TAYLOR ST 0% $0 UNDERCROSSING TO 0.4 MILE EAST OF ENGINEERING CONTRAC SAN DIEGO, CA 92110

VIEJAS CREEK BRIDGE 4211 PONDEROSA AVENUE, STE C; (619)954-8575

MILL AND REPLACE WITH 0.2' RHMA SAN DIEGO CA 92123 (619)777-8100 11-SD-8-32.0/44 IN SAN DIEGO COUNTY NEAR ALPINE FROM RV CONCRETE ALBERT LABRADOR $2,497,316 04/12/21 58% 11-2N0994 $1,739,232 04/30/21 0.2 MILES EAST OF VIEJAS CREEK BRIDGE 605 E. COMMERCIAL ST. 4050 TAYLOR STREET 66% $1,739,232 08/24/21 TO 0.9 MILES WEST OF SUNRISE HIGHWAY SAN DIEGO, CA 92110 ANAHEIM CA 92801 OC. (619)954-8575 (714)855-4201 INDIVIDUAL SLAB REPLACEMENT

11-SD-8-49.0/0 IN SAN DIEGO COUNTY NEAR PINE VALLEY DOWNSTREAM SERVICES, INC. FARMER, BRANDON $3,073,923 09/18/19 69% 11-409104 $3,078,617 10/09/19 AT BUCKMAN SPRINGS SAFETY ROADSIDE 2855 PROGRESS PLACE; 1463 BROADWAY 100% ACIM- 008-(325)E $2,840 01/14/22 REST AREA EL CAJON, CA 92021 --() ESCONDIDO CA 92029 REHAB SEWER/WATER SYSTEMS - ROAD (858)688-1509 (760)746-2544 HA26

11-SD-11-.6/2.7 IN SAN DIEGO COUNTY NEAR SAN DIEGO AT SKANSKA USA CIVIL WEST VICTOR CARDENAS $15,909,200 02/16/21 19% 11-056374 $3,319,822 03/30/21 0.2 MILE WEST OF SANYO AVENUE CALIFORNIA DISTRICT INC. 5377 OTAY MESA RD 21% $1,550,233 06/16/22 UNDERCROSSING TO 1.2 MILE EAST OF 1995 AGUA MANSA ROAD; SAN DIEGO, CA 92154

ENRICO FERMI DRIVE OVERCROSS (619)554-7675 RIVERSIDE CA 92509 CONSTRUCT INTERCHANGE AT SIEMPRE (951)684-5360

11-SD-15-11.2/31.5 IN SAN DIEGO COUNTY IN SAN DIEGO AND HMS CONSTRUCTION, INC. REZAEEAMIRI, FARIBORZ $3,981,640 01/16/20 100% 11-429804 $3,813,643 02/13/20 ESCONDIDO AT VARIOUS LOCATIONS FROM 2885 SCOTT STREET; 2863 CARMEL VALLEY RD 96% $4,560 12/31/21 0.3 MI SOUTH OF H AVE OC TO RTE 15/78 DEL MAR, CA 92014 VISTA CA 92081 SEPARATION AND AT T (858)688-1564 OVER RUN (760)727-9808 UPDATE MICROWAVE VEHICLE DETECTION

State of California Department of Transportation Page 141 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 11 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 11-SD-56-5.6/5.6 IN SAN DIEGO COUNTY IN SAN DIEGO AT FLATIRON WEST, INC. GENEL, GENARO $7,208,988 10/21/19 100% 11-404604 $7,191,648 11/19/19 0.5 MILE WEST OF CAMINO DEL SUR 16470 W. BERNARDO DRIVE; 2863 CARMEL VALLEY RD 99% $2,260 01/26/22 UNDERCROSSING DEL MAR, CA 92014 SAN DIEGO CA 92127 CONSTRUCT 2-LANE OC AT TORREY (858)720-2113 OVER RUN (760)916-9100 HB4N

11-SD-76-12.1/17.7 IN SD CNTY NEAR BONSALL & FALLBROOK, HABITAT RESTORATION SCIENCES, IRION JOSEPH $1,619,795 06/01/18 0% 11-257164 $1,212,662 06/25/18 ON RTE 15 FROM .3 MILE S/O TO .3 MILE INC. 7177 OPPORTUNITY RD 0% STPL-6211-(136)E $21,590 02/15/23 N/O RTE 76/15 SEPRTN & ON RTE 76 FROM 1217 DISTRIBUTION WAY SAN DIEGO, CA 92111 --() .4 MILE W/O SO M (858)467-4086 PLANT EST VISTA CA 92081 SR-76 EAST PLANT ESTABLISHMENT SATIS HB32 (760)479-4210

11-SD-78-2.5/2.9 IN SAN DIEGO COUNTY IN OCEANSIDE FROM JAMES MCMINN, INC. IRION, JOSEPH $2,464,514 05/17/19 0% 11-417404 $2,330,179 06/05/19 0.8 MILE TO 0.4 MILE WEST OF COLLEGE 21834 CACTUS AVE 7177 OPPORTUNITY ROAD 0% ACNH-P078-(119)E $0 07/18/23 BOULEVARD UNDERCROSSING SAN DIEGO, CA 92111 --() RIVERSIDE, CA 92518 STORMWATER MITIGATION - SLOPE (619)778-8045 PLANT EST (909)514-1231 SATIS

11-SD-78-N 17.6/21.3 IN SAN DIEGO COUNTY IN AND NEAR HAZARD CONSTRUCTION COMPANY GARY LEVINE $12,614,207 11/03/20 55% 11-419304 $7,281,816 11/20/20 ESCONDIDO FROM 0.1 MILE WEST OF 10529 VINE STREET; 871 NORTH BROADWAY 58% ACNH-P078-(120)E $2,932,552 12/01/21 NORTH BROADWAY TO FLORA VISTA STREET ESCONDIDO CA 92025 --() LAKESIDE CA 92040 PAVEMENT REHABILITATION (760)639-4430 (858)587-3600 HA22

11-SD-94-2.6/10.7 IN SAN DIEGO COUNTY AT VARIOUS 3SIXTY INNOVATION INC SULTAN GHAZIALAM $1,088,521 06/21/21 0% 11-425104 $0 07/13/21 LOCATIONS FROM 32ND STREET 3555 ROSECRANS ST 114-110; 817 SWEETWATER RD. 0% $0 UNDERCROSSING TO CAMPO ROAD SPRING VALLEY, CA 91977 SAN DIEGO CA 92110 OVERCROSSING (619)697-0217 (858)304-1093 INSTALL AND/OR UPGRADE EXISTING

11-SD-94-4.4/7.3 IN SAN DIEGO COUNTY IN SAN DIEGO AND PAL GENERAL ENGINEERING INC ART PANNU $2,067,805 04/15/21 0% 11-412204 $0 05/07/21 LEMON GROVE AT VARIOUS LOCATIONS FROM 10675 TREENA ST; 817 SWEETWATER ROAD 0% ACNH-P094-(068)E $0 08/05/22 0.2 MILE WEST OF 47TH STREET SPRING VALLEY, CA 91977 --() SAN DIEGO CA 92131 OVERCROSSING TO 0.6 MILE (619)697-0217 (855)860-5300 ROADSIDE WORKER SAFETY

State of California Department of Transportation Page 142 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 11 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 11-SD-94-10.4/14.9 IN SAN DIEGO COUNTY IN AND NEAR LA GRANITE CONSTRUCTION COMPANY ART PANNU $11,301,608 07/14/20 73% 11-420004 $8,816,641 08/07/20 MESA FROM SPRING STREET 5860 EL CAMINO REAL SUITE 200 817 SWEETWATER RD. 79% ACNH-P094-(067)E $935,467 09/18/21 UNDERCROSSING TO ROUTE 54 (CAMPO SPRING VALLEY CA 91977 --() CARLSBAD CA 92008 ROAD) (858)688-1433 (760)444-1032 PAVEMENT REHABILITATION HA22

11-SD-94-30.0/39 IN SAN DIEGO COUNTY NEAR DULZURA AND AMERICAN PAVEMENT SYSTEMS, BENJAMIN HANEY $2,692,215 02/18/21 73% 11-2N0454 $1,843,067 03/09/21 BARRETT JUNCTION FROM 0.9 MILE EAST INC. 4050 TAYLOR ST 68% $166,885 08/17/21 OF GRANDE CREEK BRIDGE TO ROUTE 188 1012 11TH STREET; SAN DIEGO, CA 92110

ASPHALT RUBBER BINDER CHIP SEAL AND (858)518-8709 SUSPENDED MODESTO CA 95354 (209)522-2277

11-SD-125-9.7/22.1 IN SAN DIEGO COUNTY AT VARIOUS J. FRANCIS COMPANY DAVID TOCI $1,170,734 05/04/21 0% 11-2N0884 $0 06/17/21 LOCATIONS FROM ELKELTON PLACE 16197 KRAMERIA AVE.; 4050 TAYLOR STREET 0% $0 11/10/21 UNDERCROSSING TO N125-W52 SEPARATION SAN DIEGO, CA 92110 RIVERSIDE CA 92504 APPLY METHACRYLATE ON BRIDGE DECK. (858)688-1599 SUSPENDED (951)776-9100

11-SD-125-/1.1 IN SAN DIEGO COUNTY IN AND NEAR SAN FLATIRON WEST, INC. DONNA "NIKKI" TIONGCO $16,933,794 07/28/20 34% 11-288834 $7,538,032 08/27/20 DIEGO AT ROUTE 11/125/905 SEPARATION 16470 W. BERNARDO DRIVE; 5377 OTAY MESA RD 45% $1,051,360 08/29/23 CONSTRUCT ROUTE 125/905 SOUTHBOUND SAN DIEGO,CA 92154 SAN DIEGO CA 92127 (858)688-3247 (760)916-9009

11-SD-163-5.6/11.2 IN SAN DIEGO COUNTY IN SAN DIEGO FROM PAL GENERAL ENGINEERING INC LABRADOR, ALBERT $1,313,325 03/30/21 92% 11-2N0744 $1,223,534 04/16/21 1.3 MILES NORTH OF FRIAARS ROAD 10675 TREENA ST; 4050 TAYLOR ST MS220 93% $540,257 07/27/21 OVERCROSSING TO 0.3 MILE NORTH OF SAN DIEGO, CA 92110 SAN DIEGO CA 92131 KEARNY VILLA ROAD OVERCRO (619)954-8575 (855)860-5300 MICROSUFACING RAMPS AT VARIOUS

11-SD-805-5.7/7.8 IN SAN DIEGO COUNTY IN CHULA VISTA AT SEMA CONSTRUCTION, INC. LAM, TAI $13,903,091 05/25/18 100% 11-2T2604 $13,826,142 06/19/18 VARIOUS LOCATIONS FROM 0.2 MILE 7353 S. EAGLE STREET 4001 EL CAJON BLVD, 99% STPL-6211-(121) $0 08/05/21 NORTH OF NAPLES STREET UC TO BONITA SUITE 208 --() CENTENNIAL, CO 80112 RD UC. PM ***5.7-7.8** SAN DIEGO, CA 92105 OVER RUN (949)470-0500 I-805 SOUTH SOUND WALLS (UNIT 1) (858)829-1020 HB5 State of California Department of Transportation Page 143 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 11 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 11-SD-805-8.4/8.8 IN SAN DIEGO COUNTY IN CHULA VISTA FLATIRON WEST, INC. SEID HODZIC $19,200,080 12/13/18 80% 11-430184 $18,337,789 01/09/19 AND NATIONAL CITY FROM 0.2 MILE 16470 W BERNARDO DR., STE 120 4001 EL CAJON BLVD, 95% B1IM- 805-(640)E $144,055 09/30/22 SOUTH OF SWEETWATER RIVER BRIDGE TO STE 207 --() SAN DIEGO, CA 92127 ROUTE 805/54 SEPARATION SAN DIEGO, CA 92105 (909)597-8413 I-805 SWEETWATER RIVER BRIDGE (858)531-8930

11-SD-805-24.7/27.6 IN SAN DIEGO COUNTY IN SAN DIEGO FROM ACCU CONSTRUCTION, INC. HODZIC, SEID $881,462 02/01/18 0% 11-2T3304 $814,182 02/21/18 0.3 MILE NORTH OF GOVERNOR DRIVE 2098 S. GRAND AVE. SUITE A 4001 EL CAJON BLVD. 0% $2,640 04/21/22 UNDERCROSSING TO 0.5 MILE NORTH OF STE 208 SANTA ANA CA 92705 MIRA MESA BOULEVARD UN SAN DIEGO, CA 92108 PLANT EST (714)641-4730 INSTALL IRRIGATION AND LANDSCAPING (858)688-1429 SATIS

11-SD-905-3.2/11.7 IN SAN DIEGO COUNTY AT VARIOUS TRUESDELL CORPORATION OF DAVID TOCI $1,054,054 04/21/21 0% 11-2N0844 $0 06/02/21 LOCATIONS CALIFORNIA, INC. 4050 TAYLOR ST 0% $0 12/30/21 APPLY METHACRYLATE ON BRIDGE DECK, 1310 W. 23RD STREET; SAN DIEGO CA 92110

(858)688-1599 SUSPENDED TEMPE AZ 85282 (602)437-1711

11-SD-905-9.6/11.4 IN SAN DIEGO COUNTY AT VARIOUS SKANSKA USA CIVIL WEST COVARRUBIAS, CARLOS $103,659,540 05/09/19 56% 11-2888U4 $91,040,992 05/28/19 LOCATIONS. CONSTRUCT SB FREEWAY TO CALIFORNIA DISTRICT INC. 5377 OTAY MESA ROAD 88% GCBI-000C-(469)N $2,901,987 01/03/23 FREEWAY CONNECTORS FROM SB RTE 125 TO 1995 AGUA MANSA ROAD OTAY MESA, CA 92154 --() EB RTE 905 AND EB RTE 11 A (619)760-7875 RIVERSIDE CA 92509 CONSTRUCT SOUTHBOUND FREEWAY TO (951)684-5360

