Development of a Strategic Corridor Plan for the Umhlathuze-Ulundi- Vryheid Secondary Corridor – ZNT 1970/2015 LG-14
Total Page:16
File Type:pdf, Size:1020Kb
Report Development of a Strategic Corridor Plan for the uMhlathuze-Ulundi- Vryheid Secondary Corridor – ZNT 1970/2015 LG-14 Milestone 5 Deliverable: Implementation and Phasing Plan KZN Cooperative Governance & Traditional Affairs: Client: LED Unit Reference: T&PMD1740-100-104R003F02 Revision: 02/Final Date: 24 July 2017 O p e n ROYAL HASKONINGDHV (PTY) LTD 30 Montrose Park Boulevard Montrose Park Village Victoria Country Club Estate Montrose Pietermaritzburg 3201 Transport & Planning Reg No. 1966/001916/07 +27 33 328 1000 T +27 33 328 1005 F [email protected] E royalhaskoningdhv.com+27 33 328 1000 W +27 33 328 1005 T Document title: Development of a Strategic Corridor Plan for the [email protected] F Secondary Corridor – ZNT 1970/2015 LG-14 royalhaskoningdhv.com+27 33 328 1000 E Document short title: SC1 Implementation & Phasing Plan +27 33 328 1005 W Reference: T&PMD1740-100-104R003F02 [email protected] T Revision: 02/Final royalhaskoningdhv.com+27 33 328 1000 F Date: 24 July 2017 +27 33 328 1005 E Project name: SC1 Corridor [email protected] W Project number: MD1740-100-104 royalhaskoningdhv.com T Author(s): Anton Martens (UPD), Bronwen Griffiths, Chris Cason, Lisa Higginson (Urban- F Econ), Nomcebo Hlophe, Rob Tarboton, Talia Feigenbaum (Urban-Econ) and E Andrew Schultz W Drafted by: Andrew Schultz Checked by: Date / initials: Approved by: Date / initials: Classification Open Disclaimer No part of these specifications/printed matter may be reproduced and/or published by print, photocopy, microfilm or by any other means, without the prior written permission of Royal HaskoningDHV (Pty) Ltd; nor may they be used, without such permission, for any purposes other than that for which they were produced. Royal HaskoningDHV (Pty) Ltd accepts no responsibility or liability for these specifications/printed matter to any party other than the persons by whom it was commissioned and as concluded under that Appointment. The integrated QHSE management system of Royal HaskoningDHV (Pty) Ltd has been certified in accordance with ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007. 24 July 2017 SC1 IMPLEMENTATION & PHASING PLAN T&PMD1740-100-104R003F02 i O p e n Table of Contents 1 Introduction 1 1.1 Project Reference 1 1.2 Statutory Obligation 1 1.2.1 Development Principles 1 1.3 Study Area 2 1.3.1 Primary Study Area 2 1.3.2 Participating Municipalities 4 1.3.3 Municipal Elections 2016 5 1.4 Spatial Vision and Concept 7 1.4.1 Study Area Role within the Region 7 1.4.2 Pillars of the Vision 7 1.4.3 Vision Statement 8 1.4.4 Mission Statement 8 1.4.5 Spatial Concepts 8 1.5 Composite Regional Spatial Development Framework 14 1.5.1 Consolidated RSDF Proposals 14 1.6 Milestone 5 Deliverable: Implementation and Phasing Plan 14 1.6.1 Purpose 14 1.6.2 Objective 14 1.6.3 Methodology 14 1.6.4 Outcome 14 1.6.5 Milestone 5: Deliverables 14 2 Spatial Framework for Capital Investment 17 2.1 Spatial Concepts and Proposals 17 2.2 Spatial Targets 17 2.2.1 Development Nodes and Corridors 17 2.2.2 Rural / Traditional Settlement Restructuring Areas 21 2.2.3 High Agricultural Potential Areas 22 2.2.4 High Biodiversity Value Areas 23 2.2.5 Key transportation aspects – R34 Route 24 2.3 Project Identification and Assessment 28 2.3.1 Initial Project Screening (Step 1) 28 2.3.2 Project Scores by Theme / Sub-Theme (Step 2) 35 2.4 Spatial / Project Priorities 37 2.4.1 Key Intervention Projects (Step 3) 37 2.4.2 Key Intervention Project Actions (Step 4) 45 2.4.3 Spatial Assessment of Projects (Step 5) 73 2.4.4 Key Intervention Project Summary (Step 6) 78 3 Spatial Governance Framework 82 3.1 Introduction 82 3.2 Implementation Tools 82 3.3 Potential Project Funding 83 24 July 2017 SC1 IMPLEMENTATION & PHASING PLAN T&PMD1740-100-104R003F02 ii O p e n 3.4 Institutional Arrangements 84 4 Conclusion 87 4.1 Summary 87 4.2 Way Forward 88 Acronyms 90 Appendix A 92 A1. Biophysical project evaluation 92 A2. Socio-Economic project evaluation 93 A3. Built Environment: Spatial Planning project evaluation 95 A4. Built Environment: Transport 96 A5. Built Environment: Infrastructure – Water 97 Appendix B 100 Table of Tables Table 1-1: SPLUMA Development Principles .................................................................................. 1 Table 1-2: Participating Municipalities (prior to 2016 Municipal Elections) ....................................... 4 Table 2-1: Proposed Node Hierarchy for SC1 SCDP .................................................................... 18 Table 2-2: Proposed Corridor Hierarchy for SC1 SCDP ................................................................ 19 Table 2-3: Investment Priority and Functions / Land Uses Appropriate for Node Typologies ......... 