285. La Trobe
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Cycle Notes Widths of Off-Road Shared Use Paths
NO. 21 - JUNe 2010 Cycle Notes Widths of Off-Road Shared Use Paths Welcome to CYCLE NOTES No. 21. The purpose of CYCLE NOTES is to provide information on the design of bicycle facilities for engineers and planners. CYCLE NOTES should be read in conjunction with: Austroads Guides to Traffic Management and Road Design. Australian Standard 1742.9, Manual of Uniform Traffic Control Devices, Part 9 Bicycle Facilities. VicRoads Traffic Engineering Manual Volumes 1 and 2. Introduction Passings and Meetings The purpose of this edition of Cycle Notes is to provide When cyclists and pedestrians are using a shared path, guidance on the width of off-road shared use paths. In they will often “meet” other cyclists and pedestrians particular, it relates the widths of paths to the volume of travelling in the opposite direction or “pass” slower cyclists cyclists and pedestrians who use the path. and pedestrians travelling in the same direction. Guidance is also provided on the circumstances under Delayed Passings which consideration should be given to separating cyclists Delayed passings occur when faster cyclists must slow from pedestrians. down to pass other path users travelling in the same direction. This usually occurs when a “passing” happens Shared Use Paths at the same time as a “meeting” and there is insufficient Shared use paths are the most common form of off road room for the faster cyclist to pass the slower path users. path in Australia and are based on cyclists and pedestrians The number of delayed passings that occur along a path is sharing the path (Figure 1). -
Victoria Railways
VICTORIA RAILWAYS - SL 120 13.11.18 page 1 of 20 PASSENGER STATIONS & STOPS Including lines in New South Wales and South Australia operated by Victorian Railways Based on Bradshaws Guide 1859 (x), Victorian Rlys (VR) Public TT (t) 1875 (y), Bradshaws Guide 1897 (z), Public TT 1912 (a), Bradshaws Guide 1924(b), Public TTs 1934 (c), 1954 (d), 1972 (e) & current TTs (f). Also 1880TT (n), Bradshaw 1930 (p), Public TTs 1941 (q), 1959 (r), 1967 (s), 1978 (t) & 1985 (u). Working TTs 1926 (v) & 1950/51 (w). a+: 1912t notes former name; a++: 1912t fares list (date)t/w other Public/Working TTs; P: 1909 Parliamentary paper with date renamed; k: 1940 TT notice # research by Langley & Whitehead, Guiney & Watson/Johnson map – date: cl/rn/rl; x-f = xyzabcdef etc. Former names: [ ]; Distances in Miles unless headed Km. Gauge 5’ 3” unless noted. R.M. : Rail Motor. op. opened; cl. closed; rn. renamed; rl. relocated; tm. terminus of service at date shown; pass?: passenger service? All dates refer to passenger services only. All locations served by passenger trains unless shown in italics in brackets, or noted. Passengers could also travel in goods trains on many lines both before and after withdrawal of advertised passenger services. 1. MELBOURNE - DENILIQUIN 82.7 Harcourt y-e + lowered into subway 2018 90.3 Ravenswood y-d 97.3 Kangaroo Flat (1st) # 1863 0.0 Melbourne (Southern Cross) f (23, 33,54, 85, 87) 97.7 Kangaroo Flat (2nd) yz.b-eu [Kangaroo a ] [Melbourne (VR) xy] 99.3 Golden Square z-e [Melbourne (Spencer Street) (rn.2005) z-e ] 100.7 Bendigo z-f [Sandhurst xy ] (11, 14, 56) 1.0 North Melbourne y-f (85, 87) 102.0 North Bendigo Junction a-e 2.3 South Kensington z-f [Bendigo Cattle Siding a+ ] 2.7 Saltwater River # 1867 104.3 Bendigo Racecourse w 3.5 Footscray (2nd) a-f (33) [Sandhurst Racecourse #1910 ] 3.7 Middle Footscray (1st) z [Footscray (1st) xy ] [Bendigo (Epsom) Racecourse a++ ] 3.8 Middle Footscray (2nd) ab 105.3 Epsom abcd.f [Epsom & Huntly 1865t ] 4.0 Middle Footscray (3rd) cdef 108.0 Huntly zabc 4.5 West Footscray a-f [Footscray West z ] 112.0 Bagshot z-e 5. -
Budget Submission