Totals: Authorized Final Amt: $919,821,692 Completed to Date: $708,883,158 Work This Month: $24,954,692 State of California Department of Transportation Page 144 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 12 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 12-ORA-1-4.9/5.5 IN ORANGE COUNTY, IN LAGUNA BEACH AND SPECTRUM CONSTRUCTION GROUP, TAING,STEVEN/CE-JOHN $6,446,155 09/11/20 51% 12-0H1504 $6,021,479 09/24/20 NEWPORT BEACH, ON RTE 001 FROM 1,000 INC. HONG 91% $0 11/23/21 FEET SOUTH OF VISTA DEL SOL TO MOSS 16 GOODYEAR, STE. 140; 3251 1/4 UNIVERSITY

STREET; AND FROM LE DRIVE,T#1 IRVINE CA 92618 REHABILITATE PAVEMENT (CAPM) IRVINE, CA 92612 HA22 (949)299-1400 (949)279-8821 12-ORA-1-7.9/10.5 IN ORANGE COUNTY IN LAGUNA BEACH, ON SPECTRUM CONSTRUCTION GROUP, BERRIOS, JOSE/CE- $9,580,910 01/26/21 1% 12-0M82U4 $2,200 02/18/21 STATE ROUTE 1 (ALSO KNOWN AS PACIFIC INC. ZOKAI, FARID 0% ANCH-P001-(673)E $0 12/30/22 COAST HIGHWAY OR SR-1) FROM RUBY 16 GOODYEAR, STE. 140; 15700 TUSTIN VILLAGE --() STREET (PM 7.9) TO LED WAY IRVINE CA 92618 UPGRADE SIDEWALK TO AMERICANS WITH TUSTIN, CA (949)299-1400 (949)279-8502 12-ORA-1-9.4/0 IN ORANGE COUNTY IN LAGUNA BEACH ON GRIFFITH COMPANY YACOUB,MOHAMAD/CE-MOH $2,171,657 06/11/20 90% 12-0M9904 $2,099,715 06/29/20 ROUTE 1 AT ROUTE 133 (BROADWAY 12200 BLOOMFIELD AVENUE; RAVA 94% $9,064 08/05/21 STREET) 6521 MARINE WAY, #1 SANTA FE SPRINGS, CA 90670 REPLACE BOX CULVERT (BRIDGE) IRVINE, CA 92618 SUSPENDED (562)929-1128 (949)279-8433 HA21

12-ORA-1-12.2/13.3 IN ORANGE COUNTY IN NEWPORT BEACH HIGHLAND CONSTRUCTION, INC. MOHAMAD, YACOUB/CE- $944,798 12/23/20 19% 12-0P6604 $808,742 01/12/21 FROM 0.2 MILE SOUTH OF REEF POINT 133 N. PIXLEY STREET; RAVANIPOUR 82% $9,814 02/16/23 DRIVE TO 0.4 MILE NORTH OF CRYSTAL 6521 MARINE WAY ORANGE CA 92868 HEIGHTS DRIVE IRVINE, CA 92618 (714)538-5156 STABILIZE BIOSWALES. (949)279-8433

12-ORA-1-27.0/29.9 IN ORANGE COUNTY IN HUNTINGTON BEACH FBD VANGUARD CONSTRUCTION, LUNA, FRANKLIN/CE- $791,611 06/09/20 52% 12-0Q2804 $755,426 07/02/20 FROM SEAPOINT STREET TO WARNER AVENUE INC. MAJID JAVA 95% SNHG-P001-(670)E $2,800 02/24/22 INSTALL OUTER SEPARATION BARRIER, 550 GREENVILLE ROAD; 3251 1/4 UNIVERSITY --() DRIVE #2 LIVERMORE CA 94550 IRVINE, CA 92612 (925)245-1300 (562)449-7999 12-ORA-5-.6/43 IN ORANGE COUNTY AT VARIOUS LOCATIONS INTERNATIONAL LINE BUILDERS, CHAUDRY, MONAS $16,189,145 09/15/20 12% 12-0P42U4 $812,508 10/02/20 INSTALL & MODIFY ITS ELEMENTS INC. 3350 E. BIRCH STREET, 5% ACNH-X059-(083)E $190,560 03/28/24 3955 TEMESCAL CANYON ROAD; STE 250 --() BREA, CA 02821 CORONA CA 92883 (949)279-8801 (951)682-2982 State of California Department of Transportation Page 145 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 12 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 12-ORA-5-.6/43 IN ORANGE COUNTY ON VARIOUS ROUTES SELECT ELECTRIC, INC. NAJM, ELIE/CE- $4,703,876 07/23/20 45% 12-0Q6904 $1,363,322 08/27/20 AND AT VARIOUS LOCATIONS 2790 BUSINESS PARK DR.; CHAUDRY, MONAS 29% $65,909 04/15/22 REPAIR AND REPLACEMENT OF NON 3350 E. BIRCH STREET, VISTA CA 92081 STE 250 (619)460-6060 BREA, CA 92821

(949)279-8826 12-ORA-5-1.6/33.1 IN ORANGE COUNTY IN SAN CLEMENTE, SAN VELARDE CONCRETE CONSTRUCTION,NADERI, ARSALAN-/CE $3,819,360 02/27/20 98% 12-0R5404 $3,664,323 03/17/20 JUAN CAPISTRANO, LAGUNA NIGUEL, INC. MOH RAVA 91% $0 04/30/21 IRVINE, TUSTIN & SANTA ANA AT VARIOUS 523 S. BRAND BLVD.; 6521 MARINE WAY T#1 06/29/21 LOCATIONS, FROM EL CAM IRVINE, CA 92618 COMPLETED SAN FERNANDO CA 91340 METHACRYLATE, JOINT SEAL, AND (949)279-8447 (818)898-2300

12-ORA-5-1.8/44.2 IN ORANGE COUTNY AT VARIOUS LOCATIONS CALPROMAX ENGINEERING INC. SIDHU, GAGANDEEP/CE- $882,535 04/29/21 0% 12-0S5904 $0 06/03/21 REPLACE "METER ON" SIGNAL HEADS 650 N.ROSE DR.#186; ESSAYLI, M 0% $0 09/18/22 6533 MARINE WAY #T2 PLACENTIA CA 92870 IRVINE, CA 92618 (714)573-4599 (949)279-8466

12-ORA-5-3.3/3.3 IN ORANGE COUNTY IN SAN CLEMENTE AT BEADOR CONSTRUCTION COMPANY, SHIEH, PETER $2,682,300 10/26/20 1% 12-0P7004 $231,639 11/17/20 AVENIDA PICO UNDERCROSSING INC. 3251 1/4 UNIVERSITY 9% $0 01/18/24 DRAINAGE RESTORATION AT THE SEGUNDA 26320 LESTER CIRCLE; DRIVE

IRVINE, CA 92612 SUSPENDED CORONA CA 92883 (949)279-8636 (951)674-7352

12-ORA-5-6.9/6.9 IN ORANGE COUNTY IN SAN JUAN STANCE CONSTRUCTION COMPANY SHIEH, PETER $455,842 03/02/21 69% 12-0S4304 $283,924 03/25/21 CAPISTRANO ON RTE 5 AT RET 5/1 SEP 5314 MARINER LN; 3251 1/4 UNIVERSITY 62% $13,723 07/21/21 AND IN IRVINE ON RTE 405 AT 0.1 MILE DRIVE CHINO CA 91710 SOUTH OF JAMBOREE RD OC IRVINE, CA 92612 (626)274-3156 CULVERT CLEANING, INSPECTING, (949)279-8636

12-ORA-5-10.3/10.3 IN ORANGE COUNTY IN SAN JUAN AUTOBAHN CONSTRUCTION, INC. RUDA, NABIL /CE-FARID $1,014,238 08/31/20 68% 12-0P0904 $1,013,072 09/21/20 CAPISTRANO AND IRVINE AT 0.6 MILE 933 N. BATAVIA ST.; ZOKAI 98% $1,920 10/29/21 SOUTH OF JUNIPERO ROAD UC AND AT 0.1 15700 TUSTINE VILLAGE ORANGE CA 92867 MILE NORTH OF N133/5 SEPARATI WAY (714)769-7025 INSTALL EROSION CONTROL FEATURES, TUSTIN, CA 92780

(949)279-8491 State of California Department of Transportation Page 146 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 12 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 12-ORA-5-12.4/14.5 IN ORANGE COUNTY IN SAN JUAN ORTIZ ENTERPRISES, INC. ZOKAI, FARID $109,717,784 12/20/19 30% 12-0K0214 $45,522,820 01/15/20 CAPISTRANO AND MISSION VIEJO FROM 0.5 6 CUSHING SUITE 200; 27405 PUERTA REAL, 42% ACIM-0052-(019)S $1,950,447 08/29/24 MILE SOUTH OF AVERY PKWY UC TO 0.8 SUITE 300 L607-1 10-(STP)L IRVINE CA 92618 MILE NORTH OF CROWN VALLEY MISSION VIEJO, CA 92691 12 0-21-() (949)753-1414 ADD ONE LANE IN EACH DIRECTION (949)279-8435

12-ORA-5-14.5/17.1 IN ORA CO, IN MISSION VIEJO AND FLATIRON WEST, INC. HONG, JOHN $134,927,805 03/05/19 44% 12-0K0224 $70,477,912 04/04/19 LAGUNA HILLS, ON ROUTE 5 FROM 0.7 1770 LA COSTA MEADOWS DRIVE 27261 LAS RAMBLAS RD, 52% TPLN-6212-(022)N $3,099,617 12/06/23 MILE S OF OSO PKWY TO 0.3 MILE S OF STE 160 --() SAN MARCOS CA 92078 ALICIA PKWY OC MISSION VIEJO, CA 92691 (760)916-9009 ADD ONE LANE IN EACH DIRECTION (949)276-8595

12-ORA-5-17.1/18.9 IN ORA CO IN MISSION VIEJO, LAGUNA GUY F ATKINSON CONSTRUCTION JAVAHERNESHAN, MAJID $90,770,498 09/23/20 13% 12-0K0234 $11,952,952 10/13/20 WOODS AND LAKE FOREST FROM 0.4 MILE LLC 3251 1/4 UNIVERSITY 13% TPLN-6212-(024) $1,643,622 01/23/24 SOUTH OF ALICIA PARKWAY OC TO 0.2 18201 VON KARMAN AVENUE DRIVE,#2 --() MILE NORTH OF EL TORO ROA IRVINE, CA 82612 IRVINE CA 92612 WIDEN FREEWAY AND BRIDGES, (949)289-3551 (703)216-1395

12-ORA-5-25.0/28.3 IN ORANGE COUNTY IN IRVINE AND RJ NOBLE BERRIOS, JOSE/CE- $6,436,652 03/10/20 60% 12-0R8704 $5,966,557 03/24/20 TUSTIN, FROM JEFFREY ROAD 15505 EAST LINCOLN AVE; ZOKAI, FARID 92% $2,738,298 09/13/21 OVERCROSSING TO TUSTIN RANCH ROAD 15700 TUSTIN VILLAGE ORANGE CA 92865 UNDERCROSSING WAY #1 (714)637-1550 RESURFACE MAINLINE, RAMPS WITH RHMA TUSTIN, CA 92780

(949)279-8502 12-ORA-5-31.0/33.3 IN ORANGE COUNTY IN SANTA ANA FROM DIVERSIFIED LANDSCAPE CO. NADERI, ARSALAN $1,386,500 08/01/19 0% 12-0N5104 $1,297,176 08/23/19 FOURTH STREET OVERCROSSING TO 21730 BUNDY CANYON ROAD; 6521 MARINE WAY T#1 0% $3,979 03/02/22 BROADWAY OVERCROSSING IRVINE, CA 92618 WILDOMAR CA 92595 RELOCATE FACILITIES AWAY FROM (949)279-8447 PLANT EST (951)245-1686 SATIS

12-ORA-5-34.5/37.4 IN ORANGE COUNTY IN ORANGE AND PETERSON-CHASE GENERAL RAMADAN, KIFAH/CE- $5,245,045 07/29/20 88% 12-0Q8504 $4,388,012 08/20/20 ANAHEIM FROM 0.1 MILE NORTH OF SANTA ENGINEERING CONSTRUCTION, INC.HONG, JOHN 81% HSIM-0052-(022)E $290,240 08/17/21 ANA RIVER BRIDGE TO HARBOR BLVD 16351 CONSTRUCTION CIR W; 3251 1/4 UNIVERSITY --() OVERCROSSING DRIVE IRVINE CA 92606 PLACE POLYESTER CONCRETE ON 3 IRVINE, CA 92612 (949)252-0441 (949)279-8625 State of California Department of Transportation Page 147 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 12 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 12-ORA-5-34.5/36.8 IN ORANGE COUNTY IN ANAHEIM AND MARINA LANDSCAPE INC. HONG, JOHN $1,120,842 03/22/21 10% 12-0P9004 $5,160 04/15/21 ORANGE FROM SANTA ANA RIVER BRIDGE TO 3707 W. GARDEN GROVE BLVD; 3251 1/4 UNIVERSITY 0% $5,160 04/21/22 0.2 MILE NORTH OF ANAHEIM BOULEVARD DRIVE, T#1 ORANGE CA 92868 UNDERCROSSING IRVINE, CA 92617 (714)939-6600 RELOCATE FACILITIES AWAY FROM (949)279-8741

12-ORA-5-36.8/38.5 IN ORANGE COUNTY IN ANAHEIM FROM 0.2 ACCU CONSTRUCTION, INC. JAY JOUBEEN/CE- $642,886 06/08/21 0% 12-0P9104 $0 06/16/21 MILE NORTH OF ANAHEIM BOULEVARD 2098 S. GRAND AVE. SUITE A; M.JAVAHERNESHAN 0% $0 OVERCROSSING TO SANTA ANA STREET 3251 1/4 UNIVERSITY SANTA ANA CA 92705 OVERCROSSING DRIVE #2 (714)641-4730 RELOCATE FACILITIES AWAY FROM IRVINE, CA 92612

(949)279-8638 12-ORA-5-42.5/42.6 ON INTERSTATE 5 AT PM 42.5 IN THE FLATIRON WEST, INC. SHIEH, PETER $2,687,000 01/04/21 71% 12-0S7104 $882,102 01/14/21 CITY OF ANAHEIM, AT ORANGETHORPE AVE 16470 W BERNARDO DR, STE 120 3251 1/4 UNIVERSITY 33% $0 11/30/21 OVERCROSSING BRIDGE, PRESSURE GROUT DRIVE SAN DIEGO, CA 92127 VOIDS FOUND DIR'S EMERG IRVINE, CA 92612

