Development of a Strategic Corridor Plan for the Umhlathuze-Ulundi- Vryheid Secondary Corridor – ZNT 1970/2015 LG-14

Total Page:16

File Type:pdf, Size:1020Kb

Development of a Strategic Corridor Plan for the Umhlathuze-Ulundi- Vryheid Secondary Corridor – ZNT 1970/2015 LG-14 Report Development of a Strategic Corridor Plan for the uMhlathuze-Ulundi- Vryheid Secondary Corridor – ZNT 1970/2015 LG-14 Milestone 5 Deliverable: Implementation and Phasing Plan KZN Cooperative Governance & Traditional Affairs: Client: LED Unit Reference: T&PMD1740-100-104R003F02 Revision: 02/Final Date: 24 July 2017 O p e n ROYAL HASKONINGDHV (PTY) LTD 30 Montrose Park Boulevard Montrose Park Village Victoria Country Club Estate Montrose Pietermaritzburg 3201 Transport & Planning Reg No. 1966/001916/07 +27 33 328 1000 T +27 33 328 1005 F [email protected] E royalhaskoningdhv.com+27 33 328 1000 W +27 33 328 1005 T Document title: Development of a Strategic Corridor Plan for the [email protected] F Secondary Corridor – ZNT 1970/2015 LG-14 royalhaskoningdhv.com+27 33 328 1000 E Document short title: SC1 Implementation & Phasing Plan +27 33 328 1005 W Reference: T&PMD1740-100-104R003F02 [email protected] T Revision: 02/Final royalhaskoningdhv.com+27 33 328 1000 F Date: 24 July 2017 +27 33 328 1005 E Project name: SC1 Corridor [email protected] W Project number: MD1740-100-104 royalhaskoningdhv.com T Author(s): Anton Martens (UPD), Bronwen Griffiths, Chris Cason, Lisa Higginson (Urban- F Econ), Nomcebo Hlophe, Rob Tarboton, Talia Feigenbaum (Urban-Econ) and E Andrew Schultz W Drafted by: Andrew Schultz Checked by: Date / initials: Approved by: Date / initials: Classification Open Disclaimer No part of these specifications/printed matter may be reproduced and/or published by print, photocopy, microfilm or by any other means, without the prior written permission of Royal HaskoningDHV (Pty) Ltd; nor may they be used, without such permission, for any purposes other than that for which they were produced. Royal HaskoningDHV (Pty) Ltd accepts no responsibility or liability for these specifications/printed matter to any party other than the persons by whom it was commissioned and as concluded under that Appointment. The integrated QHSE management system of Royal HaskoningDHV (Pty) Ltd has been certified in accordance with ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007. 24 July 2017 SC1 IMPLEMENTATION & PHASING PLAN T&PMD1740-100-104R003F02 i O p e n Table of Contents 1 Introduction 1 1.1 Project Reference 1 1.2 Statutory Obligation 1 1.2.1 Development Principles 1 1.3 Study Area 2 1.3.1 Primary Study Area 2 1.3.2 Participating Municipalities 4 1.3.3 Municipal Elections 2016 5 1.4 Spatial Vision and Concept 7 1.4.1 Study Area Role within the Region 7 1.4.2 Pillars of the Vision 7 1.4.3 Vision Statement 8 1.4.4 Mission Statement 8 1.4.5 Spatial Concepts 8 1.5 Composite Regional Spatial Development Framework 14 1.5.1 Consolidated RSDF Proposals 14 1.6 Milestone 5 Deliverable: Implementation and Phasing Plan 14 1.6.1 Purpose 14 1.6.2 Objective 14 1.6.3 Methodology 14 1.6.4 Outcome 14 1.6.5 Milestone 5: Deliverables 14 2 Spatial Framework for Capital Investment 17 2.1 Spatial Concepts and Proposals 17 2.2 Spatial Targets 17 2.2.1 Development Nodes and Corridors 17 2.2.2 Rural / Traditional Settlement Restructuring Areas 21 2.2.3 High Agricultural Potential Areas 22 2.2.4 High Biodiversity Value Areas 23 2.2.5 Key transportation aspects – R34 Route 24 2.3 Project Identification and Assessment 28 2.3.1 Initial Project Screening (Step 1) 28 2.3.2 Project Scores by Theme / Sub-Theme (Step 2) 35 2.4 Spatial / Project Priorities 37 2.4.1 Key Intervention Projects (Step 3) 37 2.4.2 Key Intervention Project Actions (Step 4) 45 2.4.3 Spatial Assessment of Projects (Step 5) 73 2.4.4 Key Intervention