Fiber Optic Backbone of Information Communications Network Llc I

Total Page:16

File Type:pdf, Size:1020Kb

Fiber Optic Backbone of Information Communications Network Llc I INTRODUCTION Information Communications Network LLC /ICNC/ was established in 2006 to operate the state owned national backbone network, to ensure secure and reliable operation and MEMBERSHIP maintenance of the network and to provide interoperability and interconnection services to telecoms operators while playing a major role in the ongoing development of Mongolia’s Information Communications Network infrastructure. LLC is an active sector member of the International Telecommunications Union Information Communications Network LLC is a leading provider of broadband services and the Asia Pacific Telecommunity. for the carrier marketplace and owner of the largest open access fiber-optic network in Mongolia. Information Communications Network LLC is a member of the Asian Productivity Currently, Information Communications Network LLC operates and maintains over 70 percent Organization, the Mongolian National of the national fiber-optic network. We own and operate 9’446 manholes, 791’684.5 Chamber of Commerce and Industry and meters of ducts, which are routed across 17’421 kilometers, 21 provinces and 283 villages of the Mongolian Human Resource Institute. Mongolia. We offer co-location services to mobile operators and telecoms service providers on our facilities and towers throughout Ulaanbaatar city, 21 provinces and 373 villages of Mongolia. Team of 1470 highly qualified employees, engineers and technicians are our most valuable assets. We are cooperating with more than 230 public and private communication service providers. ACCESSIBLE AND RELIABLE NETWORK VISION: LEADING TOGETHER FIBER OPTIC LENGTH: 17’421 KM TRANSMISSION NETWORK CAPACITY: LOCAL 25 GBPS, INTERNATIONAL: 100GBPS OUTSIDE PLANT: MISSION 9’446 MANHOLES, 791’684 METERS OF DUCTS Be the most accessible high-speed national broadband network. Deliver the latest innovations of information and communication FACILITIES AND 353 TOWERS. technology to every Mongolian citizen Promote sustainable development of social and economic growth HUMAN RESOURCE: of Mongolia. 1470 HIGHLY QUALIFIED EMPLOYEES PROFESSIONAL AND SKILLED EMPLOYEES LEASED LINE SERVICES INTERNATIONAL ICNC’s world-class backbone network infrastructure covers all major cities and TRANSIT NETWORK villages to transmit data and information on the territory of Mongolia. One of core operations of our company is fiber- optic transit service network, the shortest route Service types: connecting Asia and Europe. We are cooperating • Voice channel (TDM) with leading telecommunications companies • Data channel (Data, MPLS-VPN) of China and Russia to ensure reliability, wide • STM channel (STM-1, STM-4) coverage and low latency of the network. Technical advantages: • 7/24 network monitoring support; • Continuous network update, improvement and maintenance; • Ethernet and fiber optic connection to the end user; • Connection speed range from 1Mbps to 100Mbps; • Support of multi-protocol connectivity; • Reliable access to the network from the most villages and rural settlements of Mongolia; • Easy monitoring and control of the network; • Integrated management solution system. IT and telecom companies are interested in transmitting the information through the Mongolia transit network, as it is the shortest link with the lowest latency. This international transit network connects is routed via Mongolia, Russia, China and Kazakhstan and connects European cities such as Frankfurt, London, Helsinki with Asia to reach the internet exchange point in Hong-Kong. COMPREHENSIVE CUSTOMER SERVICE INTERNET WHOLESALE SERVICE There are 6’555 manholes and 527’238.5 meter Our company offers reliable and secure wholesale internet service, imported from ducts available for rent within 6 district, 7 international exchange point to Internet service providers through our fiber optic stations in Ulaanbaatar. The rent and service network. agreements are approved by the branch in Ulaanbaatar city. Service advantages: • Network coverage in Ulaanbaatar city, 21 provinces and 283 villages; • VPN network; • 7/24 network monitoring support; Дамбадаржаа Цагдаагийн пост • Real IP address; • Хайлааст Customer information security; 32-н • Service reliability, 1+1 routed IP network тойрог Дэнжийн 