Journal 2010 Issue4.Indd

Total Page:16

File Type:pdf, Size:1020Kb

Journal 2010 Issue4.Indd CTBUH Journal International Journal on Tall Buildings and Urban Habitat Tall buildings: design, construction and operation | 2010 Issue IV Hong Kong International Commerce Centre The Vertical Living Kids Research Project Tuned Liquid Dampers for Slender Tall Buildings Greening Modernism: Westraven Tower Educational Studio: The Remaking of Mumbai (II) Tallest World Records Talking Tall: Dormitowers Editor's Message Editor It is with a mix of new ways for the Journal to inform and inspire Jan Klerks, CTBUH strong emotions that its readership. [email protected] I hand over the It was a great pleasure to see the Journal Associate Editors editorial reigns of the develop to its current level in such a short Zak Kostura, Arup CTBUH Journal to Jan [email protected] time. I am excited to transform my role into a Klerks from this Robert Lau, Roosevelt University liaison between the Journal and industry. As a [email protected] edition onwards. practicing structural engineer with Arup in Alongside the Antony Wood, CTBUH/Illinois Institute of Technology New York, I hope to offer perspectives and [email protected] sadness I feel ideas that will further enrich the content of the knowing that work pressures are now Journal. I look forward to my future work with Editorial Board preventing me from continuing as sole editor, I Ahmad Abdelrazaq, Samsung Corporation Jan in this role and offer him my full support as Hojjat Adeli, Ohio State University am delighted to stand at this particular he infuses the position of editor with his Mir Ali, University of Illinois at Urbana-Champaign vantage point and survey how tremendously unique understanding of (and curiosity in) the Richard W. Bukowski, Rolf Jensen & Associates, Inc. our publication has grown – in both size and Mahjoub Elnimeiri, Illinois Institute of Technology tall building industry. I would like to thank all Gary C. Hart, Weidlinger Associates stature – over the last three years. I will authors, co-editors, peer reviewers, Peter Irwin, RWDI continue my involvement within the editorial contributors and above all, the readers, who Tim Johnson, NBBJ board of the Journal. However the recent Gary Lawrence, Arup helped in making the Journal what it is today. Simon Lay, WSP Buildings Ltd. growth and lingering ambition embodied Sam Lee, Guangzhou Scientific Computing Consultants within the Journal calls for an editor who can Best Regards, Tony McLaughlin, Buro Happold invest what is needed to realize the potential Philip Oldfield, University of Nottingham Lester Partridge, Bassett Applied Research of this publication. I am pleased to pass the Jason Pomeroy, Broadway Malyan torch to Jan, who has been the CTBUH Swinal Samant, University of Nottingham Communications Manager for the past two Steve Watts, Davis Langdon LLP Zak Kostura Peter Weismantle, Adrian Smith + Gordon Gill years, and is a man with endless insight into Michael Willford, Arup Design & Layout Tansri Muliani Zak has done a 1970’s building can be turned into an example [email protected] tremendous job in of sustainable retrofit in 2010. Published by bringing the CTBUH Another great paper in this issue studies the The Council on Tall Buildings and Urban Habitat Journal to the level it © CTBUH 2010 ways in which kids experience the dense and ISSN: 1946-1186 is now, and it is both urban environment. In addition, Antony a pleasure and a Wood’s High-rise Studio at the Illinois Institute Council on Tall Buildings and Urban Habitat challenge to present S.R. Crown Hall, Illinois Institute of Technology of Technology is thinking beyond the current 3360 South State Street a Journal which lives constraints to imagine and test the future of Chicago, IL 60616 up to the reputation tall buildings and urban habitat; the results of t: +1 312 567 3487 which he has helped create. I’m very much these studies are very thought-provoking. To f: +1 312 567 3820 looking forward to building upon the works of learn more about the emerging trend of tall e: [email protected] the past, while taking future opportunities to www.ctbuh.org dormitory towers, we invited a British report on relevant and timely topics such as developer to share some insights on bringing Copyright tall buildings, urban density, the urban habitat students back into the city by building student Copyright 2010 Council on Tall Buildings and Urban and sustainability. Habitat. All rights reserved. No part of this publication towers. may be reproduced or transmitted in any form or by any This Journal issue features all of these. The case means, electronic or mechanical, without permission in To conclude, I would like encourage all to writing from the publisher. study presents the supertall International provide feedback on specific articles or the Commerce Centre in Hong Kong, which is Journal by sending a Letter to the Editor. I am Image Copyright located on top of one of the busiest hubs of CTBUH Journal has endeavored to determine the looking forward to hearing from you. copyright holders