Disclosure Log
Total Page:16
File Type:pdf, Size:1020Kb
Disclosure Log The disclosure log provides summary descriptions of the nature of information requested and released under the Code on Access to Information (“the Code”) by this department. The disclosure log will be updated on a quarterly basis. If any member of the public wishes to obtain any information listed in the disclosure log, an information request should be made to our Access to Information Officer. Such requests will be handled in accordance with the Code. July to September 2015 Reference number Information requested and released 19/2015 Information about slope information of Feature No. 8SW-A/FR23 at Wong Chuk Wan Village, Sai Kung, N.T. 20/2015 Information about road works outside 1-17 Pedder Street, Central Building, Central, Hong Kong 22/2015 Information about the maintenance responsibility of the existing covered surface channels located near Ming Kum Road, Tuen Mun, N.T. 23/2015 Information about communication with Tree Management Office and documents leading to the decision to cut and prune four trees on Bonham Road 24/2015 Information about road works outside 238 Nathan Road, Kowloon 25/2015 Information about the name of contractor conducting inspection on the tree on Hospital Road and assessment report 26/2015 Information about contractor’s name and trees investigation report on the four trees felled on Bonham Road 1 28/2015 Information about the project information of ‘Widening of Castle Peak Road – Castle Peak Bay’ 29/2015 Information about risk assessment conducted in 2013 on the four trees on Bonham Road 32/2015 Information about detailed greening report on Bonham Road 35/2015 Information about road works outside 36 Queen’s Road Central, Hing Wai Building, Central, Hong Kong October to December 2015 Reference number Information requested and released 30/2015 Information about an environmental review report of October 2014 for the Project of 'Widening of Castle Peak Road - Castle Peak Bay' 31/2015 Information about an environmental review report of July 2015 for the Project of 'Widening of Castle Peak Road - Castle Peak Bay' 36/2015 Information about the island of Hong Kong-Zhuhai-Macao Bridge 38/2015 Information related to three traffic sign posts at Sai Chuen Road, Fu Cheong Estate, Kowloon 39/2015 Information about the construction of Lugard Road, the Peak and repairs or works conducted on Lugard Road 40/2015 Information about slopes 9SE-B/C8, 9SE-B/C9 and 9SE-B/F9 at North Lantau Highway, N.T. 41/2015 Information about Excavation Permits issued on Lamma Island 2 42/2015 Information about road works outside Vitasoy Headquarters Building, 1 Kin Wong Street, Tuen Mun, N.T. 43/2015 Information related to number of enforcement actions and fines for summons for violating the terms of Excavation Permits for the years from 2012 to 2015 44/2015 Information about drainage records of North Lantau Highways and Cheung Tung Road 45/2015 Information about Pound Lane Escalator Project 46/2015 Information about tree felling report of Aleurites moluccana at Princess Margaret Road, Homantin 47/2015 Information about road works outside 639 Nathan Road, One Grand Tower, Mongkok, Kowloon 48/2015 Information about road works outside 23 Wellington Street, Kailey Tower, Central, Hong Kong 49/2015 Information about general and technical requirements and specifications on Prestressing Works, Post Tensioning Works (Highways) in Hong Kong 51/2015 Information about road works outside 72-76 Kwai Cheong Road, Luen Tai Industrial Building, Kwai Chung, NT 53/2015 Information about road works outside 1 Gloucester Road, The Hong Kong Academy For Performing Arts, Wan Chai, HK 54/2015 Information about road works outside 422-448 Un Chau Street, Kowloon 55/2015 Information related to “Further Study on Dualling of Hiram’s Highway between Clear Water Bay Road and Marina Cove and Improvement to Local Access to Ho 3 Chung” – Review of Environmental Study (Final Rev. 1) 56/2015 Information about road works outside 1-17 Pedder Street, Central Building, Central, Hong Kong 57/2015 Information about road works outside 639 Nathan Road, One Grand Tower, Mongkok, Kowloon 58/2015 Information about road works outside 39-41 Hankow Road, Maxwell Centre, Tsim Sha Tsui, Kowloon Note: The disclosure log does not cover requests from individual persons/companies for information about themselves and their complaint cases, or requests for information already published or available through an existing charged service. 4 .