1000 Шархад Ханын материал Телевиз ATC-35 Баянгол Цайз зах ATC-36 ATC-45 Наран ATC-32 станц ATC-68 Улиастай Орбит Нарны ATC-63 гvvр Улиастайн гvvр Дvнжингарав ATC-34 Сонсголон Их Яармагын тэнгэр Баянзvрхийн гvvр товчоо Яармаг Ургах наран Зайсан Нисэх HYXT Морин уул CO-LOCATION AND INFRASTRUCTURE, TOWER LEASING SERVICE Our strategically located co-location sites are spread out through Ulaanbaatar city and its districts, in province centers and villages, on our microwave stations throughout Mongolia. Co-locating physical hardware in one of our co-location centers and towers benefits telecoms service providers and mobile operators with direct connection and OUTSIDE PLANT SERVICE full control – without the cost and hassle We offer rental services of our OSPs and physical cable that fully meet technical of day-to-day of cooling, power, buildings, requirements to 110 public and private service providers with the aim to fully utilize and permits, suppliers, etc. optimize the cable infrastructure and consumption level. INTEGRITY, RESPONSIBILITY AND COMMITMENT Outsourcing benefits: Outsourcing services: productivity andreducetheiroperationalcost. on ourqualifiedstaffwith theaimprovideopportunityforcompanytoincreasetheir We offeroutsourcingservicestonetworkinfrastructurecompaniesinthelocalareas based monitoring andsupport. facilities areoutsourcedonannuitycontract.Webackupouroperationwith7/24network organizations andprivatebusinesses.Technicaloperation,maintenanceofnetworks ICNC iscooperatingwithmorethan200entitiesincludingtelecomoperators,public TECHNICAL COOPERATION CONTACT INFORMATION: C FIBER OPTIC BACKBONE OF INFORMATION COMMUNICATIONS NETWORK LLC • • • • • • • • • • (1-2timesayear) • Improved consumptionoffixedassets networks Improved productivitywithpropermanagementfortechnologicalcapacities management ofthebackbonenetwork.(TerrestrialandSatellite) technical operationandmaintenancebyprovidingintegratedtechnological Cooperation ofhighlyqualifiedandexperiencedengineerscapabletoorganize Easy tocontrolthecost Decrease ofcostoperationandmaintenanceforthecustomers Assets transferandshifting Fuel anddieselsupplies Power supplyreadiness Security watchesoverpremisesandsitesinruralareas Repair networkdeficienciesandfailuresuponsubscriptions Preventive technicalcheck-upservicessubjecttofixedtimeschedulesandplans Khankh Khankh Tsagaannuur Borshoo Davst Renchinlhumbe Sagil Tes Tes Ulaan-Uul Tsagaan-Uur ULAANGOM Ereentsav Turgen Khatgal Chandmani-Undur Ulaan baishint Baga Ilenkh Bukhmurun Chuluunkhoroot Bayanzurkh SUKHBAATAR Nogoonnuur Tarialan Zuungobi Arts suuri Erdenebulgan Tushig Altanbulag Malchin ETWORK LL Tsagaannuur Alag-Erdene Tsagaannuur Shaamar Dashbalbar OMMUNICATIONS Teshig Zuunburen NFORMATION Khyargas Khovd Tes Bayantes Arbulag Tunel Ulikhan Maikhan Ulaankhus Naranbulag Баруунтуруун Orkhon Khuder I C N Altantsugts OLGIi Tsagaan-Uul Khushaat Yeruu Tsengel Umnugobi MURUN Tarialan Javkhlant Gurvanzagal Tsagaankhairkhan Zuunkhangai Asgat Tsetserleg Sagsai Бугат Ulgii Burentogtokh Selenge Bayandun Undurkhangai Tosontsengel Ikh-Uul Khutag-Undur DARKHAN Bayannuur Bayankhairkhan Khongor Mardai Tumurbulag Khangal Sant Shariingol Dadal Bayan-Uul Buyant Baruunburen Salkhit Khavirga Zavkhan Түдэвтэй Unit Rashaant Bayan-Agit Bugat Нөмрөг Jargalant Орхон Хөтөл Baruunkharaa Tolbo Erdeneburen Songino Norovlin Sergelen Dayan Altai Shine-Ider Bayangol Tsagaan-Ovoo Tosontsengel Tsetserleg BULGAN Orkhontuul TS Batshireet Urgamal Tsetsen-Uul Zuunkharaa Binder Durgun Galt Buyant Santmargats Sumber Choibalsan Bayankhoshuu Khovd Orkhontuul Myangad Telmen Ikh-Uul Khairkhan Jargalant Orkhon Bayan-Adraga Jargalant Saikhan Jargalant Bayantumen KHOVD Erdenemandal Zavkhanmandal Tseel KHERLEN Bornuur Sumber Khishig-Undur Mandal Sumber Deluun Yaruu Mogod Ugtaaltsaidam Mungunmorit Bulgan Erdenekhairkhan Ider Zaamar Bayanchandmani Batnorov Bayantsogt Tsakhir Buregkhangai Rashaant Khulunbuir Tariat Undur-Ulaan Ulziit Umnudelger Chandmani ULAANBAATAR Duut ULIASTAi Bayankhangai Bayan-Ovoo Dashinchilen 1K Aldarkhaan Battsengel Argalant Baganuur Berkh Durvuljin Khangai Nalaikh Mankhan Ugiinnuur Gurvanbulag Bayannuur Lun Tsenkhermandal Tumentsogt khukhmorit Bayandelger AltanbulagZUUNMOD Erdene TSETSERLEG Matad Zereg Chuluut Sergelen UNDURKHAAN Ikhtamir Tsenkher Jargaltkhaan Munkhkhairkhan Tsagaankhairkhan Undurshireet Bulgan Khotont Uneg tolgoi Bagakhangai Arkhust