2012-13 Pre-Budget Submission January 2012 Contents 1 Executive Summary .................................................................................................... 1 1.1 Introduction ............................................................................................................... 1 1.2 Public transport is a priority ...................................................................................... 1 1.3 Australia’s Clean Energy Future ................................................................................. 1 1.3.1 Inequities in the coverage of transport .......................................................................... 1 1.3.2 Lifecycle impact of biofuels ............................................................................................ 1 1.3.3 Mitigating the unintended consequences ...................................................................... 2 1.4 Fixing the transport imbalance .................................................................................. 2 1.4.1 Expanding coverage of fast, frequent public transport .................................................. 2 1.4.2 Cutting delays ................................................................................................................. 3 1.4.3 False solutions ................................................................................................................ 4 1.5 Freight transport ....................................................................................................... 4 2 Public -
Built Form Review: Victoria Street, Abbotsford & Richmond Heritage Analysis & Recommendations
Level 3, 124 Exhibition Street [GPO Box 2634, Melbourne 3001] Melbourne, Victoria 3000 [email protected] +61 (03) 9115 6566 gjmheritage.com ABN: 62 348 237 636 ARBV: 51910 BUILT FORM REVIEW: VICTORIA STREET, ABBOTSFORD & RICHMOND HERITAGE ANALYSIS & RECOMMENDATIONS PREPARED FOR: City of Yarra DATE: 12 April 2021 FILE: 2020-052 © GJM Heritage (2021) All Rights Reserved This report is limited in its scope to consideration of post-contact cultural heritage and does not provide advice on any Aboriginal cultural heritage significance. The subject site forms part of the 37.5% of Victoria where there is currently no formally recognized Traditional Owner groups. Nonetheless, we acknowledge the Traditional Owners of the land at this place and pay our respects to their Elders past, present and emerging. For more information, please visit https://www.aboriginalvictoria.vic.gov.au PROJECT TEAM Jim Gard’ner | Director Renae Jarman | Director Ros Coleman | Senior Associate Jessi Briggs | Associate Jessica Hogg | Heritage Consultant Cover Image: Looking west down the northern side of Victoria Street from opposite the intersection of Lithgow Street, January 2021. GLOSSARY OF ABBREVIATIONS C1Z Commercial 1 Zone C2Z Commercial 2 Zone DDO Design and Development Overlay DELWP Department of Environment, Land, Water and Planning GRZ General Residential Zone HO Heritage Overlay MAC Major Activity Centre MUZ Mixed Use Zone NAC Neighbourhood Activity Centre NRZ Neighbourhood Residential Zone PPN Planning Practice Note PUZ Public Use Zone SUZ Special Use Zone VHR Victorian Heritage Register All photos taken by GJM Heritage during 2017, 2018 and in January 2021 unless otherwise stated. DOCUMENT VERSIONS Project No. -
Appendix I Complementary Projects
Appendix I Complementary Projects February 2018 B Contents Executive summary....................................................................................................................................... 3 Complementary projects ................................................................................................................................... 3 Recommendation .............................................................................................................................................. 4 1 Introduction ....................................................................................................................................... 5 2 Scope framework ............................................................................................................................... 6 3 Complementary projects .................................................................................................................... 7 3.1 Arterial road network improvement opportunities ........................................................... 7 3.1.1 E6 transport corridor ...................................................................................................................... 8 3.1.2 Rosanna Road upgrade ................................................................................................................. 11 3.1.3 Diamond Creek road upgrade ....................................................................................................... 12 3.1.4 Templestowe Road upgrade ........................................................................................................ -