REPAIR CRACKING AND SPALLING (949)279-8636 20.20 201130 12-ORA-22-1.2/1.2 IN ORANGE COUNTY IN GARDEN GROVE AT INTERNATINAL LINE BUILDERS, KATTAO,BIBARS/CE- $495,802 04/21/21 0% 12-0Q6504 $0 05/11/21 VALLEY VIEW ST OFF-RAMP INC. DBA ILB ELECTRIC CHAUDRY,MONAS 0% SNHG-P022-(027)E $0 03/18/22 MODIFY SIGNAL AND LIGHTING, REFRESH 3955 TEMESCAL CANYON RD.; 3350 E. BIRCH ST. --() SUITE 250 CORONA CA 92883 BREA, CA 92821 (951)682-2982 (949)279-8541 12-ORA-22-2.7/11.9 IN ORANGE COUNTY IN ANAHEIM AUTOBAHN CONSTRUCTION, INC. $1,491,434 04/12/21 0% 12-0S2004 $0 04/30/21 APPLY METHACRYLATE TREATMENT, 933 N. BATAVIA ST.; 0% $0 ORANGE CA 92867 SUSPENDED (714)769-7025

12-ORA-22-5.6/10.9 IN ORANGE COUNTRY AT VARIOUS POWELL CONSTRUCTORS INC WU, ADRIAN $11,843,523 12/13/18 100% 12-0M9004 $11,574,319 01/09/19 LOCATIONS FROM 0.1 MILE WEST OF 8555 BANANA AVENUE 15700 TUSTIN VILLAGE 96% HSNH-P022-(025) $18,875 05/31/22 BROOKHURST STREET UNDERCROSSING IN WAY --() FONTANA CA 92335 GARDEN GROVE TO BEDFORD ROAD OVE TUSTIN, CA 92780 OVER RUN (909)356-8880 IMPROVE/RECONFIGURE CHANNELIZATION, (949)279-8488 SHOPP State of California Department of Transportation Page 148 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 12 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 12-ORA-22-9.1/9.1 IN ORANGE COUNTY IN GARDEN GROVE AT BEADOR CONSTRUCTION COMPANY, DAT, PHAM /CE-ADRIAN $951,700 09/16/19 0% 12-0N9204 $0 10/04/19 HASTER STREET OFF RAMP INC. WU 0% $0 08/16/21 UPGRADE DRAINAGE AND ELECTRICAL 26320 LESTER CIRCLE; 15700 TUSTIN VILLAGE

WAY, #3 SUSPENDED CORONA CA 92883 TUSTIN, CA 92780 (951)674-7352 (949)279-8586 12-ORA-22-9.4/L9.8 IN ORA CO IN ORANGE ON RTE 22 FROM BEADOR CONSTRUCTION COMPANY, NAJM, ELIE/CE- $1,694,300 05/22/20 100% 12-0P5204 $1,376,285 06/18/20 LEWIS ST OC TO 0.1 MI W OF THE CITY INC. CHAUDRY, MONAS 81% HSNH-X059-(082)E $322,035 09/01/21 DR UC AND ON RTE 57 FROM 0.2 MI S OF 26320 LESTER CIRCLE; 3350 E BIRCH STREET, --() CHAPMAN AVE UC TO 0.4 SUITE 250 CORONA CA 92883 PLACE CONCRETE BARRIER, LIGHTING, BREA, CA 92821 (951)674-7352 (949)279-8826 12-ORA-39-.6/22.2 IN ORANGE COUNTY IN HUNTINGTON BEACH, PTM GENERAL ENGINEERING NAJM, ELIE/CE-MONAS $2,098,661 12/13/17 78% 12-0M5204 $2,063,795 01/18/18 ANAHEIM AND LA HABRA AT VARIOUS SERVICES, INC. CHAUDRY 98% SNHG-P039-(035)E $31,876 10/15/21 LOCATIONS FROM ATLANTA AVENUE TO 5942 ACORN ST. 3350 E. BIRCH STREET, --() CYPRESS STREET. STE 250 RIVERSIDE CA 92504 MODIFY SIGNALS, ADD SAFETY LIGHTING BREA, CA 92821 HB1 (951)710-1000 (949)279-8826 12-ORA-39-5.1/5.1 IN ORANGE COUNTY ON ROUTE 39 AT CALIFORNIA PROFESSIONAL NAJM, ELIE/CE- MONAS $1,532,558 10/02/19 94% 12-0P0104 $1,446,542 10/25/19 VARIOUS LOCATIONS AND ON ROUTE 90 AT ENGINEERING, INC. CHAUDRY 94% HSST-X059-(080)E $33,419 07/31/21 PLACENTIA AVENNUE 19062 SAN JOSE AVENUE 3350 E BIRCH STREET, --() MODIFY SIGNAL, ADD SAFETY LIGHTING, #250 LA PUENTE CA 91748 BREA, CA 92821 (626)810-1338 (949)279-8826 12-ORA-39-8.5/11.7 IN ORANGE COUNTY, IN WESTMINSTER AND RJ NOBLE PHAM, LIEU/CE- WU, $2,804,330 03/02/21 0% 12-0S4504 $0 03/25/21 STANTON, FROM ROUTE 22/39 SEPARATION 15505 EAST LINCOLN AVE; ADRIAN 0% $0 05/03/23 TO STARR STREET 15700 TUSTIN VILLAGE ORANGE CA 92865 RESURFACE HIGHWAY WITH RHMA WAY SUSPENDED (714)637-1550 TUSTIN, CA 92780

(818)319-7095 12-ORA-39-9.7/9.7 IN ORANGE COUNTY IN STANTON AT CALPROMAX ENGINEERING INC. SIDHU, GAGANDEEP/CE- $664,988 03/11/21 0% 12-0Q6404 $0 04/01/21 CHAPMAN AVE 650 N.ROSE DR.#186; ESSAYLI, M 0% SNHG-P039-(040)E $0 02/08/22 MODIFY SIGNAL, ADD SAFETY LIGHTING, 6533 MARINE WAY, --() PLACENTIA CA 92870 TRAILER #2 (714)573-4599 IRVINE, CA 92618

(949)279-8466 State of California Department of Transportation Page 149 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 12 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 12-ORA-39-15.2/15.9 IN ORANGE COUNTY IN BUENA PARK FROM SULLY-MILLER CONTRACTING BERRIOS,JOSE /CE-FARID $1,740,000 05/14/20 66% 12-0F9704 $1,738,878 06/19/20 AUTO CENTER DRIVE TO CRAIG AVE COMPANY ZOKAI 97% $13,641 10/28/21 REHABILITATE DRAINAGE SYSTEMS, 135 S. STATE COLLEGE BLVD. 15700 TUSTIN VILLAGE

WAY BREA CA 92821 TUSTIN, CA 92780 HA22 (714)578-9600 (949)279-8502 12-ORA-55-1.4/T2.1 IN ORANGE COUNTY IN COSTA MESA AT STANCE CONSTRUCTION COMPANY $443,243 05/10/21 0% 12-0S4804 $0 06/03/21 VARIOUS LOCATIONS FROM 17TH STREET TO 5314 MARINER LN; 0% $0 0.1 MILE NORTH OF 19TH STREET CHINO CA 91710 HMA AND PRECAST CONCRETE PAVEMENT (626)274-3156

12-ORA-55-13.2/17.8 IN ORANGE COUNTY IN ORANGE AND ACCU CONSTRUCTION, INC. JOUBEEN,JAY/CE- $1,240,122 07/21/20 0% 12-0N5304 $1,233,012 08/14/20 ANAHEIM FROM 0.5 MILE NORTH OF EAST 2098 S. GRAND AVE. SUITE A; M.JAVAHERNESHAN 0% ACNH-P055-(063)E $2,320 09/27/21 LA VETA AVENUE OC TO ROUTE 55/91 3251 1/4 UNIVERSITY --() SANTA ANA CA 92705 SEPARATION DRIVE, #2 PLANT EST (714)641-4730 RELOCATE FACILITIES AWAY FROM IRVINE, CA 92612 SATIS

(949)279-8638 12-ORA-55-17.2/17.2 IN ORANGE COUNTY ON ROUTE 55 AT PETERSON-CHASE GENERAL JOUBEEN, JAY $950,744 10/11/18 100% 12-0P7204 $931,293 11/08/18 SOUTH BOUND LINCOLN AVENUE OFF RAMP ENGINEERING CONSTRUCTION, INC.3251 1/4 UNIVERSITY 94% HSNH-X059-(078) $0 07/07/21 AND ON ROUTE 91 AT EAST BOUND TUSTIN 16351 CONSTRUCTION CIRCLE WES DRIVE --() AVENUE OFF RAMP. IRVINE, CA 92612 OVER RUN IRVINE CA 92606 HFST OVERLAY, SAFETY LIGHTING, (949)279-8638 (949)252-0441

12-ORA-55-17.7/17.7 IN ORANGE COUNTY IN ANAHEIM AND PETERSON-CHASE GENERAL FRANKLIN LUNA / CE- $1,058,567 05/13/21 0% 12-0S0904 $0 06/08/21 YORBA LLINDA ON ROUTE 55 AT ROUTE ENGINEERING CONSTRUCTION, INC.M.JAVAHERNE 0% $0 12/24/21 91/5 SPEARATION AND ON ROUTE 91 AT 16351 CONSTRUCTION CIR W; 3251 1/4 UNIVERSITY

ROUTE 91/55 SEPARATION AND 0 DRIVE IRVINE CA 92606 PEER TO CONSTRUCT AND UPGRADE 91 IRVINE, CA 92612 (949)252-0441 (562)449-7999 12-ORA-57-15.6/15.6 IN ORANGE COUNTY IN ANAHEIM AT ROUTE AMERICAN CIVIL CONSTRUCTORS SHIEH, PETER $435,000 11/17/20 80% 12-0Q7904 $339,043 12/02/20 57/91 SEPARATION WEST COAST LLC 3251 1/4 UNIVERSITY 78% HSNH-P057-(070)E $0 06/04/21 INSTALL HFST & REFRESH PAVEMENT 2990 BAY VISTA COURT, SUITE D DRIVE --() IRVINE, CA 92612 BENICIA CA 94510 (949)279-8636 (707)746-8028 State of California Department of Transportation Page 150 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 12 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 12-ORA-57-16.2/20.9 IN ORANGE COUNTY FROM 0.2 MILE SOUTH ACCU CONSTRUCTION, INC. NOWAK, JOHN $1,505,443 02/15/18 0% 12-0F03U4 $1,255,587 03/09/18 OF ORANGETHORPE AVENUE UNDERCROSSING 2098 S. GRAND AVE. SUITE A 15700 TUSTIN VILLAGE 0% $1,890 05/11/22 IN PLACENTIA TO LAMBERT ROAD WAY, T4 SANTA ANA CA 92705 UNDERCROSSING IN BREA TUSTIN, CA 92780 PLANT EST (714)641-4730 HIGHWAY REPLACEMENT PLANTING (949)279-8511 SATIS HB4N

12-ORA-57-20.3/21.6 IN ORANGE CO, IN BREA, ON ROUTE 57 SECURITY PAVING COMPANY, INC. SHIEH, PETER $49,654,462 04/19/19 73% 12-0C1104 $33,245,040 05/13/19 FROM 0.6 MILE SOUTH TO 0.7 MILE 3075 TOWNSGATE ROAD, STE 200 3350 E BIRCH STREET, 66% EPNH-P057-(067)E $1,552,617 03/14/22 NORTH OF LAMBERT ROAD UC STE 250 --() WESTLAKE VILLAGE, CA 91361 RECONFIG NB RAMPS, CONST OF LOOP BREA, CA 92821 (818)362-9200 (949)279-8636 HE11

12-ORA-73-10.0/28 IN ORA CO FROM 0.3 MILE SOUTH OF S73- SPECTRUM CONSTRUCTION GROUP, BLANCO, CHRIS/CE- $18,078,013 09/16/20 36% 12-0N7204 $4,527,439 10/19/20 S5 CONN VIADUCT IN SAN JUAN INC. RAVANIPOUR,M 25% HSNH-P073-(141)E $1,203,537 06/10/22 CAPISTRANO TO 0.1 MILE NORTH OF N73- 16 GOODYEAR, STE. 140; 6521 MARINE WAY --() N405 CONN OC IN COSTA MESA IRVINE, CA 92618 IRVINE CA 92618 UPGRADE SAFETY DEVICES, RELOCATE (949)279-4560 HB1 (949)299-1400

12-ORA-73-10.3/19.5 IN ORANGE, IN VARIOUS CITIES, AT PETERSON-CHASE GENERAL BLANCO, CHRIS/CE- $2,228,631 02/25/21 39% 12-0S2304 $1,608,104 03/16/21 VARIOUS LOCATIONS, FROM S73-S5 ENGINEERING CONSTRUCTION, INC.RAVANIPOUR,M 69% $305,607 11/02/21 CONNECTOR VIADUCT TO SAND CANYON 16351 CONSTRUCTION CIR W; 6521 MARINE WAY

AVENUE UNDERCROSSING IRVINE, CA 92618 IRVINE CA 92606 METHACRYLATE TREATMENT, JOINT SEAL (949)279-4560 (949)252-0441

12-ORA-73-23.7/24.1 IN ORANGE COUNTY, IN NEWPORT, FROM BEADOR CONSTRUCTION COMPANY, JOUBEEN, JAY/CE- $6,809,581 06/25/20 32% 12-0N8604 $4,156,637 07/23/20 0.3 MILE NORTH OF BISON AVENUE TO 0.3 INC. JAVAHERNESHAN 61% HSNH-P037-(140)E $904,802 12/06/22 MILE SOUTH OF UNIVERSITY DRIVE 26320 LESTER CIRCLE; 3251 1/4 UNIVERSITY --() WIDEN EXISTING LANE FROM ONE TO TWO DRIVE CORONA CA 92883 IRVINE, CA 92612 (951)674-7352 (949)279-8638 12-ORA-74-2.9/5.1 IN ORANGE COUNTY IN THE CITY OF SAN DIVERSIFIED LANDSCAPE CO. NADERI, ARSALAN $618,640 04/10/19 54% 12-0L7224 $362,388 05/01/19 JUAN CAPISTRANO ON ROUTE 74 FROM EAST 21730 BUNDY CANYON ROAD; 6521 MARINE WAY T#1 59% HSNH-P074-(068)E $11,648 05/22/23 OF ANTO IRVINE, CA 92618 --() WILDOMAR CA 92595 PE FOR MITIGATION PLANTING FOR (949)279-8447 (951)245-1686