Murun Darvi Otgon Khashaat Gurvanbulag Дэлгэрхаан Bayan-Uul Tuvshruuleh Эрдэнэсант Bayankhutag Munkhkhaan Tsagaanchuluut Bulgan Rashaant Bayan Bayanjargalan Jargalant Kharkhorin Bayan-Unjuul Sukhbaatar Must Jargalant Khujirt Burd Buren BARUUN-URT Tsetseg Naran-elgen Bayanmunkh Taishir Zag Uulbayan Bulgan Darvi Shiluustei Bayanbulag Bat-Ulzii Yesunzuil Galuut Bayantsagaan Bayantal ALTAI Darkhan Asgat Tonkhil Zuunbayan-Ulaan Bulgan Uyench Sharga Guulin Delgerkhaan Bichigt Khureemaral Ulziit Adaatsag Tsagaandelger SUMBER Galshar Delger Uyanga Bayan-Undur Khalzan Erdenetsogt Bor-Undur Tuvshinshiree Erdenetsagaan Bayan-Ovoo Ikhkhet Altai Deren Baitag Bumbugur Taragt Shiveegobi ARVAIKHEER Delgertsogt Delgerekh Nariinteel Erdenedalai Tugrug Khaliun BAYANKHONGOR Ulziit Sant Govi-Ugtaal Dalanjargalan Buutsagaan Airag Bayandelger Biger Khairkhandulaan MANDALGOBI Bugat Baatsagaan Dariganga Tseel Bayangol Bayanjargalan Altanshiree Ongon Luus E-mail: Fax:
Recommended publications
  • Final Report on the Study of Value Chains for Live Animals/Meat and Hides/Skins in Mongolia
    Final report on the study of value chains for live animals/meat and hides/skins in Mongolia Final Report as at 31 July 2015 A d d r e s s GFA Consulting Group GmbH Eulenkrugstraße 82 22359 Hamburg Germany Telefon +49 (40) 6 03 06 – 166 Fax +49 (40) 6 03 06 – 169 E-Mail [email protected] Contents LIST OF ABBREVIATIONS .............................................................................................................. 1 LIST OF TABLES AND FIGURES ...................................................................................................... 2 INTRODUCTION ........................................................................................................................... 4 ONE. RESEARCH PROGRAM OF THE VALUE CHAIN STUDY ............................................................. 5 1.1. Objective of the study .......................................................................................................... 5 1.2. Methods of the study ........................................................................................................... 6 1.3. Study objects of the supply study ........................................................................................ 6 1.4. Study objects of the demand study ..................................................................................... 7 TWO. STUDY ON THE VALUE CHAIN OF LIVE ANIMALS AND MEAT ................................................ 8 2.1. Executive summary .............................................................................................................
    [Show full text]
  • (LAMP): Ways and Benefits of CSO Involvement in GAFSP Mongolia Project I
    The Livestock and Agricultural Marketing Project (LAMP): Ways and Benefits of CSO Involvement in GAFSP Mongolia Project I. Introduction Mongolia, a vast country of 1.56 million square kilometers, is home to 15 times more livestock than people. It has over 2.7 million human population and 43 million livestock as of 2010. The transformation of Mongolia after the collapse of the Soviet Union from collective socialism to a market economy disrupted urban and rural livelihoods, ultimately leading to increased urban poverty and food insecurity. In the last decade, while the government’s agricultural and rural development program has met with some success, the poverty level has persisted above 30%. The agriculture sector, which accounted for 15% of Mongolia’s Gross Domestic Product (GDP) in 2010 and provides livelihood to about 40% of the population, promises to be the avenue for addressing poverty. The livestock-based industry contributes to around 10% of all export revenues. But Mongolia has been unable to take advantage of its exportation of meat and other by-products due to several constraints. On average, the export price for Mongolian meat is three to four times lower than the price commanded by Australian meat exports. The domestic market, with the expansion of more formal retailing outlets 2 LAMP: Ways and Benefits of CSO Involvement in GAFSP Mongolia Project | March 2018 such as supermarkets, offers another opportunity for growth for the livestock industry. Clearly, there is a need to strengthen linkages between producers and markets, and that is the goal of the Livestock and Agricultural Marketing Project (LAMP).