of all images. Those uncredited have public transportation in the world. We also been sourced from listed authors or from within CTBUH have a look at some of the technical and Best Regards, stability implications of building tall and Print This Journal is printed by Source4, Chicago. slender in very dense, compact urban environments. The green redevelopment of Front cover: Hong Kong ICC, view from Hong Kong Island. Back cover: Hong Kong ICC Façade Detail. the Westraven Tower in Utrecht, the Jan Klerks © Kohn Pedersen Fox Associates Netherlands, also demonstrates how an old 2 | Editors' Message CTBUH Journal | 2010 Issue IV Visit www.ctbuh.org for more on the global tall building industry and Inside the Council on Tall Buildings and Urban Habitat News and Events Features 04 CTBUH Leader's Message 29 Letters 12 Case Study: International Commerce Centre atop rail stations such as New York’s Met Life the combination of strong central planning, a (Hong Kong Special Administrative Region “More than an iconic statement, the Hong Kong Building over Grand Central Station (1960) and powerful transit authority (Hong Kong’s MTRC), 2009). ICC’s success as a development stems Tim Johnson, CTBUH Trustee Feedback and Comments ICC fundamentally alters the way tall buildings more recently KPF’s JR Central Towers in and an innovative development culture. from is its seamless connections with Central, Nagoya, Japan (2002) established fundamental Hong Kong International Airport, and are seen today. Rather than just being objects in principles for integrating the tall building with mainland China via a network of high-speed transit. In Hong Kong, the practice has Kowloon Station Development rail, subway, buses, and ferry terminals (see isolation, transit integrated tall buildings achieved a level of integration and scale Sited above Kowloon Station, ICC is integrated Figure 1). Comprising over one million square without precedent. This is made possible by meters (10.77 million square feet) of built-up David Malott with a public transportation infrastructure that represent a sustainable model for future high- carries 11 million passenger journeys per day area on 135,630 square meters (1.46 million Author square feet) of reclaimed land, the Kowloon David Malott, Director rise development.” Station Development (KSD) is billed as a “super 05 CTBUH News and Events Kohn Pedersen Fox Associates PC Soaring 484 meters (1,587 feet) above Victoria Harbor, the International Commerce Centre transport city.” According to Sun Hung Kai 44 Tall Buildings in Numbers 6F,119 Madang Lu, Xintiandi Properties Group, the developer of ICC , “The Shanghai 200021, China (ICC) is the essence of Hong Kong in one destination: high-powered finance, global tourism, density of construction around the station t: +86 21 2326 7777 luxury shopping, and world-class hospitality, all gathered in a single tower built over a f: +86 21 2326 7788 sophisticated transportation network spanning the Pearl River Delta. reflects how modern rail can provide a catalyst www.kpf.com for the creation of a highly-compact and The iconic image of twin lighthouses on opposite shores of the harbor is underlined by the efficient ‘vertical city’ (Luk et al. 2003).” Antony Wood, David Malott Tallest World Records three-minute subway link between ICC, sited at the tip of Kowloon Peninsula, with the central David Malott specializes in the design and planning of supertall buildings and complex mixed-use business district across on Hong Kong Island. With the design of ICC, the Architects addressed KSD features nearly 675,000 square meters developments. With over 15 years of experience as an (7.27 million square feet) of high-rise residen- architectural designer and project director working on the challenge of bridging this divide, using expressive formal gestures and innovative projects throughout Asia, he has contributed to the firm’s technologies that connect the tower with Hong Kong’s mass transit infrastructure. tial and service apartments, 100,000 square strong presence in China, Japan, and Hong Kong. He was meters (1.07 million square feet) of retail, made a director of the firm in 2009. CTBUH Executive Director 232,500 square meters (2.50 million square Since joining KPF in 1998, David has served as Senior Poetry of Motion alternative of urban sprawl. Amongst feet) of class ‘A’ office space, and two hotels – Designer for some of the firm’s most recognized high-income societies, Hong Kong ranks as the achievements, including the 492-meter Shanghai World This case study explores the design of the the W and the Ritz-Carlton – the latter of which Financial Center, awarded the Best Tall Building Worldwide most efficient in annual per capita energy use building at three scales of connectivity. ICC, at is located at the top of ICC. This small city is by the Council of Tall Buildings and Urban Habitat in 2008, at 2,600 kgoe (kilograms of oil equivalent) and the 490-meter International Commerce Center in the macro level, forms part of a sustainable built entirely around Kowloon Station, linked Hong Kong.