State of California Department of Transportation Page 151 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 12 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 12-ORA-74-11.5/16.6 IN ORANGE COUNTY NEAR SAN JUAN AMERICAN CIVIL CONSTRUCTORS NADERI, ARSALAN/CE- $17,410,000 11/13/20 14% 12-0P0304 $3,174,777 12/02/20 CAPISTRANO FROM 1.0 MILE WEST OF SAN WEST COAST LLC RAVANIPOUR 18% HSNH-P074-(071)E $1,066,260 03/16/24 JUAN HOT SPRING ROAD TO ORANGE COUNTY 2990 BAY VISTA COURT, SUITE D 6521 MARINE WAY --() LINE IRVINE, CA 92618 BENICIA CA 94510 INSTALL HIGH FRICTION SURFACE (949)279-8447 (707)746-8028

12-ORA-90-.5/2.5 IN ORANGE COUNTY IN LA HABRA FROM CALMEX ENGINEERING, INC. SHIEH, PETER $1,651,847 03/05/21 72% 12-0S4704 $1,532,477 03/16/21 BEACH BLVD TO HARBOR BLVD 2764 S. VISTA AVE.; 3251 1/4 UNIVERSITY 92% $0 07/30/21 COLD PLANE AC PAVEMENT AND PLACE DRIVE BLOOMINGTON CA 92316 IRVINE, CA 92612 SUSPENDED (909)546-1311 (949)279-8828

12-ORA-90-2.6/5.1 IN ORANGE COUNTY IN FULLERTON AND RJ NOBLE SHIEH, PETER $3,332,274 06/19/20 93% 12-0P5804 $3,264,138 07/10/20 BREA FROM HARBOR BLVD. TO RANDOLPH 15505 EAST LINCOLN AVE; 3251 1/4 UNIVERSITY 94% $345,062 07/27/21 AVE. DRIVE ORANGE CA 92865 COLD PLANE AND OVERLAY PAVEMENT, IRVINE, CA 92612 (714)637-1550 (949)279-8636

12-ORA-90-4.0/4 IN ORANGE COUNTY IN BREA AT BERRY CROSSTOWN ELECTRICAL & DATA, NAJM, ELIE/CE-MONAS $434,983 06/11/20 0% 12-0Q4204 $0 07/02/20 STREET AND JASMINE DRIVE INC. CHAUDRY 0% SNHG-P090-(017)E $0 01/13/22 MODIFY SIGNAL, INSTALL LIGHTS, 5454 DIAZ STREET; 3350 E. BIRCH STREET, --() #250 IRWINDALE CA 91706 BREA, CA 92821 (626)813-6693 (949)279-8826 12-ORA-91-9.8/18.9 IN ORANGE COUNTY IN ANAHEIM AND ACME CONCRETE PAVING INC PHAM, DAT /CE-ADRIAN $9,517,855 11/07/19 72% 12-0N3204 $5,413,103 12/04/19 YORBA LINDA FROM 0.3 MILE WEST OF 4124 E BROADWAY AVE WU 57% ACNH-P091-(148)E $1,305,434 11/19/21 LAKEVIEW AVENUE OVERCROSSING TO 15700 TUSTIN VILLAGE --() SPOKANE WA 99202 RIVERSIDE COUNTY LINE WAY, #3 (509)242-1234 CAPM PAVEMENT PRESERVATION TUSTIN, CA 92780 HA23 (949)279-8586 12-ORA-91-12.5/13.9 IN ORANGE COUNTY IN ANAHEIM FROM 1.0 SPECTRUM CONSTRUCTION GROUP, PHAM, DAT /CE-ADRIAN $5,581,265 12/18/19 47% 12-0N4904 $5,340,949 01/22/20 MILE EAST OF ROUTE 91/90 SEPERATION INC. WU 95% $32,193 12/03/21 TO 0.5 MILE WEST OF WEIR CANYON ROAD 16 GOODYEAR STE 140; 15700 TUSTIN VILLAGE

UNDERCROSSING WAY, #3 IRVINE CA 92618 REHABILITATE COMMERCIAL VEHICLE TUSTIN, CA 92780 (949)299-1400 (949)279-8575 State of California Department of Transportation Page 152 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 12 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 12-ORA-91-13.4/14.1 RTE 91 PERALTA WB WEIGH STATION. SPECTRUM CONSTRUCTION GROUP, BILLG/JAYJ/F.LUNA/CE- $6,226,301 10/18/18 96% 12-0N2704 $6,201,929 11/08/18 RENEW AND UPGRADE PERALTA WB WEIGH INC. MAJID J. 99% $0 06/04/21 32 EDELMAN 3251 1/4 UNIVERSITY

DRIVE T#2 IRVINE CA 92618 IRVINE, CA 92612 HB4N (949)299-1400 (949)279-8638 12-ORA-91-16.6/17 IN ORANGE COUNTY IN YORBA LINDA FROM BEADOR CONSTRUCTION COMPANY, $1,587,300 05/18/21 0% 12-0S6604 $0 06/18/21 W91-S241/91 CONNECTOR SEPARATION TO INC. 0% $0 0.6 MILE EAST OF GYPSUM CANYON ROAD 26320 LESTER CIRCLE;

UNDERCROSSING CORONA CA 92883 REMOVE AC PAVEMENT AND PLACE (951)674-7352

12-ORA-133-3.2/4.1 IN ORANGE COUNTY, IN THE CITY OF GRANITE CONSTRUCTION COMPANY LUNA, FRANKLIN/CE- $6,845,845 02/23/21 0% 12-0P94U4 $0 03/11/21 LAGUNA BEACH, FROM 0.2 MILE SOUTH OF 5860 EL CAMINO REAL; JAVAHERNESHA 0% ACNH-P133-(018) $0 EL TORO ROAD TO ROUTE 73/133 3251 1/4 UNIVERSITY --() CARLSBAD CA 92008 SEPARATION DRIVE SUSPENDED (760)444-1032 ROADWAY WIDENING, RESTRIPING AND IRVINE, CA 92612

(562)449-7999 12-ORA-133-3.9/13.6 IN ORANGE COUNTY IN LAGUNA BEACH AND CHUMO CONSTRUCTION INC SHIEH, PETER $11,237,598 01/16/20 83% 12-0N6604 $3,737,822 02/13/20 IRVINE FROM 0.1 MILE SOUTH OF ROUTE 14425 JOANBRIDGE STREET; 3251 1/4 UNIVERSITY 34% HSNH-P133-(016)E $495,539 09/13/21 73/133 SEPARATION TO ROUTE 133/241 DRIVE --() BALDWIN PARK CA 91706 SEPARATION IRVINE, CA 92612 (626)960-9502 REPLACE DAMAGED AND OUTDATED MBGR, (213)220-9669 SHOPP

12-ORA-133-4.2/13.4 IN ORANGE, IN VARIOUS CITIES, AT O'DONNELL CONSTRUCTION, INC. $1,560,030 04/01/21 0% 12-0S2204 $0 04/30/21 VARIOUS LOCATIONS, FROM LAGUNA CANYON 559 W. COVINA BLVD.; 0% $0 CREEK TO SANTIAGO AQUEDUCT SAN DIMAS CA 91773 UNDERCROSSING (909)394-4510 METHACRYLATE TREATMENT, JOINT SEAL

12-ORA-142-3.1/6.4 IN ORANGE COUNTY IN BREA FROM 0.5 SULLY-MILLER CONTRACTING PHAM, LIEU/CE- WU, $1,320,000 03/16/21 94% 12-0S4404 $1,012,934 04/01/21 MILE EAST OF BREA HILLS AVENUE TO SAN COMPANY ADRIAN 77% $394,791 07/26/21 BERNARDINO COUNTY LINE 135 S. STATE COLLEGE BLVD.; 15700 TUSTIN VILLAGE

RESURFACE HIGHWAY WITH RHMA WAY BREA CA 92821 TUSTIN, CA 92780 (714)578-9600 (818)319-7095 State of California Department of Transportation Page 153 Statement of Ongoing Contracts as of 07/20/21 07/28/21

District 12 Location Awarded Contract Bid + CCOs Approved %Time Storm Water Resident Fed Aid Description Comp To date Est Comp % Work Plan Engineer Pgm Code Type Of Work Contractor This Month Accepted Message 12-ORA-241-14.5/25 IN ORANGE COUNTY IN IRVINE, LAKE PETERSON-CHASE GENERAL TAING, STEVEN/CE- $938,056 05/22/20 42% 12-0Q7004 $146,920 06/18/20 FOREST, MISSION VIEJO AND RANCHO ENGINEERING CONSTRUCTION, INC.HONG,JOHN 16% HSST-P241-(008)E $0 09/03/21 SANTA MARGARITA ON ROUTE 241 FROM OSO 16351 CONSTRUCTION CIR W; 3251 1/4 UNIVERSITY --() PARKWAY TO PORTOLA PARKWAY DR T#1 IRVINE CA 92606 INSTALL MGS AND CRASH CUSHIONS IRVINE , CA 92617 (949)252-0441 (949)279-8580 12-ORA-241-16.0/38.8 IN ORANGE COUNTY IN RANCHO SANTA SPECTRUM CONSTRUCTION GROUP, RAMADAN, KIFAH/CE-JOHN $2,016,391 02/07/20 90% 12-0R5204 $1,606,753 03/17/20 MARGARITA, MISSION VIEJO, LAKE INC. HONG 79% $0 05/06/21 FOREST, ORANGE & ANAHEIM AT VARIOUS 16 GOODYEAR STE 140; 27261 LAS RAMBLAS RD,

LOCATIONS, FROM WILDLIFE UC TO STE 160 IRVINE CA 92618 METHACRYLATE DECK SEAL TREATMENT MISSION VIEJO, CA 92691 (949)299-1400 (949)279-8625 12-ORA-241-23.1/23.1 IN LAKE FOREST, ON ROUTE 241 RSB GROUP, INC. SHIEH, PETER $890,471 06/11/19 100% 12-0Q8104 $993,650 07/03/19 NORTHBOUND OFF TO ALTON PARKWAY 20331 LAKE FOREST DR. STE C13 3251 1/4 UNIVERSITY 100% HSST-P241-(007)E $0 07/02/21 CONSTRUCT RETAINING WALLS, CURB DRIVE --() LAKE FOREST CA 92630 07/02/21 IRVINE, CA 92612 COMPLETED (949)454-1999 (949)279-8636

12-ORA-405-5.6/5.6 IN ORANGE COUNTY IN IRVINE ON ROUTE CHUMO CONSTRUCTION INC SIDHU,GAGANDEEP/CE-MO $1,143,649 06/11/20 59% 12-0P4004 $794,018 07/02/20 405 AT CULVER DRIVE OVERCROSSING 14425 JOANBRIDGE STREET; ESSAYLI 69% SIMG-405 -(013)E $142,874 10/04/21 ADA AND SIGNAL MODIFICATION 6533 MARINE WAY, --() BALDWIN PARK CA 91706 TRAILER #2 (626)960-9502 IRVINE, CA 92618

(949)279-8466 12-ORA-405-7.3/10 IN ORANGE COUNTY IN IRVINE FROM VON ACCU CONSTRUCTION, INC. NOWAK, JOHN $1,477,699 02/24/20 57% 12-0N5204 $1,397,565 03/20/20 KARMAN AVE. OC TO 0.1 MILE NORTH OF 2098 S. GRAND AVE. SUITE A; 3251 1/4 UNIVERSITY 93% $3,056 05/13/22 MACARTHUR BLVD. AND IN COSTA MESA DRIVE #2 SANTA ANA CA 92705 FROM SANTA ANA DELPHI CH IRVINE, CA 92612 (714)641-4730 RELOCATE FACILITIES AWAY FROM (949)279-8511