    [Show full text]
  • MONGOLIA Linking the Improvement in Nomadic Herding Practices To
    MONGOLIA Cachemire 4 © Pearly Jacob Linking the improvement in nomadic herding practices to sustainable cashmere production in the Gobi Desert Pearly Jacob Fighting against pasture degradation in the Gobi Desert by proposing to develop a sustainable and environmentally-friendly sector for cashmere in which it is produced. CONTEXTE ET OBJECTIFS 01/01/2015 31/12/2019 Bayankhongor Province is located in south-west Mongolia, the Project start Project end Great Lakes region, in the far north of the Gobi Desert. It is date date characterized by a semi-arid territory mainly covered by a desert steppe with sparse vegetation, and by the presence of 03/12/2014 lakes and rivers, which can dry up certain years when there is Project grant a low level of rainfall. The area has a continental climate and date experiences extreme temperatures (in both winter and Mongolie summer). Average annual rainfall stands at 100 mm. Location The project comes in addition to the “Sustainable Cashmere” Land degradation and project financed by the European Union on the baghs of Jinst er chemical pollutants Bogd and implemented by AVSF from 2014 to 2016, by adding sector(s) 3 soums: Shinejinst, Bombogor and Baatsagaan. subvention Financing Tool(s) 3 598 797 EUR DESCRIPTION Amount of the program Including FFEM funding The project area covers 5 soums (Mongolian territorial unit equivalent to a French department), especially selected for 1 200 000 EUR their complementarity in terms of agroecological areas and Amount of FFEM funding issues related to raising cashmere goats: 4 ans - Bombogor: 3,044 km² - 2,584 inhabitants Duration of funding - Baatsagaan: 5,395 km² - 3,599 inhabitants - Jinst: 5,313 km² - 2,023 inhabitants AVSF - Bogd: 3,993 km² - 2,900 inhabitants Beneficiaries - Shinejinst: 16,501 km² - 2,187 inhabitants Cofinanceur(s) The total surface area of the zone stands at 34,246 km², i.e.
    [Show full text]
  • Tuul River Mongolia
    HEALTHY RIVERS FOR ALL Tuul River Basin Report Card • 1 TUUL RIVER MONGOLIA BASIN HEALTH 2019 REPORT CARD Tuul River Basin Report Card • 2 TUUL RIVER BASIN: OVERVIEW The Tuul River headwaters begin in the Lower As of 2018, 1.45 million people were living within Khentii mountains of the Khan Khentii mountain the Tuul River basin, representing 46% of Mongolia’s range (48030’58.9” N, 108014’08.3” E). The river population, and more than 60% of the country’s flows southwest through the capital of Mongolia, GDP. Due to high levels of human migration into Ulaanbaatar, after which it eventually joins the the basin, land use change within the floodplains, Orkhon River in Orkhontuul soum where the Tuul lack of wastewater treatment within settled areas, River Basin ends (48056’55.1” N, 104047’53.2” E). The and gold mining in Zaamar soum of Tuv aimag and Orkhon River then joins the Selenge River to feed Burenkhangai soum of Bulgan aimag, the Tuul River Lake Baikal in the Russian Federation. The catchment has emerged as the most polluted river in Mongolia. area is approximately 50,000 km2, and the river itself These stressors, combined with a growing water is about 720 km long. Ulaanbaatar is approximately demand and changes in precipitation due to global 470 km upstream from where the Tuul River meets warming, have led to a scarcity of water and an the Orkhon River. interruption of river flow during the spring. The Tuul River basin includes a variety of landscapes Although much research has been conducted on the including mountain taiga and forest steppe in water quality and quantity of the Tuul River, there is the upper catchment, and predominantly steppe no uniform or consistent assessment on the state downstream of Ulaanbaatar City.