20 Table 2-4: Initial Project Identification ............................................................................................ 28 Table 2-5: Multi-Criteria Analysis using PGDS Strategic Goals and Objectives as Main Criteria and Sub-Criteria ................................................................................................................................... 33 Table 2-6: Scoring System for Scoring Impact of Projects on MCA Criteria................................... 34 Table 2-7: Project Scores by Theme / Sub-Theme ........................................................................ 35 Table 2-8: Key Intervention Projects ............................................................................................. 37 Table 2-9: Biophysical project – Project B01 ................................................................................. 45 Table 2-10: Biophysical project – Project B02 ............................................................................... 46 Table 2-11: Biophysical project – Project B03 ............................................................................... 47 Table 2-12: Biophysical project – Project B04 ............................................................................... 48 Table 2-13: Biophysical project – Project B05 ............................................................................... 49 Table 2-14: Biophysical project – Project B06 ............................................................................... 50 Table 2-15: Socio-economic project – Project S01 ........................................................................ 51 Table 2-16: Socio-economic project – Project S02 ........................................................................ 52 Table 2-17: Socio-economic project – Project S03 ........................................................................ 53 Table 2-18: Socio-economic project – Project S04 ........................................................................ 54 Table 2-19: Socio-economic project – Project S05 ........................................................................ 55 Table 2-20: Socio-economic project – Project S06 ........................................................................ 56 24 July 2017 SC1 IMPLEMENTATION & PHASING PLAN T&PMD1740-100-104R003F02 iii O p e n Table 2-21: Planning project – Project P01 ................................................................................... 57 Table 2-22: Planning project – Project P02 ................................................................................... 58 Table 2-23: Planning project – Project P03 ................................................................................... 59 Table 2-24: Planning project – Project P04 ................................................................................... 60 Table 2-25: Planning project – Project P05 ................................................................................... 61 Table 2-26: Planning project – Project P06 ................................................................................... 62 Table 2-27: Planning project – Project P07 ................................................................................... 63 Table 2-28: Transport project – Project T01 .................................................................................. 64 Table 2-29: Transport project – Project T04 .................................................................................. 65 Table 2-30: Transport project – Project T07 .................................................................................. 66 Table 2-31: Transport project – Project T08 and T09 .................................................................... 67 Table 2-32: Infrastructure project – Project I01 ............................................................................. 68 Table 2-33: Infrastructure project – Project I02 ............................................................................. 69 Table 2-34: Infrastructure project – Project I03 ............................................................................. 70 Table 2-35: Infrastructure project – Project I04 ............................................................................. 71 Table 2-36: Infrastructure project – Project I05 ............................................................................. 72 Table 2-37: Key Intervention Projects Spatial Targets ................................................................... 73 Table 2-38: Ranked Key Intervention Project Summary by timeframe ........................................... 78 Table 3-1: Potential Implementation Tools and Interventions ........................................................ 82 Table 3-2: Potential Project