Totals: Authorized Final Amt: $584,128,742 Completed to Date: $258,024,436 Work This Month: $18,212,628 Statement of Ongoing Contracts - Index Cnty Rt Pm Contract Page 01-DN-101-8.2/8.7 01-0B0904 1 01-DN-101-12.5/15.5 01-0G1004 1 01-DN-101-25.5/27.4 01-0C6604 1 01-DN-101-39.8/39.8 01-0F3104 1 01-DN-101-39.8/46.4 01-0K4704 1 01-DN-101-42.0/42 01-0L0704 1 01-DN-101-120.0/16.5 01-0L0404 2 01-DN-101-151.0/15.5 01-0L2304 2 01-DN-101-/15.5 01-0H6904 2 01-DN-199-6.5/36.3 01-488014 2 01-DN-199-9.9/9.9 01-0L3204 2 01-DN-199-27.5/36.4 01-0K7904 2 01-DN-199-335.0/33.9 01-0J5704 3 01-DN-999-/0 01-0J8604 3 01-HUM-36-5.2/30.9 01-0F8404 3 01-HUM-36-17.9/23.9 01-0F5004 3 01-HUM-36-40.4/45.6 01-0K5704 3 01-HUM-36-314.0/0 01-0J1704 3 01-HUM-96-16.8/23.1 01-0K4304 4 01-HUM-96-22.9/0 01-0F0804 4 01-HUM-101-23.0/102.3 01-0K7104 4 01-HUM-101-48.3/58.8 01-0K5404 4 Statement of Ongoing Contracts - Index Cnty Rt Pm Contract Page 01-HUM-101-65.5/69.9 01-0K4504 4 01-HUM-101-69.8/75.2 01-0C5704 4 01-HUM-101-75.1/77.4 01-0B6204 5 01-HUM-101-78.0/79.8 01-0E68U4 5 01-HUM-101-78.0/79.1 01-0K9004 5 01-HUM-101-80.1/84.3 01-0F2204 5 01-HUM-101-84.4/84.8 01-0E0004 5 01-HUM-101-87.8/90.1 01-0J5104 5 01-HUM-101-88.3/88.3 01-0E6504 6 01-HUM-101-124.5/0 01-0F9604 6 01-HUM-101-595.0/0 01-0K4204 6 01-HUM-101-17.9/87.8 01-0E7704 6 01-HUM-255-6.0/7.6 01-3660U4 6 01-HUM-299-8.5/9 01-0J8004 6 01-HUM-299-20.5/30.2 01-0F4604 7 01-HUM-299-30.7/37.7 01-0F4704 7 01-HUM-299-38.9/39.5 01-0F6804 7 01-HUM-299-1.8/1.8 01-0F5304 7 01-HUM-299-16.1/26.6 01-0E0304 7 01-HUM-999-/0 01-0J1904 7 01-HUM-999-/0 01-0A1204 8 01-LAK-20-.7/5.2 01-0K4804 8 Statement of Ongoing Contracts - Index Cnty Rt Pm Contract Page 01-LAK-20-5.1/6.3 01-0G33U4 8 01-LAK-20-12.2/45.9 01-0K5004 8 01-LAK-20-37.0/41.7 01-0K4604 8 01-LAK-29-12.7/14.5 01-0E7204 8 01-LAK-29-17.7/20.7 01-0E7304 9 01-LAK-29-28.5/31.6 01-2982U4 9 01-LAK-175-.2/.4 01-0H4604 9 01-LAK-175-25.0/27.5 01-0A0404 9 01-LAK-999-/0 01-0J8804 9 01-MEN-1-43.7/43.7 01-0E2014 9 01-MEN-1-75.5/76.5 01-0G4504 10 01-MEN-20-16.8/17.2 01-0E8604 10 01-MEN-20-24.6/24.8 01-0G4304 10 01-MEN-101-3.7/5.3 01-0B5004 10 01-MEN-101-36.0/38 01-0J7104 10 01-MEN-101-58.9/82.5 01-0C4504 10 01-MEN-101-79.0/81.5 01-0K5604 11 01-MEN-101-490.0/81.5 01-0L0104 11 01-MEN-101-510.0/55 01-0K8304 11 01-MEN-128-358.0/35.8 01-0L1804 11 01-MEN-999-/0 01-484204 11 01-MEN-999-/0 01-0J8704 11 Statement of Ongoing Contracts - Index Cnty Rt Pm Contract Page 01-VAR-101-84.0/85.5 01-0H1204 12 01-VAR--/0 01-0G0504 12 02-BUT-70-41.9/42.3 02-0H9004 12 02-LAS-36-6.0/14.6 02-4E46U4 12 02-LAS-299-18.5/25.6 02-4E4504 12 02-LAS-299-25.6/25.6 02-1H1104 13 02-LAS-395-900.0/0 02-4H8104 13 02-MOD-299-20.0/38 02-1J4404 13 02-PLU-49-/7.5 02-2J0004 13 02-PLU-70-.4/29.7 02-0H5504 13 02-PLU-70-10.0/25 02-1J5004 13 02-PLU-70-36.8/62.5 02-1H7904 14 02-SHA-5-4.9/5.1 02-4H1504 14 02-SHA-5-56.6/67 02-4G41U4 14 02-SHA-5-3.8/11.7 02-4C40V4 14 02-SHA-5-31.0/31.7 02-4G5804 14 02-SHA-5-32.0/32.3 02-1H3904 14 02-SHA-89-29.1/29.4 02-2J1604 15 02-SHA-273-4.4/12.3 02-2H9704 15 02-SIS-3-38.0/38.6 02-4G4404 15 02-SIS-5-25.4/25.9 02-2H1304 15 02-SIS-5-8.3/8.3 02-1H4004 15 Statement of Ongoing Contracts - Index Cnty Rt Pm Contract Page 02-SIS-5-15.3/16.5 02-4F5404 15 02-SIS-5-25.4/25.9 02-0J4104 16 02-SIS-89-3.2/0 02-4G6304 16 02-SIS-89-14.0/19 02-1J4504 16 02-SIS-96-34.5/92 02-1J4604 16 02-SIS-96-369.0/37.3 02-2J5104 16 02-SIS-96-7.3/15.9 02-4F6004 16 02-SIS-96-/0 02-2E4804 17 02-SIS-161-17.5/18.5 02-0J4004 17 02-TEH-5-25.4/25.4 02-4F5904 17 02-TEH-32-14.0/20 02-1J4904 17 02-TEH-36-67.5/69 02-4H7704 17 02-TEH-36-87.0/87.8 02-0H3904 17 02-TEH-36-87.8/89.1 02-1H74U4 18 02-TEH-99-12.0/12.6 02-1H3204 18 02-TRI-3-22.4/30.4 02-3H5604 18 02-TRI-3-32.8/57.9 02-0H5404 18 02-TRI-3-46.7/67.7 02-1J4704 18 02-TRI-3-58.7/60.7 02-4F2204 18 02-TRI-36-26.7/27.1 02-4F8604 19 02-TRI-36-207.0/20.7 02-2J4704 19 02-TRI-36-34.7/35.3 02-2H0504 19 Statement of Ongoing Contracts - Index Cnty Rt Pm Contract Page 02-TRI-36-/29 02-2J1404 19 02-TRI-299-1.9/2.3 02-4G5004 19 02-TRI-299-5.2/5.7 02-4H3404 19 02-TRI-299-112.0/11.2 02-2J5304 20 02-TRI-299-3.5/0 02-4G6204 20 02-TRI-299-/0 02-4G6104 20 02-TRI-299-/0 02-4G5304 20 02-VAR--/0 02-1J2404 20 02-VAR--/0 02-1J5204 20 02-VAR--/0 02-1J4804 21 02-VAR--/0 02-0J9104 21 03-BUT-5-/0 03-0H4104 21 03-BUT-70-5.6/9.1 03-3H72U4 21 03-BUT-70-154.0/15.4 03-1J9204 22 03-BUT-99-13.2/45.9 03-0H3304 22 03-BUT-99-14.9/15.7 03-0F2904 22 03-BUT-99-29.3/T37.8 03-1H8604 22 03-BUT-99-34.0/34 03-0J9004 22 03-BUT-99-30.5/30.6 03-1J3504 22 03-BUT-99-/0 03-1G9604 23 03-BUT-162-25.0/31 03-1J7604 23 03-COL-5-5.0/6.8 03-0J1804 23 Statement of Ongoing Contracts - Index Cnty Rt Pm Contract Page 03-COL-5-24.3/24.3 03-4F4304 23 03-COL-5-24.4/24.5 03-2H5504 23 03-COL-20-31.8/32.8 03-2F9804 23 03-COL-45-/19.8 03-2G0804 24 03-ED-49-9.6/14.2 03-2G1004 24 03-ED-49-10.0/11.7 03-2G2104 24 03-ED-49-16.5/23.9 03-2G0904 24 03-ED-50-18.5/24.2 03-4E62U4 24 03-ED-50-33.8/34.2 03-3H4504 24 03-ED-50-/80.4 03-0H5204 25 03-GLE-5-14.4/14.7 03-2H5104 25 03-GLE-5-14.6/14.6 03-4F4204 25 03-GLE-5-7.4/17 03-3F5004 25 03-GLE-162-66.6/76.3 03-2G1104 25 03-NEV-49-8.3/8.7 03-3H6504 25 03-NEV-49-30.0/32.1 03-2G0004 26 03-NEV-49-/7.5 03-0H2104 26 03-NEV-80-10.1/29.5 03-1H8404 26 03-NEV-80-19.3/19.3 03-2H30A4 26 03-NEV-80-28.3/28.7 03-1H0104 26 03-NEV-174-3.0/3.9 03-4F3704 26 03-NEV-174-4.6/5.3 03-1G9704 27 Statement of Ongoing Contracts - Index Cnty Rt Pm Contract Page 03-NEV-174-8.5/9.7 03-1G9804 27 03-PLA-28-10.2/10.2 03-0J2504 27 03-PLA-49-3.1/7.5 03-2F3404 27 03-PLA-65-12.9/13.1 03-4H5604 27 03-PLA-65-4.8/4.9 03-2G1404 27 03-PLA-80-1.3/63.5 03-0H7204 28 03-PLA-80-2.6/3.1 03-0H4604 28 03-PLA-80-11.4/17.5 03-2G1304 28 03-PLA-80-31.5/36.8 03-1E0504 28 03-PLA-80-38.8/41.4 03-1H0304 28 03-PLA-80-46.3/63.5 03-2F5704 28 03-PLA-80-56.9/58.2 03-0J8804 29 03-PLA-193-3.0/10.1 03-2G1504 29 03-SAC-5-.2/34.3 03-4F6404 29 03-SAC-5-9.7/24.9 03-0H10U4 29 03-SAC-5-33.8/33.8 03-4F5804 29 03-SAC-5-/0 03-4H0204 29 03-SAC-12-.6/.6 03-2H6404 30 03-SAC-50-2.6/3.8 03-1F1904 30 03-SAC-50-15.8/23.1 03-1H8204 30 03-SAC-50-/L.5 03-1G7404 30 03-SAC-50-.2/6.1 03-0H08U4 30 Statement of Ongoing Contracts - Index Cnty Rt Pm Contract Page 03-SAC-50-7.7/9.5 03-1F1504 30 03-SAC-80-9.6/12.9 03-1H1904 31 03-SAC-80-/0 03-2G0604 31 03-SAC-99-4.5/5.5 03-3F5404 31 03-SAC-99-7.1/9.4 03-0F2844 31 03-SAC-99-7.1/9.4 03-0F2864 31 03-SAC-99-7.1/9.4 03-0F2804 31 03-SAC-99-11.8/21.6 03-0H4804 32 03-SAC-99-21.9/23.6 03-0H3424 32 03-SAC-160-20.9/45 03-3F0904 32 03-SIE-49-9.2/24.7 03-4H1004 32 03-SUT-20-/0 03-3F5604 32 03-SUT-99-39.2/41.4 03-3F99U4 32 03-SUT-99-313.0/31.3 03-1J2104 33 03-VAR-12-/.4 03-4H6904 33 03-VAR-70-14.0/14.7 03-1J1904 33 03-VAR-149-/5.3 03-0J3504 33 03-VAR-999-/0 03-4H9504 33 03-VAR--/0 03-2H57U4 33 03-VAR--/0 03-2G1204 34 03-VAR--/0 03-1G7604 34 03-VAR--/0 03-0H4204 34 Statement of Ongoing Contracts - Index Cnty Rt Pm Contract Page 03-VAR--/0 03-0H5404 34 03-VAR--/0 03-0H4004 34 03-VAR--/0 03-1G5104 34 03-YOL-16-15.4/19.8 03-1G9904 35 03-YOL-16-27.5/28.3 03-4F1714 35 03-YOL-80-11.1/11.7 03-0F2504 35 03-YOL-80-/0 03-1H8704 35 03-YOL-113-6.8/11.1 03-2G1704 35 03-YOL-128-/9.8 03-2G2004 35 03-YUB-20-1.6/3.4 03-1G0104 36 03-YUB-20-13.3/18.2 03-0A5704 36 03-YUB-20-18.1/M20.1 03-3F5104 36 03-YUB-65-80.0/8 03-1J0704 36 03-YUB-70-15.5/16.5 03-1E0604 36 04-ALA-13-5.2/5.5 04-1J9904 37 04-ALA-13-10.9/12 04-2G4604 37 04-ALA-13-12.1/13.4 04-2G4824 37 04-ALA-13-/0 04-3J1104 37 04-ALA-13-/0 04-3K3104 37 04-ALA-24-5.9/6.2 04-0AC904 37 04-ALA-24-59.0/6.2 04-1Q8404 38 04-ALA-80-1.9/4 04-2J8304 38 Statement of Ongoing Contracts - Index Cnty Rt Pm Contract Page 04-ALA-80-4.5/7.6 04-3J7004 38 04-ALA-80-5.7/5.8 04-1W9904 38 04-ALA-80-6.4/6.6 04-0A7714 38 04-ALA-84-13.0/13.6 04-160304 38 04-ALA-84-13.6/18 04-2A3324 39 04-ALA-84-17.9/22.9 04-297634 39 04-ALA-84-21.9/21.9 04-4Q2604 39 04-ALA-260-1.1/1.9 04-3K2004 39 04-ALA-260-1.1/1.9 04-0W0204 39 04-ALA-580-21.0/27 04-0W3404 39 04-ALA-580-44.4/44.4 04-1W5404 40 04-ALA-580-8.0/8 04-0J5204 40 04-ALA-580-30.8/46.5 04-3J0504 40 04-ALA-580-30.8/41.5 04-270104 40 04-ALA-580-47.4/48 04-3Q3904 40 04-ALA-680-2.2/6.6 04-2537H4 40 04-ALA-680-2.4/12.4 04-4G0564 41 04-ALA-880-11.4/12.2 04-0J5304 41 04-ALA-880-20.9/20.9 04-4J7304 41 04-ALA-880-34.1/34.6 04-2W3404 41 04-CC-4-23.6/25.2 04-2J0304 41 04-CC-4-23.8/23.8 04-2W6704 41 Statement of Ongoing Contracts - Index Cnty Rt Pm Contract Page 04-CC-4-25.8/28.3 04-2J0414 42 04-CC-4-16.7/16.7 04-2Q0204 42 04-CC-4-28.7/31 04-2J0424 42 04-CC-4-38.0/39.9 04-3Q9504 42 04-CC-4-/0 04-2Q0304 42 04-CC-24-6.6/7.4 04-0W6104 42 04-CC-24-/0 04-0AC704 43 04-CC-160-1.1/.6 04-0W3904 43 04-CC-242-/1.6 04-269804 43 04-CC-580-.9/1.5 04-2J7204 43 04-CC-580-5.8/5.8 04-4G8914 43 04-CC-580-6.1/7.7 04-3G4744 43 04-CC-580-6.7/7.8 04-2W1204 44 04-CC-680-20.4/24.3 04-0W3304 44 04-CC-680-/7.6 04-0W7704 44 04-CC-680-24.9/25.5 04-3G3014 44 04-LAK-29-/0 04-0Q8504 44 04-MRN-0-/0 04-0AC804 44 04-MRN-101-.2/0 04-4J4204 45 04-MRN-101-.4/2.2 04-1W3804 45 04-MRN-101-.7/15.8 04-3K3504 45 04-MRN-101-3.5/4.8 04-1W5804 45 Statement of Ongoing Contracts - Index Cnty Rt Pm Contract Page 04-MRN-101-8.4/8.7 04-1A6614 45 04-MRN-101-8.9/0 04-0Q7304 45 04-MRN-101-10.6/10.8 04-4G8204 46 04-MRN-101-15.4/15.4 04-4G8714 46 04-MRN-131-.8/.9 04-4J4504 46 04-NAP-29-33.5/48.5 04-1W6304 46 04-NAP-29-20.4/20.8 04-2594A4 46 04-NAP-121-.5/1 04-4G2104 46 04-NAP-121-16.1/22.1 04-1W4804 47 04-NAP-121-18.6/18.6 04-4J2104 47 04-NAP-121-20.6/20.6 04-2J5704 47 04-NAP-128-20.1/20.4 04-4G8404 47 04-NAP-128-7.4/7.4 04-1G4304 47 04-SCL-9-3.6/6.9 04-3Q3804 47 04-SCL-17-2.8/13.9 04-1J9704 48 04-SCL-17-5.1/13.3 04-3K3304 48 04-SCL-17-/3.4 04-2K1404 48 04-SCL-35-/9.5 04-0W1704 48 04-SCL-82-9.8/10.4 04-4J2824 48 04-SCL-85-5.6/17.8 04-3Q4704 48 04-SCL-85-18.0/24.1 04-2G7304 49 04-SCL-87-.1/4 04-2Q0504 49 Statement of Ongoing Contracts - Index Cnty Rt Pm Contract Page 04-SCL-87-5.2/5.2 04-3Q8304 49 04-SCL-101-33.2/33.2 04-2W3904 49 04-SCL-101-/4.2 04-0J5604 49 04-SCL-130-11.2/22.5 04-1W6204 49 04-SCL-130-15.0/21.5 04-1W5104 50 04-SCL-152-13.2/0 04-2A4414 50 04-SCL-152-21.8/35.2 04-0J8004 50 04-SCL-152-/6.2 04-2A2514 50 04-SCL-237-.2/1 