    [Show full text]
  • Ìîíãîë Íóòàã Äàõü Ò¯¯Õ, Ñî¨Ëûí ¯Ë Õªäëªõ Äóðñãàë
    ÀÐÕÀÍÃÀÉ ÀÉÌÃÈÉÍ ÍÓÒÀà ÄÀÕÜ Ò¯¯Õ, ÑΨËÛÍ ¯Ë ÕªÄËªÕ ÄÓÐÑÃÀË ISBN 978-99962-67-33-8 ÑΨËÛÍ ªÂÈÉÍ ÒªÂ ÌÎÍÃÎË ÍÓÒÀà ÄÀÕÜ Ò¯¯Õ, ÑΨËÛÍ ¯Ë ÕªÄËªÕ ÄÓÐÑÃÀË HISTORICAL AND CULTURAL IMMOVABLE MONUMENTS IN MONGOLIA X ÄÝÂÒÝÐ ÀÐÕÀÍÃÀÉ ÀÉÌÀà 1 ÀÐÕÀÍÃÀÉ ÀÉÌÃÈÉÍ ÍÓÒÀà ÄÀÕÜ Ò¯¯Õ, ÑΨËÛÍ ¯Ë ÕªÄËªÕ ÄÓÐÑÃÀË ÌÎíãÎë íóòàã äàõü ò¯¯õ, ñΨëûí ¯ë õªäëªõ äóðñãàë X äýâòýð ÀðõÀíãÀé ÀéìÀã 1 DDC 900 Ý-66 Зохиогч: Г.Энхбат Г.аНХСАНАА б.ДаваацЭрЭн Гэрэл зургийг: б.ДаваацЭрЭн П.Чинбат Гар зургийг: а.мӨнГӨНЦООЖ т.эРДЭнЭцОГт Г.аНХСАНАА Дизайнер: б.аЛТАНСҮх Орчуулагч: ц.цОЛмОн Жолооч: б.ЭрДЭнЭЧИМЭГ Зохиогчийн эрх хамгаалагдсан. © 2013, Copyrigth © 2013 by the Center of Cultural Соёлын өвийн төв, Улаанбаатар, монгол улс Heritage, Ulaanbaatar, Mongolia Энэхүү цомгийг Соёлын өвийн төвийн зөвшөөрөлгүйгээр бүтнээр нь буюу хэсэгчлэн хувилан олшруулахыг хориглоно. монгол улс Улаанбаатар хот - 211238 Сүхбаатар дүүрэг Сүхбаатарын талбай 3 Соёлын төв өргөө б хэсэг Соёлын өвийн төв Шуудангийн хайрцаг 223 веб сайт: www.monheritage.mn и-мэйл: [email protected] Утас: 976-70110877 ISBN 978-99962-67-33-8 Соёл, Спорт, аялал Соёлын өвийн төв архангай аймгийн жуулчлалын яам музей 2 ÃÀÐ×Èà Өмнөх үг 4 Удиртгал 5 архангай аймгийн нутаг дахь түүх, соёлын үл хөдлөх дурсгалын тухай 18 архангай аймгийн нутаг дахь түүх, соёлын үл хөдлөх дурсгалын байршил 36 батцэнгэл сум 37 булган сум 46 Жаргалант 50 их тамир сум 55 Өгийнуур сум 61 Өлзийт сум 64 Өндөр-Улаан сум 68 тариат сум 73 төвширүүлэх сум 76 хангай сум 78 хайрхан сум 81 хашаат сум 85 хотонт сум 88 цахир сум 91 цэнхэр сум 94 цэцэрлэг сум 97 Чулуут 100 Эрдэнэмандал 103 Эрдэнэбулган 111 архангай аймгийн нутаг дахь түүх, соёлын үл хөдлөх дурсгалын жагсаалт 114 товчилсон үгийн тайлал 116 ашигласан ном бүтээлийн жагсаалт 117 ªÌÍªÕ ¯Ã СаЖЯ-ны харьяа Соёлын өвийн төв монгол нутагт оршин буй түүх, соёлын үл хөдлөх дурсгалыг анхан Сшатны байдлаар бүртгэн баримтжуулах, тоолох, хадгалалт хамгаалалт, ашиглалтын байдалд судалгаа хийх ажлыг 2008-2015 онд гүйцэтгэхээр төлөвлөн хэрэгжүүлж эхлээд байгаа билээ.