Eastern Metro Region Five Year Plan for Jobs, Services and Infrastructure 2018–2022
Eastern Metro Region Five Year Plan for Jobs, Services and Infrastructure 2018–2022 Eastern Metro Region © The State of Victoria Department of Environment, Land, Water and Planning 2018 This work is licensed under a Creative Commons Attribution 4.0 International licence. You are free to re-use the work under that licence, on the condition that you credit the State of Victoria as author. The licence does not apply to any images, photographs or branding, including the Victorian Coat of Arms, the Victorian Government logo and the Department of Environment, Land, Water and Planning (DELWP) logo. To view a copy of this licence, visit creativecommons.org/licenses/by/4.0/ Printed by (Impact Digital, Brunswick). ISBN 978-1-76077-179-9 (Print) ISBN 978-1-76077-180-5 (pdf/online/MS word) Disclaimer This publication may be of assistance to you but the State of Victoria and its employees do not guarantee that the publication is without flaw of any kind or is wholly appropriate for your particular purposes and therefore disclaims all liability for any error, loss or other consequence which may arise from you relying on any information in this publication. Accessibility If you would like to receive this publication in an alternative format, please telephone the DELWP Customer Service Centre on 136 186, or email [email protected] (or relevant address), or via the National Relay Service on 133 677, www.relayservice.com.au. This document is also available on the internet at www.delwp.vic.gov.au. Office for Suburban Development Aboriginal acknowledgement The Victorian Government proudly acknowledges Victoria’s Aboriginal community and their rich culture and pays respect to their Elders past and present. -
East West Link (Eastern Section) Project
I Major Transport Projects Facilitation Act 2009 East West Link (Eastern Section) Project Assessment Committee Report Volume 1 ‐ Report 30 May 2014 Major Transport Projects Facilitation Act 2009 Assessment Committee Report pursuant to Section 73 of the Act East West Link (Eastern Section) Project Kathryn Mitchell, Chair Nick Wimbush, Deputy Chair Lyn Denison, Member Des Grogan, Member Jim Holdsworth, Member William O’Neil, Member East West Link (Eastern Section) Project Assessment Committee Report 30 May 2014 Contents Page Executive Summary and Recommendations ......................................................................... i Part A: Background .............................................................................................................. 1 1 Introduction ................................................................................................................ 3 1.1 The Assessment Committee .................................................................................... 3 1.2 Terms of Reference and Role of the Committee .................................................... 3 1.3 Approach to this Report .......................................................................................... 5 1.4 Matters not Considered in Detail ............................................................................ 6 2 The Project.................................................................................................................. 9 2.2 Project Area Precincts .......................................................................................... -
Banyule Municipal Economic Information Base
ECONOMIC INFORMATION BASE MUNICIPAL REPORT (FINAL) BANYULE CITY COUNCIL JUNE 2017 URBAN ENTERPRISE URBAN PLANNING LAND ECONOMICS TOURISM PLANNING INDUSTRY SOFTWARE 389 ST GEORGES RD NORTH FITZROY 3068 VIC | PH: (03) 9482 3888 | WWW.URBANENTERPRISE.COM.AU AUTHORS Paul Shipp Chris Funtera Brett Hannah URBAN ENTERPRISE URBAN PLANNING LAND ECONOMICS TOURISM PLANNING INDUSTRY SOFTWARE 389 ST GEORGES RD, FITZROY NORTH, VIC 3068| PH: (03) 9482 3888 www.urbanenterprise.com.au © Copyright, Urban Enterprise Pty Ltd, 2017 This work is copyright. Apart from any uses permitted under Copyright Act 1963, no part may be reproduced without written permission of Urban Enterprise Pty Ltd. FILENAME: Banyule Municipal Economic Information_June17_Final.docx VERSION: 2 DISCLAIMER Neither Urban Enterprise Pty. Ltd. nor any member or employee of Urban Enterprise Pty. Ltd. takes responsibility in any way whatsoever to any person or organisation (other than that for which this report has been prepared) in respect of the information set out in this report, including any errors or omissions therein. In the course of our preparation of this report, projections have been prepared on the basis of assumptions and methodology which have been described in the report. It is possible that some of the assumptions underlying the projections may change. Nevertheless, the professional judgement of the members and employees of Urban Enterprise Pty. Ltd. have been applied in making these assumptions, such that they constitute an understandable basis for estimates and projections. Beyond this, to the extent that the assumptions do not materialise, the estimates and projections of achievable results may vary. CONTENTS EXECUTIVE SUMMARY 7 1. -
Monday, 24 February 2020 7.00Pm
Agenda Monday, 24 February 2020 7.00pm Ordinary Meeting of Council Olympia, Hawdon & Ibbott Rooms Level 4, 1 Flintoff Street, Greensborough Acknowledgement of the Traditional Custodians “Our meeting is being held on the Traditional Land of the Wurundjeri Woi-wurrung people and, on behalf of Banyule City Council, I wish to acknowledge them as the Traditional Custodians. I would also like to pay my respects to the Wurundjeri Woi- wurrung Elders, past, present and emerging, and to acknowledge other Aboriginal and Torres Strait Elders joining us today.” Apologies and Leave of Absence Confirmation of Minutes Ordinary Meeting of Council held 3 February 2020 and Special Meeting of Council held 10 February 2020. Disclosure of Interests 1. Urgent Business REPORTS: 2. Petitions Nil 3. People – Community Strengthening and Support 3.1 Himilo Community Connect - Request for Financial Support ......... 5 4. Planet – Environmental Sustainability Nil 5. Place – Sustainable Amenity and Built Environment 5.1 Bellfield Community Hub Concept Plan ...................................... 11 5.2 Hurstbridge Line Duplication - Stage 2 - Update ......................... 16 5.3 21 - 25 Bellevue Avenue, Rosanna - Proposed Child Care Centre - P954/2019 .................................................................................. 23 6. Participation – Community Involvement in Community Life Nil 7. Performance - Use Our Resources Wisely 7.1 Contract Award 1022-2020 Construction of Olympic Park Stage 2 ................................................................................................ -
Cycling Into the Future 2013–23
DECEMBER 2012 CYCLING INTO THE FUTURE 2013–23 VICTORIA’s cyCLING STRATEGY Published by the Victorian Government, Melbourne, December 2012. © State of Victoria 2012 This publication is copyright. No part may be reproduced in any process except in accordance with the provisions of the Copyright Act 1968. Authorised by the Victorian Government Melbourne Printing managed by Finsbury Green For more information contact 03 9655 6096 PAGE III CYCLING INTO THE FUTURe 2013–23 VICTORIA’s CYCLING STRATEGY CONTENTS Minister’s foreword v Executive summary vi 1 Cycling in Victoria 1 2 Growing cycling in Victoria 5 Current cycling patterns 5 Potential growth 5 3 Benefits of cycling 8 Healthier Victorians 8 Better places to live 9 Stronger economy 9 Healthier environment 10 4 Strategic framework 11 Direction 1: Build evidence 12 Direction 2: Enhance governance and streamline processes 14 Direction 3: Reduce safety risks 16 Direction 4: Encourage cycling 20 Direction 5: Grow the cycling economy 22 Direction 6: Plan networks and prioritise investment 24 5 Implementation, monitoring and evaluation 29 Appendix 1: Cycling networks, paths and infrastructure 30 PAGE IV CYCLING INTO THE FUTURe 2013–23 VICTORIA’s CYCLING STRATEGY Some of our work in metropolitan Melbourne includes: > a new bridge on the Capital City Trail at Abbotsford > bike lanes along Chapel Street > extensions and improvements to the Federation Trail, Gardiner’s Creek Trail and Bay Trail on Beach Road > Jim Stynes Bridge for walking and cycling between Docklands and the CBD along the Yarra River > Heatherton Road off-road bike path from Power Road to the Dandenong Creek Trail > a bridge over the Maroondah Highway at Lilydale > bike connections to Box Hill and Ringwood > Parkiteer bike cages and bike hoops at 16 railway stations > Westgate Punt weekday services > bike paths along the Dingley Bypass, Stud Road, Clyde Road and Narre Warren – Cranbourne Road > bike infrastructure as part of the Regional Rail Link project > a new trail in association with the Peninsula Link. -
Recreational Activity Surveys During COVID-19 and Comparison with Pre-Lockdown Activity Levels
More people out on bicycles: Recreational activity surveys during COVID-19 and comparison with pre-lockdown activity levels May 2020 Measuring recreational activity in unprecedented times Lockdown in Victoria On 30 March 2020, the Minister for Health and Medical Research signed an Order for stage 3 lockdown measures to be put in place across Australian states, following a national outbreak of the novel coronavirus. The Order, which in Victoria falls under section 200 of the Public Health and Wellbeing Act (2008)1, 2, places legally enforceable restrictions on all non-essential gatherings, as a means of minimising the spread of the deadly virus. During the stage 3 restrictions, there are only four reasons for Victorian residents to be outside: • purchasing food and essential supplies; • medical, care or compassionate needs; • exercise; and • work and study if they cannot be undertaken remotely2. How has this affected our recreational activities? An arising question is how these restrictions have affected the recreational needs of residents in Victoria and elsewhere. A recent survey by Bicycle Network3 found that, in response to stage 3 restrictions across Australian states: • 73 per cent [of respondents] are planning to use a bicycle to access essential services (shops, healthcare, work and education) in the coming weeks and months; • 84 per cent of healthcare workers said they would ride bicycles more or the same amount; and • Most respondents (39 per cent) said that they will be riding a bicycle outdoors to get their daily exercise. In addition, emerging data suggests an increase in bicycle purchases during lockdown restrictions4. These findings suggest that, given these increased needs for bicycle-related transport, exercise and recreation; Australian roads and shared paths may be exhibiting major deviations from normal bicycle traffic volumes. -
Rosanna Station Development Combined Planning Scheme Amendment and Planning Permit Application Town Planning and Urban Context Report
Rosanna Station Development Combined Planning Scheme Amendment and Planning Permit Application Town Planning and Urban Context Report Date prepared Prepared for Instructed by February 2021 Beetham Parade Pty Ltd SEMZ Property Advisory and Project Management Table of Contents Section Page No. ____________________________________________________________ 1 Introduction 3 1.1 Overview 3 1.2 Background 3 2 The Site and its Context 5 2.1 The Site 5 2.2 Wider Context 7 2.3 Opportunities and Constraints 8 3 Existing Planning Controls and Policy 9 3.1 Planning Controls and Provisions 9 3.2 Planning Policy Framework 11 3.3 Aboriginal Cultural Heritage 12 4 Planning Scheme Amendment 13 4.1 Overview of the Amendment 13 4.2 Proposed Zone 13 ratio:consultants pty ltd 4.3 Strategic Assessment 14 This work is copyright. Apart from any use as permitted under Copyright Act 1968, no part may be reproduced without written permission of ratio:consultants pty ltd. 5 Planning Permit Application 22 Disclaimer: neither ratio:consultants pty ltd nor any member or employee of 5.1 The Proposal 22 ratio:consultants pty ltd takes responsibility in anyway whatsoever to any person or 5.2 Assessment of the Permit Application Proposal 25 organisation (other than that for which this report is being prepared) in respect of the information set out in this report, including any errors or omissions therein. ratio:consultants pty ltd is not liable for errors in plans, specifications, documentation 6 Conclusion 39 or other advice not prepared or designed by ratio:consultants pty ltd. Appendices: Appendix A Clause 58 Assessment Rosanna Station development site – S96a Application Planning Report 2 1 Introduction 1.1 Overview development proposal in relation to relevant policies and provisions of the Banyule Planning Scheme.