04-3Q4104 50 04-SCL-280-7.9/7.9 04-0W4204 50 04-SCL-280-11.3/11.3 04-3J7104 51 04-SCL-280-11.5/20.6 04-3J3204 51 04-SCL-680-7.6/M9.9 04-2537C4 51 04-SCL-999-/0 04-2Q0604 51 04-SF-1-.7/5.9 04-3J8904 51 04-SF-1-6.3/6.8 04-3J3004 51 04-SF-1-/.9 04-4K1104 52 04-SF-80-3.8/5 04-2J8024 52 04-SF-80-5.6/7.6 04-3G4424 52 04-SF-80-7.7/7.7 04-1W0604 52 04-SF-80-7.9/7.9 04-1AA404 52 04-SF-101-1.5/2 04-3G6204 52 Statement of Ongoing Contracts - Index Cnty Rt Pm Contract Page 04-SF-101-4.1/5.1 04-2J8014 53 04-SF-101-4.3/L4.3 04-1W9804 53 04-SF-101-6.7/8.1 04-3E6024 53 04-SF-101-/4.2 04-4J3904 53 04-SM-1-17.9/47 04-2Q0804 53 04-SM-1-39.0/39 04-1AA004 53 04-SM-1-/10.6 04-0C9304 54 04-SM-35-21.7/L22.8 04-3Q3604 54 04-SM-84-17.2/17.2 04-0W1204 54 04-SM-84-24.6/25 04-0P1104 54 04-SM-92-9.5/10.4 04-0W3804 54 04-SM-92-11.8/11.8 04-0P4304 54 04-SM-92-14.4/18.8 04-3G4544 55 04-SM-101-3.1/3.1 04-2W3104 55 04-SM-101-22.6/23.1 04-3K3404 55 04-SM-101-/21.8 04-1J5694 55 04-SM-101-/6.6 04-1J5614 55 04-SM-280-20.2/20.6 04-4J0804 55 04-SOL-80-.3/1 04-2AC104 56 04-SOL-80-.5/1 04-2AC504 56 04-SOL-80-.8/1.6 04-2K8404 56 04-SOL-80-1.8/4.4 04-0J7104 56 Statement of Ongoing Contracts - Index Cnty Rt Pm Contract Page 04-SOL-80-12.0/13.1 04-0A5394 56 04-SOL-80-13.9/13.9 04-3G6904 56 04-SOL-80-14.1/15.1 04-4G8724 57 04-SOL-80-34.5/34.5 04-0J6004 57 04-SON-1-9.1/16.1 04-3Q4204 57 04-SON-1-27.3/31.5 04-1W5004 57 04-SON-1-15.0/15.7 04-0A0204 57 04-SON-12-35.1/38.9 04-1J3604 57 04-SON-37-.3/2 04-0W5404 58 04-SON-37-3.9/6.1 04-0W3704 58 04-SON-101-3.7/7.2 04-2640F4 58 04-SON-101-9.0/9 04-0J1004 58 04-SON-101-22.3/23.3 04-1Q8604 58 04-SON-101-32.8/54.2 04-0J6424 58 04-SON-116-18.6/25 04-3Q4504 59 04-SON-116-30.9/31.4 04-4G3804 59 04-SON-116-39.3/41.8 04-3Q9804 59 04-SON-128-5.0/24.7 04-2AC004 59 04-SON-128-16.8/17.6 04-2W3304 59 04-SON-128-24.2/24.7 04-1Q8704 59 04-SON-128-/12.2 04-3Q4604 60 05-MON-1-15.0/29.6 05-1N4204 60 Statement of Ongoing Contracts - Index Cnty Rt Pm Contract Page 05-MON-1-20.4/20.4 05-0Q5004 60 05-MON-1-27.2/27.6 05-1N4104 60 05-MON-1-28.1/28.1 05-1K1604 61 05-MON-1-39.8/74.6 05-1F6804 61 05-MON-1-44.3/-44.3 05-1N4304 61 05-MON-1-59.4/59.5 05-1N5004 61 05-MON-1-63.0/63 05-1H4604 61 05-MON-1-64.4/64.4 05-1K7004 61 05-MON-1-73.7/0 05-1M5204 62 05-MON-1-80.3/0 05-1M3904 62 05-MON-1-/0 05-1M9804 62 05-MON-1-/0 05-1K8604 62 05-MON-1-/0 05-1H0404 62 05-MON-1-/0 05-1G7604 62 05-MON-1-/0 05-1M7004 63 05-MON-68-16.8/20 05-1M0104 63 05-MON-101-73.0/96.8 05-1F9004 63 05-MON-101-87.3/91.5 05-1C8904 63 05-MON-101-3.1/5.2 05-1H0204 63 05-MON-101-6.7/6.7 05-1F8204 63 05-MON-101-28.0/30.6 05-1F7404 64 05-MON-101-36.9/47.7 05-1F75U4 64 Statement of Ongoing Contracts - Index Cnty Rt Pm Contract Page 05-MON-101-91.2/99.2 05-0161H4 64 05-SB-1-13.3/0 05-1K6904 64 05-SB-1-15.6/0 05-0A0504 64 05-SB-1-29.9/49.2 05-1G1304 64 05-SB-101-1.4/4.8 05-0N71U4 65 05-SB-101-2.2/3.3 05-448214 65 05-SB-101-4.4/7.7 05-0N72U4 65 05-SB-101-7.3/9.6 05-0N73U4 65 05-SB-101-22.3/23 05-0G0714 65 05-SB-101-46.6/47.1 05-1E0104 65 05-SB-101-55.9/56.2 05-1F7904 66 05-SB-101-70.6/71.2 05-1F5004 66 05-SB-101-56.2/58 05-1E0004 66 05-SB-101-/0 05-1H9904 66 05-SB-135-1.0/7.2 05-1N1704 66 05-SB-135-16.5/0 05-1J4704 66 05-SB-144-.9/2 05-1N0804 67 05-SB-154-21.3/0 05-1H6304 67 05-SB-154-22.9/23.2 05-1C4204 67 05-SB-166-8.1/8.1 05-1K1004 67 05-SB-192-7.0/13.7 05-1N1904 67 05-SB-192-17.4/21 05-1N0604 67 Statement of Ongoing Contracts - Index Cnty Rt Pm Contract Page 05-SB-246-13.6/15.2 05-0C6414 68 05-SBT-25-46.7/49.8 05-1M0404 68 05-SCR-1-10.2/17.5 05-1C85U4 68 05-SCR-1-16.7/17 05-1H0604 68 05-SCR-1-/0 05-1M6504 68 05-SCR-9-.1/7.5 05-1F9204 68 05-SCR-9-20.0/20 05-1K1304 69 05-SCR-17-.2/.5 05-1C6704 69 05-SCR-17-1.1/1.4 05-0Q6014 69 05-SCR-17-2.1/2.2 05-1M8104 69 05-SCR-17-7.4/12.4 05-1N2304 69 05-SCR-129-1.4/1.4 05-1G9904 69 05-SCR-236-2.1/15.5 05-1M7904 70 05-SLO-1-32.6/0 05-0L7214 70 05-SLO-1-64.0/66.9 05-492824 70 05-SLO-1-71.5/72 05-1M1704 70 05-SLO-41-14.2/15.9 05-1F6304 70 05-SLO-46-37.0/41.2 05-1N0504 70 05-SLO-46-49.6/49.6 05-1G3704 71 05-SLO-46-17.2/17.6 05-1H9304 71 05-SLO-46-/0 05-0N2204 71 05-SLO-58-3.1/0 05-0L7234 71 Statement of Ongoing Contracts - Index Cnty Rt Pm Contract Page 05-SLO-58-4.9/9.9 05-1M3804 71 05-SLO-101-35.6/42 05-1K2804 71 05-SLO-101-37.8/46 05-1N3504 72 05-SLO-101-38.5/39.4 05-1J7104 72 05-SLO-101-54.9/55.7 05-1F4904 72 05-SLO-101-55.4/58.4 05-1H3604 72 06-FRE-0-/0 06-0W1804 72 06-FRE-5-20.0/21 06-1A9404 73 06-FRE-5-/0 06-0X1904 73 06-FRE-41-.5/5.7 06-1C6504 73 06-FRE-41-6.3/20.1 06-0Y0304 73 06-FRE-41-39.9/41.2 06-0Y7004 73 06-FRE-41-/0 06-0V9304 73 06-FRE-99-4.9/11.6 06-0U4204 74 06-FRE-99-.9/5 06-0S4604 74 06-FRE-99-/0 06-0U2304 74 06-FRE-145-/6 06-1A8804 74 06-FRE-168-18.6/T25.5 06-0U4504 74 06-FRE-168-27.4/39.7 06-0Y1004 74 06-FRE-168-/11.7 06-0U7604 75 06-FRE-198-22.6/22.9 06-0U0304 75 06-FRE-198-26.3/26.8 06-1A5304 75 Statement of Ongoing Contracts - Index Cnty Rt Pm Contract Page 06-KER-0-/0 06-0X1804 75 06-KER-5-4.4/15.8 06-1A9004 75 06-KER-5-6.4/8.8 06-0Q8204 75 06-KER-5-7.5/9 06-0W1604 76 06-KER-5-56.6/58.1 06-1A9304 76 06-KER-5-81.7/87 06-0U4704 76 06-KER-5-/5 06-1A6004 76 06-KER-5-/0 06-0T0304 76 06-KER-33-34.2/40 06-1B0004 76 06-KER-43-.1/9.3 06-0U1004 77 06-KER-43-25.2/38.8 06-1A8904 77 06-KER-46-29.7/31.9 06-442554 77 06-KER-46-51.2/57.8 06-1A9504 77 06-KER-58-76.1/76.6 06-1C7204 77 06-KER-58-52.7/55.5 06-0G8514 77 06-KER-99-10.4/21.2 06-0Q9204 78 06-KER-99-23.6/28.4 06-0Q2804 78 06-KER-99-/11.2 06-0T20U4 78 06-KER-99-/0 06-0U2404 78 06-KER-119-9.8/13.3 06-0X2004 78 06-KER-155-35.5/37.5 06-1B0204 78 06-KER-178-10.4/57 06-0X5204 79 Statement of Ongoing Contracts - Index Cnty Rt Pm Contract Page 06-KER-178-24.6/44.2 06-0Y1104 79 06-KER-204-5.6/5.7 06-1C1304 79 06-KER-223-21.2/21.2 06-0S5104 79 06-KIN-43-/3.2 06-0X3904 79 06-MAD-49-.1/9.1 06-1A8704 79 06-MAD-99-1.5/7.4 06-1C1604 80 06-MAD-99-7.5/15.1 06-470904 80 06-MAD-99-14.0/14.5 06-0U5204 80 06-MAD-145-8.1/9.6 06-0W3604 80 06-MAD-145-8.6/8.6 06-1C0014 80 06-MAD-152-/15.5 06-1A9204 80 06-TUL-0-/0 06-0U3004 81 06-TUL-43-/22.7 06-1A9904 81 06-TUL-63-/0 06-0U0404 81 06-TUL-65-17.5/22 06-0U7304 81 06-TUL-65-6.9/10 06-1A9804 81 06-TUL-65-/0 06-0X0404 81 06-TUL-99-6.1/12.8 06-0U2704 82 06-TUL-99-19.2/19.8 06-0Q9104 82 06-TUL-99-30.6/35.2 06-360244 82 06-TUL-99-31.2/32.5 06-332214 82 06-TUL-99-41.3/52 06-1A9604 82 Statement of Ongoing Contracts - Index Cnty Rt Pm Contract Page 06-TUL-137-16.5/16.6 06-0T3504 82 06-TUL-137-16.6/0 06-1A0404 83 06-TUL-190-15.1/16.9 06-0S3114 83 07-LA-1-2.8/2.8 07-341704 83 07-LA-1-3.5/3.5 07-299104 83 07-LA-1-6.0/6 07-339804 84 07-LA-1-10.7/10.7 07-331704 84 07-LA-1-34.5/35.4 07-316904 84 07-LA-1-46.9/50.4 07-3W8704 84 07-LA-1-48.7/50.6 07-4V0104 84 07-LA-1-56.5/56.9 07-291404 84 07-LA-1-567.0/56.7 07-1XG104 85 07-LA-2-14.2/14.2 07-288304 85 07-LA-2-14.9/22.6 07-340604 85 07-LA-2-37.5/48 07-1XS204 85 07-LA-5-1.7/1.7 07-325704 85 07-LA-5-5.8/6.8 07-215954 85 07-LA-5-9.0/59 07-4W5604 86 07-LA-5-10.3/10.4 07-1XT004 86 07-LA-5-11.0/14 07-317504 86 07-LA-5-14.2/53.4 07-4W7904 86 07-LA-5-18.2/18.2 07-332704 86 Statement of Ongoing Contracts - Index Cnty Rt Pm Contract Page 07-LA-5-18.3/18.8 07-318404 86 07-LA-5-19.6/19.9 07-308004 87 07-LA-5-29.4/31.6 07-1218W4 87 07-LA-5-32.5/32.5 07-4T9804 87 07-LA-5-33.2/39.1 07-4U0604 87 07-LA-5-34.6/34.6 07-314204 87 07-LA-5-42.6/47.9 07-1XP104 87 07-LA-5-44.9/88.6 07-4W1504 88 07-LA-5-73.5/88.6 07-3W8004 88 07-LA-5-/1.5 07-2159U4 88 07-LA-5-/0 07-1XM604 88 07-LA-10-15.0/18.3 07-296604 88 07-LA-10-15.8/15.8 07-1XS804 88 07-LA-10-16.6/30.1 07-260804 89 07-LA-10-17.2/42.1 07-4W5304 89 07-LA-10-26.3/26.3 07-4P2404 89 07-LA-10-31.2/37.2 07-303904 89 07-LA-10-31.3/31.3 07-4V1604 89 07-LA-10-33.2/37.2 07-1170U4 89 07-LA-10-37.2/42.4 07-1193U4 90 07-LA-10-2.1/18.4 07-301504 90 07-LA-10-2.1/11.1 07-304204 90 Statement of Ongoing Contracts - Index Cnty Rt Pm Contract Page 07-LA-10-2.2/10.6 07-4W5704 90 07-LA-10-12.4/14.9 07-332604 90 07-LA-10-.4/21.1 07-304304 90 07-LA-14-28.9/29.2 07-337604 91 07-LA-14-35.0/53.5 07-312804 91 07-LA-14-35.7/39.8 07-1XP504 91 07-LA-14-32.1/60.7 07-3W4504 91 07-LA-14-54.6/66.2 07-311104 91 07-LA-18-/4.5 07-4W6104 91 07-LA-39-17.8/38.2 07-3W7304 92 07-LA-39-180.0/30.9 07-1XS404 92 07-LA-39-31.2/31.2 07-343404 92 07-LA-47-3.4/4.6 07-138204 92 07-LA-57-/4.5 07-304504 92 07-LA-57-7.7/11.8 07-301804 92 07-LA-60-11.0/12 07-304004 93 07-LA-60-11.5/18.3 07-4V2204 93 07-LA-60-.6/29.4 07-4W7704 93 07-LA-60-2.8/11.8 07-301104 93 07-LA-60-/21.5 07-317304 93 07-LA-71-1.2/4.3 07-4W7604 93 07-LA-71-1.6/4.8 07-210624 94 Statement of Ongoing Contracts - Index Cnty Rt Pm Contract Page 07-LA-90-1.8/1.8 07-4V0304 94 07-LA-91-17.1/17.1 07-1XU704 94 07-LA-91-10.0/10.3 07-4V1004 94 07-LA-91-12.1/20.7 07-4W9504 94 07-LA-91-14.1/15.2 07-304104 94 07-LA-101-1.5/29.1 07-300404 95 07-LA-101-1.7/6.8 07-311404 95 07-LA-101-8.0/27.3 07-303704 95 07-LA-101-11.8/31.1 07-307504 95 07-LA-101-31.1/35.1 07-4U0404 95 07-LA-101-273.0/36.2 07-1XK004 95 07-LA-101-/1 07-4W9404 96 07-LA-105-2.0/2.2 07-1XP304 96 07-LA-105-6.6/8 07-297404 96 07-LA-105-20.0/2.2 07-1XH104 96 07-LA-105-7.8/10.3 07-317404 96 07-LA-105-14.6/16.4 07-328604 96 07-LA-105-/12.9 07-4W9304 97 07-LA-107-/4.8 07-3118U4 97 07-LA-110-.7/26.1 07-312004 97 07-LA-110-3.8/5.6 07-276104 97 07-LA-110-5.4/16.9 07-4W7404 97 Statement of Ongoing Contracts - Index Cnty Rt Pm Contract Page 07-LA-110-6.8/19.5 07-4W7804 97 07-LA-110-8.0/9 07-293704 98 07-LA-110-13.4/23.1 07-238304 98 07-LA-110-18.8/23.8 07-309104 98 07-LA-110-20.5/20.7 07-1XV304 98 07-LA-110-24.0/30.4 07-2975U4 98 07-LA-118-11.3/12.8 07-1XS704 98 07-LA-118-57.0/5.8 07-1XP904 99 07-LA-118-9.0/9.9 07-310704 99 07-LA-134-2.6/4.8 07-311604 99 07-LA-134-/13.3 07-311704 99 07-LA-138-49.4/49.4 07-332904 99 07-LA-138-55.2/56.3 07-286204 99 07-LA-138-/36.9 07-310404 100 07-LA-210-34.9/35.8 07-4V0604 100 07-LA-210-252.0/28.8 07-1XR704 100 07-LA-210-/9.7 07-3096U4 100 07-LA-210-24.9/24.9 07-311004 100 07-LA-210-25.7/32.8 07-303604 100 07-LA-210-38.6/38.9 07-309304 101 07-LA-213-2.2/2.2 07-4V0204 101 07-LA-213-6.2/6.2 07-4V1404 101 Statement of Ongoing Contracts - Index Cnty Rt Pm