Recommended publications
  • Cutting Through Complexity: Managing the Design and Build Contract for CUHK Medical Centre
    Issue 9 2021 Foresight Innovation Research Sharing Training Cutting through complexity: Managing the design and build contract for CUHK Medical Centre arup.com Foreword Contents Planning, designing and building healthcare facilities in the post-COVID 19 era involves Technical solutions complex infrastructure and operational design considerations. Whether it is managing the design Cutting through complexity: Managing the design 4 and build of a hospital or structurally designing a seismically resilient hospital in an earthquake and build contract for CUHK Medical Centre zone, two recently completed healthcare projects that Arup took part in, both highlighted in this issue, reaffirm that the top priority is to keep medical personnel – and their patients – safe. Chapel of Sound 10 Hospital projects demand a high degree of accuracy in execution. For the CUHK Medical Centre Delivering CCGT power plant for CLP 14 (CUHKMC) in Hong Kong, we adopted a systematic approach to managing the complexity Designing a seismically resilient hospital 18 of planning, design, construction, fit-out, procurement and installation works. In Istanbul, we in Turkey designed the world’s largest base-isolated complex, which comprises more than 2,000 seismic isolators, within an area that has suffered highly destructive earthquakes in the past. Contributing towards Hanoi’s seamless mobility 22 The global health crisis has prompted not only the healthcare industry but also policymakers, planners and building professionals to rethink the design of future healthcare. In a recent Profiles publication, our Foresight team envisions that future healthcare infrastructure, delivery models and services will be made resilient enough to mitigate the effects of climate change while Strategic leader: Raul Manlapig 26 providing more inclusive, accessible services to keep citizens healthy at a lower cost.
    [Show full text]
  • Materials Suitable for the Construction of Long-Span Bridges Construction of Bridges 1
    Materials suitable for the Construction of Long-span Bridges Construction of Bridges 1. Stone – in arch masonry 2. Steel – in girder or box-section constructed in steel plates and standard sections Information prepared by Raymond Wong Division of Building Science and Technology, 3. Steel – truss constructed of standard sections City University of Hong Kong 4. Reinforced Concrete – in arch or spanned forms e-mail of Raymond Wong [email protected] 5. Tensioned RC – in various forms 6. Precast – mainly in box-section girder Common Bridge Forms Simple Supported – span effective from 10m to 60m Actual example – Route 3 Interchange at Au Tau, Yuen Long Continuous Span – from 10m to 100m Balanced Cantilever – span from 25m to 200m Actual example – balanced cantilever bridge series Actual example – construction of a span of continual section forming the approach to the Ting Kau Bridge of elevated highway bridge at Route 3, Kwai Chung Balanced cantilever bridge for viaduct of West Rail at Au Tau Interchange Balanced Cantilever Suspended Span – span from 50m to 300m A suspended deck from the main truss will become the pedestrian walkway afterward Steel Truss – 50m to 100m Main truss Footbridge (Langham Place) about 25m span constructed Actual example – using steel truss supported 5-span steel truss on bearing beam on two sides bridge in western and with a suspended deck part of Pearl River, erected afterward Guangzhou Steel Arch (framed or trussed) – from 150m to 500m Stone arch – from 15m to 50m Close up view of the bridge trusses Sydney Harbour Bridge and its approach Close up of the bridge at the tower support Steel arch-truss bridge crossing Pearl River Delta for the China Express Rail Steel arch-truss bridge is very common and can be found in many parts of the world Concrete Arch (ribbed or unribbed) – from 50m to 300m Concrete Arch (ribbed) approx.
    [Show full text]
  • Stonecutters Bridge – Detailed Design
    Concrete Structures: the Challenge of Creativity Stonecutters Bridge – Detailed Design Klaus FALBE-HANSEN Lars HAUGE Naeem HUSSAIN Director Director Director Arup COWI Arup Hong Kong SAR Copenhagen, Denmark Hong Kong SAR Summary Highways Department (HyD) of Hong Kong SAR is going to build a bridge across the entrance to Kwai Chung Container Port. Due to the spectacular location HyD decided to procure the concept for the bridge through an international design competition. The competition took place in the first half of 2000 and the winning scheme was a cable-stayed structure with freestanding towers located between twin box girders. The 1018m main span is in steel, while the four back spans each side are in concrete. The two towers stand on shore, providing unobstructed access to the busy container port with minimum navigation headroom of 73.5m. A number of modifications were introduced to the scheme during subsequent technical review. Detailed design started in March 2002 and tender was called in August 2003 and returned in December 2003. Completion of the bridge is scheduled for mid 2008. This paper concerns the detailed design. Keywords: Cable-stayed bridge; twin-box deck; freestanding central tower; stainless steel; composite construction; orthotropic steel deck; prestressed concrete. 1. Introduction Stonecutters Bridge is part of Route 9, an east-west expressway providing a further link between the Hong Kong International Airport at Lantau Island and the urban areas of West Kowloon. The Tsing Ma Bridge and Kap Shui Mun Bridge completed in 1997 also form part of this route. Fig. 1 Location of Stonecutters Bridge Fig.
    [Show full text]
  • Annual Report 2011 Civil Engineers at the Heart of Society, Delivering Sustainable Development Through Knowledge, Skills and Professional Expertise
    Annual Report 2011 Civil engineers at the heart of society, delivering sustainable development through knowledge, skills and professional expertise Key ICE Group statistics 2011 Key ICE Group statistics 2011 Recorded events Events TTL profit 95 89.9% £1.8m with over 18,000 overall satisfaction in 2011 online views rate HK Professional Reviews New apprenticeships Website 14.2% 53 30% increase in number enrolments in ICE increase in conducted in Advanced Technical visitor numbers Hong Kong Apprenticeship (December 2010-11) 02 ICE Annual Report 2011 Key ICE Group statistics 2011 Media coverage Pre-19 activities UK Professional Reviews 1,616 39,861 10.8% print and broadcast people reached increase in number hits in trade/regional/ through our UK conducted national media regional activities Membership Fellowship Technician 82,872 53% 34% total UK and increase increase overseas members in applications in applications ICE Annual Report 2011 03 Contents Main image Project name: Barclays Cycle Hire ICE award: Infrastructure Award, ICE London Civil Engineering Awards 2011 Client: Transport for London Partner: Serco Location: London Credit: Transport for London Contents About ICE Key ICE Group statistics 2011 02 President’s foreword Director General’s foreword A global organisation The Institution of Civil Engineers (ICE) is About ICE 04 President’s foreword Director General’s foreword an international membership organisation 2011 has continued to provide The relationship between our profession This is my first report as Director international presence continues to challenges for our industry, and government is absolutely crucial. General and Secretary of the grow, with ICE’s membership and activity affecting many of our members.
    [Show full text]
  • The 1950S Were a Period of Huge Change for Hong Kong. the End of Japanese Occupation, the Establishment of the People’S Republic of China, the U.S
    1950s The 1950s were a period of huge change for Hong Kong. The end of Japanese occupation, the establishment of the People’s Republic of China, the U.S. and U.N. trade embargoes on China and a mass influx of Mainland immigrants bringing low-cost labour to the city, shaped much of Hong Kong’s social and economic landscape during this decade. Coupled with ambitious infrastructure plans and investment-friendly policies, Hong Kong laid the foundations that, over the coming decades, were to create one of the world’s greatest trading hubs. It was during this time that Dragages was awarded the contract to construct what was to become an internationally recognised Hong Kong icon: the runway jutting out into Victoria Harbour for Kai Tak Airport. Other major projects soon followed, including the Shek Pik and Plover Cove Reservoirs, which became essential lifelines providing fresh water to Hong Kong’s rapidly growing population. For Dragages, it was a decade which was to establish its credentials as a leading partner in Hong Kong’s modernisation for the next 50 years. = = 1955 – 1958 Kai Tak Airport Runway Demand for marine expertise brings Dragages to Hong Kong Increasing demand for air travel combined with the growth in airplane size led the Hong Kong Government to plan the reconstruction and extension of the existing Kai Tak runway. By extending the runway two kilometres into Victoria Harbour, Hong Kong was the first city in the world to attempt such an ambitious project. The challenges of the project, requiring extensive dredging and more than 120 hectares of reclamation, called for a construction company with strong marine and dredging experience.
    [Show full text]
  • China and LA County, BYD Has Offices in Europe, Japan, South Korea, India, Taiwan, and Other Regions
    GROWING TOGETHER China and Los Angeles County GROWING TOGETHER China and Los Angeles County PREPARED BY: Ferdinando Guerra, International Economist Principal Researcher and Author with special thanks to George Entis, Research Assistant June, 2014 Los Angeles County Economic Development Corporation Kyser Center for Economic Research 444 S. Flower St., 37th Floor Los Angeles, CA 90071 Tel: (213) 622-4300 or (888) 4-LAEDC-1 Fax: (213)-622-7100 E-mail: [email protected] Web: http://www.laedc.org The LAEDC, the region’s premier business leadership organization, is a private, non-profit 501(c)3 organization established in 1981. GROWING TOGETHER China and Los Angeles County As Southern California’s premier economic development organization, the mission of the LAEDC is to attract, retain, and grow businesses and jobs for the regions of Los Angeles County. Since 1996, the LAEDC has helped retain or attract more than 198,000 jobs, providing over $12 billion in direct economic impact from salaries and over $850 million in property and sales tax revenues to the County of Los Angeles. LAEDC is a private, non-profit 501(c)3 organization established in 1981. Regional Leadership The members of the LAEDC are civic leaders and ranking executives of the region’s leading public and private organizations. Through financial support and direct participation in the mission, programs, and public policy initiatives of the LAEDC, the members are committed to playing a decisive role in shaping the region’s economic future. Business Services The LAEDC’s Business Development and Assistance Program provides essential services to L.A. County businesses at no cost, including coordinating site searches, securing incentives and permits, and identifying traditional and nontraditional financing including industrial development bonds.
    [Show full text]
  • Erection Control Analysis – Meeting the Demands of New Construction Techniques
    Erection Control Analysis – Meeting the Demands of New Construction Techniques Dorian Janjic Johann Stampler TDV Technische Daten- TDV Technische Daten- verarbeitung GmbH verarbeitung GmbH /Bentley Systems, Inc. /Bentley Systems, Inc. Gleisdorfer Gasse 5 Gleisdorfer Gasse 5 8010 Graz, Austria 8010 Graz, Austria [email protected] [email protected] Summary New bridge construction techniques such as the pre-cast segmental construction method yield special requirements for the design and proof checking process. In the case of stage-wise erection, an exact anticipate calculation of the bridge deformations arising throughout the construction schedule – and therefore the definition of the required pre-camber values and fabrication shapes – was for long time an almost insoluble problem. An appropriate tool allowing for getting the ability to determine the effects of constraining the structure into a certain pre-defined position at any stage of construction has recently been provided. The respective erection control facility accurately controls the position and the forces in the segments in stage-wise built structures. The presented erection control tool also supports the definition of required compensation measures due to deviations from the scheduled position. Keywords: Erection Control, geometry control, pre-camber, pre-cast segmental construction 1. Stress-less Geometry – Camber A common requirement in bridge engineering is that the final bridge shape (after deformations due to permanent loads have occurred) should comply with the theoretical design shape. Therefore, in order to compensate the deformations, the main girders of bridge structures are usually “pre- cambered” during construction. In some cases this deformation compensation process is also applied to other structural parts, such as for instance the pylons of large cable-stayed bridges.
    [Show full text]
  • HONG KONG in Brief
    2020 HONG KONG in brief Brand Hong Kong’s visual identity and brandline have become familiar to people at home and around the world – the flying dragon and 'Asia’s world city' have become synonymous with Hong Kong. The blue and green ribbons that extend from the dragon symbolise blue sky and a sustainable environment, while Lion Rock – the famous landmark that represents Hong Kong people’s 'can-do' spirit – is silhouetted by the red ribbon. The fluid shape of the ribbons evokes versatility, and the multiple colours signify the city’s diversity and dynamism. Contents ABOUT HONG KONG 4 Location Population Language Climate International Trade Centre Global Services Centre International Corporate Base Free Trade and Free Market Efficient Government Monetary System Legal System Airport Hong Kong Port ECONOMY 9 Economic Policy International Financial Centre Economic Links with the Mainland LIVING IN HONG KONG 16 Government Structure Rule of Law Employment Education Health Housing Transport Pollution and Environmental Control Law and Order Tax System Mandatory Provident Fund Media Telecommunications COMING TO HONG KONG 32 Tourism Immigration Leisure and Culture Traditional Festivals FUTURE OF HONG KONG 38 Asia’s Cyber City Building for the Future HONG KONG: THE FACTS 44 USEFUL CONTACTS 46 3 ABOUT HONG KONG About Hong Kong Population About Hong Kong At mid-2019, the population was about 7.51 million, predominantly of Chinese ethnicity but also including 652 896 non-PRC nationals. The three largest foreign groups were from the Philippines (200 925), Indonesia (177 530) and India (35 012). Overall population density was 6 930 people per sq km.
    [Show full text]
  • Copenhagen-Kissing-Bridge.Pdf
    COPENHAGEN’S ‘KISSING’ BRIDGE WEALTH CREATION The bridge’s sliding spans are cantilevering, steel box girders. Their undersides follow a smooth wave-like profile in elevation to provide the greatest structural depth at the support where the bending moment is largest. The structural depth then tapers to only 600 millimetres at the cantilever tip at midspan, where the two girders meet and interlock The middle spans on the Inner Harbour Bridge in Copenhagen slide apart to allow large boats to pass through the harbour. The spans then slide back together again and have earned the bridge the nickname Kyssebroen (the Kissing Bridge) © Jasper Carlberg Aside from COWI, the team the opening sections in a sliding focus more on functionality comprised architects Studio manner and create a functional than design. The team wanted Copenhagen is not a city that Bednarski, mechanical and and innovative bridge. to bring that sliding method is short on bridges, but one electrical designers Hardesty & The concept for the bridge of opening to an architectural was needed to link the heart Hanover, and lighting designers was decided early in the pedestrian bridge that would of the city with Christianshavn Speirs & Major Associates. process and the initial sketches create a surprise for onlookers in the east, an area that Working in a close collaborative reasonably reflect how the final who would expect the moving is undergoing substantial team, the designers came up bridge looks. Principal engineer spans to raise or swing rather COPENHAGEN’S development and is home with the innovative sliding Amar Bahra led the day-to-day than slide.
    [Show full text]
  • IABSE News, the Newsletter of the British Group of IABSE
    Newsletter of the British Group of the International Association for Bridge and Structural Engineering No. 24 January 2007 National Swimming Centre, Beijing, China – Concept and Reality Image ©Arup/CSCEC/PTW Contents British Group News 2 Events 2007 3 Presentation of the Milne Medal for 2006 4 Report – Milne Medal Lecture 2006: ‘Poised between Gravity & Levity’ 5 Report – IABSE Symposium, Budapest: ‘Responding to Tomorrow’s Challenges in 6 Structural Engineering’ Project Feature – Challenges in the Construction of Stonecutters Bridge 7 IABSE British Group Directory 12 www.iabse-uk.org IABSE British Group News ________________________________________________________________________________________ Editorial Welcome to IABSE News, the newsletter of the British Group of IABSE. The start of a new year offers the opportunity to look ahead and survey the possibilities offered by the next twelve months. This is no less the case for IABSE and it’s members than for anyone else as the calendar of events for 2007 shows. The Milne Medal lecture (see page 4 to find out the 2006 winner!) should prove a great attraction as will also the proposed half-day meeting ‘Factor 10 engineering for sustainable cities’ (the theme of the 2006 Henderson Colloquium) which will present state-of-the-art guidance and examples of how the ‘order of magnitude’ improvement in sustainability performance, suggested in some quarters as being necessary for our future, can be achieved. During 2006 it has been a pleasure to welcome over 20 new members to the IABSE British Group and I hope that members both old and new will encourage others to join in 2007. It is, perhaps, fair to say that the British Group programme of events focuses on quality rather than quantity.
    [Show full text]
  • Stonecutters Bridge
    Stonecutters Bridge Stonecutters Bridge spans across the 900m(approx.) wide The bridge has a highly distinctive structural form that comprises Rambler Channel at the entrance to the Kwai Tsing Container a bridge deck of about 53m wide with steel twin-box connected by Terminals, forming the centrepiece of the section of Route 8 cross girders, supported by two monopole towers of height up to between Tsing Yi and Cheung Sha Wan. This section of Route 8 +298.0 mPD. The streamlined split deck enhances stability under is a 7.6km long, dual three-lane road that includes Stonecutters high wind. Bridge and its approach viaducts. Besides serving as a main route to Hong Kong International Airport, this section also provides direct trunk connections to the container terminals at The towers are constructed in concrete up to a height of about Kwai Chung and Tsing Yi. +175 mPD, and the upper sections are in composite stainless steel- concrete. This is the fi rst time to use high-grade duplex stainless steel skin as an integral structural part of the upper towers. This solution is chosen to enhance the structural stability and to reduce maintenance cost by eliminating the need for re-painting. The raw materials of the bridge were sourced around the world. The stainless steel used in the upper section of the towers was imported from Sweden and fabricated into stainless steel skins in China (Zhongshan). The steel used in the deck was from Japan, Austria and Belgium and was fabricated into deck panels in Northern China (Shanhaiguan) and assembled into deck segments in Southern China (Dongguan).
    [Show full text]
  • Ian-Firth-CV.Pdf
    IAN FIRTH IAN FIRTH BSc, MSc, DIC, CEng, FREng, FICE, FIStructE, HonFRIBA Bridges and Structural Engineering Contact: email [email protected] phone +44 (0)7840 047738 Employment: 2018 – present Ian Firth Structural Engineering 2017 – 2018 Technical Director, COWI (UK) Ltd 2008 – 2016 Director, Flint & Neill Ltd (a COWI Company) 1990 – 2008 Partner, Flint & Neill Partnership 1979 – 1990 Engineer, Flint & Neill Partnership Education: BSc. University of Bristol. 1979 MSc, DIC. Imperial College of Science and Technology. 1982 Professional Affiliations: Fellow of the Royal Academy of Engineering, FREng. 2007 Fellow of the Institution of Civil Engineers, FICE. 1998 Fellow of the Institution of Structural Engineers, FIStructE. 2000 Honorary Fellow of the Royal Institute of British Architects. HonFRIBA, 2018 Appointments: President, Institution of Structural Engineers. 2017 Chairman, British Group, International Association for Bridge & Structural Engineering. 2013 - ongoing Chairman, Bridges to Prosperity UK Charitable Trust. 2014 - ongoing Council Member, Construction Industry Council. 2017 - ongoing Royal Academy of Engineering Visiting Professor, Warwick University. 2018 - ongoing Career Summary: Ian Firth has 39 years of experience in the design, assessment and structural investigation of a wide variety of bridges and other structures. These include some highly complex and challenging projects, and range from very long suspension and cable stayed bridges, such as the Messina and Stonecutters Bridges, to much smaller but unique and unusual structures, such as the Bridge of Aspiration, Lockmeadow Footbridge and Taplow Bridge for example. He has designed over 80 bridges (although not all have been built) and has developed a reputation as one of the world's leading bridge designers and strongest advocates for achieving quality and elegance in bridges and infrastructure.
    [Show full text]