    [Show full text]
  • World Bank Document
    WWF \ ORRI I) fKh K Public Disclosure Authorized AR@ 33100 Public Disclosure Authorized Public Disclosure Authorized XaTrHH; OCOHamxHMEHCYXBAATAP XaTI'HH OcopHaMxKHMFiH CYXBAATAP Public Disclosure Authorized MOHrOJI YJICbIH IHHHMJI3X YXAAHbI AIAAEMH X3JI 3OXHOJIbIH XYP33JI3H SACRED SITES OF MONGOLIA MOHFOAbIH TAXHAFAT YYA YCHbI CAHFIHHH CYaAP OPWBOH. 3MX3Tr3H 6ojioBcpyyn,K 3p,3M IUHH)CHJIF33HHR TakIi6ap, cyganraar yr4iiac3H XATIFHH OCOPHAMKIHMbIH CYXLAATAP PEXLAKTOP: ,UOKTOP, npo4eccop HI.XYP3JIEAATAP 93,R ,OKTOp m. COHHHBAIP X. B5IMBA)KAB Translation: B.ELBEGZAYA, Sh.GANBYAMBA, J.DUNN and T.LEWIS Ta]iapxa]¶ Acknowledgments: 3H3Xyy HOMbIr X3BJ WJI3X9JA,3J1XHHH BaHK, MoHroJIbIH BypxaH IIaliiHHTHbI TOB This publication has been made possible with the support of the Gandan Tegehilen (MEHIT) /FaHAaH T3r'HRj3H XHiiA/, lj3JIXHHiH BaHK-rowlaHqbIH 3acrHHH ra3pblH Monastery/ Center of Mongolian Buddhists and The World Bank-Netherlands XaMTbIH axnUuaraaHbI xeTeji6ep 60JIoH IHa1IlHH 6a BaiiraJIb XaMraan.nbIH Xo.u6oo Partnership Program, through a contract with the Alliance for Religions and Con- (IIIBXX) , Ij3JIXHHH BaHK 6a WWF (J3nIXHHH BafiraJlb XaMraajiax CaH) xaMTapcaH servation (ARC), and The World Bank-WWF Alliance for Forest Conservation OfiH HeeIgHHr xaMPaaJIax, TorTBoPToH amIHriax XeOTeJi6epHHH XYP33HA WWF and Sustainable Use, through a contract with WWF Mongolia and the assis- (J1A3nXHHH B,airaJlb XaMraaJlax CaH)-HiiH MoHPoJI Aaxb TOBIiOO 33p3r . 6a9JIXHfiyHayj caHxyyraRb Xamraaj1uiaxH CaHy.)-H H Ma OHi~rOp qaXb TOBquiar, T H tance of the following individuals working with these organizations: 6aRryynvmaryy,q caHxyyrHiiH TycjamIvaar y3yyJIC3H 6a 3Arm3p 6akryy:mara, TyyHHfi wJKMITHyyqa, TaiiapxaJi HJI3pXHHJIbe. MEHUIT/Fauda TqasiuAa Xu2i: ,LDizxuiMn Eaw?C For Gandan Monastery: ForARC: EIx xaM6aj,l. THomKaMuq TOHH YHTeH Hamba Lama D. Choijamts Baatar, Bazar )I3A A°OKTop III.
    [Show full text]
  • Defacto Defacto Defacto
    DeFacto REVIEW DeFacto ARTICLE DeFacto INTERVIEW Jargalsaikhan Dambadarjaa, Peter C. Akerley PUBLIC DEMONSTRATIONS Mongolian political and President, Chief Executive Officer and Director DEMANDING economic observer, columnist RESIGNATION OF SPEAKER THE GREATEST VALUE TO OUR CARROT AND STICK POLICY: CHAOS AROUND MARKET CAPITALIZATION FROM SALKHIT DEPOSIT THE MONGOLIAN LISTING IS A STRENGTHENING OF OUR SHAREHOLDER BASE WITH TAVAN TOLGOI FUEL INVESTORS BEING ABLE TO LOOK AT POWER PLANT US AS INVOLVING THE MONGOLIAN SOCIETY IN OUR COMPANY X PAGE II PAGE VI PAGE WEEKLY INFORMING | INSPIRING | EMPOWERING A WEEKLY INDEPENDENT, NONPARTISAN, ANALYTICAL NEWSPAPER COVERING THE POLITICS Friday, 2019.01.11 №78 AND ECONOMICS OF MONGOLIA-IN ENGLISH, JAPANESE, RUSSIAN AND MONGOLIAN www.defacto.mn DeFacto ARTICLE № 463 JARGALSAIKHAN Dambadarjaa For weekly articles, visit http://jargaldefacto.com/category/23 CARROT AND STICK POLICY: FUEL enn State University professor Randall Bakiyev and his family replaced the U.S. military Newnham talked about how Russia turned base with a Russian one and got wealthy by Pits energy resources into a leverage used supplying Russian fuel as well. for its foreign policy in his paper published in 2011. When public governance is poor and corrupt and He used specific examples to describe how Russia if your fuel supply is dependent on a single nation, it has utilized its energy resources in their carrot and is inevitable for any country to experience political stick policy to reward friends and punish enemies. instability and existential challenges depending on Newnham used facts and evidence to show Russia actions of the fuel supplier. supplied Armenia, Belarus, and Ukraine (during the time of President Kuchma, who was pro-Russia) Until 2010, Mongolia used to purchase fuel at the with specifically low-priced energy resources, price set by Rosneft.