Contract Page 07-LA-213-/8 07-306604 101 07-LA-405-.3/6.7 07-3W9004 101 07-LA-405-.8/47.7 07-4W5104 101 07-LA-405-11.9/13.2 07-289104 102 07-LA-405-13.8/39.7 07-4W1004 102 07-LA-405-14.3/15.8 07-293604 102 07-LA-405-20.5/28 07-4V1704 102 07-LA-405-41.3/41.3 07-4U0504 102 07-LA-405-42.9/0 07-305104 102 07-LA-405-/29.5 07-1XV004 103 07-LA-605-23.4/23.6 07-318804 103 07-LA-605-/26 07-311904 103 07-LA-605-10.2/20.2 07-4W8604 103 07-LA-710-17.3/26.3 07-2W9404 103 07-LA-710-20.9/24.6 07-202124 103 07-LA-710-23.3/25.6 07-304404 104 07-VEN-0-/0 07-1XQ504 104 07-VEN-1-1.5/1.6 07-1XQ704 104 07-VEN-1-9.7/15.1 07-4W6204 104 07-VEN-23-3.3/11.5 07-302504 104 07-VEN-33-7.6/7.6 07-291304 104 07-VEN-33-11.2/48.5 07-4W5904 105 Statement of Ongoing Contracts - Index Cnty Rt Pm Contract Page 07-VEN-33-15.7/15.8 07-305204 105 07-VEN-33-22.1/22.1 07-1XM404 105 07-VEN-101-7.9/38.9 07-4W8004 105 07-VEN-101-8.9/11.5 07-4W2704 105 07-VEN-101-9.1/9.1 07-4W9104 105 07-VEN-101-17.7/17.7 07-4W8204 106 07-VEN-101-26.7/31 07-4W6504 106 07-VEN-101-27.5/31 07-311304 106 07-VEN-101-.1/4.5 07-4U0004 106 07-VEN-101-36.3/40.6 07-302404 106 07-VEN-118-.5/32.4 07-4W5004 106 07-VEN-118-24.1/29.7 07-316504 107 07-VEN-126-1.0/8.2 07-312204 107 07-VEN-126-20.3/20.3 07-1XT904 107 07-VEN-126-10.0/13 07-4W6604 107 07-VEN-126-10.2/12.7 07-311504 107 07-VEN-126-13.6/34.6 07-301404 107 07-VEN-126-/13.6 07-302204 108 08-RIV-10-6.5/6.7 08-0R5704 108 08-RIV-10-6.7/25.1 08-1C38U4 108 08-RIV-10-27.6/0 08-1E5704 108 08-RIV-10-104.9/134.2 08-1C0824 108 Statement of Ongoing Contracts - Index Cnty Rt Pm Contract Page 08-RIV-10-139.0/155 08-1K1404 109 08-RIV-10-/156.5 08-1F3724 109 08-RIV-15-3.0/29.1 08-1K7404 109 08-RIV-15-8.2/23.9 08-1L6804 109 08-RIV-15-23.9/33.4 08-1F1424 109 08-RIV-15-38.2/51.5 08-1F1434 109 08-RIV-15-/3.1 08-1F1414 110 08-RIV-15-/0 08-1H5304 110 08-RIV-60-.4/15.9 08-1K7304 110 08-RIV-62-6.7/9.2 08-1E8404 110 08-RIV-74-13.2/34 08-1C6804 110 08-RIV-74-28.1/37.4 08-0N6704 110 08-RIV-74-36.9/43.6 08-1F5904 111 08-RIV-74-48.1/64.3 08-1K3004 111 08-RIV-74-12.9/12.9 08-1L7304 111 08-RIV-74-/5.8 08-1C8504 111 08-RIV-79-25.6/26.4 08-1F6004 111 08-RIV-91-1.0/20.3 08-1K7604 111 08-RIV-95-14.5/35.6 08-1G0004 112 08-SBD-2-2.4/0 08-0H4704 112 08-SBD-10-27.9/28 08-1G2914 112 08-SBD-10-29.4/39.2 08-384234 112 Statement of Ongoing Contracts - Index Cnty Rt Pm Contract Page 08-SBD-10-34.2/36.8 08-1C3004 112 08-SBD-10-21.6/23.6 08-1F44U4 112 08-SBD-10-23.8/23.8 08-0Q9104 113 08-SBD-10-36.9/39.1 08-0K2934 113 08-SBD-10-/29.8 08-1K2204 113 08-SBD-15-12.5/14.8 08-0K1214 113 08-SBD-15-16.1/169.4 08-1K1904 113 08-SBD-15-40.3/40.7 08-1H2714 113 08-SBD-15-40.4/0 08-1F9904 114 08-SBD-15-42.5/46 08-3555V4 114 08-SBD-15-64.6/75.3 08-0K1234 114 08-SBD-15-23.5/29.1 08-1H3514 114 08-SBD-18-31.9/38.5 08-1H4904 114 08-SBD-18-68.5/87.9 08-1J9404 114 08-SBD-18-97.0/99.5 08-1E0604 115 08-SBD-38-11.3/26.5 08-1L9804 115 08-SBD-38-11.3/26.5 08-1L9404 115 08-SBD-38-47.5/59.4 08-0G8004 115 08-SBD-40-28.9/28.9 08-1G5504 115 08-SBD-40-50.0/75 08-0R1604 115 08-SBD-40-75.0/100 08-0R1504 116 08-SBD-40-125.0/154.6 08-0R1424 116 Statement of Ongoing Contracts - Index Cnty Rt Pm Contract Page 08-SBD-60-.7/3 08-0F0304 116 08-SBD-60-4.6/9.9 08-0Q75U4 116 08-SBD-60-7.3/10 08-0E33U4 116 08-SBD-62-106.0/142.3 08-1H9004 116 08-SBD-62-124.8/142 08-1G0104 117 08-SBD-71-/8.5 08-0G7904 117 08-SBD-71-/8.5 08-1H9314 117 08-SBD-71-4.7/4.7 08-1J4104 117 08-SBD-138-15.3/15.3 08-1J4904 117 08-SBD-173-18.6/18.7 08-1H2904 117 08-SBD-210-1.5/21.5 08-1K6704 118 08-SBD-210-10.5/12.7 08-1G2104 118 08-SBD-210-/0 08-1L7604 118 08-SBD-215-2.2/3.2 08-1F7304 118 08-SBD-215-4.8/5.8 08-1H7704 118 08-SBD-215-7.0/17.8 08-476424 118 08-SBD-215-/2.7 08-0J0704 119 08-SBD-247-39.0/42 08-1K8404 119 08-SBD-259-/1.5 08-1H3414 119 08-SBD-5726-/0 08-0K8404 119 08-SBD-5730-/0 08-0R4204 119 09-INY-190-111.6/126.1 09-387904 120 Statement of Ongoing Contracts - Index Cnty Rt Pm Contract Page 09-INY-395-.1/.1 09-370104 120 09-INY-395-29.9/41.8 09-213414 120 09-KER-14-16.6/16.6 09-377304 120 09-KER-14-4.7/12.6 09-367404 120 09-KER-14-/0 09-385704 121 09-KER-58-129.4/143.9 09-385804 121 09-MNO-0-/0 09-366604 121 09-MNO-6-26.5/32.3 09-380904 121 09-MNO-158-6.0/15.8 09-387104 121 09-MNO-266-4.3/11.7 09-386804 121 09-MNO-395-13.5/13.9 09-378104 122 09-MNO-395-39.9/44.8 09-383504 122 09-MNO-395-52.3/53.7 09-335004 122 09-MNO-395-53.0/55.5 09-387204 122 09-MNO-395-6.9/T9.6 09-360704 122 09-VAR--/0 09-367704 122 10-ALP-0-/0 10-1J7604 123 10-ALP-0-/0 10-0X7504 123 10-ALP-4-/0 10-0S6804 123 10-ALP-88-251.0/0 10-1M1604 123 10-ALP-88-/0 10-0S7504 123 10-AMA-49-4.0/4.2 10-1F8304 124 Statement of Ongoing Contracts - Index Cnty Rt Pm Contract Page 10-AMA-49-8.3/10.5 10-1H6404 124 10-AMA-88-14.4/15 10-1L2204 124 10-AMA-88-20.7/20.7 10-1N0204 124 10-AMA-88-32.3/38 10-1J1704 124 10-AMA-104-/10.1 10-1J1004 124 10-CAL-4-29.2/29.4 10-0W8704 125 10-CAL-4-58.0/65.9 10-1J1304 125 10-MER-0-/0 10-1C8104 125 10-MER-5-.4/.9 10-1G7214 125 10-MER-5-.7/.7 10-0W6204 125 10-MER-5-17.0/22.6 10-1H4204 125 10-MER-33-/5.7 10-1J1204 126 10-MER-99-20.1/24.3 10-3A7204 126 10-MER-99-28.2/37.3 10-0Q1214 126 10-MER-99-12.7/17.8 10-1C1704 126 10-MER-99-/0 10-1G7504 126 10-MER-140-9.7/9.7 10-1K1904 126 10-MER-140-35.9/36.9 10-1F4304 127 10-MER-140-37.4/44.8 10-1J1904 127 10-MER-140-/42.1 10-0Y1104 127 10-MER-152-15.1/15.6 10-1L1204 127 10-MER-152-21.0/0 10-1J3004 127 Statement of Ongoing Contracts - Index Cnty Rt Pm Contract Page 10-MER-152-26.3/40.7 10-1C3704 127 10-MER-165-8.6/9.8 10-0X5204 128 10-MPA-49-.3/18.5 10-1C0404 128 10-MPA-140-21.2/21.8 10-0Y6004 128 10-MPA-140-42.0/42.7 10-0P9234 128 10-SJ-4-2.0/0 10-1C2004 128 10-SJ-4-5.4/13.4 10-1L2304 128 10-SJ-4-15.5/16.7 10-1C5004 129 10-SJ-4-/0 10-1C8004 129 10-SJ-4-/0 10-1G9904 129 10-SJ-5-10.6/0 10-1H3424 129 10-SJ-5-26.4/27 10-1C9404 129 10-SJ-5-33.4/33.4 10-1G4404 129 10-SJ-5-45.8/45.8 10-1N2004 130 10-SJ-5-/0 10-1K9304 130 10-SJ-12-4.4/0 10-1K6104 130 10-SJ-88-22.1/0 10-1E5314 130 10-SJ-99-8.9/9.5 10-0E6144 130 10-SJ-99-9.4/15 10-1J2104 130 10-SJ-99-14.4/29 10-1C7604 131 10-SJ-99-16.4/18.2 10-3A1014 131 10-SJ-99-16.8/17.6 10-0X3104 131 Statement of Ongoing Contracts - Index Cnty Rt Pm Contract Page 10-SJ-99-30.9/31.3 10-1C2804 131 10-STA-5-12.6/0 10-1J5204 131 10-STA-5-27.0/27.4 10-0W6304 131 10-STA-5-27.0/27.5 10-1G7224 132 10-STA-99-13.4/13.8 10-0L8704 132 10-STA-99-13.8/17.6 10-0X6704 132 10-STA-99-18.0/19.7 10-0X56Y4 132 10-TUO-108-4.3/5.1 10-0Y2104 132 11-IMP-7-.4/6.3 11-2N0084 133 11-IMP-8-36.5/37.5 11-410404 133 11-IMP-86-8.4/8.8 11-2N0574 133 11-IMP-98-32.1/32.5 11-080284 133 11-IMP-111-.1/1.2 11-2N0724 133 11-IMP-115-8.8/L11.4 11-2N0414 134 11-SD-0-/0 11-424604 134 11-SD-5-.2/15.2 11-427504 134 11-SD-5-2.3/14 11-418104 134 11-SD-5-9.0/9 11-2N0544 134 11-SD-5-20.5/20.5 11-2N0534 134 11-SD-5-38.1/39.3 11-2E1504 135 11-SD-5-.3/72.1 11-429704 135 11-SD-5-13.5/14.4 11-424704 135 Statement of Ongoing Contracts - Index Cnty Rt Pm Contract Page 11-SD-5-25.9/26.8 11-420104 135 11-SD-5-29.1/30.5 11-2T3404 135 11-SD-5-34.9/35.1 11-417504 135 11-SD-5-37.4/46.5 11-2T2174 136 11-SD-5-38.4/47.3 11-2T2184 136 11-SD-5-/0 11-424904 136 11-SD-5-/60 11-420704 136 11-SD-8-2.8/5 11-411314 136 11-SD-8-5.9/11.5 11-411334 136 11-SD-8-.3/23 11-428104 137 11-SD-8-25.1/40.1 11-422114 137 11-SD-8-25.9/32 11-2N0954 137 11-SD-8-32.0/44 11-2N0994 137 11-SD-8-49.0/0 11-409104 137 11-SD-11-.6/2.7 11-056374 137 11-SD-15-11.2/31.5 11-429804 138 11-SD-56-5.6/5.6 11-404604 138 11-SD-76-12.1/17.7 11-257164 138 11-SD-78-2.5/2.9 11-417404 138 11-SD-78-N 17.6/21.3 11-419304 138 11-SD-94-2.6/10.7 11-425104 138 11-SD-94-4.4/7.3 11-412204 139 Statement of Ongoing Contracts - Index Cnty Rt Pm Contract Page 11-SD-94-10.4/14.9 11-420004 139 11-SD-94-30.0/39 11-2N0454 139 11-SD-125-9.7/22.1 11-2N0884 139 11-SD-125-/1.1 11-288834 139 11-SD-163-5.6/11.2 11-2N0744 139 11-SD-805-5.7/7.8 11-2T2604 140 11-SD-805-8.4/8.8 11-430184 140 11-SD-805-24.7/27.6 11-2T3304 140 11-SD-905-9.6/11.4 11-2888U4 140 11-SD-905-3.2/11.7 11-2N0844 140 12-ORA-1-4.9/5.5 12-0H1504 141 12-ORA-1-7.9/10.5 12-0M82U4 141 12-ORA-1-9.4/0 12-0M9904 141 12-ORA-1-12.2/13.3 12-0P6604 141 12-ORA-1-27.0/29.9 12-0Q2804 141 12-ORA-5-.6/43 12-0P42U4 141 12-ORA-5-.6/43 12-0Q6904 142 12-ORA-5-1.6/33.1 12-0R5404 142 12-ORA-5-1.8/44.2 12-0S5904 142 12-ORA-5-3.3/3.3 12-0P7004 142 12-ORA-5-6.9/6.9 12-0S4304 142 12-ORA-5-10.3/10.3 12-0P0904 142 Statement of Ongoing Contracts - Index Cnty Rt Pm Contract Page 12-ORA-5-12.4/14.5 12-0K0214 143 12-ORA-5-14.5/17.1 12-0K0224 143 12-ORA-5-17.1/18.9 12-0K0234 143 12-ORA-5-25.0/28.3 12-0R8704 143 12-ORA-5-31.0/33.3 12-0N5104 143 12-ORA-5-34.5/37.4 12-0Q8504 143 12-ORA-5-34.5/36.8 12-0P9004 144 12-ORA-5-36.8/38.5 12-0P9104 144 12-ORA-5-42.5/42.6 12-0S7104 144 12-ORA-22-1.2/1.2 12-0Q6504 144 12-ORA-22-2.7/11.9 12-0S2004 144 12-ORA-22-5.6/10.9 12-0M9004 144 12-ORA-22-9.1/9.1 12-0N9204 145 12-ORA-22-9.4/L9.8 12-0P5204 145 12-ORA-39-.6/22.2 12-0M5204 145 12-ORA-39-5.1/5.1 12-0P0104 145 12-ORA-39-8.5/11.7 12-0S4504 145 12-ORA-39-9.7/9.7 12-0Q6404 145 12-ORA-39-15.2/15.9 12-0F9704 146 12-ORA-55-1.4/T2.1 12-0S4804 146 12-ORA-55-13.2/17.8 12-0N5304 146 12-ORA-55-17.2/17.2 12-0P7204 146 Statement of Ongoing Contracts - Index Cnty Rt Pm Contract Page 12-ORA-55-17.7/17.7 12-0S0904 146 12-ORA-57-15.6/15.6 12-0Q7904 146 12-ORA-57-16.2/20.9 12-0F03U4 147 12-ORA-57-20.3/21.6 12-0C1104 147 12-ORA-73-10.0/28 12-0N7204 147 12-ORA-73-10.3/19.5 12-0S2304 147 12-ORA-73-23.7/24.1 12-0N8604 147 12-ORA-74-2.9/5.1 12-0L7224 147 12-ORA-74-11.5/16.6 12-0P0304 148 12-ORA-90-.5/2.5 12-0S4704 148 12-ORA-90-2.6/5.1 12-0P5804 148 12-ORA-90-4.0/4 12-0Q4204 148 12-ORA-91-13.4/14.1 12-0N2704 148 12-ORA-91-9.8/18.9 12-0N3204 148 12-ORA-91-12.5/13.9 12-0N4904 149 12-ORA-91-16.6/17 12-0S6604 149 12-ORA-133-3.2/4.1 12-0P94U4 149 12-ORA-133-4.2/13.4 12-0S2204 149 12-ORA-133-3.9/13.6 12-0N6604 149 12-ORA-142-3.1/6.4 12-0S4404 149 12-ORA-241-14.5/25 12-0Q7004 150 12-ORA-241-16.0/38.8 12-0R5204 150 Statement of Ongoing Contracts - Index Cnty Rt Pm Contract Page 12-ORA-241-23.1/23.1 12-0Q8104 150 12-ORA-405-5.6/5.6 12-0P4004 150 12-ORA-405-7.3/10 12-0N5204 150