Project Summary (Step 6) 78 3 Spatial Governance Framework 82 3.1 Introduction 82 3.2 Implementation Tools 82 3.3 Potential Project Funding 83 24 July 2017 SC1 IMPLEMENTATION & PHASING PLAN T&PMD1740-100-104R003F02 ii O p e n 3.4 Institutional Arrangements 84 4 Conclusion 87 4.1 Summary 87 4.2 Way Forward 88 Acronyms 90 Appendix A 92 A1. Biophysical project evaluation 92 A2. Socio-Economic project evaluation 93 A3. Built Environment: Spatial Planning project evaluation 95 A4. Built Environment: Transport 96 A5. Built Environment: Infrastructure – Water 97 Appendix B 100 Table of Tables Table 1-1: SPLUMA Development Principles .................................................................................. 1 Table 1-2: Participating Municipalities (prior to 2016 Municipal Elections) ....................................... 4 Table 2-1: Proposed Node Hierarchy for SC1 SCDP .................................................................... 18 Table 2-2: Proposed Corridor Hierarchy for SC1 SCDP ................................................................ 19 Table 2-3: Investment Priority and Functions / Land Uses Appropriate for Node Typologies ......... 20 Table 2-4: Initial Project Identification ............................................................................................ 28 Table 2-5: Multi-Criteria Analysis using PGDS Strategic Goals and Objectives as Main Criteria and Sub-Criteria ................................................................................................................................... 33 Table 2-6: Scoring System for Scoring Impact of Projects on MCA Criteria................................... 34 Table 2-7: Project Scores by Theme / Sub-Theme ........................................................................ 35 Table 2-8: Key Intervention Projects ............................................................................................. 37 Table 2-9: Biophysical project – Project B01 ................................................................................. 45 Table 2-10: Biophysical project – Project B02 ............................................................................... 46 Table 2-11: Biophysical project – Project B03 ............................................................................... 47 Table 2-12: Biophysical project – Project B04 ............................................................................... 48 Table 2-13: Biophysical project – Project B05 ............................................................................... 49 Table 2-14: Biophysical project – Project B06 ............................................................................... 50 Table 2-15: Socio-economic project – Project S01 ........................................................................ 51 Table 2-16: Socio-economic project – Project S02 ........................................................................ 52 Table 2-17: Socio-economic project – Project S03 ........................................................................ 53 Table 2-18: Socio-economic project – Project S04 ........................................................................ 54 Table 2-19: Socio-economic project – Project S05 ........................................................................ 55 Table 2-20: Socio-economic project – Project S06 ........................................................................ 56 24 July 2017 SC1 IMPLEMENTATION & PHASING PLAN T&PMD1740-100-104R003F02 iii O p e n Table 2-21: Planning project – Project P01 ................................................................................... 57 Table 2-22: Planning project – Project P02 ................................................................................... 58 Table 2-23: Planning project – Project P03 ................................................................................... 59 Table 2-24: Planning project – Project P04 ................................................................................... 60 Table 2-25: Planning project – Project P05 ................................................................................... 61 Table 2-26: Planning project – Project P06 ................................................................................... 62 Table 2-27: Planning project – Project P07 ................................................................................... 63 Table 2-28: Transport project – Project T01 .................................................................................. 64 Table 2-29: Transport project – Project T04 .................................................................................. 65 Table 2-30: Transport project – Project T07 .................................................................................. 66 Table 2-31: Transport project – Project T08 and T09 .................................................................... 67 Table 2-32: Infrastructure project – Project I01 ............................................................................. 68 Table 2-33: Infrastructure project – Project I02 ............................................................................. 69 Table 2-34: Infrastructure project – Project I03 ............................................................................. 70 Table 2-35: Infrastructure project – Project I04 ............................................................................. 71 Table 2-36: Infrastructure project – Project I05 ............................................................................. 72 Table 2-37: Key Intervention Projects Spatial Targets ................................................................... 73 Table 2-38: Ranked Key Intervention Project Summary by timeframe ........................................... 78 Table 3-1: Potential Implementation Tools and Interventions ........................................................ 82 Table 3-2: Potential Project
Recommended publications
  • South Africa
    PUBLIC VERSION DOC Investigation No. A-791-825 ITC Investigation Nos. 701-TA-___-___ and 731-TA- ___-___ Total No. of Pages: 370 AD/CVD Operations Petitioners’ Business Proprietary Information for Which Proprietary Treatment Has Been Requested Deleted at Exhibits AD-ZA-1 (Atts. 1, 2, 5, 7,), AD-ZA- 2, AD-ZA-4, and AD-ZA-5 PUBLIC VERSION BEFORE THE INTERNATIONAL TRADE ADMINISTRATION OF THE U.S. DEPARTMENT OF COMMERCE AND THE U.S. INTERNATIONAL TRADE COMMISSION ANTIDUMPING DUTY PETITION VOLUME XVI SOUTH AFRICA COMMON ALLOY ALUMINUM SHEET FROM BAHRAIN, BRAZIL, CROATIA, EGYPT, GERMANY, GREECE, INDIA, INDONESIA, ITALY, KOREA, OMAN, ROMANIA, SERBIA, SLOVENIA, SOUTH AFRICA, SPAIN, TAIWAN, AND TURKEY PETITIONERS: THE ALUMINUM ASSOCIATION COMMON ALLOY ALUMINUM SHEET TRADE ENFORCEMENT WORKING GROUP AND ITS INDIVIDUAL MEMBERS W. BRAD HUDGENS JOHN M. HERRMANN DAVID C. SMITH WILLIAM H. CROW II PAUL C. ROSENTHAL GRACE W. KIM EMILY R. MALOOF KATHLEEN W. CANNON MELISSA M. BREWER NEREUS JOUBERT R. ALAN LUBERDA JOSHUA R. MOREY VLADIMIR VARBANOV BROOKE M. RINGEL MATTHEW G. PEREIRA GEORGETOWN ECONOMIC KELLEY DRYE & WARREN LLP SERVICES, LLC 3050 K Street, N.W., Suite 400 3050 K Street, N.W. Washington, DC 20007 Washington, D.C. 20007 (202) 342-8400 (202) 945-6660 Counsel to Petitioners March 9, 2020 PUBLIC VERSION Table of Contents Page I COMMON ALLOY ALUMINUM SHEET FROM SOUTH AFRICA IS BEING SOLD OR OFFERED FOR SALE AT LESS THAN FAIR VALUE .......,.1 A. Introduction............... 1 B. Producers in South Africa."..'. ,2 C. Export Price or Constructed Export Price' .4 D. Normal Value........ 5 E.
    [Show full text]
  • Government Gazette Staatskoerant REPUBLIC of SOUTH AFRICA REPUBLIEK VAN SUID AFRIKA
    Government Gazette Staatskoerant REPUBLIC OF SOUTH AFRICA REPUBLIEK VAN SUID AFRIKA Regulation Gazette No. 10177 Regulasiekoerant February Vol. 668 11 2021 No. 44146 Februarie ISSN 1682-5845 N.B. The Government Printing Works will 44146 not be held responsible for the quality of “Hard Copies” or “Electronic Files” submitted for publication purposes 9 771682 584003 AIDS HELPLINE: 0800-0123-22 Prevention is the cure 2 No. 44146 GOVERNMENT GAZETTE, 11 FEBRUARY 2021 IMPORTANT NOTICE: THE GOVERNMENT PRINTING WORKS WILL NOT BE HELD RESPONSIBLE FOR ANY ERRORS THAT MIGHT OCCUR DUE TO THE SUBMISSION OF INCOMPLETE / INCORRECT / ILLEGIBLE COPY. NO FUTURE QUERIES WILL BE HANDLED IN CONNECTION WITH THE ABOVE. Contents Gazette Page No. No. No. GOVERNMENT NOTICES • GOEWERMENTSKENNISGEWINGS Transport, Department of / Vervoer, Departement van 82 South African National Roads Agency Limited and National Roads Act (7/1998): Huguenot, Vaal River, Great North, Tsitsikamma, South Coast, North Coast, Mariannhill, Magalies, N17 and R30/R730/R34 Toll Roads: Publication of the amounts of Toll for the different categories of motor vehicles, and the date and time from which the toll tariffs shall become payable .............................................................................................................................................. 44146 3 82 Suid-Afrikaanse Nasionale Padagentskap Beperk en Nasionale Paaie Wet (7/1998) : Hugenote, Vaalrivier, Verre Noord, Tsitsikamma, Suidkus, Noordkus, Mariannhill, Magalies, N17 en R30/R730/R34 Tolpaaie: Publisering
    [Show full text]
  • South Africa
    Safrica Page 1 of 42 Recent Reports Support HRW About HRW Site Map May 1995 Vol. 7, No.3 SOUTH AFRICA THREATS TO A NEW DEMOCRACY Continuing Violence in KwaZulu-Natal INTRODUCTION For the last decade South Africa's KwaZulu-Natal region has been troubled by political violence. This conflict escalated during the four years of negotiations for a transition to democratic rule, and reached the status of a virtual civil war in the last months before the national elections of April 1994, significantly disrupting the election process. Although the first year of democratic government in South Africa has led to a decrease in the monthly death toll, the figures remain high enough to threaten the process of national reconstruction. In particular, violence may prevent the establishment of democratic local government structures in KwaZulu-Natal following further elections scheduled to be held on November 1, 1995. The basis of this violence remains the conflict between the African National Congress (ANC), now the leading party in the Government of National Unity, and the Inkatha Freedom Party (IFP), the majority party within the new region of KwaZulu-Natal that replaced the former white province of Natal and the black homeland of KwaZulu. Although the IFP abandoned a boycott of the negotiations process and election campaign in order to participate in the April 1994 poll, following last minute concessions to its position, neither this decision nor the election itself finally resolved the points at issue. While the ANC has argued during the year since the election that the final constitutional arrangements for South Africa should include a relatively centralized government and the introduction of elected government structures at all levels, the IFP has maintained instead that South Africa's regions should form a federal system, and that the colonial tribal government structures should remain in place in the former homelands.
    [Show full text]
  • Declaration Amendment of National Road N1 Section 16Y
    STAATSKOERANT, 1 JULIE 2015 No. 38941 3 GOVERNMENT NOTICE DEPARTMENT OF TRANSPORT No. 560 1 July 2015 THE SOUTH AFRICAN NATIONAL ROADS AGENCY SOC LIMITED Registration No: 1998/009584/30 DECLARATION AMENDMENT OF NATIONAL ROAD N1 SECTION 16Y AMENDMENT OF DECLARATION NO. 550 OF 2003 By virtue of Section 40(1)(b) of the South African National Roads Agency Limited and the National Roads Act, 1998 (Act No. 7 of 1998), I hereby amend Declaration No. 550 of 2003 by substituting Annexure paragraph (VI) the section of the descriptive declaration of the route from the junction with the R730 section 1 up to the N1 south of Kroonstad, with the subjoined sheets 1 to 11 of Plan No. P775/09. [National Road R34 Section 6: R730 Junction - N1 ( Kroonstad)] eiLQA MINIS''' R OF TRANSPORT This gazette is also available free online at www.gpwonline.co.za 4 No. 38941 GOVERNMENT GAZETTE, 1 JULY 2015 GOEWERMENTSKENNISGEWING DEPARTEMENT VAN VERVOER No. 560 1 Julie 2015 DIE SUID ®AFRI > NSE NASIONALE PADAGENTS ,P MSB BEPE Registrasie No: 1998/009584/30 VERKLARING WYSIGING VAN NASIONALE PAD N1 SEKSIE 16Y. WYSIGING VAN VERKLARING NO. 550 VAN 2003. Kragtens Artikel 40(1)(b) van die Wet op die Suid- Afrikaanse Nasionale Padagentskap Beperk en op Nasionale Paaie, 1998 (Wet no.7 van 1998), wysig ek hiermee Verklaring no. 550 van 2003 deur die Bylae paragraaf (VI) die gedeelte van die beskrywende verklaring van die roete vanaf die aansluiting met die R730 seksie 1 tot by die N1 suid van Kroonstad, te vervang met meegaande velle 1 tot 11 van Plan no.
    [Show full text]
  • Zululand District Municipality Integrated
    ZULULAND DISTRICT MUNICIPALITY INTEGRATED DEVELOPMENT PLAN: 2020/2021 REVIEW Integrated Development Planning is an approach to planning that involves the entire municipality and its citizens in finding the best solutions to achieve good long- term development. OFFICE OF THE MUNICIPAL MANAGER [Email address] TABLE OF CONTENTS Page No. 1 INTRODUCTION .............................................................................................................................................. 1 1.1 Purpose .................................................................................................................................................................. 1 1.2 Introduction to the Zululand District Municipality ................................................................................................. 1 1.3 Objectives of the ZDM IDP...................................................................................................................................... 3 1.4 Scope of the Zululand District Municipality IDP ..................................................................................................... 4 1.5 Approach ................................................................................................................................................................ 5 1.6 Public Participation ................................................................................................................................................. 6 2 PLANNING AND DEVELOPMENT LEGISLATION AND POLICY .........................................................................
    [Show full text]
  • Umlalazi Strategic Planning Session
    UMLALAZI STRATEGIC PLANNING SESSION INTEGRATED DEVELOPMENT PLANNING Lizette Dirker IDP Coordination Business Unit INFORMANTS OF THE IDP SOUTH AFRICAN PLANNING SYSTEMS National Provincial Local District wide PGDS Vision 2030 DGDP (Vision 2035) (Vision 2035) National IDP PGDP Development 5 years Plan National Provincial Municipal Planning Planning Council Commission Commission WARD BASED SDGs SDGs PLANS “KZN as a prosperous Province with healthy, secure and skilled population, living in dignity and harmony, acting as a gateway to Africa and the World” Sustainable Development Goals AGENDA 2063 50 Year Vision • Agenda 2063 is a strategic framework for the socio-economic transformation of the continent over the next 50 years. It builds on, and seeks to accelerate the implementation of past and existing continental initiatives for growth and sustainable development Adopted in January 2015 • Adopted in January 2015, in Addis Ababa, Ethiopia by the 24th African Union (AU) Assembly of Heads of State and Government 10 Year implementation cycle • Five ten year implementation plan – the first plan 2014-2023 1. A prosperous Africa based on inclusive growth and sustainable 5. An Africa with a strong cultural development identity, common heritage, shared values and ethics 2. An integrated continent, politically united and based on the ideals of Pan-Africanism and the 6. An Africa whose development vision of Africa’s Renaissance is people-driven, relying on the potential of African people, especially its women and youth, and caring for children 3. An Africa of good governance, democracy, respect for human rights, justice and the rule of law 7. Africa as a strong, united and influential global player and partner 4.
    [Show full text]
  • Idp Review 2020/21
    IDP REVIEW 2019/20 IDP REVIEW 2020/21 NGWATHE LOCAL MUNICIPALITY IDP REVIEW 2020/21 POLITICAL LEADERSHIP CLLR MJ MOCHELA CLLR NP MOPEDI EXECUTIVE MAYOR SPEAKER WARD 1 WARD 2 WARD 3 WARD 4 CLLR MATROOS CLLR P NDAYI CLLR M MOFOKENG CLLR S NTEO WARD 5 WARD 8 WARD 6 WARD 7 CLLR R KGANTSE CLLR M RAPULENG CLLR M MAGASHULE CLLR M GOBIDOLO WARD 9 WARD 10 WARD 11 WARD 12 CLLR M MBELE CLLR M MOFOKENG CLLR N TLHOBELO CLLR A VREY WARD 13 WARD 14 WARD 15 WARD 16 CLLR H FIELAND CLLR R MEHLO CLLR MOFOKENG CLLR SOCHIVA WARD 17 WARD 18 CLLR M TAJE CLLR M TOYI 2 | P a g e NGWATHE LOCAL MUNICIPALITY IDP REVIEW 2020/21 PROPORTIONAL REPRESENTATIVE COUNCILLORS NAME & SURNAME PR COUNCILLORS POLITICAL PARTY Motlalepule Mochela PR ANC Neheng Mopedi PR ANC Mvulane Sonto PR ANC Matshepiso Mmusi PR ANC Mabatho Miyen PR ANC Maria Serathi PR ANC Victoria De Beer PR ANC Robert Ferendale PR DA Molaphene Polokoestsile PR DA Alfred Sehume PR DA Shirley Vermaack PR DA Carina Serfontein PR DA Arnold Schoonwinkel PR DA Pieter La Cock PR DA Caroline Tete PR EFF Bakwena Thene PR EFF Sylvia Radebe PR EFF Petrus Van Der Merwe PR VF 3 | P a g e NGWATHE LOCAL MUNICIPALITY IDP REVIEW 2020/21 TABLE OF CONTENTS SECTION TOPIC PAGE NO Political Leadership 2-3 Proportional Representative Councillors 3 Table of Contents 4 List of Tables 5-6 Table of Figure 7 Foreword By Executive Mayor 8 Overview By Municipal Manager 9-11 Executive Summary 12-14 SECTION A Introduction and Current Reality 16 Political governance and administration SECTON B Profile of the municipality 20 SECTION C Spatial
    [Show full text]
  • Appendix E. Public Participation Process.Pdf
    Appendix E. Public Participation Public Participation Process for the Proposed Township Development on Portion 419 of Farm No. 61, Pongola, Kwazulu -Natal A Report for the BA Process March 2017 Contents 1. Circulating reports for public comment ......................................................... 3 1.1. Circulating reports to Commenting Authorities ...................................................................... 3 1.2. Issues Trail ....................................................................................................... 3 1.3. Comments and Responses to stakeholder .................................................... 3 1.4. Email correspondence with government offices ........................................... 3 2. Proof of public participation requirements .................................................... 3 2.1. Background information document: ....................................................................................... 3 2.2. Interested and Affected Party (I&AP) register ....................................................................... 6 2.3. Newspaper Advertisement: ................................................................................................... 7 2.4. Signs (notice boards) ............................................................................................................. 8 2.5. Notification of neighbours .................................................................................................... 12 2.6. Proof that Draft BAR was sent to stakeholders ..................................................................
    [Show full text]
  • Biodiversity Sector Plan for the Zululand District Municipality, Kwazulu-Natal
    EZEMVELO KZN WILDLIFE Biodiversity Sector Plan for the Zululand District Municipality, KwaZulu-Natal Technical Report February 2010 The Project Team Thorn-Ex cc (Environmental Services) PO Box 800, Hilton, 3245 Pietermaritzbur South Africa Tel: (033) 3431814 Fax: (033) 3431819 Mobile: 084 5014665 [email protected] Marita Thornhill (Project Management & Coordination) AFZELIA Environmental Consultants cc KwaZulu-Natal Western Cape PO Box 95 PO Box 3397 Hilton 3245 Cape Town 8000 Tel: 033 3432931/32 Tel: 072 3900686 Fax: 033 3432033 or Fax: 086 5132112 086 5170900 Mobile: 084 6756052 [email protected] [email protected] Wolfgang Kanz (Biodiversity Specialist Coordinator) John Richardson (GIS) Monde Nembula (Social Facilitation) Tim O’Connor & Associates P.O.Box 379 Hilton 3245 South Africa Tel/ Fax: 27-(0)33-3433491 [email protected] Tim O’Connor (Biodiversity Expert Advice) Zululand Biodiversity Sector Plan (February 2010) 1 Executive Summary The Biodiversity Act introduced several legislated planning tools to assist with the management and conservation of South Africa’s biological diversity. These include the declaration of “Bioregions” and the publication of “Bioregional Plans”. Bioregional plans are usually an output of a systematic spatial conservation assessment of a region. They identify areas of conservation priority, and constraints and opportunities for implementation of the plan. The precursor to a Bioregional Plan is a Biodiversity Sector Plan (BSP), which is the official reference for biodiversity priorities to be taken into account in land-use planning and decision-making by all sectors within the District Municipality. The overall aim is to avoid the loss of natural habitat in Critical Biodiversity Areas (CBAs) and prevent the degradation of Ecological Support Areas (ESAs), while encouraging sustainable development in Other Natural Areas.
    [Show full text]
  • 1. Socio-Economic Profile
    Zululand District Municipality Water Services Development Plan (DC26) Section 1: Socio-Economic Profile 1. SOCIO-ECONOMIC PROFILE The ZDM is the Water Services Authority (WSA) for the entire district in terms of Section 1 of the Water Services Act, 19971. In order to efficiently plan the development of water services in the DM’s jurisdictional area it is necessary to determine the existing or current situation with respect to water and sanitation supply. This Section presents and identifies, both visually and statistically, the physical and consumer profile within the DM. 1.1 Demographics The current consumer profile of the district is indicated in Table 1.1 (a) below: Table 1.1 (a): Current consumer profile (units) INDUSTRIAL / LOCAL MUNICIPALITIES DOMESTIC BUSINESSES FARM HOUSES TOTAL AbaQulusi 15 283 1 947 - 17 230 eDumbe 5 157 336 - 5 493 Nongoma 1 239 483 - 1 722 Ulundi 5 520 638 - 6 158 uPhongolo 3 557 576 - 4 133 Total (urban) 30 756 3 980 - 34 736 AbaQulusi 24 752 - 267 25 019 eDumbe 11 524 - 199 11 723 Nongoma 36 932 - - 36 932 Ulundi 31 803 - 42 31 845 uPhongolo 21 221 - 358 21 579 Total (rural) 126 232 - 866 127 098 Total 156 988 3 980 866 161 834 Present population and projected population growth rates: Population and economic growth rates are used to determine future developmental requirements within the ZDM. This determines the required increase or decrease in water services. Non-domestic consumer unit growth, particularly commercial, industrial and agricultural growth, also gives an indication of the expected increase in water demand and associated wastewater flow discharges.
    [Show full text]
  • Ethembeni Cultural Heritage
    ETHEMBENI CULTURAL HERITAGE Amafa aKwazulu-Natali 22 January 2016 195 Jabu Ndlovu Street Pietermaritzburg 3200 August Telephone 033 3946 543 [email protected] Attention Bernadet Pawandiwa Dear Ms Pawandiwa Application for Exemption from a Phase 1 Heritage Impact Assessment Proposed Expansion of Dolerite Borrow Pit Pogela Farm, Heatonville Ntambanana LM, King Cetshwayo DM, KwaZulu-Natal. Project Area and Project description1 Mr John Readman of Pogela Farm, Heatonville, wishes to expand the existing dolerite borrow pit on his farm to an area of 3.11 ha, for commercial utilisation. This proposed expansion requires the conducting of a Basic Assessment in terms of both NEMA and DMR regulations. The existing borrow pit lies adjacent to an abandoned single-quarters residential compound constructed by Tongaat-Hulett in 1994. It is Mr Readman’ intention to demolish all structures in the course of expansion activities for the borrow pit. Observations No graves are located or reported in the immediate precinct of the planned expansion and any associated plant and services proposed2. The compound buildings are utilitarian, in a state of disuse and of no intrinsic significance. They are due to be demolished. The Ntabanana and Heatonville farms were granted in compensation to returning service-men after WWI (1918) and WWII (1945).3 These farms have been under sugar cane production for at least the last 40 to 50 years4. 1 J. Readman, pers.comm to LO van Schalkwyk. 2 Ibid. 3 2016. Heritage Scoping Report for the Invubu-Theta 400 kV Transmission
    [Show full text]
  • Irrigation - Final Schedule
    IRRIGATION - FINAL SCHEDULE A) EXISTING LAWFUL USE ALLOCATED CATEGORY APPLICANT PROPERTY DESCRIPTION VOLUME (M 3/ANNUM) 1) HEATONVILLE BARNS D PTN 0 NO. 11745 HILLTOP 1 226 610 1) HEATONVILLE BAYANDA PRIMARY CO-OPERATIVE LIMITED PTN 0 NO. 11542 1 335 642 1) HEATONVILLE ELLINGHAM NO ONE ONE FOUR SEVEN EIGHT CC PTN 0 NO. 11478 ELLINGHAM 1 168 200 1) HEATONVILLE ELLINGHAM NO ONE ONE FOUR SEVEN EIGHT CC PTN 2 NO. 12922 LOT 272 EMPANGENI 155 760 1) HEATONVILLE EZIMTOTI PRIMARY CO-OPERATIVE LTD PTN 0 NO. 13313 MAJATCHA 698 584 1) HEATONVILLE FORUM SA TRADING 306 (PTY) LTD PTN 4 NO. 11582 WALLENTON 547 496 1) HEATONVILLE HEATONBERRY FARMS CC PTN 2 NO. 16786 VALLEY FARM 77 880 1) HEATONVILLE HEATONBERRY FARMS CC PTN 3 NO. 16786 HEATONBERRY 77 880 1) HEATONVILLE HUME FAMILY TRUST - TRUSTEES PTN 0 NO. 11571 BOLARUM 700 141 1) HEATONVILLE HUME FAMILY TRUST - TRUSTEES PTN 0 NO. 12085 MERCHISTON 478 183 1) HEATONVILLE ISIBUSISO FARMING AND PROJECTS PTN 0 NO. 14625 1 596 540 1) HEATONVILLE ISIBUSISO FARMING AND PROJECTS PTN 3 NO. 11582 1 074 744 1) HEATONVILLE KRAFTT F PTN 0 NO. 12280 LOT 239 EMPANGENI 1 012 440 1) HEATONVILLE KRAFTT F PTN 3 NO. 10974 PROSPECT ESTATE 310 741 1) HEATONVILLE KRAFTT F PTN 4 NO. 10974 PROSPECT ESTATE 234 419 1) HEATONVILLE LAVONI ESTATE PTN 0 NO. 12922 313 619 1) HEATONVILLE LAVONI ESTATE PTN 0 NO. 14014 529 584 1) HEATONVILLE LAVONI ESTATE PTN 0 NO. 14015 147 972 1) HEATONVILLE MONGO FARMING SERVICES PTN 0 NO.
    [Show full text]