    [Show full text]
  • Thesis Local Understanding of Hydro-Climate Changes
    THESIS LOCAL UNDERSTANDING OF HYDRO-CLIMATE CHANGES IN MONGOLIA Submitted by Tumenjargal Sukh Department of Ecosystem Science and Sustainability In partial fulfillment of the requirements For the Degree of Master of Science Colorado State University Fort Collins, Colorado Fall 2012 Master’s Committee: Advisor: Steven Fassnacht Melinda Laituri Maria Fernandez-Gimenez Greg Butters Copyright by Tumenjargal Sukh 2012 All Rights Reserved ABSTRACT LOCAL UNDERSTANDING OF HYDRO-CLIMATE CHANGES IN MONGOLIA Air temperatures have increased more in semi-arid regions than in many other parts of the world. Mongolia has an arid/semi-arid climate where much of the population is dependent upon the limited water resources, especially herders. This paper combines herder observations of changes in water availability in streams and from groundwater with an analysis of climatic and hydrologic change from station data to illustrate the degree of change of Mongolian water resources. We find that herders’ local knowledge of hydro-climatic changes is similar to the station based analysis. However, station data are spatially limited, so local knowledge can provide finer scale information on climate and hydrology. We focus on two regions in central Mongolia: the Jinst soum in Bayankhongor aimag in the desert steppe region and the Ikh-Tamir soum in Arkhangai aimag in the mountain steppe. As the temperatures have increased significantly (more in Ikh-Tamir than Jinst), precipitation amounts have decreased in Ikh-Tamir which corresponds to a decrease in streamflow, in particular, the average annual streamflow and the annual peak discharge. At Erdenemandal (Ikh-Tamir) the number of days with precipitation has decreased while at Horiult (Jinst) it has increased.
    [Show full text]
  • Tuul River Basin Basin
    GOVERNMENT OF MINISTRY OF ENVIRONMENT MONGOLIA I II III AND GREEN DEVELOPMENT Physical, Tuul river Socio-Economic geographical basin water Development and natural resource and and Future condition of water quality trend of the Tuul river Tuul River basin Basin IV V VI Water Water use Negative TUUL RIVER BASIN supply, water balance of the impacts on consumption- Tuul river basin basin water INTEGRATED WATER MANAGEMENT PLAN use and water resources demand, hydro- constructions VII VIII IX Main challenges River basin The organization and strategic integrated and control of objectives of the water resources the activities to river basin water management implement the Tuul management plan plan measures River Basin IWM INTEGRATED WATER MANAGEMENT PLAN plan Address: TUUL RIVER BASIN “Strengthening Integrated Water Resources Management in Mongolia” project Chingunjav Street, Bayangol District Ulaanbaatar-16050, Mongolia Tel/Fax: 362592, 363716 Website: http://iwrm.water.mn E-mail: [email protected] Ulaanbaatar 2012 Annex 1 of the Minister’s order ¹ A-102 of Environment and Green Development, dated on 03 December, 2012 TUUL RIVER BASIN INTEGRATED WATER MANAGEMENT PLAN (Phase 1, 2013-2015; Phase 2, 2016-2021) Ulaanbaatar 2012 DDC 555.7’015 Tu-90 This plan was developed within the framework of the “Strengthening Integrated Water Resources Management in Mongolia” project, funded by the Government of the Kingdom of the Netherlands at Ministry of Environment and Green Development of Mongolia Project Project Project Consulting Team National Director
    [Show full text]
  • Coleoptera: Dytiscidae) 43-53 ©Wiener Coleopterologenverein (WCV), Download Unter
    ZOBODAT - www.zobodat.at Zoologisch-Botanische Datenbank/Zoological-Botanical Database Digitale Literatur/Digital Literature Zeitschrift/Journal: Koleopterologische Rundschau Jahr/Year: 2008 Band/Volume: 78_2008 Autor(en)/Author(s): Shaverdo Helena Vladimirovna, Short Andrew Edward Z., Davaadorj E.Enkhnasan Artikel/Article: Diving Beetles of Mongolia (Coleoptera: Dytiscidae) 43-53 ©Wiener Coleopterologenverein (WCV), download unter www.biologiezentrum.at Koleopterologische Rundschau 78 43–53 Wien, Juli 2008 Diving Beetles of Mongolia (Coleoptera: Dytiscidae) H.V. SHAVERDO, A.E.Z. SHORT & E. DAVAADORJ Abstract Sixty-four species of the water beetle family Dytiscidae were collected from 84 localities in the north- central part of Mongolia, in the basin of the Selenge River, during 2003–2006. Twenty species and one subspecies of Dytiscidae are recorded from Mongolia for the first time. According to the present study and literature data, 87 species of Dytiscidae are currently known from Mongolia. Key words: Coleoptera, Dytiscidae, faunistics, Mongolia. Introduction The dytiscid fauna of Mongolia is relatively well known due to the works of BELLSTEDT (1985), BRANCUCCI (1982), BRINCK (1943), GUÉORGUIEV (1965, 1968, 1969, 1972), and more recent Dr. Hildegard studies (FERY 2003, SHAVERDO 2004, SHAVERDO & FERY 2001). WINKLER Nonetheless, new faunistic data and new species of Dytiscidae were obtained recently through the “Selenge River Basin Expeditions, 2003–2006” (FERY & PETROV 2006, SHAVERDO & FERY Fachgeschäft und 2006). Buchhandlung The aim of this paper is to report the faunistic results of the Dytiscidae collected during the “Selenge River Basin Expeditions, 2003–2006”, and to present a checklist of the Mongolian für Entomologie dytiscids known so far. A similar checklist for the Hydrophilidae has been published by SHORT & KANDA (2006).
    [Show full text]
  • SEMI ANNUAL REPORT (Oct 1, 2017 - Mar 31, 2018)
    Mercy Corps LTS2 Semi-annual Report (October 1, 2017 to March 31, 2018) Leveraging Tradition and Science in Disaster Risk Reduction in Mongolia-2 (LTS2 - Mongolia) SEMI ANNUAL REPORT (Oct 1, 2017 - Mar 31, 2018) Agreement # AID-OFDA-G-15-00101 Submitted to: USAID Submitted by: Mercy Corps April 2018 COUNTRY CONTACT HEADQUARTERS CONTACT Ramesh Singh Denise Ledgerwood Country Director Senior Program Officer Mercy Corps Mercy Corps PO Box 761 45 SW Ankeny Street Ulaanbaatar 79, Mongolia Portland, OR 97204 Phone: +976 9911 4204 Phone: +1.503.896.5000 [email protected] [email protected] Mercy Corps LTS2 Semi-annual Report (Oct 1, 2017 – March 31, 2018) ACRONYMS AND TRANSLATIONS Aimag An administrative unit similar to a province or state APF Aimag Partnership Facilitator AWI Advanced Weather Information Service Bagh An administrative unit similar to a sub-county (sub-soum) CITA Communication Information and Technology Authority Dzud An environmental hazard that unfolds over several seasons and includes drought conditions in the summer leading to poor forage availability and low temperatures, heavy snows and/or ice in winter, which combine to exhaust animals, leading to death from starvation or exposure. ECHO European Civil Protection and Humanitarian Aid Operations ES engageSPARK EMA Emergency Management Agency FAO Food and Agriculture Organization of the United Nations Hural An elected decision-making body at the district, province and national level ICT Information and Communication Technology KEIO Keio University of Japan LEWS
    [Show full text]
  • Map of Study Area the FEASIBILITY STUDY on CONSTRUCTION of EASTERN ARTERIAL ROAD in MONGOLIA
    ROAD NETWORK OF MONGOLIA Study Area Khankh Khandgait Ulaanbaishint Ulaangom Sukhbaatar Altanbulag Ereentsav Tsagaannuur Baga ilenkh A 0305 Ulgii Murun Bayan-uul Khavirga Darkhan Dorgon Dayan Norovlin Khovd Zavkanmandal Erdenet Sumber Bulgan Choibalsan Bayanchandman Baganuur Berkh Mankhan Tosontsengel Ulaanbaatar Uliastai Lun Kharkhorin Undurkhaan Yarantai Erdenetsagaan Bulgan Erdenesant Zuunmod A0304 Tsetserleg Maanti Baruun-urt Bichigt sum Choir Arvaikheer Altai Bayankhongor Mandalgobi Legend: Paved road Sainshand Burgastai Zamin-Uud Bogd sum Gravel road Dalanzadgad Formed earth road MILLENNIUM ROAD A0203 Earth road Center of province VERTICAL ARTERIAL ROAD Gashuun-Suhait Shivee huren Map of Study Area THE FEASIBILITY STUDY ON CONSTRUCTION OF EASTERN ARTERIAL ROAD IN MONGOLIA Photographs of Study Area (1) 1) Current Road Condition Multiple shifting tracks are widely spread on plane area. It heavily affects vegetation and often leads to desertification. It also extends vehicle operating distance and time, resulting high transport cost. 2) Road Condition in Winter Multiple shifting tracks are covered with snow in winter and become slippery due to uneven surface together with compacted snow. Vehicular movement becomes risky and travel speed is forced to decrease considerably. 3) Existing Wooden Bridge Existing wooden bridge is severely deteriorated and danger always exists for heavy vehicles to go across. This is serious cause of disruption for traffic to cross the river. Heavy vehicles go across the river only when the flow is shallow. THE FEASIBILITY STUDY ON CONSTRUCTION OF EASTERN ARTERIAL ROAD IN MONGOLIA Photographs of Study Area (2) 4) Existing the Kherlen River & Bridge The flow of the Kherlen River narrows at the point of the picture.
    [Show full text]