Statement of Ongoing Contracts - Federal Aid

District 01 Federal Aid Category Bid + CCO Work Comp -F- FEDERAL AID (PRIMARY) $97,050,912 $50,017,642 -S- FEDERAL AID (SECONDARY) $10,180,755 $4,858,725 $346,550,513 $198,550,184 District Total: $453,782,179 $253,426,551

District 02 Federal Aid Category Bid + CCO Work Comp -I- FEDERAL AID (INTERSTATE) $1,734,193 $1,384,802 -F- FEDERAL AID (PRIMARY) $4,917,782 $4,808,682 -S- FEDERAL AID (SECONDARY) $68,837,272 $40,175,189 $321,315,116 $247,380,874 District Total: $396,804,362 $293,749,546 Statement of Ongoing Contracts - Federal Aid

District 03 Federal Aid Category Bid + CCO Work Comp -I- FEDERAL AID (INTERSTATE) $74,281,767 $35,046,577 -F- FEDERAL AID (PRIMARY) $236,520,006 $145,863,590 -S- FEDERAL AID (SECONDARY) $6,652,734 $5,393,896 $1,155,391,334 $664,073,521 District Total: $1,472,845,841 $850,377,585

District 04 Federal Aid Category Bid + CCO Work Comp -I- FEDERAL AID (INTERSTATE) $196,592,913 $118,575,904 -F- FEDERAL AID (PRIMARY) $280,107,812 $152,673,162 $1,248,266,258 $683,682,264 District Total: $1,724,966,983 $954,931,330

District 05 Federal Aid Category Bid + CCO Work Comp -F- FEDERAL AID (PRIMARY) $114,731,980 $74,194,120 -S- FEDERAL AID (SECONDARY) $46,338,370 $32,379,849 $603,796,072 $260,419,391 District Total: $764,866,422 $366,993,360 Statement of Ongoing Contracts - Federal Aid

District 06 Federal Aid Category Bid + CCO Work Comp -I- FEDERAL AID (INTERSTATE) $25,095,729 $8,405,057 -F- FEDERAL AID (PRIMARY) $248,832,230 $66,106,138 -S- FEDERAL AID (SECONDARY) $7,032,374 $4,278,853 $305,567,340 $205,087,674 District Total: $586,527,674 $283,877,721

District 07 Federal Aid Category Bid + CCO Work Comp -I- FEDERAL AID (INTERSTATE) $519,327,394 $411,047,365 -F- FEDERAL AID (PRIMARY) $218,494,796 $193,668,244 -S- FEDERAL AID (SECONDARY) $21,870,867 $9,307,853 $1,730,479,204 $1,205,929,677 District Total: $2,490,172,261 $1,819,953,139

District 08 Federal Aid Category Bid + CCO Work Comp -I- FEDERAL AID (INTERSTATE) $261,507,566 $153,598,391 -F- FEDERAL AID (PRIMARY) $66,205,155 $12,006,122 -S- FEDERAL AID (SECONDARY) $18,535,397 $8,141,626 $945,051,997 $507,648,457 Statement of Ongoing Contracts - Federal Aid

District 08 Federal Aid Category Bid + CCO Work Comp District Total: $1,291,300,115 $681,394,596

District 09 Federal Aid Category Bid + CCO Work Comp -F- FEDERAL AID (PRIMARY) $46,668,321 $20,833,859 -S- FEDERAL AID (SECONDARY) $3,923,589 $3,721,721 $41,057,842 $10,483,690 District Total: $91,649,751 $35,039,270

District 10 Federal Aid Category Bid + CCO Work Comp -I- FEDERAL AID (INTERSTATE) $3,838,438 $3,104,036 -F- FEDERAL AID (PRIMARY) $150,585,006 $37,629,400 -S- FEDERAL AID (SECONDARY) $40,131,960 $19,298,838 $158,838,605 $58,867,717 District Total: $353,394,008 $118,899,992

District 11 Federal Aid Category Bid + CCO Work Comp -I- FEDERAL AID (INTERSTATE) $39,203,499 $29,973,816 Statement of Ongoing Contracts - Federal Aid

District 11 Federal Aid Category Bid + CCO Work Comp -F- FEDERAL AID (PRIMARY) $35,650,996 $19,037,813 -S- FEDERAL AID (SECONDARY) $25,583,496 $16,306,048 $819,383,701 $643,565,481 District Total: $919,821,692 $708,883,158

District 12 Federal Aid Category Bid + CCO Work Comp -I- FEDERAL AID (INTERSTATE) $109,717,784 $45,522,820 -F- FEDERAL AID (PRIMARY) $33,792,967 $7,458,624 $440,617,992 $205,042,992 District Total: $584,128,742 $258,024,436

Statement of Ongoing Contracts - Statewide Recap

Federal Aid Category Bid + CCO Work Comp -I- FEDERAL AID (INTERSTATE) $1,231,299,283 $806,658,769 $8,116,315,972 $4,890,731,922 -S- FEDERAL AID (SECONDARY) $249,086,815 $143,862,599 -F- FEDERAL AID (PRIMARY) $1,533,557,961 $784,297,395 Statement of Ongoing Contracts - Statewide Recap

Federal Aid Category Bid + CCO Work Comp Statewide Totals $11,130,260,031 $6,625,550,684

Statement of Ongoing Contracts -Summary District Work Completed This Period 05 $26,129,352

11 $92,104,459

10 $3,722,680

12 $4,709,831

02 $16,399,825

01 $2,266,894

08 $58,236,454

09 $3,923,589

07 $11,902,620

04 $49,818,150

03 $877,120

$270,090,972 Work completed this Period: